A slurry and reinforcement method suitable for soft water-rich formations
By using a combination of pipe shed support, deep hole grouting and advanced small conduit grouting in weak water-rich strata, the problems of low positioning accuracy and uneven grouting in traditional reinforcement methods are solved, achieving greater efficiency and safety. Tunnel reinforcement effect.
Patent Information
- Application Number
- CN202410953918.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-07-17
AI Technical Summary
In weak water-rich strata, traditional tunnel reinforcement methods have problems such as low positioning accuracy, large grid installation errors, and uneven grouting, which lead to construction safety hazards and impact on project quality.
A combination method of pipe shed support, deep hole grouting and advanced small pipe grouting is adopted. The pipe shed positioning device and grid positioning device are used to improve the installation accuracy, adjust the grouting hole position, and use a grout ratio suitable for the soil type. Ensure grouting is uniform and deep.
It improves the installation accuracy and efficiency of reinforcement, reduces later adjustments and rework, enhances the stability of the tunnel structure and construction safety, and reduces resource consumption and waste generation.
Smart Images

Figure CN118499000B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of stratum reinforcement, relates to the advance reinforcement of underground tunnels, and in particular to a slurry suitable for soft and water-rich strata and a reinforcement method. Background Art
[0002] With the acceleration of urbanization, the development and utilization of underground urban space has become an important way to solve the shortage of land resources and optimize the urban spatial structure. Due to the particularity of urban underground space, complex geological conditions have a great impact on tunnel construction. For example, soft and water-rich strata, large water content in the surrounding soil, and weak bearing capacity lead to the risk of collapse during tunnel construction. Therefore, it is necessary to reinforce the soil layer or stratum before tunnel excavation to ensure the safety of tunnel construction. Traditional reinforcement methods include advanced pipe support, deep hole grouting, grid support, and advanced small pipe grouting, which have the following problems:
[0003] 1. Advanced pipe-roof support: A pipe-roof support is set behind the tunnel face, and a pipe shed is erected on the pipe-roof support to support and reinforce the unexcavated area in front of the tunnel face, and grouting is performed to improve the surrounding rock conditions. The spacing and position of the pipe shed are very important, and they are usually positioned manually, with large errors and low precision. If there is a deviation, it needs to be reinstalled, which is inconvenient to adjust;
[0004] 2. The traditional grid installation precision control technology uses instruments to lay out the synchronous mileage and corresponding elevation of the tunnel, and then uses a level and a tape measure to measure the relationship between the grid at that location and the known synchronous mileage and the corresponding elevation. The elevation of the location and the installation mileage of the grid are calculated based on the known information. This process has the problem of large tape measure measurement errors, resulting in inconsistent elevations of the left and right corner plates of the tunnel grid, or the mileage is not synchronized during the process, causing the grid to twist. Subsequent adjustments are time-consuming and laborious. The large error directly affects the smoothness of the subsequent waterproofing construction of the tunnel, the thickness of the protective layer for the installation of the second lining steel bars, and the overall linearity and outer tube quality of the tunnel, which has a certain impact on the engineering construction;
[0005] 3. If Figure 8 As shown, after the first cycle of grouting is completed, the insertion angle of the grouting pipe 3 is limited during the subsequent cycle of grouting, and several original grouting holes 6 are arranged at vertical intervals and have the same length, resulting in a part of the position that cannot be grouted between the two cycles of grouting, forming a cavity 5, the grouting reinforcement is not comprehensive, the surrounding soil is unevenly stressed, and there is a safety hazard.
[0006] Therefore, we propose a slurry and reinforcement method suitable for soft and water-rich formations to solve the above problems. Summary of the invention
[0007] The purpose of the present invention is to overcome the deficiencies of the prior art and provide a slurry and reinforcement method suitable for soft and water-rich formations with accurate installation and quick positioning.
