Prefabricated column and prefabricated beam-slab assembly node and construction method thereof

By designing grooves, convex grooves and plug-in columns in the assembly nodes of prefabricated columns and prefabricated beam slabs, combined with fasteners and concrete pouring, the problem of insolid prefabricated assembly nodes in the prior art is solved, and prefabricated beam slabs are realized The firm assembly of the main body, the lower prefabricated column and the upper prefabricated column improves construction efficiency and stability.

CN118581971BActive Publication Date: 2024-12-03QIDONG ZHUCHENG PREFABRICATED BUILDING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411034970.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-12-03
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

The connection of existing prefabricated assembly nodes is not firm, resulting in low construction efficiency and easy to damage, and it is impossible to effectively solve the assembly problem of prefabricated assembly nodes.

Method used

A prefabricated column and prefabricated beam slab assembly node is designed, and grooves and convex grooves are provided on the top and bottom of the lower prefabricated column and the upper prefabricated column, and internal clamping is achieved using plug-in columns and fasteners, combining concrete Pour to fix the assembly, forming a cavity to be poured into concrete for a firm assembly.

Benefits of technology

Through the inter-jamming and clamping of the upper plug-in column and the lower plug-in column, the internal fixation of the prefabricated beam slab body, the lower prefabricated column and the upper prefabricated column are achieved, and the assembly firmness is enhanced after the concrete solidifies. and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118581971B_ABST
    Figure CN118581971B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of assembled building, and discloses an assembly node of a prefabricated column and a prefabricated beam and slab and a construction method thereof, comprising a prefabricated beam and slab main body, a lower prefabricated column body and an upper prefabricated column body, a lower plug-in column is provided in the middle of a bottom groove, an upper plug-in column is provided in the middle of a top groove, and after the upper plug-in column and the lower plug-in column are inserted into the interior of the prefabricated beam and slab main body, the upper plug-in column and the lower plug-in column are clamped together; a clip is provided in the skeleton to be cast, and when the upper prefabricated column body is seated on the top of the lower prefabricated column body, the abutting claw on the side of the upper plug-in column pushes the clip outward until the clip clamps and connects the lower prefabricated column and the upper prefabricated column; the present invention can realize the firm assembly of the prefabricated beam and slab main body, the lower prefabricated column and the upper prefabricated column by clamping the upper plug-in column and the lower plug-in column together, and injecting concrete into the cavity to be cast.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of assembled buildings, in particular to an assembly node of a prefabricated column and a prefabricated beam and slab and a construction method thereof. Background Art

[0002] Prefabricated parts in the construction field are initially produced in factories and then transferred to the construction site for assembly when used. This can greatly improve the construction efficiency of the building. The assembly of prefabricated parts has become an important development direction for the construction industry.

[0003] Since the connection of the prefabricated assembly nodes is limited by the structure of each prefabricated part, the mutual coordination of the assembly nodes is not in place, resulting in poor assembly firmness of the assembly nodes. In the later stage, steel plates and other fasteners are often used from the outside of the prefabricated parts for secondary fastening. This not only has low construction efficiency, but also cannot fundamentally solve the problem of easy damage at the prefabricated assembly nodes. For this reason, we introduce an assembly node of prefabricated columns and prefabricated beams and slabs and its construction method. Summary of the invention

[0004] The object of the present invention is to provide a prefabricated column and prefabricated beam-slab assembly node and a construction method thereof, so as to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] A prefabricated column and prefabricated beam assembly node, comprising a prefabricated beam body, a lower prefabricated column and an upper prefabricated column, wherein the top of the lower prefabricated column is provided with a bottom groove for clamping the prefabricated beam body, and the bottom of the upper prefabricated column is provided with a top groove for clamping the prefabricated beam body;

[0007] A lower plug-in column is provided in the middle of the bottom groove, and an upper plug-in column is provided in the middle of the top groove. After the upper plug-in column and the lower plug-in column are inserted into the main body of the prefabricated beam plate, the upper plug-in column and the lower plug-in column are engaged with each other;

[0008] The side wall of the bottom groove is provided with a lower casting groove, the side wall of the top groove is provided with an upper casting groove, and the two sides of the beam and slab frame inside the prefabricated beam and slab body are connected with a frame to be cast extending through a vertical groove and extending between the upper casting groove and the lower casting groove;

[0009] A snap fastener is provided in the frame to be cast. When the upper prefabricated column is seated on the top of the lower prefabricated column, the abutting claws on the side of the upper plug-in column push the snap fastener outward until the snap fastener snaps the lower prefabricated column and the upper prefabricated column together.

