A method and system for automatically selecting water quality sampling points in plain river network areas
Through the GIS platform, the river water system and infrastructure data are processed, and the water quality sampling points in the plain river network area are automatically selected, which solves the problems of low automation and inaccurate sampling in the existing technology, and realizes efficient and accurate selection of water quality sampling points, which meets the needs of the Water quality monitoring requirements.
Patent Information
- Application Number
- CN202411009829.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-26
AI Technical Summary
The existing technology has low degree of automation in the selection of water quality sampling points, requires a lot of manpower and time, and cannot fully and accurately reflect the water quality.
The GIS platform collects river water system and infrastructure data, automatically generates sampling points and assigns index coefficients, and realizes automatic selection of water quality sampling points in plain river network areas, including the initial generation of global sampling points, river sections and partition sampling points, combined with different The coefficient calculations at the regional and river levels are finally balanced and representative sampling points are selected.
The automatic selection of water quality sampling points is realized, labor and time costs are reduced, and the convenience and accuracy of selection is improved, which can more comprehensively reflect the river water quality status.
Smart Images

Figure CN118535670B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of water environment monitoring, and in particular relates to a method and system for automatically selecting water quality sampling points in a plain river network area. Background Art
[0002] Water quality monitoring is the basic premise for taking water quality assurance measures, and the layout of water quality sampling points is an important part of water quality monitoring. However, the plain river network is densely distributed, greatly affected by human activities, and has dense infrastructure. There are many factors that need to be considered for the reasonable layout of water quality monitoring points. Usually, water quality monitoring points are mainly manually laid out, and some use cluster analysis methods for optimization, but there are problems such as low degree of automation, large manpower and time costs, and lack of comprehensiveness and accuracy.
[0003] At present, there are relatively few studies on the automatic selection of water quality sampling points. Some technicians have conducted relevant research on the selection of water quality sampling points and proposed some feasible technical solutions. The current invention focuses on clustering analysis of indicators to achieve the optimization of sampling points for monitoring river water ecosystems. However, the existing technical solutions require a lot of manpower and time costs, and cannot fully and accurately reflect the water quality. The present invention collects and processes data on river systems, infrastructure, etc. through a GIS platform, realizes automatic generation of global sampling points and automatic assignment of indicator coefficients, thereby automatically selecting water quality sampling points in plain river network areas, and improving the convenience and applicability of water quality sampling point selection. Summary of the invention
[0004] The purpose of the present invention is to overcome the deficiencies of the prior art and to provide a method and system for automatically selecting water quality sampling points in a plain river network area, so as to provide technical support for water environment monitoring sampling.
[0005] To achieve the above purpose, the technical solution adopted by the present invention is as follows:
[0006] A method for automatically selecting water quality sampling points in a plain river network area comprises the following steps:
[0007] S1. Use GIS platform to read basic river data in the study area and preliminarily generate global sampling points;
[0008] S2. According to the sampling points of each river section, a first value assignment calculation is performed on each sampling point to screen out the optimal sampling points of each river section;
[0009] S3. According to the different areas, river levels and boundary buffer ranges of each sub-area, a second value assignment calculation is performed on the sampling optimal points of each river section in the sub-area to screen out the sub-area sampling optimal points of each sub-area;
[0010] S4. According to the number requirements of the optimal sampling points in the partition and the control area, three balanced assignments are performed to screen out the final optimal sampling points.
[0011] Furthermore, the step S1 includes the following sub-steps:
[0012] S11. Process the water area and centerline data of the river in the study area through the GIS platform, divide the river into sections at the intersections, and correspond the water area and centerline of the river one by one through the river section number attribute;
[0013] S12, calculating the average width of each river section, setting a threshold a for the average width of the river section, and selecting the river sections with an average width above the threshold a as the river sections to be set up with sampling points;
[0014] S13. For the river section where sampling points are to be arranged, set a distance d, and generate equidistant points with a distance d on the center line of the river as global sampling points.
