Antifreeze pile extraction system and construction method

By adopting an anti-freeze-pull system combining variable-section pile body and straight pile body in the frozen soil area, using geothermal pipe heating and the reverse cone structure of the positive cone part, the problem of freezing pile foundation in the frozen soil area is solved and the stability of pulling resistance is improved and construction efficiency reduces costs.

CN117627066BActive Publication Date: 2024-11-05SHIJIAZHUANG TIEDAO UNIV
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410020684.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-11-05
Estimated Expiration
2044-01-05

AI Technical Summary

Technical Problem

In frozen soil areas, the phenomenon of freezing and pulling pile foundations is caused by the freezing and swelling changes due to the seasonal freezing and thawing process, which leads to uneven deformation of the building foundations, which poses a major safety hazard and affects the normal use of the building.

Method used

The anti-freeze-pull pile pulling system is adopted that combines variable cross-section pile body and straight pile body. It is connected to the ground source heat pump unit through the geothermal pipe, and the structure of the positive cone and the inverted cone is used to weaken the freeze-pull force. The geothermal pipe heats the pile body to improve the anti-freeze-pull performance.

Benefits of technology

It effectively reduces the impact of freezing and pulling stress on pile foundations, improves the pulling stability of pile foundations, shortens the construction cycle, reduces costs, and improves the reliability of pile foundations in frozen areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117627066B_ABST
    Figure CN117627066B_ABST
Patent Text Reader

Abstract

The present invention provides an antifreeze-pulling pile system and construction method, including a variable-section pile body, a straight pile body connected to the bottom of the variable-section pile body, and a geothermal pipe pre-buried in the variable-section pile body and the straight pile body, wherein the variable-section pile body is provided with at least one above the straight pile body, the variable-section pile body includes a positive cone and an inverted cone, the inverted cone is connected to the bottom of the positive cone, and the geothermal pipe is connected to a ground source heat pump unit. The antifreeze-pulling pile provided by the present invention forms a variable-section pile body by combining the positive cone and the inverted cone, which can achieve the effect of actively weakening the freezing-pulling force, facilitate the decomposition and conversion of the force, effectively reduce the freezing-pulling effect of the freezing-pulling shear stress on the pile foundation, and improve the anti-pulling stability of the pile foundation. The geothermal pipe can effectively heat the variable-section pile body and the straight pile body, and improve the antifreeze-pulling performance of the pile body. The above-mentioned antifreeze-pulling pile structure can effectively improve the reliability of the pile foundation in the frozen area, and facilitate the reduction of the economic cost of pile foundation production and construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of antifreeze pile pulling, and more specifically, relates to an antifreeze pile pulling system and a construction method. Background Art

[0002] In frozen soil areas, pile foundation frost pullout is a common problem. The frost pullout of pile foundation is mainly caused by the seasonal freeze-thaw process and is closely related to the frost heave of the soil. During the freeze-thaw process of frozen soil, when the temperature drops below the freezing temperature of the soil, it enters the frost heave period. At this time, the volume of the frozen soil layer in the foundation expands upward, and the thickness of the frozen soil layer expands and increases. During the expansion process, an upward frost pullout force will be formed on the pile foundation.

[0003] During the above-mentioned freezing and thawing process, the horizontal frost heave force around the existing pile foundation increases, the friction resistance of the contact surface between the pile foundation and the frozen soil active layer increases, and the frozen shear stress formed on the contact surface between the pile foundation and the frozen soil causes the pile body to displace upward, forming the pile foundation frozen shear phenomenon. The above phenomenon can easily lead to uneven deformation of the building foundation, cause harm to the building, affect the normal use of the building, and pose a great safety hazard. Summary of the invention

[0004] The object of the present invention is to provide an anti-freezing and pulling-out pile system and a construction method, which can effectively reduce the freezing and pulling-out effect of freezing and pulling-out shear stress on the pile foundation and improve the anti-pulling stability of the pile foundation.

[0005] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: to provide an antifreeze pull-out pile, including a variable-section pile body, a straight pile body connected to the bottom of the variable-section pile body, and a geothermal pipe pre-buried in the variable-section pile body and the straight pile body, the variable-section pile body is provided with at least one above the straight pile body, the variable-section pile body includes a positive cone part and an inverted cone part, the inverted cone part is connected to the bottom of the positive cone part, and the geothermal pipe is connected to the ground source heat pump unit.

