A cup-shaped foundation inner mold construction structure and construction method
By designing the inner mold construction structure of the cup-shaped foundation, and using quick-demolded line pipes and spherical rubber pastes, the problem of formwork removal and chiseling during cup-mouth foundation construction is solved, the construction efficiency and quality are improved, and resource waste is reduced.
Patent Information
- Application Number
- CN202310171757.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-02-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2043-02-27
AI Technical Summary
During the construction of the cup mouth foundation, the formwork is difficult to remove and chisel, resulting in slow construction progress, low quality, and the formwork is easily damaged and cannot be used again.
A cup-shaped foundation inner mold construction structure is designed, including the cup mouth outer mold and the inner mold. The inner mold is spliced by multiple inner mold bodies to form a fence, and the groove is reserved to install a quick-die wire tube and spherical rubber patch to simplify The template is overlapped and removed, and the spherical rubber paste forms a chisel structure after pouring, reducing manual operation.
It realizes rapid mold removal and free chiseling construction, improves construction efficiency and quality, reduces mechanical and labor costs, and extends the service life of the formwork.
Smart Images

Figure CN116240915B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of cup-mouth foundation construction, and in particular relates to a cup-shaped foundation inner mold construction structure and a construction method. Background Art
[0002] With the development of science and technology and the progress of society, a large number of super-high-rise, large-span venues and factories have been newly built. The portal steel structure has the disadvantages of insufficient span and space utilization, while the box-type steel column can fully solve the span and space utilization problems. The cup-mouth foundation is the most economical and best-loaded bearing foundation from the perspective of cost and force. The cup-mouth foundation construction also has disadvantages. The cup-mouth construction template is not easy to remove. It is often embedded in the four corners of the side wall and cannot be removed. The cup mouth is narrow and difficult to chisel. The construction site is usually not chiseled in place. The disadvantages of the cup-mouth foundation construction have seriously affected the quality of the cup-mouth foundation molding. How to quickly construct and ensure the construction quality is the key construction control point for the construction unit.
[0003] The inner diameter of the cup-mouth foundation is relatively small, and the cup-mouth foundation formwork is easy to support, but it is difficult to remove the formwork, which takes a lot of time. The joints between the formworks are tight, and they can often only be removed by force with a crowbar. The formwork cannot be reused if damaged, and the cup-mouth molded concrete can easily be destroyed by a crowbar.
[0004] The inner wall of the cup-mouth foundation is smooth after forming, and needs to be roughened during the secondary pouring of concrete. During the construction process, since the depth of the cup-mouth is generally around 1m-1.5m and the size of the cup-mouth is relatively narrow, it is not conducive to manual and mechanical operation. The roughening can often only be chiseled about 0.3m from the upper mouth, and the lower mouth cannot be roughened. The roughening at the construction site is very random, and the construction quality cannot be guaranteed. Summary of the invention
[0005] In recent years, relatively advanced construction technologies and methods have been accumulated and innovated in the construction of cup-mouth foundations. Significant results have been achieved in the application of cup-mouth foundation rapid demoulding and cup-mouth concrete chiseling-free construction methods. In order to solve the problems of cup-mouth foundation construction progress and construction quality, the present invention summarizes the problems of cup-mouth foundation rapid construction process, designs a cup-shaped foundation inner mold construction structure and construction method, effectively solves the quality problems caused by the difficulty of demoulding the cup-mouth foundation template construction and the difficulty of chiseling the cup-mouth side wall, and effectively improves the construction efficiency and quality.
[0006] The object of the present invention is achieved through the following technical solutions:
[0007] A cup-shaped foundation inner mold construction structure comprises a cup mouth foundation, on which a cup mouth outer mold and a cup mouth inner mold are arranged, a cup mouth casting space is formed between the cup mouth outer mold and the cup mouth inner mold, the inner side of the cup mouth casting space forms the cup mouth, the cup mouth inner mold comprises a plurality of inner mold plates, the inner mold plates are spliced with each other to form a complete enclosure side, reserved grooves are arranged between adjacent inner mold plates, quick-release mold line tubes are arranged in the reserved grooves, and a spherical rubber patch is arranged on the enclosure surface of the inner mold plate.
[0008] Furthermore, the inner mold plates are provided with four pieces, and the four inner mold plates are arranged in a square shape.
[0009] Furthermore, the reserved groove is a square cross-section groove.
[0010] Furthermore, the quick-release mold line tube is made of PVC material, and the quick-release mold line tube is fixed to the inner mold body by nails.
[0011] Furthermore, the support surface of the inner formwork body is provided with wooden planks, which include supporting wooden planks attached to the support surface of the inner formwork body and reinforcing wooden planks supported between the opposite supporting wooden planks.
[0012] Furthermore, the spherical rubber stickers are arranged on the inner template body in a horizontal and vertical lattice.
