A multi-factor roadbed settlement prediction method based on deep learning

By combining the deep learning multi-factor AM-BI-LSTM model with the subgrade settlement observation system and considering the environment and geotechnical engineering properties, the problem of poor subgrade settlement prediction accuracy in the existing technology is solved, and more efficient settlement control and assessment are achieved.

CN118031899BActive Publication Date: 2024-10-01CHINA RAILWAY 21TH BUREAU GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410094733.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-23
Publication Date
2024-10-01
Estimated Expiration
2044-01-23

AI Technical Summary

Technical Problem

Existing subgrade settlement prediction methods have poor prediction accuracy and fail to effectively consider the impact of environmental and geotechnical engineering properties on subgrade settlement. It is especially difficult to achieve millimeter-level settlement control in high-speed railway projects.

Method used

The multi-factor AM-BI-LSTM model based on deep learning is used, combined with the subgrade settlement observation system to obtain data on subgrade settlement, minimum temperature and soil moisture content, and is predicted through the multi-factor model, taking into account the influence of ambient temperature and geotechnical engineering properties. Improve prediction accuracy.

Benefits of technology

It significantly improves the accuracy and efficiency of subgrade settlement prediction, provides more accurate data for high-speed railway subgrade settlement assessment, and can better control subgrade settlement changes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118031899B_ABST
    Figure CN118031899B_ABST
Patent Text Reader

Abstract

The present invention proposes a multi-factor roadbed settlement prediction method based on deep learning, and performs multi-factor roadbed post-construction settlement prediction on the high-speed railway roadbed based on a multi-factor bidirectional long short-term memory neural network model (AM-BI-LSTM) optimized by attention mechanism. AM is used to calculate the weight of the BI-LSTM model output value, and the attention of the environment and geotechnical engineering properties to the roadbed post-construction settlement is allocated to improve the accuracy of the roadbed post-construction settlement, so as to provide more accurate data for the high-speed railway roadbed settlement assessment, and at the same time improve the assessment efficiency of the roadbed post-construction settlement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of roadbed engineering, and specifically relates to a multi-factor roadbed settlement prediction method based on deep learning. Background Art

[0002] The roadbed is the main body that supports the high-speed railway track structure and trains. In order to achieve high safety of train operation and high smoothness of the high-speed railway track structure, the post-construction settlement of the ballastless track high-speed railway roadbed in general sections is not more than 20mm, and the post-construction settlement of the ballasted track high-speed railway roadbed in general sections is not more than 50mm. This is a very big challenge for geotechnical engineering. Therefore, before the construction of the high-speed railway track project, a strict post-construction settlement assessment of the roadbed must be carried out.

[0003] At present, the post-construction settlement assessment of high-speed railway subgrade is to install monitoring equipment in the subgrade, collect settlement data through long-term observation, draw the "fill height-time-settlement" curve, and perform regression fitting on the post-construction settlement data based on methods such as hyperbola method, exponential curve method, Asaoka method or gray theory, and then predict the long-term post-construction settlement of the subgrade. These methods play an important role in the post-construction settlement assessment of high-speed railway subgrade, but are greatly affected by long-term fluctuations. In actual projects, the geotechnical engineering environment of the subgrade is complex and changeable, and the settlement is affected by factors such as temperature, groundwater and load changes. The subgrade in the loess area is mostly in an unsaturated state, and it is easy to have excessive post-construction settlement under dry-wet cycles and freeze-thaw cycles. However, the traditional single-factor regression fitting settlement prediction models such as hyperbola method, exponential curve method, Asaoka method have obvious time dependence and cannot consider the influence of factors such as temperature and precipitation. Although the gray theory method can make up for the shortcomings of poor information and uncertainty, it has volatility. Practice has proved that the single factor regression fitting settlement prediction model has a high accuracy in predicting the post-construction settlement of soft soil roadbed. The prediction results of post-construction settlement of loess roadbed still require long-term observation and evaluation. For the millimeter-level control of roadbed settlement of high-speed railways, the post-construction settlement prediction method of roadbed still needs to be improved, and it is very necessary to improve its prediction accuracy.