[0008] To solve the above problems, the technical solution of the present invention is:
[0009] A reinforcement method applicable to soft water-rich formations, comprising the following steps:
[0010] Step S101: pipe support
[0011] A pipe shed support is set up in front of the tunnel, and a number of pipe shed positioning devices are slidably installed on the pipe shed support for the pipe shed;
[0012] Step S103: Deep hole grouting
[0013] Grouting reinforcement is carried out on the unexcavated soil in the tunnel, and the grout is a grout suitable for soft and water-rich strata;
[0014] Step S105: Grid support
[0015] A grille is set up in front of the tunnel, and a grille positioning device is fixedly installed on the grille, which is suitable for adjusting the installation position of the grille;
[0016] Step S107: Advance small conduit grouting
[0017] Several small advance guide tubes are fixedly installed on the grid to carry out grouting reinforcement on the unexcavated soil in the tunnel.
[0018] In a further embodiment, in step S101 of pipe rack support, the pipe rack positioning device is a T-shaped structure with a pipe rack installation hole in the middle, suitable for installing the pipe rack; a plurality of pipe rack positioning device bolt holes are provided at intervals at the top end of the pipe rack positioning device, suitable for fixed installation on the pipe rack bracket.
[0019] In a further embodiment, the pipe rack support comprises a pair of channel steels, the pair of channel steels are spaced a certain distance apart, suitable for the insertion of the pipe rack positioning device, and the bottom ends of the pair of channel steels are fixedly mounted together by a connecting plate;
[0020] A pair of channel steels are each provided with a pipe shed installation groove corresponding to the pipe shed installation hole in the middle, a bolt groove corresponding to the bolt hole of the pipe shed positioning device is formed at the top, a slide rail is fixedly installed at the bottom, and the bottom end of the pipe shed positioning device is inserted between the pair of slide rails and slides.
[0021] In a further embodiment, in step S101 of pipe-roof support, a plurality of pipe-roof positioning devices are inserted between a pair of channel steels, slid to a predetermined position, fixed by bolts, and the pipe-roofs are inserted on the pipe-roof positioning devices and the channel steels.
[0022] In a further embodiment, in step S103 of deep hole grouting, the two or three rows of new grouting holes located on the upper side in the first cycle grouting are extended so that the outer side of the first grouting range of the first cycle grouting forms an inclination angle corresponding to the grouting pipe.
[0023] In a further embodiment, in step S105 of the grille support, the grille positioning device includes a level ruler, a mounting rod and an extension rod assembly, the level ruler is inserted into the mounting rod, and the extension rod assemblies are fixedly mounted at both ends of the mounting rod.
[0024] In a further embodiment, a reflective sheet is fixedly installed in the middle of the level ruler, and a first bubble meter is fixedly installed horizontally above the reflective sheet, and the bubble in the first bubble meter is located in the middle when in a horizontal state;
[0025] Both ends of the level ruler are fixedly installed with a second bubble meter that is vertically arranged. In a vertical state, the bubble in the second bubble meter is located in the center.
[0026] In a further embodiment, the extension rod assembly includes an extension rod, a fixing member and a slot, the extension rod is fixedly mounted inside the fixing member, and the extension rod and the mounting rod are threadedly connected together by a nut;
[0027] The fixing piece is hingedly connected to a slot at one end thereof close to the grille.
[0028] In a further embodiment, an arc-shaped groove is formed at the outer end of the slot, suitable for being mounted on the grille;
[0029] The card slot is flipped outwards to open when in use, and is folded inwards to the inside of the fixing piece after use.