[0010] A cavity to be poured is formed between the upper pouring trough, the lower pouring trough and the vertical trough, and concrete is injected into the cavity to be poured through the pouring trough on the top of the clip. After the concrete solidifies on the outside of the skeleton to be poured, the precast beam and slab body, the lower precast column and the upper precast column are assembled and fixed.

[0011] Preferably, a positioning cylinder is provided in the middle of the beam-slab frame, and connecting seats are fixed on the front and rear sides of the upper and lower ends of the positioning cylinder, and the connecting seats are embedded in the prefabricated beam-slab body, and the surface of the connecting seat is flush with the surface of the prefabricated beam-slab body;

[0012] The frame to be cast includes U-shaped steel bars connected to the left and right sides of the positioning tube and distributed at equal intervals up and down, and the U-shaped steel bars extend into the upper casting trough and the lower casting trough.

[0013] Preferably, the frame to be cast further comprises horizontal bars connected to the middle of the left and right sides of the positioning tube and distributed front to back;

[0014] The bottom side of the lower casting trough is provided with a lower clamping connection groove, the top side of the upper casting trough is provided with an upper clamping connection groove, and the bottom of the upper clamping connection groove is provided with a downwardly inclined expansion slope;

[0015] The fastener comprises a fastener plate penetrated by a horizontal rod and a horizontal gusset plate connected to the upper and lower ends of the fastener plate, and the upper and lower sets of horizontal gusset plates extend out of the upper fastener slot and the lower fastener slot respectively;

[0016] The pouring trough is arranged at the upper middle end of the upper horizontal gusset plate, and the depth of the pouring trough gradually increases from the outside to the inside. A reserved through groove is arranged at the lower part of the card plate, a protrusion is arranged on the inner side of the upper end of the card plate, and a supporting inclined surface is arranged on the top of the protrusion.

[0017] Preferably, the upper plug-in column and the lower plug-in column are respectively inserted into the positioning cylinder from top to bottom;

[0018] The top of the lower plug-in column is provided with an inclined groove which is gradually recessed inwards, and the top of the inclined groove is provided with a first guiding inclined surface whose outer diameter gradually increases from top to bottom;

[0019] The bottom of the upper plug-in column is provided with a second guiding inclined surface whose inner diameter gradually increases from top to bottom, and the top of the second guiding inclined surface is provided with an annular protruding buckle which is stuck in the inclined surface groove.

[0020] Preferably, the front and rear side walls of the lower casting trough are provided with lower clamping grooves, and the front and rear side walls of the upper casting trough are provided with upper clamping grooves;

[0021] The U-shaped steel bar frame is provided with extension rods on the side, and the outer sides of several groups of extension rods on the same side of the U-shaped steel bar frame are connected to side stirrups, and the clamping frame composed of several groups of extension rods and side stirrups is arranged inside the upper clamping groove and the lower clamping groove.

[0022] Preferably, four groups of rectangularly distributed vertical steel bars are provided between the upper and lower connecting seats, and reinforcing stirrups evenly spaced up and down are sleeved on the outside of the four groups of rectangularly distributed vertical steel bars, and the vertical steel bars and the reinforcing stirrups are located in the beam-slab skeleton.

[0023] Preferably, the upper and lower ends of the prefabricated beam body are clamped with clamping seats, which are locked and fixed with corresponding connecting seats by bolts, and the middle part of the clamping seat is provided with a triangular groove seat corresponding to the side walls of the lower prefabricated column and the upper prefabricated column.

