A Slope Finding Method for Complex Roofs Based on BIM
Patent Information
- Application Number
- CN202411073618.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-08-07
AI Technical Summary
在屋面施工前,按照设计图纸进行放线、布置标高控制点、定位分水线,遇到形状复杂、面积大排水口多的复杂屋面,如果采用传统的方法就难以满足屋面找坡和排水的需求,需要反复调整,既增加了时间成本与材料成本的投入,又影响施工进度
[0023] Compared with the existing technology, the present invention has the following advantages: the present invention uses BIM technology to establish a roof grading model, and then accurately generates a grading deepening diagram, forming a set of standardized deepening processes, efficiently and accurately guiding on-site construction, and providing a basis for subsequent Construction and production bring great convenience. Specifically, by sloping the complex area components of the roof, a visual model can be formed during the deepening process, which not only meets the roof drainage requirements but also accurately displays the roof sloping requirements, avoiding the difficulty of sloping during on-site roof construction and the need for repeated adjustments, and thus Issues affecting construction progress.
Smart Images

Figure CN118607079B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field, and in particular to a slope finding method for a complex roof based on BIM. Background Art
[0002] Slope finding for complex roofs is a difficult point in on-site construction. Before roof construction, layout, elevation control points and watershed positioning are carried out according to the design drawings. If traditional methods are used, it is difficult to meet the needs of roof slope finding and drainage for complex roofs with complex shapes, large areas and many drainage outlets. Repeated adjustments are required, which not only increases the investment of time and material costs, but also affects the construction progress. Summary of the invention
[0003] The purpose of the present invention is to provide a slope finding method for complex roofs based on BIM, which uses BIM technology to model and draw complex roofs in advance, which not only meets the roof drainage requirements but also accurately displays the roof slope finding requirements, avoiding the difficulty of slope finding in on-site roof construction and the need for repeated adjustments, thereby affecting the construction progress.
[0004] To achieve the above object, the present invention provides a complex roof slope finding method based on BIM, comprising the following steps:
[0005] S1. Obtain drawing component information data;
[0006] S2. Create a basic floor component model;
[0007] S3. Perform data slope processing on the foundation floor component model;
[0008] S4, generating positioning point data;
[0009] S5. Export the roof slope diagram;
[0010] Wherein, in step S3, data slope processing is performed on the foundation floor component model, including:
[0011] S31. Analyze the slope direction in the drawings: On the foundation slab component model, analyze the slope direction according to the slope line marked on the drawings, calculate the height of the starting point of the slope, and locate the highest point of the slope;
[0012] S32, obtaining the sloping location data: according to the calculated starting point height data information, using the Revit software to determine the starting point height, and perform data location of the sloping point;
[0013] S33, generating a sloping watershed line: generating a sloping watershed line in the model based on the acquired sloping positioning data;
[0014] S34. Adjust the starting elevation of the slope.
[0015] In one embodiment of the present invention, in step S1, obtaining drawing component information data includes: obtaining component information data in the roof CAD drawing, identifying the outer contour of the roof component, reading the elevation information and the slope of the roof, the drainage direction, and the position of the drainage outlet.
[0016] In one embodiment of the present invention, in step S2, creating a basic floor component model includes: drawing a floor edge line through the edge of the building exterior wall, and establishing a basic floor component model according to the drawing data parameters, wherein the drawing data parameters include the thickness of the floor structure, the edge position of the floor and the parapet, the intersection position of the floor and the staircase elevator room and the roof machine room, the position of the drainage ditch and the drainage hole, the equipment foundation, and the construction method of the external drainage. When creating the roof foundation model, first make the position of the staircase, elevator room, and roof machine room and the edge position of the floor and the parapet accurate, then create the equipment foundation, drainage ditch and drainage hole according to the drawing position, and then draw the slope-finding structural floor on the structural floor according to the construction method of the drawing and the slope line of the roof given by the drawing.
[0017] In one embodiment of the present invention, in step S31, on the foundation floor component model, the sloping direction is analyzed according to the sloping line marked on the drawing, the height of the sloping starting point is calculated, and the position of the highest point of the sloping is located, including: according to the percentage slope parameter on the drawing, the sloping length is obtained in the foundation floor component model, and the height of the sloping starting point is calculated in Excel, and the height of the sloping starting point is input on the foundation floor component model using revit software to locate the position of the highest point of the sloping.
[0018] In one embodiment of the present invention, in step S32, the height of the starting point of the slope is determined by using the revit software according to the calculated data information of the height of the starting point of the slope, and the data positioning of the sloping point is performed, including: according to the height data of the starting point of the slope calculated in step S31, the plane positioning of the starting point of the slope is determined by using the revit software on the basic floor component model through the add point command on the shape editing panel, and according to the marking of the starting point of the slope on the drawing, the modify sub-element command on the shape editing panel is used to input the sloping elevation in the basic floor component model to determine the height of the starting point of the slope.