[0030] In a further embodiment, in step S103 deep hole grouting, the slurry used is one, or two, or three of chemical slurry, double liquid slurry and single liquid slurry, the chemical slurry includes dilute sulfuric acid and sodium silicate aqueous solution, the dilute sulfuric acid is diluted with concentrated sulfuric acid with a concentration of 98% and water, and the mass fraction ratio of concentrated sulfuric acid to water is 6:200 to 9:200; the double liquid slurry includes cement slurry and sodium silicate aqueous solution, and the single liquid slurry includes cement slurry;
[0031] When the water-cement ratio of the cement slurry of the single-liquid slurry is 0.8:1-1.5:1; or the water-cement ratio of the cement slurry of the double-liquid slurry is 0.8:1-1.3:1, the Baume degree of the sodium silicate aqueous solution is 15-22, and the volume ratio of the cement slurry to the sodium silicate aqueous solution is 0.7:1-1.4:1; or the Baume degree of the sodium silicate aqueous solution of the chemical slurry is 19-22, and the volume ratio of the sodium silicate aqueous solution to dilute sulfuric acid is 10:1-15:1, it is suitable for the soil layer types of clay and silt;
[0032] When the water-cement ratio of the cement slurry of the single-liquid slurry is 0.8:1-1.3:1; or the water-cement ratio of the cement slurry of the double-liquid slurry is 0.7:1-1.2:1, the Baume degree of the sodium silicate aqueous solution is 18-23, and the volume ratio of the cement slurry to the sodium silicate aqueous solution is 0.5:1-1.2:1; or the Baume degree of the sodium silicate aqueous solution of the chemical slurry is 20-23, and the volume ratio of the sodium silicate aqueous solution to dilute sulfuric acid is 15:1-25:1, it is suitable for fine sand and medium sand soil types;
[0033] When the water-cement ratio of the cement slurry of the single-liquid slurry is 0.9:1-1.2:1; or the water-cement ratio of the cement slurry of the double-liquid slurry is 0.7:1-1.1:1, the Baume degree of the sodium silicate aqueous solution is 20-23, and the volume ratio of the cement slurry to the sodium silicate aqueous solution is 0.8:1-1.1:1; or the Baume degree of the sodium silicate aqueous solution of the chemical slurry is 20-24, and the volume ratio of the sodium silicate aqueous solution to dilute sulfuric acid is 20:1-55:1, it is suitable for the soil layer types of coarse sand and gravel sand;
[0034] When the water-cement ratio of the cement slurry of the single-liquid slurry is 0.8:1-1.1:1; or the water-cement ratio of the cement slurry of the double-liquid slurry is 0.6:1-0.9:1, the Baume degree of the sodium silicate aqueous solution is 22-25, and the volume ratio of the cement slurry to the sodium silicate aqueous solution is 0.6:1-0.9:1; or the Baume degree of the sodium silicate aqueous solution of the chemical slurry is 22-26, and the volume ratio of the sodium silicate aqueous solution to dilute sulfuric acid is 55:1-85:1, it is suitable for the pebble soil layer type;
[0035] When the water-cement ratio of the cement slurry of the single-liquid slurry is 0.7:1-1.1:1; or the water-cement ratio of the cement slurry of the double-liquid slurry is 0.5:1-0.8:1, the Baume degree of the sodium silicate aqueous solution is 23-26, and the volume ratio of the cement slurry to the sodium silicate aqueous solution is 0.5:1-0.8:1; or the Baume degree of the sodium silicate aqueous solution of the chemical slurry is 23-28, and the volume ratio of the sodium silicate aqueous solution to dilute sulfuric acid is 60:1-100:1, it is suitable for the soil layer type in the rock fracture zone.
[0036] Compared with the prior art, the present invention has the following beneficial effects:
[0037] 1. This reinforcement method uses pipe-roof support and deep-hole grouting to carry out large-scale foundation grouting reinforcement on the unexcavated soil in front of the tunnel, and then uses an advanced small guide tube to carry out small-scale precise grouting reinforcement to fill the gaps in deep-hole grouting, ensure uniform distribution of the grouting range, and improve the grouting effect.
[0038] 2. This reinforcement method slides and installs several pipe-roof positioning devices on the pipe-roof bracket. The pipe-roof positioning devices are used to insert the pipe-roof. The pipe-roof positioning devices are moved to the specified position and then fixed with bolts. The movement is convenient and quick, and the distribution position can be adjusted to improve the beam-arch effect of the entire pipe-roof, ensure that the pipe-roof is evenly arranged, accurately fixed, beautiful in line shape, and highly accurately installed; and reduce the settlement and changes of the pipe-roof and the soil above it caused by the later excavation of the hole, and also reduce the risks of tunnel surges and collapses caused by the removal of the horse head gate, reduce the settlement risk of surrounding infrastructure, and enhance the overall stability of the foundation pit retaining structure.
