BIM-based hanging basket design method, device, electronic device and storage medium

Through the BIM-based hanging basket design method, the problem of difficult control of the construction accuracy of the longitudinal center line of the prestressed concrete continuous box girder on the circular curve is solved, and efficient linear control is achieved.

CN118568847BActive Publication Date: 2024-11-195TH ENGINEERING LTD OF THE FIRST HIGHWAY ENGINEERING BUREAU CCCC +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411060581.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-19
Estimated Expiration
2044-08-05

AI Technical Summary

Technical Problem

Traditional technology is difficult to ensure the construction accuracy and linear control of the longitudinal center line of prestressed concrete continuous box girder on the circular curve.

Method used

Using the BIM-based hanging basket design method, the BIM model of walking track adapted to the longitudinal linear shape is generated, the construction section is divided, the theoretical and measurement influence parameters are obtained, and the hanging basket model is adjusted to ensure linear shape control.

Benefits of technology

Improve the accuracy and construction efficiency of linear control of curved prestressed suspended beams.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118568847B_ABST
    Figure CN118568847B_ABST
Patent Text Reader

Abstract

The present invention provides a BIM-based hanging basket design method, device, electronic device and storage medium, including: generating a walking track BIM model on a BIM model of a section to be constructed; dividing the section to be constructed into one or more first sections based on a combined model; dividing the first section into one or more second sections according to a hanging basket design specification, and obtaining a first BIM model of each second section hanging basket based on the combined model; adjusting the first BIM model of the second section hanging basket based on a first plane linear control parameter and a first elevation control parameter to obtain a corresponding second BIM model; adjusting the hanging basket construction of the second section based on a second plane linear control parameter and a second elevation control parameter. The scheme can ensure the accuracy and efficiency of the linear control of the curved prestressed cantilever beam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building engineering, and in particular to a BIM-based hanging basket design method, device, electronic equipment and storage medium. Background Art

[0002] Prestressed concrete continuous box girders have been widely used in bridge engineering due to their good structural performance and economy. In particular, large-span bridges, such as railway bridges and highway bridges, are often constructed using the cantilever casting method. The cantilever casting method is a scaffold-free construction method suitable for the construction of box girders where it is impossible to set up scaffolds under the spans of cross-line bridges and river-crossing bridges. This method uses a hanging basket to move on the completed beam section, and performs operations such as template installation, steel bar binding, prestressed pipe installation, concrete pouring and prestressing tensioning in each section until the entire bridge is closed.

[0003] In the cantilever casting construction technology of prestressed concrete continuous box beams, the application of BIM (Building Information Modeling) technology is an important aspect. BIM technology integrates information from various stages of building design, construction, operation and maintenance into a shared data platform by creating a three-dimensional digital model, thereby improving construction efficiency, reducing costs, and enhancing project visualization and management capabilities.

[0004] At present, BIM technology has been more and more widely used in the design and construction of prestressed concrete continuous box girders. However, the traditional technology is relatively mature for the design and construction of prestressed concrete continuous box girders with a straight longitudinal centerline. When the longitudinal centerline of the prestressed concrete continuous box girder is on a circular curve, it is difficult for the traditional solution to ensure construction accuracy and linear control. Therefore, an efficient and accurate design and construction method is needed to solve this problem. Summary of the invention

[0005] The present invention provides a BIM-based hanging basket design method, device, electronic device and storage medium, which are used to solve the problem in the prior art that when the longitudinal center line of a prestressed concrete continuous box girder is on a circular curve, the traditional solution is difficult to ensure construction accuracy and linear control.

[0006] On the one hand, the present invention provides a BIM-based hanging basket design method, comprising:

[0007] On the BIM model of the section to be constructed of the prestressed cantilevered box girder, a BIM model of the walking track of the hanging basket adapted to the longitudinal line shape of the section to be constructed is generated; wherein the longitudinal line shape of the section to be constructed is a curved line;

[0008] Based on the combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket, the section to be constructed is divided into one or more first sections; wherein the walking track in each first section is continuous;

[0009] For each first segment, the first segment is divided into one or more second segments according to the cradle design specification, and a first BIM model of each second segment cradle is obtained based on the combined model;

[0010] For each second segment, the theoretical plane linear influencing parameters and theoretical elevation influencing parameters of the second segment are obtained, and the theoretical plane linear influencing parameters are input into a preset linear parameter prediction model, and the corresponding first plane linear control parameters are output; the theoretical elevation influencing parameters are input into a preset elevation parameter prediction model, and the corresponding first elevation control parameters are output; and the first BIM model of the second segment hanging basket is adjusted based on the first plane linear control parameters and the first elevation control parameters to obtain the corresponding second BIM model;

[0011] Based on the second BIM model corresponding to each second segment, the second segment is subjected to hanging basket construction, and the measured plane linearity influencing parameters and the measured elevation influencing parameters in the construction process are obtained, the measured plane linearity influencing parameters are input into the preset linearity parameter prediction model, and the corresponding second plane linearity control parameters are output, the measured elevation influencing parameters are input into the preset elevation parameter prediction model, and the corresponding second elevation control parameters are output, and the hanging basket construction of the second segment is adjusted based on the second plane linearity control parameters and the second elevation control parameters.

[0012] In an optional embodiment of the present application, a BIM model of a walking track of a hanging basket adapted to the longitudinal line shape of the section to be constructed is generated on the BIM model of the section to be constructed of the prestressed cantilevered box girder, including:

[0013] According to the design drawings of the section to be constructed, characteristic parameters of the section to be constructed are obtained, and based on the characteristic parameters of the section to be constructed, a corresponding BIM model is obtained;

[0014] According to the BIM model of the section to be constructed, the walking track parameters of the hanging basket that are adapted to the longitudinal center curve of the section to be constructed are obtained, and the walking track BIM model of the hanging basket is obtained based on the walking track parameters.

[0015] In an optional embodiment of the present application, the parameters of the walking track of the hanging basket adapted to the longitudinal center curve of the section to be constructed are obtained according to the BIM model of the section to be constructed, including:

[0016] Obtain the longitudinal center curve of the BIM of the section to be constructed and the longitudinal edge curves on both sides of the prestressed cantilevered box girder of the section to be constructed, and make the longitudinal center curve and the longitudinal edge curves on both sides be in the same plane rectangular coordinate system, and the starting point of the longitudinal center curve is located at the origin of the plane rectangular coordinate system;

[0017] The longitudinal center curve and the longitudinal edge curves on both sides are segmented by using a plurality of segmentation lines parallel to the vertical axis of the plane rectangular coordinate system to obtain the intersection points of each segmentation line and each curve, and the adjacent intersection points on each curve are sequentially connected to obtain the connecting line segments corresponding to each curve; wherein the slope of each connecting line segment is not greater than a preset value;

[0018] According to the design specification of the width of the hanging basket walking track, a pair of walking track lines are set in each segmented interval, and each pair of walking track lines are equidistant from the connecting line segment of the longitudinal center curve in the corresponding segmented interval, and are located within the connecting line segment of the longitudinal edge curves on both sides of the corresponding segmented interval;

[0019] The geometric parameters of the walking track line are used as the corresponding walking track parameters of the hanging basket.