[0006] In a possible implementation, the cone angle of the inverted cone is α, 0°≤α≤45°, and the ratio of the height of the positive cone to the height of the inverted cone is 2:1≤h i1 :h i2 ≤3:1, where h i1 is the height of the positive cone of the i-th variable-section pile, h i2 is the height of the inverted cone of the i-th variable-section pile.

[0007] In some embodiments, the height of the straight pile body h3>h i1 +h i2 , where h3 is the height of the straight pile.

[0008] In a possible implementation, the minimum diameter of the positive cone portion and the minimum diameter of the inverted cone portion are respectively equal to the diameter of the straight pile body.

[0009] In a possible implementation, two variable-section pile bodies are provided, and the two variable-section pile bodies are arranged in the up-and-down direction, and the lower end of the variable-section pile body located at the bottom is connected to the upper end of the straight pile body.

[0010] In a possible implementation, one end of the geothermal pipe is connected to the outlet end of the geothermal heat pump unit, and the other end of the geothermal pipe is connected to the inlet end of the geothermal heat pump unit. The geothermal pipe is used to heat the variable-section pile body and the straight pile body.

[0011] In a possible implementation, the forward cone portion and the inverted cone portion are integrally formed, and the variable-section pile body and the straight pile body are integrally formed.

[0012] The present invention also provides an antifreeze pile pulling construction method, which comprises the following steps:

[0013] S100: placing a geothermal pipe in the antifreeze pile template, connecting the geothermal pipe to a ground source heat pump, pouring concrete between the geothermal pipe and the antifreeze pile template, and after curing, removing the template to obtain the antifreeze pile;

[0014] S200: Apply asphalt water repellent to the surface of the antifreeze pile to form a coating layer;

[0015] S300: drilling a pile hole on the ground, placing an antifreeze pile into the pile hole, and calibrating the antifreeze pile so that its axis is perpendicular to the ground;

[0016] S400: Fill the natural soil between the antifreeze pull-out pile and the inner wall of the pile hole, and vibrate the natural soil to make it dense.

[0017] In some embodiments, before step S200, the concrete on the surface of the antifreeze pile is cleaned, and after step S200, vaseline is applied to the periphery of the coating layer.

[0018] In some embodiments, the asphalt hydrophobic material includes a ferroferric oxide salt solution, asphalt and asphalt oil residue mixture coated sequentially from the inside to the outside, the density of the asphalt is greater than 95%, and the thickness of the asphalt layer is 5mm-6mm.

[0019] Compared with the prior art, the scheme shown in the embodiment of the present application provides an anti-freeze-pulling pile, which utilizes a combination of a positive cone and an inverted cone to form a variable-section pile body, and can achieve the effect of actively weakening the freeze-pulling force, facilitate the decomposition and transformation of the force, effectively reduce the freeze-pulling effect of the freeze-pulling shear stress on the pile foundation, and improve the pull-out stability of the pile foundation. The geothermal pipe can effectively heat the variable-section pile body and the straight pile body, and improve the anti-freeze-pulling performance of the pile body. The above-mentioned anti-freeze-pulling pile is convenient for engineering production and mechanized construction, can effectively shorten the construction period, improve the reliability of the pile foundation in the frozen area, and facilitate reducing the economic cost of pile foundation production and construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0021] Figure 1 A schematic diagram of the structure of the antifreeze pile extraction provided by an embodiment of the present invention;

[0022] Figure 2 A schematic diagram of the front and cross-sectional structure of the antifreeze pulling pile provided in an embodiment of the present invention;

[0023] Figure 3 For the embodiment of the present invention Figure 1 Force analysis diagram of the center cone and soil;

[0024] Figure 4 For the embodiment of the present invention Figure 1 Force analysis diagram of the middle inverted cone and soil;

[0025] Figure 5 For the embodiment of the present invention Figure 1 Force analysis diagram of medium frost-proof pull-out pile;

[0026] Figure 6 For the embodiment of the present invention Figure 1 A schematic diagram of the main cross-sectional structure of the middle inverted cone;

[0027] Figure 7 For the embodiment of the present invention Figure 1 Top view of the structure of the middle inverted cone and soil.

[0028] Among them, the reference numerals in the figure are:

[0029] 1. Variable cross-section pile; 11. Positive cone; 12. Inverted cone; 2. Straight pile; 3. Geothermal pipe. DETAILED DESCRIPTION

[0030] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0031] It should be noted that when an element is referred to as being "disposed on" another element, it may be directly on the other element or indirectly on the other element. It should be understood that the orientation or positional relationship indicated by the terms "length", "width", "upper", "lower", "front", "back", "top", "bottom", "inside", "outside", etc. is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention. The terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "several" is two or more, unless otherwise clearly and specifically defined.