[0004] Although deep learning models have been used to predict roadbed settlement, there is still a lack of deep learning settlement prediction methods and systems that consider environmental and geotechnical properties. The environmental and geotechnical properties of different time series have different effects on roadbeds, and the existing deep learning settlement prediction methods have not yet realized the calculation of the influence of environmental and geotechnical properties on settlement. Summary of the invention

[0005] In view of this, the purpose of the present invention is to provide a multi-factor roadbed settlement prediction method based on deep learning. The present invention aims to solve the problem that the existing roadbed settlement prediction method has poor prediction accuracy and does not consider the impact of environmental and geotechnical properties on roadbed settlement.

[0006] To achieve the above object, the present invention provides a multi-factor roadbed settlement prediction method based on deep learning, comprising the following steps:

[0007] S1. Establish a roadbed settlement observation system;

[0008] The roadbed settlement observation system includes a static level, a moisture meter, a thermometer, a data transmission system and a power supply system. The static level is used to obtain the settlement data of the foundation and the roadbed surface. The moisture meter is used to obtain the moisture content of the soil inside the foundation. The thermometer is used to obtain the ambient temperature near the roadbed.

[0009] S2. Collect data and pre-process the data;

[0010] S3. Use deep learning machine to establish a multi-factor AM-BI-LSTM model;

[0011] S4. Define the input data set according to the multi-factor AM-BI-LSTM model and divide it into a training data set and a test data set;

[0012] S5. Data segmentation: Set the window segmentation length L c ;

[0013] S6. Model parameter adjustment;

[0014] Import the data set into the multi-factor AM-BI-LSTM model and conduct model training. The training process takes the minimum root mean square error (RMSE) as the optimization goal, and uses the Adam optimization algorithm to update the weights until the RMSE is minimized.

[0015] S7. Rolling forecast;

[0016] S8. Select evaluation indicators to determine the degree of deviation between the predicted value and the measured value.

[0017] Further, the step S2 includes the following sub-steps:

[0018] S2.1 monitoring the daily minimum temperature, the moisture content of the foundation soil, and the settlement data of the roadbed surface and the foundation in the area where the project is located through the roadbed settlement observation system described in step S1;

[0019] S2.2 Eliminate obvious abnormal data;

[0020] S2.3 interpolate and fill in gaps and process the data in equal time intervals;

[0021] S2.4 performs normalization on the data, converting the original data into a uniform range of [0, 1].

[0022] Furthermore, in step S2.3, the time interval of the equal time interval processing is in units of 3 days.

[0023] Furthermore, in step S2.4, data normalization is performed using a min-max normalization method, and the calculation expression of the min-max normalization function is as follows:

[0024]

[0025] In the formula, X * is the standardized data; X is the original data; X max is the maximum value in the original data, X min is the minimum value of the original data.

[0026] Further, the step S4 includes the following sub-steps:

[0027] S4.1 Based on the multi-factor AM-BI-LSTM model, define the input data set F n ;

[0028] F n =(x1,x2,…,x t ,…x n )

[0029] x t ={S ct ,T t ,w t}

[0030] In the formula, S ct is the settlement at time t; T t is the minimum temperature at time t; w t is the moisture content of foundation soil at time t;

[0031] S4.2 The data after standardization and format conversion are divided into training data set F t ' rain And the test dataset F t ' est ;

[0032] F t ' rain =(x1',x'2,…,x' m ),

[0033] F t ' est =(x' m+1 ,x' m+2 ,…,x' n )

[0034] Among them, F t ' rainis the training set after data processing, and the window length of the training set is 75% of the total data; F t ' rain is the test set after data processing, and the window length of the test set is 25% of the total data; m is the number of factors of the training sample; n is the total number of training and test samples.

[0035] Furthermore, the calculation process of the multi-factor AM-BI-LSTM model is as follows:

[0036] I. According to the split window length L c , input the dataset into the hidden layer of the multi-factor AM-BI-LSTM model;

[0037] The data set for the input hidden layer is: X = (X1, X2, X t …,X Lc ), X t =(x t ',x t ' +1 ,…,x' m-Lc+t-1 );

[0038] The theoretical output of the hidden layer is:

[0039] II. Y t Input to the AM layer to calculate the corresponding weights, and use the calculated weights to weight the encoding vector as the input of the decoder;

[0040] III. The actual output obtained after the decoder is:

[0041] IV. The actual output of the final AM-BI-LSTM model is: H t =AM-BI-LSTM(X t ,c t-1 ,h t-1 ).

