A prefabricated wall panel installation structure and method
By designing a prefabricated wall panel installation structure including installation slots, slots, rotating rods and adhesives, the problem of cumbersome and misalignment of wall panel installation in the prior art is solved, and rapid, stable and safe wall panel fixation is achieved, improving the Construction efficiency and ornamentality.
Patent Information
- Application Number
- CN202211588597.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-09
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2042-12-09
AI Technical Summary
The existing prefabricated wall panels are cumbersome during the installation process, which can easily lead to misalignment of the wall panels and affect the construction progress and cycle.
An installation structure including installation groove, clamp groove, rotating rod, limiting plate, snapping, bidirectional threaded rod and storage bag is designed. Through the cooperation of the rotating rod and the threaded rod, the wall panel can be quickly aligned and fixed. And use adhesive to adhere to ensure the stability and safety of the wall panel.
It realizes rapid installation and stable fixation of wall panels, simplifies the operation process, improves construction efficiency, and ensures the ornamentality and safety of wall panels.
Smart Images

Figure CN115874757B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building engineering, and in particular relates to an installation structure and method of a prefabricated wall panel. Background Art
[0002] Prefabricated wall panels generally refer to prefabricated concrete wall panels, which are processed in prefabrication plants or construction sites to form reinforced concrete slab components for building assembly. This construction method can improve the degree of factory production and mechanization, reduce on-site operations at construction sites, and effectively shorten the construction period.
[0003] Most of the prefabricated wall panels currently in use use steel bars to fix two wall panels during installation. In actual operation, the operation is too cumbersome, and it is easy to cause the heights of the wall panels at both ends to be different during installation, resulting in the two wall panels being misaligned, which in turn affects the progress of construction and increases the construction period. Therefore, an installation structure and method of a prefabricated wall panel are provided. Summary of the invention
[0004] The purpose of the present invention is to solve the above-mentioned problem and to propose a prefabricated wall panel installation structure and method.
[0005] In order to achieve the above-mentioned object, the present invention adopts the following technical scheme: a prefabricated wall panel installation structure, comprising a wall panel, a side wall of the wall panel is provided with an installation groove, an upper surface of the wall panel is provided with a clamping groove, and an installation component and a connection component are provided on the inner wall of the wall panel;
[0006] The installation assembly includes a rotating rod, one end of which extends outside the side wall of the wall panel, a turntable is fixedly installed on one end of the rotating rod, and a limit plate is fixedly installed on the other end of the rotating rod. The side wall of the limit plate is rotatably connected to the inner wall of the wall panel through a rotating shaft.
[0007] As a further description of the above technical solution:
[0008] A slot hole is provided on the side wall of the limit plate, a telescopic spring is fixedly installed on the inner wall of the slot hole, a limit block is fixedly installed on one end of the telescopic spring, one end of the limit block extends out of the slot hole, a limit hole is provided on the inner wall of the wall panel, and the limit block is adapted to the limit hole in size.
[0009] As a further description of the above technical solution:
[0010] A fixing plate is fixedly installed on the outer surface of the rotating rod, a connecting rod is rotatably installed on the side wall of the fixing plate, a buckle is fixedly installed on one end of the connecting rod, one end of the buckle extends outside the side wall of the mounting groove, and a positioning assembly is provided on the lower surface of the buckle.
[0011] As a further description of the above technical solution:
[0012] The positioning assembly includes a fixing rod and a bidirectional threaded rod, one end of the fixing rod is fixedly connected to the lower surface of the buckle, and the other end of the fixing rod is fixedly installed with a lifting plate, a threaded hole is provided on the inner wall of the lifting plate, and the lifting plate is threadedly connected to the outer surface of the bidirectional threaded rod through the threaded hole.
[0013] As a further description of the above technical solution:
[0014] One end of the bidirectional threaded rod is rotatably connected to the inner wall of the bottom surface of the wall panel, a positioning sleeve is threadedly installed on the outer surface of the bidirectional threaded rod, a limiting rod is fixedly installed on the outer surface of the positioning sleeve, one end of the limiting rod is slidably connected to the inner wall of the wall panel, and one end of the positioning sleeve extends to the inside of the installation groove.
