Heat, cooling and power cogeneration energy storage system and method for industrial steam

By combining heat-cooling and power cogeneration technology in the energy storage system of the industrial park, using excess electricity and heat energy to compress air and prepare industrial steam, the problem of low energy utilization in the energy storage process of the industrial park is solved, and the system energy efficiency is achieved Convert and utilize.

CN118481768BActive Publication Date: 2024-11-05XI AN JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410716401.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-04
Publication Date
2024-11-05
Estimated Expiration
2044-06-04

AI Technical Summary

Technical Problem

During the energy storage process, industrial parks can only store and convert electricity through compressed air energy storage technology, and cannot effectively utilize industrial vapors, resulting in low energy utilization.

Method used

A hot and cold power cogeneration energy storage system was designed, including low-pressure compressors, high-pressure compressors, heat exchangers, low-temperature tanks and industrial steam preparation modules, which utilizes excess electrical and thermal energy during power consumption troughs to compress the air and pass through the replacement of the The heater and steam generator continuously prepare industrial steam, combined with high-pressure turbine and cooling capacity preparation module to prepare cooling capacity during the energy release process, improving the energy utilization rate of the system.

Benefits of technology

It realizes continuous preparation of industrial vapors during energy storage, avoids single energy conversion, improves the energy utilization rate of the system, and provides cooling during energy release, further improving the energy conversion efficiency of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118481768B_ABST
    Figure CN118481768B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of energy storage technology, and relates to a heat, cooling and power cogeneration energy storage system for industrial steam, including a low-pressure compressor, a high-pressure compressor, a high-pressure gas storage tank, a first heat exchanger, a first inlet of the first heat exchanger is connected to the outlet of the low-pressure compressor, and the first outlet of the first heat exchanger is connected to the inlet of the high-pressure compressor; a second heat exchanger, a first inlet is connected to the outlet of the high-pressure compressor; a low-temperature tank, the outlet is respectively connected to the second inlet of the first heat exchanger and the second inlet of the second heat exchanger, and the interior of the low-temperature tank is used to store low-temperature heat storage medium; an industrial steam preparation module, which is used to prepare industrial steam using the heat generated by the low-pressure compressor and the high-pressure compressor. The present invention can store heat and continuously prepare industrial steam for 24 hours through the industrial steam preparation module, avoiding the relatively single energy conversion during the energy storage process, and improving the energy utilization rate of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of energy storage, and relates to a heat, cooling and power combined energy storage system and method for industrial steam. Background Art

[0002] The application of energy storage technology can largely solve the drawbacks of volatility and intermittency of renewable energy power generation, effectively solve the problem of shifting peaks and filling valleys, and has high flexibility and dispatchability, suitable for enterprises of different sizes. Enterprises can call up the power, capacity and energy storage services provided by the energy storage system according to their own needs. It can realize the time-sharing, space-sharing and land-sharing of electricity and storage resources among enterprises in the industrial park, and efficiently and collaboratively utilize the energy resources in the park.

[0003] At present, industrial parks often use compressed air energy storage technology when storing energy. When electricity consumption is low, excess electricity is used to drive the compressor to compress the air for storage, and then converted into electricity to supply the industrial park during peak electricity consumption.

[0004] However, since industrial parks need not only electricity but also industrial steam, the energy conversion that can be achieved using compressed air energy storage technology is relatively simple, resulting in the need for enterprises in industrial parks to prepare industrial steam through electricity, which reduces the energy utilization rate of the system. Summary of the invention

[0005] The purpose of the present invention is to provide a combined heat, cooling and power energy storage system and method for industrial steam, which can continuously provide industrial steam to industrial parks during the energy storage process, avoid relatively single energy conversion during the energy storage process, and improve the energy utilization rate of the system.

[0006] To achieve the above-mentioned purpose, the specific technical scheme of a combined heat, cooling and power energy storage system and method for industrial steam provided by the present invention is as follows:

[0007] A heat, cooling and power cogeneration energy storage system for industrial steam, comprising a low-pressure compressor, a high-pressure compressor and a high-pressure gas storage tank, wherein the inlet of the low-pressure compressor is used to introduce air at normal temperature and pressure, the outlet of the low-pressure compressor is connected to the inlet of the high-pressure compressor, and the outlet of the high-pressure compressor is connected to the inlet of the high-pressure gas storage tank, and further comprising:

[0008] A first heat exchanger is disposed between the low-pressure compressor and the high-pressure compressor, wherein a first inlet of the first heat exchanger is connected to an outlet of the low-pressure compressor, and a first outlet of the first heat exchanger is connected to an inlet of the high-pressure compressor;

[0009] a second heat exchanger having a first inlet connected to an outlet of the high pressure compressor;

[0010] A low-temperature tank, the outlet of which is respectively connected to the second inlet of the first heat exchanger and the second inlet of the second heat exchanger, and the interior of the low-temperature tank is used to store a low-temperature heat storage medium;

[0011] The industrial steam preparation module is connected to the second outlet of the first heat exchanger and the second outlet of the second heat exchanger respectively, and is used to prepare industrial steam using the heat generated by the low-pressure compressor and the high-pressure compressor.

[0012] The present invention is also characterized in that:

[0013] The industrial steam preparation module includes a medium-temperature tank, a high-temperature tank, a steam generator, a first preheater, a second preheater and a mixer. The inlet of the medium-temperature tank is connected to the second outlet of the second heat exchanger, the outlet of the medium-temperature tank is connected to the first inlet of the first preheater, the inlet of the high-temperature tank is connected to the second outlet of the first heat exchanger, the outlet of the high-temperature tank is connected to the first inlet of the steam generator, the first outlet of the steam generator is connected to the first inlet of the second preheater, the first outlet of the first preheater and the first outlet of the second preheater are respectively connected to the inlet of the low-temperature tank, the second inlet of the first preheater and the second inlet of the second preheater are respectively used to enter high-pressure water, the second outlet of the first preheater is connected to the first inlet of the mixer, the second outlet of the second preheater is connected to the second inlet of the mixer, the outlet of the mixer is connected to the second inlet of the steam generator, and the outlet of the steam generator is used to supply industrial steam to the industrial park.

