A construction structure and method for installing steel truss floor decking for assembled steel structure residential buildings
Through the structure of tension beams, tension rod groups and support beams, the shortcomings of the support system in the construction of prefabricated steel structure residential steel bar truss bearing plates are solved, and stable support in special-shaped and cantilevered structures is achieved, which reduces the construction The quality and cost have improved the construction quality.
Patent Information
- Application Number
- CN202211297216.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-10-21
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-10-21
AI Technical Summary
Prefabricated steel structure residential steel bar truss bearing plates require a large amount of support system during the construction process, which increases the construction volume and cost, and is limited in special-shaped and cantilevered structures, affecting the construction quality.
The construction structure of tension beams, tension rod groups and support beams is adopted to maintain the position of the steel bar truss bearing plates through tension, reduce the construction volume and cost of the support system, and is suitable for special-shaped structures.
It effectively reduces the construction volume and cost, reduces the deformation of steel columns in steel structures, improves construction quality and construction efficiency, and is suitable for the construction of steel bar truss floor bearing plates in special-shaped and cantilevered structures.
Smart Images

Figure CN115653175B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a construction structure and method for installing a steel truss floor deck of an assembled steel structure residential building. Background Art
[0002] Steel truss floor deck is a composite formwork that integrates steel trusses with galvanized corrugated steel plates or bamboo plywood. It is widely used in buildings such as steel structure houses. Generally, steel truss floor decks are produced in factory workshops and transported to the construction site as a whole. Concrete can be poured by simply tying the edges of the steel trusses to the building structure. There is no need to tie the steel trusses on the construction site, and there is no need to use and install the formwork, which effectively improves construction efficiency.
[0003] At present, in the construction process of steel truss floor decking of prefabricated steel structure residential buildings, a simply supported and supported structure is usually adopted, which can make full use of the rigidity and support of the truss itself to jointly bear the concrete deadweight and other construction loads during construction. The truss steel bars are consistent with the steel bars of the concrete floor slab under normal stress state, and have good economy. However, the steel truss floor decking adopts a simply supported and supported construction structure, and it is necessary to adopt a support system such as a socket-type disc buckle scaffolding to support the lower part of the steel truss floor decking to maintain the structural position of the steel truss floor decking during pouring construction. The support system requires a large number of scaffolding, which greatly increases the construction volume and construction load of manual installation and disassembly. However, the compressive bearing capacity of the steel column of the prefabricated steel structure residential building is relatively small before the concrete is poured. When the top-back support structure is adopted, the construction load will cause a large deformation of the steel column, affecting the construction quality of the steel structure. At the same time, this simply supported and supported structure is subject to greater restrictions in the construction of special-shaped structures and cantilever structures, and it is still necessary to set up external cantilever scaffolding, which increases the construction cost and construction volume. Summary of the invention
[0004] Based on this, the present invention provides a construction structure and method for installing steel truss floor decking in an assembled steel structure residential building. The construction structure is pulled up on the steel truss floor decking to maintain the stable position of the steel truss floor decking structure during the construction process, effectively reduce the construction volume and construction materials, and can better adapt to the construction needs of special-shaped structures and cantilever structures.
[0005] In order to achieve the above-mentioned objectives, in a first aspect, the present invention provides a construction structure for installing a steel truss floor deck of a prefabricated steel structure residence, comprising a tension beam, a tension rod group and a supporting beam. The tension beams include multiple and separately detachable supports on the building structure, and each of the tension beams is spaced apart and arranged in the same horizontal plane above the steel truss floor deck that needs to be cast and constructed; the tension rod group includes multiple and arrayed arrangements between the tension beams and the steel truss floor deck; the tension rod group includes a tie rod, an upper fastener and a lower fastener, and the upper fastener and the lower fastener are respectively arranged at both ends of the tie rod and at least one of them can be adjusted in axial position; the supporting beams include multiple and separately detachable arrangements below the bottom of the steel truss floor deck, the middle of the tie rod passes through a through hole arranged in the steel truss floor deck, the upper end is connected to the tension beam through an upper fastener, and the lower end is connected to the supporting beam through a lower fastener, and the tension beam generates tension on the supporting beam through the tension rod group, so as to lift the steel truss floor deck through the supporting beam, thereby keeping the position and structure of the steel truss floor deck stable during casting construction.
