A method and system for designing urban rail intelligent buildings
By combining the convolutional neural network model for passenger flow prediction and planning, the problem of not considering passenger flow in the design of urban rail stations is solved, accurate passenger flow estimation and reasonable design of urban rail stations to be built are achieved, and design efficiency and safety are improved. .
Patent Information
- Application Number
- CN202410373977.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-03-29
AI Technical Summary
Passenger flow is not fully considered in the architectural design of existing urban rail stations, resulting in congestion and safety hazards, and passenger flow prediction methods fail to accurately consider building types and resident types, resulting in inaccurate predictions.
Adopting an urban rail smart building design method, by obtaining the first estimated passenger flow data of the urban rail station to be built, correcting and combining traffic influencing factors, using the convolutional neural network model for passenger flow prediction and planning, and generating a BIM model to ensure the design plan Meet actual needs.
It achieves accurate prediction of passenger flow at urban rail stations to be built, reduces design costs, improves design efficiency, ensures reasonable connectivity methods for urban rail stations, and avoids congestion and safety hazards.
Smart Images

Figure CN118133400B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of smart cities, and in particular relates to a method and system for designing smart urban rail buildings. Background Art
[0002] In the existing technology, during the design of urban rail station buildings, only the connection of the passing urban rail lines is often considered, without fully considering the passenger flow that the urban rail station can bear. As a result, the connection mode within the urban rail station is set up unreasonably, which easily causes congestion and even danger.
[0003] Existing passenger flow prediction methods often only consider passenger card swiping data, and do not consider the building types and resident types around the urban rail stations to be built, which leads to inaccurate passenger flow predictions. Summary of the invention
[0004] In order to solve the above problems in the prior art, the present invention proposes a method and system for designing urban rail intelligent buildings.
[0005] A method for designing an urban rail intelligent building, characterized in that the method comprises:
[0006] S1: Obtain the first estimated passenger flow data of the urban rail station to be built;
[0007] S2: Obtaining the converted passenger flow data of the urban rail station to be built, and correcting the first estimated passenger flow data to obtain estimated passenger flow data;
[0008] S3: Obtaining traffic influencing factors of the urban rail station to be built, and inputting the traffic influencing factors and the estimated passenger flow data into a first urban rail planning model to obtain a first urban rail planning scheme;
[0009] S4: Generate a BIM model according to the first urban rail planning scheme;
[0010] The S1 comprises the following sub-steps:
[0011] S11: Acquire all existing bus stops within the centroid range of the urban rail station to be built;
[0012] S12: Calculate the overlap between the line where each of the existing bus stops is located and the line of the urban rail to be built, and take a number of the existing bus stops whose line overlap is less than an overlap threshold as a first bus stop set;
[0013] S13: Acquire peak-hour card swiping data of each bus stop in the first bus stop set, and generate second estimated passenger flow data;
[0014] S14: inputting the point of interest data and the residential area data within the centroid range into the first passenger flow prediction model to obtain third estimated passenger flow data;
[0015] S15: inputting the second estimated passenger flow data and the third estimated passenger flow data into a second passenger flow prediction model to obtain first estimated passenger flow data;
[0016] The point of interest data includes the type of point of interest and the scale of personnel within the centroid, the scale of personnel is the number of personnel that the point of interest can accommodate, the residential area data includes the number of residents, the age distribution of residents and the type distribution of residents within the centroid, the type distribution of residents is the distribution of occupations of residents;
[0017] In S2, the data of the points of interest and the residential area within the centroid are input into the transformation
[0018] In the passenger flow prediction model, the conversion passenger flow data is output; wherein the conversion passenger flow data refers to the passenger flow that changes from private car travel to urban rail travel;
[0019] The transition passenger flow prediction model is specifically trained in the following way:
[0020] First, the transformed passenger flow data of existing urban rail stations are used as training samples. In each of the training samples, the data of points of interest and residential areas are used as inputs, and the transformed passenger flow data are used as outputs.