[0015] Furthermore, the step S2 includes the following sub-steps:
[0016] S21. Collect location information of relevant elements of rainwater and sewage outfalls, riverside roads or greenways, waterside parks, water conservancy projects, and hydrological monitoring stations in the study area, and digitize them;
[0017] S22. Different coefficients are set according to the degree of influence of different factors near the global sampling points on water quality, as well as the starting point and end point of the river channel. The coefficient values can be determined according to target requirements;
[0018] S23. For each sampling point in the river section, if there are relevant elements within a certain range, such as within 500m, the score is calculated by multiplying the corresponding coefficient of the relevant element, and the point with the highest score is used as the preferred sampling point for the river section;
[0019] The calculation formula is: ;
[0020] In the formula, Score each sampling point in the river;
[0021] The coefficients are respectively for hydrological monitoring stations, water conservancy projects, roads along the river or parks near the water, the starting point or end point of the river, and the rainwater and sewage discharge outlets;
[0022] S24, assigning values to the coefficients in step S22, generally, the coefficient values are: hydrological monitoring site>water conservancy project>road along the river, waterside park>starting point or end point of the river>1, and the rainwater and sewage discharge outlet is -1;
[0023] S25. With respect to step S23, if there are multiple optimal sampling points, a preferred sampling point is randomly selected therefrom.
[0024] Furthermore, the step S3 includes the following sub-steps:
[0025] S31. Determine the scope of different water systems or towns, collect information on different areas such as industrial parks, hospitals, farms, sewage treatment plants, etc. in the study area, and digitize them;
[0026] S32. For the impact range of different infrastructures in the water system zone, three buffer zones are divided according to the degree of water quality impact, namely the central zone, the impact zone and the buffer zone from the inside to the outside. Different coefficients are set, and the coefficient values decrease in sequence and are all greater than 1. They can be determined according to the target needs;
[0027] S33. According to the "River Management Regulations of the People's Republic of China", rivers are divided into five levels, and different coefficients are set. The coefficient values decrease from high to low, and are all greater than 1.
[0028] S34. For the water system zoning boundary, the boundary buffer range is delineated according to 1000m, and a coefficient greater than 1 is set, which is determined according to the target demand;
[0029] S35. For the sampling preferred points of the river sections in each partition, if they exist in the buffer partition or river level in steps S32-S34, the scores are calculated by multiplying them by the corresponding coefficients of the relevant areas and sorting them;
[0030] The formula is: ;
[0031] In the formula, is the score of each sampling point in the partition; y1 is the coefficient of the corresponding different buffer partitions, y2 is the corresponding river level coefficient; y3 is the boundary buffer coefficient;
[0032] S36. According to the sorting results of step S35, the river section sampling preferred points with the highest scores are preferentially selected according to the number of sampling points required as the partition sampling preferred points.
[0033] Furthermore, in step S32, the division ranges of the three buffer zones are respectively: the central zone is the area within a radius of 500m with the infrastructure in S31 as the center; the impact zone is the area within a radius of 500-2000m with the infrastructure in S31 as the center; the buffer zone is the area within a radius of 2000-5000m with the infrastructure in S31 as the center.
[0034] Furthermore, the step S4 includes the following sub-steps:
[0035] S41, for each selected partition sampling preferred point, perform Thiessen polygon analysis, calculate the controlled area of the partition sampling preferred point and sort it;
[0036] S42. Determine the administrative divisions of the county and count the number of optimal sampling points within each county;
[0037] S43. According to the requirements for setting the number of sampling points, the number of sampling points in different sub-areas is balanced through an algorithm, and the sampling points in sub-areas with too many sampling points and those with a small control area in each county are preferentially eliminated to ensure the representativeness of the final sampling points;
[0038] S44, determine whether the final sampling optimization point position meets the requirements, adjust the different elements and different regional coefficients, and perform optimization again.
[0039] A system for automatically selecting water quality sampling points in a plain river network area, the system is applied to any of the above-mentioned methods for automatically selecting water quality sampling points in a plain river network area, the system comprising:
[0040] A global sampling point preliminary generation module generates equidistant sampling points for large-scale river sections in the study area;
[0041] The module for generating the optimal sampling points of a river section assigns weights to the sampling points on the river section and selects the optimal sampling points of the river section; the coefficients can be manually adjusted by the user according to the target requirements;
[0042] The module for generating the optimal sampling points in different zones is used to assign weights to the optimal sampling points in each river section in the water system zone, and select the optimal sampling points in different zones; the coefficients can be manually adjusted by the user according to the target requirements;
[0043] The water quality sampling point balancing module performs spatial analysis on the optimal sampling points for the partitions, and adjusts the assignment coefficients according to the optimal results to determine the final optimal sampling points.
