A railway T-beam prefabrication production mold
By adopting a hydraulic release system in the prefabricated production mold of railway T-beam, one-time synchronous release of prefabricated components of prefabricated bridges is solved, and the problems of low demolding efficiency and high labor intensity in the prior art are improved. Efficiency and quality.
Patent Information
- Application Number
- CN202410375238.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-03-29
AI Technical Summary
The existing railway T-beam slag retaining wall has low mold release efficiency, high labor intensity, and is prone to fatigue of workers, increasing construction safety hazards, and affecting production quality.
A railway T-beam prefabricated production mold is adopted, including side outer plates, substrates, cross beams and hydraulic mold release systems. The substrates and cross beams are driven to move around the circularly through the hydraulic cylinder to realize one-time synchronous mold release of the prefabricated components of the prefabricated bridges.
It improves the demolding efficiency and quality, reduces the dependence on manual labor, reduces the labor intensity of workers, ensures the quality stability of each railway T-beam slag retaining wall, and saves the space occupied.
Smart Images

Figure CN118305872B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a prefabricated production mould for railway T-beams. Background Art
[0002] The production of prefabricated components for assembled bridges is a modern method of bridge construction. It uses a factory-based production model to prefabricate bridge components in factories and then transport them to the site for assembly. Compared with the traditional on-site casting method, the production of prefabricated components can greatly improve production efficiency and save construction time. The production of prefabricated components for assembled bridges depends on formwork and mold technology. Through advanced formwork and mold technology, bridge components with regular shapes and precise dimensions can be produced to ensure the accuracy and consistency of the components.
[0003] Among them, the railway T-beam slag retaining wall, as one of the prefabricated components of the assembled bridge, is an important structure used in the construction of railway bridges. It is usually located on both sides of the railway bridge to prevent the slag, stones and other materials at the bottom of the bridge from falling onto the railway line, thereby ensuring the safety and smoothness of the railway line. Therefore, during the prefabrication of the railway T-beam slag retaining wall, an effective demoulding method can make the concrete fully hardened and the mold removed smoothly, avoiding surface damage or dimensional deformation of the railway T-beam slag retaining wall, increasing the difficulty of subsequent processing, and thus ensuring the quality and stability of the T-beam slag retaining wall.
[0004] However, in the prior art, when demoulding the railway T-beam slag retaining wall, a single piece manual disassembly method is often adopted, and the slag retaining wall template needs to be separately hoisted and placed in a designated position after each demoulding, and each time the slag retaining wall needs to be repositioned before prefabricated production. Therefore, the existing railway T-beam slag retaining wall demoulding technology requires a large amount of manpower input, including disassembly, hoisting and placement work, with high labor intensity, low demoulding efficiency, and easy to cause worker fatigue, increasing construction safety hazards; and production personnel may not be able to guarantee the position, horizontality and verticality of each slag retaining wall, resulting in low production quality. Summary of the invention
[0005] The problem to be solved by the invention is: how to improve the demoulding efficiency and quality of the railway T-beam slag retaining wall.
[0006] The present invention provides a prefabricated production mold for a railway T-beam, comprising: a side outer plate, a base plate, a crossbeam and a hydraulic demoulding system, wherein the base plate is arranged on the inner side of the side outer plate, and the base plate and the side outer plate have the same extension direction, and are respectively used to surround the inner and outer sides of the T-beam slag retaining wall, a plurality of the crossbeams are arranged at intervals in the extension direction of the base plate, one end of each of the crossbeams is fixedly connected to the top of the base plate, and the other end of each of the crossbeams is movably connected to the top of the side outer plate, and the hydraulic demoulding system comprises a hydraulic cylinder, and the hydraulic cylinder is used to drive the base plate and the crossbeam to perform circular motion around the movably connected end of the crossbeam.
