A Deep Learning-Based Method for Monitoring and Managing Construction Progress

By using the Retinex algorithm and deep learning model in construction progress supervision and management, the image quality and target detection accuracy are improved, the problem of inefficiency of traditional methods is solved, and efficient and accurate supervision and management of building construction progress are achieved.

CN118607905BActive Publication Date: 2024-10-01JINAN HUIFU ARCHITECTURE INSTALL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411080403.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-10-01
Estimated Expiration
2044-08-08

AI Technical Summary

Technical Problem

Traditional construction progress supervision and management are inefficient and error-prone. Deep learning models have low detection accuracy and slow speed in complex scenes. Image quality is greatly affected by lighting and angles, making it difficult to meet the needs of construction projects.

Method used

Use Retinex-based adaptive high dynamic range image local tone mapping algorithm and normalization processing to improve image quality, combine Mask R-CNN and Cascade R-CNN, and introduce the Transformer module for target detection, and obtain images in real time for online analysis and construction Plan comparisons and regularly update models and algorithms.

Benefits of technology

It improves the efficiency and accuracy of construction progress supervision and management, ensures the smooth progress of construction projects, and provides timely decision-making basis for project management through real-time monitoring and detailed progress reports.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FHA0000006614080000011
    Figure FHA0000006614080000011
  • Figure FHA0000006614080000021
    Figure FHA0000006614080000021
  • Figure FHA0000006614080000022
    Figure FHA0000006614080000022
Patent Text Reader

Abstract

The present invention relates to the field of construction management, and in particular to a construction progress supervision management method based on deep learning. The method first uses a camera to collect images and transmits them to a server for storage in real time; then, a Retinex-based algorithm and normalization processing are used to preprocess the images to improve image quality and contrast; then, Mask R-CNN and Cascade R-CNN are combined and a Transformer module is introduced to detect the construction progress of the target to improve the detection speed and accuracy; then, new images are acquired in real time for online analysis, compared and evaluated with the construction plan, and a progress report is generated; finally, the equipment operation status is checked regularly, and the model and algorithm are updated according to the construction progress and demand changes. This method can improve the efficiency and accuracy of construction progress supervision management, provide timely decision-making basis for project managers, and ensure the smooth progress of construction projects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of construction management, and in particular to a construction progress supervision and management method based on deep learning. Background Art

[0002] In the field of construction, effective supervision and management of construction progress is the key to ensuring that the project is completed on time. Traditional construction progress supervision and management mainly rely on manual inspection and record keeping, which is not only inefficient but also prone to errors and omissions. With the continuous expansion of the scale and complexity of construction projects, traditional methods can no longer meet actual needs. In recent years, deep learning technology has made significant progress in image recognition, target detection and other fields, providing new ideas and methods for supervision and management of construction progress. By using cameras to collect images of the construction site and applying deep learning algorithms to analyze and process these images, real-time monitoring and accurate evaluation of the construction progress can be achieved.

[0003] However, the application of deep learning technology in construction progress supervision and management still faces some challenges. For example, images of the construction site may be affected by factors such as lighting and angle, resulting in poor image quality, which in turn affects subsequent target detection and analysis. In addition, when dealing with complex construction site scenes, existing deep learning models may have problems such as low detection accuracy and slow speed. Therefore, the present invention highlights a construction progress supervision and management method based on deep learning, which can improve the efficiency and accuracy of construction progress supervision and management and ensure the smooth progress of construction projects. Summary of the invention

[0004] The present invention aims to solve the technical problems existing in the above-mentioned traditional construction progress supervision and management, and proposes a construction progress supervision and management method based on deep learning. In order to achieve the above-mentioned purpose, the present invention includes the following steps:

[0005] S1, first use the camera to collect images, and transmit the collected images to the server in real time for classification and storage;

[0006] S2, then use the Retinex-based adaptive high dynamic range image local tone mapping algorithm and normalization processing to pre-process the image to improve the image quality and contrast, making subsequent target detection more accurate;

[0007] S3. Secondly, Mask R-CNN and Cascade R-CNN are combined to detect the construction progress of the target, improving the speed and accuracy of target detection;

[0008] S4, then acquire the newly acquired images in real time, perform online analysis, compare and evaluate the analysis results with the construction plan, and generate a detailed progress report;

[0009] S5. Finally, regularly check the operating status of cameras and network equipment, and update models and algorithms according to changes in construction progress and demand.

[0010] Preferably, the step S2 of preprocessing the image using a Retinex-based adaptive high dynamic range image local tone mapping algorithm and normalization processing is as follows:

[0011] S21. First image Represented as the object reflectivity and lighting component The product of: , in order to obtain the reflectivity of the object , the illumination component needs to be removed from the image ;

[0012] S22, then use the multi-scale Retinex algorithm to estimate the illumination component by performing multi-scale Gaussian filtering on the image , and remove these estimated illumination components from the original image, for each scale , Gaussian filter is defined as follows: For each pixel , light component The estimate is: in, Represents the convolution operation; reflectivity The estimate is: R s ( x , y ) = log [ I ( x , y ) ] − log [ L s ( x , y ) ] The final reflectivity is the weighted average of reflectivity at each scale: in, is the weight for each scale;

[0013] S23, then improve the quality of the image, perform local tone mapping on the image output by multi-scale Retinex, and adjust the pixel value based on the local contrast and brightness distribution of the image. The formula is: in, is the input image, For the output image, are the maximum and minimum values ​​of the input image respectively;

[0014] S24. Finally, the pixel value of the image is adjusted to a standard range, and the image is normalized. The normalization formula is: in, is the pixel value of the original image, is the normalized pixel value.

