Bidding agent quality management method, system and equipment based on project management
Through the bidding agency quality management method based on project-based management, the problems of lack of systematicity and coherence, insufficient information processing capabilities and weak risk control in the traditional bidding agency service model are solved, and more efficient and high-quality bidding agency services are achieved.
Patent Information
- Application Number
- CN202411681798.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-02-25
AI Technical Summary
The traditional bidding agency service model lacks systematicity and coherence, insufficient information processing capabilities, and weak risk control, resulting in low service efficiency and quality.
Adopt the bidding agency quality management method based on project management, and by building project management standards and project management network structure, obtaining and preprocessing project information, conducting compliance and risk assessment, optimizing project management plans, and realizing refined management and monitoring.
The overall management level and service quality of bidding agency services have been improved, the process has been standardized and transparent, the accuracy and efficiency of information processing have been enhanced, potential risks have been identified and prevented in advance, and the quality and efficiency of project execution have been ensured.
Smart Images

Figure CN119515191A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of quality management, and in particular to a bidding and tendering agency quality management method, system and equipment based on project management. Background Art
[0002] With the rapid development of social economy and increasingly fierce market competition, bidding agency services, as an important bridge connecting supply and demand, play an indispensable role in engineering projects, government procurement and other fields; however, the traditional bidding agency service model has many shortcomings, which are mainly reflected in the following aspects: Lack of systematicness and continuity: Existing bidding agency services often focus on the operation of a single link and lack the ability to comprehensively plan and manage the project as a whole. This leads to the emergence of information islands in actual operations, affecting the continuity and efficiency of services.
[0003] Insufficient information processing capabilities: During the bidding and tendering agency process, a large amount of project information needs to be processed, including bidding documents, tender documents, contract terms, etc. The complexity and diversity of this information poses a huge challenge to the collection, organization and analysis of information. The existing information processing methods mostly rely on manual work, which is not only time-consuming and labor-intensive, but also prone to errors, reducing the accuracy and efficiency of project management.
[0004] Weak risk control: Bidding agency services involve multiple links, each of which may involve legal and operational risks. Existing risk control measures are relatively simple, mainly relying on experience and judgment, and lack scientific and effective evaluation and prevention mechanisms.
[0005] To sum up, there is an urgent need to provide a bidding quality management method that can improve the overall management level and service quality of bidding agency services and improve the efficiency of bidding agency services. Summary of the invention
[0006] In order to improve the overall management level and service quality of bidding agency services and improve the efficiency of bidding agency services, this application provides a bidding agency quality management method, system and equipment based on project management.
[0007] In the first aspect, the invention objective of the present application is achieved by adopting the following technical solutions: The quality management method of bidding and tendering agency based on project management includes: According to each key link and service standard in the bidding agency service process, a project management standard is constructed, and a plurality of project management nodes corresponding to the bidding agency service process are constructed, and the plurality of project management nodes form a project management network structure; initial bidding project information to be managed is obtained, and the initial bidding project information to be managed is subjected to standardized preprocessing to obtain preprocessed project information; type and feature analysis is performed on the preprocessed project information to obtain project feature information; compliance and risk assessment is performed on the preprocessed project information to obtain assessment results and corresponding risk level identifiers, and project management nodes of the project management network structure are associated and matched based on the assessment results and corresponding risk level identifiers to determine and obtain an initial project management plan; Matching corresponding quality management standards according to the project feature information and risk level identifier of the pre-processed project information, and optimizing and adjusting the initial project management plan to obtain a target project management plan; The pre-processed project information is project managed according to the target project management scheme.
[0008] By adopting the above technical solutions, this application constructs project management standards and project management network structures. Due to the adoption of the concept of integrated project management, each environment of the bidding agency service can be finely managed and monitored, effectively solving the technical problems of the lack of systematicness and coherence of the bidding agency service in the existing technology, and realizing the standardization and transparency of the bidding agency service process. By obtaining and preprocessing the bidding project information and adopting standardized preprocessing technology, the accuracy and consistency of the project information are ensured, and the efficiency and accuracy of project management are improved. Then, the compliance assessment and risk assessment of the information in the entire agency service process of the bidding project are carried out to obtain the assessment results and the corresponding risk level identification, which can identify and prevent potential legal risks and operational risks in advance, and effectively solve the problem of insufficient risk control in the existing technology. Finally, by optimizing the project management plan, that is, adopting a highly targeted target project management plan, the implementation of the bidding agency service can be more accurately guided to avoid problems with the expected goals of the project execution, ensuring the quality and efficiency of the bidding agency service, and significantly improving the overall management level and service quality of the bidding agency service process.
[0009] In a preferred example of the present application: the project management network structure is provided with different levels for the plurality of project management nodes, and the plurality of project management nodes of different levels form a project flow corresponding to the bidding agency service process; The step of performing compliance and risk assessment on the pre-processed project information to obtain an assessment result and a corresponding risk level identifier, associating and matching the project management nodes of the project management network structure based on the assessment result and the corresponding risk level identifier, and determining that an initial project management plan is obtained includes: Obtaining the project acquisition time in the project information of the pre-processed project information; within a preset time period, creating multiple project information transmission compression intervals according to the project acquisition time of multiple groups of the pre-processed project information of the project management nodes of the same level of the current processing level and the corresponding risk level identifiers; According to the plurality of the project information transmission compression intervals, the plurality of groups of the pre-processed project information are combined and compressed to obtain a plurality of pre-processed project information compression sets; Deliver the plurality of compressed sets of pre-processed project information to a next-level project management node.
[0010] By adopting the above-mentioned technical scheme, the present application adopts a hierarchical management system divided into multiple different management levels, and realizes hierarchical management of the bidding agency service process through project management nodes at different levels, thereby improving the precision of management. At the same time, in order to realize efficient and reasonable merging and compression of project information and information delivery of different management nodes, reasonably allocate and utilize information resources, and improve the overall efficiency of bidding project management, the present application creates a project information transmission compression interval. Through the creation and management of the project information transmission compression interval, it is ensured that the risks and information access rights when project information is transmitted between project management nodes at different levels are controlled with high precision, so as to realize efficient project risk management, strictly prevent the occurrence of leakage of highly sensitive information, and at the same time improve the processing efficiency and response speed of project data.