[0024] The present invention also provides a construction method for assembling nodes of prefabricated columns and prefabricated beams and slabs, which specifically comprises the following steps:

[0025] S1. The precast beam and slab body is clamped in the bottom groove, and the lower plug-in column is inserted into the interior of the precast beam and slab body, and the lower part of the frame to be cast is extended into the lower casting groove;

[0026] S2, placing the upper precast column on the top of the lower precast column so that the upper part of the frame to be cast extends into the upper casting trough;

[0027] The abutting claws on the side of the upper plug-in column move downward to contact the inner side of the top of the clip, and the clip is pushed outward until the clip clip connects the lower prefabricated column and the upper prefabricated column;

[0028] S3, at the same time, the upper plug-in column is inserted into the interior of the prefabricated beam and slab body and then is engaged with the lower plug-in column;

[0029] S4. Concrete is injected into the cavity to be poured through the pouring groove on the top of the clip. After the concrete solidifies, the precast beam and slab body, the lower precast column and the upper precast column are assembled and fixed.

[0030] Compared with the prior art, the beneficial effects of the present invention are as follows: when the upper precast column is located on the top of the lower precast column, the upper plug-in column and the lower plug-in column are inserted into the interior of the precast beam body, so that the upper plug-in column and the lower plug-in column are clamped with each other, so that the upper plug-in column and the lower plug-in column are clamped with each other, so that the precast beam body, the lower precast column and the upper precast column can be assembled and fixed from the inside; the abutment claws on the sides of the upper plug-in column push the snapping piece outward until the snapping piece clamps the lower precast column and the upper precast column together, so that the precast beam body, the lower precast column and the upper precast column can be further firmly assembled from the inside; a cavity to be cast is formed between the upper casting groove, the lower casting groove and the vertical groove, and concrete is injected into the cavity to be cast through the casting groove on the top of the snapping piece. After the concrete solidifies on the outside of the skeleton to be cast, the precast beam body, the lower precast column and the upper precast column can be firmly assembled from the inside. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1It is a schematic diagram of the exploded structure of the prefabricated beam and slab body, the lower prefabricated column, the upper prefabricated column and the fastener assembly of the present invention;

[0032] Figure 2 It is a schematic diagram of the three-dimensional structure of the prefabricated column of the present invention;

[0033] Figure 3 It is a schematic diagram of the three-dimensional structure of the prefabricated column of the present invention;

[0034] Figure 4 For the present invention Figure 3 Schematic diagram of the cross-sectional structure at AA in the middle;

[0035] Figure 5 It is a cross-sectional structural schematic diagram of the connection between the upper plug-in column, the lower plug-in column and the positioning cylinder of the present invention;

[0036] Figure 6 It is a schematic diagram of a three-dimensional structure of the connection between the prefabricated beam and slab body and the frame to be cast in the present invention;

[0037] Figure 7 It is a schematic diagram of a first three-dimensional structure of a buckle of the present invention;

[0038] Figure 8 It is a second three-dimensional structural schematic diagram of the buckle of the present invention;

[0039] Fig. 9 It is a schematic diagram of a three-dimensional structure in which a positioning tube, a U-shaped steel bar frame, side stirrups, vertical steel bars and horizontal bars are connected in the present invention;

[0040] Fig.10 It is a schematic diagram of the three-dimensional structure after the overall assembly of the present invention;

[0041] Fig.11 This is a schematic diagram of the exploded structure of the present invention when the upper prefabricated column is seated on the top of the lower prefabricated column;

[0042] Fig.12 It is a schematic diagram of the cross-sectional structure after assembly of the present invention.