[0019] In one embodiment of the present invention, in step S33, based on the sloping positioning data of step S32, a watershed is generated in the model, including: in the basic floor slab component model, the sloping starting point height data calculated in step S31 is input according to the highest point of the sloping to generate the sloping watershed; then, according to the drawing marking, the undisplayed sloping watershed is added using the Add Splitting Line command on the Shape Editing Panel; if the sloping watershed generated by the Revit software has a position deviation from the drawing marking, the position of the sloping watershed is adjusted by modifying the Move command on the panel.
[0020] In one embodiment of the present invention, in step S34, adjusting the starting elevation of the slope includes: adding the highest point watershed line in the area along the ramp based on the slope positioning data according to the location of the equipment foundation; judging whether there are problems with the roof slope and drainage of the model, and if there are drainage problems, adjusting the starting elevation of the slope by modifying the sub-element command on the shape editing panel to ensure the roof drainage and slope requirements, optimizing the detailed waterline model according to the location of the drain outlet, so that each drain outlet can drain in an orderly manner, and obtaining the adjusted foundation floor component model.
[0021] In one embodiment of the present invention, in step S4, the positioning point data is generated, including: using the revit software drawing module to mark the positions of the watershed elevation points, elevation point slopes, and slope lengths in the adjusted foundation floor component model, and marking the relative positions of the watershed and other structures, wherein the other structures include elevator rooms, stairwells, roof machine rooms, equipment foundations, and exhaust shafts.
[0022] In one embodiment of the present invention, in step S5, the roof slope diagram is exported, including: exporting a DWG plan view through software, processing the DWG file in CAD software, deleting unnecessary lines in the revit software in the CAD software, and exporting a construction drawing to guide on-site construction.
[0023] Compared with the prior art, the present invention has the following advantages: the present invention uses BIM technology to establish a roof slope model, and then accurately generates a slope deepening diagram, forming a set of standardized deepening processes, efficiently and accurately guiding on-site construction, and bringing great convenience to subsequent construction production. Specifically, by performing slope processing on components in complex roof areas, a visual model can be formed during the deepening process, which not only meets the roof drainage requirements but also accurately displays the roof slope requirements, avoiding the difficulty of slope finding in on-site roof construction, and the need for repeated adjustments, which in turn affects the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a flow chart of a slope finding method for a complex roof based on BIM according to an embodiment of the present invention;
[0025] Figure 2 It is a flow chart of data slope finding processing for a basic floor component model according to an embodiment of the present invention;
[0026] Figure 3 is a schematic diagram of obtaining drawing component information data in step S1 according to an embodiment of the present invention;
[0027] Figure 4 Schematic diagram of setting the highest point waterline and the detailed waterline in step S34 according to an embodiment of the present invention. DETAILED DESCRIPTION
[0028] The specific implementation modes of the present invention are described in detail below in conjunction with the accompanying drawings, but it should be understood that the protection scope of the present invention is not limited by the specific implementation modes.
[0029] Unless explicitly stated otherwise, throughout the specification and claims, the term “comprise” or variations such as “include” or “comprising”, etc., will be understood to include the stated elements or components but not to exclude other elements or components.
[0030] Embodiment 1:
[0031] like Figures 1 to 3 As shown, according to this embodiment, a complex roof slope finding method based on BIM is provided to solve the surface slope finding of flat roofs to meet drainage requirements. This is mainly due to the large number of components on the roof (elevator room, stairwell, equipment room, equipment foundation, vents and drains, etc.), the large roof area, and the need to meet drainage requirements. The constraints of the above conditions constitute the difficulty of drainage on complex roofs. For ease of understanding, the specific process of the present invention is described below through examples: The complex roof slope finding method based on BIM of the present invention includes the following steps:
[0032] Step S1, obtaining drawing component information data.
[0033] Get CAD drawings, such as Figure 3 As shown, component information data is obtained in the roof CAD drawing, the outer contour of the roof component (the outer edge line of the floor slab 201) is identified, and the elevation information and the slope 202 of the roof slope, the drainage direction, and the position of the drainage outlet 203 are read.
[0034] Step S2: Create a basic floor slab component model.
[0035] Draw the floor edge line through the edge of the building's exterior wall, and establish the basic floor component model according to the drawing data parameters, where the drawing data parameters include the thickness of the floor structure, the edge position of the floor and the parapet, the intersection of the floor and the staircase elevator room and the roof machine room, the position of the drain and the drain hole, the equipment foundation, and the construction method of the external drainage. When creating the roof foundation model, first make the position of the staircase, elevator room, and roof machine room and the edge position of the floor and the parapet accurate, then create the equipment foundation, drain and drain holes according to the drawing position (the position can be adjusted appropriately according to the later deepening), and then draw the sloped structural floor on the structural floor according to the construction method of the drawing and the slope line 204 of the roof given by the drawing, so as to provide the basic data model, positioning information and plane size information as a basis for the next step.