[0021] Secondly, taking the POI data and residential area data as input and the transformed passenger flow data as output, training a convolutional neural network model;
[0022] Finally, the convolutional neural network model obtained through training is verified using a verification set, and when the output accuracy exceeds a preset value, the transition passenger flow prediction model is obtained;
[0023] In S3, the first urban rail planning model is trained and obtained by:
[0024] First, sample data is obtained, each of which includes urban rail information of a known urban rail station, data of points of interest and residential areas around it, passenger flow data, and an urban rail planning scheme corresponding to the known urban rail station;
[0025] Secondly, the urban rail information, surrounding points of interest data, residential area data, and passenger flow data in the sample data are used as input, and the corresponding urban rail planning scheme is used as output to train a convolutional neural network model;
[0026] Finally, the convolutional neural network model obtained through training is verified using a verification set, and when the output accuracy exceeds a preset value, the first urban rail planning model is obtained;
[0027] Among them, the traffic influencing factors include urban rail information passing through the urban rail station to be built, point of interest data and residential community data around the urban rail station to be built, the urban rail information includes the transfer relationship between urban rail lines passing through the urban rail station to be built, and the transfer relationship includes the number of lines passing through the urban rail station to be built and the line relationship with the largest transfer volume.
[0028] Preferably, the correcting of the first estimated passenger flow data in S2 specifically includes:
[0029] The first estimated passenger flow data and the converted passenger flow data are added to obtain the estimated passenger flow data.
[0030] Preferably, the S12 further includes:
[0031] The angle between the line to which the existing bus stop belongs and the line to which the urban rail to be built belongs is taken as the line overlap degree.
[0032] Preferably, in S12, the overlap threshold is 30 degrees.
[0033] Preferably, in S4, the first urban rail planning scheme includes the number of floors of urban rail stations, the connection method between different floors, the number of exits, and the orientation of the exits.
[0034] This application also proposes a city rail smart building design system for implementing the above-mentioned city rail smart building design method.
[0035] The present application proposes a method and system for designing smart urban rail buildings. First, the first estimated passenger flow data of the urban rail station to be built is obtained, and then the converted passenger flow data of the urban rail station to be built is obtained, and the first estimated passenger flow data is corrected to obtain the estimated passenger flow data, and then the traffic influencing factors of the urban rail station to be built are obtained, and the traffic influencing factors and the estimated passenger flow data are input into the first urban rail planning model to obtain the first urban rail planning scheme, and finally a BIM model is generated according to the first urban rail planning scheme. Through the technical solution of the present application, the passenger flow can be estimated in combination with the characteristics of the urban rail line and the surrounding building complex connected to the urban rail station to be built, and the converted passenger flow from self-driving to urban rail travel is also considered, and the passenger flow of the urban rail station to be built is accurately estimated, and the planning scheme of the urban rail station to be built is obtained in combination with the planning scheme of the existing urban rail station, so that the final BIM model meets the actual needs, and greatly saves the labor cost of urban rail station planning and design, and improves the design efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0037] Figure 1 It is an execution flow chart of a method for designing urban rail intelligent buildings according to the present invention. DETAILED DESCRIPTION
[0038] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments, wherein the illustrative embodiments and descriptions are only used to explain the present invention but are not intended to limit the present invention.
[0039] The following is a detailed description of a method and system for designing urban rail intelligent buildings according to the present invention.
[0040] A method for designing urban rail intelligent buildings, the method flow is as follows Figure 1 shown.
[0041] S1: Obtain the first estimated passenger flow data of the urban rail station to be built.
[0042] The step S1 is divided into the following sub-steps:
[0043] S11: Acquire all existing bus stops within the centroid range of the urban rail station to be built.
[0044] The centroid range is a circular area within a preset distance from the urban rail station to be built. The preset distance is the distance that the general public would choose to walk to.
[0045] S12: Calculate the overlap between the line where each of the existing bus stops is located and the line of the urban rail to be built, and take a number of the existing bus stops whose line overlap is less than an overlap threshold as a first bus stop set.