[0039] 3. This reinforcement method installs a grille positioning device on the grille to improve the accuracy of the grille installation in one time, avoid unnecessary rework and waste, ensure the integrity of the grille installation, the stability of the initial support, ensure that the position and elevation of each grille are installed correctly, ensure that the initial support is quickly closed, and effectively reduce the risk of settlement and collapse of the arch of the initial support structure; the grille positioning device includes a level, a mounting rod and an extension rod assembly, the mounting rod is fixedly installed with a level, and a horizontally set first bubble meter and a pair of vertically set second bubble meters are fixedly installed on the level to ensure the horizontality of the grille installation and avoid the torsion of the grille due to inconsistent left and right elevations; a reflector is fixedly installed in the middle of the level to ensure that the grille installation axis and elevation meet the construction requirements and the positioning is accurate; and the two ends of the mounting rod are threadedly connected to the extension rod assembly, which is convenient for adjusting the length of the grille positioning device according to the size of the grille and improving the scope of application of the device. One end of the extension rod assembly is hinged with a slot, which is mounted on both sides of the grille through the slot, and the installation and removal are quick and convenient.
[0040] 4. This reinforcement method extends the uppermost rows of new grouting holes in the first cycle of grouting, increases the grouting depth, and forms an inclination angle corresponding to the grouting pipe outside the first grouting range of the first cycle of grouting, eliminates voids, ensures uniform grouting, avoids reinforcement weak points, and improves the grouting reinforcement effect.
[0041] 5. In the deep hole grouting in step S103, this reinforcement method adopts different slurry ratios according to different soil layer types and groundwater conditions, which can improve the success rate and efficiency of grouting and improve construction safety; and compared with traditional slurry, less material is used to achieve the same effect, reducing the negative impact on the environment, thereby reducing resource consumption and waste generation. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 It is a flow chart of a reinforcement method applicable to soft and water-rich formations;
[0043] Figure 2 It is a front view of a pipe-roof positioning device for a reinforcement method suitable for soft and water-rich formations;
[0044] Figure 3 A side view of a pipe-roof positioning device for a reinforcement method suitable for soft, water-rich formations;
[0045] Figure 4 A top view of a pipe-roof positioning device for a reinforcement method suitable for soft, water-rich formations;
[0046] Figure 5 A side cross-sectional view of a pipe rack support for a reinforcement method suitable for soft, water-rich formations;
[0047] Figure 6 The front view of a pipe-roof support for a reinforcement method suitable for soft and water-rich formations;
[0048] Figure 7 A top view of a pipe-roof support for a reinforcement method suitable for soft, water-rich formations;
[0049] Figure 8 A prior art schematic diagram of step S103 of a reinforcement method applicable to soft water-rich formations;
[0050] Fig. 9 A schematic diagram of step S103 of a reinforcement method applicable to soft water-rich formations;
[0051] Fig.10 A front view of a grid for a reinforcement method suitable for soft, water-rich formations;
[0052] Fig.11 It is a front view of a grid positioning device for a reinforcement method suitable for soft and water-rich formations;
[0053] Fig.12 A side cross-sectional view of a grid positioning device for a reinforcement method suitable for soft, water-rich formations;
[0054] Fig.13 A top view of a slot expansion state of a reinforcement method suitable for soft and water-rich formations;
[0055] Fig.14 A main view of a slot expansion state of a reinforcement method suitable for soft and water-rich formations;
[0056] Fig.15 The front view of the slot in the folded state is a reinforcement method suitable for soft and water-rich formations.
[0057] In the figure: 1. pipe roof positioning device; 11. pipe roof installation hole; 12. pipe roof positioning device bolt hole; 2. pipe roof bracket; 21. channel steel; 211. bolt slot; 212. pipe roof installation slot; 22. slide rail; 23. connecting plate; 3. grouting pipe; 4. tunnel; 5. cavity; 6. original grouting hole; 7. new grouting hole; 8. grille; 9. grille positioning device; 91. level; 911. first bubble meter; 912. reflector; 913. second bubble meter; 92. mounting rod; 921. mounting slot; 93. extension rod assembly; 931. extension rod; 932. fixing piece; 933. bolt; 934. slot; 935. nut; X1, first excavation distance; X2, second excavation distance; Y1, first grouting range; Y2, second grouting range. DETAILED DESCRIPTION
[0058] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.