[0015] As a further description of the above technical solution:
[0016] The connecting assembly includes a support plate and a placement bin, the upper surface of the support plate is fixedly connected to the inner wall of the wall panel, an extrusion spring is fixedly installed on the side wall of the support plate, a trapezoidal block is fixedly installed on one end of the extrusion spring, and one end of the trapezoidal block extends to the inside of the slot.
[0017] As a further description of the above technical solution:
[0018] The placement bin is arranged inside the wall panel, a storage bag is slidably installed on the inner wall of the bottom surface of the placement bin, the storage bag extends to the inside of the card slot, pressure plates are fixedly installed on both side walls of the storage bag, a threaded cylinder is rotatably installed on the side wall of the pressure plate, and one end of the threaded cylinder extends to the inside of the wall panel.
[0019] As a further description of the above technical solution:
[0020] A threaded rod is threadedly installed on the inner wall of the threaded barrel, one end of the threaded rod is rotatably connected to the inner wall of the wallboard, a threaded plate is threadedly installed on the outer surface of the threaded rod, and the upper surface of the threaded plate is fixedly connected to the lower surface of the trapezoidal block.
[0021] As a further description of the above technical solution:
[0022] An embedded block is fixedly installed on the other side wall of the wall panel, a socket is provided on the side wall of the embedded block, the buckle is adapted to the size of the socket, the embedded block is adapted to the size of the installation groove, a card plate is fixedly installed on the lower surface of the wall panel, the card plate is adapted to the size of the card groove, and a cone thorn is fixedly installed on the lower surface of the card plate.
[0023] The present invention also discloses a method for using the installation structure of the prefabricated wall panel, comprising the following steps:
[0024] S1. After aligning the embedded block on the side wall of one wall panel with the mounting groove on the side wall of another wall panel, the embedded block is inserted into the mounting groove. At this time, the buckle inside the mounting groove is also inserted into the insertion hole on the side wall of the embedded block. Then, the turntable is rotated to drive the rotating rod to rotate. During the rotation of the rotating rod, the fixed plate and the limit plate are driven to rotate. When the fixed plate rotates, the buckle is driven to move through the connecting rod, so that the buckle is stuck in the insertion hole. Then, when the limit plate rotates, the limit block is driven to move. When the limit block is aligned with the limit hole on the inner wall of the wall panel, the telescopic spring will bounce the limit block into the limit hole, thereby fixing the rotating rod;
[0025] S2. When the buckle is displaced, the lifting plate is driven to slide on the outer surface of the bidirectional threaded rod through the fixing rod, so that the bidirectional threaded rod rotates on the inner wall of the bottom surface of the wall panel. At this time, the bidirectional threaded rod causes the positioning sleeve to move into the positioning hole of the embedded block under the limit of the limit rod through the surface thread, so that the embedded block is fixed again;
[0026] S3, then insert the card plate on the lower surface of another wall panel into the card slot, at this time the card plate will squeeze the trapezoidal block in the card slot, as the trapezoidal block is squeezed, it will drive the threaded plate to slide on the outer surface of the threaded rod, so that the threaded rod rotates on the inner wall of the wall panel, at this time the threaded rod through the thread on the outer surface will drive the pressing plate to slide on the inner wall of the bottom surface of the placement bin;
[0027] S4. As the pressure plate moves, the storage capsule is squeezed. When the storage capsule is subjected to a certain pressure, the upper surface of the storage capsule will be punctured by the thorns on the lower surface of the cardboard. At this time, the adhesive in the storage capsule will gradually flow from the hole punctured by the thorns into the card slot, thereby bonding the card board and the card slot.
[0028] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0029] 1. In the present invention, an installation component is provided, after the embedded block on the side wall of one wall panel is aligned with the installation groove on the side wall of the other wall panel, the embedded block is inserted into the installation groove, and the buckle inside the installation groove is also inserted into the insertion hole on the side wall of the embedded block, and then the turntable is rotated to drive the rotating rod to rotate. During the rotation of the rotating rod, the fixing plate and the limit plate are driven to rotate. When the fixing plate rotates, the buckle is driven to move through the connecting rod, so that the buckle is stuck in the insertion hole, and then when the limit plate rotates, the limit block is driven to move. When the limit block is aligned with the limit hole on the inner wall of the wall panel, the telescopic spring will bounce the limit block into the limit hole, thereby fixing the rotating rod, which is convenient for quickly installing the two wall panels, and the installation method is simple and easy to operate. At the same time, the installation structure has a certain aesthetics, which can increase the ornamental value of the wall panel.