[0020] In an optional embodiment of the present application, based on the combined model, obtaining the first BIM model of each second segment hanging basket includes:

[0021] Based on the combined model, the load-bearing system parameters, hanging system parameters, walking system parameters, template system parameters and anchoring system parameters of the hanging basket adapted to the second segment are obtained; wherein the walking system parameters include walking track parameters;

[0022] Generate the first preliminary BIM model of the second segment hanging basket based on the load-bearing system parameters, hanging system parameters, walking system parameters, formwork system parameters and anchoring system parameters;

[0023] The preliminary first BIM model of each second-segment hanging basket is combined with the BIM model of the section to be constructed and then optimized and adjusted to obtain the first BIM model of each second-segment hanging basket.

[0024] In an optional embodiment of the present application, the theoretical plane linear influencing parameters include at least one of the theoretical value of the structural stiffness of the hanging basket, the theoretical value of the accuracy of the hanging basket walking track, the theoretical value of the hanging basket positioning accuracy, the theoretical value of the shrinkage and creep of concrete, and the theoretical value of the construction load, and the theoretical elevation influencing parameters include at least one of the theoretical value of the deadweight of concrete, the theoretical value of the deadweight and deformation of the hanging basket, the theoretical value of the prestressing tension, the theoretical value of the shrinkage and creep of concrete, the temperature, and the theoretical value of the construction load;

[0025] The measured parameters affecting the plane linearity include at least one of the measured value of the rigidity of the hanging basket structure, the measured value of the accuracy of the hanging basket walking track, the measured value of the accuracy of the hanging basket in place, the measured value of the shrinkage creep of concrete, and the measured value of the construction load; the measured parameters affecting the elevation include at least one of the measured value of the deadweight of concrete, the measured value of the deadweight and deformation of the hanging basket, the measured value of the prestressing tension, the measured value of the shrinkage creep of concrete, the temperature, and the measured value of the construction load;

[0026] The plane linear control parameter includes any type of support structure stiffness adjustment indication, walking system accuracy adjustment indication and deformation compensation adjustment indication;

[0027] The elevation control parameters include any type of support structure stiffness adjustment indication, pre-camber adjustment indication and deformation compensation adjustment indication.

[0028] In an optional embodiment of the present application, the preset linear parameter prediction model is obtained by:

[0029] Acquire a preset number of plane alignment influence parameter samples, the plane alignment influence parameter samples include theoretical plane alignment influence parameter samples and historical plane alignment influence parameter samples, and each sample is annotated with multiple types of plane alignment control parameter labels;

[0030] For each type of plane linear control parameter, the initial linear parameter prediction model is trained using the plane linear influencing parameter samples and the plane linear control parameter labels of the corresponding type to obtain the corresponding preset linear parameter prediction model.

[0031] In an optional embodiment of the present application, the preset elevation parameter prediction model is obtained by:

[0032] Obtain a preset number of elevation influence parameter samples, the elevation influence parameter samples include theoretical elevation influence parameter samples and historical elevation influence parameter samples, and each sample is marked with multiple types of elevation control parameter labels;

[0033] For each type of elevation control parameter, the initial elevation parameter prediction model is trained using elevation influencing parameter samples and corresponding type of elevation control parameter labels to obtain the corresponding preset elevation parameter prediction model.

[0034] In a second aspect, the present invention further provides a BIM-based hanging basket design device, comprising:

[0035] The walking track BIM model acquisition module is used to generate a walking track BIM model of the hanging basket that is compatible with the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilevered box girder; wherein the longitudinal line shape of the section to be constructed is a curve change;

[0036] A first segment division module is used to divide the section to be constructed into one or more first segments based on a combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket; wherein the walking track in each first segment is continuous;

[0037] A second segment division module is used to divide each first segment into one or more second segments according to the cradle design specification, and obtain a first BIM model of each second segment cradle based on the combined model;

[0038] A first control parameter acquisition module is used to acquire theoretical plane linear influencing parameters and theoretical elevation influencing parameters of each second segment, input the theoretical plane linear influencing parameters into a preset linear parameter prediction model, output corresponding first plane linear control parameters, input the theoretical elevation influencing parameters into a preset elevation parameter prediction model, output corresponding first elevation control parameters, and adjust the first BIM model of the second segment hanging basket based on the first plane linear control parameters and the first elevation control parameters to obtain a corresponding second BIM model;

[0039] The second control parameter acquisition module is used to perform hanging basket construction on the second segment based on the second BIM model corresponding to each second segment, and obtain the measured plane linear influencing parameters and the measured elevation influencing parameters during the construction process, input the measured plane linear influencing parameters into the preset linear parameter prediction model, output the corresponding second plane linear control parameters, input the measured elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding second elevation control parameters, and adjust the hanging basket construction of the second segment based on the second plane linear control parameters and the second elevation control parameters.

[0040] In an optional embodiment of the present application, the walking track BIM model acquisition module is specifically used for:

[0041] According to the design drawings of the section to be constructed, characteristic parameters of the section to be constructed are obtained, and based on the characteristic parameters of the section to be constructed, a corresponding BIM model is obtained;

[0042] According to the BIM model of the section to be constructed, the walking track parameters of the hanging basket that are adapted to the longitudinal center curve of the section to be constructed are obtained, and the walking track BIM model of the hanging basket is obtained based on the walking track parameters.

[0043] In an optional embodiment of the present application, the walking track BIM model acquisition module is further used to:

[0044] Obtain the longitudinal center curve of the BIM of the section to be constructed and the longitudinal edge curves on both sides of the prestressed cantilevered box girder of the section to be constructed, and make the longitudinal center curve and the longitudinal edge curves on both sides be in the same plane rectangular coordinate system, and the starting point of the longitudinal center curve is located at the origin of the plane rectangular coordinate system;

[0045] The longitudinal center curve and the longitudinal edge curves on both sides are segmented by using a plurality of segmentation lines parallel to the vertical axis of the plane rectangular coordinate system to obtain the intersection points of each segmentation line and each curve, and the adjacent intersection points on each curve are sequentially connected to obtain the connecting line segments corresponding to each curve; wherein the slope of each connecting line segment is not greater than a preset value;

[0046] According to the design specification of the width of the hanging basket walking track, a pair of walking track lines are set in each segmented interval, and each pair of walking track lines are equidistant from the connecting line segment of the longitudinal center curve in the corresponding segmented interval, and are located within the connecting line segment of the longitudinal edge curves on both sides of the corresponding segmented interval;

[0047] The geometric parameters of the walking track line are used as the corresponding walking track parameters of the hanging basket.

[0048] In an optional embodiment of the present application, the second segment division module is specifically used to:

[0049] Based on the combined model, the load-bearing system parameters, hanging system parameters, walking system parameters, template system parameters and anchoring system parameters of the hanging basket adapted to the second segment are obtained; wherein the walking system parameters include walking track parameters;

[0050] Generate the first preliminary BIM model of the second segment hanging basket based on the load-bearing system parameters, hanging system parameters, walking system parameters, formwork system parameters and anchoring system parameters;

[0051] The preliminary first BIM model of each second-segment hanging basket is combined with the BIM model of the section to be constructed and then optimized and adjusted to obtain the first BIM model of each second-segment hanging basket.