[0046] Generally speaking, when the distance between a bus stop and a city rail stop is within a preset range, and the bus stop and the city rail have a high degree of overlap, passengers will give priority to taking the city rail. Therefore, this part of the passenger flow originally belonging to the bus stop will be diverted to the newly built city rail stop.
[0047] However, if the bus stop's line has a low degree of overlap with the urban rail line, the passengers originally at the bus stop will continue to choose to take the bus.
[0048] Preferably, the angle between the line to which the existing bus stop belongs and the line to which the urban rail to be built belongs is taken as the line overlap degree.
[0049] Preferably, when the angle is less than 30 degrees, it is determined that the overlap is high; when the angle is greater than or equal to 30 degrees, it is determined that the overlap is low.
[0050] S13: Obtain peak-hour card swiping data for each bus stop in the first bus stop set, and generate second estimated passenger flow data.
[0051] Preferably, the card swiping data includes the card swiping time and the card swiping location, and the peak period is the morning peak period or the evening peak period, for example, the morning peak period is from 7 am to 9 am, and the evening peak period is from 5 pm to 7 pm.
[0052] Preferably, each card swiping data generated during the peak period and within the centroid can be regarded as a valid card swiping data. For all valid card swiping data generated by each bus stop in the first bus stop set, the second estimated passenger flow data generated during the peak period and within the centroid is obtained by statistics.
[0053] S14: Inputting the data of points of interest and residential areas within the centroid range into the first passenger flow prediction model to obtain third estimated passenger flow data.
[0054] The point of interest data includes the type of point of interest and the scale of personnel within the centroid, and the scale of personnel is the number of personnel that the point of interest can accommodate. The residential area data includes the number of residents, the age distribution of residents, and the type distribution of residents within the centroid, and the type distribution of residents is the distribution of the types of occupations that residents are engaged in.
[0055] The first passenger flow prediction model is trained and obtained by the following method:
[0056] First, sample data is obtained, each of which includes point of interest data and residential community data within the centroid of an existing urban rail station, as well as actual passenger flow of the urban rail station.
[0057] Secondly, the point of interest data and residential area data of each sample data are taken as input, and the actual passenger flow of the existing urban rail station is taken as output to train the convolutional neural network model.
[0058] Finally, the validation set is used to verify the convolutional neural network model obtained through training. When the output accuracy exceeds a preset value, the first passenger flow prediction model is obtained.
[0059] S15: Inputting the second estimated passenger flow data and the third estimated passenger flow data into a second passenger flow prediction model to obtain first estimated passenger flow data.
[0060] The second passenger flow prediction model is trained and obtained by the following method:
[0061] First, sample data is obtained, each of which corresponds to an existing urban rail station and includes second estimated passenger flow data, third estimated passenger flow data and actual passenger flow data of an urban rail station.
[0062] Secondly, the second estimated passenger flow data and the third estimated passenger flow data of each piece of the sample data are taken as input, and the actual passenger flow data is taken as output to train the convolutional neural network model.
[0063] Finally, the validation set is used to verify the convolutional neural network model obtained through training. When the output accuracy exceeds a preset value, the second passenger flow prediction model is obtained.
[0064] S2: Obtain the converted passenger flow data of the urban rail station to be built, and correct the first estimated passenger flow data to obtain the estimated passenger flow data.
[0065] Generally, when a city rail station is built, some residents who used to go to work by private car will choose to go to work by city rail, so this part of passenger flow can also be called conversion passenger flow data. The conversion passenger flow data is usually affected by the interest point data and residential community data within the centroid range.
[0066] Preferably, the data of points of interest and residential areas within the centroid range are input into a transition passenger flow prediction model, and the transition passenger flow data can be output.
[0067] The transformed passenger flow data is obtained by training in the following way:
[0068] First, the transformed passenger flow data of existing urban rail stations are used as training samples. In each of the training samples, the point of interest data and the residential area data are input, and the transformed passenger flow data is output.
[0069] Secondly, the POI data and residential area data are used as input, and the transformed passenger flow data is used as output to train a convolutional neural network model.