[0011] In a preferred example of the present application: the project management node includes a basic level project management node; when the risk level identifier of the basic level project management node meets the preset optimization processing identifier condition: Creating multiple project information transmission compression intervals according to the project acquisition time of multiple groups of pre-processed project information of project management nodes at the same level of the current processing level and the corresponding risk level identifiers; Determine whether the project acquisition time of the currently processed pre-processed project information is within the created project information transmission compression interval: if it is within the created project information transmission compression interval, merge it into the corresponding project information to-be-compressed package; If it is within the expandable interval of the created project information transmission compression interval, the compression time range of the interval is updated and the pre-processed project information currently being processed is merged; If it is not within the created project information transmission compression interval and its expandable interval, a new project information transmission compression interval is created, and the currently processed pre-processed project information is merged into the new interval.
[0012] By adopting the above technical scheme, the project information transmission compression interval adopts a dynamic compression interval to compress and transmit information, which is suitable for application scenarios with complex information of bidding and tendering agency quality projects. In the process of project association, it can centrally process project information with similar risk wind turbines and similar acquisition time, effectively solving the problems of scattered project information and low processing efficiency in the prior art. By dynamically adjusting the range of the project information compression interval to adapt to the processing requirements of different project information, the project information processing flexibility is high, and a new compression interval is created for the pre-processed project information that is not within the created large project information transmission compression interval and its expandable interval, to ensure that all project information can be effectively compressed and managed, to avoid project information omissions and management blind spots, thereby enhancing the comprehensiveness of project management and information integrity.
[0013] In a preferred example of the present application, the step of determining whether the currently processed pre-processed project information is within the created project information transmission compression interval includes: According to the project acquisition time of the next pre-processed project information to be processed, the created project information transmission compression interval is extended to an increase-time transmission compression interval or a decrease-time transmission compression interval in combination with the preset dynamic compression duration; Determine whether the corresponding project information transmission compression interval is a time-increasing transmission compression interval or a time-reducing transmission compression interval, and the maximum value of the maximum compression time of the time-increasing transmission compression interval and the time-reducing transmission compression interval satisfies the sum of the minimum compression time and the dynamic compression duration; if the creation time of a project information transmission compression interval satisfies the preset timeout time, the project information transmission compression interval is compressed and output.
[0014] By adopting the above technical solution, when faced with large amounts of project information, in order to improve the processing efficiency and flexibility of project information, the present application can flexibly adjust the duration of the compression interval according to actual conditions when processing project information, so as to flexibly adapt to changes in project information. By increasing the transmission time of the compression interval or reducing the compression transmission interval, and limiting the maximum value of the maximum compression time, it is possible to ensure compression efficiency while avoiding waste of platform resources of the quality management system due to excessively long compression intervals. The compression interval setting is more reasonable, which effectively solves the problems of information processing delays or omissions that may exist in the prior art, improves the timeliness of project management and information integrity, and provides comprehensive guarantees for the high-quality execution of bidding agency services.
[0015] In a preferred example of the present application, the compliance and risk assessment of the pre-processed project information is performed to obtain an assessment result and a corresponding risk level identifier, and based on the assessment result and the corresponding risk level identifier, the project management node of the project management network structure is associated and matched to determine the initial project management plan, specifically including: Creating and associating a project index for the preprocessed project information, matching a risk project index with a preset risk assessment rule based on the project index, generating multiple risk projects based on the successfully matched risk project index, and obtaining a risk attribute label for each risk project; Determining, from the risk management solution groups corresponding to the most label types among the plurality of risk items, a plurality of pending risk management solutions matching the highest risk level of the label level; The project process step information of the preprocessed project information is determined by the acquired project management process configuration information, and the project management nodes connected to the project management network structure are matched according to the project process step information to obtain an initial project management solution from the pending risk management solutions.
[0016] By adopting the above technical solution, the risk attribute label includes a label type for characterizing the project type and a label level for characterizing the risk level; by creating and associating the project index for the pre-processed project information and matching the risk assessment rules based on the project index, accurate risk assessment and classification of project information can be achieved. By matching the number of label categories and risk levels of the risk management plan, the most effective risk management measures can be ensured for high-risk projects, thereby enhancing the pertinence and effectiveness of risk management. Finally, by matching the project management flow and the initial project management plan of the project management node, the project management plan can be closely integrated with the actual project process of the actual bidding and tendering agency project, thereby improving the practicality and operability of the management plan.
[0017] In a preferred example of the present application, the project management of the pre-processed project information according to the target project management scheme specifically includes: According to the project characteristic information and corresponding quality management standards of the bidding agency project, determine the preliminary evaluation results at the start-up stage and the real-time evaluation results during the project execution; Generate a service quality comparison table for comparing and adjusting the target project management plan based on the preliminary evaluation results, the real-time evaluation results and the preset service quality standards; Obtaining a service quality change reference range representing a tolerance for project execution deviation, and generating a project execution quality control model according to the service quality change reference range and a service quality comparison table; The actual service quality data during the project execution is obtained, and the actual service quality data is input into the project execution quality control model to obtain the project evaluation execution analysis results and the program execution adjustment suggestions.
[0018] By adopting the above-mentioned technical scheme, it is possible to comprehensively and timely grasp the quality status during the project execution process. The project quality management evaluation of the bidding agency project is more comprehensive and timely. According to the evaluation results and the preset service quality standards, a service quality comparison table is generated, which provides a clear reference standard for quality management during the project execution process, enhances the operability and standardization of quality management, and through the generated project execution quality control model, it is possible to realize dynamic monitoring and early warning of project execution quality. The project execution quality control is more flexible. Finally, through the project evaluation analysis results and the implementation adjustment suggestions of the plan, the efficiency of responding to project execution problems and the accuracy of plan adjustment are improved.
