By designing an offshore wind power construction platform including support seat, main floating plate, inductive impeller, suction cup and magnetic suction plate, the serious problem of platform shaking under the action of ocean current is solved, the stable connection between the platform and offshore wind power equipment is achieved, and the safety of construction workers is improved.
Patent Information
- Application Number
- CN202411819111.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-11
- Publication Date
- 2025-03-14
AI Technical Summary
The offshore wind power construction platform will shake greatly under the action of the ocean current, which will make it difficult and low safety for construction workers to board Shanghai's onboard wind power facilities.
An offshore wind power construction platform including a support base, a main floating plate, a flow-inductive impeller, a suction cup and a magnetic suction plate is designed. The suction force of the suction cup is enhanced through the inductive impeller pumping chamber system, and the combined connection of the magnetic suction board and suction cup is used to ensure that the platform is stablely connected to offshore wind power equipment.
It effectively reduces the shaking of offshore wind power construction platform, improves the stable connection between the platform and offshore wind power equipment, reduces the difficulty for construction workers to board Shanghai's onboard wind power facilities, and improves the safety of use.
Smart Images

Figure CN119611635A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of offshore wind power facilities, and in particular discloses an offshore wind power construction platform and a method for using the platform. Background Art
[0002] Offshore wind power equipment can convert the abundant wind energy at sea into electrical energy. As a green, large-storage and renewable clean energy, offshore wind energy resources have better utilization efficiency. Therefore, with the continuous development of related technologies, offshore wind power equipment will have great development potential in the future.
[0003] The use of offshore wind power equipment also means that it is necessary to regularly inspect and maintain the offshore wind power equipment. A Chinese patent with publication number CN115626256A discloses an offshore wind power construction platform, including a buoy base and a detachable mounting platform, wherein the mounting platform includes support legs, and the support legs are detachably fixed to the buoy base through connecting members; a balancing mechanism is also installed at the bottom of the buoy base, and connecting mechanisms are installed on both sides of the buoy base. The balance of the buoy base is adjusted by the balancing mechanism, and positioning is provided for adjacent buoy bases to be connected end to end through the connecting mechanism.
[0004] During the use of the offshore wind power platform, although it is used in the case of strong winds and waves at sea to ensure a certain stability and can indeed prevent capsizing, under the influence of ocean currents, the offshore wind power platform will still sway greatly relative to the offshore wind power equipment, that is, there will be a large relative displacement between the offshore wind power platform and the offshore wind power equipment. In this way, when construction workers need to climb onto the offshore wind power facilities for maintenance, climbing is difficult and the safety of using the offshore wind power platform is low. Summary of the invention
[0005] In response to the technical problems raised in the above-mentioned background technology, the present invention provides a more stable offshore wind power construction platform and a method of using the platform for boarding offshore wind power facilities, aiming to solve the problem of great difficulty and low safety for construction workers in boarding offshore wind power facilities.
[0006] A technical solution for an offshore wind power construction platform, comprising: a support seat, a main floating plate connected to the bottom of the support seat, and connecting rings fixedly connected to the left and right sides of the support seat; and also comprising: an air extraction chamber arranged at the bottom of the main floating plate; A piston plate slidably connected in the air pumping chamber; Rotating the flow-sensing impeller arranged at the bottom of the main floating plate; An adapter provided between the flow-sensing impeller and the piston plate; A connecting sleeve plate arranged at the rear side of the main floating plate; A suction cup disposed on the connecting sleeve; A one-way ventilation pipe is connected between the suction cup and the air extraction cavity, and the one-way ventilation pipe is a one-way passage pipe; A one-way valve fixedly connected to the side wall of the air extraction chamber; A driving wheel fixedly connected to the bottom of the main floating plate; And a connecting chain fixedly connected to the supporting seat.
[0007] As a further improvement of the present invention, the adapter comprises: a mounting frame X fixedly connected to the bottom of the main floating plate; A slide slot slidably arranged in the mounting frame X; The turntable connected in the mounting frame X is rotated, and the turntable is fixedly connected to the flow sensing impeller; A protruding rod is fixedly connected to the rotating disk, and the protruding rod is slidably connected in the sliding groove; And a connecting frame fixedly connected between the piston plate and the slide groove.
[0008] As a further improvement of the present invention, it also includes: a sliding frame slidably arranged at the bottom of the main floating plate; A compression elastic member X is mounted on the sliding frame; A connecting rod is fixedly connected to the rear side of the sliding frame, and a connecting sleeve is rotatably connected to the connecting rod; And a torsion elastic member fixedly connected between the connecting rod and the connecting sleeve plate.
[0009] As a further improvement of the present invention, it also includes: a mounting ring fixedly connected to the connecting sleeve plate, and the suction cup is fixedly connected to the mounting ring; A sliding plate slidably connected to the mounting ring, the sliding plate consisting of a circular plate portion and a rod portion, the circular plate portion of the sliding plate is inside the connecting sleeve plate, and the rod portion of the sliding plate is outside the mounting ring; And a compression elastic member Y is sleeved and connected to the rod portion of the sliding plate, and the compression elastic member Y is connected between the sliding plate and the mounting ring.