[0052] In an optional embodiment of the present application, the theoretical plane linear influencing parameters include at least one of the theoretical value of the structural stiffness of the hanging basket, the theoretical value of the accuracy of the hanging basket walking track, the theoretical value of the hanging basket positioning accuracy, the theoretical value of the shrinkage and creep of concrete, and the theoretical value of the construction load, and the theoretical elevation influencing parameters include at least one of the theoretical value of the deadweight of concrete, the theoretical value of the deadweight and deformation of the hanging basket, the theoretical value of the prestressing tension, the theoretical value of the shrinkage and creep of concrete, the temperature, and the theoretical value of the construction load;

[0053] The measured parameters affecting the plane linearity include at least one of the measured value of the rigidity of the hanging basket structure, the measured value of the accuracy of the hanging basket walking track, the measured value of the accuracy of the hanging basket in place, the measured value of the shrinkage creep of concrete, and the measured value of the construction load; the measured parameters affecting the elevation include at least one of the measured value of the deadweight of concrete, the measured value of the deadweight and deformation of the hanging basket, the measured value of the prestressing tension, the measured value of the shrinkage creep of concrete, the temperature, and the measured value of the construction load;

[0054] The plane linear control parameter includes any type of support structure stiffness adjustment indication, walking system accuracy adjustment indication and deformation compensation adjustment indication;

[0055] The elevation control parameters include any type of support structure stiffness adjustment indication, pre-camber adjustment indication and deformation compensation adjustment indication.

[0056] In an optional embodiment of the present application, the device further includes a first training module, which is used to:

[0057] Acquire a preset number of plane alignment influence parameter samples, the plane alignment influence parameter samples include theoretical plane alignment influence parameter samples and historical plane alignment influence parameter samples, and each sample is annotated with multiple types of plane alignment control parameter labels;

[0058] For each type of plane linear control parameter, the initial linear parameter prediction model is trained using the plane linear influencing parameter samples and the plane linear control parameter labels of the corresponding type to obtain the corresponding preset linear parameter prediction model.

[0059] In an optional embodiment of the present application, the device further includes a first training module, which is used to:

[0060] Obtain a preset number of elevation influence parameter samples, the elevation influence parameter samples include theoretical elevation influence parameter samples and historical elevation influence parameter samples, and each sample is marked with multiple types of elevation control parameter labels;

[0061] For each type of elevation control parameter, the initial elevation parameter prediction model is trained using elevation influencing parameter samples and corresponding type of elevation control parameter labels to obtain the corresponding preset elevation parameter prediction model.

[0062] In a third aspect, the present invention further provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, any one of the above-mentioned BIM-based hanging basket design methods is implemented.

[0063] In a fourth aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements any of the above-mentioned BIM-based hanging basket design methods.

[0064] In a fifth aspect, the present invention further provides a computer program product, comprising a computer program, which, when executed by a processor, implements any of the above-mentioned BIM-based hanging basket design methods.

[0065] The solution of the present application is to generate a BIM model of the walking track of the hanging basket that is compatible with the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilevered box girder; based on the combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket, the section to be constructed is divided into one or more first sections; wherein the walking track in each first section is continuous; for each first section, the first section is divided into one or more second sections according to the hanging basket design specification, and based on the combined model, the first BIM model of the hanging basket of each second section is obtained; for each second section, the theoretical plane linear influencing parameters and theoretical elevation influencing parameters of the second section are obtained, and the theoretical plane linear influencing parameters are input into a preset linear parameter prediction model, and the corresponding first plane linear control parameters are output. number, input the theoretical elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding first elevation control parameters, and adjust the first BIM model of the second segment hanging basket based on the first plane linear control parameters and the first elevation control parameters to obtain the corresponding second BIM model; perform hanging basket construction on the second segment based on the second BIM model corresponding to each second segment, and obtain the measured plane linear influencing parameters and the measured elevation influencing parameters during the construction process, input the measured plane linear influencing parameters into the preset linear parameter prediction model, output the corresponding second plane linear control parameters, input the measured elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding second elevation control parameters, and adjust the hanging basket construction of the second segment based on the second plane linear control parameters and the second elevation control parameters. This scheme ensures the accuracy and efficiency of the linear control of the curved prestressed cantilever beam by reasonably segmenting the curved sections to be constructed, adjusting the BIM model of the segment hanging basket based on theoretical elevation influencing parameters and theoretical plane linear influencing parameters in the design stage, and adjusting the segment hanging basket based on measured elevation influencing parameters and measured plane linear influencing parameters in the construction section. BRIEF DESCRIPTION OF THE DRAWINGS

[0066] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0067] Figure 1 A schematic diagram of a flow chart of a hanging basket design method based on BIM provided by the present invention;

[0068] Figure 2 A structural block diagram of a BIM-based hanging basket design device provided by the present invention;

[0069] Figure 3 It is a structural schematic diagram of the electronic device provided by the present invention. DETAILED DESCRIPTION

[0070] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0071] Figure 1 A flow chart of a BIM-based hanging basket design method provided by an embodiment of the present invention is as follows: Figure 1 As shown, the method may include:

[0072] Step S101, generating a BIM model of a walking track of a hanging basket that is compatible with the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilever box girder; wherein the longitudinal line shape of the section to be constructed is a curve.

[0073] The longitudinal line shape of the section to be constructed refers to the shape of its longitudinal center line. The longitudinal center line is a curve change, which generally means that it is a quadratic curve, such as an arc, a parabola, etc.

[0074] Specifically, first, various characteristic parameters of the broken cantilevered beam, including shape, size and other information, can be obtained according to the design drawings of the section to be constructed, and BIM modeling can be performed based on this information to obtain the BIM model of the section to be constructed. Then, since the longitudinal center line of the section to be constructed is a curve, the laying of its walking track is given priority when designing the hanging basket, so it is necessary to generate the corresponding BIM model of the hanging basket according to the BIM model of the section to be constructed. The generation of the BIM model of the hanging basket provides a basis for dividing different construction sections in the subsequent steps and designing hanging baskets with different structures for different construction sections.

[0075] It should be noted that when generating the BIM model of the walking track, not only the adaptation with the BIM model of the section to be constructed should be considered, but also the existing design specifications of the hanging basket should be considered, such as the width design standard and parallelism design standard of the hanging basket.

[0076] Step S102: Based on the combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket, the section to be constructed is divided into one or more first sections; wherein the walking track in each first section is continuous.

[0077] Specifically, the BIM model of the walking track of the hanging basket is combined with the BIM model of the section to be constructed to obtain a combined model, and then the section to be constructed is segmented according to the continuity of the walking track. Specifically, the walking track of each first section obtained after the division is continuous, so that the hanging basket does not need to be disassembled and assembled during the construction of the first section hanging basket, thereby ensuring construction efficiency.

[0078] It is understandable that when dividing the first section, the section to be constructed can be divided into a whole first section, which means that the hanging basket of the section to be constructed can travel on the same walking track. However, it can generally be divided into multiple first sections, which is conducive to ensuring the stability of the walking track, and then ensuring the accuracy and linear control of the construction.

[0079] Step S103: for each first segment, divide the first segment into one or more second segments according to the cradle design specification, and obtain the first BIM model of each second segment cradle based on the combined model.

[0080] Specifically, after the construction section is divided into multiple first sections based on the walking track in the previous step, each first section needs to be further divided according to the hanging basket design specification to obtain the minimum section for hanging basket construction, that is, the second section. Then, the characteristic parameters of the hanging basket of each second section are obtained based on the combined model, and then the first BIM model of the hanging basket adapted to the second section is obtained.

[0081] Step S104, for each second segment, obtain the theoretical plane linear influence parameters and theoretical elevation influence parameters of the second segment, and input the theoretical plane linear influence parameters into the preset linear parameter prediction model, output the corresponding first plane linear control parameters, input the theoretical elevation influence parameters into the preset elevation parameter prediction model, output the corresponding first elevation control parameters, and adjust the first BIM model of the second segment hanging basket based on the first plane linear control parameters and the first elevation control parameters to obtain the corresponding second BIM model.