[0019] In a preferred example of the present application: the actual service quality data obtained during the project execution process, the actual service quality data input into the project execution quality control model, and the project evaluation execution analysis result are obtained, specifically including: in the project execution quality control model, a plurality of project units are established based on the target management area of the pre-processed project information bidding agency project; Taking each of the project units as a basic unit, performing quality assessment according to a preset first evaluation standard to obtain a corresponding quality qualification index, and calculating corresponding quality assurance data according to the quality rationality index; Taking each of the project units as a basic unit, the service quality data is calculated according to the preset second evaluation standard and the actual service quality data, and based on the instruction assurance data and service quality data corresponding to each project unit, the project evaluation execution analysis results of the bidding agency project are obtained.
[0020] By adopting the above technical solution, the bidding and tendering agency projects are finely divided into project units for analysis and management, thereby improving the precision of project management. Based on the first evaluation standard (such as legality, compliance, technical compliance, etc.), the quality qualification index and quality assurance data of each project unit are quantitatively evaluated to provide data for subsequent quality control, thereby enhancing the objectivity and accuracy of quality evaluation. At the same time, based on the second evaluation standard (such as customer satisfaction, project progress, cost control, etc.), the service quality data is calculated to comprehensively consider the service quality and actual implementation of the project unit, and obtain comprehensive project evaluation execution analysis results, thereby improving the comprehensiveness and practicality of the project evaluation results, thereby providing strong technical support for the high-quality execution and continuous improvement of bidding and tendering agency projects.
[0021] In the second aspect, the invention objective of the present application is achieved by adopting the following technical solutions: The bidding and tendering agent quality management system based on project management is applied to the bidding and tendering agent quality management method based on project management as described above, and the system includes: A project management standard construction module is used to construct a project management standard according to each key link and service standard in the bidding agency service process, and to construct a plurality of project management nodes corresponding to the bidding agency service process, wherein the plurality of project management nodes form a project management network structure; The project information preprocessing module is used to obtain the initial bidding project information to be managed, perform standardized preprocessing on the initial bidding project information to be managed, and obtain preprocessed project information; perform type and feature analysis on the preprocessed project information to obtain project feature information; A compliance and risk assessment module, configured to perform compliance and risk assessment on the pre-processed project information, obtain an assessment result and a corresponding risk level identifier, and associate and match the project management nodes of the project management network structure based on the assessment result and the corresponding risk level identifier to determine an initial project management plan; A project management scheme optimization module is used to match the corresponding quality management standards according to the project feature information and risk level identification of the pre-processed project information, and optimize and adjust the initial project management scheme to obtain a target project management scheme; a project management execution module is used to perform project management on the pre-processed project information according to the target project management scheme.
[0022] By adopting the above technical solutions, this application constructs project management standards and project management network structures. Due to the adoption of the concept of integrated project management, each environment of the bidding agency service can be finely managed and monitored, effectively solving the technical problems of the lack of systematicness and coherence of the bidding agency service in the existing technology, and realizing the standardization and transparency of the bidding agency service process. By obtaining and preprocessing the bidding project information and adopting standardized preprocessing technology, the accuracy and consistency of the project information are ensured, and the efficiency and accuracy of project management are improved. Then, the compliance assessment and risk assessment of the information in the entire agency service process of the bidding project are carried out to obtain the assessment results and the corresponding risk level identification, which can identify and prevent potential legal risks and operational risks in advance, and effectively solve the problem of insufficient risk control in the existing technology. Finally, by optimizing the project management plan, that is, adopting a highly targeted target project management plan, the implementation of the bidding agency service can be more accurately guided to avoid problems with the expected goals of the project execution, ensuring the quality and efficiency of the bidding agency service, and significantly improving the overall management level and service quality of the bidding agency service process.
[0023] In the third aspect, the invention objective of this application is achieved by adopting the following technical solutions: A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of the above-mentioned bidding and tendering agent quality management method based on project management are implemented.
[0024] In a fourth aspect, the invention objective of the present application is achieved by adopting the following technical solutions: A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned bidding and tendering agency quality management method based on project management.
[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. This application has constructed a project management standard and a project management network structure. Due to the adoption of the concept of integrated project management, each environment of the bidding agency service can be finely managed and monitored, which effectively solves the technical problem of the lack of systematicness and coherence of the bidding agency service in the existing technology, and realizes the standardization and transparency of the bidding agency service process. By obtaining and pre-processing the bidding project information and adopting standardized pre-processing technology, the accuracy and consistency of the project information are ensured, and the efficiency and accuracy of project management are improved. Then, the compliance assessment and risk assessment of the information in the entire agency service process of the bidding project are carried out to obtain the assessment results and the corresponding risk level identification, which can identify and prevent potential legal risks and operational risks in advance, and effectively solve the problem of insufficient risk control in the existing technology. Finally, by optimizing the project management plan, that is, adopting a highly targeted target project management plan, the implementation of the bidding agency service can be more accurately guided to avoid the problem of the expected goals of the project execution, the quality and efficiency of the bidding agency service are guaranteed, and the overall management level and service quality of the bidding agency service process are significantly improved; 2. By creating and associating project indexes for pre-processed project information and matching risk assessment rules based on project indexes, accurate risk assessment and classification of project information can be achieved. By matching the number of label categories and risk levels of the risk management plan, the most effective risk management measures can be ensured for high-risk projects, thereby enhancing the pertinence and effectiveness of risk management. Finally, by matching the project management flow and the initial project management plan of the project management node, the project management plan can be closely integrated with the actual project process of the actual bidding and tendering agency project, thereby improving the practicality and operability of the management plan. 3. This application constructs project management standards and project management network structures. Due to the adoption of the concept of integrated project management, each environment of the bidding and tendering agency service can be finely managed and monitored, effectively solving the problem of the lack of systematic bidding and tendering agency services in the prior art. It solves the technical problems of integrity and coherence, realizes the standardization and transparency of the bidding agency service process, obtains and pre-processes the bidding project information, adopts standardized pre-processing technology, ensures the accuracy and consistency of project information, and improves the efficiency and accuracy of project management. Then, it conducts compliance assessment and risk assessment on the information in the entire agency service process of the bidding project, obtains the assessment results and the corresponding risk level identification, can identify and prevent potential legal risks and operational risks in advance, and effectively solves the problem of insufficient risk control in the existing technology. Finally, by optimizing the project management plan, that is, adopting a highly targeted target project management plan, the implementation of the bidding agency service is guided more accurately, so as to avoid problems with the expected goals of the project execution, ensure the quality and efficiency of the bidding agency service, and significantly improve the overall management level and service quality of the bidding agency service process. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a flow chart of a bidding agency quality management method for project management in one embodiment of the present application; Figure 2 It is a flowchart after step S3 in the project-based management bidding agency quality management method in one embodiment of the present application; Figure 3 It is another flow chart of the bidding and tendering agent quality management method for project management in one embodiment of the present application; Figure 4 It is a schematic diagram of a device in an embodiment of the present application. DETAILED DESCRIPTION
[0027] The present application is further described in detail below in conjunction with the accompanying drawings.
