A robot path planning method based on artificial intelligence
Through the robot path planning method based on artificial intelligence, the coordination problem of multiple AGV robots working at the same time is solved, ensuring a balanced distribution of the workshop area, avoiding congestion, and improving production efficiency.
Patent Information
- Application Number
- CN202410985555.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-07-23
AI Technical Summary
Existing AGV robot path planning solutions ignore the coordination problem when multiple robots work at the same time, resulting in crossing paths and regional congestion, affecting workshop production efficiency.
The robot path planning method based on artificial intelligence is used to obtain road information of the AGV robot's working environment, divide the road area, determine the current position and target position of each robot, generate an overall path plan, calculate the robot distribution equilibrium value, and determine the optimal path , to avoid regional congestion.
It achieves a balanced distribution of multiple AGV robots in the working environment, avoids regional congestion, and improves the material flow efficiency and overall production efficiency of the workshop.
Smart Images

Figure CN118518115B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of path planning, and in particular to a robot path planning method based on artificial intelligence. Background Art
[0002] The main functions of AGV robots are concentrated in automatic logistics handling and transfer. AGV handling robots automatically transport items to designated locations through special landmark navigation. In existing industrial automation designs, AGV robots are an important means of material flow between different production processes. In existing industrial designs, landmark navigation roads for AGV robots to walk on are usually marked in advance in the workshop. AGV robots carry out material flow by walking on the navigation roads.
[0003] Existing applications and path planning solutions for AGV robots are usually only targeted at a single AGV robot, that is, they can only intelligently generate the optimal path for a single robot based on the working status information of a single AGV robot. However, in the actual application production process, there are usually multiple AGV robots working at the same time in the automated production workshop. The existing technology ignores the coordination problem when multiple robots work at the same time, which can easily lead to the intersection of the robot's walking paths, resulting in congestion when multiple robots move to the same area at the same time, affecting the overall production efficiency of the workshop. Summary of the invention
[0004] In order to solve the above technical problems, a robot path planning method based on artificial intelligence is provided. This technical solution solves the problem that the above-mentioned existing technology ignores the coordination problem when multiple robots work at the same time, which easily leads to the intersection of the robot walking paths, thereby causing congestion when multiple robots move to the same area at the same time, affecting the overall production efficiency of the workshop.
[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:
[0006] A robot path planning method based on artificial intelligence, comprising:
[0007] Acquire the working road information of the working environment of the AGV robot, and divide the working road of the working environment of the AGV robot into multiple road areas based on the road attributes;
[0008] Determine the current position and target position of all AGV robots in the working environment;
[0009] Based on the current positions and moving target positions of all AGV robots in the working environment, generate at least one robot working path coordination plan;
[0010] Calculate the robot distribution balance value of the AGV robot working environment under each robot work path coordination plan respectively;
[0011] Determine the optimal robot work path coordination plan based on the robot distribution balance value;
[0012] Determine the moving path of each AGV robot in the optimal robot work path coordination plan, which is recorded as the optimal moving path of the AGV robot;
[0013] The optimal moving path of the AGV robot is sent to the corresponding AGV robot, and it is controlled to move to the target position according to the optimal moving path.
[0014] Preferably, the dividing of the working road of the AGV robot working environment into a plurality of road areas based on road attributes specifically includes:
[0015] Continuous areas with the same road features in the working road of the AGV robot working environment are classified as the same road area, all road areas in the working road of the AGV robot working environment are obtained, and the working road division of the AGV robot working environment is completed, wherein the road features include road bending radius and road width.
[0016] Preferably, the generating of at least one robot working path coordination plan based on the current positions and target positions of all AGV robots in the working environment specifically includes:
[0017] Based on the current position and the target position of the AGV robot, at least one walking path is determined from the working road of the working environment of the AGV robot, and all walking paths corresponding to the AGV robot are combined into a set of candidate walking paths corresponding to the AGV robot;
[0018] Select a walking path corresponding to an AGV robot from the set of candidate walking paths corresponding to each AGV robot, and combine them into a robot work path coordination plan;
[0019] Traverse the combination of walking paths corresponding to all AGV robots and obtain several robot work path coordination plans.