[0043] In the figure: 1, precast beam and slab body; 101, vertical groove; 2, lower precast column; 201, lower clamping groove; 202, bottom groove; 203, lower casting groove; 204, lower clamping groove; 205, lower plug-in column; 206, inclined groove; 207, first guide inclined surface; 3, upper precast column; 301, upper clamping groove; 3011, expansion inclined surface; 302, top groove; 303, upper casting groove; 304, upper clamping groove; 305, upper plug-in column; 3051, second guide inclined surface; 3 052, annular raised buckle; 306, abutment claw; 4, bolt; 5, fastener; 501, clamping plate; 502, horizontal buckle plate; 503, protrusion; 504, casting trough; 505, abutment slope; 506, reserved through groove; 6, skeleton to be cast; 601, U-shaped steel frame; 602, side stirrups; 603, extension rod; 604, horizontal rod; 605, connecting seat; 606, positioning tube; 607, vertical steel bar; 608, reinforcing stirrups; 7, clamping seat; 8, triangular groove seat. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] See also Figure 1-12 , the present invention provides a technical solution:

[0046] A prefabricated column and prefabricated beam assembly node, comprising a prefabricated beam body 1, a lower prefabricated column 2 and an upper prefabricated column 3, wherein the upper end of the lower prefabricated column 2 extends and protrudes to the left and right, that is, the size between the left and right sides of the upper end of the lower prefabricated column 2 gradually increases;

[0047] The lower end of the upper prefabricated column 3 extends and protrudes to the left and right, that is, the size between the left and right sides of the lower end of the upper prefabricated column 3 gradually increases;

[0048] The top of the lower prefabricated column 2 is provided with a bottom groove 202 for clamping the prefabricated beam and slab body 1, and the bottom of the upper prefabricated column 3 is provided with a top groove 302 for clamping the prefabricated beam and slab body 1;

[0049] A lower plug-in column 205 is provided in the middle of the bottom groove 202. When the precast beam slab body 1 is seated in the bottom groove 202, the lower plug-in column 205 is inserted from the lower end of the positioning cylinder 606 into the positioning cylinder 606. In this way, the positioning plug-in of the lower plug-in column 205 and the positioning cylinder 606 can realize the accurate assembly of the precast beam slab body 1 and the lower precast column 2.

[0050] An upper plug-in column 305 is provided in the middle of the top groove 302. When the upper prefabricated column 3 is seated on the top of the lower prefabricated column 2 and the prefabricated beam slab body 1 is inserted into the top groove 302, the upper plug-in column 305 is inserted from the upper end of the positioning cylinder 606 into the positioning cylinder 606. In this way, the positioning and plugging of the upper plug-in column 305 and the positioning cylinder 606 can realize the accurate assembly of the upper prefabricated column 3 and the lower prefabricated column 2.

[0051] After the upper plug-in column 305 and the lower plug-in column 205 are inserted into the interior of the prefabricated beam slab body 1, the upper plug-in column 305 and the lower plug-in column 205 are engaged with each other;

[0052] Prefabricated column frames are provided inside the lower prefabricated column 2 and the upper prefabricated column 3, and the upper plug-in column 305 and the lower plug-in column 205 are fixedly connected to the corresponding prefabricated column frames;

[0053] The upper plug-in column 305 and the lower plug-in column 205 are respectively inserted into the positioning tube 606 from top to bottom;

[0054] like Figure 2 As shown, the top of the lower plug-in column 205 is provided with a gradually inwardly recessed inclined groove 206, and the top of the inclined groove 206 is provided with a first guiding inclined surface 207 whose outer diameter gradually increases from top to bottom;

[0055] like Figure 4 As shown, a second guiding inclined surface 3051 with an inner diameter gradually increasing from top to bottom is provided at the bottom of the upper plug-in column 305 , and an annular protruding buckle 3052 which is clamped in the inclined surface groove 206 is provided at the top of the second guiding inclined surface 3051 .

[0056] After the upper prefabricated column 3 is seated on the top of the lower prefabricated column 2, the first guide bevel 207 first contacts the inner wall of the second guide bevel 3051, until the first guide bevel 207 slides upward along the inner wall of the second guide bevel 3051, so that the annular protrusion buckle 3052 is inserted into the bevel groove 206, thus completing the mutual engagement of the upper plug-in column 305 and the lower plug-in column 205. The engagement state of the two is as shown in FIG. Figure 5 shown.