[0028] In one embodiment, if Figure 1 As shown, the present application discloses a bidding agency quality management method based on project management, which specifically includes the following steps: S1: According to the key links and service standards in the bidding agency service process, a project management standard is constructed, and multiple project management nodes corresponding to the bidding agency service process are constructed. Multiple project management nodes form a project management network structure.
[0029] In this embodiment, the project management standard refers to a set of standardized management specifications and processes formulated according to the key links and service standards of the bidding agency services, which are used to guide and supervise each link of the bidding agency services; the project management node refers to the specific management point established under the project management standard for each key link in the bidding agency service process; the project management network structure refers to a network structure composed of multiple project management nodes, which is used to realize the systematization and coordination of project management.
[0030] Specifically, collect industry standards, laws and regulations, and best practices, analyze the company's internal needs and experience, and establish project management standards for designated projects based on the project management process, key links, and management environment of the bidding agency project. Based on the key links in the bidding agency service process (such as preparation of bidding documents, screening of bidders, contract signing, etc.), establish specific project management nodes in each key link, and clarify the responsibilities, tasks, and information processing authority of each node.
[0031] S2: Acquire initial bidding project information to be managed, perform standardized preprocessing on the initial bidding project information to be managed, and obtain preprocessed project information; perform type and feature analysis on the preprocessed project information to obtain project feature information.
[0032] In this embodiment, standardized preprocessing refers to cleaning, correcting and formatting the initial bidding project information to be managed to ensure the accuracy and consistency of the information; project characteristic information includes project cycle, project type, scale, complexity, budget, time requirements and risk points, etc.
[0033] Specifically, the standardized preprocessing of project information includes: first collecting all relevant information of the initial bidding project to be managed, including bidding documents, bidder information, contract terms, etc., then using data cleaning tools and algorithms to remove redundant information and erroneous information, and then applying data correction algorithms to fill in missing values, correct logical errors, and generate the final preprocessed project information. The data classification of preprocessed project information can be classified according to project type or project scale.
[0034] S3: Conduct compliance and risk assessment on the pre-processed project information to obtain assessment results and corresponding risk level identifiers, associate and match project management nodes of the project management network structure based on the assessment results and corresponding risk level identifiers, and determine an initial project management plan.
[0035] In this embodiment, the initial project management plan is a preliminary project management plan generated based on the assessment results and risk level identification, matching the project management nodes of the project management network structure, and includes project planning, resource allocation and risk management measures.
[0036] Specifically, use compliance checking tools, such as RegTech platforms, to conduct legality and compliance checks, and use risk assessment models such as Monte Carlo simulation and decision trees to determine the severity and probability of risk by inputting project information and parameters, and automatically generate risk level identification. Risk level identification includes technical risk, market risk and legal risk. The risk level identification is a quantitative representation of the degree of risk identified in the risk assessment process of the bidding agency project. Different levels can be divided according to the severity of the case to conduct risk assessment on the pre-processed project information.
[0037] S4: Match the corresponding quality management standards according to the project feature information and risk level identification of the pre-processed project information, and optimize and adjust the initial project management plan to obtain the target project management plan.
[0038] In this embodiment, the target project management plan refers to the final project management plan generated after optimizing the initial project management plan based on project characteristic information and risk level identification; the target project management plan has clear service standards, quality management standards and project management nodes in each key link; the risk level identification includes high risk, medium risk and low risk.
[0039] Specifically, a quality management standard library containing various project types and risk levels is established in advance. Each standard contains specific management requirements and operating guidelines. Then, according to the project feature information and risk level identification, the corresponding quality management standard is matched from the quality management standard library. Then, the initial project plan is reviewed and risk points are identified to identify potential risk points (such as time delays, cost overruns, substandard quality, etc.). Then, it is evaluated whether the human, material and financial resources in the initial project management plan are sufficient and whether there are resource bottlenecks. Then, specific risk control measures (including resource optimization, process optimization and quality assurance measures) are formulated for the identified risk points. Resource optimization includes: increasing spare resources, formulating emergency plans, strengthening monitoring, etc. Then, according to the resource assessment results, optimize resource allocation to ensure the smooth progress of the project; for example, adjust human resource allocation, optimize material procurement plans, etc. Process optimization includes simplifying unnecessary steps, optimizing communication mechanisms, etc. Quality assurance measures include increasing the frequency of quality inspections, introducing third-party audits, etc.
[0040] S5: Perform project management on the pre-processed project information according to the target project management plan.
[0041] Specifically, according to the target project management plan, carry out specific project management activities, such as implementation of project plans, allocation of resources, etc.; Monitoring and adjustment: through project management software or tools, monitor project progress, adjust the project management plan in a timely manner, and ensure that the project proceeds smoothly as planned.
[0042] In one embodiment, if Figure 2 As shown, the project management network structure is provided with different levels for multiple project management nodes, and multiple project management nodes of different levels form a project flow corresponding to the bidding agency service process; after step 3, the bidding agency quality management method based on project management includes: S301: Obtain the project acquisition time in the project information of the pre-processed project information; within the preset time length, create multiple project information transmission compression intervals based on the project acquisition time of multiple groups of pre-processed project information of the project management nodes at the same level of the current processing level and the corresponding risk level identifiers.