[0044] An electronic device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the method for automatically selecting water quality sampling points in any plain river network area mentioned above is implemented.
[0045] A computer-readable storage medium stores a computer program, which, when executed, implements the above-mentioned method for automatically selecting water quality sampling points in any plain river network area.
[0046] Compared with the existing method, the beneficial effects of the present invention are:
[0047] 1. The present invention processes data such as river networks, water systems, and infrastructure through a GIS platform, automatically arranges global sampling points, analyzes spatial relationships, automatically assigns index coefficients, selects target water quality sampling points, and implements automated processes, reducing manpower and time costs.
[0048] 2. The present invention provides a water quality sampling point balancing module, which allows manual adjustment of the assignment coefficient, improves the pertinence and representativeness of the water quality sampling points, and enables the target water quality sampling points to meet the sampling requirements and fully reflect the water quality conditions of the river. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 is a flow chart of the method of the present invention;
[0050] Figure 2 A schematic diagram of global sampling points automatically selected by the present invention;
[0051] Figure 3 A schematic diagram of the optimal sampling points of a river section automatically selected by the present invention;
[0052] Figure 4 A schematic diagram of the optimal points for partition sampling automatically selected by the present invention;
[0053] Figure 5 This is a schematic diagram of the optimal point balance for partition sampling of the present invention;
[0054] Figure 6 It is a schematic diagram of the structure of the system of the present invention.
[0055] In the figure: 1, global sampling point; 1a, first global sampling point; 1b, second global sampling point; 1c, third global sampling point; 1d, fourth global sampling point; 1e, fifth global sampling point; 1f, sixth global sampling point; 1g, seventh global sampling point; 2, rainwater and sewage outfall; 3, riverside road or greenway; 4, waterside park; 5, water conservancy project; 6, hydrological monitoring station; 7, river starting point; 8, river end point; 9, river section sampling preferred point; 9a, first river section sampling preferred point; 9b, second river section sampling preferred point; 9c, third river section sampling preferred point; 9d, fourth river section sampling preferred point 9e, the sampling point of the fifth river section; 9f, the sampling point of the sixth river section; 9g, the sampling point of the seventh river section; 9h, the sampling point of the eighth river section; 9i, the sampling point of the ninth river section; 9j, the sampling point of the tenth river section; 9k, the sampling point of the eleventh river section; 9l, the sampling point of the twelfth river section; 10, industrial park; 11, hospital; 12, breeding farm; 13, sewage treatment plant; 14, third-level river; 15, fourth-level river; 16, fifth-level river; 17, subdivision boundary; 18, boundary buffer zone; 19, central area; 20, impact zone; 21, buffer zone; 22. Zoned sampling preferred points; 22a. First zoned sampling preferred points; 22b. Second zoned sampling preferred points; 22c. Third zoned sampling preferred points; 22d. Fourth zoned sampling preferred points; 22e. Fifth zoned sampling preferred points; 22f. Sixth zoned sampling preferred points; 201. Global sampling point preliminary generation module; 202. River section sampling preferred point generation module; 203. Zoned sampling preferred point generation module; 204. Water quality sampling point balance module. DETAILED DESCRIPTION
[0056] The present invention will be further described in detail below in conjunction with the accompanying drawings. The river channels in this embodiment and the accompanying drawings are simulated river channel conditions and do not involve actual river channel information.
[0057] like Figure 1 As shown, the present invention provides a method for automatically selecting water quality sampling points in a plain river network area, comprising the following steps:
[0058] S1. Use the GIS platform to read the basic data of rivers in the study area and preliminarily generate global sampling points 1;
[0059] S2. According to the sampling points of each river section, a first value assignment calculation is performed on each sampling point to screen out the optimal sampling points 9 of each river section;
[0060] S3, according to the different areas, river levels and boundary buffer zones 18 of each sub-area, a second value assignment calculation is performed on the sampling optimal points 9 of each river section in the sub-area, and the sub-area sampling optimal points 22 of each sub-area are screened out;
[0061] S4. According to the quantity requirement of the partition sampling preferred points 22 and the control area, three balanced assignments are performed to screen out the final preferred sampling points.