[0014] The outlet of the high-pressure gas storage tank is connected to the inlet of the high-pressure turbine, the outlet of the high-pressure turbine is connected to the inlet of the medium-pressure buffer tank, the outlet of the medium-pressure buffer tank is connected to the inlet of the low-pressure turbine, a first cold preparation module is arranged between the high-pressure turbine and the medium-pressure buffer tank, the outlet of the low-pressure turbine is connected to the second cold preparation module, the first cold preparation module and the second cold preparation module are respectively used for preparing cold and supplying the prepared cold to the industrial park.

[0015] The first cold energy preparation module includes a third heat exchanger, a first inlet of the third heat exchanger is connected to the outlet of the high-pressure turbine, a first outlet of the third heat exchanger is connected to the inlet of the medium-pressure buffer tank, a second inlet of the third heat exchanger is used to introduce normal temperature water, and a second outlet of the third heat exchanger is used to supply cold energy to the industrial park.

[0016] The second cooling preparation module includes a fourth heat exchanger, a first inlet of the fourth heat exchanger is connected to the outlet of the low-pressure turbine, a first outlet of the fourth heat exchanger is connected to the atmosphere, a second inlet of the fourth heat exchanger is used to introduce normal temperature water, and a second outlet of the fourth heat exchanger is used to supply cooling to the industrial park.

[0017] A first air preheater is provided at the inlet of the low-pressure compressor, a second air preheater is provided between the first heat exchanger and the high-pressure compressor, a third air preheater is provided between the high-pressure air storage tank and the high-pressure turbine, and a fourth air preheater is provided between the medium-pressure buffer tank and the low-pressure turbine.

[0018] A first control valve is provided at the inlet of the first air preheater, a second control valve is provided between the second heat exchanger and the high-pressure gas storage tank, a third control valve is provided between the high-pressure gas storage tank and the third air preheater, a fourth control valve is provided at the outlet of the low-temperature tank, a fifth control valve is provided between the medium-temperature tank and the first preheater, the second outlet of the second heat exchanger is connected to the first inlet of the first preheater through a sixth control valve, a seventh control valve is provided between the high-temperature tank and the steam generator, the first heat exchanger is connected to the first inlet of the steam generator through an eighth control valve, and a ninth control valve is provided at the inlet of the low-temperature tank.

[0019] A heat, cooling and power cogeneration energy storage method for industrial steam includes an energy storage process and an energy release process. In the energy storage process, excess electric energy during low electricity consumption is converted into heat energy and compressed air for storage, and the heat energy is used to prepare industrial steam. In the energy release process, the stored high-pressure air is used to convert it into electric energy, and the low-temperature air after decompression is used to prepare cold. The energy storage process includes the following steps:

[0020] Normal temperature and normal pressure air is introduced into the first air preheater, and waste heat generated in the industrial park is used to preheat the normal temperature and normal pressure air, so that the normal temperature and normal pressure air becomes medium temperature and normal pressure air, and then the medium temperature and normal pressure air is introduced into the low pressure compressor, and the surplus electric energy during the low electricity consumption is used to drive the low pressure compressor to work, so that the medium temperature and normal pressure air becomes high temperature and medium pressure air;

[0021] The high-temperature medium-pressure air is introduced into the first heat exchanger to perform heat exchange with the low-temperature heat storage medium from the low-temperature tank, the low-temperature heat storage medium is converted into high-temperature heat storage medium and is stored in the high-temperature tank, and the high-temperature medium-pressure air is converted into low-temperature medium-pressure air;

[0022] The low-temperature medium-pressure air is introduced into the second air preheater, and the waste heat generated by the industrial park is used to preheat the medium-temperature medium-pressure air, so that the low-temperature medium-pressure air becomes medium-temperature medium-pressure air, and then the medium-temperature medium-pressure air is introduced into the high-pressure compressor, and the surplus electric energy during the low electricity consumption is used to drive the high-pressure compressor to work, so that the medium-temperature medium-pressure air becomes high-temperature high-pressure air;

[0023] The high-temperature and high-pressure air is introduced into the second heat exchanger to exchange heat with the low-temperature heat storage medium from the low-temperature tank. The low-temperature heat storage medium becomes the medium-temperature heat storage medium and enters the medium-temperature tank for storage. The high-temperature and high-pressure air becomes the low-temperature and high-pressure air and enters the high-pressure gas storage tank for storage.

[0024] High-pressure water is introduced into the first preheater and the second preheater respectively. In the first preheater, the high-pressure water exchanges heat with the medium-temperature heat storage medium stored in the medium-temperature tank. The high-pressure water becomes high-pressure saturated water and enters the mixer. The medium-temperature heat storage medium becomes low-temperature heat storage medium and enters the low-temperature tank. The high-pressure saturated water in the mixer enters the steam generator and exchanges heat with the medium-temperature heat storage medium from the high-temperature tank. The high-pressure saturated water becomes industrial steam and is supplied to the industrial park. The high-temperature heat storage medium becomes medium-temperature heat storage medium and enters the second preheater. The high-pressure water exchanges heat with the medium-temperature heat storage medium in the second preheater. The high-pressure water becomes high-pressure saturated water and enters the mixer. The medium-temperature heat storage medium becomes low-temperature heat storage medium and enters the low-temperature tank.

[0025] The energy release process includes the following steps:

[0026] The low-temperature and high-pressure air in the high-pressure air storage tank is introduced into the third air preheater, and the waste heat generated by the industrial park is used to preheat the low-temperature and high-pressure air, so that the low-temperature and high-pressure air becomes medium-temperature and high-pressure air;

[0027] The medium-temperature and high-pressure air is introduced into the high-pressure turbine for expansion to generate power, and the medium-temperature and high-pressure air is converted into ultra-low-temperature medium-pressure air;

[0028] The ultra-low temperature medium pressure air is introduced into the third heat exchanger to exchange heat with normal temperature water. The ultra-low temperature medium pressure air becomes low temperature medium pressure air, and the normal temperature water becomes low temperature water to supply cooling to the industrial park.

[0029] The low-temperature medium-pressure air is introduced into the medium-pressure buffer tank, and then enters the fourth air preheater, and the waste heat generated by the industrial park is used to preheat the low-temperature medium-pressure air, and the low-temperature medium-pressure air is converted into medium-temperature medium-pressure air;

[0030] The medium-temperature and medium-pressure air is introduced into the low-pressure turbine for expansion to generate power, and the medium-temperature and medium-pressure air is converted into ultra-low temperature and normal-pressure air;

[0031] The ultra-low temperature normal pressure air is introduced into the fourth heat exchanger to exchange heat with normal temperature water. The ultra-low temperature normal pressure air is converted into normal temperature overpressure air and discharged into the atmosphere, and the normal temperature water is converted into low temperature water to supply cooling to the industrial park.