[0032] Please also read Figures 1 to 7 The antifreeze pile pulling system and construction method provided by the present invention are now described. The antifreeze pile pulling system includes a variable cross-section pile body 1, a straight pile body 2 connected to the bottom of the variable cross-section pile body 1, and a geothermal pipe 3 pre-buried in the variable cross-section pile body 1 and the straight pile body 2. The variable cross-section pile body 1 is provided with at least one above the straight pile body 2. The variable cross-section pile body 1 includes a positive cone 11 and an inverted cone 12. The inverted cone 12 is connected to the bottom of the positive cone 11. The geothermal pipe 3 is connected to the ground source heat pump unit.

[0033] Compared with the prior art, the antifreeze pile pulling system provided in the present embodiment uses a variable-section pile body 1 structure formed by combining a positive cone 11 and an inverted cone 12, which can achieve the effect of actively weakening the freezing-pulling force, facilitate the decomposition and transformation of the force, effectively reduce the freezing-pulling effect of the freezing-pulling shear stress on the pile foundation, and improve the anti-pulling stability of the pile foundation. The geothermal pipe 3 can effectively heat the variable-section pile body 1 and the straight pile body 2, thereby improving the antifreeze-pulling performance of the pile body. The above-mentioned antifreeze pile pulling system is convenient for engineering production and mechanized construction, can effectively shorten the construction period, improve the reliability of the pile foundation in the frozen area, and facilitate reducing the economic cost of pile foundation production and construction.

[0034] For the convenience of description, the variable cross-section body 1 and the straight pile body 2 are defined as a pile body, which is cast by concrete, and the geothermal pipe 3 is pre-buried inside the pile body, and the pile body can be heated by geothermal energy. Specifically, the geothermal pipe 3 is provided with two interconnected stainless steel pipe structures inside the pile body, so that the ground source heat forms a structure of sending in and returning in the geothermal pipe 3, ensuring the orderly transmission of heat.

[0035] Furthermore, setting the extension direction of the stainless steel pipe to a bent structure can increase the contact area between the geothermal pipe 3 and the pile body, improve the heat exchange capacity between the stainless steel pipe and the pile body, and enhance the heating effect on the pile body.

[0036] In this embodiment, when the freezing depth of the ground is within the height range of the positive cone 11, due to the existence of the cone angle of the positive cone 11, the shape of the pile body in the above corresponding area can weaken the freezing pull effect of the surrounding soil on the pile foundation. The above is the advantage of the cone angle of the positive cone 11.

[0037] As the freezing depth of the stratum gradually increases to within the height range of the inverted cone 12, the pile shape of the inverted cone 12 not only cannot reduce the freezing and pulling effect of the pile foundation, but increases the risk of the pile foundation being frozen and pulled. However, at this time, the interaction force between the pile body and the soil layer located in the inverted cone 12 area gradually increases as the freezing degree of the soil layer deepens, and stress concentration occurs in the soil body near this position. In addition, since the cold energy is transmitted downward from the surface, the stratum temperature near the inverted cone 12 is still in a high state just after freezing, and the frozen soil strength is low. Under the large pressure of the pile body of the inverted cone 12, the frozen soil at this position is very easy to enter a plastic state, and even cracking damage and other damages may occur in severe cases, so the degree of damage to the soil body around the inverted cone 12 is relatively increased.

[0038] The cone angle advantage of the positive cone 11 and the plastic failure of the high-temperature frozen soil at the position of the inverted cone 12 can effectively weaken the frost pullout effect of the pile body, so that the frost pullout displacement of the anti-freeze pullout pile is much smaller than the displacement of the traditional straight pile. Compared with the ordinary integral conical piles of the same height, when the taper of the integral conical pile is the same as the taper of the positive cone 11, the bottom cross-sectional area of ​​the integral conical pile is much larger than the cross-sectional area of ​​any height of the above-mentioned variable cross-sectional pile body 1. The structure of the variable cross-sectional pile body 1 can effectively reduce the amount of construction materials, thereby reducing the project cost.