[0057] The side wall of the bottom groove 202 is provided with a lower casting groove 203, and the side wall of the top groove 302 is provided with an upper casting groove 303. The two sides of the beam and slab skeleton inside the precast beam and slab body 1 are connected with a skeleton 6 to be cast that extends through the vertical groove 101 and extends between the upper casting groove 303 and the lower casting groove 203;

[0058] A positioning cylinder 606 is provided in the middle of the beam-slab frame, and connecting seats 605 are fixed to the front and rear sides of the upper and lower ends of the positioning cylinder 606;

[0059] Four groups of rectangularly distributed vertical steel bars 607 are arranged between the upper and lower connecting seats 605. The outer sides of the four groups of rectangularly distributed vertical steel bars 607 are sleeved with reinforcing stirrups 608 distributed at equal intervals up and down. The vertical steel bars 607 and the reinforcing stirrups 608 are located in the beam-slab skeleton.

[0060] Such an arrangement makes the connection between the positioning tube 606 and the prefabricated beam and slab body 1 more secure and more integrated.

[0061] The connecting seat 605 is embedded in the precast beam and slab body 1, and the surface of the connecting seat 605 is flush with the surface of the precast beam and slab body 1. The upper and lower ends of the precast beam and slab body 1 are clamped with a clamping seat 7, and the clamping seat 7 is locked and fixed with the corresponding connecting seat 605 by bolts 4, and a triangular groove seat 8 is provided in the middle of the clamping seat 7, which is tightly attached to the side walls of the lower precast column 2 and the upper precast column 3.

[0062] Such installation can further play the role of abutting the side walls of the lower prefabricated column 2 and the upper prefabricated column 3 to the left and right, preventing the lower prefabricated column 2 and the upper prefabricated column 3 from shaking back and forth.

[0063] The skeleton 6 to be cast includes U-shaped steel bars 601 connected to the left and right sides of the positioning tube 606 and distributed at equal intervals in the upper and lower directions. The U-shaped steel bars 601 extend into the upper casting trough 303 and the lower casting trough 203 .

[0064] Extension rods 603 are provided on the side of the U-shaped steel frame 601, and the outer sides of several groups of extension rods 603 on the same side of the U-shaped steel frame 601 are connected to side stirrups 602. The clamping frame composed of several groups of extension rods 603 and side stirrups 602 is arranged inside the upper clamping groove 304 and the lower clamping groove 204.

[0065] Such an arrangement enables the solidified concrete to further achieve the firmness of the connection between the precast beam and slab body 1 , the lower precast column 2 and the upper precast column 3 after the concrete solidifies and forms outside the clamping frame.

[0066] A fastener 5 is provided in the frame 6 to be cast. The fastener 5 includes a fastener plate 501 penetrating through a horizontal rod 604 and a horizontal gusset plate 502 connected to the upper and lower ends of the fastener plate 501. The upper and lower sets of horizontal gusset plates 502 extend out of the upper fastening groove 301 and the lower fastening groove 201 respectively.

[0067] The pouring groove 504 is arranged at the middle upper end of the upper horizontal buckle plate 502, and the depth of the pouring groove 504 gradually increases from the outside to the inside. A reserved through groove 506 is provided at the lower part of the card plate 501, a protrusion 503 is provided on the inner side of the upper end of the card plate 501, and a supporting inclined surface 505 is provided on the top of the protrusion 503.

[0068] When the upper prefabricated column 3 is seated on the top of the lower prefabricated column 2, the lower end of the abutting claw 306 first contacts the abutting inclined surface 505 at the top of the protrusion 503. As the upper prefabricated column 3 descends, the abutting claw 306 moves downward along the abutting inclined surface 505, thereby pushing the card plate 501 to move outward along the horizontal rod 604 until the horizontal buckle plates 502 at the upper and lower ends of the card plate 501 extend out of the upper card connection slot 301 and the lower card connection slot 201 respectively. Fig.10 and 12 shown.