[0043] In this embodiment, the project management network structure refers to a network structure composed of multiple project management nodes of different levels, which is used to realize hierarchical management and collaborative work of the bidding agency service process; in actual applications, when a construction company undertakes multiple large-scale construction projects, since each project has a complex bidding process, including but not limited to project design, material procurement, construction and other links, in order to improve the efficiency and quality of bidding, in actual operations, the company's project management team first conducts compliance and risk assessment on the pre-processing information of each project (such as project scale, budget, expected completion time, etc.). For example, for an infrastructure construction project with a high estimated cost and a long construction period, the system may mark it as a high-risk project and automatically assign it to a senior project manager with rich experience. The project manager is responsible. At the same time, the system will record the acquisition time of the project, and within a preset time period (such as one week), collect the acquisition time and risk level identification of all projects with the same processing level, and then create multiple project information transmission compression intervals. Next, the system will merge and compress these project information to form multiple pre-processed project information compression sets, which will then be sent to the next level of project management nodes, for example, from the project manager level to the department manager level for further review and decision-making, effectively solving the problem of information overload in the traditional bidding agency process, due to the large number of projects and the huge amount of information, which makes it difficult for management to quickly and accurately account for the specific circumstances of each project, affecting decision-making efficiency, while improving the objectivity and accuracy of risk assessment management.
[0044] Specifically, various project management nodes are connected through project management software or platform to form a collaborative network structure; the acquisition time of each project information is recorded through project management software or platform, and within the preset time, a project information transmission compression interval is created based on the project acquisition time and risk level identification; through the risk assessment tool, a risk assessment is performed on the pre-processed project information to generate a risk level identification; finally, based on the project acquisition time and risk level identification, a corresponding project information transmission compression interval is created.
[0045] S302: According to the plurality of project information transmission compression intervals, the plurality of groups of pre-processed project information are combined and compressed to obtain a plurality of corresponding pre-processed project information compression sets.
[0046] In this embodiment, the project information transmission compression interval refers to a time period within a preset time length, which is created based on the project acquisition time and risk level identification, and is used for compression and management of project information. The pre-processed project information compression set refers to a set formed by merging and compressing multiple pre-processed project information, which is used to reduce the amount of data transmission and improve processing efficiency.
[0047] S303: Deliver the plurality of pre-processed project information compression sets to the next level project management node.
[0048] In this embodiment, the next level project management node refers to a project management node at a higher level than the current processing level in the project management network structure, and is used to receive and process the delivered compressed set of project information.
[0049] In one embodiment, if Figure 3 As shown, the bidding agency quality management method based on project management also includes: S10: creating multiple project information transmission compression intervals according to the project acquisition time and corresponding risk level identifier of multiple groups of pre-processed project information of project management nodes of the same level of the current processing level.
[0050] In this embodiment, the basic-level project management node refers to a project management node at the lowest level in the project management network structure, which is responsible for the preliminary processing and risk assessment of specific projects.
[0051] Specifically, by merging project information according to certain compression interval merging and output rules, the quality management system can still improve the efficiency of project information processing when faced with large amounts of project information, thereby meeting the business needs of efficient and timely project information management.
[0052] S20: Determine whether the project acquisition time of the pre-processed project information currently being processed is within the created project information transmission compression interval.
[0053] In this embodiment, the project acquisition time is the project information acquisition time.
[0054] S30: If it is within the created project information transmission compression interval, merge it into the corresponding project information to-be-compressed package.
[0055] In this embodiment, the creation time of the project information transmission compression interval is within the preset timeout range, and the process continues to wait and determine whether the new project information meets the merging conditions. When the preset timeout is reached, the corresponding project information to be compressed package is directly compressed and sent to the intelligent terminal of the project management node.
[0056] S40: If it is within the expandable interval of the created project information transmission compression interval, the compression time range of the interval is updated, and the pre-processed project information currently being processed is merged.
[0057] In this embodiment, the expandable interval refers to an extended portion of the project information transmission compression interval, which is used to accommodate project information that is outside the preset interval but still belongs to a similar time range.
[0058] Specifically, in order to improve the compression transmission efficiency of the project information transmission compression interval, the present application adopts a method of dynamically calculating the project information transmission compression interval. When it is determined that the data acquisition time of the currently processed preprocessed project information is not within the created project information transmission compression interval, the compression time interval of the created project information transmission compression interval and the dynamic expansion method of the expandable interval time range are updated based on the data acquisition time of the currently processed preprocessed data to be governed.
[0059] S50: If the project information is not within the created project information transmission compression interval and its expandable interval, a new project information transmission compression interval is created, and the currently processed pre-processed project information is merged into the new interval.
[0060] In this embodiment, the new project information transmission compression interval refers to a newly created project information transmission compression interval when the project information is not within the created project information transmission compression interval and its expandable interval.
[0061] Specifically, the present application sets a timeout condition for each project information transmission compression interval. When the project information transmission compression interval meets the timeout condition, the corresponding project information to be compressed package is immediately compressed and output. Therefore, the expandable interval of the created project information transmission compression interval cannot be expanded continuously to avoid data transmission delay problems.
[0062] In one embodiment, before step S20, the bidding and tendering agency quality management method based on project management includes: S201: according to the project acquisition time of the next pre-processed project information to be processed, combined with the preset dynamic compression duration, the created project information transmission compression interval is expanded to an increased time transmission compression interval or a reduced time transmission compression interval.
[0063] In this embodiment, the expandable interval of the project information transmission compression interval expands the data transmission compression interval into an increased-time transmission compression interval or a decreased-time transmission compression interval according to a preset dynamic compression duration. The time range of the increased-time transmission compression interval is obtained by performing a time increase calculation based on the data acquisition time of the next pre-processed data to be processed and to be governed; the time range of the decreased-time transmission compression interval is obtained by performing a time reduction calculation based on the data acquisition time of the next pre-processed data to be processed and to be governed.