[0059] Embodiment 1:
[0060] A slurry and reinforcement method suitable for soft water-rich formations, such as Figures 1 to 15 As shown, the following steps are included:
[0061] Step S101: pipe support
[0062] A pipe rack support 2 is set up behind the tunnel face 4, and a plurality of pipe rack positioning devices 1 are slidably installed on the pipe rack support 2. A plurality of pipe racks are inserted through the pipe rack positioning devices 1, which facilitates the positioning of the pipe racks and reinforces the unexcavated soil in the tunnel 4.
[0063] like Figures 2 to 7As shown, the pipe-roof positioning device 1 is a T-shaped structure, and a pipe-roof mounting hole 11 is formed in the middle of the web of the pipe-roof positioning device 1 for inserting the pipe-roof; four pipe-roof positioning device bolt holes 12 are formed at intervals on the wing plate of the pipe-roof positioning device 1, respectively located at the four corners of the wing plate, to ensure a firm installation; the pipe-roof bracket 2 includes a pair of channel steels 21, the pair of channel steels 21 are relatively arranged and spaced a certain distance apart, the spacing distance corresponds to the thickness of the pipe-roof positioning device 1, and is convenient for the pipe-roof positioning device 1 to be inserted into the pipe-roof bracket 2, the bottom ends of the pair of channel steels 21 are fixedly installed together by a connecting plate 23 to form a whole, the top ends of the pair of channel steels 21 are provided with a full-length bolt groove 211, and the bolt groove 211 corresponds to the bolt hole 12 of the pipe-roof positioning device, so that the pipe-roof positioning device 1 can be installed on the pair of channel steels 21 by bolts; the middle parts of the pair of channel steels 21 are provided with a full-length bolt groove 211, and the bolt groove 211 corresponds to the bolt hole 12 of the pipe-roof positioning device, so that the pipe-roof positioning device 1 can be installed on the pair of channel steels 21 by bolts; A pipe roof installation groove 212, the width of which corresponds to the diameter of the pipe roof installation hole 11, is convenient for inserting the pipe roof; the upper surfaces of the bottom ends of a pair of channel steels 21 are respectively fixedly installed with slide rails 22 set throughout the length, and the spacing of a pair of slide rails 22 corresponds to the thickness of the pipe roof positioning device 1. Several pipe roof positioning devices 1 are inserted from the gap between the top ends of a pair of channel steels 21, and the bottom ends of the pipe roof positioning devices 1 are inserted between the pair of slide rails 22, so that the pipe roof positioning devices 1 can move left and right along the slide rails 22. After moving the first pipe roof positioning device 1 to the specified position, align the pipe roof positioning device bolt hole 12 at the top end of the pipe roof positioning device 1 with the bolt groove 211 of the channel steel 21 and fix them with high-strength bolts. The remaining pipe roof positioning devices 1 are arranged at designed spacings and fixedly installed, so that all pipe roofs are evenly arranged, accurately positioned, and have beautiful lines. Preferably, the pipe-roof positioning device 1 is made of steel, and the slide rail 22 is made of steel bars; the pipe-roof support 2 can be either an arched structure or a linear structure according to construction requirements.