[0069] After the concrete enters the inner side of the card plate 501, the reserved through groove 506 can be set to allow the concrete to enter the left and right sides of the card plate 501 through the reserved through groove 506 until the concrete completely wraps the card plate 501. Fig.12 shown.

[0070] The frame 6 to be cast also includes horizontal rods 604 connected to the middle of the left and right sides of the positioning tube 606 and distributed front to back; the arrangement of the horizontal rods 604 allows the clamping plate 501 to move outwards smoothly along the horizontal rods 604 .

[0071] A lower clamping connection groove 201 is provided at the bottom side of the lower pouring groove 203, an upper clamping connection groove 301 is provided at the top side of the upper pouring groove 303, and a downwardly inclined expansion slope 3011 is provided at the bottom of the upper clamping connection groove 301;

[0072] The front and rear side walls of the lower casting trough 203 are provided with lower clamping grooves 204, and the front and rear side walls of the upper casting trough 303 are provided with upper clamping grooves 304;

[0073] By setting the extended inclined surface 3011, the upper prefabricated column 3 descends so that the abutting claw 306 moves down along the abutting inclined surface 505, thereby pushing the clamping plate 501 to move outward along the horizontal rod 604, so that when the upper horizontal buckle plate 502 is about to be inserted into the upper clamping groove 301, the upper horizontal buckle plate 502 is first inserted to the inner bottom of the extended inclined surface 3011, and at this time, the lower horizontal buckle plate 502 is just inserted into the lower clamping groove 201;

[0074] Subsequently, as the upper prefabricated column 3 continues to descend, the card plate 501 continues to move outward, and finally the upper horizontal buckle plate 502 is fully inserted into the upper card connection groove 301, and the lower horizontal buckle plate 502 is fully inserted into the lower card connection groove 201. At the same time, the upper prefabricated column 3 is seated on the top of the lower prefabricated column 2.

[0075] When the upper prefabricated column 3 is seated on the top of the lower prefabricated column 2, the abutting claw 306 on the side of the upper plug-in column 305 pushes the fastener 5 outward until the fastener 5 fastens and connects the lower prefabricated column 2 and the upper prefabricated column 3;

[0076] A cavity to be poured is formed between the upper pouring groove 303, the lower pouring groove 203 and the vertical groove 101, and concrete is injected into the cavity to be poured through the pouring groove 504 at the top of the fastener 5. After the concrete solidifies on the outside of the skeleton 6 to be poured, the precast beam and slab main body 1, the lower precast column 2 and the upper precast column 3 are assembled and fixed.

[0077] The present invention also provides a construction method for assembling nodes of prefabricated columns and prefabricated beams and slabs, which specifically comprises the following steps:

[0078] S1, clamp the precast beam body 1 in the bottom groove 202, insert the lower plug-in column 205 into the precast beam body 1, and extend the lower part of the frame 6 to be cast into the lower casting groove 203;

[0079] S2, place the upper prefabricated column 3 on the top of the lower prefabricated column 2, so that the upper part of the frame 6 to be cast extends into the upper casting trough 303;

[0080] The abutting claw 306 on the side of the upper plug-in column 305 moves downward to contact the inner side of the top of the fastener 5, and the fastener 5 is pushed outward until the fastener 5 fastens and connects the lower prefabricated column 2 and the upper prefabricated column 3;

[0081] S3, at the same time, the upper plug-in column 305 is inserted into the interior of the prefabricated beam slab body 1 and then is engaged with the lower plug-in column 205;

[0082] S4. Concrete is poured into the cavity to be poured through the pouring groove 504 on the top of the fastener 5. After the concrete solidifies, the precast beam and slab body 1, the lower precast column 2 and the upper precast column 3 are assembled and fixed.