[0020] Preferably, the robot distribution balance value of the AGV robot working environment under each robot working path coordination scheme is calculated separately, specifically comprising:
[0021] Based on the walking properties of each AGV robot, determine the position of the AGV robot at each moment in the future when it moves along each corresponding walking path;
[0022] Based on the positions of all AGV robots at each moment in the future in the overall planning of each robot's work path, calculate the number of AGV robots in each road area at each moment in the future;
[0023] Calculate and determine the area of each road area;
[0024] Determine the analysis period;
[0025] Based on the number of AGV robots in each road area at each moment in the future and the area of each road area, the robot distribution equilibrium value of the AGV robot working environment is calculated through the equilibrium evaluation formula;
[0026] The balance evaluation formula is specifically:
[0027] In the formula, is the robot distribution balance value, is the number of AGV robots in the i-th road area at time t in the future, is the area of the ith road region, T is the determined analysis period, and n is the total number of road regions.
[0028] Preferably, the specific steps of determining the analysis period are:
[0029] Determine the time required for each AGV robot to move to the target position under the robot work path coordination plan, which is recorded as the target movement time of the AGV robot;
[0030] The minimum target moving time of all AGV robots is selected as the analysis period.
[0031] Preferably, the overall planning scheme for determining the optimal robot working path based on the robot distribution balance value is specifically:
[0032] The robot work path coordination plan corresponding to the minimum robot distribution balance value is selected as the optimal robot work path coordination plan.
[0033] Preferably, the overall planning scheme for determining the optimal robot working path based on the robot distribution balance value is specifically:
[0034] Based on the importance of the work of all AGV robots, an important weight is added to each AGV robot;
[0035] Based on the set of candidate walking paths corresponding to the AGV robot, calculate the time required for the AGV robot to move to the target position along each walking path;
[0036] Combined with the important weight of the AGV robot and the time required for the AGV robot to move to the target position according to each walking path, calculate the reasonable indicators of the robot's work path coordination plan;
[0037] Based on the reasonable indicators of the robot work path coordination plan and the robot distribution balance value of the AGV robot working environment under the robot work path coordination plan, the comprehensive indicators of the robot work path coordination plan are calculated through a comprehensive fitting formula;
[0038] Select the robot work path coordination plan corresponding to the minimum value of the comprehensive index as the optimal robot work path coordination plan;
[0039] Among them, the comprehensive fitting formula is specifically:
[0040] In the formula, As a comprehensive indicator, To focus on reasonable indicators, Emphasize weight for distribution.
[0041] Preferably, the above-mentioned reasonable indicators for calculating the robot working path coordination plan by combining the important weight of the AGV robot and the time required for the AGV robot to move to the target position according to each walking path specifically include:
[0042] Determine the walking path corresponding to the minimum time required for each AGV robot to move to the target position, record it as the most reasonable path for the robot, and record the time required to move to the target position along the most reasonable path as the optimal movement time of the AGV robot;
[0043] Based on the optimal moving time of all AGV robots and the important weights of AGV robots, the reasonable indicators of the robot work path coordination plan are calculated through the time-consuming focus calculation formula;
[0044] The time-consuming calculation formula is as follows:
[0045] In the formula, is the important weight of the jth AGV robot, is the optimal moving time of the jth AGV robot, The time required for the jth AGV robot to move to the target position in the robot work path coordination plan is: is the time required for the jth AGV robot to move to the target position along the kth walking path, is the total number of walking paths corresponding to the jth AGV robot, and m is the total number of AGV robots.
