An optimization method for integrated energy system of highway

Optimizing the energy system of the expressway service area through a double-layer optimization model solves the problem that a single energy supply method cannot meet the low-carbon and high-efficiency needs, achieves multi-energy coordinated operation and reduces carbon emissions, and improves system reliability and energy Usage efficiency.

CN117788207BActive Publication Date: 2024-10-29SHANDONG ZHENGCHEN TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202311619694.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-29
Publication Date
2024-10-29
Estimated Expiration
2043-11-29

AI Technical Summary

Technical Problem

The traditional single energy transmission and supply method cannot meet the low-carbon, high energy utilization efficiency, and high self-consistency requirements of the expressway service area, which may affect the safety and stability of the service area when the municipal power grid is off-grid.

Method used

A two-layer optimization model is adopted, including the upper-layer optimization model aiming to reduce power supply costs, reducing carbon emissions and minimizing interactive power per unit area, and the lower-layer optimization model to achieve real-time load balancing among various energy supply equipment, users and local energy grids. , establish a collaborative optimization strategy through a comprehensive energy system model to optimize the coordinated operation of multiple energy sources.

Benefits of technology

It effectively guarantees the power quality of highway transportation facilities, reduces operation and maintenance costs, and improves system reliability and energy efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117788207B_ABST
    Figure CN117788207B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of energy optimization operation, and specifically provides an optimization method for a highway integrated energy system, comprising: a step of establishing a model of the integrated energy system, a step of establishing an optimization model, obtaining operation data of the highway integrated energy system, a solving step, and an optimization step; the present invention optimizes the renewable energy and energy storage capacity of the upper layer and the operation scheduling of the lower layer through a double-layer optimization model, completes the optimization of the power quality, can effectively ensure the smooth and economical operation of the prefabricated cabin, and thus reduce the operation and maintenance costs of highway traffic facilities.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of energy optimization operation, and in particular relates to an optimization method for a highway integrated energy system. Background Art

[0002] Highway service areas provide resting places for passengers and drivers. The main places include restaurants, water tank rooms, toilets, service main buildings, hotels, bathrooms, gas stations, gas stations, charging pile parking spaces, non-charging pile parking spaces, etc. Service areas are usually far away from urban areas. The energy system includes photovoltaics, batteries, air conditioning systems, lighting systems, hot water systems, sewage treatment systems, etc. The energy form is mainly electric energy, including electricity, cold, heat and other forms. Since the service area has been in continuous operation for a long time, once the municipal power grid is disconnected, it will seriously affect the safety and stability of the service area.

[0003] The development trend of highway service areas is low carbon, high energy utilization efficiency, and high self-consistency. The traditional single energy transmission and supply method is far from meeting the requirements, so the coordinated operation of multiple energy systems in service areas must be considered. Summary of the invention

[0004] In view of the defect in the prior art that the traditional single energy transmission and supply mode is far from meeting the requirements, the present invention provides an optimization method for a highway integrated energy system to solve the above technical problems.

[0005] The present invention provides a method for optimizing a highway integrated energy system, comprising:

[0006] Steps for establishing the comprehensive energy system model: According to the actual highway application environment, establish a highway comprehensive energy system model that includes a variety of energy supply equipment, energy conversion equipment, energy transmission equipment and energy distribution network;

[0007] Optimization model establishment steps: According to the operation requirements of the highway integrated energy system, a two-layer optimization model is established, including an upper optimization model and a lower optimization model; the upper optimization model takes reducing power supply costs, reducing carbon emissions and minimizing the interactive power per unit area as the optimization goals, and the lower optimization model takes achieving real-time load balance among various energy supply equipment, users and local energy networks as the optimization goal;

[0008] Obtaining the operation data of the highway integrated energy system;

[0009] Solution steps: Based on the operation data, the variables to be optimized in the two-level optimization model are solved to obtain the coordinated optimization strategy of the highway integrated energy system;

[0010] Optimization steps: According to the coordinated optimization strategy of highway integrated energy system, the highway integrated energy system is coordinated and optimized to achieve coordinated operation and optimized use of multiple energy sources.

