A mine-use measurement system and method
By using piston cylinder buffer structure, acceleration sleeve and spiral sheet in the mining drilling measurement system to improve the medium flow rate, fan blades and plug-in pipes to optimize airflow uniformity, and electrode materials adjust temperature difference, high-temperature and high-pressure vibration during drilling is solved. The impact on the system extends the system life and improves efficiency.
Patent Information
- Application Number
- CN202410476168.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-04-19
AI Technical Summary
The mining drilling measurement system is affected by high temperature, pressure and vibration during the drilling process, resulting in accelerated mechanical wear and reducing system stability and service life.
A mining drilling measurement system is designed, using a piston cylinder and a buffer spring structure to buffer impact force, and the media flow rate and impact force are increased by accelerating the sleeve and spiral sheet, and the fan blade and plug-in pipe are used to ensure air flow uniformity, combining with external semiconductors and internal semiconductor electrode materials adjust temperature difference and optimize dielectric flow and temperature uniformity.
It effectively reduces mechanical wear, improves the cooling efficiency and cutting ability of the medium, ensures gas flow efficiency and temperature uniformity, and extends the service life of the system.
Smart Images

Figure CN118309414B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of mining systems, and in particular to a mining measurement while drilling system and method. Background Art
[0002] MWD for mining is a kind of measuring equipment used in mines or drilling operations, mainly used to measure the properties, geological characteristics, rock thickness, ore grade and other related information of underground mineral deposits. This device is usually installed near the drill bit of the drill pipe. By lowering it into the wellbore or wellbore for measurement, it can obtain the physical data of the wellbore, such as temperature, pressure, flow rate, rock density, etc., and convert these data into readable information through sensors and instruments. MWD for mining mainly includes measuring sensors, data acquisition systems and data analysis software. Measuring sensors can be selected according to needs, such as pressure sensors, temperature sensors, gravity sensors, magnetic sensors, etc. The data acquisition system is responsible for receiving the data from the sensors and transmitting it to the data analysis software for processing and interpretation. The main purpose of the MWD for mining is to provide geological information and azimuth angle information underground, so that the constructors can make timely decisions to optimize the drilling and blasting plans, improve mining efficiency, and provide data support for mine planning and development.
[0003] At present, during the operation of a mine measurement while drilling system, due to the depth of the borehole, the mine measurement while drilling system needs to withstand high temperature, pressure, vibration and other influences, which will accelerate the mechanical wear of the instrument and reduce the stability and service life of the system. Based on this, a mine measurement while drilling system and method are proposed. Summary of the invention
[0004] The purpose of the present invention is to solve the problem in the prior art that due to the depth of the borehole, the mining measurement while drilling system needs to withstand the influence of higher temperature, pressure and vibration, which will accelerate the mechanical wear of the instrument and reduce the stability and service life of the system, and to propose a mining measurement while drilling system and method.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A mining measurement while drilling system comprises a measuring tube and a measuring sleeve, and also comprises: a piston cylinder fixedly connected between the measuring tube and the measuring sleeve, a piston plate being slidably connected inside the piston cylinder, a buffer spring and a buffer rod being fixedly connected on both sides of the piston plate, a buffer sleeve being fixedly connected at one end of the buffer rod away from the piston plate, and the buffer sleeve being fixedly connected to the measuring sleeve, wherein the buffer spring is fixedly connected inside the piston cylinder, the buffer rod passes through the measuring sleeve and is slidably connected to the measuring sleeve; and a fan blade arranged between the measuring tube and the measuring sleeve.
[0007] In order to accelerate the flow rate of the medium flowing inside the measuring tube, increase the impact force of the medium, prevent the drill bit from being blocked, affect the cooling efficiency of the medium on the drill bit, and the medium's ability to carry cuttings, preferably, it also includes a motor installed on the inner wall of the measuring sleeve, the output end of the motor is fixedly connected to a rotating shaft, and the end of the rotating shaft away from the motor is fixedly connected to a transmission gear, wherein an installation groove is opened inside the measuring tube, an accelerating sleeve is rotatably connected in the installation groove, a spiral piece is installed in the accelerating sleeve, the outer wall of the accelerating sleeve is fixedly connected to a gear ring, the gear ring is meshed with the transmission gear, the top of the spiral piece is fixedly connected to the top of the inner wall of the accelerating sleeve, and the rotating shaft passes through the measuring tube and is rotatably connected to the measuring tube.