[0083] Specifically, when in use, the precast beam body 1 is stuck in the bottom groove 202, and the lower plug-in column 205 is inserted into the interior of the precast beam body 1 (that is, the lower plug-in column 205 is inserted from the lower end of the positioning tube 606 into the positioning tube 606), and the lower part of the skeleton 6 to be cast is extended into the lower casting groove 203 (that is, the lower groups of U-shaped steel bars 601 are extended into the lower casting groove 203);

[0084] At the same time, the lower part of the clamping frame (i.e., the lower groups of extension rods 603 and the lower part of the side stirrups 602) extends into the lower clamping groove 204;

[0085] After the upper precast column 3 is lifted, it is lowered and placed on the top of the lower precast column 2, and at the same time, the upper plug-in column 305 is inserted into the interior of the precast beam slab body 1 (that is, the upper plug-in column 305 is inserted from the upper end of the positioning cylinder 606 into the positioning cylinder 606), and the upper part of the skeleton 6 to be cast is extended into the upper casting groove 303 (that is, the upper several groups of U-shaped steel bars 601 are extended into the upper casting groove 303);

[0086] As the upper prefabricated column 3 moves downward, the abutting claw 306 on the side of the upper plug-in column 305 contacts the abutting inclined surface 505 on the top of the protrusion 503, and the abutting claw 306 moves downward along the abutting inclined surface 505, thereby pushing the clamping plate 501 to move outward along the horizontal rod 604, until the horizontal buckle plates 502 at the upper and lower ends of the clamping plate 501 extend out of the upper clamping groove 301 and the lower clamping groove 201 respectively, so that the clamping member 5 clamps and connects the lower prefabricated column 2 and the upper prefabricated column 3;

[0087] At this time, the clamping frame is completely located inside the upper clamping groove 304 and the lower clamping groove 204, and the upper plug-in column 305 is inserted into the prefabricated beam body 1 and is clamped with the lower plug-in column 205;

[0088] Then, concrete is injected into the cavity to be poured through the pouring groove 504 on the top of the snap fastener 5, and the snap-fit ​​seat 7 is clamped at the corresponding positions of the upper and lower ends of the precast beam and slab body 1. The snap-fit ​​seat 7 is locked and fixed with the corresponding connecting seat 605 by bolts 4, and the triangular groove seat 8 on the snap-fit ​​seat 7 is made to be tightly attached to the side walls of the lower precast column 2 and the upper precast column 3. After the concrete solidifies, the assembly and fixation of the precast beam and slab body 1, the lower precast column 2 and the upper precast column 3 are realized.

[0089] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A prefabricated column and prefabricated beam assembly node, comprising a prefabricated beam body, a lower prefabricated column and an upper prefabricated column, characterized in that: The top of the lower prefabricated column is provided with a bottom groove for clamping the prefabricated beam and slab body, and the bottom of the upper prefabricated column is provided with a top groove for clamping the prefabricated beam and slab body; A lower plug-in column is provided in the middle of the bottom groove, and an upper plug-in column is provided in the middle of the top groove. After the upper plug-in column and the lower plug-in column are inserted into the main body of the prefabricated beam plate, the upper plug-in column and the lower plug-in column are engaged with each other; The side wall of the bottom groove is provided with a lower casting groove, the side wall of the top groove is provided with an upper casting groove, and the two sides of the beam and slab frame inside the prefabricated beam and slab body are connected with a frame to be cast extending through a vertical groove and extending between the upper casting groove and the lower casting groove; A snap fastener is provided in the frame to be cast. When the upper prefabricated column is seated on the top of the lower prefabricated column, the abutting claws on the side of the upper plug-in column push the snap fastener outward until the snap fastener snaps the lower prefabricated column and the upper prefabricated column together. A cavity to be cast is formed between the upper casting groove, the lower casting groove and the vertical groove, and concrete is poured into the cavity to be cast through the casting groove on the top of the clip. After the concrete solidifies outside the frame to be cast, the assembly and fixation of the precast beam and slab body, the lower precast column and the upper precast column are realized; A positioning cylinder is provided in the middle of the beam-slab frame, and connecting seats are fixed on the front and rear sides of the upper and lower ends of the positioning cylinder. The connecting seats are embedded in the prefabricated beam-slab body, and the surface of the connecting seat is flush with the surface of the prefabricated beam-slab body; The frame to be cast includes U-shaped steel bars connected to the left and right sides of the positioning tube and distributed at equal intervals above and below, and the U-shaped steel bars extend into the upper casting trough and the lower casting trough; The frame to be cast also includes horizontal bars connected to the middle of the left and right sides of the positioning tube and distributed front and back; The bottom side of the lower casting trough is provided with a lower clamping connection groove, the top side of the upper casting trough is provided with an upper clamping connection groove, and the bottom of the upper clamping connection groove is provided with a downwardly inclined expansion slope; The fastener comprises a fastener plate penetrated by a horizontal rod and a horizontal gusset plate connected to the upper and lower ends of the fastener plate, and the upper and lower sets of horizontal gusset plates extend out of the upper fastener slot and the lower fastener slot respectively; The pouring trough is arranged at the upper middle end of the upper horizontal gusset plate, and the depth of the pouring trough gradually increases from the outside to the inside. A reserved through groove is arranged at the lower part of the card plate, a protrusion is arranged on the inner side of the upper end of the card plate, and a supporting inclined surface is arranged on the top of the protrusion.