[0030] 2. In the present invention, by providing a positioning assembly, when the buckle is displaced, the lifting plate will be driven to slide on the outer surface of the two-way threaded rod through the fixing rod, so that the two-way threaded rod can rotate on the inner wall of the bottom surface of the wall panel. At this time, the two-way threaded rod can use the surface threads to make the positioning sleeve move into the positioning hole of the embedded block under the limit of the limit rod, so as to fix the embedded block again and position it while installing, ensuring that the wall panel will not be offset after installation, thereby improving the stability of the wall panel.
[0031] 3. In the present invention, a connecting component is provided, and a card plate on the lower surface of another wall panel is inserted into the card slot. At this time, the card plate will squeeze the trapezoidal block in the card slot. As the trapezoidal block is squeezed, the threaded plate will be driven to slide on the outer surface of the threaded rod, so that the threaded rod is rotated on the inner wall of the wall panel. At this time, the threaded rod will drive the pressure plate to slide on the inner wall of the bottom surface of the placement bin through the threads on the outer surface. As the pressure plate moves, the storage bag will be squeezed. When the storage bag is subjected to a certain pressure, the upper surface of the storage bag will be punctured by the cone thorns on the lower surface of the card plate. At this time, the adhesive in the storage bag will gradually flow from the hole punctured by the cone thorns into the card slot, thereby bonding the card plate to the card slot. After installation, they are connected by adhesive to prevent the upper wall panel from falling off during future use, further improving the safety of the wall panel. At the same time, the adhesive extends upward from the bottom, which can effectively prevent the adhesive from being smeared on the inside of the card slot. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 The present invention is a three-dimensional structural schematic diagram of a prefabricated wall panel installation structure.
[0033] Figure 2 It is a three-dimensional structural schematic diagram of a prefabricated wall panel installation structure from another angle.
[0034] Figure 3The figure is a schematic diagram of the internal structure of a prefabricated wall panel installation structure.
[0035] Figure 4 The present invention is a three-dimensional structural schematic diagram of an installation component in an installation structure of a prefabricated wall panel.
[0036] Figure 5 This is a schematic diagram of the enlarged structure of point A in the installation structure of a prefabricated wall panel.
[0037] Figure 6 This is a schematic diagram of the enlarged structure of point B in the installation structure of a prefabricated wall panel.
[0038] Figure 7 The present invention is a schematic diagram of the three-dimensional structure of a threaded rod, a threaded cylinder and a pressing plate in an installation structure of a prefabricated wall panel.
[0039] Legend:
[0040] 1. Wall panel; 2. Mounting slot; 3. Card slot; 4. Mounting assembly; 41. Turntable; 42. Rotating rod; 43. Limiting plate; 44. Connecting rod; 45. Buckle; 46. Fixed plate; 47. Telescopic spring; 48. Limiting block; 5. Card plate; 6. Embedded block; 7. Socket; 8. Cone; 9. Connecting assembly; 91. Support plate; 92. Extrusion spring; 93. Trapezoidal block; 94. Threaded plate; 95. Threaded rod; 96. Threaded barrel; 97. Pressing plate; 98. Storage bag; 99. Storage bin; 10. Positioning assembly; 101. Fixed rod; 102. Lifting plate; 103. Bidirectional threaded rod; 104. Positioning sleeve; 105. Limiting rod. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] See also Figure 1-7 The present invention provides a technical solution: a prefabricated wall panel installation structure, comprising a wall panel 1, a mounting groove 2 is provided on the side wall of the wall panel 1, a clamping groove 3 is provided on the upper surface of the wall panel 1, and a mounting component 4 and a connecting component 9 are provided on the inner wall of the wall panel 1;
[0043] The mounting assembly 4 includes a rotating rod 42, one end of which extends to the outside of the side wall of the wall panel 1, a rotating disk 41 is fixedly installed on one end of the rotating rod 42, and a limiting plate 43 is fixedly installed on the other end of the rotating rod 42. The side wall of the limiting plate 43 is rotatably connected to the inner wall of the wall panel 1 through a rotating shaft, a slot is provided on the side wall of the limiting plate 43, a telescopic spring 47 is fixedly installed on the inner wall of the slot, a limiting block 48 is fixedly installed on one end of the telescopic spring 47, one end of the limiting block 48 extends to the outside of the slot, a limiting hole is provided on the inner wall of the wall panel 1, and the limiting block 48 is adapted to the size of the limiting hole, a fixing plate 46 is fixedly installed on the outer surface of the rotating rod 42, a connecting rod 44 is rotatably installed on the side wall of the fixing plate 46, a buckle 45 is fixedly installed on one end of the connecting rod 44, one end of the buckle 45 extends to the outside of the side wall of the mounting slot 2, and a positioning assembly 10 is provided on the lower surface of the buckle 45.