[0064] S202: Determine whether the corresponding project information transmission compression interval is a time-increasing transmission compression interval or a time-reducing transmission compression interval, and the maximum value of the maximum compression time of the time-increasing transmission compression interval and the time-reducing transmission compression interval satisfies the sum of the minimum compression time and the dynamic compression duration.
[0065] S203: If the creation time of a certain project information transmission compression interval meets the preset timeout period, the project information transmission compression interval is compressed and output.
[0066] In this embodiment, the project information transmission compression interval is calculated based on the duration: Exemplarily, the calculation of the time-increasing transmission compression interval and the time-reducing transmission compression interval is as follows: Assume [Project Information Transmission Compression Interval] is [T x , T y ], the dynamic compression duration is D, and the expandable [project information transmission compression interval] is [T y -D,T x +D]; Determine whether the [data acquisition time] t of the currently processed preprocessing project information is within the [project information transmission compression interval] [T x , T y ]Inside; If T x ≤t≤T y , determine that the data acquisition time of the next pre-processed project information to be processed is within the existing project information transmission compression interval, and no expansion processing is required, that is, [project information transmission compression interval] [T x , T y ] and scalable [project information transmission compression interval] [T y -D,T x +D] unchanged; If T y <t≤T x +D, determine that the corresponding project information transmission compression interval of the next pre-processed project information to be processed is the time-increasing transmission compression interval, and the project information transmission compression interval [T x , T y ] is expanded to [T x, t], the scalable project information transmission compression interval is [tD, T x +D]; T y -D<t<T x , determine the corresponding project information transmission compression interval of the next pre-processed project information to be processed as the reduced time transmission compression interval, and the project information transmission compression interval [T x , T y ] is expanded to [t, T y ], the extensible project information transmission compression interval is [T y -C, t+C].
[0067] In one embodiment, in step S3, compliance and risk assessment is performed on the pre-processed project information to obtain an assessment result and a corresponding risk level identifier, and based on the assessment result and the corresponding risk level identifier, the project management node of the project management network structure is associated and matched to determine an initial project management plan, which specifically includes: S31: Create and associate a project index for the preprocessed project information, match a risk project index with a preset risk assessment rule based on the project index, generate multiple risk projects based on the successfully matched risk project index, and obtain a risk attribute label for each risk project.
[0068] In this embodiment, project management operations for safely identifying project risks and differentiating risk levels of project information are implemented through project management nodes, which is conducive to associating and matching corresponding project management solutions for high-real-time and high-risk project information.
[0069] Specifically, a unique project index is generated for each pre-processed project information, and the label type and label risk level of each bidding agency project can be obtained according to the project index.
[0070] S32: Determine, from the risk management solution group corresponding to the most label types in the multiple risk projects, a number of pending risk management solutions that match the highest risk level of the label levels.
[0071] S33: determining the project process step information of the preprocessed project information through the acquired project management process configuration information, matching the project management nodes connected to the project management network structure according to the project process step information, and selecting an initial project management plan from several pending risk management plans.
[0072] In this embodiment, the risk attribute label is set to B. ij , i is the label type, j is the label risk level, and i and j are integers greater than or equal to 1.
[0073] Exemplarily, eight groups of sensitive data are generated through step S32, and the risk attribute label of each group of sensitive data is B 32 , B 24 , B 26 , B 25 , B 22 , B 34 , B 13 , B 12 ; Among them, the number of times the label type attribute is 1 is 2, the number of times the label type attribute is 2 is 4, and the number of times the label type attribute is 3 is 2, so the label type attribute is determined to be 2. Therefore, the corresponding risk management solution is found from the group of risk management solutions whose label type is 2. Further, the data whose label type is 2 are B 24 , B 26 , B 25 , B 22 , the highest sensitivity level is 6, so we need to find a risk management solution with a sensitivity level of 6 from the risk management solution group with label type 2, and label the risk attribute as B 26 The corresponding risk management plan is determined as the initial project management plan.
[0074] In one embodiment, in step S5, project management is performed on the pre-processed project information according to the target project management scheme, specifically including: S51: Based on the project characteristic information of the bidding agency project and the corresponding quality management standards, determine the preliminary evaluation results at the initial start-up and the real-time evaluation results during the project execution.
[0075] In this embodiment, the preliminary evaluation results refer to the preliminary evaluation results of the project at the initial stage of project launch; the real-time evaluation results refer to the real-time evaluation results of the project during the project execution process; and the quality management standards refer to a series of preset standards used to evaluate and manage project quality.
[0076] Specifically, at the beginning of the project, a scoring system is used to conduct a preliminary assessment of the project, including project feature information, project plan, resource allocation, etc.; during the project execution, a real-time monitoring system, data analysis tools, etc. are used to conduct a real-time assessment of the project during the actual execution process, including project progress, quality, cost, etc.
[0077] S52: Based on the preliminary evaluation results, the real-time evaluation results and the preset service quality standards, a service quality comparison table for comparing and adjusting the target project management plan is generated.
[0078] Specifically, service quality standards refer to preset service quality standards used to measure the execution quality of a project.
[0079] S53: Obtain a service quality change reference range representing the tolerance of project execution deviation, and generate a project execution quality control model according to the service quality change reference range and the service quality comparison table.
[0080] Specifically, quality control tools, such as statistical process control (SPC) and Six Sigma, are used to generate a project execution quality control model; the service quality change reference range refers to the reference range that represents the tolerance for project execution deviation, which is used to evaluate the execution quality of the project; the service quality comparison table refers to a comparison table generated based on the preliminary evaluation results, real-time evaluation results and preset service quality standards, including project characteristic information, preliminary evaluation results, real-time evaluation results, service quality standards and other contents.
[0081] S54: Obtain the actual service quality data during the project execution process, input the actual service quality data into the project execution quality control model, and obtain the project evaluation execution analysis results and solution execution adjustment suggestions.