[0010] As a further improvement of the present invention, it also includes: a magnetic attraction plate fixedly connected to the rear side of the connecting sleeve plate.
[0011] As a further improvement of the present invention, it also includes: a secondary floating plate slidably connected to the bottom of the support seat; A motor fixedly connected to the support base; The screw connected to the support seat is rotated, and the screw is threadedly connected to the secondary floating plate; And bevel gears X are respectively fixedly connected to the output end of the motor and the screw rod, and the two bevel gears X are meshed with each other.
[0012] As a further improvement of the present invention, it also includes: a mounting frame Y fixedly connected to the bottom of the support base, and openings are opened on the left and right sides of the mounting frame Y; Turn the double-ended screw connected to the top of the mounting frame Y; The bevel gears Y are respectively fixedly connected to the end of the double-headed screw and the output end of the motor, and the two bevel gears Y are meshed with each other; A rack fixedly connected to the top of the mounting frame Y; Two moving frames are slidably connected in the installation frame Y, and the two moving frames are respectively connected to the two ends of the double-headed screw by threaded engagement; Rotate the column gear connected to the two moving frames, and the column gear meshes with the rack; Rotate the wire wheel connected to the moving frame, the wire wheel is fixedly connected to the column gear; and a weighted ball connected to the reel via a line.
[0013] As a further improvement of the present invention, it also includes: a fold-slowing plate sliding on the installation frame Y, and a line connecting the weighted ball contacts the fold-slowing plate; Rotating a rotating plate connected to the bottom of the slow-folding plate; And a compression elastic member Z is arranged between the slow-folding plate and the installation frame Y.
[0014] As a further improvement of the present invention, it also includes: a buffer frame slidably arranged on the left and right sides of the support seat; And a compression elastic member T is arranged between the buffer frame and the support seat.
[0015] The present invention also provides a method for using an offshore wind power construction platform, comprising the following steps: S1. After the construction vessel approaches the offshore wind power equipment, the most appropriate number of the construction platforms to be used is calculated according to the actual size of the offshore wind power equipment, and all the construction platforms of this number are connected end to end in sequence through connecting rings to form the construction platform group, and then the construction platform group is put into the sea surface, and the driving wheel on the construction platform at the head end is started to drive the entire construction platform group to move close to the offshore wind power equipment; S2. When the construction platform at the very front end is close to the offshore wind power equipment, it is connected to the offshore wind power equipment using a connecting chain. Then, the connecting sleeve on the construction platform at the very front end is close to the offshore wind power equipment, and the magnetic suction plate is magnetically attracted to the offshore wind power equipment. At the same time, the suction cup is used to adsorb on the side wall of the offshore wind power equipment. At this time, the driving wheel of the construction platform at the very front end is closed; after the suction cup at the very front end is adsorbed on the offshore wind power equipment, the sliding plate slides to connect the suction cup with the connecting sleeve. At this time, the flow-sensing impeller acts to extract the air in the suction cup, that is, the construction platform at the very front end completes the connection with the offshore wind power equipment; S3, start the construction platform at the rear end, move it around the offshore wind power equipment, and then connect the connection ring at the rear end of the construction platform at the rear end with the connection ring at the front end of the construction platform at the front end, so that the entire construction platform group surrounds the offshore wind power equipment, and repeat the steps in S2 to connect all the remaining construction platforms with the offshore wind power equipment, thereby completing the connection between the entire construction platform group and the offshore wind power equipment; S4, driving the motors on all the construction platforms to slide the secondary floating plates of all the construction platforms relative to their front sides, thereby increasing the contact area with the sea surface. At the same time, the moving frame moves to release the counterweight ball, which sinks into the sea surface, thus changing the center of gravity of the construction platform. At this time, the entire construction platform group is finally fixed and installed, and the construction workers can board the offshore wind power equipment through the construction platform; S5. After completing the maintenance inspection, when it is necessary to return or inspect the next offshore wind power equipment, open the connection sleeve to release the air, release the connection between all the suction cups and the offshore wind power equipment, release the connection between the connection chain and the offshore wind power equipment, perform the above two steps on all the construction platforms, and then release the connection between the tail end connection ring of the construction platform at the rear end and the head end connection ring of the construction platform at the head end. In this process, the connection between the magnetic suction plate and the offshore wind power equipment is automatically released, and finally the construction platform at the head end is driven to move.
[0016] Compared with the prior art, the present invention can achieve the following beneficial effects: 1. By utilizing the connection function of the suction cup and the magnetic suction plate, the construction platform can be stably connected to the offshore wind power equipment. Through the arrangement of the flow-sensing impeller, the connecting piece and the suction chamber, the greater the wind and waves at sea, the stronger the connection effect of the suction cup. Thus, the connection effect of the suction cup is ensured, so that the construction platform can be relatively still when connected to the offshore wind power equipment, and the construction workers can easily board the offshore wind power equipment for maintenance, thereby improving the safety of the construction platform.