[0070] Finally, the validation set is used to verify the convolutional neural network model obtained through training, and when the output accuracy exceeds a preset value, the transition passenger flow prediction model is obtained.
[0071] Preferably, the estimated passenger flow data can be obtained by adding the first estimated passenger flow data and the converted passenger flow data.
[0072] S3: Obtain traffic influencing factors of the urban rail station to be built, and input the traffic influencing factors and the estimated passenger flow data into a first urban rail planning model to obtain a first urban rail planning solution.
[0073] The traffic influencing factors include urban rail information passing through the urban rail station to be built, point of interest data and residential community data around the urban rail station to be built, the urban rail information includes the transfer relationship between urban rail lines passing through the urban rail station to be built, and the transfer relationship specifically includes the number of lines passing through the urban rail station to be built and the line relationship with the largest transfer volume.
[0074] The first urban rail planning scheme includes the number of floors of urban rail stations, the connection methods between different floors, the number of exits, and the directions of the exits.
[0075] The first urban rail planning model is trained and obtained by the following method:
[0076] First, sample data is obtained, each of which includes urban rail information of a known urban rail station, surrounding point of interest data and residential community data, passenger flow data, and an urban rail planning scheme corresponding to the known urban rail station.
[0077] Secondly, the urban rail information, surrounding points of interest data, residential area data, and passenger flow data in the sample data are taken as input, and the corresponding urban rail planning scheme is taken as output to train a convolutional neural network model.
[0078] Finally, the validation set is used to verify the convolutional neural network model obtained through training. When the output accuracy exceeds a preset value, the first urban rail planning model is obtained.
[0079] For example, if there are three urban rail lines passing through the urban rail station to be built, and the most common situation is to transfer from line 1 to line 3, the buildings with large surrounding passenger flow are point of interest 1 and residential area 1, the relative coordinates of point of interest 1 and the urban rail station to be built are [a, b], and the relative coordinates of residential area 1 and the urban rail station to be built are [c, d]. Then the six-dimensional vector [3, lines 1 to 3, 2, [a, b], [c, d], estimated passenger flow data] is used as the input of the first urban rail planning model, where 3 represents the number of lines and 2 represents the number of buildings. Then the urban rail planning scheme output by the first urban rail planning model will include the connection methods between lines 1-3, the number of exits and the location of the exits, and the connection methods include elevators, escalators and stairs.
[0080] S4: Generate a BIM model according to the first urban rail planning scheme.
[0081] A preliminary BIM model can be automatically generated based on the number of floors of the urban rail stations in the first urban rail planning scheme, the connection methods between different floors, the number of exits, and the orientations of the exits.
[0082] Designers can optimize and adjust the implementation details based on the BIM model to form the final urban rail planning plan.
[0083] In another embodiment of the present application, a city rail smart building design system is also proposed, which is used to implement the above-mentioned city rail smart building design method.
[0084] The present application proposes a method and system for designing smart urban rail buildings. First, the first estimated passenger flow data of the urban rail station to be built is obtained, and then the converted passenger flow data of the urban rail station to be built is obtained, and the first estimated passenger flow data is corrected to obtain the estimated passenger flow data, and then the traffic influencing factors of the urban rail station to be built are obtained, and the traffic influencing factors and the estimated passenger flow data are input into the first urban rail planning model to obtain the first urban rail planning scheme, and finally a BIM model is generated according to the first urban rail planning scheme. Through the technical solution of the present application, the passenger flow can be estimated in combination with the characteristics of the urban rail line and the surrounding building complex connected to the urban rail station to be built, and the converted passenger flow from self-driving to urban rail travel is also considered, and the passenger flow of the urban rail station to be built is accurately estimated, and the planning scheme of the urban rail station to be built is obtained in combination with the planning scheme of the existing urban rail station, so that the final BIM model meets the actual needs, and greatly saves the labor cost of urban rail station planning and design, and improves the design efficiency.
[0085] The above description is only a preferred embodiment of the present invention, so all equivalent changes or modifications made according to the structure, characteristics and principles described in the scope of the patent application of the present invention are included in the scope of the patent application of the present invention.