[0011] A further improvement of the technical solution is that the upper optimization model uses the rated power of renewable energy and the energy storage capacity of the energy storage device as optimization variables, and the lower optimization model uses the rated output power of the energy storage device as the optimization variable.

[0012] A further improvement of the technical solution is that the upper optimization model takes reducing the power supply cost as the optimization goal, specifically taking reducing the power supply cost per unit area SCPUA as the optimization goal, and the evaluation index formula of the power supply cost per unit area SCPUA is:

[0013]

[0014] Among them, AC IES is the annual cost of the system, A NZEC is the total energy supply area.

[0015] A further improvement of this technical solution is that the upper optimization model takes reducing carbon emissions as the optimization goal, specifically taking reducing carbon emissions per unit area CEPUA as the optimization goal, and its evaluation index formula is:

[0016]

[0017] Among them, CE IES is the total annual carbon emissions of the system, in tons;

[0018] Total annual carbon emissions of the system CE IES The calculation formula is:

[0019]

[0020] Among them, ce grid is the unit carbon emission of the city grid, E grid,buy (t) is the real-time output load of the city grid, in kW, ce PV is the unit carbon emission of photovoltaics, P PV (t) is the power generated by photovoltaic power generation within the road section, in kWh, ce WT is the unit carbon emission of wind power, P WT (t) is the power generated by wind power, in kWh.

[0021] A further improvement of the technical solution is that the upper optimization model takes minimizing the interaction power per unit area as the optimization goal, and the evaluation index formula of the interaction power per unit area SIPUA is:

[0022]

[0023] Among them, SI I P ES is the total interactive power of the system, in kilowatt-hours; the smaller the SIPUA, the less dependent the system is on the city grid and the higher the reliability;

[0024] System total interactive power SI I P ES The calculation formula is:

[0025]

[0026] A further improvement of the technical solution is that the upper optimization model takes the real-time output cold supply balance, heat supply balance and power supply balance among the devices as constraints.

[0027] A further improvement of the technical solution is that the cold supply balance is evaluated and analyzed according to the following formula:

[0028] C ASHP (t)+C AHP (t) = C user (t);

[0029] Among them, C ASHP (t) and C AHP (t) are the cooling power of air source heat pump and absorption heat pump, in kW; C user (t) is the cooling load in the prefabricated cabin in the integrated energy system, in kW; the prefabricated cabin includes power load, cooling load and heat load.

[0030] A further improvement of this technical solution is that the heat supply balance is evaluated and analyzed according to the following formula:

[0031]

[0032] Among them, Q STC (t) is the solar collector power of the prefabricated cabin in the comprehensive energy system of the road section, in kW; Q other,in (t) is the thermal power delivered to the energy station of this section from other sections, in kW; Q other,out (t) is the thermal power delivered by the energy station to other communities, in kW; Q ASHP (t) is the heating power of the air source heat pump, in kWh; P tank,in (t) and P tank,out (t) are the thermal charge and discharge power of the water tank, in kW; Q user (t) is the heat load of the prefabricated cabin, in kW; Q waste (t) is the heat wasted by the energy station, in kW.

[0033] A further improvement of this technical solution is that the power supply balance is evaluated and analyzed according to the following formula:

[0034]

[0035] Among them, P PV (t) and P WT (t) are the power generation of photovoltaic power and wind power in the road section, in kWh; P othe,rin (t) is the power transmitted from the city power to the prefabricated cabin energy station in the integrated energy system, in kW; P other,out (t) is the electric energy transmitted from the energy station to the power grid, in kW; P Li-ion,in (t) and P Li-ion,out (t) are the charge and discharge power of the lithium battery, in kW; P ASHP (t) is the electrical power of the air source heat pump, in kWh; E user (t) is the power load of the road section, in kW; E grid,buy (t) is the real-time output load of the city grid, in kW; E grid,syn (t) is the electricity connected from the energy station to the municipal grid, in kW.