[0032] The temperature of the medium-temperature normal-pressure air is 70-75°C, the temperature of the valley high-temperature medium-pressure air is 310-320°C, and the pressure is 550-650kPa. The temperature of the valley high-temperature heat storage medium is 305-315°C. During the valley energy storage process, the temperature of the low-temperature medium-pressure air is 12-25°C, and the pressure is 550-650kPa. The temperature of the valley medium-temperature medium-pressure air is 70-75°C, and the pressure is 550-650kPa. The temperature of the valley high-temperature high-pressure air is 280-310°C, and the pressure is 2.8-3.2MPa. The temperature of the valley medium-temperature heat storage medium is 275-305°C, and the temperature of the valley low-temperature high-pressure air is The temperature of the valley is 12-25℃ and the pressure is 2.8-3.2MPa. The temperature of the high-pressure saturated water in the valley is 180-188℃ and the pressure is 1-1.2MPa. The temperature of the industrial steam in the valley is 300-310℃. The temperature of the medium-temperature high-pressure air in the valley is 70-75℃ and the pressure is 2.8-3.2MPa. The temperature of the ultra-low-temperature medium-pressure air in the valley is -20-10℃ and the pressure is 550-650kPa. During the energy release process in the valley, the temperature of the low-temperature medium-pressure air is 2-20℃ and the pressure range is 550-650kPa. The temperature of the low-temperature water in the valley is 7-15℃ and the temperature of the ultra-low-temperature normal-pressure air in the valley is -20-10℃.

[0033] The heat, cooling and power combined energy storage system and method for industrial steam of the present invention has the following advantages:

[0034] First, through the cooperation of the low-pressure compressor, the high-pressure compressor, the first heat exchanger, the second heat exchanger, the cryogenic tank and the industrial steam preparation module, heat can be stored and industrial steam can be continuously prepared 24 hours a day through the industrial steam preparation module, avoiding the relatively single energy conversion during the energy storage process and improving the energy utilization rate of the system.

[0035] Second, through the cooperation of the high-pressure turbine, the low-pressure turbine, the first cooling preparation module and the second cooling preparation module, cooling can be prepared in the process of energy release and supplied to the industrial park, further avoiding the relatively single energy conversion.

[0036] Third, through the cooperation of the first air preheater, the second air preheater, the third air preheater and the fourth air preheater, the waste heat generated by the industrial park can be used as a heat source to preheat the air. While ensuring the normal operation of the system, more energy can be stored for the energy conversion of the system, further improving the energy utilization rate of the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0038] Figure 2 It is a schematic diagram of the energy storage process of the present invention;

[0039] Figure 3 It is a schematic diagram of the energy release process of the present invention.

[0040] Reference numerals:

[0041] 1. First air preheater; 2. Low-pressure compressor; 3. First heat exchanger; 4. Second air preheater; 5. High-pressure compressor; 6. Second heat exchanger; 7. High-pressure air storage tank; 8. Third air preheater; 9. High-pressure turbine; 10. Third heat exchanger; 11. Medium-pressure buffer tank; 12. Fourth air preheater; 13. Low-pressure turbine; 14. Fourth heat exchanger; 15. Low-temperature tank; 16. Medium-temperature tank; 17. High-temperature tank; 18. Steam generator; 19. First preheater; 20. Second preheater; 21. Mixer; 22. First control valve; 23. Second control valve; 24. Third control valve; 25. Fourth control valve; 26. Fifth control valve; 27. Sixth control valve; 28. Seventh control valve; 29. ​​Eighth control valve; 30. Ninth control valve. DETAILED DESCRIPTION

[0042] The technical solution in the present application will be described clearly and in detail below in conjunction with the accompanying drawings. Among them, in the description of the embodiments of the present application, unless otherwise specified, " / " means or, for example, A / B can mean A or B: "and / or" in the text is only a description of the association relationship of associated objects, indicating that there can be three relationships, such as A and / or B, which can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, in the description of the embodiments of the present application, "multiple" refers to two or more than two. The following terms "first" and "second" are used for descriptive purposes only and cannot be understood as implying or suggesting relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features.

[0043] like Figure 1As shown, the present invention provides a heat, cooling and power cogeneration energy storage system for industrial steam, a low-pressure compressor 2, a high-pressure compressor 5, a high-pressure gas storage tank 7, a first heat exchanger 3, a second heat exchanger 6, a cryogenic tank 15 and an industrial steam preparation module, the inlet of the low-pressure compressor 2 is used to introduce air, the outlet of the low-pressure compressor 2 is connected to the inlet of the high-pressure compressor 5, the outlet of the high-pressure compressor 5 is connected to the inlet of the high-pressure gas storage tank 7, the first heat exchanger 3 is arranged between the low-pressure compressor 2 and the high-pressure compressor 5, the first inlet of the first heat exchanger 3 is connected to the outlet of the low-pressure compressor 2, the first outlet of the first heat exchanger 3 is connected to the inlet of the high-pressure compressor 5, and the first inlet of the second heat exchanger 6 is connected to the outlet of the high-pressure compressor 5 The outlet of the cryogenic tank 15 is respectively connected to the second inlet of the first heat exchanger 3 and the second inlet of the second heat exchanger 6. The interior of the cryogenic tank 15 is used to store a cryogenic heat storage medium. The industrial steam preparation module is respectively connected to the second outlet of the first heat exchanger 3 and the second outlet of the second heat exchanger 6. The industrial steam preparation module is used to use the heat generated by the low-pressure compressor 2 and the high-pressure compressor 5 to prepare industrial steam. The compression heat generated by the low-pressure compressor 2 and the high-pressure compressor 5 compress the air in turn, and respectively exchanges heat with the cryogenic heat storage medium from the cryogenic tank 15. Then the heat is stored and the industrial steam is continuously prepared through the industrial steam preparation module, thereby avoiding the single energy conversion in the energy storage process and improving the energy utilization rate of the system.