[0082] Among them, the theoretical plane linear influencing parameters include at least one of the theoretical value of the hanging basket structure stiffness, the theoretical value of the hanging basket walking track accuracy, the theoretical value of the hanging basket positioning accuracy, the theoretical value of concrete shrinkage and creep, and the theoretical value of the construction load; the theoretical elevation influencing parameters include at least one of the theoretical value of concrete deadweight, the theoretical value of the hanging basket deadweight and deformation, the theoretical value of prestressing, the theoretical value of concrete shrinkage and creep, temperature, and the theoretical value of the construction load.

[0083] Among them, the first plane linear control parameter includes any type of support structure stiffness adjustment indication, walking system accuracy adjustment indication and deformation compensation adjustment indication; the first elevation control parameter includes any type of support structure stiffness adjustment indication, pre-arch adjustment indication and deformation compensation adjustment indication.

[0084] Specifically, firstly, in the scheme of the present application, preset elevation parameter prediction models corresponding to various types of elevation control parameters and preset linear parameter prediction models corresponding to preset linear control parameters corresponding to different plane linear control parameters are trained. For example, the preset elevation parameter prediction model corresponding to the support structure stiffness adjustment indication has an output result that is the support structure stiffness adjustment indication, and the preset elevation parameter prediction model corresponding to the pre-camber adjustment indication has an output result that is the pre-camber adjustment indication. At the same time, preset linear parameter control models corresponding to different types of plane linear control parameters are trained. For example, the preset linear parameter prediction model corresponding to the support structure stiffness adjustment indication has an output result that is the support structure stiffness adjustment indication, and the preset linear parameter prediction model corresponding to the walking system precision adjustment indication has an output result that is the walking system precision adjustment indication.

[0085] Specifically, the type of the preset elevation parameter prediction model and the type of the preset linear elevation parameter prediction model are first selected. Then the theoretical elevation influencing parameters and theoretical plane linear influencing parameters are obtained. These ideal values ​​can be obtained by structural calculation and mechanical calculation after introducing the ideal construction plan based on the BIM model. Then the ideal elevation influencing parameters and the ideal plane linear influencing parameters are input into the corresponding model, and the corresponding first elevation control parameters and first plane linear control parameters are output. It should be noted that these control parameters are all a certain type of indication value, which can indicate whether adjustment is required or not, and the need for adjustment can specifically indicate the different magnitudes of adjustment required. Among them, the magnitudes of adjustment correspond to different adjustment steps. For example, if the preset elevation parameter prediction model outputs the support structure stiffness adjustment indication as no adjustment is required, it means that the support structure stiffness of the hanging basket does not need to be adjusted. If the output support structure adjustment indication is that adjustment is required, and the adjustment magnitude is level 2, the support structure stiffness of the hanging basket needs to be adjusted according to the adjustment step corresponding to the level 2. The adjustment step corresponding to the adjustment magnitude can be pre-set according to the design and construction experience and the sample label during training.

[0086] Furthermore, in the present application, this step only selects a single type of preset elevation parameter prediction model and a single type of predicted linear parameter prediction model. For example, a preset linear parameter prediction model corresponding to the walking system precision adjustment indication and a preset elevation parameter prediction model corresponding to the pre-arch adjustment indication can be selected.

[0087] Finally, after obtaining the first elevation control parameter and the first plane linear control parameter output by the model, the first BIM model of the second section hanging basket is adjusted based on the two control parameters, that is, the first BIM model of the second section hanging basket is optimized based on the two control parameters to obtain the corresponding second BIM model. This ensures that in the hanging basket design stage, the BIM model of the hanging basket has as little influence on the elevation and plane linear shape of the second section during construction as possible.

[0088] Step S105, based on the second BIM model corresponding to each second segment, the second segment is subjected to hanging basket construction, and the measured plane linearity influencing parameters and the measured elevation influencing parameters during the construction process are obtained, the measured plane linearity influencing parameters are input into the preset linearity parameter prediction model, and the corresponding second plane linearity control parameters are output, the measured elevation influencing parameters are input into the preset elevation parameter prediction model, and the corresponding second elevation control parameters are output, and the hanging basket construction of the second segment is adjusted based on the second plane linearity control parameters and the second elevation control parameters.

[0089] Among them, the measured parameters affecting the plane linear shape include at least one of the measured value of the rigidity of the hanging basket structure, the measured value of the accuracy of the hanging basket walking track, the measured value of the accuracy of the hanging basket in place, the measured value of the shrinkage creep of concrete and the measured value of the construction load; the measured parameters affecting the elevation include at least one of the measured value of the dead weight of concrete, the measured value of the dead weight and deformation of the hanging basket, the measured value of the prestressing, the measured value of the shrinkage creep of concrete, the temperature and the measured value of the construction load.

[0090] Specifically, the scheme of the present application will use different types of models for elevation control and plane linear control in turn. Specifically, first obtain the measured elevation influencing parameters and the measured plane linear influencing parameters, and these measured values ​​can be obtained through the various measurement points set during the construction stage. Then, the construction is divided into multiple sections, and a type of model is used in each section to obtain the corresponding control parameters to adjust the hanging basket structure during the construction process. For example, for elevation control, first, the preset elevation parameter prediction model corresponding to the support structure stiffness adjustment indication can be used. After the current measured elevation influencing parameters are input into the model, the support structure stiffness adjustment indication is output, and the hanging basket is adjusted based on this indication. Then, the preset elevation parameter prediction model corresponding to the pre-camber adjustment indication is used. After the current measured elevation influencing parameters are input into the model, the pre-camber adjustment indication is output, and the hanging basket is adjusted based on this indication. Then, the preset elevation parameter prediction model corresponding to the deformation compensation adjustment indication is used. After the current measured elevation influencing parameters are input into the model, the deformation compensation adjustment indication is output, and the hanging basket is adjusted based on this indication. The above process can be repeated until the construction of the second section is completed. Similarly, the above method can also be used for plane linear control.

[0091] It can be understood that this step performs elevation control and plane alignment control on the section to be constructed in the construction section.

[0092] The solution of the present application is to generate a BIM model of the walking track of the hanging basket that is compatible with the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilevered box girder; based on the combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket, the section to be constructed is divided into one or more first sections; wherein the walking track in each first section is continuous; for each first section, the first section is divided into one or more second sections according to the hanging basket design specification, and based on the combined model, the first BIM model of the hanging basket of each second section is obtained; for each second section, the theoretical plane linear influencing parameters and theoretical elevation influencing parameters of the second section are obtained, and the theoretical plane linear influencing parameters are input into a preset linear parameter prediction model, and the corresponding first plane linear control parameters are output. number, input the theoretical elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding first elevation control parameters, and adjust the first BIM model of the second segment hanging basket based on the first plane linear control parameters and the first elevation control parameters to obtain the corresponding second BIM model; perform hanging basket construction on the second segment based on the second BIM model corresponding to each second segment, and obtain the measured plane linear influencing parameters and the measured elevation influencing parameters during the construction process, input the measured plane linear influencing parameters into the preset linear parameter prediction model, output the corresponding second plane linear control parameters, input the measured elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding second elevation control parameters, and adjust the hanging basket construction of the second segment based on the second plane linear control parameters and the second elevation control parameters. This scheme ensures the accuracy and efficiency of the linear control of the curved prestressed cantilever beam by reasonably segmenting the curved sections to be constructed, adjusting the BIM model of the segment hanging basket based on theoretical elevation influencing parameters and theoretical plane linear influencing parameters in the design stage, and adjusting the segment hanging basket based on measured elevation influencing parameters and measured plane linear influencing parameters in the construction section.