[0036] A further improvement of the technical solution is that the lower optimization model takes the real-time load balance inside and outside the prefabricated cabin as a constraint condition.

[0037] The beneficial effect of the present invention is that the present invention optimizes the renewable energy and energy storage capacity of the upper layer and the operation scheduling of the lower layer through a double-layer optimization model, thereby completing the optimization of the power quality, and can effectively ensure the smooth and economical operation of the prefabricated cabin, thereby reducing the operation and maintenance costs of highway transportation facilities.

[0038] In addition, the invention has a reliable design principle, a simple structure and a very broad application prospect. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0040] Figure 1 is a schematic flow chart of a method according to an embodiment of the present invention. DETAILED DESCRIPTION

[0041] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0042] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.

[0043] Figure 1 is a schematic flow chart of a method according to an embodiment of the present invention. The method for optimizing the integrated energy system of a highway provided by the embodiment of the present invention is executed by a computer device. Figure 1 The execution subject may be an optimization system for a highway integrated energy system. According to different requirements, the order of the steps in the flow chart may be changed, and some may be omitted.

[0044] like Figure 1 As shown, the method includes:

[0045] Step 110, a step of establishing a comprehensive energy system model: according to the actual highway application environment, establishing a highway comprehensive energy system model including a variety of energy supply equipment, energy conversion equipment, energy transmission equipment and energy distribution network;

[0046] Step 120, optimization model establishment step: a two-layer optimization model is established according to the operation requirements of the highway integrated energy system, including an upper optimization model and a lower optimization model; the upper optimization model takes reducing power supply costs, reducing carbon emissions and minimizing interactive power per unit area as optimization goals, and the lower optimization model takes achieving real-time load balance among various energy supply devices, users and local energy networks as optimization goals;

[0047] Step 130, obtaining operation data of the highway integrated energy system;

[0048] Step 140, solving step: solving the variables to be optimized in the two-layer optimization model according to the operation data to obtain a coordinated optimization strategy for the highway integrated energy system;

[0049] Step 150, optimization step: collaboratively optimize the highway integrated energy system according to the highway integrated energy system collaborative optimization strategy to achieve coordinated operation and optimized use of multiple energy sources.

[0050] To facilitate understanding of the present invention, the optimization method for the highway integrated energy system provided by the present invention is further described below based on the principle of the optimization method for the highway integrated energy system of the present invention and in combination with the process of optimizing the highway integrated energy system in the embodiment.

[0051] Specifically, the optimization method of the highway integrated energy system includes:

[0052] The following is a reference analysis based on the operational characteristics of expressways, mainly considering the following aspects:

[0053] 1. Layout and design concept of prefabricated cabins: Based on actual needs, specific and differentiated investigations should be conducted on factors such as climate conditions, road conditions and terrain, traffic flow, and vehicle types along the highway to ensure that the prefabricated cabins can adapt to various environments and meet traffic needs;

[0054] 2. Collaborative optimization of energy supply and consumption: Collaborative optimization of energy supply and consumption of prefabricated cabins, including electricity, heat, cooling and other energy types;

[0055] 3. Conversion and utilization of multiple energy sources: Consider the conversion and utilization of different types of energy, such as using the photovoltaic effect of solar panels to absorb solar energy and convert it into electrical energy, thereby reducing dependence on energy supply channels such as municipal electricity and gas turbines;

[0056] 4. Intelligent management of prefabricated cabins: Through the organic coordination of multiple energy sources and the integration of energy data and business data in the data center, big data support is provided for enterprises to achieve digital and intelligent operations;

[0057] 5. Comprehensive benefit analysis: mainly includes three aspects: environment, economy and society. Among them, environmental benefits include reducing carbon emissions, reducing air pollution, saving water resources, etc., providing a technical basis for sustainable development. Economic benefit analysis considers investment costs, operating costs, energy costs and other aspects. Through economic benefit analysis, the return on investment of high-speed IES projects can be evaluated, providing a reference for decision makers to formulate policies. Social benefit analysis includes considering setting the response level of traffic facilities, reducing the risk of traffic accidents through the task actions of the integrated energy system (IES), and other beneficial social measures.