[0044] The specific implementation method is as follows: after aligning the embedding block 6 on the side wall of one wall panel 1 with the mounting groove 2 on the side wall of another wall panel 1, the embedding block 6 is inserted into the mounting groove 2. At this time, the buckle 45 inside the mounting groove 2 is also inserted into the insertion hole 7 on the side wall of the embedding block 6. Then, by rotating the turntable 41, the turntable 41 drives the rotating rod 42 to rotate. During the rotation of the rotating rod 42, the fixing plate 46 and the limiting plate 43 are driven to rotate. When the fixing plate 46 rotates, the buckle 45 is driven to move through the connecting rod 44, so that the buckle 45 is stuck in the insertion hole 7. Then, when the limiting plate 43 rotates, the limiting block 48 is driven to move. When the limiting block 48 is aligned with the limiting hole on the inner wall of the wall panel 1, the telescopic spring 47 will bounce the limiting block 48 into the limiting hole, thereby fixing the rotating rod 42.
[0045] The positioning assembly 10 includes a fixing rod 101 and a bidirectional threaded rod 103, one end of the fixing rod 101 is fixedly connected to the lower surface of the buckle 45, and the other end of the fixing rod 101 is fixedly installed with a lifting plate 102, and a threaded hole is provided on the inner wall of the lifting plate 102, and the lifting plate 102 is threadedly connected to the outer surface of the bidirectional threaded rod 103 through the threaded hole, one end of the bidirectional threaded rod 103 is rotatably connected to the inner wall of the bottom surface of the wall panel 1, and a positioning sleeve 104 is threadedly installed on the outer surface of the bidirectional threaded rod 103, and a limiting rod 105 is fixedly installed on the outer surface of the positioning sleeve 104, one end of the limiting rod 105 is slidably connected to the inner wall of the wall panel 1, and one end of the positioning sleeve 104 extends to the inside of the mounting groove 2.
[0046] Its specific implementation is: when the buckle 45 is displaced, the lifting plate 102 will be driven by the fixing rod 101 to slide on the outer surface of the bidirectional threaded rod 103, so that the bidirectional threaded rod 103 will rotate on the inner wall of the bottom surface of the wall panel 1. At this time, the bidirectional threaded rod 103 will use the surface thread to make the positioning sleeve 104 move into the positioning hole of the embedded block 6 under the limit of the limiting rod 105, so as to fix the embedded block 6 again.
[0047] The connecting assembly 9 includes a support plate 91 and a placement bin 99. The upper surface of the support plate 91 is fixedly connected to the inner wall of the wall panel 1. An extrusion spring 92 is fixedly installed on the side wall of the support plate 91. A trapezoidal block 93 is fixedly installed on one end of the extrusion spring 92. One end of the trapezoidal block 93 extends to the inside of the slot 3. The placement bin 99 is arranged inside the wall panel 1. A storage capsule 98 is slidably installed on the inner wall of the bottom surface of the placement bin 99. The storage capsule 98 extends to the inside of the slot 3. Press plates 97 are fixedly installed on both side walls of the storage capsule 98. A threaded cylinder 96 is rotatably installed on the side wall of the press plate 97. One end of the threaded cylinder 96 extends Extending to the interior of the wall panel 1, a threaded rod 95 is threadedly installed on the inner wall of the threaded tube 96, one end of the threaded rod 95 is rotatably connected to the inner wall of the wall panel 1, a threaded plate 94 is threadedly installed on the outer surface of the threaded rod 95, the upper surface of the threaded plate 94 is fixedly connected to the lower surface of the trapezoidal block 93, an embedded block 6 is fixedly installed on the other side wall of the wall panel 1, a socket 7 is provided on the side wall of the embedded block 6, the buckle 45 is adapted to the size of the socket 7, the embedded block 6 is adapted to the size of the mounting groove 2, a card plate 5 is fixedly installed on the lower surface of the wall panel 1, the card plate 5 is adapted to the size of the card slot 3, and a cone thorn 8 is fixedly installed on the lower surface of the card plate 5.