[0093] In an optional embodiment of the present application, a BIM model of a walking track of a hanging basket adapted to the longitudinal line shape of the section to be constructed is generated on the BIM model of the section to be constructed of the prestressed cantilevered box girder, including:

[0094] According to the design drawings of the section to be constructed, characteristic parameters of the section to be constructed are obtained, and based on the characteristic parameters of the section to be constructed, a corresponding BIM model is obtained;

[0095] According to the BIM model of the section to be constructed, the walking track parameters of the hanging basket that are adapted to the longitudinal center curve of the section to be constructed are obtained, and the walking track BIM model of the hanging basket is obtained based on the walking track parameters.

[0096] Specifically, the parameters of the hanging basket walking track that are adapted to the longitudinal center curve of the section to be constructed are obtained according to the BIM model of the section to be constructed, including:

[0097] Obtain the longitudinal center curve of the BIM of the section to be constructed and the longitudinal edge curves on both sides of the prestressed cantilevered box girder of the section to be constructed, and make the longitudinal center curve and the longitudinal edge curves on both sides be in the same plane rectangular coordinate system, and the starting point of the longitudinal center curve is located at the origin of the plane rectangular coordinate system;

[0098] The longitudinal center curve and the longitudinal edge curves on both sides are segmented by using a plurality of segmentation lines parallel to the vertical axis of the plane rectangular coordinate system to obtain the intersection points of each segmentation line and each curve, and the adjacent intersection points on each curve are sequentially connected to obtain the connecting line segments corresponding to each curve; wherein the slope of each connecting line segment is not greater than a preset value;

[0099] According to the design specification of the width of the hanging basket walking track, a pair of walking track lines are set in each segmented interval, and each pair of walking track lines are equidistant from the connecting line segment of the longitudinal center curve in the corresponding segmented interval, and are located within the connecting line segment of the longitudinal edge curves on both sides of the corresponding segmented interval;

[0100] The geometric parameters of the walking track line are used as the corresponding walking track parameters of the hanging basket.

[0101] Among them, the dividing interval is a space formed by the dividing line, two longitudinal edge curves and the corresponding connecting line segments. The first dividing interval is the space formed by the first dividing line, the longitudinal axis of the plane rectangular coordinate system and the connecting line segments corresponding to the two longitudinal edge curves. The subsequent dividing spaces can be determined by analogy.

[0102] Controlling the longitudinal center connecting line segment below the preset slope can ensure that when the parallel walking track is set based on the connecting line segment later, the track has appropriate load-bearing capacity and ensures the stability of the walking track. When designing the walking track specifically, first determine the width of the walking track based on the design specifications and the size of the segmented interval. Then, using the connecting line segment corresponding to the longitudinal center line in the segmented interval as the center reference, set a walking track on both sides of the center reference, and both walking tracks are parallel to the center reference, and the two walking tracks are equidistant from the center reference. These settings are also to ensure the accuracy and stability of the walking track.

[0103] In an optional embodiment of the present application, the preset linear parameter prediction model is obtained by:

[0104] Acquire a preset number of plane alignment influence parameter samples, the plane alignment influence parameter samples include theoretical plane alignment influence parameter samples and historical plane alignment influence parameter samples, and each sample is annotated with multiple types of plane alignment control parameter labels;

[0105] For each type of plane linear control parameter, the initial linear parameter prediction model is trained using the plane linear influencing parameter samples and the plane linear control parameter labels of the corresponding type to obtain the corresponding preset linear parameter prediction model.

[0106] The preset elevation parameter prediction model is obtained in the following ways:

[0107] Obtain a preset number of elevation influence parameter samples, the elevation influence parameter samples include theoretical elevation influence parameter samples and historical elevation influence parameter samples, and each sample is marked with multiple types of elevation control parameter labels;

[0108] For each type of elevation control parameter, the initial elevation parameter prediction model is trained using elevation influencing parameter samples and corresponding type of elevation control parameter labels to obtain the corresponding preset elevation parameter prediction model.

[0109] Specifically, when processing the theoretical plane linear influencing parameters and theoretical elevation influencing parameters of the second segment, and predicting the corresponding first plane linear control parameters and first elevation control parameters through a preset model, and when processing the measured plane linear influencing parameters and measured elevation influencing parameters of the second segment, and predicting the corresponding second plane linear control parameters and second elevation control parameters through a preset model, a linear regression model and a neural network model can be used. The present application scheme can use a neural network model, such as a multi-layer feedforward neural network (such as a BP neural network), which has stronger nonlinear mapping and learning capabilities, and is suitable for processing complex nonlinear relationships. The specific model and model structure can be set based on experience, and this scheme does not limit it. For the prediction of plane linear and elevation control parameters, a suitable model can be selected according to the complexity of the data and the requirements of prediction accuracy.

[0110] Figure 2 A structural block diagram of a hanging basket design device based on BIM is provided for an embodiment of the present invention, such as Figure 2 As shown, the device may include:

[0111] The walking track BIM model acquisition module 201 is used to generate a walking track BIM model of the hanging basket that is compatible with the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilevered box girder; wherein the longitudinal line shape of the section to be constructed is a curved line;

[0112] The first segment division module 202 is used to divide the section to be constructed into one or more first segments based on the combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket; wherein the walking track in each first segment is continuous;

[0113] The second segment division module 203 is used to divide each first segment into one or more second segments according to the cradle design specification, and obtain the first BIM model of each second segment cradle based on the combined model;

[0114] The first control parameter acquisition module 204 is used to acquire the theoretical plane linear influencing parameters and theoretical elevation influencing parameters of each second segment, input the theoretical plane linear influencing parameters into the preset linear parameter prediction model, output the corresponding first plane linear control parameters, input the theoretical elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding first elevation control parameters, and adjust the first BIM model of the second segment hanging basket based on the first plane linear control parameters and the first elevation control parameters to obtain the corresponding second BIM model;

[0115] The second control parameter acquisition module 205 is used to perform hanging basket construction on the second segment based on the second BIM model corresponding to each second segment, and obtain the measured plane linearity influencing parameters and the measured elevation influencing parameters during the construction process, input the measured plane linearity influencing parameters into the preset linearity parameter prediction model, output the corresponding second plane linearity control parameters, input the measured elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding second elevation control parameters, and adjust the hanging basket construction of the second segment based on the second plane linearity control parameters and the second elevation control parameters.

[0116] The solution of the present application is to generate a BIM model of the walking track of the hanging basket that is compatible with the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilevered box girder; based on the combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket, the section to be constructed is divided into one or more first sections; wherein the walking track in each first section is continuous; for each first section, the first section is divided into one or more second sections according to the hanging basket design specification, and based on the combined model, the first BIM model of the hanging basket of each second section is obtained; for each second section, the theoretical plane linear influencing parameters and theoretical elevation influencing parameters of the second section are obtained, and the theoretical plane linear influencing parameters are input into a preset linear parameter prediction model, and the corresponding first plane linear control parameters are output. number, input the theoretical elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding first elevation control parameters, and adjust the first BIM model of the second segment hanging basket based on the first plane linear control parameters and the first elevation control parameters to obtain the corresponding second BIM model; perform hanging basket construction on the second segment based on the second BIM model corresponding to each second segment, and obtain the measured plane linear influencing parameters and the measured elevation influencing parameters during the construction process, input the measured plane linear influencing parameters into the preset linear parameter prediction model, output the corresponding second plane linear control parameters, input the measured elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding second elevation control parameters, and adjust the hanging basket construction of the second segment based on the second plane linear control parameters and the second elevation control parameters. This scheme ensures the accuracy and efficiency of the linear control of the curved prestressed cantilever beam by reasonably segmenting the curved sections to be constructed, adjusting the BIM model of the segment hanging basket based on theoretical elevation influencing parameters and theoretical plane linear influencing parameters in the design stage, and adjusting the segment hanging basket based on measured elevation influencing parameters and measured plane linear influencing parameters in the construction section.