[0006] Compared with the construction structure of the prior art that supports the steel truss floor deck by supporting the top-back structure, the construction structure of the steel truss floor deck installation of the assembled steel structure residential provided by the present invention changes the top to the tension, and the tension beam generates tension on the supporting beam through the tension rod group to keep the position structure of the steel truss floor deck stable during the pouring construction. It can effectively reduce the construction volume of the support system and reduce the construction cost, and by adjusting the length of the tension rod group, it can be suitable for the construction needs of the steel truss floor deck of the special-shaped structure, and the structure is simple and easy to operate.
[0007] Optionally, the construction structure further includes a support, and the tension beam is detachably supported on the building structure via the support.
[0008] Optionally, the tension beam comprises two tension beam bodies which are horizontally spaced and opposed to each other, the upper end of the pull rod passes through a gap between the two tension beam bodies and is connected to an upper fastener, and the upper fastener is jointly supported by the two tension beam bodies.
[0009] Optionally, the supporting beam comprises two supporting beam bodies which are horizontally spaced and opposed to each other, the lower end of the pull rod passes through a gap between the two supporting beam bodies and is connected to a lower fastener, and the lower fastener is used to support the two supporting beam bodies at the same time.
[0010] Optionally, by setting the upper fasteners and lower fasteners of each tension rod group to have the same spacing, the flat plate structure of the steel truss floor deck is adapted to the casting construction, so as to keep the structural position of the flat plate structure stable during the casting construction.
[0011] Optionally, by setting different spacings between upper fasteners and lower fasteners of each tension rod group, the special-shaped structure of the steel truss floor deck that needs to be cast can be adapted to keep the structural position of the special-shaped structure stable during the casting construction.
[0012] Optionally, the special-shaped structure is an arc-shaped structure, and the supporting beam is configured as an arc-shaped structure having an arc angle consistent with that of the arc-shaped structure set for the steel truss floor deck.
[0013] Optionally, each of the supporting beams is arranged in parallel directly below each of the tensile beams, and each tensile beam is connected to the tensile beam directly below it via a tensile rod group arranged along the tensile beam array.
[0014] In order to achieve the above-mentioned purpose, in a second aspect, the present invention provides a construction method for installing a steel structure residential steel truss floor deck, which is used for the construction structure of the steel structure residential steel truss floor deck, including: a plurality of spaced-apart tension beams are arranged above the steel truss floor deck, and the tension beams are supported on the building structure through support seats; a plurality of spaced-apart supporting beams are arranged at the bottom of the steel truss floor deck, and each of the supporting beams is arranged in parallel and directly below each tension beam; each tension beam is connected to the supporting beam directly below through a tension rod group arranged in an array along the length direction of the tension beam; so that tension is generated on the supporting beam directly below through each tension beam; concrete is poured above the steel truss floor deck; after the concrete solidifies, the tension rod group, the tension beam and the supporting beam are removed.
[0015] Optionally, before pouring concrete, the distance between the upper fasteners and the lower fasteners of each tension rod group is adjusted to adapt to the flat plate structure or arc structure set for the steel truss floor deck to be poured.
[0016] Compared with the prior art, the construction method for installing the steel truss floor deck of a prefabricated steel structure residential building provided by the present invention is to set a detachable tension beam on the building structure, and the tension beam generates tension on the supporting beam through the tension rod group, so as to keep the position structure of the steel truss floor deck stable during the pouring construction. This construction method of changing the top to the pull has a lighter overall structure weight, which can effectively reduce the construction volume of the support system and reduce the construction cost. At the same time, it greatly reduces the construction load of the steel truss floor deck installation and ensures the quality of the steel column installation of the steel structure; and it can quickly complete the steel truss floor deck of a special-shaped structure or a cantilever structure by adjusting the tension rod group, which has a simple structure and convenient construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. The accompanying drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention.