[0046] Compared with the prior art, the present invention has the following beneficial effects:
[0047] The present invention proposes a robot path planning scheme based on artificial intelligence, and introduces a robot distribution balance value as an environmental congestion assessment indicator when multiple robots work simultaneously in a coordinated planning workspace. Based on the artificial intelligence central control center, the comprehensive fitting value between the AGV robot data existing in each area of the road and the area of each area under the robot work path coordination scheme is calculated, and the robot distribution balance value is used as the robot distribution balance value. This can realize the overall coordinated planning of multiple robots working at the same time, ensure that the robots in each area of the working environment are evenly distributed when the robots are walking and working, and avoid congestion caused by multiple robots moving to the same area at the same time, thereby greatly ensuring the material flow efficiency of the AGV robots in the workshop and improving the overall production efficiency of the workshop. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] Figure 1 This is a flow chart of the robot path planning method based on artificial intelligence proposed by the present invention;
[0049] Figure 2 A flow chart of a method for generating at least one robot working path coordination plan in the present invention;
[0050] Figure 3 A flow chart of a method for calculating a robot distribution balance value of an AGV robot working environment under a coordinated plan for each robot working path in the present invention;
[0051] Figure 4 A flow chart of a method for determining an analysis cycle in the present invention;
[0052] Figure 5 A flow chart of a method for determining an optimal robot work path coordination solution based on a robot distribution balance value in certain embodiments of the present invention;
[0053] Figure 6 A flow chart of a method for calculating a robot work path coordination plan focusing on reasonable indicators in certain embodiments of the present invention;
[0054] Figure 7 This is a structural diagram of the electronic device proposed by the present invention;
[0055] Figure 8 This is a schematic diagram of the structure of the computer-readable storage medium proposed in the present invention. DETAILED DESCRIPTION
[0056] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.
[0057] Reference Figure 1 As shown, a robot path planning method based on artificial intelligence includes:
[0058] Acquire the working road information of the working environment of the AGV robot, and divide the working road of the working environment of the AGV robot into multiple road areas based on the road attributes;
[0059] Determine the current position and target position of all AGV robots in the working environment;
[0060] Based on the current positions and moving target positions of all AGV robots in the working environment, generate at least one robot working path coordination plan;
[0061] Calculate the robot distribution balance value of the AGV robot working environment under each robot work path coordination plan respectively;
[0062] Determine the optimal robot work path coordination plan based on the robot distribution balance value;
[0063] Determine the moving path of each AGV robot in the optimal robot work path coordination plan, which is recorded as the optimal moving path of the AGV robot;
[0064] The optimal moving path of the AGV robot is sent to the corresponding AGV robot, and it is controlled to move to the target position according to the optimal moving path.
[0065] The robot distribution balance value is introduced as an environmental congestion assessment indicator for the coordinated planning of multiple robots working simultaneously in the workspace. Based on the artificial intelligence central control center, the overall coordinated planning of multiple robots working simultaneously is realized to ensure that the robots are evenly distributed in various areas of the working environment when the robots are walking and working.
[0066] The method of dividing the working road of the AGV robot working environment into multiple road areas based on road attributes specifically includes:
[0067] Continuous areas with the same road features in the working road of the AGV robot working environment are classified as the same road area, all road areas in the working road of the AGV robot working environment are obtained, and the working road division of the AGV robot working environment is completed, wherein the road features include road bending radius and road width.
[0068] It can be understood that the walking properties of the AGV robot are the same in roads with the same road bending radius and road width, so continuous road areas with the same road characteristics have the same walking property analysis. Therefore, they are divided into the same road area in this scheme to facilitate subsequent road planning analysis.
[0069] Reference Figure 2 As shown, the generating of at least one robot working path coordination plan based on the current position and target position of all AGV robots in the working environment specifically includes:
[0070] Based on the current position and the target position of the AGV robot, at least one walking path is determined from the working road of the working environment of the AGV robot, and all walking paths corresponding to the AGV robot are combined into a set of candidate walking paths corresponding to the AGV robot;
[0071] Select a walking path corresponding to an AGV robot from the set of candidate walking paths corresponding to each AGV robot, and combine them into a robot work path coordination plan;
[0072] Traverse the combination of walking paths corresponding to all AGV robots and obtain several robot work path coordination plans.
[0073] It is understandable that the AGV robot can achieve a variety of walking paths from the starting point to the end point. In this solution, an exhaustive release is adopted to combine all the walking paths of all robots to obtain a comprehensive plan for all possible robot working paths.