[0008] In order to make the fan blades rotate and allow air to circulate between the partitions, ensure the uniformity of temperature between the measuring tube and the measuring sleeve, prevent heat from accumulating between the detector and the sensor, and affect the service life of the detector and the sensor, further, it also includes a fixed frame fixedly connected between the measuring tube and the measuring sleeve, a transmission shaft is rotatably connected to the fixed frame, a second bevel gear is fixedly connected to the top of the transmission shaft, a plug-in rod is fixedly connected to the bottom of the transmission shaft, a plug-in tube is plugged into the plug-in rod, wherein a first bevel gear is fixedly connected to the rotating shaft, the first bevel gear is meshed with the second bevel gear, and the fan blades are mounted on the plug-in tube.
[0009] In order to adjust the distance between the spiral sheets, the impact force of the medium is in a changing state, thereby making the force of the medium impacting the blockage in a changing state, so that the blockage can shake under the action of the changing impact force, thereby facilitating the discharge of the blockage. Furthermore, it also includes a sliding bin fixedly connected to the inner wall of the measuring tube, a slide plate is slidably connected in the sliding bin, a return spring is fixedly connected to the bottom of the slide plate, a lifting rod is fixedly connected to the top of the slide plate, and an adjusting ring is fixedly connected to the top of the lifting rod, wherein the return spring is fixedly connected to the inner top of the sliding bin, the lifting rod passes through the top of the sliding bin and is slidably connected to the sliding bin, the adjusting ring is slidably connected in the acceleration sleeve, and the bottom of the spiral sheet is rotatably connected to the top of the adjusting ring.
[0010] In order to enable the fan blades to move up and down, increase the uniformity of the airflow between the measuring tube and the measuring sleeve, help eliminate airflow dead corners, and improve the gas flow efficiency in the measuring tube and the measuring sleeve, and further include an exhaust pipe fixedly connected to the top of the piston cylinder, one side of the exhaust pipe is fixedly connected to a first air injection pipe, the other side of the exhaust pipe is fixedly connected to a second air injection pipe, the end of the second air injection pipe away from the exhaust pipe is fixedly connected to a fixed sleeve, a connecting plate is slidably connected in the fixed sleeve, wherein the first air injection pipe is communicated with the sliding bin.
[0011] Furthermore, the top of the connecting plate is rotatably connected to the bottom of the plug-in tube, the plug-in tube is slidably connected to the fixed sleeve, and the fixed sleeve is fixedly connected between the measuring tube and the measuring sleeve.
[0012] In order to generate electricity according to the temperature difference between the inside and outside of the measuring system, it further includes an external semiconductor electrode material installed on the inner wall of the measuring sleeve, and the side of the external semiconductor electrode material away from the measuring sleeve is fixedly connected to an electrode column, and the end of the electrode column away from the external semiconductor electrode material is fixedly connected to an internal semiconductor electrode material, and the internal semiconductor electrode material is installed on the measuring tube.
[0013] Preferably, a partition is fixedly connected between the measuring tube and the measuring sleeve, and the inner wall of the measuring sleeve is installed with a first detector, a second detector, a first sensor and a second sensor, two partitions are arranged between the first detector and the second detector, two partitions are arranged between the second detector and the first sensor, two partitions are arranged between the first sensor and the second sensor, and two partitions are arranged between the first detector and the second sensor.
[0014] Preferably, the measuring tube and the measuring sleeve are connected by threads, the top of the measuring tube is fixedly connected with a screw joint for connecting a drill rod, and the bottom of the measuring tube is provided with a screw groove for connecting a drill bit.