[0017] 2. By adding a counterweight ball that can drop suddenly, the center of gravity of the construction platform can be instantly dropped when in use, thereby improving the stability of the construction platform at sea. By unfolding the secondary floating plate, the buoyancy support of the construction platform can be increased. Therefore, the addition of the counterweight ball and the secondary floating plate are used to prevent the construction platform from being easily overturned by the ocean current and prevent the connection effect of the suction cup from being affected by the ocean current.
[0018] 3. The fold-slowing plate is used to prevent the wire rope from being damaged at the opening on the installation frame Y. At the same time, the sliding fold-slowing plate can also buffer the movement of the counterweight ball. The rotating plate is used to receive the counterweight ball to prevent the counterweight ball from hitting the installation frame Y and damaging the installation frame Y. That is, the addition of the fold-slowing plate and the rotating plate can optimize the use of the counterweight ball.
[0019] 4. The buffer frame can buffer the impact force when the two construction platforms are close to each other, thereby improving the safety of the construction platforms. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0021] Figure 2 It is a schematic diagram of the structure of the present invention from a bottom perspective.
[0022] Figure 3 The present invention is a schematic structural diagram showing the connection and positional relationship between the air extraction chamber, the connecting sleeve, the suction cup and the flow sensing impeller.
[0023] Figure 4 It is a structural cross-sectional view of the air pumping chamber and the piston plate in the present invention.
[0024] Figure 5 It is a schematic diagram of the structure of the suction cup on the connecting sleeve in the present invention.
[0025] Figure 6 It is an exploded view of the structure between the suction cup, the sliding plate and the mounting ring in the present invention.
[0026] Figure 7 The present invention is a schematic structural diagram showing the connection and positional relationship between the flow sensing impeller and the air extraction chamber.
[0027] Figure 8 It is a structural cross-sectional view of the flow-sensing impeller and the air extraction chamber in the present invention.
[0028] Fig. 9 It is a structural exploded view of the flow-sensing impeller, the mounting frame X, the slide groove and the connecting frame in the present invention.
[0029] Fig.10 It is a structural schematic diagram of the position relationship of the motor on the support base and the position relationship between the motor and the secondary floating plate in the present invention.
[0030] Fig.11 It is a schematic diagram of the structure of the motor, bevel gear X, screw and secondary floating plate in the present invention.
[0031] Fig.12 It is a structural schematic diagram showing the positional relationship of the installation frame Y in the present invention.
[0032] Fig.13 It is a schematic diagram of the structure of the installation frame Y, double-headed screw, bevel gear Y, rack and moving frame in the present invention.
[0033] Fig.14 A structural cross-sectional view showing the connection relationship and positional relationship among the mounting frame Y, the moving frame and the counterweight ball in the present invention.
[0034] Fig.15 for Fig.14 A local enlarged schematic diagram of point A in the middle.
[0035] Fig.16 It is a structural cross-sectional view of the positional relationship of the slow-folding plate on the installation frame Y in the present invention.
[0036] Fig.17 It is a structural schematic diagram of the connection relationship between the slow folding plate and the installation frame Y in the present invention.
[0037] Fig.18 It is a schematic diagram of the structure of the buffer frame and the driving wheel in the present invention.
[0038] The marks in the attached drawings are: 1-support seat, 2-main floating plate, 21-secondary floating plate, 3-air pumping chamber, 31-mounting plate, 32-sliding frame, 33-compression elastic member X, 34-piston plate, 35-one-way valve, 36-limiting rod, 4-connecting sleeve plate, 41-connecting rod, 42-torsion elastic member, 43-magnetic suction plate, 44-one-way ventilation pipe, 5-suction cup, 51-mounting ring, 52-sliding plate, 53-compression elastic member Y, 6-flow impeller, 61-mounting frame X, 62-turntable, 63-guide rod, 64-slideway, 65-convex rod, 66-connecting frame, 7-connecting chain, 8-motor, 81-bevel gear X, 82-screw, 9-weight ball, 91-mounting frame Y, 92-double-headed screw, 93-bevel gear Y, 94-rack, 95-moving frame, 96-column gear, 97-wire wheel, 10-slow folding plate, 101-mounting rod, 102-compression elastic member Z, 103-rotating plate, 11-connecting ring, 12-buffer frame, 121-mounting frame, 122-compression elastic member T, 13-driving wheel. DETAILED DESCRIPTION
[0039] It should be noted that the technical solution of the present invention will be described in detail and completely below in combination with the drawings provided by the present invention and the marks in the drawings, corresponding to the technical solution of the present invention. However, the described content must only be one of the embodiments presented by the technical solution of the present invention, and cannot cover all the contents of the present invention. They are only embodiments of devices and methods consistent with some aspects of the present invention as detailed in the attached claims. Therefore, based on the embodiments listed in the present invention, any embodiments derived from the embodiments obtained by those skilled in the art without substantial creation shall fall within the scope of protection of the present invention.