[0036] Step S3, performing data slope processing on the foundation floor component model. Specifically, it includes the following steps:
[0037] Step S31, analyzing the slope direction in the drawing: on the foundation floor component model, analyzing the slope direction according to the slope line 204 marked on the drawing, calculating the height of the slope starting point, and locating the position of the highest point of the slope.
[0038] Step S32, obtaining the sloping location data: according to the calculated starting point height data information, using the Revit software to determine the starting point height, and perform data location of the sloping point.
[0039] Step S33, generating a grading watershed line: generating a grading watershed line in the model based on the acquired grading positioning data.
[0040] Step S34, adjusting the starting slope elevation: Since there are many machine rooms, exhaust shafts, equipment foundations, elevator rooms, and stairwells on the complex roof, in order to ensure smooth drainage, the starting slope elevation needs to be further adjusted to meet drainage requirements and obtain a model that meets the drainage slope requirements.
[0041] Step S4, generating positioning point data: using the revit software drawing module, marking the position of the watershed elevation point, elevation point slope, and slope length in the adjusted model that meets the drainage slope, and marking the relative position of the watershed and other structures, which will serve as a basis for later drawing. Among them, other structures include elevator rooms, stairwells, roof machine rooms, equipment foundations, and exhaust shafts.
[0042] Step S5, exporting the roof slope diagram: based on step S4, exporting the DWG plan through software, processing the DWG file in the CAD software, deleting unnecessary lines in the Revit software in the CAD software, and exporting the construction drawing to guide on-site construction.
[0043] Example 2
[0044] On the basis of Example 1, in step S31, on the foundation floor component model, the sloping direction is analyzed according to the sloping line marked on the drawing, the height of the sloping starting point is calculated, and the position of the highest point of the sloping is located, including: according to the percentage slope parameter on the drawing, the sloping length is obtained in the foundation floor component model, the height of the sloping starting point is calculated in Excel, and the height of the sloping starting point is input on the foundation floor component model using the revit software, and the position of the highest point of the sloping is located through the drawing.
[0045] In step S32, the height of the starting point of the slope is determined by using the revit software according to the calculated data information of the height of the starting point of the slope, and the data positioning of the sloping point is performed, including: according to the height data of the starting point of the slope calculated in step S31, the plane positioning of the starting point of the slope is determined by using the add point command on the shape editing panel on the basic floor component model using the revit software; according to the marking of the starting point of the slope on the drawing, the modify sub-element command on the shape editing panel is used to input the slope elevation in the basic floor component model, determine the height of the starting point of the slope, and perform data positioning of the sloping point.
[0046] In step S33, based on the grading positioning data of step S32, a watershed is generated in the model, including: inputting the starting point height data calculated in step S31 according to the highest point of the grading in the foundation floor component model to generate a grading watershed; and then adding an undisplayed grading watershed according to the drawing annotation using the Add Splitting Line command on the Shape Editing Panel. If the grading watershed generated by the Revit software has a position deviation from the drawing annotation, the position of the grading watershed is adjusted by modifying the Move command on the panel to meet the design requirements.
[0047] In step S34, the slope elevation is adjusted, including: due to the large number of machine rooms, exhaust shafts, equipment foundations, elevator rooms, and stairwells on the complex roof. According to the location of the equipment foundation, the highest point watershed 301 is added in the area along the slope as described above, such as Figure 4 As shown. Combined with the equipment foundation of the electromechanical profession, it will affect the roof drainage, so the existing model is used to determine whether there are problems with the roof slope and drainage. If there are drainage problems, the slope elevation is adjusted through the Modify Sub-element command on the Shape Editing Panel to ensure the roof drainage slope requirements. Then, the detailed waterline 302 model is optimized for the location of the drain outlet, so that each drain outlet can drain in an orderly manner, and the equipment foundation slope adjustment 303 is completed to obtain the adjusted foundation floor component model.
[0048] The foregoing description of specific exemplary embodiments of the present invention is for the purpose of illustration and demonstration. These descriptions are not intended to limit the present invention to the precise form disclosed, and it is clear that many changes and variations can be made based on the above teachings. The purpose of selecting and describing the exemplary embodiments is to explain the specific principles of the present invention and its practical application, so that those skilled in the art can realize and utilize various different exemplary embodiments of the present invention and various different selections and changes. The scope of the present invention is intended to be limited by the claims and their equivalents.