[0039] It can be seen that the essence of the anti-freeze-pullout pile to reduce the freeze-pullout effect is to reduce the freeze-pullout force acting on the pile body by changing the pile shape, taking advantage of the cone angle of the positive cone 11 and the characteristics of the surrounding soil stress concentration and plastic failure caused by the inverted cone 12. The above-mentioned pile body shape can reduce the freeze-pullout force acting on the positive cone 11 of the pile body. At the same time, based on the characteristic that the strength of the pile body itself is higher than that of the frozen soil, during the cold transfer process, the inverted cone 12 increases the extrusion stress of the surrounding frozen soil layer to achieve plastic failure of the frozen soil to achieve the reduction of the freeze-pullout effect of the pile body.

[0040] Changes in ambient temperature affect the physical and mechanical properties of frozen soil, and negative temperature is a prerequisite for soil freezing and a key factor in determining the mechanical properties of the pile-soil interface during the freezing process.

[0041] See also Figure 3 and Figure 4Now, taking a single variable cross-section pile 1 as an example, only the stress state of the positive cone 11 under the action of soil frost heave deformation (that is, when the antifreeze pull-out pile is above the frost depth line) is considered. Figure 3 As shown, the stress state of the inverted cone 12 is as follows Figure 4 The stress condition of the part of the antifreeze pile below the freezing depth line is opposite to the stress condition of the corresponding part below the freezing depth line.

[0042] Figure 4 In the equation, V is the vertical frost heave force generated by frozen soil; H is the horizontal frost heave force generated by frozen soil; V′ is the vertical resistance generated by the pile body; H′ is the horizontal resistance generated by the pile body. The anti-freeze pull-out pile is mainly affected by the vertical frost heave force V generated by frozen soil and the horizontal frost heave force H generated by frozen soil; the soil is mainly affected by the vertical resistance V′ generated by the pile body and the horizontal resistance H′ generated by the pile body.

[0043] From the force analysis diagram, we can see that:

[0044] Frozen shear stress of positive cone 11:

[0045] Normal compressive stress of positive cone 11:

[0046] Frozen shear stress of inverted cone 12:

[0047] Normal compressive stress of inverted cone 12:

[0048] Wherein: τ1 is the freeze-drawn shear stress on the positive cone 11 of the antifreeze-drawn pile; τ2 is the freeze-drawn shear stress on the inverted cone 12 of the antifreeze-drawn pile; N1 is the normal compressive stress on the positive cone 11 of the antifreeze-drawn pile; N2 is the normal compressive stress on the inverted cone 12 of the antifreeze-drawn pile. The above parameters are obtained by combining the components of the vertical resistance V′ and the horizontal resistance H′ of the pile body.

[0049] It should be noted that the above stress conditions of the positive cone portion 11 and the inverted cone portion 12 are only for the antifreeze-pulling pile with a single variable-section pile body 1 .

[0050] Under the condition of negative temperature and no overlying load, the overall stress analysis of the antifreeze pile is as follows: Figure 5 shown.

[0051] The equilibrium condition of the vertical force is:

[0052]

[0053] Where: P is the combined force of freezing and pulling; G is the weight of the pile foundation of the anti-freezing and pulling pile; F is the reaction force at the bottom of the pile; α is the cone angle of the positive cone 11; β is the angle between the positive cone 11 and the inverted cone 12, τ kis the shear freezing stress on the pile-soil interface of the straight pile body 2; τ is the freezing shear stress at the corresponding position of the antifreeze pull-out pile; N is the normal compressive stress at the corresponding position of the antifreeze pull-out pile, and Li is the height of the positive cone 11 or the inverted cone 12.

[0054] See also Figure 5 As can be seen from the figure, the normal compressive stress directions above and below the freezing depth line are the same, while the freezing shear stress directions are opposite. The anti-freezing and pulling effect of the pile body is mainly reflected in the position where the anti-freezing and pulling pile is located above the freezing depth line.

[0055] Figure 5 In the figure, the part of the variable-section pile body 1 located above the freezing depth line, due to the existence of the cone angle of the positive cone 11, the normal compressive stress of the surrounding soil on the positive cone 11 is directed toward the lower side of the axis of the positive cone 11, and the positive cone 11 can form an outward and upward reaction force on the soil, which can weaken the freezing pullout effect of the surrounding soil on the pile foundation. The above effects form the cone angle advantage of the positive cone 11.

[0056] At the same time, the normal compressive stress of the surrounding soil on the inverted cone 12 is directed toward the upper axial side of the positive cone 11. The inverted cone 12 can form an outward and downward reaction force on the soil, which can make the frozen soil at this position enter a plastic state. In severe cases, it may even cause cracking damage and other damage. Therefore, the degree of damage to the soil around the inverted cone 12 is relatively increased.