[0040] Embodiment 1: An offshore wind power construction platform, see Figure 1-Figure 2, including: a support base 1, which is used by construction workers or related personnel or for loading maintenance equipment; a main floating plate 2 installed at the bottom of the support base 1 to increase the buoyancy of the support base 1 so that the support base 1 has sufficient buoyancy to float on the sea surface; connecting rings 11 installed on the left and right sides, through which the construction platform can be connected end to end, and multiple construction platforms can be combined and connected for use.
[0041] See also Fig.10 and Fig.17 , and also includes: a connecting chain 7 respectively installed on the left and right sides of the rear side of the support seat 1, which can be used to connect with the offshore wind power equipment; a driving wheel 13 installed on the left side of the main floating plate 2, and the driving wheel 13 can be used to drive the construction platform to move on the sea; using the construction platform for movement, compared with a large construction ship, it can be more flexible to travel between offshore wind power equipment, providing convenience for the maintenance work of the construction workers.
[0042] See also Figure 3-Figure 4 , further comprising: a mounting plate 31 mounted at the bottom of the main floating plate 2; a sliding frame 32 slidably mounted on the mounting plate 31, the sliding frame 32 slides back and forth; a compression elastic member X33 mounted on the sliding frame 32, in this embodiment, the compression elastic member X33 is a compression spring, the compression elastic member X33 is connected between the sliding frame 32 and the mounting plate 31, and the compression elastic member X33 automatically returns the sliding frame 32 to its original position after the position of the sliding frame 32 changes; an air pumping chamber 3 mounted on the mounting plate 31; a sliding member X33 mounted on the air pumping chamber 3, the piston plate 34 is composed of a piston part and a sleeve part, the piston part of the piston plate 34 is in the air pumping chamber 3, when the piston plate 34 slides, it will push and draw the air in the air pumping chamber 3 and the parts connected with the air pumping chamber 3; the limiting rod 36 installed on the front side of the rear part of the sliding frame 32, the sleeve part of the piston plate 34 is sleeved outside the limiting rod 36, which guides the movement of the piston plate 34; the one-way valve 35 installed in the air pumping chamber 3, when the piston plate 34 moves, the air in the air pumping chamber 3 will be pushed out from the one-way valve 35.
[0043] See also Figure 4-Figure 6, further comprising: a connecting rod 41 installed at the rear side of the rear of the sliding frame 32; a connecting sleeve 4 installed at the rear end of the connecting rod 41 is rotatable, and the connecting sleeve 4 can be sealed and unsealed for venting; a torsion elastic member 42 installed between the connecting sleeve 4 and the connecting rod 41. In this embodiment, the torsion elastic member 42 is a torsion spring. After the position of the connecting sleeve 4 changes, the torsion elastic member 42 automatically returns the connecting sleeve 4 to its original position, so that the connecting sleeve 4 itself can perform an adaptive change in angle folding, and the sliding sliding frame 32 and the compression elastic member X33 cooperate to enable the connecting sleeve 4 to perform an adaptive change in the front and rear positions; two magnetic suction plates 4 installed on the left and right sides of the rear side of the connecting sleeve 4 3. The magnetic plate 43 can be magnetically connected to the side wall of the offshore wind power equipment. First, position the connecting plate 4 on the side wall of the offshore wind power equipment; install the mounting ring 51 on the rear side of the connecting plate 4. There are ten mounting rings 51, which are evenly distributed on the connecting plate 4. All mounting rings 51 are between the two magnetic plates 43; correspondingly install the suction cup 5 on each mounting ring 51; slide the sliding plate 52 on each mounting ring 51. The sliding plate 52 is composed of a circular plate portion and a rod portion. The circular plate portion of the sliding plate 52 is inside the connecting plate 4, and the rod portion of the sliding plate 52 is outside the mounting ring 51; the compression elastic member Y53 is sleeved on the rod portion of the sliding plate 52. In this embodiment, the compression elastic member Y53 is a compression spring, and the compression spring Y53 is connected between the rod of the sliding plate 52 and the mounting ring 51, and the compression spring Y53 makes the sliding plate 52 and the mounting ring 51 close to each other; when the suction cup 5 is adsorbed on the offshore wind power equipment, the side wall of the suction cup 5 is displaced, and the suction cup 5 will push the sliding plate 52 forward, and the sliding plate 52 leaves the mounting ring 51, so that the suction cup 5 is connected with the connecting sleeve plate 4; two one-way ventilation pipes 44 are installed and connected between the exhaust chamber 3 and the connecting sleeve plate 4, and the one-way ventilation pipe 44 is a one-way passage. When the piston plate 34 slides forward, the air in the suction cup 5 will be extracted through the one-way ventilation pipe 44 and the connecting sleeve plate 4, and when the piston plate 34 slides backward, the exhaust chamber 3 is pushed out from the one-way valve 35, but not from the one-way one-way vent pipe 44 to the suction cup 5. It should be noted here that only the suction cup 5 adsorbed to the side wall of the offshore wind power equipment can push the sliding plate 52 to connect with the connecting sleeve 4, while the suction cup 5 not adsorbed to it will not be connected with the connecting sleeve, and will not be affected by the suction chamber 3. In this way, it can be prevented that the suction cup 5 is not completely adsorbed to the offshore wind power equipment due to the influence of the connection part with the offshore wind power equipment, resulting in the suction cup 5 being deflated and affecting normal use. In addition, the elastic force of the compression spring Y53 is much greater than the suction pressure generated when the piston plate 34 slides. When the piston plate 34 slides to suck air, the sliding plate 52 cannot be moved.