[0007] The railway T-beam prefabrication production mold provided by the present invention has, compared with the prior art, the following beneficial effects but not limited to:
[0008] The railway T-beam prefabricated production mold described in the present invention ensures that the concrete is fully solidified in the mold before demoulding to achieve sufficient strength and stability, and generally waits according to the concrete design strength and solidification time. During demoulding, the hydraulic demoulding system is started, and appropriate force is applied by the hydraulic cylinder to push the base plate and the crossbeam around the movable connection end of the crossbeam to make a circular motion in the direction away from the slag retaining wall, so that the base plate is separated from the slag retaining wall. The mold closing process is similar to the demoulding process. The hydraulic demoulding system is started, and appropriate force is applied by the hydraulic cylinder to push the base plate and the crossbeam around the movable connection end of the crossbeam to make a circular motion in the direction close to the slag retaining wall, and finally the car is stopped at the designated position, and then the concrete is poured. Since the length of the side outer plate and the base plate is relatively long, the length is about 30 meters, so the number of hydraulic cylinders can be set at intervals according to the actual situation. In the process of mold closing and demoulding, it is only necessary to ensure the synchronization of the movement of multiple hydraulic cylinders, thereby realizing the one-time synchronous demoulding of the prefabricated components of the assembled bridge. Compared with the prior art, the railway T-beam prefabricated production mold of the present invention can accurately control the demoulding process, ensure the quality stability of each railway T-beam slag retaining wall after demoulding, help reduce possible damage or deformation during the demoulding process, and improve the consistency and quality of the product. The present technical solution does not require the cooperation of a crane, can achieve automated operation, accelerates the demoulding process, greatly improves production efficiency, and shortens the production cycle. The present technical solution does not require separate manual disassembly of the slag retaining wall formwork, reduces dependence on manual labor, and reduces the labor intensity of workers. The present technical solution does not require separate storage of the slag retaining wall formwork, and can be left suspended in the air, effectively saving floor space.
[0009] Optionally, the side outer plate includes an outer plate body, columns, and a first horizontal rib. The outer plate body is disposed opposite to the base plate and has the same extending direction. A plurality of the columns are disposed on a side of the outer plate body away from the base plate and are spaced apart in the extending direction of the outer plate body. The first horizontal rib is disposed between any two adjacent columns, and an end of the cross beam away from the base plate is movably connected to the first horizontal rib.
[0010] Optionally, a first hinge seat is disposed in the middle of the first horizontal rib, and an end of the cross beam away from the base plate is hinged to the first hinge seat.
[0011] Optionally, the side outer plate further includes a second horizontal rib. The second horizontal rib is disposed between any two adjacent columns and is located below the first horizontal rib. A second hinge seat is disposed on the second horizontal rib, and a third hinge seat is disposed on the cross beam. A fixed end of the hydraulic cylinder is hinged to the second hinge seat, and a telescopic end of the hydraulic cylinder is hinged to the third hinge seat. Hinge axes of the second hinge seat, the third hinge seat, and the first hinge seat are parallel.
[0012] Optionally, a cross section of the base plate has a C-shaped structure, which includes a top plate, a bottom plate, and an intermediate plate connecting the top plate and the bottom plate.
[0013] Optionally, a plurality of stiffening ribs are spaced between the top plate and the bottom plate.
[0014] Optionally, the hydraulic demolding system further includes a hydraulic pump, a hydraulic pipeline, and a control system. The hydraulic pipeline is connected between the hydraulic pump and the hydraulic cylinder. The hydraulic pump and the hydraulic cylinder are respectively electrically connected to the control system. The control system is configured to adjust the working pressure of the hydraulic pump and the working speed of the hydraulic cylinder.
[0015] Optionally, a displacement sensor is disposed in the hydraulic cylinder. The displacement sensor is electrically connected to the control system and is configured to measure a piston position of the hydraulic cylinder and feedback position information to the control system.
[0016] Optionally, a plurality of the hydraulic cylinders are provided. The plurality of hydraulic cylinders are spaced along the length direction of the base plate, and each of the hydraulic cylinders is respectively provided with the displacement sensor to achieve synchronization of movements of the plurality of hydraulic cylinders.
[0017] Optionally, the side outer plate has the same length as the base plate. Description of the Drawings
[0018] Figure 1It is a cross-sectional view of the overall structure of the railway T-beam prefabrication production mold according to an embodiment of the present invention;
[0019] Figure 2 It is a partial cross-sectional view of the mold-closing state of the railway T-beam prefabrication production mold according to an embodiment of the present invention;
[0020] Figure 3 It is a partial cross-sectional view of the demoulding state of the railway T-beam prefabrication production mold according to an embodiment of the present invention;
[0021] Figure 4 Schematic diagram of the structure of a substrate according to an embodiment of the present invention.