[0042] Further, in step S6, the calculation expression of the root mean square error RMSE is as follows:

[0043]

[0044] Where P i is the actual output of the decoder; Y i is the theoretical output of the hidden layer.

[0045] Further, the step S7 includes the following sub-steps:

[0046] S7.1 Input time series sample data set F n , and obtain the settlement prediction set Yi ;

[0047] S7.2 will be Y i and the corresponding time T t 、w t Form the next time series sample set F n1 After training and running the multi-factor AM-BI-LSTM model, the predicted settlement value Y at the corresponding time is obtained. i1 ;

[0048] S7.3 Repeat step S7.2, iterating forward one window length each time, until the settlement development trend stabilizes or reaches the specified time.

[0049] Further, in step S8, the evaluation indicators include mean absolute error MAE and root mean square error RMSE;

[0050]

[0051]

[0052] In the formula, is the predicted value, S t is the measured value.

[0053] Beneficial effects:

[0054] 1. The present invention provides a multi-factor roadbed settlement prediction method based on deep learning. The roadbed settlement observation system is used to obtain three factors, namely, roadbed settlement value, minimum temperature and foundation soil moisture content, and a multi-factor AM-BI-LSTM model is established. The input parameters include: roadbed settlement value, minimum temperature and foundation soil moisture content, and the output parameter is the post-construction settlement prediction value of the roadbed.

[0055] Since the roadbed undergoes freeze-thaw cycles and wet-dry cycles during its construction and service period, these two processes have a great influence on the physical and mechanical indicators of the foundation soil, and the settlement of the roadbed is directly related to the physical and mechanical indicators of the foundation soil. It is labor-intensive and unrealistic to obtain the physical and mechanical indicators of the foundation soil through real-time experiments. Therefore, the present invention uses the minimum temperature to characterize the freeze-thaw cycle of the roadbed, and uses the moisture content of the foundation soil to characterize the wet-dry cycle of the roadbed. The influence of ambient temperature and engineering properties of the foundation soil are taken into account in the prediction of post-construction settlement of the roadbed, thereby improving the accuracy of the prediction.

[0056] 2. The present invention provides a multi-factor bidirectional long short-term memory (BI-LSTM) neural network model based on attention mechanism (AM) optimization, represented by AM-BI-LSTM, which can be used for the prediction of multi-factor post-construction settlement of high-speed railway subgrade. The output value of the BI-LSTM model is weighted by AM, and the attention of the environment and geotechnical engineering properties to the post-construction settlement of the subgrade is allocated to improve the accuracy of the post-construction settlement of the subgrade, thereby providing more accurate data for the high-speed railway subgrade settlement assessment and improving the efficiency of the post-construction settlement assessment of the subgrade.

[0057] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] Figure 1 It is a multi-factor AM-BI-LSTM model structure;

[0059] Figure 2 It is the basic unit structure of BI-LSTM neural network;

[0060] Figure 3 It is the AM structural layer;

[0061] Figure 4 It is the basic unit structure of LSTM neural network;

[0062] Figure 5 Rolling forecast process for multi-factor AM-BI-LSTM model;

[0063] Figure 6 The roadbed settlement observation system of Example 1;

[0064] Figure 7 The equidistant distribution of the settlement data of measuring points W6-W8;

[0065] Figure 8 is the equidistant distribution of the daily minimum temperature;

[0066] Fig. 9 is the equidistant distribution of soil moisture content;

[0067] Fig.10 This is the loss curve of the multi-factor AM-BI-LSTM model training process;

[0068] Fig.11 Comparison between the measured and predicted values ​​of the test set for point W6;

[0069] Fig.12Comparison between the measured and predicted values ​​of the test set for point W7;

[0070] Fig.13 Comparison between the measured and predicted values ​​of the test set for point W8. DETAILED DESCRIPTION

[0071] In order to make the technical solutions, advantages and purposes of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the described embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the protection scope of this application.