[0048] The specific implementation example is as follows: then the card plate 5 on the lower surface of another wall panel 1 is inserted into the card slot 3. At this time, the card plate 5 will squeeze the trapezoidal block 93 in the card slot 3. As the trapezoidal block 93 is squeezed, the threaded plate 94 will be driven to slide on the outer surface of the threaded rod 95, so that the threaded rod 95 rotates on the inner wall of the wall panel 1. At this time, the threaded rod 95 will drive the pressure plate 97 to slide on the inner wall of the bottom surface of the placement bin 99 through the thread on the outer surface of the threaded tube 96. As the pressure plate 97 moves, the storage capsule 98 will be squeezed. When the storage capsule 98 is subjected to a certain pressure, the upper surface of the storage capsule 98 will be punctured by the cone thorn 8 on the lower surface of the card plate 5. At this time, the adhesive in the storage capsule 98 will gradually flow from the hole punctured by the cone thorn 8 into the card slot 3, thereby bonding the card plate 5 to the card slot 3.
[0049] The present invention also discloses a method for using the installation structure of the prefabricated wall panel, comprising the following steps:
[0050] S1. After aligning the embedded block 6 on the side wall of one wall panel 1 with the mounting groove 2 on the side wall of another wall panel 1, the embedded block 6 is inserted into the mounting groove 2. At this time, the buckle 45 inside the mounting groove 2 is also inserted into the insertion hole 7 on the side wall of the embedded block 6. Then, by rotating the turntable 41, the turntable 41 drives the rotating rod 42 to rotate. During the rotation of the rotating rod 42, the fixing plate 46 and the limiting plate 43 are driven to rotate. When the fixing plate 46 rotates, the buckle 45 is driven to move through the connecting rod 44, so that the buckle 45 is stuck in the insertion hole 7. Then, when the limiting plate 43 rotates, the limiting block 48 is driven to move. When the limiting block 48 is aligned with the limiting hole on the inner wall of the wall panel 1, the telescopic spring 47 will bounce the limiting block 48 into the limiting hole, thereby fixing the rotating rod 42.
[0051] S2. When the buckle 45 is displaced, the lifting plate 102 is driven to slide on the outer surface of the bidirectional threaded rod 103 through the fixing rod 101, so that the bidirectional threaded rod 103 rotates on the inner wall of the bottom surface of the wall panel 1. At this time, the bidirectional threaded rod 103 uses the surface threads to make the positioning sleeve 104 move into the positioning hole of the embedded block 6 under the limit of the limiting rod 105, so as to fix the embedded block 6 again.
[0052] S3, then insert the card plate 5 on the lower surface of another wall panel 1 into the card slot 3, at this time the card plate 5 will squeeze the trapezoidal block 93 in the card slot 3, as the trapezoidal block 93 is squeezed, it will drive the threaded plate 94 to slide on the outer surface of the threaded rod 95, so that the threaded rod 95 rotates on the inner wall of the wall panel 1, at this time the threaded rod 95 through the thread on the outer surface will drive the threaded tube 96 to drive the pressing plate 97 to slide on the inner wall of the bottom surface of the placement bin 99;
[0053] S4. As the pressure plate 97 moves, the storage capsule 98 will be squeezed. When the storage capsule 98 is subjected to a certain pressure, the upper surface of the storage capsule 98 will be punctured by the cone thorn 8 on the lower surface of the card plate 5. At this time, the adhesive in the storage capsule 98 will gradually flow from the hole punctured by the cone thorn 8 into the card slot 3, thereby bonding the card plate 5 to the card slot 3.