[0057] The cone angle advantage of the positive cone 11 and the plastic damage of the inverted cone 12 to the frozen soil can effectively reduce the freezing pullout effect of the pile body, so that the freezing pullout displacement of the anti-freezing pullout pile is much smaller than the displacement of the traditional straight pile. The structure of the variable cross-section pile body 1 is relative to the ordinary upright conical piles of the same height. When the taper of the conical pile is the same as the taper of the positive cone 11, the bottom cross-sectional area of ​​the conical pile is much larger than the cross-sectional area of ​​any height of the variable cross-sectional pile body 1. The structure of the variable cross-sectional pile body 1 can effectively reduce the amount of construction materials, thereby reducing the project cost.

[0058] In summary, the variable-section pile body 1 structure formed by combining the positive cone 11 and the inverted cone 12 can achieve the effect of actively weakening the freeze-up force, facilitate the decomposition and transformation of the force, effectively reduce the freeze-up effect of the freeze-up shear stress on the pile foundation, and improve the pull-out stability of the pile foundation.

[0059] In order to verify whether the frozen soil near the inverted cone 12 of the antifreeze pile can achieve plastic failure, the plastic state of the antifreeze pile is analyzed based on the failure theory at the pile-soil interface. During the freezing process of the soil, the soil on the pile side near the inverted cone 12 will be subjected to pressure, and the soil on the pile side will gradually deform under the extrusion and enter the plastic state. The area outside the plastic zone is the elastic deformation zone, such as Figure 6 to Figure 7As shown in the figure, due to the effect of force, the antifreeze pile will produce a slight deformation, forming an approximately elliptical cross-sectional shape. Similarly, the plastic zone and the elastic zone are also approximately elliptical cross-sectional shapes.

[0060] Assume that the minimum radius of the inverted cone 12 of the antifreeze pile is R, the cone angle of the inverted cone 12 is γ, and the radius of the plastic zone is R P , the plastic failure condition meets the Mohr-Coulomb model criterion. It can be seen from the structural type of the anti-freezing pull-out pile that the inverted cone 12 will produce extrusion stress on the pile-soil contact surface under the combined force of the pile side normal pressure N and the tangential force τ. (BC meaning, R circle meaning)

[0061] According to the elastic theory of soil under compression:

[0062]

[0063] Where: r , σ θ are the radial and tangential stresses at a certain point in the soil around the pile (kPa); σ ru is the compressive stress of the horizontal stress on the pile-soil interface (kPa).

[0064] Horizontal stress σ at a point on the pile-soil contact surface ru for:

[0065] σ ru =(Ncosγ-τsinγ) (2-3)

[0066] Wherein: γ is half of the cone top angle of the inverted cone 12 of the antifreeze pile.

[0067] The Mohr-Coulmb failure condition can be used to determine whether the material has reached the yield state:

[0068]

[0069] Where: is the internal friction angle of soil; c is the cohesion of soil (kPa).

[0070] Substituting formula (2-2) into formula (2-4) we get:

[0071]

[0072] This formula still holds true at the boundary between the elastic zone and the plastic zone; if a plastic zone appears in the soil, the plastic zone will inevitably appear first at the interface between the pile and the soil.

[0073] Therefore, we can order:

[0074]

[0075] Then the σ ru The value indicates that the material is at the end of the elastic stage and is about to enter the plastic flow stage;

[0076] That is to say: when the compressive stress on the pile-soil surface meets When the pile is in the soil, plastic deformation occurs.

[0077] In one possible implementation, see Figure 2 The antifreeze pile pulling system also includes a geothermal pipe 3 pre-buried in the variable-section pile body 1 and the straight pile body 2. The geothermal pipe 3 is provided in the geothermal pipe 3. The geothermal pipe 3 is connected to the ground source heat pump for heating the variable-section pile body 1 and the straight pile body 2.

[0078] In this embodiment, the antifreeze pile and ground source heat pump technology are combined to use the ground source heat pump to extract low-level heat energy in the soil. After being upgraded by the heat pump unit, it is transported to the antifreeze pile to heat the fill in the antifreeze pile, thereby preventing the antifreeze pile from being damaged by freezing. The above method can not only solve the problem of freeze-drawn damage to the antifreeze pile, but also make full use of renewable energy, thereby achieving the purpose of energy saving and reducing energy consumption.