[0022] Description of reference numerals:
[0023] 1. Side outer plate; 11. Outer plate body; 111. Second articulated seat; 12. Column; 13. First horizontal rib plate; 131. First articulated seat; 14. Second horizontal rib plate; 2. Base plate; 21. Top plate; 22. Bottom plate; 23. Middle plate; 24. Stiffening rib; 3. Cross beam; 31. Third articulated seat; 4. Hydraulic cylinder. DETAILED DESCRIPTION
[0024] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0025] In the description of the present invention, the directions or positional relationships indicated by “up”, “down”, “left”, “right”, “top”, “bottom”, “front”, “back”, “inside” and “outside” are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention. They do not indicate or imply that the device referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limiting the scope of protection of the present invention.
[0026] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0027] In the description of this specification, the description with reference to the terms "embodiment", "one embodiment" and "one implementation" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or implementation are included in at least one embodiment or implementation of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or implementation. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or implementations in a suitable manner.
[0028] Moreover, the Z-axis in the accompanying drawings represents the vertical direction, that is, the up and down position, and the positive direction of the Z-axis (that is, the direction of the arrow of the Z-axis) represents the top, and the negative direction of the Z-axis (that is, the direction opposite to the positive direction of the Z-axis) represents the bottom; the X-axis in the accompanying drawings represents the horizontal direction, that is, the left and right position, and the positive direction of the X-axis (that is, the direction of the arrow of the X-axis) represents the left, and the negative direction of the X-axis (that is, the direction opposite to the positive direction of the X-axis) represents the right.
[0029] It should also be noted that the aforementioned Z-axis and X-axis are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention.
[0030] like Figures 1 to 3 As shown, the prefabricated production mold for railway T-beams of an embodiment of the present invention includes: side outer plates 1, base plates 2, cross beams 3 and a hydraulic demoulding system, wherein the base plates 2 are arranged on the inner side of the side outer plates 1, and the extension direction of the base plates 2 is the same as that of the side outer plates 1, and they are respectively used to surround the inner and outer sides of the T-beam slag retaining wall, and a plurality of cross beams 3 are arranged at intervals in the extension direction of the base plates 2, one end of each of the cross beams 3 is fixedly connected to the top of the base plates 2, and the other end of each of the cross beams 3 is movably connected to the top of the side outer plates 1, and the hydraulic demoulding system includes a hydraulic cylinder 4, and the hydraulic cylinder 4 is used to drive the base plates 2 and the cross beams 3 to perform circular motion around the movably connected end of the cross beams 3.
[0031] In this embodiment, combined with the attached Figure 1 and Figure 2 and attached Figure 3 As shown, before demoulding, ensure that the concrete is fully solidified in the mold to achieve sufficient strength and stability. Generally, the waiting time is based on the concrete design strength and solidification time. Figure 1As shown, the T-beam prefabricated production mold includes two symmetrically arranged side outer panels 1, which surround both sides of the T-beam. The T-beam slag retaining wall is a raised structure above the horizontal edges of the T-beam. The side outer panels 1 are fitted with the outer side surfaces of the T-beam. The side outer panels 1 include both partial plates fitted with the vertical and horizontal parts of the T-beam and partial plates fitted with the slag retaining wall. The partial plates of the side outer panels 1 fitted with the slag retaining wall and the base plate 2 are relatively arranged, and the two are respectively used to fit the outer side and the inner side of the slag retaining wall for mold closing of the slag retaining wall.