[0117] In an optional embodiment of the present application, the walking track BIM model acquisition module is specifically used for:

[0118] According to the design drawings of the section to be constructed, characteristic parameters of the section to be constructed are obtained, and based on the characteristic parameters of the section to be constructed, a corresponding BIM model is obtained;

[0119] According to the BIM model of the section to be constructed, the walking track parameters of the hanging basket that are adapted to the longitudinal center curve of the section to be constructed are obtained, and the walking track BIM model of the hanging basket is obtained based on the walking track parameters.

[0120] In an optional embodiment of the present application, the walking track BIM model acquisition module is further used to:

[0121] Obtain the longitudinal center curve of the BIM of the section to be constructed and the longitudinal edge curves on both sides of the prestressed cantilevered box girder of the section to be constructed, and make the longitudinal center curve and the longitudinal edge curves on both sides be in the same plane rectangular coordinate system, and the starting point of the longitudinal center curve is located at the origin of the plane rectangular coordinate system;

[0122] The longitudinal center curve and the longitudinal edge curves on both sides are segmented by using a plurality of segmentation lines parallel to the vertical axis of the plane rectangular coordinate system to obtain the intersection points of each segmentation line and each curve, and the adjacent intersection points on each curve are sequentially connected to obtain the connecting line segments corresponding to each curve; wherein the slope of each connecting line segment is not greater than a preset value;

[0123] According to the design specification of the width of the hanging basket walking track, a pair of walking track lines are set in each segmented interval, and each pair of walking track lines are equidistant from the connecting line segment of the longitudinal center curve in the corresponding segmented interval, and are located within the connecting line segment of the longitudinal edge curves on both sides of the corresponding segmented interval;

[0124] The geometric parameters of the walking track line are used as the corresponding walking track parameters of the hanging basket.

[0125] In an optional embodiment of the present application, the second segment division module is specifically used to:

[0126] Based on the combined model, the load-bearing system parameters, hanging system parameters, walking system parameters, template system parameters and anchoring system parameters of the hanging basket adapted to the second segment are obtained; wherein the walking system parameters include walking track parameters;

[0127] Generate the first preliminary BIM model of the second segment hanging basket based on the load-bearing system parameters, hanging system parameters, walking system parameters, formwork system parameters and anchoring system parameters;

[0128] The preliminary first BIM model of each second-segment hanging basket is combined with the BIM model of the section to be constructed and then optimized and adjusted to obtain the first BIM model of each second-segment hanging basket.

[0129] In an optional embodiment of the present application, the theoretical plane linear influencing parameters include at least one of the theoretical value of the structural stiffness of the hanging basket, the theoretical value of the accuracy of the hanging basket walking track, the theoretical value of the hanging basket positioning accuracy, the theoretical value of the shrinkage and creep of concrete, and the theoretical value of the construction load, and the theoretical elevation influencing parameters include at least one of the theoretical value of the deadweight of concrete, the theoretical value of the deadweight and deformation of the hanging basket, the theoretical value of the prestressing tension, the theoretical value of the shrinkage and creep of concrete, the temperature, and the theoretical value of the construction load;

[0130] The measured parameters affecting the plane linearity include at least one of the measured value of the rigidity of the hanging basket structure, the measured value of the accuracy of the hanging basket walking track, the measured value of the accuracy of the hanging basket in place, the measured value of the shrinkage creep of concrete, and the measured value of the construction load; the measured parameters affecting the elevation include at least one of the measured value of the deadweight of concrete, the measured value of the deadweight and deformation of the hanging basket, the measured value of the prestressing tension, the measured value of the shrinkage creep of concrete, the temperature, and the measured value of the construction load;

[0131] The plane linear control parameter includes any type of support structure stiffness adjustment indication, walking system accuracy adjustment indication and deformation compensation adjustment indication;

[0132] The elevation control parameters include any type of support structure stiffness adjustment indication, pre-camber adjustment indication and deformation compensation adjustment indication.

[0133] In an optional embodiment of the present application, the device further includes a first training module, which is used to:

[0134] Acquire a preset number of plane alignment influence parameter samples, the plane alignment influence parameter samples include theoretical plane alignment influence parameter samples and historical plane alignment influence parameter samples, and each sample is annotated with multiple types of plane alignment control parameter labels;

[0135] For each type of plane linear control parameter, the initial linear parameter prediction model is trained using the plane linear influencing parameter samples and the plane linear control parameter labels of the corresponding type to obtain the corresponding preset linear parameter prediction model.

[0136] In an optional embodiment of the present application, the device further includes a first training module, which is used to:

[0137] Obtain a preset number of elevation influence parameter samples, the elevation influence parameter samples include theoretical elevation influence parameter samples and historical elevation influence parameter samples, and each sample is marked with multiple types of elevation control parameter labels;

[0138] For each type of elevation control parameter, the initial elevation parameter prediction model is trained using elevation influencing parameter samples and corresponding type of elevation control parameter labels to obtain the corresponding preset elevation parameter prediction model.

[0139] Figure 3 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 3As shown, the electronic device may include: a processor (processor) 310, a communication interface (Communications Interface) 320, a memory (memory) 330 and a communication bus 340, wherein the processor 310, the communication interface 320, and the memory 330 communicate with each other through the communication bus 340. The processor 310 can call the logic instructions in the memory 330 to execute the BIM-based hanging basket design method, which includes: generating a BIM model of the walking track of the hanging basket that is compatible with the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilever box girder; wherein the longitudinal line shape of the section to be constructed is a curved line; based on the combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket, the section to be constructed is divided into one or more first sections; wherein the walking track in each first section is continuous; for each first section, the first section is divided into one or more second sections according to the hanging basket design specification, and based on the combined model, the first BIM model of the hanging basket of each second section is obtained; for each second section, the theoretical plane line shape influencing parameters and the theoretical elevation influencing parameters of the second section are obtained, and the theoretical plane line shape influencing parameters and the theoretical elevation influencing parameters are converted into the theoretical plane line shape. The shape influencing parameters are input into the preset linear parameter prediction model, and the corresponding first plane linear control parameters are output; the theoretical elevation influencing parameters are input into the preset elevation parameter prediction model, and the corresponding first elevation control parameters are output; and the first BIM model of the second segment hanging basket is adjusted based on the first plane linear control parameters and the first elevation control parameters to obtain the corresponding second BIM model; the second segment is subjected to hanging basket construction based on the second BIM model corresponding to each second segment, and the measured plane linear influencing parameters and the measured elevation influencing parameters in the construction process are obtained, the measured plane linear influencing parameters are input into the preset linear parameter prediction model, and the corresponding second plane linear control parameters are output; the measured elevation influencing parameters are input into the preset elevation parameter prediction model, and the corresponding second elevation control parameters are output; and the hanging basket construction of the second segment is adjusted based on the second plane linear control parameters and the second elevation control parameters.