[0079] In a possible implementation, the above-mentioned characteristic inverted cone portion 12 can be implemented as follows: Figure 2 See the structure shown. Figure 2 The cone angle of the inverted cone 12 is α, 0°≤α≤45°, and the ratio of the height of the positive cone 11 to the height of the inverted cone 12 is 2:1≤h i1 :h i2 ≤3:1, where h i1 is the height of the positive cone 11 of the i-th variable cross-section pile body 1, h i2 is the height of the inverted cone 12 of the i-th variable-section pile body 1.

[0080] When selecting the cone angles of the inverted cone 12 and the positive cone 11, the cone angle α of the inverted cone 12 should be within a certain range to ensure the anti-freezing pullout performance of the pile body. The cone angle α of the positive cone 11 should meet 0°≤α≤45° to avoid the cone angle being too large or too small to form a cone angle advantage, so that the high-temperature frozen soil around the inverted cone 12 forms a plastic failure effect, so as to achieve the effect of weakening the freezing pullout effect of the pile body.

[0081] Specifically, the ratio of the height of the positive tapered portion 11 to the height of the inverted tapered portion 12 is 2:1≤h i1 :h i2 ≤3:1, the height ratio meets a certain range value, so that the relative ratio of the positive cone portion 11 and the inverted cone portion 12 is within the moving range, achieving a cone angle advantage.

[0082] On the basis of the above structure, the height ratio of the positive cone portion 11 and the inverted cone portion 12 is limited, and then, on the premise that the maximum outer diameters of the two are equal and the minimum outer diameters are equal (the minimum outer diameters of the two are equal to the outer diameter of the straight pile body 2), the length of the positive cone portion 11 is made greater than the length of the inverted cone portion 12. Under the premise of ensuring the cone angle advantage of the positive cone portion 11, the inverted cone portion 12 is used to form plastic damage on the frozen soil, thereby reducing the frost pullout force acting on the pile body, thereby improving the frost pullout resistance of the pile body.

[0083] The height of the straight pile body 2 h3>h i1 +h i2 , where h3 is the height of the straight pile body 2. The minimum diameter of the positive cone 11 and the minimum diameter of the inverted cone 12 are respectively equal to the diameter of the straight pile body 2. This arrangement keeps the length of the straight pile body 2 below the freezing depth line within a certain height range, so that the straight pile body 2 has a certain extension length, forms a certain gravity, and ensures the anti-freezing performance of the anti-freezing pile.

[0084] In a possible implementation, the above-mentioned characteristic variable cross-section pile body 1 can be adopted as follows Figure 2 See the structure shown. Figure 2 There are two variable-section pile bodies 1 , which are arranged in the up-down direction, and the lower end of the variable-section pile body 1 located at the bottom is connected to the upper end of the straight pile body 2 .

[0085] In this embodiment, the number of variable cross-section pile bodies 1 is set according to the height of the freezing depth line, and the variable cross-section pile bodies 1 are set to be two connected up and down. During installation, it should be ensured that the freezing depth line is located in the area where the positive cone part 11 of the variable cross-section pile body 1 arranged at the bottom is located, so that the anti-freezing and pulling pile has better anti-freezing and pulling performance, and the reliability of pile body installation is improved.

[0086] In a possible implementation, the above-mentioned characteristic geothermal pipe 3 can be installed in the following manner. One end of the geothermal pipe 3 is connected to the outlet end of the geothermal heat pump unit, and the other end of the geothermal pipe 3 is connected to the inlet end of the geothermal heat pump unit. The geothermal pipe 3 is used to heat the variable-section pile body 1 and the straight pile body 2. When installing the geothermal pipe 3, the two ends of the geothermal pipe 3 are respectively connected to the inlet end and the outlet end of the geothermal heat pump unit, so that the heat exchange medium can smoothly enter the geothermal pipe 3 to realize heat exchange, so as to heat the pile body and avoid the freezing phenomenon.

[0087] In a possible implementation, the positive cone portion 11 and the inverted cone portion 12 are integrally formed, and the variable-section pile body 1 and the straight pile body 2 are integrally formed. The positive cone portion 11 and the inverted cone portion 12 are formed by concrete pouring, and the variable-section pile body 1 and the straight pile body 2 are integrally formed. The above-mentioned molding method can ensure the structural strength of the entire antifreeze pull-out pile, improve the bearing capacity of the pile body, and improve the pull-out stability of the pile foundation.

[0088] Based on the same inventive concept, the embodiment of the present application also provides an antifreeze pile pulling construction method, which includes the following steps:

[0089] S100: placing a geothermal pipe 3 in the antifreeze pile template, connecting the geothermal pipe 3 to a ground source heat pump, pouring concrete between the geothermal pipe 3 and the antifreeze pile template, and after curing, removing the template to obtain the antifreeze pile.