[0054] Working principle: After aligning the embedded block 6 on the side wall of one wall panel 1 with the mounting groove 2 on the side wall of another wall panel 1, the embedded block 6 is inserted into the mounting groove 2. At this time, the buckle 45 inside the mounting groove 2 is also inserted into the insertion hole 7 on the side wall of the embedded block 6. Then, by rotating the turntable 41, the turntable 41 drives the rotating rod 42 to rotate. During the rotation of the rotating rod 42, the fixing plate 46 and the limit plate 43 are driven to rotate. When the fixing plate 46 rotates, the buckle 45 is driven through the connecting rod 44. 5 is displaced, so that the buckle 45 is stuck in the insertion hole 7, and then the limit plate 43 rotates to drive the limit block 48 to move. When the limit block 48 is aligned with the limit hole on the inner wall of the wall panel 1, the telescopic spring 47 will bounce the limit block 48 into the limit hole, so as to fix the rotating rod 42. When the buckle 45 is displaced, it will drive the lifting plate 102 to slide on the outer surface of the two-way threaded rod 103 through the fixing rod 101, so that the two-way threaded rod 103 is at the bottom of the wall panel 1. The two-way threaded rod 103 rotates on the inner wall of the surface, and at this time, the two-way threaded rod 103 will use the surface thread to make the positioning sleeve 104 move into the positioning hole of the embedded block 6 under the limit of the limit rod 105, so as to fix the embedded block 6 again, and then the clamping plate 5 on the lower surface of another wall panel 1 is inserted into the clamping groove 3. At this time, the clamping plate 5 will squeeze the trapezoidal block 93 in the clamping groove 3. As the trapezoidal block 93 is squeezed, the threaded plate 94 will slide on the outer surface of the threaded rod 95, so that the threaded rod 95 is fixed on the wall. The plate 1 rotates on the inner wall of the plate 1, and the threaded rod 95, through the thread on the outer surface, will make the threaded tube 96 drive the pressure plate 97 to slide on the bottom inner wall of the placement bin 99. As the pressure plate 97 moves, the storage capsule 98 is squeezed. When the storage capsule 98 is subjected to a certain pressure, the upper surface of the storage capsule 98 will be punctured by the cone thorn 8 on the lower surface of the card plate 5. At this time, the adhesive in the storage capsule 98 will gradually flow from the hole punctured by the cone thorn 8 into the card slot 3, thereby bonding the card plate 5 to the card slot 3.
[0055] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A prefabricated wall panel installation structure, comprising a wall panel (1), a side wall of the wall panel (1) being provided with an installation groove (2), and an upper surface of the wall panel (1) being provided with a clamping groove (3), characterized in that: The inner wall of the wall panel (1) is provided with a mounting component (4) and a connecting component (9); The mounting assembly (4) comprises a rotating rod (42), one end of the rotating rod (42) extending outside the side wall of the wall panel (1), a rotating disk (41) being fixedly mounted on one end of the rotating rod (42), and a limiting plate (43) being fixedly mounted on the other end of the rotating rod (42), the side wall of the limiting plate (43) being rotatably connected to the inner wall of the wall panel (1) via a rotating shaft; A slot hole is provided on the side wall of the limit plate (43), a telescopic spring (47) is fixedly mounted on the inner wall of the slot hole, a limit block (48) is fixedly mounted on one end of the telescopic spring (47), one end of the limit block (48) extends outside the slot hole, a limit hole is provided on the inner wall of the wall panel (1), the limit block (48) is adapted to the size of the limit hole, a fixing plate (46) is fixedly mounted on the outer surface of the rotating rod (42), a connecting rod (44) is rotatably mounted on the side wall of the fixing plate (46), a buckle (45) is fixedly mounted on one end of the connecting rod (44), one end of the buckle (45) extends outside the side wall of the installation slot (2), a positioning assembly (10) is provided on the lower surface of the buckle (45), the positioning assembly (10) comprises a fixing rod (101) and a fixing rod (102). A bidirectional threaded rod (103), one end of the fixing rod (101) being fixedly connected to the lower surface of the buckle (45), the other end of the fixing rod (101) being fixedly mounted with a lifting plate (102), the inner wall of the lifting plate (102) being provided with a threaded hole, the lifting plate (102) being threadedly connected to the outer surface of the bidirectional threaded rod (103) through the threaded hole, one end of the bidirectional threaded rod (103) being rotatably connected to the inner wall of the bottom surface of the wall panel (1), a positioning sleeve (104) being threadedly mounted on the outer surface of the bidirectional threaded rod (103), a limiting rod (105) being fixedly mounted on the outer surface of the positioning sleeve (104), one end of the limiting rod (105) being slidably connected to the inner wall of the wall panel (1), and one end of the positioning sleeve (104) extending into the interior of the mounting groove (2); An embedding block (6) is fixedly mounted on the other side wall of the wall panel (1); a plug hole (7) is provided on the side wall of the embedding block (6); the buckle (45) is adapted to the size of the plug hole (7); the embedding block (6) is adapted to the size of the mounting groove (2); a card plate (5) is fixedly mounted on the lower surface of the wall panel (1); the card plate (5) is adapted to the size of the card groove (3); and a cone thorn (8) is fixedly mounted on the lower surface of the card plate (5).