[0013] Furthermore, the spherical rubber sticker is fixed on the inner template body by nailing or bonding.
[0014] A cup-shaped foundation inner mold construction method comprises the following steps:
[0015] Step S01, installing a cup mouth outer mold and a cup mouth inner mold on the cup mouth base, forming a cup mouth casting space between the cup mouth outer mold and the cup mouth inner mold, the cup mouth inner mold includes a plurality of inner mold bodies, and reserved grooves are provided between adjacent inner mold bodies, and a quick-release mold line tube is fixed in the reserved groove, and a spherical rubber patch is provided on the enclosure surface of the inner mold body;
[0016] Step S02, setting embedded bolts in the cup mouth casting space;
[0017] Step S03, pouring concrete in the cup-mouth pouring space, and forming a cup-mouth inside the cup-mouth pouring space;
[0018] Step S04, dismantling the outer mold of the cup mouth and the inner mold of the cup mouth, quickly dismantling the mold line tube to reduce the overlap between the inner mold plates, facilitating the removal of the inner mold of the cup mouth, and the spherical rubber is attached to the inner wall of the cup mouth to form a roughening structure;
[0019] Step S05, insert the steel structure column into the cup mouth, pass the load-bearing steel plate on the steel structure column through the embedded bolts, and use the adjusting nuts on the embedded bolts to adjust the elevation and verticality of the steel structure column;
[0020] Step S06, pouring concrete in the cup mouth and connecting the cup mouth with the steel structure column.
[0021] Furthermore, in the step S02, four embedded bolts are provided, and the four embedded bolts are respectively located in the four directions of front, back, left and right. In the step S05, the four embedded bolts are used to act on the bearing steel plates on the four sides of the steel structure column respectively to adjust the elevation and verticality of the steel structure column.
[0022] Furthermore, the inner template bodies are provided with four pieces, and the four inner template bodies are arranged in a square shape; the reserved grooves are square cross-section grooves; and the spherical rubber stickers are arranged on the inner template bodies in a horizontal and vertical lattice.
[0023] Beneficial effects of the present invention:
[0024] 1. The process is simple and easy to operate.
[0025] When constructing the cup mouth template, only square holes are reserved and PVC wire pipes are added; after the template is formed, spherical rubber veneers are added, and the rubber veneers are pasted or fixed with nails. The process is simple, the above steps are easy for ordinary workers to operate, and the technical construction difficulty is low.
[0026] 2. Saves machine labor costs.
[0027] It reduces the construction process, saves the labor cost of chiseling, reduces construction waste and saves resources.
[0028] 3. Reduce the number of working procedures and increase construction efficiency.
[0029] The cup mouth chiseling process is eliminated, which increases construction efficiency and improves the quality of cup mouth concrete pouring.
[0030] 4. The materials are simple and easy to obtain locally.
[0031] PVC wire pipe is common on construction sites and is easy to purchase. The spherical rubber veneer can be produced by recycling waste rubber. The material is simple and reliable, and it can be recycled for secondary use after construction is completed.
[0032] The aforementioned main scheme of the present invention and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection by the present invention; and in the present invention, (non-conflicting options) options and other options can also be freely combined. After understanding the scheme of the present invention, those skilled in the art can understand that there are many combinations based on the prior art and common knowledge, all of which are technical schemes to be protected by the present invention, and they are not exhaustively listed here. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a top view of the structure of the inner mold of the cup mouth of the present invention (wireless tube).
[0034] Figure 2 It is a top view of the structure of the inner mold of the cup mouth of the present invention (with wired tube).
[0035] Figure 3 It is a structural front view (section view) of the cup mouth inner mold of the present invention.
[0036] Figure 4 It is a structural front view of the inner template body of the present invention.
[0037] Figure 5 It is a structural side view of the inner template body of the present invention.
[0038] Figure 6 It is a front view (section view) of the structure of the cup mouth base formed after one-time pouring of the present invention.
[0039] Figure 7 It is a front view (section view) of the structure of the cup mouth base formed after secondary pouring of the present invention.
[0040] In the figure: 1-cup mouth foundation, 2-cup mouth, 3-inner formwork body, 4-reserved groove, 5-quick-release mold line tube, 6-wooden square, 7-spherical rubber sticker, 8-nails, 9-embedded bolts, 10-steel structure column, 11-bearing steel plate, 12-adjusting nut, 13-expanding concrete. DETAILED DESCRIPTION
[0041] The following non-limiting examples serve to illustrate the invention.