[0015] A method for using a mining measurement while drilling system comprises the following steps:
[0016] Step 1: Install the measurement system between the drill bit and the drill rod;
[0017] Step 2: Drilling with a drill bit and a drill rod;
[0018] Step 3: During the drilling process, the measurement system is used to measure the resistivity of the formation, the gravity acceleration of the formation, the geological parameters of the formation, and the changes in the earth's magnetic field;
[0019] Step 4: Send the measured data to the orifice explosion-proof computer, which will calculate, process and analyze it through the measurement system of the explosion-proof computer.
[0020] Compared with the prior art, the present invention provides a mining measurement while drilling system and method, which has the following beneficial effects:
[0021] 1. The mining measurement while drilling system, through the reciprocating sliding of the piston plate in the piston cylinder, can buffer the impact force on the measurement system on the one hand, reduce the mechanical wear of the measurement system, and ensure the stability and service life of the measurement system; on the other hand, it can change the distance between the spiral pieces, so that the flow rate of the medium is in a changing state, thereby making the impact force of the medium on the blockage in the drill bit in a changing state. The impact force in the changing state can cause irregular impact on the blockage, thereby increasing the probability of flushing it open, preventing the blockage of the drill bit, affecting the cooling efficiency of the medium on the measurement system, and thus reducing the temperature of the measurement system during operation.
[0022] 2. The mining measurement while drilling system increases the circulation speed of the medium inside the measuring tube by accelerating the sleeve to drive the spiral blade to rotate, thereby increasing the impact force of the medium, improving the cooling efficiency of the medium on the drill bit, and increasing the ability of the medium to carry cuttings, thereby improving the drilling efficiency.
[0023] 3. The mining measurement while drilling system can ensure the circulation efficiency of the gas inside the measuring tube and the measuring sleeve by sliding the plug-in tube up and down along the plug-in rod and rotating the fan blades. At the same time, due to the up and down sliding of the plug-in tube on the plug-in rod, the fan blades produce a more uniform airflow distribution, which helps to eliminate airflow dead angles and improve the flow efficiency of the gas in the measuring tube and the measuring sleeve, thereby ensuring the uniformity of the internal temperature of the measuring tube and the measuring sleeve, preventing heat from accumulating between the detector and the sensor, and affecting the service life of the detector and the sensor. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 A schematic diagram of the three-dimensional structure of a mining measurement while drilling system proposed by the present invention;
[0025] Figure 2 A schematic diagram of a three-dimensional partially cutaway structure of a mining measurement while drilling system proposed by the present invention;
[0026] Figure 3 This is a schematic diagram of the front middle section structure of a mining measurement while drilling system proposed by the present invention;
[0027] Figure 4 A mine-use measurement while drilling system proposed by the present invention Figure 3 The enlarged structural diagram at A in the middle;
[0028] Figure 5 A mine-use measurement while drilling system proposed by the present invention Figure 3 The enlarged structural diagram at B in the middle;
[0029] Figure 6 A schematic diagram of a partial three-dimensional structure of a mine-use measurement while drilling system proposed by the present invention;
[0030] Figure 7 A schematic diagram of the three-dimensional structure of a partition of a mine-use measurement while drilling system proposed by the present invention;
[0031] Figure 8 This is a schematic diagram of the cross-section structure of the top of an electrode column of a mining measurement while drilling system proposed by the present invention;
[0032] Fig. 9 The present invention is a schematic diagram of the middle section structure of a mining measurement while drilling system.