[0032] Specifically, in the railway T-beam prefabricated production mold of this embodiment, when demolding, the hydraulic demolding system is started, and appropriate force is applied through the hydraulic oil cylinder 4 to push the base plate 2 and the cross beam 3 to make a circular motion around the movable connection end of the cross beam 3 in a direction away from the slag retaining wall, so as to separate the base plate 2 from the slag retaining wall. The mold closing process is similar to the demolding process. The hydraulic demolding system is started, and appropriate force is applied through the hydraulic oil cylinder 4 to push the base plate 2 and the cross beam 3 to make a circular motion around the movable connection end of the cross beam 3 in a direction close to the slag retaining wall, and finally stop at a specified position (for example, the cross beam 3 is attached to the Figure 2 The horizontal state in the Figure 3 The vertical state in the middle), and then the concrete is poured. Since the length of the railway T-beam formwork and the slag retaining wall formwork is relatively long, about 30 meters in length, the number of hydraulic cylinders 4 can be arranged at intervals according to the actual situation. During the mold closing and demoulding process, it is only necessary to ensure the synchronization of the movement of multiple hydraulic cylinders 4, thereby realizing the one-time synchronous demoulding of the prefabricated components of the assembled bridge. Compared with the prior art, the railway T-beam prefabricated production mold of the present invention can accurately control the demoulding process, ensure the quality stability of each railway T-beam slag retaining wall after demoulding, help reduce the damage or deformation that may occur during the demoulding process, and improve the consistency and quality of the product. The present technical solution does not require the cooperation of a crane, can realize automated operation, speed up the demoulding process, greatly improve production efficiency, and shorten the production cycle. The present technical solution does not require manual disassembly of the slag retaining wall formwork separately, reduces the dependence on manual labor, and reduces the labor intensity of workers. The present technical solution does not require the slag retaining wall formwork to be stored separately, and can be suspended in the air, which effectively saves floor space.
[0033] It should be noted that the railway T-beam prefabrication production mold (prefabricated bridge prefabricated component production mold) is a tool or mold used to produce prefabricated components. They are manufactured according to design requirements and component specifications and are key equipment for producing various prefabricated bridge prefabricated components in factories or prefabrication sites. The railway T-beam slag retaining wall is a wall structure used to prevent debris, gravel, soil, etc. from falling from structures such as bridges or viaducts onto the railway line. It helps to keep the railway line clean and safe.
[0034] Optionally, the side outer panel 1 includes an outer panel body 11, columns 12 and a first horizontal rib 13. The outer panel body 11 is arranged opposite to the base plate 2 and have the same extension direction. A plurality of columns 12 are arranged on the side of the outer panel body 11 away from the base plate 2 and are spaced apart in the extension direction of the outer panel body 11. The first horizontal rib 13 is arranged between any two adjacent columns 12, and the end of the cross beam 3 away from the base plate 2 is movably connected to the first horizontal rib 13.
[0035] In this embodiment, combined with the attached Figure 1 As shown, the column 12 is a long columnar structure, extending in the length direction of the outer plate body 11 (perpendicular to the attached Figure 2 In the X-axis direction), a plurality of columns 12 are arranged at intervals on the side of the outer panel body 11 away from the base plate 2. The bending structure on the right side of the column 12 is the outer panel body 11. The upper part of the column 12 can be connected to the outer panel body 11 by welding, and the column 12 and the outer panel body 11 can be connected to each other by a horizontal beam to enhance the structural strength between the two. Figure 2 As shown, the position between the upper vertical section of the outer plate body 11 and the base plate 2 is the casting position of the slag retaining wall. The first horizontal rib 13 can be connected between any two adjacent columns 12 by welding or bolting. The end of the cross beam 3 away from the base plate 2 (attached Figure 2 The first horizontal ribs 13 are movably connected to the first horizontal ribs 13 in the positive direction of the middle X axis. The number of the first horizontal ribs 13 is the same as the number of the cross beams 3.
[0036] Optionally, a first hinge seat 131 is provided in the middle of the first horizontal rib 13 , and an end of the crossbeam 3 away from the base plate 2 is hinged to the first hinge seat 131 .
[0037] In this embodiment, combined with the attached Figure 1 and attached Figure 2 As shown, a first hinge seat 131 is provided in the middle of the first horizontal rib 13, and the end of the beam 3 away from the base plate 2 is hinged to the first hinge seat 131, so that the base plate 2 and the beam 3 can make circular motion around the movable connection end of the beam 3 (the first hinge seat 131) in the direction close to or away from the slag retaining wall.
[0038] Optionally, the side outer plate 1 further includes a second horizontal rib 14, which is disposed between any two adjacent columns 12, and the second horizontal rib 14 is located below the first horizontal rib 13. A second hinge seat 111 is provided on the second horizontal rib 14, and a third hinge seat 31 is provided on the cross beam 3. The fixed end of the hydraulic cylinder 4 is hinged to the second hinge seat 111, and the telescopic end of the hydraulic cylinder 4 is hinged to the third hinge seat 31. The hinge axes of the second hinge seat 111, the third hinge seat 31, and the first hinge seat 131 are parallel.