[0062] Furthermore, the step S1 includes the following sub-steps:
[0063] S11. Process the water area and centerline data of the river in the study area through the GIS platform, divide the river into sections at the intersections, and correspond the water area and centerline of the river one by one through the river section number attribute;
[0064] S12, calculating the average width of each river section, setting a threshold a for the average width of the river section, and selecting the river sections with an average width above the threshold a as the river sections to be set up with sampling points;
[0065] S13, for the river section where the sampling points are to be arranged, set the distance d, and generate equidistant points with a distance d on the center line of the river as global sampling points 1, as shown in the attached figure. Figure 2 shown.
[0066] Furthermore, the step S2 includes the following sub-steps:
[0067] S21. Collect the location information of relevant elements in the study area, including rainwater and sewage outlets, 2 roads or greenways along the river, 3 waterside parks, 4 water conservancy projects, 5 and hydrological monitoring stations, and digitize them;
[0068] S22, according to the influence of different factors on water quality near the global sampling point 1, as well as the river starting point 7 and the river end point 8, different coefficients are set, and the coefficient values can be determined according to the target requirements;
[0069] S23. For each sampling point in the river section, if there is a relevant factor within a certain range, such as within 500 m, the score is calculated by multiplying the corresponding coefficient of the relevant factor. If there is no relevant coefficient, the default coefficient is 1, and the point with the highest score is used as the preferred sampling point for the river section 9;
[0070] The calculation formula is: ;
[0071] In the formula, Score each sampling point in the river;
[0072] They are the coefficient values of hydrological monitoring station 6, water conservancy project 5, riverside road or greenway 3 or waterside park 4, river starting point 7 or river end point 8, and rainwater and sewage discharge outlet 2;
[0073] S24. For the coefficient assignment in step S22, the acquisition of hydrological parameters, the convenience of sampling, and the representativeness of water quality sampling results are considered. In order to facilitate the use of the parameters of the hydrological monitoring station 6 and realize the combination of water quality monitoring and water quantity monitoring, it is preferred to arrange the sampling points near the hydrological monitoring station 6; for water conservancy projects 5, such as gates and pumps, some hydrological parameters can be obtained for subsequent water quality analysis; for the river roads or greenways 3 and rivers around the waterside park 4, the riverbed is stable, the water flow is steady, and it is convenient for sampling; for the starting point 7 or the end point 8 of the river, the starting point 7 of the river has not been affected by the pollution source, and the sewage and river water at the end point 8 of the river have been basically mixed evenly, which is used as a control section to analyze the changes in water quality; for the rain and sewage discharge outlet 2, the sewage and river water have not been mixed evenly, and the water quality representativeness of the sampling point is weak, so try to avoid arranging sampling points at the rain and sewage discharge outlet 2. In general, the coefficient values are: hydrological monitoring site 6> water conservancy project 5> riverside road or greenway 3, waterside park 4> river starting point 7 or river end point 8> 1, and rainwater and sewage outlet 2 is -1;
[0074] In this embodiment, the coefficient of the hydrological monitoring site 6 is assigned a value of 2, the coefficient of the water conservancy project 5 is assigned a value of 1.5, the coefficient of the riverside road or greenway 3 and the waterside park 4 is assigned a value of 1.3, the coefficient of the river starting point 7 and the river end point 8 is assigned a value of 1.1, and the coefficient of the rainwater and sewage discharge outlet 2 is assigned a value of -1;
[0075] S25. For step S23, if there are multiple optimal sampling points, a river section optimal sampling point 9 is randomly selected from them, such as Figure 3 As shown;
[0076] In this embodiment, Figure 3 The scores of the seven global sampling points 1, namely the first global sampling point 1a, the second global sampling point 1b, the third global sampling point 1c, the fourth global sampling point 1d, the fifth global sampling point 1e, the sixth global sampling point 1f, and the seventh global sampling point 1g, are calculated. The calculation results are shown in Table 2. The sixth global sampling point 1f has the highest score and is used as the optimal sampling point 9 for the river section.