[0064] Step S103: Deep hole grouting
[0065] After the pipe shed is installed, deep hole grouting is carried out in the unexcavated area in front of tunnel 4 to reinforce the foundation of a large area of soil. According to the on-site construction conditions, the purpose of grouting, hydrogeological conditions, soil characteristics of the stratum, grouting test results, economic costs and other factors are comprehensively considered to select appropriate grouting materials and proportions. In order to determine the best construction parameters, a small-scale on-site grouting test is carried out at the actual project site to evaluate the influence of different construction parameters on the fluidity of the slurry and the filling effect. The flow of the slurry and the filling effect are monitored in real time during the grouting process. Grouting parameters such as grouting pressure, time and slurry proportion are adjusted in time according to the monitoring data. The sodium silicate aqueous solution used for on-site grouting, i.e., water glass, should meet the requirements of Table 1:
[0066] Table 1
[0067]
[0068] According to the results of the on-site grouting test, the grouting construction parameters under different water contents in different strata are shown in Table 2:
[0069] Table 2
[0070]
[0071] In Table 2, the working face elevation is set to 0 meters. When the groundwater level is lower than -0.5 meters, there is no visible water. When the groundwater level is between -0.5 meters and 0.5 meters, there is a small amount of interlayer water stagnation. When the groundwater level is higher than 0.5 meters, there is a large amount of water gushing. The chemical slurry is a mixture of dilute sulfuric acid and water glass solution. Dilute sulfuric acid is a mixture of 98% concentrated sulfuric acid and water, and the mass fraction ratio is 9:200. Preferably, the single-liquid slurry is cement slurry, and the double-liquid slurry is cement slurry and water glass.
[0072] like Figure 8 , Fig. 9 As shown, in the prior art, the tunnel 4 is excavated and grouting is performed for multiple times, wherein the first grouting range Y1 is larger than the first excavation distance X1, the second grouting range Y2 is larger than the second excavation distance X2, the first excavation distance X1 and the second excavation distance X2 are connected, the first grouting range Y1 and the second grouting range Y2 partially overlap, and due to the insertion angle limitation of the grouting pipe 3, there is a part of the position that cannot be reinforced by grouting between the two cycles of grouting, forming a cavity 5; in order to avoid the appearance of the cavity 5, the rows of new grouting holes 7 located on the upper side of the first cycle of grouting are extended to increase the grouting depth, so that the outer side of the first grouting range Y1 of the first cycle of grouting forms an inclination angle corresponding to the grouting pipe 3, thereby eliminating the cavity 5.
[0073] Step S105: Grid support
[0074] like Figures 10 to 15 As shown, after the deep hole grouting is completed, an infrared laser is installed at the starting position of the tunnel 4 according to the designed axis and elevation, and the angle and direction of the infrared laser are adjusted according to the axis and slope of the tunnel 4. After the adjustment is completed, it is fixed; according to the first grid 8, the calibration level is installed to correspond to the overall length of the section. After the calibration is completed, the length of the grid positioning device 9 is adjusted and fixed to correspond to the width of the grid 8.
[0075] The grille positioning device 9 includes a level ruler 91, a mounting rod 92 and an extension rod assembly 93. The level ruler 91 is inserted into the top end of the mounting rod 92. Both ends of the mounting rod 92 are fixedly mounted with one end of the extension rod assembly 93. The other ends of the two extension rod assemblies 93 are respectively clamped on both sides of the grille 8.
[0076] The level 91 is a plate-like structure, with a reflective sheet 912 fixedly installed in the middle of the level 91, and a first bubble meter 911 fixedly installed above the reflective sheet 912. In the horizontal state, the bubble in the first bubble meter 911 is located in the middle and corresponds to the center line of the reflective sheet 912; second bubble meters 913 are fixedly installed at the top ends of the level 91, and in the vertical state, the bubble in the second bubble meter 913 is located in the middle. The positions of the bubbles in the first bubble meter 911 and the second bubble meter 913 can be used to know whether the grille 8 is installed in place. If there is a deviation, it is adjusted until the installation is correct, thereby improving the installation accuracy of the grille 8; a pair of vertically arranged mounting grooves 921 are fixedly installed at the top end of the mounting rod 92, and the spacing between the pair of mounting grooves 921 corresponds to the length of the level 91. When in use, the level 91 is inserted into the pair of mounting grooves 921, and the level 91 is pulled out after use for easy storage.