[0044] See also Figure 7-Figure 9, further comprising: a mounting frame X61 mounted at the bottom of the main floating plate 2, the mounting frame X61 being at the bottom of the mounting plate 31; a flow-sensing impeller 6 mounted at the bottom of the mounting frame X61 being rotated, the flow-sensing impeller 6 being rotated by the action of the ocean current; a turntable 62 mounted in the mounting frame X61 being rotated, the turntable 62 being connected to the flow-sensing impeller 6; a guide rod 63 mounted in the mounting frame X61; a slideway 64 slidably connected to the guide rod 63, the direction of the slideway 64 being perpendicular to the guide rod 63, the slideway 64 sliding back and forth on the guide rod 63; a convex rod 65 mounted on the turntable 62, the convex rod 65 sliding in the slideway 64; a connecting frame 66 mounted at the rear end of the slideway 64, the connecting frame 66 being also fixedly connected to the sleeve portion of the piston plate 34; the rotation of the flow-sensing impeller 6 drives the turntable 62 to rotate, so that the rotation The protruding rod 65 on the disk 62 is displaced, and because the protruding rod 65 slides in the sliding groove 64, the left and right displacement of the protruding rod 65 is offset by the sliding groove 64, and the forward and backward displacement of the protruding rod 65 will cause the sliding groove 64 to move forward and backward, that is, the piston plate 34 will be driven to move forward and backward through the connecting frame 66, and the air in the air extraction chamber 3 will be pumped out, that is, the sea water will fluctuate, which will cause the flow-sensing impeller 6 to rotate. The greater the amplitude of the sea water fluctuation, the faster the flow-sensing impeller 6 rotates, the faster the speed of pumping the air in the air extraction chamber 3, and the faster the air in the suction cup 5 is pumped away, so that the suction cup 5 can be more firmly adsorbed to the side wall of the offshore wind power equipment, until the air in all the suction cups 5 is sucked to the limit, the piston plate 34 will no longer be able to pump air, the piston plate 34 will no longer move, and the flow-sensing impeller 6 will also stop rotating.
[0045] See also Figure 10-11 , and also includes: a secondary floating plate 21 slidably installed at the bottom of the support seat 1, the secondary floating plate 21 slides back and forth; a motor 8 installed on the left side of the support seat 1; a screw rod 82 installed on the left side of the bottom of the support seat 1 is rotatable, and the secondary floating plate 21 is threadedly connected with the screw rod 82; a bevel gear X81 installed on the output end of the motor 8 and on the screw rod 82, and the two bevel gears X81 are meshed with each other; when the motor 8 is started, the output end of the motor 8 and the bevel gear X81 thereon rotate, and through the meshing action of the bevel gears X81, the bevel gear X81 on the screw rod 82 and the screw 82 rotate, and through the threaded relationship, the secondary floating plate 21 will slide forward and unfold, thereby increasing the contact area between the construction platform and the sea surface, and making the construction platform more stable at sea.