[0018] Figure 1 It is a front view of a first embodiment of the provided construction structure.
[0019] Figure 2 is a side view of a first embodiment of a construction structure.
[0020] Figure 3 It is a structural diagram of the support.
[0021] Figure 4 It is a structural schematic diagram of a tension beam fastened by a U-shaped clip.
[0022] Figure 5 It is a structural schematic diagram of a second embodiment of the provided construction structure.
[0023] Figure 6 It is a front view of a third embodiment of the provided construction structure.
[0024] Figure 7 It is a flowchart of the construction method provided.
[0025] In the figure,
[0026] 1—tension beam;
[0027] 2—tension rod assembly, 21—tension rod, 22—upper fastener, 23—lower fastener, 24—gasket;
[0028] 3—support beam;
[0029] 4—support, 41—top plate, 42—middle rod, 43—bottom rod, 44—vertical rod, 45—diagonal rod;
[0030] 5—U-shaped card;
[0031] 6—Reinforced steel truss floor deck;
[0032] 7—Prefabricated steel residential building structure. DETAILED DESCRIPTION
[0033] The steel truss floor deck adopts a simply supported and braced construction structure, and needs to use a support system such as a socket-and-socket scaffolding to support the lower part of the steel truss floor deck. A large number of scaffolds are required, which greatly increases the amount of manual installation and construction load. However, before the steel columns of the prefabricated steel structure residential buildings are poured with concrete, the compressive bearing capacity of the steel columns is small. When the top-back support structure is adopted, the construction load will cause a large deformation of the steel columns, affecting the quality of the steel structure construction. Moreover, this simply supported and braced structure is subject to greater restrictions in the construction of special-shaped structures and cantilever structures.
[0034] In order to solve the above problems, the present invention provides a construction structure and method for installing a steel truss floor deck of a prefabricated steel structure residential building. The construction structure and method for installing a steel truss floor deck of a prefabricated steel structure residential building of the present invention will be specifically described below with reference to the accompanying drawings of the specification through embodiments.
[0035] like Figure 1 and Figure 2 As shown, in the first preferred embodiment, a construction structure for installing a steel structure residential steel truss floor deck includes a tension beam 1, a tension rod group 2 and a supporting beam 3; the tension beam 1 includes a plurality of and is detachably supported on a building structure 7, and each tension beam 1 is arranged at intervals in the same horizontal plane above a steel truss floor deck 6 to be cast and constructed; the tension rod group 2 includes a plurality of and is arranged in an array between the tension beam 1 and the steel truss floor deck 6; the tension rod group 2 includes a tie rod 21, an upper fastener 22 and a lower fastener 23, and the upper fastener 22 and the lower fastener 23 are respectively arranged on the tie rod 21, and at least one of the two ends thereof can be adjusted in axial position; the supporting beam 3 includes a plurality of detachable supporting beams arranged below the bottom of the steel truss floor deck 6, and each tension beam 1 is arranged relative to each supporting beam 3 up and down, and the middle of the pull rod 21 passes through a through hole arranged in the steel truss floor deck 6, and the upper end is connected to the tension beam 1 through an upper fastener 22, and the lower end is connected to the supporting beam 3 through a lower fastener 23. The tension beam 1 generates tension on the supporting beam 3 through the tension rod group 2, so as to lift the steel truss floor deck 6 through the supporting beam 3, so as to keep the position structure of the steel truss floor deck 6 stable during the pouring construction.
[0036] This reinforced truss floor deck construction structure "changes top to pull". When constructing the floor deck, the steel structure has been installed and the support is directly installed on the steel beam. No bracket is needed during installation, which saves costs and improves construction efficiency. It can accurately control the pre-arch and elevation of the floor deck installation according to the installation elevation of the beam, thereby improving the construction quality of the concrete floor. This floor deck installation structure has a small self-weight, is light and flexible, because the steel tube concrete columns of steel structure houses are generally poured with column core concrete every 3 to 4 floors, and before the steel columns are poured with column core concrete, the compressive strength of the steel columns is low, and the bearing capacity of the steel columns to resist deformation is small. The use of this installation structure can reduce construction loads and reduce the deformation of steel columns of steel structures.