Claims
1. A method for designing urban rail intelligent buildings, characterized in that: The method includes: S1: Obtain the first estimated passenger flow data of the urban rail station to be built; S2: Obtaining the converted passenger flow data of the urban rail station to be built, and correcting the first estimated passenger flow data to obtain estimated passenger flow data; S3: Obtaining traffic influencing factors of the urban rail station to be built, and inputting the traffic influencing factors and the estimated passenger flow data into a first urban rail planning model to obtain a first urban rail planning scheme; S4: Generate a BIM model according to the first urban rail planning scheme; The S1 comprises the following sub-steps: S11: Acquire all existing bus stops within the centroid range of the urban rail station to be built; S12: Calculate the overlap between the line where each of the existing bus stops is located and the line of the urban rail to be built, and take a number of the existing bus stops whose line overlap is less than an overlap threshold as a first bus stop set; S13: Acquire peak-hour card swiping data of each bus stop in the first bus stop set, and generate second estimated passenger flow data; S14: inputting the point of interest data and the residential area data within the centroid range into the first passenger flow prediction model to obtain third estimated passenger flow data; S15: inputting the second estimated passenger flow data and the third estimated passenger flow data into a second passenger flow prediction model to obtain first estimated passenger flow data; The point of interest data includes the type of point of interest and the scale of personnel within the centroid, the scale of personnel is the number of personnel that the point of interest can accommodate, the residential area data includes the number of residents, the age distribution of residents and the type distribution of residents within the centroid, the type distribution of residents is the distribution of occupations of residents; In S2, the data of points of interest and residential areas within the centroid range are input into a change passenger flow prediction model, and the change passenger flow data is output; wherein the change passenger flow data refers to the passenger flow that changes from private car travel to urban rail travel; The transition passenger flow prediction model is specifically trained in the following way: First, the transformed passenger flow data of existing urban rail stations are used as training samples. In each of the training samples, the data of points of interest and residential areas are used as inputs, and the transformed passenger flow data are used as outputs. Secondly, taking the POI data and residential area data as input and the transformed passenger flow data as output, training a convolutional neural network model; Finally, the convolutional neural network model obtained through training is verified using a verification set, and when the output accuracy exceeds a preset value, the transition passenger flow prediction model is obtained; In S3, the first urban rail planning model is trained and obtained by: First, sample data is obtained, each of which includes urban rail information of a known urban rail station, data of points of interest and residential areas around it, passenger flow data, and an urban rail planning scheme corresponding to the known urban rail station; Secondly, the urban rail information, surrounding points of interest data, residential area data, and passenger flow data in the sample data are used as input, and the corresponding urban rail planning scheme is used as output to train a convolutional neural network model; Finally, the convolutional neural network model obtained through training is verified using a verification set, and when the output accuracy exceeds a preset value, the first urban rail planning model is obtained; Among them, the traffic influencing factors include urban rail information passing through the urban rail station to be built, point of interest data and residential community data around the urban rail station to be built, the urban rail information includes the transfer relationship between urban rail lines passing through the urban rail station to be built, and the transfer relationship includes the number of lines passing through the urban rail station to be built and the line relationship with the largest transfer volume.
2. The urban rail intelligent building design method according to claim 1 is characterized in that: The correcting of the first estimated passenger flow data in S2 specifically includes: The first estimated passenger flow data and the converted passenger flow data are added to obtain the estimated passenger flow data.
3. The urban rail intelligent building design method according to claim 1 is characterized in that: The S12 further includes: The angle between the line to which the existing bus station belongs and the line to which the urban rail station to be built belongs is taken as the line overlap degree.
4. The urban rail intelligent building design method according to claim 3 is characterized in that: In S12, the overlap threshold is 30 degrees.
5. The urban rail intelligent building design method according to claim 4 is characterized in that: In S4, the first urban rail planning scheme includes the number of floors of urban rail stations, the connection method between different floors, the number of exits, and the orientation of the exits.