[0046] See also Figure 12-14, further comprising: an installation frame Y91 installed at the bottom of the support seat 1, with openings on both the left and right sides of the installation frame Y91; a double-headed screw 92 rotating on the top of the installation frame Y91; a bevel gear Y93 installed at the left end of the double-headed screw 92 and the output end of the motor 8, the two bevel gears Y93 are meshed, and the bevel gear Y93 at the output end of the motor 8 is above the bevel gear X81 at the output end of the motor 8; two racks 94 installed at the top of the installation frame Y91; two moving frames 95 slidably installed in the installation frame Y91, The two moving frames 95 slide left and right, and the two moving frames 95 are connected to the two ends of the double-headed screw 92 by threaded matching, that is, when the double-headed screw 92 rotates forward, the two moving frames 95 move in the opposite direction, and when the double-headed screw 92 rotates in the opposite direction, the two moving frames 95 move toward each other; the two column gears 96 installed on the two moving frames 95 are rotated respectively, a total of four column gears 96, and the two column gears 96 on each moving frame 95 are respectively engaged with the two racks 94; the two column gears 96 installed on the same moving frame 95 are respectively engaged with the two racks 94; The wire wheel 97 between the column gears 96; the counterweight balls 9 installed on the wire wheel 97 through the wire ropes, when the wire wheel 97 is driven to rotate forward and reverse, the wire ropes will be tightened or released to control the counterweight balls 9, and the moving frame 95 can push the two counterweight balls 9 to move to the left and right sides of the installation frame Y91, and finally fall out from the openings on both sides of the installation frame Y91; when the output end of the motor 8 is turned on, the double-headed screw 92 rotates forward and the two moving frames 95 move in the opposite direction, and the wire wheel 9 is rotated through the meshing action of the column gear 96 and the rack 94. 7 releases the line rope, and at the same time, the two moving frames 95 move in the opposite direction, push out the counterweight ball 9 to both ends, and drop it from the through hole on the installation frame Y91, so that the counterweight ball 9 instantly enters the sea water, lowering the center of gravity of the construction platform, making the construction platform more stable at sea, and the construction platform is not easily overturned by the ocean current to affect the connection effect of the suction cup 5; the motor 8 is started, the output end is reversed, the moving frame 95 gathers and retracts to the middle part of the installation frame Y91, and the line wheel 97 is reversed, and the counterweight ball 9 is retracted into the installation frame Y91 through the line rope.
[0047] See also Figure 15-17, further comprising: a folding-delay plate 10; a mounting rod 101 mounted on the folding-delay plate 10, the folding-delay plate 10 being slidably mounted on the mounting frame Y91 through the mounting rod 101, and the folding-delay plate 10 sliding left and right; a compression elastic member Z102 mounted on the mounting rod 101, the compression elastic member Z102 being connected between the folding-delay plate 10 and the mounting frame Y91, in this embodiment, the compression elastic member Z102 is a compression spring; a rotating plate 103 rotatably mounted at the bottom of the folding-delay plate 10; when the counterweight ball 9 is retracted in the mounting During the process in frame Y91, the rope connected between the counterweight ball 9 and the wire wheel 97 will be bent on the folding buffer plate 10 to prevent the rope from being damaged at the opening on the installation frame Y91. At the same time, the sliding folding buffer plate 10 can also buffer the rope, and the rotating rotating plate 103 can adaptively change the counterweight ball 9 to support the counterweight ball 9 to prevent the counterweight ball 9 from hitting the installation frame Y91 and damaging the installation frame Y91. That is, the addition of the folding buffer plate 10 and the rotating plate 103 can optimize the use of the counterweight ball 9.
[0048] See also Fig.18 , and also includes: two mounting frames 121 respectively mounted on the left and right sides of the support seat 1; a buffer frame 12 respectively sliding on each mounting frame 121; a compression elastic member T122 installed between the mounting frame 121 and the buffer frame 12. In this embodiment, the compression elastic member T122 is a compression spring; when the two construction platforms are connected by the connecting ring 11, the compression elastic member T122 is deformed so that the buffer frame 12 will be able to buffer the collision force generated by the sea water fluctuation between the construction platforms, thereby improving the safety of the construction platform.
[0049] The present invention also provides a method for using an offshore wind power construction platform, comprising the following steps: S1. After the construction vessel approaches the offshore wind power equipment, the most appropriate number of the construction platforms to be used is calculated according to the actual size of the offshore wind power equipment, and all the construction platforms of this number are connected end to end in sequence through the connecting ring 11 to form the construction platform group, and then the construction platform group is put into the sea surface, and the driving wheel 13 on the construction platform at the head end is started to drive the entire construction platform group to move close to the offshore wind power equipment; S2. When the construction platform at the head end is close to the offshore wind power equipment, the connection chain 7 is used to connect with the offshore wind power equipment, then the connection plate 4 on the construction platform at the head end is close to the offshore wind power equipment, the magnetic plate 43 is magnetically attracted to the offshore wind power equipment, and the suction cup 5 is used to adsorb on the side wall of the offshore wind power equipment. At this time, the driving wheel 13 of the construction platform at the head end is closed; after the suction cup 5 at the head end is adsorbed on the offshore wind power equipment, the sliding plate 52 slides to make the suction cup 5 communicate with the connection plate 4, and at this time, the flow-sensing impeller 6 acts to extract the air in the suction cup 5, that is, the construction platform at the head end completes the connection with the offshore wind power equipment; S3, start the construction platform at the rear end, move it around the offshore wind power equipment, and then connect the connection ring 11 at the rear end of the construction platform at the rear end with the connection ring 11 at the front end of the construction platform at the front end, surround the entire construction platform group around the offshore wind power equipment, and repeat the steps in S2 to connect all the remaining construction platforms with the offshore wind power equipment, thereby completing the connection between the entire construction platform group and the offshore wind power equipment; S4, drive the motors 8 on all the construction platforms to slide the secondary floating plates 21 of all the construction platforms relative to their front, increase the contact area with the sea surface, and at the same time, move the moving frame 95 to release the counterweight ball 9, the counterweight ball 9 sinks into the sea surface, and changes the center of gravity of the construction platform. At this time, the entire construction platform group completes the final fixed installation, and the construction workers can board the offshore wind power equipment through the construction platform; S5. After completing the maintenance inspection, when it is necessary to return or inspect the next offshore wind power equipment, open the connection sleeve 4 to release the air, release the connection between all the suction cups 5 and the offshore wind power equipment, release the connection between the connection chain 7 and the offshore wind power equipment, perform the above two steps on all the construction platforms, and then release the connection between the tail end connection ring 11 of the construction platform at the rear end and the head end connection ring 11 of the construction platform at the head end. In this process, the connection between the magnetic suction plate 43 and the offshore wind power equipment is automatically released, and finally the construction platform at the head end is driven to move.