[0077] Table 1 Score calculation table for optimal sampling points in river sections
[0078]
[0079] Furthermore, the step S3 includes the following sub-steps:
[0080] S31. Determine the different water system divisions or township scopes, collect information on the different regional scopes of industrial parks10, hospitals11, breeding farms12, and sewage treatment plants13 in the study area, and digitize them, such as Figure 4 As shown;
[0081] S32. For the impact range of different infrastructures in the water system zone, the closer to the infrastructure, the greater the impact on water quality, and the sampling points should be prioritized. Three buffer zones are divided according to the degree of water quality impact, from the inside to the outside, namely the central zone 19, the impact zone 20 and the buffer zone 21. The coefficient values decrease in sequence and are all greater than 1. According to the target requirements, in this embodiment, the coefficient of the central zone 19 is assigned to 1.5, the coefficient of the impact zone 20 is assigned to 1.3, and the buffer zone 21 is assigned to 1.1;
[0082] S33. According to the Regulations of the People's Republic of China on River Management, the natural scale of the river and its importance to social, economic development and ecological environment are comprehensively considered, and the river is divided into five levels. The sampling points are arranged in rivers with higher levels first, so the coefficient values decrease from high to low, and are all greater than 1; in this embodiment, the coefficient of the first-level river is 1.5, the coefficient of the second-level river is 1.4, the coefficient of the third-level river is 1.3, the coefficient of the fourth-level river is 1.2, and the coefficient of the fifth-level river is 1.1; this embodiment includes three types of third-level river 14, fourth-level river 15 and fifth-level river 16, and according to the coefficient value rules, they are 1.3, 1.2 and 1.1 respectively;
[0083] S34. For the water system partition boundary 17, the boundary position is generally the upstream or downstream of the river, which can be used as a reference section to analyze the evolution characteristics of river water quality. The boundary buffer zone 18 range is demarcated according to 1000m, and a coefficient greater than 1 is set. In this embodiment, the coefficient is assigned a value of 1.2;
[0084] S35. For the sampling preferred points 9 in the river sections in each partition, if they exist in the buffer partition or river level in steps S32-S34, the scores are calculated by multiplying them by the corresponding coefficients of the relevant areas and sorting them;
[0085] The formula is: ;
[0086] In the formula, is the score of each sampling point in the partition; y1 is the coefficient of the corresponding different buffer partitions, y2 is the corresponding river level coefficient; y3 is the boundary buffer 18 coefficient;
[0087] S36. According to the sorting result of step S35, the river section sampling preferred point 9 with the highest score is preferentially selected according to the number of sampling points required as the partition sampling preferred point 22.
[0088] Furthermore, in step S32, the three buffer zones are divided into: the central zone 19 is within 500m of the infrastructure of S31, the impact zone 20 is within 500-2000m of the infrastructure of S31, and the buffer zone 21 is within 2000-5000m of the infrastructure of S31.
[0089] In this embodiment, Figure 4 The first river section sampling preferred point 9a, the second river section sampling preferred point 9b, the third river section sampling preferred point 9c, the fourth river section sampling preferred point 9d, the fifth river section sampling preferred point 9e, the sixth river section sampling preferred point 9f, the seventh river section sampling preferred point 9g, the eighth river section sampling preferred point 9h, the ninth river section sampling preferred point 9i, the tenth river section sampling preferred point 9j, the eleventh river section sampling preferred point 9k, the twelfth river section sampling preferred point 9l and other 12 river section sampling preferred points 9 are the river section sampling preferred points selected in step S2. The sub-area sampling preferred point score calculation is performed, and the calculation results are shown in Table 2. The point 9i with the highest score is used as the sub-area sampling preferred point 22.