[0044] like Figure 1 As shown, the industrial steam preparation module includes a medium-temperature tank 16, a high-temperature tank 17, a steam generator 18, a first preheater 19, a second preheater 20 and a mixer 21. The inlet of the medium-temperature tank 16 is connected to the second outlet of the second heat exchanger 6, the outlet of the medium-temperature tank 16 is connected to the first inlet of the first preheater 19, the inlet of the high-temperature tank 17 is connected to the second outlet of the first heat exchanger 3, the outlet of the high-temperature tank 17 is connected to the first inlet of the steam generator 18, the first outlet of the steam generator 18 is connected to the first inlet of the second preheater 20, the first outlet of the first preheater 19 and the first outlet of the second preheater 20 are respectively connected to the inlet of the low-temperature tank 15, the second inlet of the first preheater 19 and the second inlet of the second preheater 20 are respectively used to enter high-pressure water, the second outlet of the first preheater 19 is connected to the first inlet of the mixer 21, the second outlet of the second preheater 20 is connected to the second inlet of the mixer 21, the outlet of the mixer 21 is connected to the second inlet of the steam generator 18, and the outlet of the steam generator 18 is used to supply industrial steam to the industrial park.

[0045] like Figure 1As shown, the outlet of the high-pressure gas storage tank 7 is connected to the inlet of the high-pressure turbine 9, the outlet of the high-pressure turbine 9 is connected to the inlet of the medium-pressure buffer tank 11, the outlet of the medium-pressure buffer tank 11 is connected to the inlet of the low-pressure turbine 13, a first cold preparation module is arranged between the high-pressure turbine 9 and the medium-pressure buffer tank 11, and the outlet of the low-pressure turbine 13 is connected to the second cold preparation module, the first cold preparation module and the second cold preparation module are respectively used for preparing cold and supplying the prepared cold to the industrial park.

[0046] like Figure 1 As shown, the first cold energy preparation module includes a third heat exchanger 10, a first inlet of the third heat exchanger 10 is connected to the outlet of the high-pressure turbine 9, a first outlet of the third heat exchanger 10 is connected to the inlet of the medium-pressure buffer tank 11, a second inlet of the third heat exchanger 10 is used to introduce normal temperature water, and a second outlet of the third heat exchanger 10 is used to supply cold energy to the industrial park.

[0047] like Figure 1 As shown, the second cooling preparation module includes a fourth heat exchanger 14, a first inlet of the fourth heat exchanger 14 is connected to the outlet of the low-pressure turbine 13, a first outlet of the fourth heat exchanger 14 is connected to the atmosphere, a second inlet of the fourth heat exchanger 14 is used to introduce normal temperature water, and a second outlet of the fourth heat exchanger 14 is used to supply cooling to the industrial park.

[0048] like Figure 1 As shown, a first air preheater 1 is provided at the inlet of the low-pressure compressor 2, that is, the outlet of the first air preheater 1 is connected to the inlet of the low-pressure compressor 2, and the inlet of the first air preheater 1 is used to introduce air. A second air preheater 4 is provided between the first heat exchanger 3 and the high-pressure compressor 5, that is, the inlet of the second air preheater 4 is connected to the first outlet of the first heat exchanger 3, and the outlet of the second air preheater 4 is connected to the inlet of the high-pressure compressor 5. A third air preheater 8 is provided between the high-pressure air storage tank 7 and the high-pressure turbine 9, that is, the inlet of the third air preheater 8 is connected to the outlet of the high-pressure air storage tank 7. The outlet of the third air preheater 8 is connected to the inlet of the high-pressure turbine 9, and a fourth air preheater 12 is arranged between the medium-pressure buffer tank 11 and the low-pressure turbine 13, that is, the inlet of the fourth air preheater 12 is connected to the outlet of the medium-pressure buffer tank 11, and the outlet of the fourth air preheater 12 is connected to the inlet of the low-pressure turbine 13. The waste heat generated by the industrial park is introduced as a heat source into the first air preheater 1, the second air preheater 4, the third air preheater 8 and the fourth air preheater 12 respectively to preheat the air therein, and the waste heat includes recycled water generated by producing industrial steam.

[0049] like Figure 1As shown, a first control valve 22 is provided at the inlet of the first air preheater 1, a second control valve 23 is provided between the second heat exchanger 6 and the high-pressure gas storage tank 7, a third control valve 24 is provided between the high-pressure gas storage tank 7 and the third air preheater 8, a fourth control valve 25 is provided at the outlet of the low-temperature tank 15, a fifth control valve 26 is provided between the medium-temperature tank 16 and the first preheater 19, the second outlet of the second heat exchanger 6 is connected to the first inlet of the first preheater 19 through a sixth control valve 27, a seventh control valve 28 is provided between the high-temperature tank 17 and the steam generator 18, the first heat exchanger 3 is connected to the first inlet of the steam generator 18 through an eighth control valve 29, and a ninth control valve 30 is provided at the inlet of the low-temperature tank 15.

[0050] like Figure 2 As shown, the present invention also provides a heat, cooling and power cogeneration energy storage method for industrial steam, which includes an energy storage process and an energy release process. In the energy storage process, the excess electric energy during the low electricity consumption is converted into heat energy and compressed air for storage, and the heat energy is used to prepare industrial steam. In the energy release process, the stored high-pressure air is used to convert it into electric energy, and the low-temperature air after the pressure is reduced is used to prepare cold. The energy storage process includes the following steps:

[0051] Normal temperature and normal pressure air is introduced into the first air preheater 1, and waste heat generated in the industrial park is used to preheat the normal temperature and normal pressure air, so that the normal temperature and normal pressure air becomes medium temperature and normal pressure air, and then the medium temperature and normal pressure air is introduced into the low pressure compressor 2, and the surplus electric energy during the low electricity consumption is used to drive the low pressure compressor 2 to work, so that the medium temperature and normal pressure air becomes high temperature and medium pressure air;

[0052] The high-temperature medium-pressure air is introduced into the first heat exchanger 3 to exchange heat with the low-temperature heat storage medium from the low-temperature tank 15. The low-temperature heat storage medium becomes high-temperature heat storage medium and enters the high-temperature tank 17 for storage. The high-temperature medium-pressure air becomes low-temperature medium-pressure air.