[0050] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.
Claims
1. An offshore wind power construction platform, comprising: A support seat (1), a main floating plate (2) connected to the bottom of the support seat (1), and a connecting ring (11) fixedly connected to the left and right sides of the support seat (1); characterized in that it also includes: an air extraction chamber (3) arranged at the bottom of the main floating plate (2); A piston plate (34) slidably connected to the air pumping chamber (3); Rotating a flow-sensing impeller (6) disposed at the bottom of the main floating plate (2), wherein the flow-sensing impeller (6) rotates under the action of the ocean current; An adapter is provided between the flow-sensing impeller (6) and the piston plate (34); when the flow-sensing impeller (6) rotates, the piston plate (34) is controlled to slide via the adapter; A connecting sleeve plate (4) arranged on the rear side of the main floating plate (2); A suction cup (5) disposed on the connection sleeve (4) and used for being adsorbed and connected to the side wall of the offshore wind power equipment; A one-way vent pipe (44) is provided between the suction cup (5) and the air extraction chamber (3); when the piston plate (34) slides in the air extraction chamber (3), gas between the suction cup (5) and the side wall of the offshore wind power equipment is sucked through the one-way vent pipe (44); A one-way valve (35) is fixedly connected to the side wall of the air pumping chamber (3), and the gas sucked out by the piston plate (34) sliding in the air pumping chamber (3) is discharged through the one-way valve (35); A driving wheel (13) fixedly connected to the bottom of the main floating plate (2) and used for driving the construction platform to move on the sea; And a connection chain (7) fixedly connected to the support seat (1) and used for connection with offshore wind power equipment.
2. An offshore wind power construction platform according to claim 1, characterized in that: The adapter comprises: a mounting frame X (61) fixedly connected to the bottom of the main floating plate (2); a flow sensing impeller (6) rotatably connected to the bottom of the mounting frame X (61); A slide groove (64) slidably disposed in the mounting frame X (61); A rotating disk (62) rotatably connected to the mounting frame X (61), wherein the rotating disk (62) is fixedly connected to the flow sensing impeller (6); A protruding rod (65) fixedly connected to the rotating disk (62), the protruding rod (65) being slidably connected in the sliding groove (64); and a connecting frame (66) fixedly connected between the piston plate (34) and the slide groove (64).
3. An offshore wind power construction platform according to claim 2, characterized in that: Also includes: A sliding frame (32) slidably arranged at the bottom of the main floating plate (2); A compression elastic member X (33) sleeve-connected to the sliding frame (32); A connecting rod (41) fixedly connected to the rear side of the sliding frame (32), and a connecting sleeve (4) rotatably connected to the connecting rod (41); and a torsion elastic member (42) fixedly connected between the connecting rod (41) and the connecting sleeve plate (4).
4. An offshore wind power construction platform according to claim 3, characterized in that: Also includes: A mounting ring (51) fixedly connected to the connecting sleeve (4), and a suction cup (5) fixedly connected to the mounting ring (51); A sliding plate (52) is slidably connected to the mounting ring (51), the sliding plate (52) being composed of a circular plate portion and a rod portion, the circular plate portion of the sliding plate (52) being inside the connecting sleeve (4), the rod portion of the sliding plate (52) being outside the mounting ring (51), and the suction cup (5) being deformed by adsorption and then squeezing the rod portion of the sliding plate (52); And a compression elastic member Y (53) sleeved and connected to the rod portion of the sliding plate (52), the compression elastic member Y (53) being connected between the sliding plate (52) and the mounting ring (51).
5. An offshore wind power construction platform according to claim 4, characterized in that: Also includes: A magnetic attraction plate (43) fixedly connected to the rear side of the connection sleeve plate (4) and used for magnetically connecting to the side wall of the offshore wind power equipment.
6. An offshore wind power construction platform according to claim 5, characterized in that: Also includes: A secondary floating plate (21) slidably connected to the bottom of the support seat (1) and used to increase the contact area with the sea surface; A motor (8) fixedly connected to the support base (1); Rotating a screw rod (82) connected to the support seat (1), wherein the screw rod (82) is threadedly connected to the secondary floating plate (21); and bevel gears X (81) respectively fixedly connected to the output end of the motor (8) and the screw rod (82), the two bevel gears X (81) being meshed with each other.