[0033] In the figure: 1, measuring tube; 2, measuring sleeve; 3, screw joint; 4, screw groove; 5, outer semiconductor electrode material; 6, electrode column; 7, inner semiconductor electrode material; 8, partition; 9, first detector; 10, second detector; 11, first sensor; 12, second sensor; 13, motor; 14, rotating shaft; 15, transmission gear; 16, gear ring; 17, accelerating sleeve; 18, spiral sheet; 19, first bevel gear; 20, second bevel gear; 21, transmission shaft; 22, plug-in rod; 23, plug-in tube; 24, fan blade; 25, fixing frame; 26, fixing sleeve; 27, connecting plate; 28, piston cylinder; 29, piston plate; 30, buffer spring; 31, buffer rod; 32, buffer sleeve; 33, exhaust pipe; 34, first gas injection pipe; 35, second gas injection pipe; 36, sliding bin; 37, sliding plate; 38, reset spring; 39, lifting rod; 40, adjusting ring. DETAILED DESCRIPTION
[0034] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0035] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Example
[0036] Reference Figure 1-Figure 3 , Figure 7-Figure 9A mining measurement while drilling system comprises a measuring tube 1 and a measuring sleeve 2, wherein a partition 8 is fixedly connected between the measuring tube 1 and the measuring sleeve 2, a first detector 9, a second detector 10, a first sensor 11 and a second sensor 12 are installed on the inner wall of the measuring sleeve 2, two partitions 8 are arranged between the first detector 9 and the second detector 10, two partitions 8 are arranged between the second detector 10 and the first sensor 11, two partitions 8 are arranged between the first sensor 11 and the second sensor 12, and two partitions 8 are arranged between the first detector 9 and the second sensor 12. The measuring tube 1 and the measuring sleeve 2 are connected by threads, a screw joint 3 is fixedly connected to the top of the measuring tube 1 for connecting a drill rod, and a screw groove 4 is provided at the bottom of the measuring tube 1 for connecting a drill bit.
[0037] When in use, firstly, the measuring sleeve 2 is fixedly connected to the measuring tube 1 by threads, and then the measuring tube 1 is fixedly connected to the drill rod by the screw joint 3, and then the drill bit can be threadedly connected to the screw groove 4, and then drilling can be carried out. During the drilling process, the circulating medium in the drill rod flows out through the measuring tube 1 and is released by the drill bit. Through the first detector 9, the second detector 10, the first sensor 11 and the second sensor 12 (the first detector 9 is a resistivity detector, the second detector 10 is a magnetic field detector, the first sensor 11 is a pressure sensor and the second sensor 12 is a gravity sensor), the resistivity of the formation, the change of the earth's magnetic field, the geological parameters of the formation and the gravity acceleration of the formation are measured, and the measured data are sent to the central control system for analysis.
[0038] Reference Figure 2 , Figure 3 , Figure 7 , Figure 8 , and also includes an outer semiconductor electrode material 5 installed on the inner wall of the measuring sleeve 2, the side of the outer semiconductor electrode material 5 away from the measuring sleeve 2 is fixedly connected to an electrode column 6, the end of the electrode column 6 away from the outer semiconductor electrode material 5 is fixedly connected to an inner semiconductor electrode material 7, the inner semiconductor electrode material 7 is installed on the measuring tube 1, and the power generation device composed of the outer semiconductor electrode material 5, the electrode column 6 and the inner semiconductor electrode material 7 is used to power the motor 13, the first detector 9, the second detector 10, the first sensor 11 and the second sensor 12.
[0039] As the drilling goes deeper, there will be a temperature difference between the measuring sleeve 2 and the measuring tube 1. At this time, the outer semiconductor electrode material 5 and the inner semiconductor electrode material 7 generate electricity under the action of the temperature difference, which is used by the power supply machine 13, the first detector 9, the second detector 10, the first sensor 11 and the second sensor 12. At the same time, the temperature between the measuring tube 1 and the measuring sleeve 2 is improved, making the temperature between the measuring tube 1 and the measuring sleeve 2 more uniform.
[0040] Reference Figure 1-Figure 9, also includes: a piston cylinder 28 fixedly connected between the measuring tube 1 and the measuring sleeve 2, a piston plate 29 slidably connected in the piston cylinder 28, a buffer spring 30 and a buffer rod 31 are fixedly connected on both sides of the piston plate 29, a buffer sleeve 32 is fixedly connected to the end of the buffer rod 31 away from the piston plate 29, and the buffer sleeve 32 is fixedly connected to the measuring sleeve 2, wherein the buffer spring 30 is fixedly connected in the piston cylinder 28, the buffer rod 31 passes through the measuring sleeve 2 and is slidably connected to the measuring sleeve 2, and also includes an exhaust pipe 33 fixedly connected to the top of the piston cylinder 28, one side of the exhaust pipe 33 is fixedly connected to the first gas injection pipe 34, and the other side of the exhaust pipe 33 is fixedly connected to the second gas injection pipe 35.