2. The installation structure of a prefabricated wall panel according to claim 1, characterized in that: The connection assembly (9) comprises a support plate (91) and a placement bin (99); the upper surface of the support plate (91) is fixedly connected to the inner wall of the wall panel (1); a compression spring (92) is fixedly mounted on the side wall of the support plate (91); a trapezoidal block (93) is fixedly mounted on one end of the compression spring (92); and one end of the trapezoidal block (93) extends to the interior of the slot (3).
3. The installation structure of a prefabricated wall panel according to claim 2, characterized in that: The placement bin (99) is arranged inside the wall panel (1), a storage bag (98) is slidably mounted on the inner wall of the bottom surface of the placement bin (99), the storage bag (98) extends into the interior of the card slot (3), a pressure plate (97) is fixedly mounted on both side walls of the storage bag (98), a threaded cylinder (96) is rotatably mounted on the side wall of the pressure plate (97), and one end of the threaded cylinder (96) extends into the interior of the wall panel (1).
4. The installation structure of a prefabricated wall panel according to claim 3, characterized in that: A threaded rod (95) is threadedly mounted on the inner wall of the threaded cylinder (96); one end of the threaded rod (95) is rotatably connected to the inner wall of the wall panel (1); a threaded plate (94) is threadedly mounted on the outer surface of the threaded rod (95); the upper surface of the threaded plate (94) is fixedly connected to the lower surface of the trapezoidal block (93).
5. The method for using the installation structure of a prefabricated wall panel according to claim 4, characterized in that: The steps include: S1. After aligning the embedding block (6) on the side wall of one wall panel (1) with the mounting groove (2) on the side wall of another wall panel (1), the embedding block (6) is inserted into the mounting groove (2). At this time, the buckle (45) inside the mounting groove (2) is also inserted into the insertion hole (7) on the side wall of the embedding block (6). Then, by rotating the turntable (41), the turntable (41) drives the rotating rod (42) to rotate. During the rotation of the rotating rod (42), the fixing plate (46) is driven. The fixing plate (46) rotates with the limiting plate (43). When the fixing plate (46) rotates, the buckle (45) is displaced through the connecting rod (44), so that the buckle (45) is stuck in the insertion hole (7). Then, when the limiting plate (43) rotates, the limiting block (48) is driven to move. When the limiting block (48) is aligned with the limiting hole on the inner wall of the wall panel (1), the telescopic spring (47) will bounce the limiting block (48) into the limiting hole, thereby fixing the rotating rod (42); S2. When the buckle (45) is displaced, the lifting plate (102) is driven to slide on the outer surface of the bidirectional threaded rod (103) through the fixing rod (101), so that the bidirectional threaded rod (103) rotates on the inner wall of the bottom surface of the wall panel (1). At this time, the bidirectional threaded rod (103) causes the positioning sleeve (104) to move into the positioning hole of the embedded block (6) under the limit of the limit rod (105) through the surface thread, so that the embedded block (6) is fixed again; S3, then inserting the clamping plate (5) on the lower surface of another wall panel (1) into the clamping slot (3), the clamping plate (5) will squeeze the trapezoidal block (93) in the clamping slot (3), and as the trapezoidal block (93) is squeezed, the threaded plate (94) will slide on the outer surface of the threaded rod (95), so that the threaded rod (95) rotates on the inner wall of the wall panel (1), and the threaded rod (95) will drive the threaded tube (96) to slide on the inner wall of the bottom surface of the placement bin (99) through the threads on the outer surface; S4. As the pressure plate (97) moves, the storage capsule (98) is squeezed. When the storage capsule (98) is subjected to a certain pressure, the upper surface of the storage capsule (98) is punctured by the cone thorn (8) on the lower surface of the card plate (5). At this time, the adhesive in the storage capsule (98) gradually flows from the hole punctured by the cone thorn (8) into the card slot (3), thereby bonding the card plate (5) to the card slot (3).