[0039] In this embodiment, in combination with the attached Figure 2 and the attached Figure 3 As shown, the second horizontal rib 14 can be connected between any two adjacent columns 12 by welding or bolting. The second horizontal rib 14 and the first horizontal rib 13 are not coaxially arranged. A second hinge seat 111 is correspondingly provided at the middle position of each second horizontal rib 14. The fixed end of the hydraulic cylinder 4 can be hinged to the second hinge seat 111, and a third hinge seat 31 is provided on the cross beam 3. The telescopic end of the hydraulic cylinder 4 can be hinged to the third hinge seat 31. In this way, by the telescopic movement of the hydraulic cylinder 4, the substrate 2 and the cross beam 3 can be pushed to perform a circular motion around the movable connection end of the cross beam in a direction close to or away from the slag retaining wall. The number of hydraulic cylinders 4 is the same as that of the second horizontal ribs 14.
[0040] Optionally, the cross section of the substrate 2 is in a U-shaped structure, which includes a top plate 21, a bottom plate 22, and an intermediate plate 23 connecting between the top plate 21 and the bottom plate 22.
[0041] In this embodiment, in combination with the attached Figure 4 As shown, the cross section of the substrate 2 is in a U-shaped structure, including a top plate 21, a bottom plate 22, and an intermediate plate 23 connecting between the top plate 21 and the bottom plate 22. One side of the intermediate plate 23 facing away from the top plate 21 and the bottom plate 22 is used to abut against the slag retaining wall.
[0042] Optionally, a plurality of stiffening ribs 24 are spaced between the top plate 21 and the bottom plate 22.
[0043] In this embodiment, since the overall length of the substrate 2 is relatively long, by spacing a plurality of stiffening ribs 24 between the top plate 21 and the bottom plate 22, the overall structural strength of the substrate 2 can be enhanced.
[0044] Optionally, the hydraulic demoulding system further includes a hydraulic pump, a hydraulic pipeline, and a control system. The hydraulic pipeline is connected between the hydraulic pump and the hydraulic cylinder 4. The hydraulic pump and the hydraulic cylinder 4 are respectively electrically connected to the control system. The control system is used to adjust the working pressure of the hydraulic pump and the working speed of the hydraulic cylinder 4.
[0045] In this embodiment, the control system includes an electrical control installation analog module and a PLC (programmable logic controller), wherein the installation of the analog module can realize the monitoring and control of analog signals in the electrical control system. The analog module is usually used to measure and control continuously changing physical quantities such as temperature, pressure, flow, etc., so as to realize the monitoring and control of analog signals in the electrical control system. The hydraulic pipeline is connected between the hydraulic pump and the hydraulic cylinder 4, and the working pressure of the hydraulic pump and the working speed of the hydraulic cylinder 4 can be adjusted through the control system.
[0046] Optionally, a displacement sensor is provided in the hydraulic cylinder 4 , and the displacement sensor is electrically connected to the control system to measure the piston position of the hydraulic cylinder 4 and feed back the position information to the control system.
[0047] There are multiple hydraulic cylinders 4 , which are spaced apart along the length direction of the base plate 2 , and each hydraulic cylinder 4 is provided with a displacement sensor to achieve synchronization of the movements of the multiple hydraulic cylinders 4 .
[0048] In this embodiment, the displacement sensor disposed inside the hydraulic cylinder 4 is used to measure the piston position of the hydraulic cylinder 4 and feed back the position information to the control system. The displacement sensor is connected to the control system, and the control system can be based on a PLC (programmable logic controller) or other automatic control equipment to monitor and control the movement of the hydraulic cylinder. When the control system receives the signal from the displacement sensor, it adjusts the working parameters of the hydraulic system according to the preset control logic, controls the working state of each hydraulic cylinder 4, and makes them move at the same speed and amplitude. The control system continuously receives feedback information from the displacement sensor and makes adjustments according to the real-time position data to ensure that all hydraulic cylinders 4 always keep synchronous movement, thereby realizing the one-time synchronous demoulding of the prefabricated components of the assembled bridge.
[0049] Optionally, the side outer panel 1 and the base panel 2 have the same length.