[0041] During the drilling process, the measurement system may collide with the inner wall of the well. At this time, the impact force is buffered by the buffer sleeve 32, the buffer rod 31, the piston plate 29 and the buffer spring 30. During the impact buffering process, the piston plate 29 will slide back and forth along the inner wall of the piston cylinder 28, and the airflow will be discharged into the exhaust pipe 33, and then divided into the first air injection pipe 34 and the second air injection pipe 35, and the gas in the first air injection pipe 34 and the second air injection pipe 35 will be extracted through the exhaust pipe 33;
[0042] The impact force on the measuring system is buffered, the mechanical wear of the measuring system is reduced, and the stability and service life of the measuring system are ensured.
[0043] Reference Figure 2 , Figure 3 , Figure 6 , Figure 7 , and also includes a motor 13 installed on the inner wall of the measuring sleeve 2, the output end of the motor 13 is fixedly connected to a rotating shaft 14, and the end of the rotating shaft 14 away from the motor 13 is fixedly connected to a transmission gear 15, wherein an installation groove is opened inside the measuring tube 1, and an accelerating sleeve 17 is rotatably connected in the installation groove, and a spiral piece 18 is installed in the accelerating sleeve 17, and a gear ring 16 is fixedly connected to the outer wall of the accelerating sleeve 17, and the gear ring 16 is meshed with the transmission gear 15, and the top of the spiral piece 18 is fixedly connected to the top of the inner wall of the accelerating sleeve 17, and the rotating shaft 14 passes through the measuring tube 1 and is rotatably connected to the measuring tube 1.
[0044] During the drilling process, the motor 13 is started so that the rotating shaft 14 drives the gear ring 16 to rotate through the transmission gear 15, thereby causing the acceleration sleeve 17 to rotate along the installation groove, causing the spiral piece 18 to rotate, thereby accelerating the flow rate of the medium;
[0045] The impact force of the medium is increased, the cooling efficiency of the medium on the drill bit is improved, and the ability of the medium to carry cuttings is increased, thereby improving the efficiency of drilling.
[0046] Reference Figure 2-Figure 7, and also includes a fixing frame 25 fixedly connected between the measuring tube 1 and the measuring sleeve 2, a transmission shaft 21 is rotatably connected to the fixing frame 25, a second bevel gear 20 is fixedly connected to the top of the transmission shaft 21, a plug-in rod 22 is fixedly connected to the bottom of the transmission shaft 21, a plug-in tube 23 is plugged into the plug-in rod 22, wherein a first bevel gear 19 is fixedly connected to the rotating shaft 14, and the first bevel gear 19 is meshed with the second bevel gear 20; a fan blade 24 is arranged between the measuring tube 1 and the measuring sleeve 2, the fan blade 24 is installed on the plug-in tube 23, the top of the connecting disk 27 is rotatably connected to the bottom of the plug-in tube 23, the end of the second gas injection pipe 35 away from the exhaust pipe 33 is fixedly connected to a fixing sleeve 26, a connecting disk 27 is slidably connected in the fixing sleeve 26, the plug-in tube 23 is slidably connected to the fixing sleeve 26, and the fixing sleeve 26 is fixedly connected between the measuring tube 1 and the measuring sleeve 2.