[0074] Reference Figure 3 As shown, the calculation of the robot distribution balance value of the AGV robot working environment under each robot working path coordination plan specifically includes:
[0075] Based on the walking properties of each AGV robot, determine the position of the AGV robot at each moment in the future when it moves along each corresponding walking path;
[0076] Based on the positions of all AGV robots at each moment in the future in the overall planning of each robot's work path, calculate the number of AGV robots in each road area at each moment in the future;
[0077] Calculate and determine the area of each road area;
[0078] Determine the analysis period;
[0079] Based on the number of AGV robots in each road area at each moment in the future and the area of each road area, the robot distribution equilibrium value of the AGV robot working environment is calculated through the equilibrium evaluation formula;
[0080] The balance evaluation formula is specifically:
[0081] In the formula, is the robot distribution balance value, is the number of AGV robots in the i-th road area at time t in the future, is the area of the ith road region, T is the determined analysis period, and n is the total number of road regions.
[0082] In this solution, based on the number of regional robot distribution, As the normalized distribution index of robots in each area, based on the area of each area, As the normalized area ratio index of each region, the vector distance between the normalized distribution index of the robot and the normalized area ratio index is calculated as the robot distribution balance value. The smaller the robot distribution balance value is, the closer the normalized distribution index of the robot and the normalized area ratio index are. That is, the larger the area of the region, the more robots are distributed and the more balanced the distribution of the number of robots is.
[0083] Reference Figure 4 As shown, the specific steps of determining the analysis cycle are:
[0084] Determine the time required for each AGV robot to move to the target position under the robot work path coordination plan, which is recorded as the target movement time of the AGV robot;
[0085] The minimum target moving time of all AGV robots is selected as the analysis period.
[0086] In some embodiments, the optimal robot working path coordination scheme is determined based on the robot distribution balance value as follows:
[0087] The robot work path coordination plan corresponding to the minimum robot distribution balance value is selected as the optimal robot work path coordination plan.
[0088] When all AGV robots in the workshop perform the same work, or there is no obvious difference in the work of all AGV robots in the workshop, at this time, the minimum robot distribution balance value, that is, the most balanced robot distribution solution, can be used to coordinate the movement paths of all AGV robots.
[0089] Reference Figure 5 As shown, in some embodiments, the optimal robot working path coordination scheme based on the robot distribution balance value is specifically determined as follows:
[0090] Based on the importance of the work of all AGV robots, an important weight is added to each AGV robot;
[0091] Based on the set of candidate walking paths corresponding to the AGV robot, calculate the time required for the AGV robot to move to the target position along each walking path;
[0092] Combined with the important weight of the AGV robot and the time required for the AGV robot to move to the target position according to each walking path, calculate the reasonable indicators of the robot's work path coordination plan;
[0093] Based on the reasonable indicators of the robot work path coordination plan and the robot distribution balance value of the AGV robot working environment under the robot work path coordination plan, the comprehensive indicators of the robot work path coordination plan are calculated through a comprehensive fitting formula;
[0094] Select the robot work path coordination plan corresponding to the minimum value of the comprehensive index as the optimal robot work path coordination plan;
[0095] Among them, the comprehensive fitting formula is specifically:
[0096] In the formula, As a comprehensive indicator, To focus on reasonable indicators, Emphasize weight for distribution.
[0097] Among them, the distribution emphasis weight is determined based on the total number of AGV robots. The larger the total number of AGV robots, the more important it is to ensure that the AGV robots can move smoothly in the environment relative to the importance of the tasks of the AGV robots. At this time, the larger the distribution emphasis weight is. The specific value of the distribution emphasis weight can be personalized by the staff according to the actual work workshop.
[0098] Reference Figure 6 As shown, the reasonable indicators for calculating the robot work path coordination plan by combining the important weight of the AGV robot and the time required for the AGV robot to move to the target position according to each walking path include:
[0099] Determine the walking path corresponding to the minimum time required for each AGV robot to move to the target position, record it as the most reasonable path for the robot, and record the time required to move to the target position along the most reasonable path as the optimal movement time of the AGV robot;
[0100] Based on the optimal moving time of all AGV robots and the important weights of AGV robots, the reasonable indicators of the robot work path coordination plan are calculated through the time-consuming focus calculation formula;
[0101] The time-consuming calculation formula is as follows:
[0102] In the formula, is the important weight of the jth AGV robot, is the optimal moving time of the jth AGV robot, The time required for the jth AGV robot to move to the target position in the robot work path coordination plan is: is the time required for the jth AGV robot to move to the target position along the kth walking path, is the total number of walking paths corresponding to the jth AGV robot, and m is the total number of AGV robots.