Claims
1. A complex roof slope finding method based on BIM, characterized in that: The steps include: S1. Obtain drawing component information data; S2. Create a basic floor component model; S3. Perform data slope processing on the foundation floor component model; S4, generating positioning point data; S5. Export the roof slope diagram; Wherein, in step S3, data slope processing is performed on the foundation floor component model, including: S31. Analyze the slope direction in the drawings: On the foundation slab component model, analyze the slope direction according to the slope line marked on the drawings, calculate the height of the starting point of the slope, and locate the highest point of the slope; S32, obtaining the sloping location data: according to the calculated height of the sloping starting point, the height of the sloping starting point is determined by using the Revit software, and the data of the sloping point is located; S33, generating a sloping watershed line: generating a sloping watershed line in the model based on the acquired sloping positioning data; S34, adjust the slope elevation; Wherein, in step S2, creating a basic floor component model includes: drawing a floor edge line through the edge of the building exterior wall, and establishing a basic floor component model according to the drawing data parameters, wherein the drawing data parameters include the thickness of the floor structure, the edge position of the floor and the parapet, the intersection position of the floor and the staircase elevator room and the roof machine room, the position of the drainage ditch and the drainage hole, the equipment foundation and the construction method of the external drainage. When creating the roof foundation model, first make the position of the staircase, the elevator room and the roof machine room and the edge position of the floor and the parapet accurate, then create the equipment foundation, drainage ditch and drainage hole according to the drawing position, and then draw the sloped structural floor on the structural floor according to the construction method of the drawing and the slope line of the roof given by the drawing; In step S31, on the foundation floor component model, the sloping direction is analyzed according to the sloping line marked on the drawing, the height of the sloping starting point is calculated, and the position of the highest point of the sloping is located, including: according to the percentage slope parameter on the drawing, the sloping length is obtained in the foundation floor component model, and the height of the sloping starting point is calculated in Excel, and the height of the sloping starting point is input on the foundation floor component model using the Revit software to locate the position of the highest point of the sloping; In step S34, the starting elevation is adjusted, including: according to the location of the equipment foundation, based on the slope positioning data, adding the highest point watershed line in the area along the ramp; judging whether there are problems with the roof slope and drainage of the model, if there are drainage problems, adjusting the starting elevation through the Modify Sub-element command on the Shape Editing Panel to ensure the roof drainage and slope requirements, optimizing the detailed waterline model according to the location of the drain outlet, so that each drain outlet can drain in an orderly manner, and obtaining the adjusted foundation floor component model.
2. The complex roof slope finding method based on BIM as claimed in claim 1, characterized in that: In step S1, the drawing component information data is obtained, including: obtaining component information data in the roof CAD drawing, identifying the outer contour of the roof component, reading the elevation information and the slope of the roof, the drainage direction, and the position of the drainage outlet.
3. The complex roof slope finding method based on BIM as claimed in claim 2, characterized in that: In step S32, the height of the starting point of the slope is determined by using the revit software according to the calculated data information of the height of the starting point of the slope, and the data positioning of the sloping point is performed, including: according to the height data of the starting point of the slope calculated in step S31, the plane positioning of the starting point of the slope is determined by using the add point command on the shape editing panel on the basic floor component model using the revit software; according to the marking of the starting point of the slope on the drawing, the modify sub-element command on the shape editing panel is used to input the sloping elevation in the basic floor component model to determine the height of the starting point of the slope.
4. The complex roof slope finding method based on BIM as claimed in claim 3, characterized in that: In step S33, based on the sloping positioning data of step S32, a watershed is generated in the model, including: in the foundation slab component model, the sloping starting point height calculated in step S31 is input according to the highest sloping point to generate a sloping watershed; then, according to the drawing markings, the undisplayed sloping watershed is added using the Add Splitting Line command on the Shape Editing Panel; if the sloping watershed generated by the Revit software has a position deviation from the drawing markings, the position of the sloping watershed is adjusted by modifying the Move command on the panel.
5. The complex roof slope finding method based on BIM as claimed in claim 4, characterized in that: In step S4, the positioning point data is generated, including: using the revit software drawing module to mark the position of the watershed elevation point, elevation point slope, and slope length in the adjusted foundation floor component model, and mark the relative position of the watershed and other structures, where other structures include elevator rooms, stairwells, roof machine rooms, equipment foundations, and exhaust shafts.
6. The complex roof slope finding method based on BIM as claimed in claim 1, characterized in that: In step S5, the roof slope diagram is exported, including: exporting the DWG plan through software, processing the DWG file in the CAD software, deleting unnecessary lines in the revit software in the CAD software, and exporting the construction drawing to guide the on-site construction.
Citation Information
Patent Citations
Revit-based site editing system
CN110119596A
BIM modeling method and system for accurately positioning component side line
CN113536411A
Method for rapidly generating roof slope-finding elevation control point by Dynamo
CN115758519A
Method for quickly acquiring bottom contour line of foundation slab component
CN116628832A
Plotter and program
JP2023113465A