[0047] When the rotating shaft 14 is working, the second bevel gear 20 will be driven to rotate through the first bevel gear 19, and then the transmission shaft 21 will drive the fan blades 24 to rotate through the plug rod 22 and the plug tube 23, so that the fan blades 24 draw the gas at the top between the partitions 8 into the bottom, so that the gas between the partitions 8 is in a flowing state, and in this process, due to the exhaust and suction operation of the exhaust pipe 33 into the second gas injection pipe 35, and the second gas injection pipe 35 is connected to the fixed sleeve 26, the connecting plate 27 will slide up and down along the fixed sleeve 26 under the action of air pressure, so that the plug tube 23 moves up and down, so that the fan blades 24 move up and down;
[0048] It can ensure the circulation efficiency of the gas inside the measuring tube 1 and the measuring sleeve 2. At the same time, due to the up and down sliding of the plug-in tube 23 on the plug-in rod 22, the fan blades 24 produce a more uniform airflow distribution, which helps to eliminate airflow dead corners and improve the flow efficiency of the gas in the measuring tube 1 and the measuring sleeve 2, thereby ensuring the uniformity of the internal temperature of the measuring tube 1 and the measuring sleeve 2, preventing heat from accumulating between the detector and the sensor, and affecting the service life of the detector and the sensor.
[0049] Reference Figure 5 , Figure 6 , also includes a sliding bin 36 fixedly connected to the inner wall of the measuring tube 1, a slide plate 37 is slidably connected in the sliding bin 36, a reset spring 38 is fixedly connected to the bottom of the slide plate 37, a lifting rod 39 is fixedly connected to the top of the slide plate 37, and an adjusting ring 40 is fixedly connected to the top of the lifting rod 39, wherein the reset spring 38 is fixedly connected to the inner top of the sliding bin 36, the lifting rod 39 passes through the top of the sliding bin 36 and is slidably connected to the sliding bin 36, the adjusting ring 40 is slidably connected in the accelerating sleeve 17, the bottom of the spiral sheet 18 is rotatably connected to the top of the adjusting ring 40, wherein the first gas injection pipe 34 is connected to the sliding bin 36.
[0050] During the process of exhausting and drawing air from the exhaust pipe 33 into the first air injection pipe 34, the slide plate 37 will slide up and down under the action of the air pressure and the elastic force of the return spring 38, and then the adjustment ring 40 will slide up and down through the lifting rod 39, so that the adjustment ring 40 intermittently reduces the distance between the spiral plates 18;
[0051] The flow rate of the medium is in a changing state, so that the impact force of the medium on the blockage in the drill bit is in a changing state. The changing impact force can cause irregular impact on the blockage, thereby increasing the probability of flushing it open, preventing the drill bit from being blocked, affecting the cooling efficiency of the medium on the measuring system, and thus reducing the temperature of the measuring system during operation.
[0052] Reference Figure 1-Figure 9 A method for using a mine-use measurement while drilling system comprises the following steps:
[0053] Step 1: Install the measurement system between the drill bit and the drill rod;
[0054] First, the measuring sleeve 2 is fixedly connected to the measuring tube 1 through a thread, and then the measuring tube 1 is fixedly connected to the drill rod through a screw joint 3, and then the drill bit can be threaded into the screw groove 4;
[0055] Step 2: Drilling with a drill bit and a drill rod;
[0056] Step 3: During the drilling process, the measurement system is used to measure the resistivity of the formation, the gravity acceleration of the formation, the geological parameters of the formation, and the changes in the earth's magnetic field;
[0057] During the drilling process, the medium flowing in the drill pipe flows out through the measuring tube 1 and is released by the drill bit. The resistivity of the formation, the change of the earth's magnetic field, the geological parameters of the formation and the gravity acceleration of the formation are measured through the first detector 9, the second detector 10, the first sensor 11 and the second sensor 12 (the first detector 9 is a resistivity detector, the second detector 10 is a magnetic field detector, the first sensor 11 is a pressure sensor and the second sensor 12 is a gravity sensor).