[0053] The low-temperature medium-pressure air is introduced into the second air preheater 4, and the waste heat generated by the industrial park is used to preheat the medium-temperature medium-pressure air, so that the low-temperature medium-pressure air becomes medium-temperature medium-pressure air, and then the medium-temperature medium-pressure air is introduced into the high-pressure compressor 5, and the surplus electric energy during the low electricity consumption is used to drive the high-pressure compressor 5 to work, so that the medium-temperature medium-pressure air becomes high-temperature high-pressure air;

[0054] The high-temperature and high-pressure air is introduced into the second heat exchanger 6 to exchange heat with the low-temperature heat storage medium from the low-temperature tank 15. The low-temperature heat storage medium becomes the medium-temperature heat storage medium and enters the medium-temperature tank 16 for storage. The high-temperature and high-pressure air becomes the low-temperature and high-pressure air and enters the high-pressure gas storage tank 7 for storage.

[0055] High-pressure water is introduced into the first preheater 19 and the second preheater 20 respectively. The high-pressure water exchanges heat with the medium-temperature heat storage medium stored in the medium-temperature tank 16 in the first preheater 19, and the high-pressure water becomes high-pressure saturated water and enters the mixer 21. The medium-temperature heat storage medium becomes low-temperature heat storage medium and enters the low-temperature tank 15. The high-pressure saturated water in the mixer 21 enters the steam generator 18 and exchanges heat with the medium-temperature heat storage medium from the high-temperature tank 17. The high-pressure saturated water becomes industrial steam and is supplied to the industrial park. The high-temperature heat storage medium becomes medium-temperature heat storage medium and enters the second preheater 20. The high-pressure water exchanges heat with the medium-temperature heat storage medium in the second preheater 20. The high-pressure water becomes high-pressure saturated water and enters the mixer 21. The medium-temperature heat storage medium becomes low-temperature heat storage medium and enters the low-temperature tank 15.

[0056] like Figure 3 As shown, the energy release process includes the following steps:

[0057] The low-temperature and high-pressure air in the high-pressure air storage tank 7 is introduced into the third air preheater 8, and the waste heat generated by the industrial park is used to preheat the low-temperature and high-pressure air, so that the low-temperature and high-pressure air becomes medium-temperature and high-pressure air;

[0058] The medium-temperature high-pressure air is introduced into the high-pressure turbine 9 for expansion to generate power, and the medium-temperature high-pressure air is converted into ultra-low-temperature medium-pressure air;

[0059] The ultra-low temperature medium pressure air is introduced into the third heat exchanger 10 to exchange heat with the normal temperature water, the ultra-low temperature medium pressure air becomes low temperature medium pressure air, and the normal temperature water becomes low temperature water to supply cooling to the industrial park;

[0060] The low-temperature medium-pressure air is introduced into the medium-pressure buffer tank 11, and then enters the fourth air preheater 12, where the waste heat generated by the industrial park is used to preheat the low-temperature medium-pressure air, and the low-temperature medium-pressure air is converted into medium-temperature medium-pressure air;

[0061] The medium-temperature medium-pressure air is introduced into the low-pressure turbine 13 for expansion to generate power, and the medium-temperature medium-pressure air is converted into ultra-low temperature normal-pressure air;

[0062] The ultra-low temperature normal pressure air is introduced into the fourth heat exchanger 14 to exchange heat with normal temperature water. The ultra-low temperature normal pressure air is converted into normal temperature overpressure air and discharged into the atmosphere, and the normal temperature water is converted into low temperature water to supply cooling to the industrial park.

[0063] Among them, the temperature of medium-temperature normal-pressure air is 70-75°C, the temperature of low-temperature medium-pressure air is 310-320°C, the pressure is 550-650kPa, the temperature of low-temperature high-pressure heat storage medium is 305-315°C, the temperature of low-temperature medium-pressure air during valley energy storage is 12-25°C, the pressure is 550-650kPa, the temperature of low-temperature medium-pressure air is 70-75°C, the pressure is 550-650kPa, the temperature of low-temperature high-pressure air is 280-310°C, the pressure is 2.8-3.2MPa, the temperature of low-temperature medium-temperature heat storage medium is 275-305°C, and the temperature of low-temperature high-pressure air is The temperature of the valley is 12-25℃ and the pressure is 2.8-3.2MPa. The temperature of the high-pressure saturated water in the valley is 180-188℃ and the pressure is 1-1.2MPa. The temperature of the industrial steam in the valley is 300-310℃. The temperature of the medium-temperature high-pressure air in the valley is 70-75℃ and the pressure is 2.8-3.2MPa. The temperature of the ultra-low-temperature medium-pressure air in the valley is -20-10℃ and the pressure is 550-650kPa. During the energy release process in the valley, the temperature of the low-temperature medium-pressure air is 2-20℃ and the pressure range is 550-650kPa. The temperature of the low-temperature water in the valley is 7-15℃ and the temperature of the ultra-low-temperature normal-pressure air in the valley is -20-10℃.

[0064] Working principle: In the initial state, close the first control valve 22, the second control valve 23, the third control valve 24, the fourth control valve 25, the fifth control valve 26, the sixth control valve 27, the seventh control valve 28, the eighth control valve 29, and the ninth control valve 30, a total of nine control valves. The high-pressure gas storage tank 7 and the medium-pressure buffer tank 11 store compressed air with a certain pressure.