[0090] When the temperature drops in winter, the geothermal heat pump unit delivers a certain amount of water-based antifreeze liquid into a highly sealed tank at a certain pressure, and then performs heat exchange between different heat sources, so that the outlet of the geothermal heat pump unit can deliver a relatively high-temperature water-based antifreeze liquid, and deliver the water-based antifreeze liquid to the geothermal pipe 3 (the geothermal pipe 3 is a highly sealed stainless pipe structure). The geothermal pipe 3 is used to transfer the heat carried inside to the inside of the pile body, so that the temperature inside the pile body increases, effectively avoiding the occurrence of pile foundation freeze-pullout.

[0091] In order to ensure the structural performance of the antifreeze piles, they need to be cured for a certain period of time after pouring. After the curing is completed, the antifreeze pile template is removed to obtain the formed antifreeze piles.

[0092] S200: Clean the concrete and other impurities on the surface of the antifreeze pile to ensure the cleanliness of the outside of the antifreeze pile. Then, apply asphalt water repellent to the surface of the antifreeze pile to form a coating layer, and finally apply vaseline to the periphery of the coating layer.

[0093] First, apply the ferroferric oxide solution evenly on the surface of the antifreeze pile and let it stand for a while to dry. Then, heat and melt the asphalt, dehydrate it, and apply the molten asphalt to the periphery of the ferroferric oxide solution with a thickness of 5mm-6mm, and then let it stand to solidify. The density of the above asphalt should be maintained above 95%.

[0094] After that, boil asphalt oil residue mixture, which has good anti-freezing performance. Apply asphalt oil residue mixture on the surface of the asphalt layer, check the uniformity of application, and reapply in time if there are defects.

[0095] Finally, apply Vaseline on the outside of the asphalt oil-residue mixture to prevent the antifreeze piles from combining with the soil due to unpredictable factors, such as moisture entering the gaps between the antifreeze piles and the soil. The use of Vaseline can prevent the antifreeze piles from freezing into one with the soil, thereby preventing the two from being pulled up as a whole.

[0096] S300: Drill a pile hole on the ground, place the antifreeze pile into the pile hole, and calibrate the antifreeze pile so that its axis is perpendicular to the ground. Drill a hole at a designated location on the ground. The drilling depth should be consistent with the height of the antifreeze pile. Place the antifreeze pile into the pile hole. The inner diameter of the pile hole should be larger than the maximum outer diameter of the antifreeze pile to ensure smooth placement of the antifreeze pile. Then calibrate the antifreeze pile in the pile hole so that its axis is perpendicular to the ground.

[0097] S400: Fill the natural soil between the antifreeze pile and the inner wall of the pile hole, and vibrate and compact the natural soil. When burying the antifreeze pile, the freezing depth line should be located in the height range where the positive cone 11 of the lowest variable-section pile body 1 is located. At this time, the antifreeze pile has the best antifreeze performance. In addition, the gap between the outer periphery of the antifreeze pile and the inner wall of the pile hole is filled with natural soil, and the natural soil needs to be vibrated and compacted to ensure the installation stability of the antifreeze pile.

[0098] The anti-freeze-pulling pile construction method provided in this embodiment utilizes the combination of the positive cone 11 and the inverted cone 12 to form a variable-section pile body 1 structure, which can achieve the effect of actively weakening the freezing-pulling force, facilitate the decomposition and transformation of the force, effectively reduce the freezing-pulling effect of the freezing-pulling shear stress on the pile foundation, and improve the anti-pulling stability of the pile foundation. The geothermal pipe 3 can effectively heat the variable-section pile body 1 and the straight pile body 2, thereby improving the anti-freeze-pulling performance of the pile body. The above-mentioned anti-freeze-pulling pile is convenient for engineering production and mechanized construction, can effectively shorten the construction period, improve the reliability of the pile foundation in the frozen area, and facilitate reducing the economic cost of pile foundation production and construction.