[0058] The specific method for collaborative optimization and benefit analysis of IES prefabricated cabins for highways should include the following main steps:

[0059] 1. Construct a high-speed regional integrated energy system model, including a variety of energy supply equipment, energy conversion equipment, energy transmission and distribution networks, etc.;

[0060] 2. Extract the input and output characteristics of various equipment and the transmission, distribution and use characteristics of cold, heat and electricity energy, and establish mathematical models for each equipment;

[0061] 3. Determine the optimization scope according to the system operation requirements and optimization objectives, including time scope, space scope and energy type scope;

[0062] 4. Construct an operation optimization model with the goal of minimizing the operating cost of the regional multi-energy supply system, consider the coordinated optimization operation of multiple energy sources, and improve energy efficiency;

[0063] 5. Input system parameters, equipment parameters and load forecast data, optimize and solve the objective function, and obtain the collaborative optimization operation plan of the regional comprehensive energy system;

[0064] 6. According to the optimization results, the high-speed regional integrated energy system is coordinated and optimized to achieve the coordinated and optimized use of multiple energy sources and reduce the operating costs of the regional integrated energy system;

[0065] 7. Conduct benefit analysis on the optimized system and evaluate its impact on the environment, economy and society.

[0066] The present invention improves energy utilization efficiency and reduces the operating costs of the regional comprehensive energy system through the coordinated and optimized operation of multiple energy sources such as cold, heat and electricity in the high-speed regional comprehensive energy system, and also helps to achieve environmental protection and sustainable development.

[0067] The following describes this method from three aspects: collaborative optimization model, model solution, and performance analysis.

[0068] The collaborative optimization model should include three aspects: determining optimization variables, constraints, and objective functions.

[0069] The capacity and output rate of photovoltaic, mains and energy storage determine the scale of utilization of renewable energy by high-speed IES. If the allocation is too small, local renewable energy cannot be fully utilized; if the allocation is too large, the initial investment will be too large, and large-scale electricity consumption will be incorporated into the municipal power grid.

[0070] The capacity of energy storage equipment affects the peak-shaving and valley-filling function of the system, and also has an important impact on the overall benefits of the system. When the charging and discharging power of the energy storage device is too small, the battery capacity will be wasted, and a large amount of heat or electricity will need to be incorporated into the municipal energy supply network. If the charging and discharging power is too large, the excess equipment capacity will be shelved, and the initial investment of the system will be increased.

[0071] Therefore, we must first determine the number of photovoltaic panels, the number of solar thermal collectors, and the capacity of energy storage batteries in each section of the highway as upper-level parameters for optimization, and use the charging and discharging power of photovoltaic modules and battery packs as the bottom-level optimization parameters.

[0072] In the prefabricated cabin, it is very necessary to maintain real-time cold supply balance, heat supply balance and power supply balance between the photovoltaic station, energy storage station, charging pile, substation and data center. Therefore, the upper optimization model uses the real-time output cold supply balance, heat supply balance and power supply balance between each device as a constraint condition.

[0073] Specifically, the cold supply balance is evaluated and analyzed according to the following formula:

[0074] C ASHP (t)+C AHP (t) = C user (t);

[0075] Among them, C ASHP (t) and C AHP (t) are the cooling power of air source heat pump and absorption heat pump, in kW; C user (t) is the cooling load in the prefabricated cabin in the integrated energy system, in kW; the prefabricated cabin includes power load, cooling load and heat load.

[0076] The heat supply balance is evaluated and analyzed according to the following formula:

[0077]

[0078] Among them, Q STC (t) is the solar collector power of the prefabricated cabin in the comprehensive energy system of the road section, in kW; Q other,in (t) is the thermal power delivered to the energy station of this section from other sections, in kW; Q other,out (t) is the thermal power delivered by the energy station to other communities, in kW; Q ASHP (t) is the heating power of the air source heat pump, in kWh; P tank,in (t) and P tank,out (t) are the thermal charge and discharge power of the water tank, in kW; Q user (t) is the heat load of the prefabricated cabin, in kW; Q waste (t) is the heat wasted by the energy station, in kW.