[0058] As drilling goes deeper, there will be a temperature difference between the measuring sleeve 2 and the measuring tube 1. At this time, the outer semiconductor electrode material 5 and the inner semiconductor electrode material 7 generate electricity under the action of the temperature difference, which is used by the power supply machine 13, the first detector 9, the second detector 10, the first sensor 11 and the second sensor 12, and at the same time, the temperature between the measuring tube 1 and the measuring sleeve 2 is improved, so that the temperature between the measuring tube 1 and the measuring sleeve 2 is more uniform;
[0059] During the drilling process, the measurement system may collide with the inner wall of the well. At this time, the impact force is buffered by the buffer sleeve 32, the buffer rod 31, the piston plate 29 and the buffer spring 30. During the impact buffering process, the piston plate 29 will slide back and forth along the inner wall of the piston cylinder 28, and the airflow will be discharged into the exhaust pipe 33, and then divided into the first air injection pipe 34 and the second air injection pipe 35, and the gas in the first air injection pipe 34 and the second air injection pipe 35 will be extracted through the exhaust pipe 33;
[0060] During the drilling process, the motor 13 is started so that the rotating shaft 14 drives the gear ring 16 to rotate through the transmission gear 15, thereby causing the acceleration sleeve 17 to rotate along the installation groove, causing the spiral piece 18 to rotate, thereby accelerating the flow rate of the medium; increasing the impact force of the medium, improving the cooling efficiency of the medium on the drill bit, and increasing the ability of the medium to carry cuttings, thereby improving the drilling efficiency;
[0061] When the rotating shaft 14 is working, the second bevel gear 20 will be driven to rotate through the first bevel gear 19, and then the transmission shaft 21 will drive the fan blades 24 to rotate through the plug rod 22 and the plug tube 23, so that the fan blades 24 draw the gas at the top between the partitions 8 into the bottom, so that the gas between the partitions 8 is in a flowing state, and in this process, due to the exhaust and suction operation of the exhaust pipe 33 into the second gas injection pipe 35, and the second gas injection pipe 35 is connected to the fixed sleeve 26, the connecting plate 27 will slide up and down along the fixed sleeve 26 under the action of air pressure, so that the plug tube 23 moves up and down, so that the fan blades 24 move up and down;
[0062] During the process of exhausting and pumping air from the exhaust pipe 33 into the first air injection pipe 34, the slide plate 37 will slide up and down under the action of the air pressure and the elastic force of the return spring 38, and then the adjusting ring 40 will slide up and down through the lifting rod 39, so that the adjusting ring 40 intermittently reduces the distance between the spiral pieces 18; the flow rate of the medium is in a changing state, so that the impact force of the medium on the blockage in the drill bit is in a changing state, and the impact force in the changing state can cause irregular impact on the blockage, thereby increasing the probability of flushing it open, preventing the blockage of the drill bit, affecting the cooling efficiency of the medium on the measuring system, and thus reducing the temperature of the measuring system during operation;
[0063] Step 4: Send the measured data to the orifice explosion-proof computer, which will calculate, process and analyze it through the measurement system of the explosion-proof computer.
[0064] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A measurement while drilling system for mining, comprising a measuring tube (1) and a measuring sleeve (2), characterized in that: Also includes: A piston cylinder (28) is fixedly connected between the measuring tube (1) and the measuring sleeve (2), a piston plate (29) is slidably connected inside the piston cylinder (28), a buffer spring (30) and a buffer rod (31) are fixedly connected to both sides of the piston plate (29), a buffer sleeve (32) is fixedly connected to one end of the buffer rod (31) away from the piston plate (29), and the buffer sleeve (32) is fixedly connected to the measuring sleeve (2). The buffer spring (30) is fixedly connected in the piston cylinder (28), and the buffer rod (31) passes through the measuring sleeve (2) and is slidably connected to the measuring sleeve (2); A fan blade (24) disposed between the measuring tube (1) and the measuring sleeve (2); It also includes a motor (13) mounted on the inner wall of the measuring sleeve (2), wherein the output end of the motor (13) is fixedly connected to a rotating shaft (14), and an end of the rotating shaft (14) away from the motor (13) is fixedly connected to a transmission gear (15). The measuring tube (1) is provided with an installation groove inside, an accelerating sleeve (17) is rotatably connected in the installation groove, a spiral piece (18) is installed