[0042] Embodiment 1:
[0043] refer to Figure 1 to Figure 6 As shown, a cup-shaped foundation inner mold construction structure includes a cup mouth foundation 1, a cup mouth outer mold and a cup mouth inner mold. The cup mouth outer mold and the cup mouth inner mold are arranged on the cup mouth foundation 1, and the cup mouth outer mold and the cup mouth inner mold both form a completely closed enclosure side, so that a cup mouth casting space is formed between the cup mouth outer mold and the cup mouth inner mold, and the cup mouth casting space is used for subsequent pouring of concrete to form a cup mouth 2 on the inner side of the cup mouth casting space.
[0044] The cup mouth inner mold comprises four inner mold bodies 3, which are arranged in a square shape. The four inner mold bodies 3 are spliced together to form a complete enclosure side, and the active surface faces outward to block the concrete.
[0045] A reserved groove 4 is provided between adjacent inner template bodies 3, that is, the reserved groove 4 is located at the four positive corners of the cup mouth inner mold. The reserved groove 4 is a 15mm×15mm square cross-section groove, and a quick-release mold line tube 5 is provided in the reserved groove 4. The quick-release mold line tube 5 is made of DN15 PVC material and is fixed to the inner template body 3 by nails. The PVC line tube is smooth, which reduces the overlap between templates and is easy to remove when demolding, thereby increasing the secondary utilization rate of the template, increasing construction efficiency, and reducing damage to the cup mouth molding.
[0046] The enclosure surface of the inner formwork body 3 is provided with a spherical rubber sticker 7, which is arranged in a horizontal and vertical lattice on the inner formwork body 3, and the spherical rubber sticker 7 is fixed to the inner formwork body 3 by nails 8 or bonding. The spherical protrusion size of the spherical rubber sticker 7 is 10mm×7mm. After the concrete is poured and formed, a 10mm×7mm groove distributed in a horizontal and vertical lattice is formed, achieving a chiseling-free effect, increasing the concrete contact surface, reducing labor input, and improving construction efficiency.
[0047] The support surface of the inner formwork body 3 is provided with wooden planks 6, which include support wooden planks attached to the support surface of the inner formwork body, and the support wooden planks support the vertical span of the inner formwork body to prevent the formwork from deforming during pouring. The wooden planks also include reinforcing wooden planks that support the opposite supporting wooden planks, and the reinforcing wooden planks support the supporting wooden planks to prevent the supporting wooden planks from moving inward.
[0048] Embodiment 2:
[0049] refer to Figure 1 to Figure 7 As shown, a cup-shaped foundation inner mold construction method comprises the following steps:
[0050] Step S01, installing a cup mouth outer mold and a cup mouth inner mold on a cup mouth base 1, and forming a cup mouth casting space between the cup mouth outer mold and the cup mouth inner mold. The cup mouth inner mold includes four inner mold bodies 3, which are arranged in a square shape, and reserved grooves 4 are provided between adjacent inner mold bodies 3, that is, reserved grooves 4 are provided at the elevation angle position of the cup mouth inner mold.
[0051] A quick-release mold line tube 5 is fixed in the reserved groove 4, which is a square cross-section groove located between the joints of two adjacent inner mold bodies 3, and the quick-release mold line tube 5 is arranged along the joint direction between the inner mold bodies 3. The enclosure surface of the inner mold body 3 is provided with a spherical rubber sticker 7, which is fixed to the inner mold body 3 by nails 8 or bonding, and the spherical rubber sticker 7 is arranged on the inner mold body 3 in a horizontal and vertical lattice.
[0052] Step S02, set embedded bolts 9 in the cup-mouth casting space, the embedded bolts 9 are arranged vertically, and the upper threaded part of the embedded bolts 9 extends out of the cup-mouth casting space. There are four embedded bolts 9, and the four embedded bolts 9 are respectively located in the four directions of front, back, left and right, and are welded and fixed on the steel bars of the casting space.
[0053] Step S03, pouring concrete in the cup-mouth pouring space. After pouring and curing, a cup-mouth 2 is formed inside the cup-mouth pouring space.
[0054] Step S04, dismantle the outer mold and the inner mold of the cup mouth, quickly dismantle the mold line tube 5 to reduce the overlap between the inner mold plate bodies 3, facilitate the removal of the inner mold of the cup mouth, and the spherical rubber sticker 7 forms a roughened structure on the inner wall of the cup mouth 2.
[0055] The quick-release mold line tube 5 is made of PVC material. The PVC line tube is smooth, which reduces the overlap between the templates and is easy to remove when demolding, thereby increasing the secondary utilization rate of the template, increasing construction efficiency, and reducing cup mouth molding damage.
[0056] The spherical protrusion size of the spherical rubber sticker 7 is 10mm×7mm. After the concrete is poured and formed, a 10mm×7mm groove with a horizontal and vertical dot matrix distribution is formed on the inner wall of the cup mouth, achieving a chiseling-free effect, increasing the concrete contact surface, reducing labor input, and improving construction efficiency.