[0072] The present invention provides a multi-factor roadbed settlement prediction method based on deep learning, comprising the following steps:

[0073] S1. Establish a roadbed settlement observation system;

[0074] The roadbed settlement observation system includes a static level, a moisture meter, a thermometer, a data transmission system and a power supply system. The static level is used to obtain the settlement data of the foundation and the roadbed surface. The moisture meter is used to obtain the moisture content of the soil inside the foundation. The thermometer is used to obtain the ambient temperature near the roadbed. The data is the data continuously observed within a certain period of time and recorded in days.

[0075] S2. Collect data and pre-process the data;

[0076] S2.1 monitoring the daily minimum temperature, the moisture content of the foundation soil, and the settlement data of the roadbed surface and the foundation in the area where the project is located through the roadbed settlement observation system described in step S1;

[0077] S2.2 Eliminate obvious abnormal data;

[0078] S2.3 interpolate and fill in gaps and process the data in equal time intervals;

[0079] In step S2.3, the time interval of the equal time interval processing is 3 days;

[0080] S2.4 performs normalization on the data, converting the original data into a uniform range of [0, 1].

[0081] In step S2.4, data normalization is processed using the min-max normalization method to satisfy the gradient sensitivity interval of the activation function. The calculation expression of the min-max normalization function is as follows:

[0082]

[0083] In the formula, X * is the standardized data; X is the original data; X max is the maximum value in the original data, X min is the minimum value of the original data.

[0084] S3. Use deep learning machine to establish a multi-factor AM-BI-LSTM model and set relevant parameters;

[0085] Multi-factor AM-BI-LSTM model Figure 1 As shown in the figure, the multi-factor AM-BI-LSTM model for post-construction settlement prediction of roadbed includes two independent LSTM and AM mechanisms, in which the input sequence of BI-LSTM is input into two LSTM neural networks in forward and reverse order for feature extraction. The word vector formed by connecting the two output vectors (i.e., the extracted feature vectors) is used as the final feature expression of the word. The design concept of the Bi-LSTM neural network is to make the feature data obtained at time t have both past and future information, and then input the feature data obtained at time t into the AM layer, encode it through the encoder, and then calculate the corresponding weights ((α1, α2,…, α n ), use the calculated weights to weight the encoded vector as the input of the decoder, and finally get the output through the decoder. By continuously learning and optimizing the corresponding weights, the key information in the input features is highlighted, and the nonlinear features between variables are further deeply mined. Experiments show that the neural network is superior to a single LSTM neural network in terms of text feature extraction efficiency and performance. The two LSTM neural network parameters in the AM-BI-LSTM neural network are independent of each other. They share the embedding word vector list. The basic unit structure is as follows Figure 2 As shown in the figure, the AM mechanism can well capture the characteristics of sedimentation changes. It changes the traditional encoder-decoder structure. The traditional decoder gives the same weight to each input, but in reality, the importance of different inputs is often different. The AM mechanism is as follows Figure 3 shown.

[0086] The BI-LSTM neural network model includes forward and backward calculation output vectors at time t, specifically:

[0087] Create the forward calculation output vector

[0088] Create the backward calculation output vector

[0089] Calculate the hidden layer theoretical output value y t :

[0090] In the formula, and They are the weight matrix and bias vector of the forward LSTM network respectively; are the weight matrix and bias vector of the reverse LSTM respectively; W1, W2, b y are the weight matrix and bias vector of the fully connected layer respectively; sigmoid and ReLu are activation functions; To calculate the output vector forward, each layer is connected to the previous hidden state h t-1 The weight matrix of To calculate the output vector backward, each layer is connected to the previous hidden state h t-1 The weight matrix of .