[0065] When the user is in the low electricity consumption period, the third control valve 24, the fifth control valve 26, the sixth control valve 27, the seventh control valve 28, the eighth control valve 29 and the ninth control valve 30 are closed, and the first control valve 22, the second control valve 23 and the fourth control valve 25 are opened to start the heat storage work. The normal temperature and pressure air enters the first air preheater 1 and is preheated by the waste heat, so that the normal temperature and pressure air becomes medium temperature and pressure air. The medium temperature and pressure air enters the low pressure compressor 2, and the low voltage electricity is used to drive the low pressure compressor 2 to work and heat the medium temperature and pressure air. The air is compressed so that the medium-temperature normal-pressure air becomes high-temperature medium-pressure air, and the high-temperature medium-pressure air enters the first heat exchanger 3 for heat exchange and cooling, and the heat is transferred to the low-temperature heat storage medium from the low-temperature tank 15, and the high-temperature medium-pressure air becomes low-temperature medium-pressure air, and the low-temperature heat storage medium becomes high-temperature heat storage medium, and the high-temperature heat storage medium enters the high-temperature tank 17 for storage, and the low-temperature medium-pressure air enters the second air preheater 4 to be preheated again using waste heat, and the low-temperature medium-pressure air becomes medium-temperature medium-pressure air, and the medium-temperature medium-pressure air enters the high-pressure compressor 5, and the electricity during the valley is used. It can drive the high-pressure compressor 5 to work to further compress the high-temperature medium-pressure air, and the medium-temperature medium-pressure air becomes high-temperature high-pressure air. The high-temperature high-pressure air enters the second heat exchanger 6 for heat exchange and cooling, and transfers the heat to the low-temperature heat storage medium from the low-temperature tank 15. The low-temperature heat storage medium becomes the medium-temperature heat storage medium and enters the medium-temperature tank 16 for storage. The high-temperature and high-pressure air becomes low-temperature and high-pressure air and enters the high-pressure gas storage tank 7 for storage. When the gas in the high-pressure gas storage tank 7 is stored to the design value, the third control valve 24 is opened, and the low-temperature and high-pressure air passes through the high-pressure gas storage tank 7 enters the third air preheater 8 for preheating with waste heat, and the low-temperature high-pressure air becomes medium-temperature high-pressure air. The medium-temperature high-pressure air enters the high-pressure turbine 9 for expansion, and the expanded medium-pressure air enters the third heat exchanger 10 for heat exchange and temperature increase, and then enters the fourth air preheater 12 through the medium-pressure buffer tank 11 for preheating again with waste heat. The medium-temperature medium-pressure air finally enters the low-pressure turbine 13 for expansion, and the air expanded to normal pressure enters the fourth heat exchanger 14 for heat exchange and temperature increase. The air restored to normal temperature and pressure is finally discharged into the atmosphere. This completes the heat storage process of the system.

[0066] When the user needs to use the stored heat to produce industrial steam, the heating process starts to run. The working conditions of the heating process of the system of the present invention are divided into two types. When the heating process is running independently, the first control valve 22, the second control valve 23, the third control valve 24, the fourth control valve 25, the sixth control valve 27 and the eighth control valve 29 are closed, and the fifth control valve 26, the seventh control valve 28 and the ninth control valve 30 are opened. The medium-temperature heat storage medium stored in the medium-temperature tank 16 enters the first preheater 19 to work, and all the stored heat is transferred to the high-pressure water. The high-pressure water becomes high-pressure saturated water and enters the mixer 21, and the medium-temperature heat storage medium becomes low-temperature heat storage medium and enters the low-temperature tank 15. At the same time, the high-temperature heat storage medium stored in the high-temperature tank 17 enters the steam generator 18 and the second preheater 20 to work, and transfers part of the stored heat to the high-pressure water in the second preheater 20, and the high-pressure water becomes high-pressure saturated water and enters the mixer 21. The two parts of high-pressure saturated water are mixed in the mixer 21. The mixed high-pressure saturated water enters the steam generator 18 and uses the high-temperature heat storage medium stored in the high-temperature tank 17 to convert the saturated liquid water into high-temperature industrial steam. Finally, the generated high-temperature industrial steam is supplied to the industrial park, thereby completing the independent operation of the system heating process.

[0067] When the heating process and the heat storage process are running simultaneously, the third control valve 24, the fifth control valve 26 and the seventh control valve 28 are closed, and the first control valve 22, the second control valve 23, the fourth control valve 25, the sixth control valve 27, the eighth control valve 29 and the ninth control valve 30 are opened. The heat storage medium heated by the first heat exchanger 3 is partially stored in the high-temperature tank 17, and partially enters the steam generator 18 and the second preheater 20 to work. In the second preheater 20, part of the stored heat is transferred to the high-pressure water, and the high-pressure water is heated to a saturated liquid state, so that it becomes high-pressure saturated water. The medium-temperature heat storage medium heated by the second heat exchanger 6 is partially stored in the medium-temperature tank 16, and partially enters the first preheater 19 to work, and all the stored heat is transferred to the high-pressure water, and the high-pressure water is heated to a saturated liquid state. The medium-temperature heat storage medium after cooling returns to the low-temperature tank 15 for storage. The two parts of high-pressure saturated water enter the mixer 21 for mixing, and the mixed saturated liquid water enters the steam generator 18 to convert the high-pressure saturated water into high-temperature industrial steam, and finally the generated high-temperature industrial steam is supplied to the industrial park. At this point, the system heat supply process and heat storage process are simultaneously operated.

[0068] When the user is at the peak of electricity consumption, the first control valve 22, the second control valve 23, the fourth control valve 25, the fifth control valve 26, the sixth control valve 27, the seventh control valve 28, the eighth control valve 29 and the ninth control valve 30 are closed, and the third control valve 24 is opened. The energy release process of a heat, cooling and power cogeneration energy storage system for industrial steam begins to work. The low-temperature high-pressure air stored in the high-pressure air storage tank 7 enters the third air preheater 8 and is heated by waste heat exchange, so that the low-temperature high-pressure air becomes medium-temperature high-pressure air, and the medium-temperature high-pressure air enters the high-pressure turbine 9 to expand and generate power, and the medium-temperature high-pressure air becomes ultra-low-temperature medium-pressure air, and the ultra-low-temperature medium-pressure air enters the third heat exchanger 10 to exchange heat with normal-temperature water, and the ultra-low-temperature medium-pressure air becomes low-temperature medium-pressure air, and the normal-temperature water becomes low-temperature water to supply cold to the industrial park, and the low-temperature medium-pressure air enters the medium-pressure buffer tank 11, and then enters the fourth air preheater 12, and the waste heat generated by the industrial park is used to preheat the low-temperature medium-pressure air, and the low-temperature medium-pressure air becomes medium-temperature medium-pressure air, and the medium-temperature medium-pressure air enters the low-pressure turbine 13 to expand and generate power, and the medium-temperature medium-pressure air becomes ultra-low-temperature normal-pressure air, and the ultra-low-temperature normal-pressure air enters the fourth heat exchanger 14 to exchange heat with normal-temperature water, and the ultra-low-temperature normal-pressure air becomes normal-temperature overpressure air and is discharged into the atmosphere, and the normal-temperature water becomes low-temperature water to supply cold to the industrial park. This completes the energy release process of the system.

[0069] The heat, cooling and power combined energy storage system and method for industrial steam of the present invention has the following advantages:

[0070] First, through the cooperation of the low-pressure compressor, the high-pressure compressor, the first heat exchanger, the second heat exchanger, the cryogenic tank and the industrial steam preparation module, heat can be stored and industrial steam can be continuously prepared 24 hours a day through the industrial steam preparation module, avoiding the relatively single energy conversion during the energy storage process and improving the energy utilization rate of the system.