[0079] The power supply balance is evaluated and analyzed according to the following formula:

[0080]

[0081] Among them, P PV (t) and P WT (t) are the power generation of photovoltaic power and wind power in the road section, in kWh; P othe,rin(t) is the power transmitted from the city power to the prefabricated cabin energy station in the integrated energy system, in kW; P other,out (t) is the electric energy transmitted from the energy station to the power grid, in kW; P Li-ion,in (t) and P Li-ion,out (t) are the charge and discharge power of the lithium battery, in kW; P ASHP (t) is the electrical power of the air source heat pump, in kWh; E user (t) is the power load of the road section, in kW; E grid,buy (t) is the real-time output load of the city grid, in kW; E grid,syn (t) is the electricity connected from the energy station to the municipal grid, in kW.

[0082] In addition, the lower optimization model takes the real-time load balance inside and outside the prefabricated cabin as a constraint.

[0083] For the constraints of the objective function, the present invention takes reducing the power supply cost per unit area SCPUA as the optimization goal to evaluate the economy of the system. The evaluation index formula of the power supply cost per unit area SCPUA is:

[0084]

[0085] Among them, AC IES is the annual cost of the system, A NZEC is the total energy supply area.

[0086] System annual cost AC IES The calculation formula is:

[0087] AC IES =C inv +C ope +C pur +C pun +C car ;

[0088] Among them, C inv is the initial investment, C ope is the maintenance cost, C pur is the energy purchase cost, C pun is the penalty cost, C car For carbon tax.

[0089] Initial investment C inv The calculation formula is:

[0090] C inv =C inv1 +C inv2 .

[0091] Initial investment in system equipment C inv1 The calculation formula is:

[0092] C inv1 =r i ×(c inv,grid ×L gird +c inv,heat ×L heat );

[0093] Among them, c inv,grid is the initial unit investment of the power grid, L gird is the laying length of the power grid, in CNY; c inv,heat is the initial unit investment in the heating network, L heat is the laying length of the heating network, the unit is: m; i represents different equipment types, r i is the cost recovery factor.

[0094] Initial investment in distribution network C inv2 The calculation formula is:

[0095] C inv2 =∑(r i ×c inv,i ×G eq,i ×n i );

[0096] Among them, c inv,i is the unit initial investment of type i equipment, in CNY; G eq,i is the rated capacity of class i equipment in kW, n i is the number of devices of category i.

[0097] Cost recovery factor r i The calculation formula is:

[0098]

[0099] Among them, i0 is the annual interest rate, which is 5% here; n0 is the service life of the equipment, which is set at 20 years.

[0100] Maintenance cost ope The calculation formula is:

[0101]

[0102] Among them, c ope,i is the unit maintenance cost of type i equipment; E eq,i (t) is the output power of the equipment of category i, in kWh; n i is the number of devices of category i.

[0103] Energy purchase cost C pur The calculation formula is:

[0104]

[0105] Among them, c grid (t) is the time-of-use electricity price, unit: yuan / kWh; E grid,buy (t) is the real-time output load of the city grid, in kW.

[0106] Penalty cost C pun The calculation formula is:

[0107]

[0108] Among them, c pun The penalty cost for grid connection is 0.8CNY / kWh in this invention; E grid,syn (t) is the electricity connected from the energy station to the municipal grid, in kW.

[0109] Carbon Tax car The calculation formula is:

[0110]

[0111] Among them, ce grid is the unit carbon emission of the city grid, and the present invention takes 326.27g / kWh; ce PV is the unit carbon emission of photovoltaics, and the present invention takes 61.00g / kWh; ce WT is the unit carbon emission of wind power, and the present invention takes 31.36g / kWh; c car As the unit carbon tax of the equipment, the present invention takes 292.4CNY / t.