2. The prefabricated column and prefabricated beam assembly node according to claim 1, characterized in that: The upper plug-in column and the lower plug-in column are respectively inserted into the positioning cylinder from top to bottom; The top of the lower plug-in column is provided with an inclined groove which is gradually recessed inwards, and the top of the inclined groove is provided with a first guiding inclined surface whose outer diameter gradually increases from top to bottom; The bottom of the upper plug-in column is provided with a second guiding inclined surface whose inner diameter gradually increases from top to bottom, and the top of the second guiding inclined surface is provided with an annular protruding buckle which is stuck in the inclined surface groove.

3. The prefabricated column and prefabricated beam assembly node according to claim 1, characterized in that: The front and rear side walls of the lower casting trough are provided with lower clamping grooves, and the front and rear side walls of the upper casting trough are provided with upper clamping grooves; The U-shaped steel bar frame is provided with extension rods on the side, and the outer sides of several groups of extension rods on the same side of the U-shaped steel bar frame are connected to side stirrups, and the clamping frame composed of several groups of extension rods and side stirrups is arranged inside the upper clamping groove and the lower clamping groove.

4. The prefabricated column and prefabricated beam assembly node according to claim 1, characterized in that: Four groups of rectangularly distributed vertical steel bars are arranged between the upper and lower connecting seats. The outer sides of the four groups of rectangularly distributed vertical steel bars are sleeved with reinforcing stirrups distributed at equal intervals above and below. The vertical steel bars and the reinforcing stirrups are located in the beam and slab skeleton.

5. The prefabricated column and prefabricated beam assembly node according to claim 1, characterized in that: The upper and lower ends of the prefabricated beam body are clamped with clamping seats, which are locked and fixed with corresponding connecting seats by bolts, and the middle part of the clamping seat is provided with a triangular groove seat corresponding to the side walls of the lower prefabricated column and the upper prefabricated column.

6. A construction method for the assembly node of a prefabricated column and a prefabricated beam and slab according to any one of claims 1 to 5, characterized in that: The specific steps include: S1. The precast beam and slab body is clamped in the bottom groove, and the lower plug-in column is inserted into the interior of the precast beam and slab body, and the lower part of the frame to be cast is extended into the lower casting groove; S2, placing the upper precast column on the top of the lower precast column so that the upper part of the frame to be cast extends into the upper casting trough; The abutting claws on the side of the upper plug-in column move downward to contact the inner side of the top of the clip, and the clip is pushed outward until the clip clip connects the lower prefabricated column and the upper prefabricated column; S3, at the same time, the upper plug-in column is inserted into the interior of the prefabricated beam and slab body and then is engaged with the lower plug-in column; S4. Concrete is injected into the cavity to be poured through the pouring groove on the top of the clip. After the concrete solidifies, the precast beam and slab body, the lower precast column and the upper precast column are assembled and fixed.