[0057] Step S05, extend the steel structure column 10 into the cup mouth 2, the load-bearing steel plate 11 on the steel structure column 10 passes through the embedded bolts 9, and the adjustment nuts 12 on the embedded bolts 9 are used to adjust the elevation and verticality of the steel structure column 10, that is, four embedded bolts 9 are used to act on the load-bearing steel plates 11 welded on the four sides of the steel structure column 10 respectively, so as to adjust the elevation and verticality of the steel structure column 10.
[0058] Step S06 , pouring expansive concrete 13 in the cup mouth 2 , connecting the cup mouth 2 with the steel structure column 10 .
[0059] The above basic examples of the present invention and their further optional examples can be freely combined to form multiple embodiments, all of which are embodiments that can be adopted and claimed for protection by the present invention. In the scheme of the present invention, each optional example can be arbitrarily combined with any other basic examples and optional examples.
[0060] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A cup-shaped foundation inner mold construction structure, comprising a cup mouth foundation (1), a cup mouth outer mold and a cup mouth inner mold are arranged on the cup mouth foundation (1), a cup mouth casting space is formed between the cup mouth outer mold and the cup mouth inner mold, and a cup mouth (2) is formed inside the cup mouth casting space, characterized in that: The cup mouth inner mold comprises a plurality of inner mold plates (3), the inner mold plates (3) being spliced with each other to form a complete enclosure side surface, reserved grooves (4) being provided between adjacent inner mold plates (3), quick-release mold line tubes (5) being provided in the reserved grooves (4), and the enclosure surface of the inner mold plates (3) being provided with spherical rubber stickers (7); The inner mold plates (3) are provided with four pieces, and the four inner mold plates (3) are arranged in a square shape; The reserved groove (4) is a square cross-section groove; the reserved groove (4) is located at the four positive corners of the cup mouth inner mold; The quick-release mold line tube (5) is made of PVC material, and the quick-release mold line tube (5) is fixed to the inner mold body (3) by nails; The spherical rubber stickers (7) are arranged in a horizontal and vertical lattice on the inner template body (3).
2. The cup-shaped foundation inner mold construction structure according to claim 1 is characterized in that: The support surface of the inner formwork body (3) is provided with wooden planks (6), and the wooden planks (6) include support wooden planks attached to the support surface of the inner formwork body, and also include reinforcement wooden planks supported between the opposing support wooden planks.
3. The cup-shaped foundation inner mold construction structure according to claim 1 is characterized in that: The spherical rubber sticker (7) is fixed on the inner template body (3) by means of nails (8) or bonding.
4. A cup-shaped foundation inner mold construction method, characterized in that: The steps include: Step S01, installing a cup mouth outer mold and a cup mouth inner mold on a cup mouth base (1), forming a cup mouth casting space between the cup mouth outer mold and the cup mouth inner mold, the cup mouth inner mold comprising a plurality of inner mold bodies (3), reserved grooves (4) being provided between adjacent inner mold bodies (3), a quick-release mold line tube (5) being fixed in the reserved grooves (4), and a spherical rubber patch (7) being provided on the enclosure surface of the inner mold body (3); Step S02, setting embedded bolts (9) in the cup opening casting space; Step S03, pouring concrete in the cup-mouth pouring space, and forming a cup-mouth (2) inside the cup-mouth pouring space; Step S04, dismantling the outer mold of the cup mouth and the inner mold of the cup mouth, using a quick-release mold line tube (5) to reduce the overlap between the inner mold plate body (3) and facilitate the removal of the inner mold of the cup mouth, and using a spherical rubber sticker (7) to form a roughened structure on the inner wall of the cup mouth (2); Step S05, inserting the steel structure column (10) into the cup mouth (2), passing the bearing steel plate (11) on the steel structure column (10) through the embedded bolts (9), and adjusting the elevation and verticality of the steel structure column (10) using the adjusting nuts (12) on the embedded bolts (9); Step S06, pouring concrete in the cup mouth (2) to connect the cup mouth (2) to the steel structure column (10); The inner mold plate bodies (3) are provided with four pieces, and the four inner mold plate bodies (3) are arranged in a square shape; the reserved grooves (4) are square cross-section grooves; the reserved grooves (4) are located at the four positive corners of the cup mouth inner mold; and the spherical rubber stickers (7) are arranged in a horizontal and vertical lattice on the inner mold plate bodies (3).
5. The cup-shaped foundation inner mold construction method according to claim 4 is characterized in that: In the step S02, four embedded bolts (9) are provided, and the four embedded bolts (9) are respectively located in four directions of front, back, left and right. In the step S05, the four embedded bolts (9) are used to act on the bearing steel plates (11) on four sides of the steel structure column (10) respectively, so as to adjust the elevation and verticality of the steel structure column (10).