[0112] In addition, the upper optimization model takes reducing carbon emissions as the optimization goal, specifically reducing carbon emissions per unit area CEPUA as the optimization goal. Photovoltaic and wind power generation will produce a certain amount of carbon dioxide during construction and operation, so the evaluation index formula is:

[0113]

[0114] Among them, CE IES is the total annual carbon emissions of the system, in tons;

[0115] Total annual carbon emissions of the system CE IES The calculation formula is:

[0116]

[0117] Among them, ce grid is the unit carbon emission of the city grid, E grid,buy (t) is the real-time output load of the city grid, in kW, ce PV is the unit carbon emission of photovoltaics, PPV (t) is the power generated by photovoltaic power generation within the road section, in kWh, ce WT is the unit carbon emission of wind power, P WT (t) is the power generated by wind power, in kWh.

[0118] The upper optimization model takes minimizing the interactive power SIPUA per unit area as the optimization goal, which can effectively reflect the reliability of the system. The smaller the SIPUA, the less dependent the system is on the city network and the higher the reliability. The evaluation index formula of the interactive power SIPUA per unit area is:

[0119]

[0120] Among them, SIP IES is the total interactive power of the system, in kilowatt-hours;

[0121] System total interactive power SIP IES The calculation formula is:

[0122]

[0123] In addition, the optimization method also includes: the upper optimization model uses the rated power of renewable energy and the energy storage capacity of the energy storage device as optimization variables, and the lower optimization model uses the rated output power of the energy storage device as the optimization variable.

[0124] After modeling and optimizing IES, the optimal equipment configuration and optimal operating state of the system are obtained by considering economy, carbon emissions and independence. First, the comprehensive benefits of the separated production system, independent integrated energy system (I IES) and regional integrated energy system (RIES) are compared, highlighting the superiority of RIES. Then, the real-time energy balance of I IES and RIES on typical days in summer, transition season and winter is analyzed to clarify the role of multi-regional energy sharing in system scheduling.

[0125] Although the present invention has been described in detail by referring to the accompanying drawings and in combination with the preferred embodiments, the present invention is not limited thereto. Without departing from the spirit and essence of the present invention, a person of ordinary skill in the art may make various equivalent modifications or substitutions to the embodiments of the present invention, and these modifications or substitutions shall be within the scope of the present invention. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, and all of these shall be within the scope of protection of the present invention. Therefore, the scope of protection of the present invention shall be subject to the scope of protection of the claims.

Claims

1. A method for optimizing a highway integrated energy system, characterized in that: include: Steps for establishing the comprehensive energy system model: According to the actual highway application environment, establish a highway comprehensive energy system model that includes a variety of energy supply equipment, energy conversion equipment, energy transmission equipment and energy distribution network; Optimization model establishment steps: According to the operation requirements of the highway integrated energy system, a two-layer optimization model is established, including an upper optimization model and a lower optimization model; the upper optimization model takes reducing power supply costs, reducing carbon emissions and minimizing the interactive power per unit area as the optimization goals, and the lower optimization model takes achieving real-time load balance among various energy supply equipment, users and local energy networks as the optimization goal; Obtaining the operation data of the highway integrated energy system; Solution steps: Based on the operation data, the variables to be optimized in the two-level optimization model are solved to obtain the coordinated optimization strategy of the highway integrated energy system; Optimization steps: According to the coordinated optimization strategy of the highway integrated energy system, the highway integrated energy system is coordinated and optimized to achieve the coordinated operation and optimized use of multiple energy sources; Among them, the upper optimization model is used to reduce the power supply cost per unit area For the optimization goal, the power supply cost per unit area The evaluation index formula is: ; in, is the annual cost of the system, is the total energy supply area; System annual cost The calculation formula is: ; in, For initial investment, For maintenance costs, For energy purchase costs, For the penalty cost, for carbon tax; Initial Investment The calculation formula is: ; Initial investment in system equipment The calculation formula is: ; in, is the initial unit investment of the grid, is the initial unit investment of the heating network, in CNY; is the laying length of the power grid, is the laying length of the heating network, the unit is: m; i represents different equipment types, is the cost recovery factor; Initial investment in distribution network The calculation formula is: ; in, is the unit initial investment of type i equipment, in CNY; is the rated capacity of class i equipment, in kW; is the number of class i devices; Cost recovery factor The calculation formula is: ; in, is the annual interest rate; The service life of the equipment; Maintenance costs The calculation formula is: ; in, is the unit maintenance cost of type i equipment; is the output power of class i equipment, in kWh; is the number of class i devices; Energy purchase costs The calculation formula is: ; in, It is the time-of-use electricity price, the unit is: yuan / kWh; is the real-time output load of the city grid, in kW; Penalty Cost The calculation formula is: ; in, Penalty costs for grid connection; The power connected from the energy station to the municipal power grid, in kW; Carbon tax The calculation formula is: ; in, is the unit carbon emission of the city grid; is the unit carbon emission of photovoltaics; is the unit carbon emission of wind power; a unit carbon tax for equipment; The upper optimization model uses the rated power of renewable energy and the energy storage capacity of the energy storage device as optimization variables, while the lower optimization model uses the rated output power of the energy storage device as optimization variable; The upper optimization model takes the real-time output cold supply balance, heat supply balance and power supply balance among the equipment as constraints; The lower optimization model takes the real-time load balance inside and outside the prefabricated cabin as a constraint.