[0090] Table 2 Score calculation table for optimal sampling points in different zones
[0091]
[0092] Furthermore, the step S4 includes the following sub-steps:
[0093] S41, for each selected partition sampling preferred point 22, use the [Analysis Tool] - [Neighborhood Analysis] - [Create Thiessen Polygon] function in ArcGIS software, input the vector data of the partition sampling preferred point 22, generate Thiessen polygons, calculate the Thiessen polygon area of the partition sampling preferred point 22 and sort it, the area of the Thiessen polygon represents the size of the control range of the sampling point;
[0094] S42, determine the administrative divisions of the county, and count the number of optimal sampling points 22 within each county;
[0095] S43. According to the requirements for setting the number of sampling points, the number of sampling points in different sub-areas is balanced through an algorithm, and the sub-area sampling preferred points 22 in each county with too many sub-area sampling preferred points and sub-area sampling preferred points 22 with a small control area are preferentially eliminated to ensure the representativeness of the final sampling preferred points;
[0096] S44, determine whether the final sampling optimization point position meets the requirements, adjust the different elements and different regional coefficients, and perform optimization again. In this embodiment, the number of target sampling points is 5. There are 6 optimal sampling points 22 for each subarea selected by step S3, such as Figure 5As shown, they are respectively the first sub-area sampling preferred point 22a, the second sub-area sampling preferred point 22b, the third sub-area sampling preferred point 22c, the fourth sub-area sampling preferred point 22d, the fifth sub-area sampling preferred point 22e, and the sixth sub-area sampling preferred point 22f; the solid line in the figure is the administrative division boundary, and the dotted line is the Thiessen polygon division boundary 17. According to the balance principle of S43, the control area of the first sub-area sampling preferred point 22a is small, and the number of sampling points in the administrative area is relatively large. Considering eliminating the first sub-area sampling preferred point 22a, the second sub-area sampling preferred point 22b, the third sub-area sampling preferred point 22c, the fourth sub-area sampling preferred point 22d, the fifth sub-area sampling preferred point 22e, and the sixth sub-area sampling preferred point 22f are the finally selected water quality sampling points.
[0097] like Figure 6 As shown, a system for automatically selecting water quality sampling points in a plain river network area is applied to any of the above-mentioned methods for automatically selecting water quality sampling points in a plain river network area, and the system includes:
[0098] A global sampling point preliminary generation module 201 generates equidistant global sampling points 1 for large-scale river sections in the study area;
[0099] The river section sampling optimal point generation module 202 assigns weights to the sampling points on the river section and selects the river section sampling optimal points 9; the coefficients can be manually adjusted by the user according to the target requirements;
[0100] The sub-area sampling optimal point generation module 203 assigns weights to the sampling optimal points 9 of each river section in the water system sub-area, and selects the sub-area sampling optimal points 22; the coefficients can be manually adjusted by the user according to the target requirements;
[0101] The water quality sampling point balancing module 204 performs spatial analysis on the partition sampling optimization points 22, and adjusts the assignment coefficients according to the optimization effect to determine the final optimization sampling points.
[0102] An electronic device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the method for automatically selecting water quality sampling points in any plain river network area mentioned above is implemented.
[0103] A computer-readable storage medium stores a computer program, which, when executed, implements the above-mentioned method for automatically selecting water quality sampling points in any plain river network area.
[0104] The above embodiments and the specific parameters therein are only for clearly describing the invention verification process, and are not intended to limit the patent protection scope of the present invention. The patent protection scope of the present invention shall still be based on its claims. Any equivalent structural changes made using the contents of the description and drawings of the present invention should also be included in the protection scope of the present invention.
Claims
1. A method for automatically selecting water quality sampling points in a plain river network area, characterized in that: The following steps are involved: S1. Use GIS platform to read basic river data in the study area and preliminarily generate global sampling points; S2. According to the sampling points of each river section, a first value assignment calculation is performed on each sampling point to screen out the optimal sampling points of each river section; S3. According to the different areas, river levels and boundary buffer ranges of each sub-area, a second value assignment calculation is performed on the sampling optimal points of each river section in the sub-area to screen out the sub-area sampling optimal points of each sub-area; S4. According to the number of optimal sampling points required for the partition and the control area, a third balanced assignment is performed to select the final optimal sampling points; The step S1 comprises the following sub-steps: S11. Process the water area and centerline data of the river in the study area through the GIS platform, divide the river into sections at the intersections, and correspond the water area and centerline of the river one by one through the river section number attribute; S12, calculating the average width of each river section, setting a threshold a for the average width of the river section, and selecting the river sections with an average width above the threshold a as the river sections to be set up with sampling points; S13, for the river section where the sampling points are to be arranged, set the distance d, and generate equidistant points with a distance d on the center line of the river as global sampling points; The step S2 comprises the following sub-steps: S21. Collect the location information of relevant