[0037] like Figure 1 and Figure 2As shown, preferably, by setting the upper fasteners and lower fasteners of each tension rod group 2 to have the same spacing, the flat plate structure of the steel truss floor deck 6 is adapted to the pouring construction, so as to keep the structural position of the flat plate structure stable during the pouring construction. Preferably, the two ends of the tie rod 21 are provided with external threads, and the lower fastener 23 and the upper fastener 22 are meshed and connected with the external threads at both ends. The tension rod group also includes a cushion 24, which is movably sleeved on the tie rod and located on the inner side of the upper fastener and the lower fastener. In a specific implementation, through the connection relationship of threaded matching, the upper fastener or the lower fastener is rotated to adjust the gap between the upper fastener and the lower fastener, so that the tie rod is kept in a tensioned state, thereby playing a role in the tensioning state of the supporting beam, so as to maintain the supporting state of the steel truss floor deck, withstand the deadweight of the concrete and other construction loads during construction, and keep the structural position of the steel truss floor deck stable.
[0038] If the steel truss floor decking 6 that needs to be cast is a cantilever structure, it is only necessary to install the tension beam 1 above the cantilever structure and the supporting beam 3 at the bottom of the cantilever structure. The tension beam 1 applies tension to the supporting beam 3 through the tension rod group 22 to support the cantilever structure, thereby maintaining the structural position stable during the casting construction without the need to set up a support system. The construction is simple and no cantilever support system is required. A large amount of construction materials and construction workload can be saved, and the construction speed can be effectively improved. This construction structure solves the support problem of the steel truss floor decking at the cantilever structure of each floor.
[0039] The provided construction structure for installing the reinforced steel truss floor deck of a prefabricated steel structure residential building changes top force into tension force, and the tension beam generates tension on the supporting beam through the tension rod group to keep the position structure of the reinforced steel truss floor deck stable during the pouring construction, which can effectively reduce the construction volume and construction load of the support system and reduce the construction cost.
[0040] like Figure 1 and Figure 3As shown, preferably, the construction structure for installing the steel truss floor deck of the prefabricated steel structure residential building provided also includes a support 4, and the tensile beam 1 is detachably supported on the building structure 7 through the support 4. The support cross-section is an isosceles trapezoid, including a top plate 41, an intermediate rod 42 and a bottom rod 43 arranged at intervals from top to bottom. The top plate 41, the intermediate rod 42 and the bottom rod 43 are fixedly connected by a vertical rod 44 in the middle and the outer ends on the same side are connected by a diagonal rod 45. At the construction site, multiple supports are installed at the height of the building structure close to the steel truss floor deck, such as the steel beams of the building structure that have been installed near the height of the steel truss floor deck, the supports are installed on the steel beams, the supports 4 are positioned by positioning bolts, the tensile beam 1 is installed on the top plate 41 of the support 4, and supported by the support 4, the tensile beam 1 and the steel truss floor deck 6 that need to be cast and constructed are arranged at intervals from top to bottom to maintain a stable state. The support structure is used to support the tension beam 1, which has a simple structure, is convenient for installation and disassembly, and can effectively avoid excessive load burden on the building structure.
[0041] like Figure 2 and Figure 4 As shown, preferably, the tension beam 1 includes two tension beam bodies that are horizontally spaced and opposed to each other, and the upper end of the pull rod 21 passes through the gap between the two tension beam bodies and is connected to the upper fastener 22, and the upper fastener 22 is supported by the two tension beam bodies. The tension beam body includes but is not limited to an I-beam, a channel steel or an angle steel. The two tension beam bodies are separately arranged, and the relative positions of the two tension beam bodies are fixed by a detachable U-shaped clip 5. By arranging the tension beam 1 into two opposing tension beam bodies, not only the bearing capacity of the tension beam 1 is increased and the pulling force on the pull rod is kept symmetrical, but also it is convenient for on-site hoisting, lifting, installation and other operations.