[0082] Specifically, use data visualization tools, such as Tableau, PowerBI, etc., to display the progress and results of project management; the content of the project evaluation execution analysis results includes the quality status of project execution, existing problems, improvement suggestions, etc.; program implementation adjustment suggestions include optimizing resource allocation, adjusting project plans, strengthening quality control, etc.
[0083] In one embodiment, in step S54, actual service quality data during the project execution process is obtained, and the actual service quality data is input into the project execution quality control model to obtain the project evaluation execution analysis results, which specifically include: S541: In the project execution quality control model, multiple project units are established based on the target management area of the pre-processed project information bidding agency project.
[0084] Specifically, a project unit refers to a basic management unit divided within the target management area according to project characteristics and management needs. Each project unit is responsible for specific project tasks.
[0085] S542: Taking each project unit as a basic unit, perform quality assessment according to the preset first evaluation standard to obtain the corresponding quality qualification index, and calculate the corresponding quality assurance data according to the quality rationality index.
[0086] Specifically, the first evaluation criterion can identify potential risks in the early stages of a project, take preventive measures, and reduce the probability of risk occurrence. It can provide a basis for early stage optimization of the project and ensure that the project has a high-quality foundation from the beginning. Its evaluation content includes the completeness of the project plan, the rationality of resource allocation, initial risk management measures, etc. The evaluation method is to use qualitative evaluation methods such as checklists and scoring sheets.
[0087] S543: Taking each project unit as a basic unit, the service quality data is calculated according to the preset second evaluation standard and the actual service quality data, and based on the instruction guarantee data and service quality data corresponding to each project unit, the project evaluation execution analysis result of the bidding agency project is obtained.
[0088] In this embodiment, the second evaluation standard can timely discover the actual risks in the project execution process, take countermeasures and reduce the impact of risks. The evaluation results of the second evaluation standard can provide a basis for optimization in the project execution process and ensure that the project is continuously improved during the execution process. The evaluation content is: deviation of project progress, quality compliance, cost control, customer feedback, and quantitative evaluation methods such as data analysis and performance indicators can be used.
[0089] Specifically, instruction assurance data refers to the data calculated based on the quality qualification index obtained by evaluation according to the first evaluation standard, which is used to ensure that the project unit meets the basic quality requirements at the startup and initial stages, usually including the completeness of the project plan, the rationality of resource allocation, preliminary measures for risk management, compliance and standardization, etc.; service quality data refers to the data calculated based on the second evaluation standard and actual service quality data, which is used to evaluate the actual service quality of the project unit during the execution process, usually including project progress deviation, quality compliance, cost control data, customer satisfaction, problem and risk management, performance indicators, etc.
[0090] It should be understood that the serial numbers of the steps in the above embodiments do not imply a sequence of execution. The execution sequence of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0091] In one embodiment, a bidding and tendering agent quality management system based on project management is provided, and the bidding and tendering agent quality management system based on project management corresponds to the bidding and tendering agent quality management method based on project management in the above embodiment.
[0092] A bidding and tendering agent quality management system based on project management, including a project management standard construction module, a project information preprocessing module, a compliance and risk assessment module, a project management solution optimization module and a project management execution module. The detailed description of each functional module is as follows: The project management standard construction module is used to construct the project management standard according to each key link and service standard in the bidding agency service process, and to construct multiple project management nodes corresponding to the bidding agency service process, and the multiple project management nodes form a project management network structure; The project information preprocessing module is used to obtain the initial bidding project information to be managed, perform standardized preprocessing on the initial bidding project information to be managed, and obtain preprocessed project information; perform type and feature analysis on the preprocessed project information to obtain project feature information; A compliance and risk assessment module is used to perform compliance and risk assessment on pre-processed project information, obtain assessment results and corresponding risk level identifiers, associate and match project management nodes of the project management network structure based on the assessment results and corresponding risk level identifiers, and determine an initial project management plan; The project management plan optimization module is used to match the corresponding quality management standards according to the project feature information and risk level identification of the pre-processed project information, and optimize and adjust the initial project management plan to obtain the target project management plan; The project management execution module is used to perform project management on the pre-processed project information according to the target project management plan.
[0093] For the specific limitations of the bidding and tendering agency quality management system based on project management, please refer to the limitations of the bidding and tendering agency quality management method based on project management in the above text, which will not be repeated here; each module in the above-mentioned bidding and tendering agency quality management system based on project management can be implemented in whole or in part through software, hardware and a combination thereof; each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.
[0094] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 4 As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store project management network structure and bidding project information, etc. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a bidding agent quality management method based on project management is implemented.
[0095] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps of a bidding and tendering agent quality management method based on project management are implemented.
[0096] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps of a bidding agency quality management method based on project management are implemented.
[0097] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0098] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.
[0099] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, it should be understood by those skilled in the art that the technical solutions described in the aforementioned embodiments may still be modified, or some of the features thereof may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. The bidding and tendering agency quality management method based on project management is characterized by: include: According to each key link and service standard in the bidding agency service process, a project management standard is constructed, and a plurality of project management nodes corresponding to the bidding agency service process are constructed, and the plurality of project management nodes form a project management network structure; Acquire initial bidding project information to be managed, and perform standardized preprocessing on the initial bidding project information to be managed to obtain preprocessed project information; Performing type and feature analysis on the preprocessed project information to obtain project feature information; Performing compliance and risk assessment on the pre-processed project information to obtain assessment results and corresponding risk level identifiers, and correlating and matching project management nodes of the project management network structure based on the assessment results and the corresponding risk level identifiers to determine an initial project management plan; Matching corresponding quality management standards according to the project feature information and risk level identifier of the pre-processed project information, and optimizing and adjusting the initial project management plan to obtain a target project management plan; The pre-processed project information is project managed according to the target project management scheme.