[0071] Second, through the cooperation of the high-pressure turbine, the low-pressure turbine, the first cooling preparation module and the second cooling preparation module, cooling can be prepared in the process of energy release and supplied to the industrial park, further avoiding the relatively single energy conversion.

[0072] Third, through the cooperation of the first air preheater, the second air preheater, the third air preheater and the fourth air preheater, the waste heat generated by the industrial park can be used as a heat source to preheat the air. While ensuring the normal operation of the system, more energy can be stored for the energy conversion of the system, further improving the energy utilization rate of the system.

[0073] It is to be understood that the present invention is described by some embodiments, and it is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.

Claims

1. A heat, cooling and power cogeneration energy storage system for industrial steam, comprising a low-pressure compressor (2), a high-pressure compressor (5) and a high-pressure gas storage tank (7), wherein the inlet of the low-pressure compressor (2) is used to introduce air at normal temperature and pressure, the outlet of the low-pressure compressor (2) is connected to the inlet of the high-pressure compressor (5), and the outlet of the high-pressure compressor (5) is connected to the inlet of the high-pressure gas storage tank (7), characterized in that: Also includes: A first heat exchanger (3) is arranged between the low-pressure compressor (2) and the high-pressure compressor (5), wherein a first inlet of the first heat exchanger (3) is connected to an outlet of the low-pressure compressor (2), and a first outlet of the first heat exchanger (3) is connected to an inlet of the high-pressure compressor (5); A second heat exchanger (6), a first inlet of which is connected to an outlet of the high-pressure compressor (5); A low-temperature tank (15), the outlet of which is respectively connected to the second inlet of the first heat exchanger (3) and the second inlet of the second heat exchanger (6), and the interior of the low-temperature tank (15) is used to store a low-temperature heat storage medium; An industrial steam preparation module is connected to the second outlet of the first heat exchanger (3) and the second outlet of the second heat exchanger (6) respectively, and is used to prepare industrial steam using the heat generated by the low-pressure compressor (2) and the high-pressure compressor (5); The industrial steam preparation module comprises a medium-temperature tank (16), a high-temperature tank (17), a steam generator (18), a first preheater (19), a second preheater (20) and a mixer (21); the inlet of the medium-temperature tank (16) is connected to the second outlet of the second heat exchanger (6); the outlet of the medium-temperature tank (16) is connected to the first inlet of the first preheater (19); the inlet of the high-temperature tank (17) is connected to the second outlet of the first heat exchanger (3); the outlet of the high-temperature tank (17) is connected to the first inlet of the steam generator (18); the first outlet of the steam generator (18) is connected to the first inlet of the second preheater (20); The first outlet of the first preheater (19) and the first outlet of the second preheater (20) are connected to the inlet of the low-temperature tank (15), respectively; the second inlet of the first preheater (19) and the second inlet of the second preheater (20) are respectively used to enter high-pressure water; the second outlet of the first preheater (19) is connected to the first inlet of the mixer (21), the second outlet of the second preheater (20) is connected to the second inlet of the mixer (21), the outlet of the mixer (21) is connected to the second inlet of the steam generator (18), and the outlet of the steam generator (18) is used to supply industrial steam to the industrial park.

2. The heat, cooling and power combined energy storage system for industrial steam according to claim 1 is characterized in that: The outlet of the high-pressure gas storage tank (7) is connected to the inlet of the high-pressure turbine (9), the outlet of the high-pressure turbine (9) is connected to the inlet of the medium-pressure buffer tank (11), the outlet of the medium-pressure buffer tank (11) is connected to the inlet of the low-pressure turbine (13), a first cold energy preparation module is arranged between the high-pressure turbine (9) and the medium-pressure buffer tank (11), and the outlet of the low-pressure turbine (13) is connected to the second cold energy preparation module, the first cold energy preparation module and the second cold energy preparation module are respectively used for preparing cold energy and supplying the prepared cold energy to the industrial park.

3. The heat, cooling and power combined energy storage system for industrial steam according to claim 2 is characterized in that: The first cold energy preparation module comprises a third heat exchanger (10), a first inlet of the third heat exchanger (10) being connected to the outlet of the high-pressure turbine (9), a first outlet of the third heat exchanger (10) being connected to the inlet of the medium-pressure buffer tank (11), a second inlet of the third heat exchanger (10) being used for introducing normal temperature water, and a second outlet of the third heat exchanger (10) being used for supplying cold energy to the industrial park.

4. The heat, cooling and power combined energy storage system for industrial steam according to claim 3 is characterized in that: The second cold energy preparation module comprises a fourth heat exchanger (14), a first inlet of the fourth heat exchanger (14) is connected to the outlet of the low-pressure turbine (13), a first outlet of the fourth heat exchanger (14) is connected to the atmosphere, a second inlet of the fourth heat exchanger (14) is used to introduce normal temperature water, and a second outlet of the fourth heat exchanger (14) is used to supply cold energy to the industrial park.

5. The heat, cooling and power combined energy storage system for industrial steam according to claim 4 is characterized in that: A first air preheater (1) is provided at the inlet of the low-pressure compressor (2), a second air preheater (4) is provided between the first heat exchanger (3) and the high-pressure compressor (5), a third air preheater (8) is provided between the high-pressure air storage tank (7) and the high-pressure turbine (9), and a fourth air preheater (12) is provided between the medium-pressure buffer tank (11) and the low-pressure turbine (13).

6. The heat, cooling and power combined energy storage system for industrial steam according to claim 5 is characterized in that: A first control valve (22) is provided at the inlet of the first air preheater (1), a second control valve (23) is provided between the second heat exchanger (6) and the high-pressure gas storage tank (7), a third control valve (24) is provided between the high-pressure gas storage tank (7) and the third air preheater (8), a fourth control valve (25) is provided at the outlet of the low-temperature tank (15), a fifth control valve (26) is provided between the medium-temperature tank (16) and the first preheater (19), the second outlet of the second heat exchanger (6) is connected to the first inlet of the first preheater (19) via a sixth control valve (27), a seventh control valve (28) is provided between the high-temperature tank (17) and the steam generator (18), the first heat exchanger (3) is connected to the first inlet of the steam generator (18) via an eighth control valve (29), and a ninth control valve (30) is provided at the inlet of the low-temperature tank (15).