[0042] like Figure 2 As shown, preferably, the supporting beam 3 includes two supporting beam bodies that are horizontally spaced and opposed to each other, and the lower end of the pull rod 21 passes through the gap between the two supporting beam bodies 3 and is connected to the lower fastener 23, and the lower fastener 23 is used to support the two supporting beam bodies at the same time. The two supporting beam bodies are separately arranged, and the supporting beam bodies include but are not limited to square wood strips, square tubes or round tubes. The above structure of the supporting beam body can keep the supporting force of the pull rod on the two supporting beam bodies symmetrical through the lower fastener 23, and increase the supporting capacity, which is convenient for on-site installation and disassembly operations.
[0043] like Figure 5As shown, in the second preferred embodiment, by setting the upper fasteners and the lower fasteners of each tension rod group 2 at different spacings, the special-shaped structure of the steel truss floor deck 6 that needs to be cast and constructed is adapted to maintain the structural position stability of the special-shaped structure during the casting and construction. Preferably, the special-shaped structure is an arc structure, and the supporting beam is set to an arc structure with the same arc as the arc set by the steel truss floor deck 6. As shown in the figure, in the specific implementation, by rotating the upper fastener 22 and the lower fastener 23, the distance between the upper fastener 22 and the lower fastener 23 at both ends of the middle tie rod 21 is small and suitable for the middle shape of the arc structure, and by rotating the upper fastener 22 and the lower fastener 23, the distance between the upper fastener 22 and the lower fastener 23 at both ends of the middle tie rod 21 is large and suitable for the outer shape of the arc structure. By adjusting the length of the tension rod group, it can be suitable for the construction needs of steel truss floor decking with special-shaped structures. The structure is simple and easy to operate. For special-shaped structures such as arc-shaped structures, the truss floor decking can be installed by adjusting the position of the tension screw. The force point setting is determined according to the structure shape. It is simple and flexible, and the force is clear.
[0044] like Figure 6 As shown, in the third preferred embodiment, a plurality of tension beams 1 are arranged above the steel truss floor deck 6, and each tension beam 1 is arranged at intervals, and a plurality of supporting beams are arranged at the bottom of the steel truss floor deck 6, and each supporting beam 3 is arranged at intervals, and each supporting beam 3 is arranged in parallel directly below each tension beam 1, and each tension beam 1 is connected to the tension beam 1 directly below through a tension rod group 2 arranged in an array along the tension beam 1. This structure can evenly distribute the load of the steel truss floor deck 6 to each tension beam by setting a plurality of tension beams and supporting beams arranged relatively up and down, and connecting them through a tension rod group, which is suitable for the casting construction needs of large-area steel truss floor decks.
[0045] Implementation example: Figure 1 and Figure 2As shown, the construction structure for installing the steel structure residential reinforced truss floor deck provided is that the tension beam 1 is an assembled horizontal upper beam, the tension rod group 2 is a three-stage tool tension screw, the supporting beam 3 is a horizontal lower beam, the support 4 is an assembled beam stirrup support, the upper beam is fixed by a U-shaped clip 5, the assembled horizontal upper beam is composed of two 8# channel steels, and the two channel steels are assembled together by the U-shaped clip 5, and the U-shaped clip is composed of a U-shaped clamping ring, a U-shaped clamping nut, and a U-shaped clamping gasket; after the assembled upper horizontal beam is assembled, it is installed on the main steel beam of the steel structure by the assembled beam stirrup support, the horizontal lower beam is fixed to the assembled horizontal upper beam by a three-stage tool tension screw, and the horizontal lower beam is composed of two 40㎜×60㎜ square timbers; the reinforced truss floor deck is paved on the horizontal lower beam 3. The construction structure of the steel truss floor decking installation of the assembled steel structure residential building "changes the top to the pull", giving full play to the advantages of assembled steel structure residential buildings to install the steel truss floor decking, which is not only light in weight and practical, but also can reduce the construction load borne by the steel structure. Moreover, compared with the traditional socket-type disc buckle support frame, the cost is correspondingly reduced, and the construction and installation are more economical and efficient; therefore, it is feasible and practical in terms of technology and economic comparison.