[0103] It is understandable that in some application environments where AGV robots have different work importance, simply considering whether the robot distribution is balanced does not meet the actual application needs. At this time, it is necessary to make the AGV robots with more important work have shorter working time on the basis of satisfying the balanced distribution of robots. Based on this, this scheme introduces a focus on reasonable indicators. By calculating the difference indicator between the movement time of the AGV robot in the scheme and the shortest movement time of the AGV robot, the focus on reasonable indicators is calculated in combination with the important weight of the AGV robot. The smaller the focus on reasonable indicators, the closer the movement time of each AGV robot in the scheme is to the shortest time. The rationality of the scheme is comprehensively evaluated by combining the focus on reasonable indicators representing the work importance of the AGV robot and the robot distribution balance value representing the balanced distribution of the AGV robot, which can effectively ensure the efficient and reasonable implementation of the workshop production plan.
[0104] Furthermore, the method according to the embodiment of the present application can also be performed by Figure 7 The electronic device architecture shown in FIG. Figure 7 As shown, the electronic device 500 may include a bus 501, one or more CPUs 502, a read-only memory (ROM) 503, a random access memory (RAM) 504, a communication port 505 connected to a network, an input / output component 506, a hard disk 507, etc. The storage device in the electronic device 500, such as the ROM 503 or the hard disk 507, may store a robot path planning method based on artificial intelligence provided by the present application. The electronic device 500 may also include a user interface 508. Of course, Figure 7 The architecture shown is only exemplary and can be omitted according to actual needs when implementing different devices. Figure 7 One or more components of an electronic device are shown.
[0105] Figure 8 Schematic diagram of a computer-readable storage medium structure provided by an embodiment of the present application. Figure 8As shown, it is a computer-readable storage medium 600 according to an embodiment of the present application. Computer-readable instructions are stored on the computer-readable storage medium 600. When the computer-readable instructions are executed by the processor, a robot path planning method based on artificial intelligence according to an embodiment of the present application described with reference to the above figures can be executed. The computer-readable storage medium 600 includes, but is not limited to, for example, volatile memory and / or non-volatile memory. Volatile memory may include, for example, random access memory (RAM) and cache memory (cache), etc. Non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc.
[0106] In summary, the advantages of the present invention are: ensuring balanced distribution of robots in various areas, greatly ensuring the material flow efficiency of the AGV robots in the workshop, and improving the overall production efficiency of the workshop.
[0107] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A robot path planning method based on artificial intelligence, characterized in that: include: Acquire the working road information of the working environment of the AGV robot, and divide the working road of the working environment of the AGV robot into multiple road areas based on the road attributes; Determine the current position and target position of all AGV robots in the working environment; Based on the current positions and moving target positions of all AGV robots in the working environment, generate at least one robot working path coordination plan; Calculate the robot distribution balance value of the AGV robot working environment under each robot work path coordination plan respectively; Determine the optimal robot work path coordination plan based on the robot distribution balance value; Determine the moving path of each AGV robot in the optimal robot work path coordination plan, which is recorded as the optimal moving path of the AGV robot; Send the optimal moving path of the AGV robot to the corresponding AGV robot, and control it to move to the target position according to the optimal moving path; The method of dividing the working road of the AGV robot working environment into multiple road areas based on road attributes specifically includes: Classify the continuous areas with the same road features in the working road of the AGV robot working environment as the same road area, obtain all road areas in the working road of the AGV robot working environment, and complete the division of the working road of the AGV robot working environment, wherein the road features include the road bending radius and the road width; The generating of at least one robot working path coordination plan based on the current positions and target positions of all AGV robots in the working environment specifically includes: Based on the current position and the target position of the AGV robot, at least one walking path is determined from the working road of the working environment of the AGV robot, and all walking paths corresponding to the AGV robot are combined into a set of candidate walking paths corresponding to the AGV robot; Select a walking path corresponding to an AGV robot from the set of candidate walking paths corresponding to each AGV robot, and combine them into a robot work path coordination plan; Traverse the combination of walking paths corresponding to all AGV robots to obtain several robot working path coordination plans; The robot distribution balance value of the AGV robot working environment under each robot working path coordination scheme is calculated separately, specifically including: Based on the walking properties of each AGV robot, determine the position of the AGV robot at each moment in the future when it moves along each corresponding walking path; Based on the positions of all AGV robots at each moment in the future in the overall planning of each robot's work path, calculate the number of AGV robots in each road area at each moment in the future; Calculate and determine the area of each road area; Determine the analysis period; Based on the number of AGV robots in each road area at each moment in the future and the area of each road area, the robot distribution equilibrium value of the AGV robot working environment is calculated through the equilibrium evaluation formula; The balance evaluation formula is specifically: , where is the robot distribution balance value, is the number of AGV robots in the i-th road area at time t in the future, is the area of the ith road area, is the determined analysis period, and n is the total number of road areas.