7. An offshore wind power construction platform according to claim 6, characterized in that: Also includes: A mounting frame Y (91) fixedly connected to the bottom of the support seat (1), the mounting frame Y (91) being between the main floating plate (2) and the secondary floating plate (21), and openings being provided on left and right sides of the mounting frame Y (91); Rotate the double-headed screw (92) connected to the top of the mounting frame Y (91); bevel gears Y (93) respectively fixedly connected to the end of the double-headed screw (92) and the output end of the motor (8), the two bevel gears Y (93) meshing with each other; A rack (94) fixedly connected to the top of the mounting frame Y (91); Two movable frames (95) are slidably connected in the installation frame Y (91), and the two movable frames (95) are respectively connected to the two ends of the double-headed screw (92) by threaded engagement; Rotating a column gear (96) connected to the two moving frames (95), the column gear (96) meshes with the rack (94); Rotating a wire wheel (97) connected to the moving frame (95), wherein the wire wheel (97) is fixedly connected to the column gear (96), and the wire wheel (97) and the column gear (96) rotate synchronously; A counterweight ball (9) is connected to the line wheel (97) through a line, and the moving frame (95) moves to control the counterweight ball (9) to move in the installation frame Y (91). The counterweight ball (9) enters and exits the installation frame Y (91) through openings on both sides of the installation frame Y (91).
8. An offshore wind power construction platform according to claim 7, characterized in that: Also includes: The fold-slowing plate (10) is slid on the mounting frame Y (91), and the rope connected to the weighted ball (9) is in contact with the fold-slowing plate (10); Rotating a rotating plate (103) connected to the bottom of the slow-folding plate (10); And a compression elastic member Z (102) arranged between the folding buffer plate (10) and the mounting frame Y (91).
9. An offshore wind power construction platform according to claim 8, characterized in that: Also includes: A buffer frame (12) slidably arranged on the left and right sides of the support seat (1); And a compression elastic member T (122) arranged between the buffer frame (12) and the support seat (1).
10. A method for using an offshore wind power construction platform according to claims 1-9, comprising the following steps: S1. After the construction vessel approaches the offshore wind power equipment, the most appropriate number of the construction platforms to be used is calculated according to the actual size of the offshore wind power equipment, and all the construction platforms of the number are connected end to end in sequence through the connecting ring (11) to form the construction platform group, and then the construction platform group is placed on the sea surface, and the driving wheel (13) on the construction platform at the head end is started to drive the entire construction platform group to move closer to the offshore wind power equipment; S2. When the construction platform at the front end approaches the offshore wind power equipment, the connection chain (7) is used to connect with the offshore wind power equipment, and the connection sleeve (4) on the construction platform at the front end is close to the offshore wind power equipment, the magnetic suction plate (43) is magnetically attracted to the offshore wind power equipment, and the suction cup (5) is used to adsorb on the side wall of the offshore wind power equipment. At this time, the driving wheel (13) of the construction platform at the front end is closed; after the suction cup (5) at the front end is adsorbed on the offshore wind power equipment, the sliding plate (52) slides to make the suction cup (5) communicate with the connection sleeve (4), and the flow-sensing impeller (6) acts to extract the air in the suction cup (5), that is, the construction platform at the front end is connected to the offshore wind power equipment; S3, starting the construction platform at the rear end, moving it around the offshore wind power equipment, and then connecting the connection ring (11) at the rear end of the construction platform at the rear end with the connection ring (11) at the front end of the construction platform at the front end, so that the entire construction platform group surrounds the offshore wind power equipment, and repeating the steps in S2, connecting all the remaining construction platforms to the offshore wind power equipment, and completing the connection between the entire construction platform group and the offshore wind power equipment; S4, driving the motors (8) on all the construction platforms to slide the secondary floating plates (21) of all the construction platforms relative to their front sides, thereby increasing the contact area with the sea surface. At the same time, the moving frame (95) moves to release the counterweight ball (9), which sinks into the sea surface, thereby changing the center of gravity of the construction platform. At this time, the entire construction platform group is finally fixed and installed, and the construction workers can board the offshore wind power equipment through the construction platform. S5. After the maintenance inspection is completed, when it is necessary to return or to inspect the next offshore wind power equipment, the connection sleeve (4) is opened to release the air, and the connection between all the suction cups (5) and the offshore wind power equipment is released, and the connection between the connection chain (7) and the offshore wind power equipment is released. The above two steps are performed on all the construction platforms, and then the connection between the tail end connection ring (11) of the rearmost construction platform and the head end connection ring (11) of the headmost construction platform is released. In this process, the connection between the magnetic suction plate (43) and the offshore wind power equipment is automatically released, and finally the headmost construction platform is driven to move.
Citation Information
Patent Citations
Offshore wind power construction platform
CN115626256A
Cited By
Floating self-elevating offshore electrical platform and installation method thereof
CN121019780A