2. The optimization method of the highway integrated energy system according to claim 1, characterized in that: The upper optimization model takes reducing carbon emissions as its optimization goal, specifically reducing carbon emissions per unit area. To optimize the target, the evaluation index formula is: ; in, is the total annual carbon emissions of the system, in tons; Total annual carbon emissions of the system The calculation formula is: ; in, is the unit carbon emission of the city grid; is the real-time output load of the city grid, in kW; is the unit carbon emission of photovoltaics; is the power generated by photovoltaic power generation within the road section, in kWh; is the unit carbon emission of wind power; It is the power generated by wind power, in kWh.

3. The optimization method of the highway integrated energy system according to claim 2 is characterized in that: The upper optimization model takes minimizing the interaction power per unit area as the optimization goal. Evaluation index formula: ; in, is the total interactive power of the system, in kilowatt-hours; The smaller it is, the less dependent the system is on the city network and the higher the reliability; Total system interactive power The calculation formula is: ; in, is the real-time output load of the city grid, in kW; It is the electricity connected from the energy station to the municipal power grid, in kW.

4. The optimization method of the highway integrated energy system according to claim 1, characterized in that: The cold supply balance is evaluated and analyzed according to the following formula: ; in, and are the cooling power of the air source heat pump and absorption heat pump respectively, in kW; It is the cooling load in the prefabricated cabin in the comprehensive energy system, in kW; the prefabricated cabin includes power load, cooling load and heat load.

5. The optimization method of the highway integrated energy system according to claim 4 is characterized in that: The heat supply balance is evaluated and analyzed according to the following formula: ; in, The solar collector power of the prefabricated cabin in the road section integrated energy system, in kW; The thermal power delivered to the road energy station by other road sections, in kW; It is the thermal power delivered by the energy station to other communities, in kW; is the heating power of the air source heat pump, in kWh; and They are the thermal charge and discharge power of the water tank, in kW; is the heat load of the prefabricated cabin, in kW; It is the heat wasted by the energy station, in kW.

6. The optimization method of the highway integrated energy system according to claim 4 is characterized in that: The power supply balance is evaluated and analyzed according to the following formula: ; in, and They are the power generation of photovoltaic power generation and wind power generation within the road section, in kWh; The power transmitted from the city power to the prefabricated cabin energy station in the integrated energy system, in kW; It is the electric energy transmitted from the energy station to the power grid, in kW; and They are the charging and discharging power of lithium batteries, in kW; is the electrical power of the air source heat pump, in kWh; is the power load of the road section, in kW; is the real-time output load of the city grid, in kW; It is the electricity connected from the energy station to the municipal power grid, in kW.

Citation Information

Patent Citations

  • Park comprehensive energy multi-energy coupling optimization method, system and device

    CN113344259A