2. The robot path planning method based on artificial intelligence according to claim 1, characterized in that: The specific steps of determining the analysis cycle are: Determine the time required for each AGV robot to move to the target position under the robot work path coordination plan, which is recorded as the target movement time of the AGV robot; The minimum target moving time of all AGV robots is selected as the analysis period.
3. The robot path planning method based on artificial intelligence according to claim 2, characterized in that: The overall planning scheme for determining the optimal robot working path based on the robot distribution balance value is specifically as follows: The robot work path coordination plan corresponding to the minimum robot distribution balance value is selected as the optimal robot work path coordination plan.
4. The robot path planning method based on artificial intelligence according to claim 3, characterized in that: The overall planning scheme for determining the optimal robot working path based on the robot distribution balance value is specifically as follows: Based on the importance of the work of all AGV robots, an important weight is added to each AGV robot; Based on the set of candidate walking paths corresponding to the AGV robot, calculate the time required for the AGV robot to move to the target position along each walking path; Combined with the important weight of the AGV robot and the time required for the AGV robot to move to the target position according to each walking path, calculate the reasonable indicators of the robot's work path coordination plan; Based on the reasonable indicators of the robot work path coordination plan and the robot distribution balance value of the AGV robot working environment under the robot work path coordination plan, the comprehensive indicators of the robot work path coordination plan are calculated through a comprehensive fitting formula; Select the robot work path coordination plan corresponding to the minimum value of the comprehensive index as the optimal robot work path coordination plan; Among them, the comprehensive fitting formula is specifically: , where As a comprehensive indicator, To focus on reasonable indicators, Emphasize weight for distribution.
5. The method for robot path planning based on artificial intelligence according to claim 4, characterized in that: The above-mentioned reasonable indicators for calculating the robot work path coordination plan by combining the important weight of the AGV robot and the time required for the AGV robot to move to the target position according to each walking path include: Determine the walking path corresponding to the minimum time required for each AGV robot to move to the target position, record it as the most reasonable path for the robot, and record the time required to move to the target position along the most reasonable path as the optimal movement time of the AGV robot; Based on the optimal moving time of all AGV robots and the important weights of AGV robots, the reasonable indicators of the robot work path coordination plan are calculated through the time-consuming focus calculation formula; The time-consuming calculation formula is as follows: , where is the important weight of the jth AGV robot, is the optimal moving time of the jth AGV robot, The time required for the jth AGV robot to move to the target position in the robot work path coordination plan is: is the time required for the jth AGV robot to move to the target position along the kth walking path, is the total number of walking paths corresponding to the jth AGV robot, and m is the total number of AGV robots.
6. An electronic device, characterized in that: include: at least one processor; and a memory communicatively connected to the at least one processor; wherein, The memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute an artificial intelligence-based robot path planning method as described in any one of claims 1-5.
7. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the robot path planning method based on artificial intelligence described in any one of claims 1 to 5 is implemented.