7. A method for storing heat, cooling and electricity combined energy for industrial steam, characterized in that: The heat, cooling and power cogeneration energy storage system for industrial steam as claimed in claim 6 includes an energy storage process and an energy release process. In the energy storage process, excess electric energy during low electricity consumption is converted into heat energy and compressed air for storage, and the heat energy is used to prepare industrial steam. In the energy release process, the stored high-pressure air is used to convert it into electric energy, and the low-temperature air after decompression is used to prepare cold. The energy storage process includes the following steps: Introducing normal temperature and normal pressure air into a first air preheater (1), using waste heat generated in the industrial park to preheat the normal temperature and normal pressure air, so that the normal temperature and normal pressure air becomes medium temperature and normal pressure air, and then introducing the medium temperature and normal pressure air into a low pressure compressor (2), using surplus electric energy during a low electricity consumption period to drive the low pressure compressor (2) to work, so that the medium temperature and normal pressure air becomes high temperature and medium pressure air; Introducing high-temperature medium-pressure air into the first heat exchanger (3) to perform heat exchange with the low-temperature heat storage medium from the low-temperature tank (15), so that the low-temperature heat storage medium becomes high-temperature heat storage medium and enters the high-temperature tank (17) for storage, and the high-temperature medium-pressure air becomes low-temperature medium-pressure air; Introducing low-temperature medium-pressure air into a second air preheater (4), using waste heat generated in the industrial park to preheat the medium-temperature medium-pressure air, so that the low-temperature medium-pressure air becomes medium-temperature medium-pressure air, and then introducing the medium-temperature medium-pressure air into a high-pressure compressor (5), using excess electric energy during a low electricity consumption period to drive the high-pressure compressor (5) to work, so that the medium-temperature medium-pressure air becomes high-temperature high-pressure air; The high-temperature and high-pressure air is introduced into the second heat exchanger (6) to perform heat exchange with the low-temperature heat storage medium from the low-temperature tank (15), the low-temperature heat storage medium is converted into a medium-temperature heat storage medium and enters the medium-temperature tank (16) for storage, and the high-temperature and high-pressure air is converted into low-temperature and high-pressure air and enters the high-pressure gas storage tank (7) for storage; The high-pressure water is introduced into the first preheater (19) and the second preheater (20) respectively. The high-pressure water performs heat exchange with the medium-temperature heat storage medium stored in the medium-temperature tank (16) in the first preheater (19). The high-pressure water becomes high-pressure saturated water and enters the mixer (21). The medium-temperature heat storage medium becomes low-temperature heat storage medium and enters the low-temperature tank (15). The high-pressure saturated water in the mixer (21) enters the steam generator (18) and performs heat exchange with the medium-temperature heat storage medium from the high-temperature tank (17). The high-pressure saturated water becomes industrial steam and is supplied to the industrial park. The high-temperature heat storage medium becomes medium-temperature heat storage medium and enters the second preheater (20). The high-pressure water performs heat exchange with the medium-temperature heat storage medium in the second preheater (20). The high-pressure water becomes high-pressure saturated water and enters the mixer (21). The medium-temperature heat storage medium becomes low-temperature heat storage medium and enters the low-temperature tank (15).

8. The method for storing heat, cooling and power combined energy for industrial steam according to claim 7, characterized in that: The energy release process comprises the following steps: Introducing the low-temperature and high-pressure air in the high-pressure air storage tank (7) into the third air preheater (8), using the waste heat generated by the industrial park to preheat the low-temperature and high-pressure air, so that the low-temperature and high-pressure air becomes medium-temperature and high-pressure air; The medium-temperature high-pressure air is introduced into the high-pressure turbine (9) for expansion to generate power, and the medium-temperature high-pressure air is converted into ultra-low-temperature medium-pressure air; The ultra-low temperature medium-pressure air is introduced into the third heat exchanger (10) to exchange heat with normal temperature water, whereby the ultra-low temperature medium-pressure air is converted into low temperature medium-pressure air and the normal temperature water is converted into low temperature water to supply cooling to the industrial park; Introducing low-temperature medium-pressure air into a medium-pressure buffer tank (11), and then allowing it to enter a fourth air preheater (12), using waste heat generated by the industrial park to preheat the low-temperature medium-pressure air, thereby converting the low-temperature medium-pressure air into medium-temperature medium-pressure air; The medium-temperature medium-pressure air is introduced into the low-pressure turbine (13) for expansion to generate power, and the medium-temperature medium-pressure air is converted into ultra-low-temperature normal-pressure air; The ultra-low temperature normal pressure air is introduced into the fourth heat exchanger (14) to exchange heat with normal temperature water. The ultra-low temperature normal pressure air is converted into normal temperature overpressure air and discharged into the atmosphere. The normal temperature water is converted into low temperature water to supply cooling to the industrial park.

9. The method for storing heat, cooling and power combined energy for industrial steam according to claim 8, characterized in that: The temperature of the medium-temperature normal-pressure air is 70~75°C, the temperature of the high-temperature medium-pressure air is 310~320°C, and the pressure is 550~650kPa, the temperature of the high-temperature heat storage medium is 305~315°C, the temperature of the low-temperature medium-pressure air in the energy storage process is 12~25°C, and the pressure is 550~650kPa, the temperature of the medium-temperature medium-pressure air is 70~75°C, and the pressure is 550~650kPa, the temperature of the high-temperature high-pressure air is 280~310°C, and the pressure is 2.8~3.2MPa, the temperature of the medium-temperature heat storage medium is 275~305°C, and the temperature of the low-temperature high-pressure air is 12~25℃, pressure is 2.8~3.2MPa, the temperature of the high-pressure saturated water is 180~188℃, pressure is 1~1.2MPa, the temperature of the industrial steam is 300~310℃, the temperature of the medium-temperature high-pressure air is 70~75℃, pressure is 2.8~3.2MPa, the temperature of the ultra-low temperature medium-pressure air is -20~10℃, pressure is 550~650kPa, the temperature of the low-temperature medium-pressure air during the energy release process is 2~20℃, the pressure range is 550~650kPa, the temperature of the low-temperature water is 7~15℃, the temperature of the ultra-low temperature normal-pressure air is -20~10℃.