in the accelerating sleeve (17), a gear ring (16) is fixedly connected to the outer wall of the accelerating sleeve (17), the gear ring (16) is meshed with the transmission gear (15), the top of the spiral piece (18) is fixedly connected to the top of the inner wall of the accelerating sleeve (17), and the rotating shaft (14) passes through the measuring tube (1) and is rotatably connected to the measuring tube (1); It also comprises a fixing frame (25) fixedly connected between the measuring tube (1) and the measuring sleeve (2), the fixing frame (25) being rotatably connected to a transmission shaft (21), the top of the transmission shaft (21) being fixedly connected to a second bevel gear (20), the bottom of the transmission shaft (21) being fixedly connected to a plug-in rod (22), the plug-in rod (22) being plugged with a plug-in tube (23), The rotating shaft (14) is fixedly connected to a first bevel gear (19), the first bevel gear (19) is meshed with a second bevel gear (20), and the fan blade (24) is mounted on the plug-in tube (23); It also comprises a sliding bin (36) fixedly connected to the inner wall of the measuring tube (1), a sliding plate (37) being slidably connected in the sliding bin (36), a return spring (38) being fixedly connected to the bottom of the sliding plate (37), a lifting rod (39) being fixedly connected to the top of the sliding plate (37), and an adjusting ring (40) being fixedly connected to the top of the lifting rod (39). The return spring (38) is fixedly connected to the inner top of the sliding bin (36), the lifting rod (39) passes through the top of the sliding bin (36) and is slidably connected to the sliding bin (36), the adjusting ring (40) is slidably connected in the accelerating sleeve (17), and the bottom of the spiral sheet (18) is rotatably connected to the top of the adjusting ring (40); It also comprises an exhaust pipe (33) fixedly connected to the top of the piston cylinder (28), a first air injection pipe (34) fixedly connected to one side of the exhaust pipe (33), a second air injection pipe (35) fixedly connected to the other side of the exhaust pipe (33), a fixed sleeve (26) fixedly connected to one end of the second air injection pipe (35) away from the exhaust pipe (33), a connecting plate (27) slidably connected inside the fixed sleeve (26), Wherein, the first gas injection pipe (34) is connected to the sliding bin (36); A partition (8) is fixedly connected between the measuring tube (1) and the measuring sleeve (2); a first detector (9), a second detector (10), a first sensor (11) and a second sensor (12) are installed on the inner wall of the measuring sleeve (2); two partitions (8) are arranged between the first detector (9) and the second detector (10); two partitions (8) are arranged between the second detector (10) and the first sensor (11); two partitions (8) are arranged between the first sensor (11) and the second sensor (12); and two partitions (8) are arranged between the first detector (9) and the second sensor (12).
2. A mining measurement while drilling system according to claim 1, characterized in that: The top of the connection plate (27) is rotatably connected to the bottom of the plug-in tube (23), the plug-in tube (23) is slidably connected to a fixed sleeve (26), and the fixed sleeve (26) is fixedly connected between the measuring tube (1) and the measuring sleeve (2).
3. A mining measurement while drilling system according to claim 1, characterized in that: It also comprises an outer semiconductor electrode material (5) mounted on the inner wall of the measuring sleeve (2); a side of the outer semiconductor electrode material (5) away from the measuring sleeve (2) is fixedly connected to an electrode column (6); an end of the electrode column (6) away from the outer semiconductor electrode material (5) is fixedly connected to an inner semiconductor electrode material (7); and the inner semiconductor electrode material (7) is mounted on the measuring tube (1).
4. A mining measurement while drilling system according to claim 1, characterized in that: The measuring tube (1) and the measuring sleeve (2) are connected via threads; a screw joint (3) is fixedly connected to the top of the measuring tube (1) for connecting to a drill rod; and a screw groove (4) is provided at the bottom of the measuring tube (1) for connecting to a drill bit.
5. A method for using a mine-use measurement while drilling system, using a mine-use measurement while drilling system according to any one of claims 1 to 4, characterized in that: The steps include: Step 1: Install the measurement system between the drill bit and the drill rod; Step 2: Drilling with a drill bit and a drill rod; Step 3: During the drilling process, the measurement system is used to measure the resistivity of the formation, the gravity acceleration of the formation, the geological parameters of the formation, and the changes in the earth's magnetic field; Step 4: Send the measured data to the orifice explosion-proof computer, which will calculate, process and analyze it through the measurement system of the explosion-proof computer.