2. The bidding and tendering agent quality management method based on project management according to claim 1 is characterized in that: The project management network structure is provided with different levels for the plurality of project management nodes, and the plurality of project management nodes of different levels form a project flow corresponding to the bidding agency service process; The step of performing compliance and risk assessment on the pre-processed project information to obtain an assessment result and a corresponding risk level identifier, associating and matching the project management nodes of the project management network structure based on the assessment result and the corresponding risk level identifier, and determining that an initial project management plan is obtained includes: Obtaining the project acquisition time in the project information of the pre-processed project information; within a preset time period, creating multiple project information transmission compression intervals according to the project acquisition time of multiple groups of the pre-processed project information of the project management nodes of the same level of the current processing level and the corresponding risk level identifiers; According to the plurality of the project information transmission compression intervals, the plurality of groups of the pre-processed project information are combined and compressed to obtain a plurality of pre-processed project information compression sets; Deliver the plurality of compressed sets of pre-processed project information to a next-level project management node.
3. The bidding and tendering agent quality management method based on project management according to claim 2 is characterized in that: The project management node includes a basic-level project management node; when the risk level identifier of the basic-level project management node meets a preset optimization processing identifier condition: Creating multiple project information transmission compression intervals according to the project acquisition time of multiple groups of pre-processed project information of project management nodes at the same level of the current processing level and the corresponding risk level identifiers; Determine whether the project acquisition time of the currently processed pre-processed project information is within the created project information transmission compression interval: If it is within the created project information transmission compression interval, it will be merged into the corresponding project information to be compressed package; If it is within the expandable interval of the created project information transmission compression interval, the compression time range of the interval is updated and the pre-processed project information currently being processed is merged; If it is not within the created project information transmission compression interval and its expandable interval, a new project information transmission compression interval is created, and the currently processed pre-processed project information is merged into the new interval.
4. The bidding and tendering agent quality management method based on project management according to claim 3 is characterized in that: The determining whether the currently processed pre-processed project information is within the created project information transmission compression interval includes: According to the project acquisition time of the next pre-processed project information to be processed, the created project information transmission compression interval is extended to an increase-time transmission compression interval or a decrease-time transmission compression interval in combination with the preset dynamic compression duration; Determine that the corresponding project information transmission compression interval is a time-increasing transmission compression interval or a time-reducing transmission compression interval, and the maximum value of the maximum compression time of the time-increasing transmission compression interval and the time-reducing transmission compression interval satisfies the sum of the minimum compression time and the dynamic compression duration; If the creation time of a certain project information transmission compression interval meets the preset timeout period, the project information transmission compression interval is compressed and output.
5. The bidding and tendering agent quality management method based on project management according to claim 1 is characterized in that: The step of performing compliance and risk assessment on the pre-processed project information to obtain an assessment result and a corresponding risk level identifier, and associating and matching the project management nodes of the project management network structure based on the assessment result and the corresponding risk level identifier to determine an initial project management plan specifically includes: Creating and associating a project index for the preprocessed project information, matching a risk project index with a preset risk assessment rule based on the project index, generating multiple risk projects based on the successfully matched risk project index, and obtaining a risk attribute label for each risk project; Determining, from the risk management solution groups corresponding to the most label types among the plurality of risk items, a plurality of pending risk management solutions matching the highest risk level of the label level; The project process step information of the preprocessed project information is determined by the acquired project management process configuration information, and the project management nodes connected to the project management network structure are matched according to the project process step information to obtain an initial project management solution from the pending risk management solutions.
6. The bidding and tendering agent quality management method based on project management according to claim 1 is characterized in that: The project management of the pre-processed project information according to the target project management scheme specifically includes: According to the project characteristic information and corresponding quality management standards of the bidding agency project, determine the preliminary evaluation results at the start-up stage and the real-time evaluation results during the project execution; Generate a service quality comparison table for comparing and adjusting the target project management plan based on the preliminary evaluation results, the real-time evaluation results and the preset service quality standards; Obtaining a service quality change reference range representing a tolerance for project execution deviation, and generating a project execution quality control model according to the service quality change reference range and a service quality comparison table; The actual service quality data during the project execution is obtained, and the actual service quality data is input into the project execution quality control model to obtain the project evaluation execution analysis results and the program execution adjustment suggestions.
7. The bidding and tendering agent quality management method based on project management according to claim 6 is characterized in that: The obtaining of actual service quality data during the project execution process, inputting the actual service quality data into the project execution quality control model, and obtaining the project evaluation execution analysis results specifically includes: In the project execution quality control model, a plurality of project units are established based on the target management area of the pre-processed project information bidding agency project; Taking each of the project units as a basic unit, performing quality assessment according to a preset first evaluation standard to obtain a corresponding quality qualification index, and calculating corresponding quality assurance data according to the quality rationality index; Taking each of the project units as a basic unit, the service quality data is calculated according to the preset second evaluation standard and the actual service quality data, and based on the instruction assurance data and service quality data corresponding to each project unit, the project evaluation execution analysis results of the bidding agency project are obtained.
8. The bidding and tendering agency quality management system based on project management is characterized by: Applied to the bidding and tendering agent quality management method based on project management as described in any one of claims 1 to 7, the system comprises: A project management standard construction module is used to construct a project management standard according to each key link and service standard in the bidding agency service process, and to construct a plurality of project management nodes corresponding to the bidding agency service process, wherein the plurality of project management nodes form a project management network structure; The project information preprocessing module is used to obtain the initial bidding project information to be managed, perform standardized preprocessing on the initial bidding project information to be managed, and obtain preprocessed project information; perform type and feature analysis on the preprocessed project information to obtain project feature information; A compliance and risk assessment module, configured to perform compliance and risk assessment on the pre-processed project information, obtain an assessment result and a corresponding risk level identifier, and associate and match the project management nodes of the project management network structure based on the assessment result and the corresponding risk level identifier to determine an initial project management plan; A project management scheme optimization module, used to match the corresponding quality management standards according to the project feature information and risk level identification of the pre-processed project information, and optimize and adjust the initial project management scheme to obtain a target project management scheme; A project management execution module is used to perform project management on the pre-processed project information according to the target project management solution.
9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the bidding and tendering agency quality management method based on project management as described in any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the bidding and tendering agency quality management method based on project management as described in any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Performance form application method based on supervision field project management
CN119863219A