[0091] The LSTM neural network in the multi-factor BI-LSTM model includes:

[0092] Establish the forget gate f t :f t =sigmoid(U f h t-1 +W f x t +b f );

[0093] Create input gate i t :i t =sigmoid(U i h t-1 +W i x t +b i );

[0094] Establish control gate t :o t =sigmoid(U o h t-1 +W o x i +b o );

[0095] Creating new memories

[0096] Building long-term memory t :

[0097] Calculate the output vector h t :h t =o t otanh(c t );

[0098] In the formula, x t 、h t are the input and output vectors respectively; f t 、i t , o t are the control states of the forget gate, input gate and output gate respectively; c is the unit state; C t , - is long-term memory and new memory; sigmoid and tanh are activation functions; W is the weight matrix; b is the bias vector; o is the Hadamard product operation.

[0099] The basic unit structure of LSTM neural network is shown in Figure 4 .

[0100] AM layer weight distribution:

[0101] u j =tanh(W i Y t +b i );

[0102] Among them, W i is the weight coefficient, b i is the offset, u j Input into the softmax function, normalize it, and get the normalized weight a j :

[0103]

[0104] Among them, u w is a randomly initialized attention weight matrix. The S of the AM mechanism is the cumulative sum of the products of different weights and the corresponding hidden layer states, calculated as follows:

[0105]

[0106] Finally, the output of the AM layer in which each variable is given different attention is obtained, as shown below:

[0107] H j =P(S,P i )

[0108] The input of the fully connected layer is the output of the AM layer. The fully connected layer calculates the input of this layer and obtains the predicted result of C settlement. It is subtracted from the actual settlement and returns the loss function. Through the back propagation of the loss function, the weights and prediction results are continuously corrected.

[0109] S4. Define the input data set according to the multi-factor AM-BI-LSTM model and divide it into a training data set and a test data set;

[0110] S4.1 Based on the multi-factor AM-BI-LSTM model, define the input data set F n ;

[0111] F n =(x1,x2,…,x t ,…x n )

[0112] x t ={S ct ,T t ,w t}

[0113] In the formula, S ct is the settlement at time t; T t is the minimum temperature at time t; w t is the moisture content of foundation soil at time t;

[0114] S4.2 The data after standardization and format conversion are divided into training data set F t ' rain And the test dataset F t ' est ;

[0115] F t ' rain =(x1',x'2,…,x' m ),

[0116] F t ' est =(x' m+1 ,x' m+2 ,…,x' n )

[0117] Among them, F t ' rain is the training set after data processing, and the window length of the training set is 75% of the total data; F t ' rain is the test set after data processing, and the window length of the test set is 25% of the total data; m is the number of factors of the training sample; n is the total number of training and test samples.

[0118] S5. Data segmentation: Set the window segmentation length L c , the window segmentation length L in this embodiment c =85;

[0119] Based on steps S1 to S5, the calculation process of the multi-factor AM-BI-LSTM model of the present invention is as follows:

[0120] I. According to the split window length L c, input the dataset into the hidden layer of the multi-factor AM-BI-LSTM model;

[0121] The data set for the input hidden layer is: X = (X1, X2, X t …,X Lc ), X t =(x t ',x t ' +1 ,…,x' m-Lc+t-1 );

[0122] The theoretical output of the hidden layer is:

[0123] II. Y t Input to the AM layer to calculate the corresponding weights, and use the calculated weights to weight the encoding vector as the input of the decoder;

[0124] III. The actual output obtained after the decoder is:

[0125] IV. The actual output of the final AM-BI-LSTM model is: H t =AM-BI-LSTM(X t ,c t-1 ,h t-1 ).

[0126] S6. Model parameter adjustment;

[0127] Import the data set into the multi-factor AM-BI-LSTM model and conduct model training. The training process takes the minimum root mean square error (RMSE) as the optimization goal, and uses the Adam optimization algorithm to update the weights until the RMSE is minimized.

[0128] In step S6, the calculation expression of the root mean square error RMSE is as follows:

[0129]

[0130] Where P i is the actual output of the decoder; Y i is the theoretical output of the hidden layer.