elements of rainwater and sewage outfalls, riverside roads or greenways, waterside parks, water conservancy projects, and hydrological monitoring stations in the study area, and digitize them; S22. Different coefficients are set according to the influence of different factors on water quality near the global sampling points, as well as the starting point and end point of the river channel. The coefficient values are determined according to the target requirements. S23. For each sampling point in the river section, if there are relevant elements within a certain range, such as within 500m, the score is calculated by multiplying the corresponding coefficient of the relevant element, and the point with the highest score is used as the preferred sampling point for the river section; The calculation formula is: In the formula, Score each sampling point in the river; The coefficients are respectively for hydrological monitoring stations, water conservancy projects, roads along the river or parks near the water, the starting point or end point of the river, and the rainwater and sewage discharge outlets; S24, assigning values to the coefficients in step S22, generally, the coefficient values are: hydrological monitoring site>water conservancy project>road along the river, waterside park>starting point or end point of the river>1, and the rainwater and sewage discharge outlet is -1; S25. For step S23, if there are multiple optimal sampling points, randomly select one optimal sampling point from them; The step S3 comprises the following sub-steps: S31. Determine the scope of different water systems or townships, collect information on the scope of different infrastructures such as industrial parks, hospitals, farms, and sewage treatment plants in the study area, and digitize them; S32. For the impact range of different infrastructures within the water system zone, three buffer zones are divided according to the degree of their water quality impact, namely the central zone, the impact zone and the buffer zone from the inside to the outside. Different coefficients are set, and the coefficient values decrease in sequence, all greater than 1, and are determined according to the target needs; S33, divide the river into five levels, set different coefficients, and reduce the coefficient values from high to low in order, all of which are greater than 1; S34. For the water system zoning boundary, the boundary buffer range is delineated according to 1000m, and a coefficient greater than 1 is set, which is determined according to the target demand; S35. For the sampling preferred points of the river sections in each partition, if they exist in the buffer partition or river level in steps S32-S34, the scores are calculated by multiplying them by the corresponding coefficients of the relevant areas and sorting them; The calculation formula is: In the formula, is the score of each sampling point in the partition; y1 is the coefficient of the corresponding different buffer partitions, y2 is the corresponding river level coefficient; y3 is the boundary buffer coefficient; S36, according to the sorting results of step S35, the river section sampling preferred points with the highest scores are preferentially selected as the sub-area sampling preferred points according to the number of sampling points required; The step S4 comprises the following sub-steps: S41, for each selected partition sampling preferred point, perform Thiessen polygon analysis, calculate the controlled area of the partition sampling preferred point and sort it; S42. Determine the administrative divisions of the county and count the number of optimal sampling points within each county; S43. According to the requirements for setting the number of sampling points, the number of sampling points in different sub-areas is balanced through an algorithm, and the sampling points in sub-areas with too many sampling points and those with a small control area in each county are preferentially eliminated to ensure the representativeness of the final sampling points; S44, determine whether the final sampling optimization point position meets the requirements, adjust the different elements and different regional coefficients, and perform optimization again.
2. The method for automatically selecting water quality sampling points in a plain river network area according to claim 1 is characterized by: In step S32, the division ranges of the three buffer zones are respectively: the central zone is the area within a radius of 500m with the infrastructure in S31 as the center; the impact zone is the area within a radius of 500-2000m with the infrastructure in S31 as the center; the buffer zone is the area within a radius of 2000-5000m with the infrastructure in S31 as the center.
3. An automatic selection system for water quality sampling points in plain river network areas, characterized by: The system is applied to the method for automatically selecting water quality sampling points in a plain river network area according to claim 1 or 2, and the system comprises: A global sampling point preliminary generation module generates equidistant sampling points for large-scale river sections in the study area; The module for generating the optimal sampling points of a river section assigns weights to the sampling points on the river section and selects the optimal sampling points of the river section; the coefficients are manually adjusted by the user according to the target requirements; The module for generating the optimal sampling points of each section in the water system partition is used to assign weights to the optimal sampling points of each river section, and select the optimal sampling points of each section; the coefficients are manually adjusted by the user according to the target requirements; The water quality sampling point balancing module performs spatial analysis on the optimal sampling points for the partitions, and adjusts the assignment coefficients according to the optimal results to determine the final optimal sampling points.
4. An electronic device, characterized in that: It includes a memory, a processor, and a computer program stored in the memory and capable of running on the processor. When the processor executes the computer program, it implements the automatic selection method of water quality sampling points in a plain river network area as described in claim 1 or 2.
5. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and when the computer program is executed, the method for automatically selecting water quality sampling points in a plain river network area as claimed in claim 1 or 2 is implemented.