[0077] The extension rod assembly 93 includes an extension rod 931, a fixing piece 932 and a slot 934. The fixing piece 932 is an angle steel and the extension rod 931 is fixedly installed on the inner side. The extension rod 931 and the mounting rod 92 are threadedly connected together through a nut 935. The nut 935 is fixedly installed on the inner side of the fixing piece 932. The fixing piece 932 is provided with a bolt hole. After the extension rod 931 is adjusted to the required length, a bolt 933 is inserted into the fixing piece 932, and the mounting rod 92 is tightened by the bolt 933 to complete the fixation; the fixing piece 932 is hingedly connected to the end of the grille 8 near the end of the grille 8. The slot 934 is a plate-like structure and an arc-shaped groove is formed on the edge near the grille 8, which is suitable for being mounted on the grille 8. Fig.14 As shown, when in use, the card slot 934 is turned outward and unfolded, as shown in FIG. Fig.15 As shown, after use, the card slot 934 is folded inward to the inner side of the fixing member 932 for easy storage and transportation.
[0078] When setting up the grid 8 at the face of the tunnel 4, the grid positioning device 9 is clamped at the corresponding position on the first grid 8, and it is checked whether the infrared laser instrument coincides with the center of the reflective sheet 912. If it coincides, it means that the installation axis and elevation of the grid 8 meet the requirements. If not, the installation position of the grid 8 is adjusted until it coincides. After the coincidence, observe whether the bubble positions in the first bubble meter 911 and the second bubble meter 913 are centered, and adjust the installation level of the grid 8 according to the bubble position to ensure that the left and right elevations of the grid 8 are consistent to avoid torsion. The other grids 8 are fixedly connected to this grid 8 by bolts to form a whole to ensure that the force is stable.
[0079] Step S107: Advance small conduit grouting
[0080] After the installation of the grid 8 is completed, several advance small pipes are fixed on the grid 8, and small-scale fine grouting is carried out into the unexcavated soil in front of the tunnel 4 to fill the gaps of deep hole grouting, ensure uniform grouting, and improve the reinforcement effect; mark the designed hole position, adopt the hole-leading and top-entry method, the drilling direction should be straight, the drilling depth and diameter should match the advance small pipe, and the hole is cleaned by the blowing method. After the hole is formed, the advance small pipe is inserted into the hole according to the design requirements, or the advance small pipe is directly driven into the hole from the upper and middle parts of the grid 8, with an exposed length greater than or equal to 30 cm and a lap length greater than or equal to 1 m, supported on the steel frame behind the excavation surface, and together with the steel frame, it forms a pre-support system; the exposed part of the advance small pipe is welded and fixed to the grid 8, and the grid 8 is used to assist the advance small pipe to support the soil above the subsequent excavation position.
[0081] The front end of the advance small conduit is a conical structure with a length of 20cm. A steel hoop with a diameter of 6mm is welded to the rear end of the advance small conduit. The outer diameter of the advance small conduit is 32mm, the thickness is 20.75mm, and the length is 2.8m. Overflow holes with a diameter of 6mm are arranged in a plum blossom shape at intervals of 20 to 30cm on the advance small conduit. No holes are opened within 100cm of the rear end of the advance small conduit.