[0131] S7. Rolling forecast;

[0132] Due to the periodicity of climate characteristics, the minimum temperature and soil moisture monitoring data are rolled on an annual basis. The rolling prediction of the multi-factor BI-LSTM model can be achieved through the window sliding method. During the initial prediction, the window length of the initial prediction is set to the original window. The training set of the settlement data in the window corresponds to the minimum temperature and soil moisture time series. When the second prediction is carried out, the data window slides forward, and the minimum temperature, soil moisture and settlement values ​​of the window corresponding to the time series after the sliding are taken as the training set for training and operation. By analogy, the rolling prediction of the multi-factor AM-BI-LSTM model is completed. The workflow is as follows: Figure 5 As shown;

[0133] S7.1 Input time series sample data set F n , including S ct , T t , w t , and obtain the settlement prediction set Y i ;

[0134] S7.2 will be Y i and the corresponding time T t 、w t Form the next time series sample set F n1 After training and running the multi-factor AM-BI-LSTM model, the predicted settlement value Y at the corresponding time is obtained. i1 ;

[0135] S7.3 Repeat step S7.2, iterating forward one window length each time, until the settlement trend stabilizes or reaches the specified time.

[0136] S8. Select evaluation indicators to determine the degree of deviation between the predicted value and the measured value;

[0137] The evaluation criteria of the model prediction results have different sensitivity to data due to the differences in their algorithms. At the same time, the roadbed settlement characteristics are obvious and the settlement period is long. Finally, it was decided to select two discriminant indicators, MAE (mean absolute error) and RMSE (root mean square error), for analysis to determine the degree of deviation between the predicted value and the measured value. The calculation expressions of MAE and RMSE are as follows:

[0138]

[0139]

[0140] In the formula, is the predicted value, S t is the measured value.

[0141] Example 1

[0142] The present invention provides a multi-factor roadbed settlement prediction method based on deep learning, comprising the following steps:

[0143] a. Establish a roadbed settlement observation system, including a static level, moisture sensor, temperature sensor, data acquisition module, solar power supply system, etc. See Figure 6 As shown;

[0144] b. Obtain data on roadbed settlement, soil moisture content, and daily minimum temperature monitored by static levels, moisture sensors, and temperature sensors. The data are continuously observed over a period of time and are recorded in days.

[0145] c. The roadbed settlement, soil moisture content, and daily minimum temperature data were processed with 3 days as the time interval. The data after equidistant processing are as follows Figure 7 to Figure 9 As shown;

[0146] d. Define training data set and test data set: Select data from July 2021 to March 14, 2022 for standardization. The processed sample data is 85 groups. Then standardize the data. The data after standardization and format conversion is divided into training data set F t ' rain And the test dataset F t ' est , the training set has 64 samples and the test set has 21 samples;

[0147] e. A multi-factor AM-BI-LSTM model structure is established using a deep learning machine for training. The data set is imported into the model, and then the model is trained. The training batch size is set to 30, the number of iterations is 250, each round of iterations is 2 times, and a total of 500 training times are performed. The loss function is RMSE, and the optimizer is the Adam algorithm. The training goal is to minimize the loss. The optimizer is used to continuously update the network weights until the network loss is minimized. The loss curve of the training process in this embodiment is as follows: Fig.10 As shown;

[0148] f. Comparative analysis of prediction results: Figure 6 The predicted data of the middle measuring points W6-W8 are compared with the traditional single factor prediction model and the measured values. The comparison results are as follows: Figure 11 to Figure 13 As shown;

[0149] Prediction accuracy comparison:

[0150] Table 1. MAE and RMSE values ​​of the prediction set (test set) of the AM-BI-LSTM model

[0151]

[0152] It can be seen from Table 1 that compared with the traditional single-factor prediction model, the multi-factor roadbed settlement prediction method based on deep learning and the multi-factor AM-BI-LSTM model of the present invention have higher prediction accuracy, and the prediction results are closer to the measured values.

[0153] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the protection scope of the present invention.