[0046] Combine the following Figure 7 , the construction method for installing the steel truss floor deck of the assembled steel structure residential building provided by the present invention is introduced in detail. Figure 7 As shown, the construction method for installing the steel truss floor deck of the assembled steel structure residential building provided by the present invention comprises the following steps:
[0047] S10: A plurality of tension beams 1 are arranged at intervals above the steel truss floor deck 6, and the tension beams 1 are supported on the building structure 7 through support seats;
[0048] S20: a plurality of support beams 3 are arranged at intervals at the bottom of the steel truss floor deck 6, and each support beam 3 is arranged parallel to and directly below each tension beam 1;
[0049] S30: Each tension beam 1 is connected to the supporting beam 3 directly below through a tension rod group 2 arranged in an array along the length direction of the tension beam 1;
[0050] S40: adjusting the distance between the upper fastener and the lower fastener of the tension rod group 2 so as to generate tension on the supporting beam 3 directly below through each tension beam 1;
[0051] S50: pouring concrete on the top of the steel truss floor deck 6;
[0052] S60: After the concrete solidifies, the tension rod group 2, the tension beam 1 and the supporting beam 3 are removed.
[0053] Preferably, S40: adjusting the distance between the upper fasteners 22 and the lower fasteners 23 of each tension rod group 2 to adapt to the flat plate structure or arc structure set by the steel truss floor deck 6 to be cast and constructed.
[0054] Compared with the prior art, the construction method for installing the steel truss floor deck of a prefabricated steel structure residential building provided by the present invention is to set a detachable tension beam on the building structure, and the tension beam generates tension on the supporting beam through the tension rod group, so as to keep the position structure of the steel truss floor deck stable during the pouring construction. This construction method of changing the top to the pull can effectively reduce the construction amount of the support system and reduce the construction cost, and can quickly complete the steel truss floor deck of the special-shaped structure or cantilever structure by adjusting the tension rod group, and has a simple structure and convenient construction.
[0055] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it; although the present invention has been described in detail with reference to the preferred embodiments, without departing from the spirit of the technical solution of the present invention, the specific implementation mode of the present invention may be modified or some technical features may be replaced by equivalents, which shall all be included in the scope of the technical solution for which protection is requested by the present invention.
Claims
1. A construction structure for installing a steel truss floor deck in a prefabricated steel structure residence, characterized in that: It comprises a tension beam (1), a tension rod group (2) and a supporting beam (3); The tension beams (1) include a plurality of detachable supports on a steel structure building structure (7), and each of the tension beams (1) is arranged at intervals in the same horizontal plane above a steel truss floor deck (6) that needs to be poured with concrete; The tension rod group (2) comprises a plurality of tension rods which are arranged in an array between the tension beam (1) and the steel truss floor deck (6); the tension rod group (2) comprises a tension rod (21), an upper fastener (22) and a lower fastener (23); the upper fastener (22) and the lower fastener (23) are respectively arranged at two ends of the tension rod (21) and at least one of them has an adjustable axial position; The supporting beam (3) includes a plurality of detachable supporting beams arranged below the bottom of the steel truss floor deck (6); the middle of the tension rod (21) passes through a through hole arranged in the steel truss floor deck (6); the upper end is connected to the tension beam (1) through an upper fastener (22); and the lower end is connected to the supporting beam (3) through a lower fastener (23); the tension beam (1) generates a tensile force on the supporting beam (3) through the tension rod group (2), so as to support the steel truss floor deck (6) through the supporting beam (3), thereby maintaining the position structure of the steel truss floor deck (6) stable during the concrete pouring construction; The construction structure further comprises a support (4), and the tension beam (1) is detachably supported by the support (4) at a position where the height of the building structure (7) is close to the height of the steel truss floor deck (6).