[0082] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A reinforcement method suitable for soft water-rich formations, characterized in that: The following steps are involved: Step 1: Pipe Shed Support A pipe shed support (2) is set up in front of the tunnel (4), and a plurality of pipe shed positioning devices (1) are slidably mounted on the pipe shed support (2) for installing the pipe shed; The pipe rack positioning device (1) is a T-shaped structure, with a pipe rack installation hole (11) formed in the middle, suitable for inserting the pipe rack; a plurality of pipe rack positioning device bolt holes (12) are formed at intervals at the top end of the pipe rack positioning device (1), suitable for being fixedly mounted on the pipe rack support (2); Step 2: Deep hole grouting Performing grouting reinforcement on the unexcavated soil in the tunnel (4); The tunnel (4) is excavated and grouted for multiple times, wherein the first grouting range (Y1) is greater than the first excavation distance (X1), the second grouting range (Y2) is greater than the second excavation distance (X2), the first excavation distance (X1) and the second excavation distance (X2) are connected, the first grouting range (Y1) and the second grouting range (Y2) partially overlap, and after the first cycle of grouting is completed, because the insertion angle of the grouting pipe (3) in the subsequent cycle of grouting is limited, there is a part of the position that cannot be reinforced by grouting between the two cycles of grouting, forming a cavity (5); in order to avoid the appearance of the cavity (5), the uppermost rows of grouting holes (7) in the first cycle of grouting are extended to increase the grouting depth, so that the outer side of the first grouting range (Y1) forms an inclined angle corresponding to the grouting pipe (3), thereby eliminating the cavity (5); Step 3: Grille support A grille (8) is installed in front of the tunnel (4), and a grille positioning device (9) is fixedly installed on the grille (8) to adjust the installation position of the grille (8); The grid positioning device (9) comprises a level ruler (91), a mounting rod (92) and an extension rod assembly (93); the level ruler (91) is inserted into the mounting rod (92), and the extension rod assembly (93) is fixedly mounted at both ends of the mounting rod (92); A reflective sheet (912) is fixedly mounted in the middle of the level (91), and a first bubble meter (911) arranged horizontally is fixedly mounted above the reflective sheet (912), wherein the bubble in the first bubble meter (911) is located in the middle when in a horizontal state; A second bubble meter (913) arranged vertically is fixedly mounted on both ends of the level ruler (91), and in a vertical state, the bubble in the second bubble meter (913) is located in the middle; Step 4: Advance small tube grouting A plurality of small advance guide tubes are fixedly installed on the grid (8) to perform grouting reinforcement on the unexcavated soil in the tunnel (4).
2. A reinforcement method suitable for soft water-rich formations according to claim 1, characterized in that: The pipe rack support (2) comprises a pair of channel steels (21), the top ends of the pair of channel steels (21) having a gap corresponding to the pipe rack positioning device (1) and suitable for the pipe rack positioning device (1) to be inserted, and the bottom ends of the pair of channel steels (21) are fixedly mounted together via a connecting plate (23); A pipe rack installation groove (212) corresponding to the pipe rack installation hole (11) is formed at the middle of the pair of channel steels (21), a bolt groove (211) corresponding to the bolt hole (12) of the pipe rack positioning device is formed at the top end of the pair of channel steels (21), a slide rail (22) is fixedly mounted at the bottom end of the pair of channel steels (21), and the bottom end of the pipe rack positioning device (1) is inserted between the pair of slide rails (22), so that the pipe rack positioning device (1) can move along the slide rail (22).
3. A reinforcement method suitable for soft water-rich formations according to claim 2, characterized in that: In the pipe rack support of step 1, a plurality of the pipe rack positioning devices (1) are inserted between a pair of the channel steels (21), slid to a predetermined position, fixed by bolts, and the pipe rack is inserted on the pipe rack positioning devices (1) and the channel steels (21).
4. A reinforcement method suitable for soft water-rich formations according to claim 3, characterized in that: The extension rod assembly (93) comprises an extension rod (931), a fixing member (932) and a clamping slot (934); the extension rod (931) is fixedly mounted inside the fixing member (932); the extension rod (931) and the mounting rod (92) are threadedly connected together via a nut (935); An end of the fixing member (932) close to the grille (8) is hingedly connected to the slot (934).
5. A reinforcement method suitable for soft water-rich formations according to claim 4, characterized in that: The outer end of the clamping slot (934) is provided with an arc-shaped groove suitable for clamping on the grille (8); When in use, the card slot (934) is flipped outward and opened, and after use, the card slot (934) is folded inward to the inside of the fixing member (932).
6. A reinforcement method suitable for soft water-rich formations according to claim 5, characterized in that: In the deep hole grouting of step 2, the slurry used is one, two or three of chemical slurry, double liquid slurry and single liquid slurry. The chemical slurry is a mixture of dilute sulfuric acid and sodium silicate aqueous solution. The dilute sulfuric acid is diluted with concentrated sulfuric acid with a concentration of 98% and water. The mass fraction ratio of concentrated sulfuric acid to water is 6:200 to 9:
200. The double liquid slurry is cement slurry and sodium silicate aqueous solution, and the single liquid slurry is cement slurry.