[0050] In this embodiment, the side outer plate 1 and the base plate 2 have the same and fixed length, for example, 32.6 meters. It should be noted that the length value is not limited.
[0051] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features.
[0052] Although the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.
Claims
1. A railway T-beam prefabrication production mold, characterized in that: Including: Side outer plate (1), base plate (2), cross beam (3) and hydraulic demoulding system. The base plate (2) is arranged inside the side outer plate (1), and the base plate (2) has the same extension direction as the side outer plate (1), and is respectively used to surround the inner and outer sides of the T-beam slag retaining wall. A plurality of the cross beams (3) are arranged at intervals in the extension direction of the base plate (2). One end of each cross beam (3) is fixedly connected to the top of the base plate (2), and the other end of each cross beam (3) is movably connected to the top of the side outer plate (1). The hydraulic demoulding system includes a hydraulic cylinder (4), and the hydraulic cylinder (4) is used to drive the base plate (2) and the cross beam (3) to make a circular motion around the movable connection end of the cross beam (3); The side outer plate (1) includes an outer plate body (11), columns (12) and first horizontal rib plates (13). The outer plate body (11) is arranged opposite to the base plate (2) and has the same extension direction. A plurality of the columns (12) are arranged on the side of the outer plate body (11) away from the base plate (2) and are arranged at intervals in the extension direction of the outer plate body (11). The first horizontal rib plate (13) is arranged between any two adjacent columns (12). The end of the cross beam (3) away from the base plate (2) is movably connected to the first horizontal rib plate (13); A first hinge seat (131) is arranged in the middle of the first horizontal rib plate (13), and the end of the cross beam (3) away from the base plate (2) is hinged to the first hinge seat (131); The side outer plate (1) further includes a second horizontal rib plate (14). The second horizontal rib plate (14) is arranged between any two adjacent columns (12), and the second horizontal rib plate (14) is located below the first horizontal rib plate (13). A second hinge seat (111) is arranged on the second horizontal rib plate (14), a third hinge seat (31) is arranged on the cross beam (3), the fixed end of the hydraulic cylinder (4) is hinged to the second hinge seat (111), the telescopic end of the hydraulic cylinder (4) is hinged to the third hinge seat (31), and the hinge axes of the second hinge seat (111), the third hinge seat (31) and the first hinge seat (131) are parallel.
2. The railway T-beam prefabrication production mold according to claim 1 is characterized in that: The cross section of the base plate (2) is in a U-shaped structure, which includes a top plate (21), a bottom plate (22) and an intermediate plate (23) connected between the top plate (21) and the bottom plate (22).
3. The railway T-beam prefabrication production mold according to claim 2 is characterized in that: A plurality of stiffening ribs (24) are arranged at intervals between the top plate (21) and the bottom plate (22).
4. The railway T-beam prefabrication production mold according to claim 1 is characterized in that: The hydraulic demoulding system further includes a hydraulic pump, a hydraulic pipeline and a control system. The hydraulic pipeline is connected between the hydraulic pump and the hydraulic cylinder (4). The hydraulic pump is electrically connected to the control system, and the control system is used to adjust the working pressure of the hydraulic pump.
5. The railway T-beam prefabrication production mold according to claim 4 is characterized in that: A displacement sensor is arranged inside the hydraulic cylinder (4). The displacement sensor is electrically connected to the control system and is used to measure the piston position of the hydraulic cylinder (4) and feed back the position information to the control system.
6. The railway T-beam prefabrication production mold according to claim 5 is characterized in that: A plurality of the hydraulic cylinders (4) are provided, and the plurality of the hydraulic cylinders (4) are arranged at intervals along the length direction of the base plate (2), and each of the hydraulic cylinders (4) is provided with a displacement sensor, so as to achieve synchronization of the movement of the plurality of the hydraulic cylinders (4).
7. The railway T-beam prefabrication production mold according to claim 5, characterized in that: The side outer plate (1) and the base plate (2) have the same length.
Citation Information
Patent Citations
Automatic control system of adjustment curve radius's flexible prestressed concrete beam template
CN204844465U
Cast -in -place platform truck of railway T roof beam sound barrier beam slab
CN207512629U
Novel railway T-beam ballast retaining wall formwork
CN215150151U