2. The construction structure for installing the steel truss floor deck of a prefabricated steel structure residence according to claim 1 is characterized by: The tension beam (1) comprises two tension beam bodies which are horizontally spaced and opposed to each other, the upper end of the tension rod (21) passes through the gap between the two tension beam bodies and is connected to an upper fastener (22), and the upper fastener (22) is supported by the two tension beam bodies.
3. The construction structure for installing the steel truss floor deck of a prefabricated steel structure residential building according to claim 1 is characterized by: The supporting beam (3) comprises two supporting beam bodies which are horizontally spaced and opposed to each other. The lower end of the pull rod (21) passes through the gap between the two supporting beam bodies and is connected to a lower fastener (23). The lower fastener (23) is used to simultaneously support the two supporting beam bodies.
4. The construction structure for installing the steel truss floor deck of a prefabricated steel structure residential building according to any one of claims 1 to 3, characterized in that: By arranging the upper fasteners (22) and the lower fasteners (23) of each tension rod group (2) to have the same spacing, the flat plate structure of the steel truss floor deck (6) during pouring construction is adapted to maintain the structural position of the flat plate structure stable during pouring construction.
5. The construction structure for installing the steel truss floor deck of a prefabricated steel structure residential building according to any one of claims 1 to 3, characterized in that: By arranging the upper fasteners (22) and the lower fasteners (23) of each tension rod group (2) to have different spacings, the special-shaped structure of the steel truss floor deck (6) to be cast in construction is adapted to keep the structural position of the special-shaped structure stable during the casting construction.
6. The construction structure for installing the steel truss floor deck of a prefabricated steel structure residence according to claim 5 is characterized by: The special-shaped structure comprises an arc-shaped structure, and the supporting beam is arranged to be an arc-shaped structure with the same arc as that set by the steel bar truss floor deck (6).
7. The construction structure for installing the steel truss floor deck of a prefabricated steel structure residence according to claim 1 is characterized by: Each of the supporting beams (3) is arranged in parallel directly below each of the tension beams (1), and each tension beam (1) is connected to the tension beam (1) directly below it via a tension rod group (2) arranged in an array along the tension beams (1).
8. A construction method for installing a steel truss floor deck of a prefabricated steel structure residential building, used for the construction structure for installing a steel truss floor deck of a prefabricated steel structure residential building according to any one of claims 1 to 7, characterized in that: include: A plurality of tension beams (1) arranged at intervals are provided above the steel truss floor deck (6), and the tension beams (1) are supported on the steel structure building structure (7) via support seats; A plurality of spaced-apart supporting beams (3) are arranged at the bottom of the steel truss floor deck (6), and each of the supporting beams (3) is arranged in parallel and directly below each tension beam (1); Each tension beam (1) is connected to the supporting beam (3) directly below via a tension rod group (2) arranged in an array along the length direction of the tension beam (1); so that each tension beam (1) can generate a tensile force on the supporting beam (3) directly below; pouring concrete on the top of the steel truss floor deck (6); After the concrete solidifies, the tension rod assembly (2), the tension beam (1) and the supporting beam (3) are removed.
9. The construction method for installing the steel truss floor deck of a prefabricated steel structure residence according to claim 8 is characterized by: Before pouring concrete, the distance between the upper fastener (22) and the lower fastener of each tension rod group (2) is adjusted to adapt to the flat plate structure or arc structure set by the steel truss floor deck (6) to be poured.
Citation Information
Patent Citations
Steel bar truss floor bearing hollow composite board and construction method thereof
CN114108915A
Construction method of steel bar truss floor support plate supporting system
CN114575592A
Connecting structure for steel beam lifting plate
CN212613274U
Formwork structure for concrete pouring of steel bar truss floor support plate
CN214575648U
Floor bearing plate with temporary supporting structure
CN215406825U