[0140] In addition, the logic instructions in the above-mentioned memory 330 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0141] On the other hand, the present invention also provides a computer program product, which includes a computer program, which can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the BIM-based hanging basket design method provided by the above methods, the method comprising: on the BIM model of the section to be constructed of the prestressed cantilever box girder, generating a BIM model of the walking track of the hanging basket that is compatible with the longitudinal line shape of the section to be constructed; wherein the longitudinal line shape of the section to be constructed is a curved line; based on the combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket, the section to be constructed is divided into one or more first segments; wherein the walking track in each first segment is continuous; for each first segment, the first segment is divided into one or more second segments according to the hanging basket design specification, and based on the combined model, the first BIM model of the hanging basket of each second segment is obtained; for each second segment, The theoretical plane linear influencing parameters and theoretical elevation influencing parameters of the second segment are obtained, and the theoretical plane linear influencing parameters are input into the preset linear parameter prediction model to output the corresponding first plane linear control parameters, and the theoretical elevation influencing parameters are input into the preset elevation parameter prediction model to output the corresponding first elevation control parameters, and the first BIM model of the second segment hanging basket is adjusted based on the first plane linear control parameters and the first elevation control parameters to obtain the corresponding second BIM model; the second segment is subjected to hanging basket construction based on the second BIM model corresponding to each second segment, and the measured plane linear influencing parameters and the measured elevation influencing parameters during the construction process are obtained, the measured plane linear influencing parameters are input into the preset linear parameter prediction model to output the corresponding second plane linear control parameters, the measured elevation influencing parameters are input into the preset elevation parameter prediction model to output the corresponding second elevation control parameters, and the hanging basket construction of the second segment is adjusted based on the second plane linear control parameters and the second elevation control parameters.

[0142] On the other hand, the present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the BIM-based hanging basket design method provided by the above-mentioned methods, the method comprising: generating a BIM model of a walking track of a hanging basket that is compatible with the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilevered box girder; wherein the longitudinal line shape of the section to be constructed is a curved line; based on a combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket, the section to be constructed is divided into one or more first segments; wherein the walking track in each first segment is continuous; for each first segment, the first segment is divided into one or more second segments according to the hanging basket design specification, and based on the combined model, the first BIM model of the hanging basket of each second segment is obtained; for each second segment, the theoretical plane line shape influence of the second segment is obtained Parameters and theoretical elevation influencing parameters, and input the theoretical plane linear influencing parameters into the preset linear parameter prediction model, output the corresponding first plane linear control parameters, input the theoretical elevation influencing parameters into the preset elevation parameter prediction model, output the corresponding first elevation control parameters, and adjust the first BIM model of the second segment hanging basket based on the first plane linear control parameters and the first elevation control parameters to obtain the corresponding second BIM model; based on the second BIM model corresponding to each second segment, the second segment is subjected to hanging basket construction, and the measured plane linear influencing parameters and the measured elevation influencing parameters in the construction process are obtained, the measured plane linear influencing parameters are input into the preset linear parameter prediction model, output the corresponding second plane linear control parameters, the measured elevation influencing parameters are input into the preset elevation parameter prediction model, output the corresponding second elevation control parameters, and the hanging basket construction of the second segment is adjusted based on the second plane linear control parameters and the second elevation control parameters.

[0143] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0144] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0145] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A BIM-based hanging basket design method, characterized in that: include: On the BIM model of the section to be constructed of the prestressed cantilevered box girder, a BIM model of the walking track of the hanging basket adapted to the longitudinal line shape of the section to be constructed is generated; wherein the longitudinal line shape of the section to be constructed is a curved line; Based on the combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket, the section to be constructed is divided into one or more first sections; wherein the walking track in each first section is continuous; For each first segment, the first segment is divided into one or more second segments according to the cradle design specification, and a first BIM model of each second segment cradle is obtained based on the combined model; For each second segment, a theoretical plane linear influencing parameter and a theoretical elevation influencing parameter of the second segment are obtained, and the theoretical plane linear influencing parameter is input into a preset linear parameter prediction model, and the corresponding first plane linear control parameter is output; the theoretical elevation influencing parameter is input into a preset elevation parameter prediction model, and the corresponding first elevation control parameter is output; and the first BIM model of the second segment hanging basket is adjusted based on the first plane linear control parameter and the first elevation control parameter to obtain a corresponding second BIM model; Based on the second BIM model corresponding to each second segment, the second segment is subjected to hanging basket construction, and the measured plane linear influencing parameters and the measured elevation influencing parameters during the construction process are obtained, the measured plane linear influencing parameters are input into the preset linear parameter prediction model, and the corresponding second plane linear control parameters are output, the measured elevation influencing parameters are input into the preset elevation parameter prediction model, and the corresponding second elevation control parameters are output, and the hanging basket construction of the second segment is adjusted based on the second plane linear control parameters and the second elevation control parameters; Wherein, generating a BIM model of a walking track of a hanging basket adapted to the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilevered box girder comprises: According to the design drawings of the section to be constructed, characteristic parameters of the section to be constructed are obtained, and based on the characteristic parameters of the section to be constructed, a corresponding BIM model is obtained; According to the BIM model of the section to be constructed, parameters of the walking track of the hanging basket adapted to the longitudinal center curve of the section to be constructed are obtained, and based on the walking track parameters, a BIM model of the walking track of the hanging basket is obtained; Wherein, the step of obtaining the walking track parameters of the hanging basket adapted to the longitudinal center curve of the section to be constructed according to the BIM model of the section to be constructed includes: Obtain the longitudinal center curve of the BIM of the section to be constructed and the longitudinal edge curves on both sides of the prestressed cantilevered box girder of the section to be constructed, and make the longitudinal center curve and the longitudinal edge curves on both sides be in the same plane rectangular coordinate system, and the starting point of the longitudinal center curve is located at the origin of the plane rectangular coordinate system; The longitudinal center curve and the longitudinal edge curves on both sides are segmented using a plurality of segmentation lines parallel to the vertical axis of the plane rectangular coordinate system to obtain intersections between the segmentation lines and the curves, and the adjacent intersections on the curves are sequentially connected to obtain connecting line segments corresponding to the curves; wherein the slope of each connecting line segment is not greater than a preset value; According to the design specification of the width of the hanging basket walking track, a pair of walking track lines are set in each segmentation interval, and each pair of walking track lines are equidistant from the connecting line segments of the longitudinal center curve in the corresponding segmentation interval, and are located within the connecting line segments of the longitudinal edge curves on both sides of the corresponding segmentation interval; wherein the segmentation interval is a space formed by the segmentation line, the two longitudinal edge curves and the corresponding connecting line segments, wherein the first segmentation interval is a space formed by the first segmentation line, the longitudinal axis of the plane rectangular coordinate system and the connecting line segments corresponding to the two longitudinal edge curves, and the subsequent segmentation spaces can be determined by analogy; The geometric parameters of the walking track line are used as the corresponding hanging basket walking track parameters; The theoretical plane linear influencing parameters include at least one of the theoretical value of the basket structure stiffness, the theoretical value of the basket walking track accuracy, the theoretical value of the basket positioning accuracy, the theoretical value of the concrete shrinkage creep, and the theoretical value of the construction load; the theoretical elevation influencing parameters include at least one of the theoretical value of the concrete deadweight, the theoretical value of the basket deadweight and deformation, the theoretical value of the prestressing tension, the theoretical value of the concrete shrinkage creep, the temperature, and the theoretical value of the construction load; The measured plane linear influencing parameters include at least one of the measured value of the rigidity of the hanging basket structure, the measured value of the accuracy of the hanging basket walking track, the measured value of the hanging basket positioning accuracy, the measured value of the shrinkage creep of concrete, and the measured value of the construction load; the measured elevation influencing parameters include at least one of the measured value of the deadweight of concrete, the measured value of the deadweight and deformation of the hanging basket, the measured value of the prestressing tension, the measured value of the shrinkage creep of concrete, the temperature, and the measured value of the construction load; The plane linear control parameter includes any type of support structure stiffness adjustment indication, walking system accuracy adjustment indication and deformation compensation adjustment indication; The elevation control parameters include any type of support structure stiffness adjustment indication, pre-camber adjustment indication and deformation compensation adjustment indication.