[0099] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. Antifreeze pile pulling system, characterized by: The invention comprises a variable-section pile body, a straight pile body connected to the lower part of the variable-section pile body, and a geothermal pipe pre-buried in the variable-section pile body and the straight pile body, wherein the variable-section pile body is provided with two above the straight pile body, the variable-section pile body comprises a positive cone part and an inverted cone part, the inverted cone part is connected to the lower part of the positive cone part, and the geothermal pipe is connected to a ground source heat pump unit; the cone angle of the inverted cone part is α, 0°≤α≤45°, the ratio of the height of the positive cone part to the height of the inverted cone part is 2:1≤h i1 :h i2 ≤3:1, where h i1 is the height of the positive cone of the i-th variable-section pile, h i2 is the height of the inverted cone of the i-th variable cross-section pile body; the height of the straight pile body h3>h i1 +h i2 , where h3 is the height of the straight pile body; the positive cone located above the freezing depth line is used to form an outward and upward reaction force on the soil body to weaken the freezing pull of the soil body; the inverted cone located above the freezing depth line is used to form an outward and downward reaction force on the soil body to make the frozen soil enter a plastic state and weaken the freezing pull; the minimum diameter of the positive cone and the minimum diameter of the inverted cone are respectively equal to the diameter of the straight pile body; the two variable-section pile bodies are arranged in the up and down direction, and the lower end of the variable-section pile body located below is connected to the upper end of the straight pile body; one end of the geothermal pipe is connected to the outlet end of the ground source heat pump unit, and the other end of the geothermal pipe is connected to the inlet end of the ground source heat pump unit, and the geothermal pipe is used to heat the variable-section pile body and the straight pile body; definition It is the vertical frost heave force generated by frozen soil; It is the horizontal frost heave force produced by frozen soil; is the vertical resistance generated by the pile; is the horizontal resistance generated by the pile; Frozen shear stress of positive cone: ; (1-1) Normal compressive stress in the positive cone: ; (1-2) Frozen shear stress of inverted cone: ; (1-3) Normal compressive stress at the inverted cone: ; (1-4) Where: It is the frost shear stress on the positive cone of the frost-proof pile; It is the frost shear stress on the inverted cone of the frost-proof pile; It is the normal compressive stress on the positive cone of the antifreeze pile; The normal compressive stress on the inverted cone of the antifreeze pile is calculated by the vertical resistance generated by the pile body. and horizontal resistance get; Under the conditions of negative temperature and no overlying load, the equilibrium condition of the force in the vertical direction of the pile is: (2-1) Where: P is the freezing pullout force; G The weight of the pile foundation for frost-proof pull-out piles; F The reaction force at the bottom of the pile for frost-proofing; α is the cone angle of the positive cone; β is the angle between the positive cone and the inverted cone, τ k is the shear freezing stress on the pile-soil interface of the vertical pile; The freezing shear stress of the corresponding part of the anti-freezing pile; is the normal compressive stress at the corresponding part of the antifreeze pile, Li is the height of the positive cone; The directions of the normal compressive stress on the upper and lower sides of the freezing depth line are the same, and the directions of the freezing shear stress on the upper and lower sides of the freezing depth line are opposite. The anti-freezing and pulling effect of the pile body is mainly reflected in the part where the anti-freezing and pulling pile is located above the freezing depth line. The construction method of the anti-freezing and pulling pile system includes the following steps: S100: placing a geothermal pipe in the antifreeze pile template, connecting the geothermal pipe with a ground source heat pump, pouring concrete between the geothermal pipe and the antifreeze pile template, and after curing, removing the template to obtain the antifreeze pile; S200: applying asphalt water-repellent to the surface of the antifreeze pile to form a coating layer; S300: drilling a pile hole on the ground, placing an antifreeze pile into the pile hole, and calibrating the antifreeze pile so that its axis is perpendicular to the ground; S400: Filling natural soil between the antifreeze-pull pile and the inner wall of the pile hole, and vibrating the natural soil to make it dense.

2. The antifreeze pile pulling system according to claim 1, characterized in that: The forward tapered portion and the inverted tapered portion are integrally formed, and the variable-section pile body and the straight pile body are integrally formed.

3. The antifreeze pile pulling system according to claim 1, characterized in that: Before step S200, the concrete on the surface of the antifreeze pile is cleaned, and after step S200, vaseline is applied to the periphery of the coating layer.

4. The antifreeze pile pulling system according to claim 3, characterized in that: The asphalt hydrophobic material comprises a ferroferric oxide salt solution, asphalt and asphalt oil residue mixture coated in sequence from the inside to the outside, the density of the asphalt is greater than 95%, and the thickness of the asphalt layer is 5mm-6mm.

Citation Information

Patent Citations

  • Energy complementary anti-sliding structure with automatic snow melting pavement and construction and operation method

    CN108842567A

  • Photovoltaic support steel pipe pile foundation containing nanometer phase-change materials and suitable for frozen earth areas

    CN116378085A

  • Squeezed branch pile foundation of power transmission line

    CN202500150U