Claims

1. A multi-factor roadbed settlement prediction method based on deep learning, characterized in that: The following steps are involved: S1. Establish a roadbed settlement observation system; The roadbed settlement observation system includes a static level, a moisture meter, a thermometer, a data transmission system and a power supply system. The static level is used to obtain the settlement data of the foundation and the roadbed surface. The moisture meter is used to obtain the moisture content of the soil inside the foundation. The thermometer is used to obtain the ambient temperature near the roadbed. S2. Collect data and pre-process the data; The step S2 comprises the following sub-steps: S2.1 monitoring the daily minimum temperature, the moisture content of the foundation soil, and the settlement data of the roadbed surface and the foundation in the area where the project is located through the roadbed settlement observation system described in step S1; S2.2 Eliminate obvious abnormal data; S2.3 interpolate and fill in gaps and process the data in equal time intervals; S2.4 performs normalization processing on the data, converting the original data into a uniform interval of [0, 1]; S3. Use deep learning machine to establish a multi-factor AM-BI-LSTM model; S4. Define the input data set according to the multi-factor AM-BI-LSTM model and divide it into a training data set and a test data set; The step S4 comprises the following sub-steps: S4.1 Based on the multi-factor AM-BI-LSTM model, define the input data set F n ; F n =(x1,x2,…,x t ,…x n ) x t ={S ct ,T t ,w t } In the formula, S ct is the settlement at time t; T t is the minimum temperature at time t; w t is the moisture content of foundation soil at time t; S4.2 The data after standardization and format conversion are divided into training data set F t ' rain And the test dataset F t ' est ; F t ' rain =(x1',x'2,…,x' m ), F t ' est =(x' m+1 ,x' m+2 ,…,x' n ) Among them, F t ' rain is the training set after data processing, and the window length of the training set is 75% of the total data; F t ' rain is the test set after data processing, and the window length of the test set is 25% of the total data; m is the number of factors in the training sample; n is the total number of training and test samples; S5. Data segmentation: Set the window segmentation length L c ; S6. Model parameter adjustment; Import the data set into the multi-factor AM-BI-LSTM model and conduct model training. The training process takes the minimum root mean square error (RMSE) as the optimization goal, and uses the Adam optimization algorithm to update the weights until the RMSE is minimized. S7. Rolling forecast; The step S7 comprises the following sub-steps: S7.1 Input time series sample data set F n , and obtain the settlement prediction set Y i ; S7.2 will be Y i and the corresponding time T t 、w t Form the next time series sample set F n1 After training and running the multi-factor AM-BI-LSTM model, the predicted settlement value Y at the corresponding time is obtained. i1 ; S7.3 Repeat step S7.2, iterating forward one window length each time, until the settlement development trend stabilizes or reaches a specified time; S8. Select evaluation indicators to determine the degree of deviation between the predicted value and the measured value.

2. The multi-factor roadbed settlement prediction method based on deep learning according to claim 1 is characterized in that: In the step S2.3, the time interval of the equal time interval processing is 3 days.

3. The multi-factor roadbed settlement prediction method based on deep learning according to claim 1 is characterized in that: In step S2.4, data normalization is performed using the min-max normalization method, and the calculation expression of the min-max normalization function is as follows: Where, X * is the standardized data; X is the original data; X max is the maximum value in the original data, X min is the minimum value of the original data.

4. The multi-factor roadbed settlement prediction method based on deep learning according to claim 1 is characterized in that: The calculation process of the multi-factor AM-BI-LSTM model is as follows: I. According to the split window length L c , input the dataset into the hidden layer of the multi-factor AM-BI-LSTM model; The data set for the input hidden layer is: X = (X1, X2, X t …,X Lc ), X t =(x t ',x t ' +1 ,…,x' m-Lc+t-1 ); The theoretical output of the hidden layer is: II. Y t Input to the AM layer to calculate the corresponding weights, and use the calculated weights to weight the encoding vector as the input of the decoder; III. The actual output obtained by the decoder is: P = {P1, P2, ... Pt, ... P Lc }; IV. The actual output of the final AM-BI-LSTM model is: H t =AM-BI-LSTM(X t ,c t-1 ,h t-1 ), where c t-1 For long-term memory, h t-1 is the output vector.

5. The multi-factor roadbed settlement prediction method based on deep learning according to claim 4 is characterized in that: In step S6, the calculation expression of the root mean square error RMSE is as follows: Where P i is the actual output of the decoder; Y i is the theoretical output of the hidden layer.

6. The multi-factor roadbed settlement prediction method based on deep learning according to claim 5 is characterized in that: In step S8, the evaluation indicators include mean absolute error MAE and root mean square error RMSE; In the formula, is the predicted value, S t is the measured value.