2. The method according to claim 1, characterized in that The step of obtaining a first BIM model of each second segment hanging basket based on the combined model includes: Based on the combined model, the load-bearing system parameters, the hanging system parameters, the walking system parameters, the template system parameters and the anchoring system parameters of the hanging basket adapted to the second segment are obtained; wherein the walking system parameters include walking track parameters; Generate a preliminary first BIM model of the second segment hanging basket based on the load-bearing system parameters, the hanging system parameters, the walking system parameters, the formwork system parameters, and the anchoring system parameters; The preliminary first BIM model of each second segment hanging basket is combined with the BIM model of the section to be constructed and then optimized and adjusted to obtain the first BIM model of each second segment hanging basket.

3. The method according to claim 1, characterized in that The preset linear parameter prediction model is obtained by: Acquire a preset number of plane alignment influencing parameter samples, wherein the plane alignment influencing parameter samples include theoretical plane alignment influencing parameter samples and historical plane alignment influencing parameter samples, and each sample is annotated with multiple types of plane alignment control parameter labels; For each type of plane linear control parameter, the initial linear parameter prediction model is trained using the plane linear influencing parameter samples and the plane linear control parameter labels of the corresponding type to obtain the corresponding preset linear parameter prediction model.

4. The method according to claim 1, characterized in that The preset elevation parameter prediction model is obtained by: Acquire a preset number of elevation influence parameter samples, wherein the elevation influence parameter samples include theoretical elevation influence parameter samples and historical elevation influence parameter samples, and each sample is marked with multiple types of elevation control parameter labels; For each type of elevation control parameter, the initial elevation parameter prediction model is trained using elevation influencing parameter samples and elevation control parameter labels of the corresponding type to obtain the corresponding preset elevation parameter prediction model.

5. A BIM-based hanging basket design device, characterized in that: include: The walking track BIM model acquisition module is used to generate a walking track BIM model of the hanging basket that is compatible with the longitudinal line shape of the section to be constructed on the BIM model of the section to be constructed of the prestressed cantilevered box girder; wherein the longitudinal line shape of the section to be constructed is a curved line; A first segment division module is used to divide the section to be constructed into one or more first segments based on a combined model of the BIM model of the section to be constructed and the BIM model of the walking track of the hanging basket; wherein the walking track in each first segment is continuous; A second segment division module is used for dividing each first segment into one or more second segments according to the cradle design specification, and obtaining a first BIM model of each second segment cradle based on the combined model; A first control parameter acquisition module is used to acquire, for each second segment, theoretical plane linear influence parameters and theoretical elevation influence parameters of the second segment, input the theoretical plane linear influence parameters into a preset linear parameter prediction model, output corresponding first plane linear control parameters, input the theoretical elevation influence parameters into a preset elevation parameter prediction model, output corresponding first elevation control parameters, and adjust the first BIM model of the second segment hanging basket based on the first plane linear control parameters and the first elevation control parameters to obtain a corresponding second BIM model; A second control parameter acquisition module is used to perform hanging basket construction on each second segment based on a second BIM model corresponding to each second segment, and obtain a measured plane linear influencing parameter and a measured elevation influencing parameter during the construction process, input the measured plane linear influencing parameter into the preset linear parameter prediction model, output the corresponding second plane linear control parameter, input the measured elevation influencing parameter into the preset elevation parameter prediction model, output the corresponding second elevation control parameter, and adjust the hanging basket construction of the second segment based on the second plane linear control parameter and the second elevation control parameter; Among them, the walking track BIM model acquisition module is specifically used for: According to the design drawings of the section to be constructed, characteristic parameters of the section to be constructed are obtained, and based on the characteristic parameters of the section to be constructed, a corresponding BIM model is obtained; According to the BIM model of the section to be constructed, the parameters of the walking track of the hanging basket adapted to the longitudinal center curve of the section to be constructed are obtained, and based on the walking track parameters, the BIM model of the walking track of the hanging basket is obtained; Among them, the walking track BIM model acquisition module is further used for: Obtain the longitudinal center curve of the BIM of the section to be constructed and the longitudinal edge curves on both sides of the prestressed cantilevered box girder of the section to be constructed, and make the longitudinal center curve and the longitudinal edge curves on both sides be in the same plane rectangular coordinate system, and the starting point of the longitudinal center curve is located at the origin of the plane rectangular coordinate system; The longitudinal center curve and the longitudinal edge curves on both sides are segmented by using a plurality of segmentation lines parallel to the vertical axis of the plane rectangular coordinate system to obtain the intersection points of each segmentation line and each curve, and the adjacent intersection points on each curve are sequentially connected to obtain the connecting line segments corresponding to each curve; wherein the slope of each connecting line segment is not greater than a preset value; According to the design specification of the width of the hanging basket walking track, a pair of walking track lines are set in each segmentation interval, and each pair of walking track lines are equidistant from the connecting line segments of the longitudinal center curve in the corresponding segmentation interval, and are located within the connecting line segments of the longitudinal edge curves on both sides of the corresponding segmentation interval; wherein the segmentation interval is a space formed by the segmentation line, the two longitudinal edge curves and the corresponding connecting line segments, wherein the first segmentation interval is a space formed by the first segmentation line, the longitudinal axis of the plane rectangular coordinate system and the connecting line segments corresponding to the two longitudinal edge curves, and the subsequent segmentation spaces can be determined by analogy; The geometric parameters of the walking track line are used as the corresponding walking track parameters of the hanging basket; The theoretical plane linear influencing parameters include at least one of the theoretical value of the basket structure stiffness, the theoretical value of the basket walking track accuracy, the theoretical value of the basket positioning accuracy, the theoretical value of the concrete shrinkage creep, and the theoretical value of the construction load; the theoretical elevation influencing parameters include at least one of the theoretical value of the concrete deadweight, the theoretical value of the basket deadweight and deformation, the theoretical value of the prestressing tension, the theoretical value of the concrete shrinkage creep, the temperature, and the theoretical value of the construction load; The measured plane linear influencing parameters include at least one of the measured value of the rigidity of the hanging basket structure, the measured value of the accuracy of the hanging basket walking track, the measured value of the hanging basket positioning accuracy, the measured value of the shrinkage creep of concrete, and the measured value of the construction load; the measured elevation influencing parameters include at least one of the measured value of the deadweight of concrete, the measured value of the deadweight and deformation of the hanging basket, the measured value of the prestressing tension, the measured value of the shrinkage creep of concrete, the temperature, and the measured value of the construction load; The plane linear control parameter includes any type of support structure stiffness adjustment indication, walking system accuracy adjustment indication and deformation compensation adjustment indication; The elevation control parameters include any type of support structure stiffness adjustment indication, pre-camber adjustment indication and deformation compensation adjustment indication.

6. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the method according to any one of claims 1 to 4 is implemented.

7. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 4 is implemented.