[0015] Preferably, step S3 combines Mask R-CNN and Cascade R-CNN to gradually refine the detection and segmentation results in a cascade manner, and introduces a Transformer module to capture more global context information to calculate the final construction progress. The specific implementation steps are as follows:

[0016] S31. First, use Swin Transformer to extract features, divide the image into 4×4 blocks, flatten each block into a vector, and then map the vector of each block to a high-dimensional feature space through a linear embedding layer;

[0017] S32. Secondly, multiple attention heads are used to process in parallel in different subspaces to capture more diverse feature representations: ,in Represents dimension; Q, K, and V are Query, Key, and Value respectively. The Query vector plays the role of finding relevant information. The Key vector determines which input position information is most important for the current Query. The Value vector represents the information at each position that we think is valuable for subsequent processing.

[0018] S33, then use the shift window technique to alternately divide the window and shift the calculation, so as to capture the global information across windows, and then perform layer normalization to stabilize the training process;

[0019] S34, then define the loss function ,in is the cross entropy loss, represents the Dice loss, is the weight coefficient;

[0020] S35, then use the AdamW optimizer to train the model, AdamW optimizer: ,in are model parameters, is the learning rate, are respectively the exponentially weighted moving average of the momentum estimate and the squared gradient, is a stabilizing term to prevent division by zero, is the weight decay coefficient, and the learning rate and batch size hyperparameters are adjusted according to the performance of the model;

[0021] S36, then perform model evaluation and tuning, use the average precision mean and intersection-over-union ratio indicators to evaluate model performance, adjust model hyperparameters based on the evaluation results, and perform data enhancement and regularization processing;

[0022] S37. Then, the trained model is used to segment the construction site image, and the area of ​​each target area is calculated according to the segmentation result. The pixel number and image resolution conversion formula are used to convert the pixel number into the actual area: ,in is the number of pixels in the target area, Indicates the pixel density of the image;

[0023] S38. Finally, assume the total area of ​​the construction area , according to the area of ​​the completed part in the segmentation result Calculate construction progress percentage: .

[0024] Preferably, the specific implementation process of the step S4 of online analysis of construction progress for prediction and evaluation is as follows:

[0025] S41. First, generate a detailed construction progress report based on the actual situation of the current construction site, combined with historical data and current progress;

[0026] S42 then provides construction progress reports to project managers so that timely decisions can be made and construction plans adjusted;

[0027] S43. Secondly, the analysis results are visualized to generate charts and images so that project managers can intuitively understand the construction progress and potential problems;

[0028] S44. Finally, compare the current construction progress with the original plan, identify progress deviations and possible causes of delays, and provide improvement suggestions.

[0029] Compared with the prior art, the advantages and positive effects of the present invention are: 1. By preprocessing the image using a Retinex-based adaptive high dynamic range image local tone mapping algorithm and normalization processing, the image quality and contrast are improved, making subsequent target detection more accurate.

[0030] 2. Combining Mask R-CNN and Cascade R-CNN and introducing the Transformer module improves the speed and accuracy of target detection and can better capture global contextual information.

[0031] 3. It can acquire newly acquired images in real time for online analysis, compare and evaluate them with the construction plan, generate detailed progress reports, and provide timely decision-making basis for project managers. DETAILED DESCRIPTION

[0032] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described below in conjunction with embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0033] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0034] Embodiment, in the process of building construction, effective supervision and management of construction progress is crucial. Traditional construction progress supervision and management methods often rely on manual inspection and reporting, which has the problems of low efficiency and low accuracy. With the development of deep learning technology, a new solution is provided for the supervision and management of building construction progress. By using a camera to collect images and combining deep learning algorithms to analyze the images, real-time monitoring and accurate evaluation of the construction progress can be achieved, and the efficiency and quality of construction management can be improved. However, the current related technologies still have some shortcomings in image preprocessing, target detection, and construction progress analysis, which need to be improved and optimized. Therefore, the present invention proposes a method for supervision and management of building construction progress based on deep learning. First, conduct a site survey, analyze the layout and lighting conditions of the construction site, and determine the preliminary camera installation position and angle; then, in combination with the construction plan, identify the key links and key areas in the construction process, and adjust the camera installation position and angle; then, shoot test images through trial operation, evaluate the coverage and clarity of the image, and adjust the camera installation position and angle if necessary; finally, determine the final camera installation position and angle, and fix the installation to ensure that the camera can work stably during the construction process.

[0035] Further, for the processing of image data, different from the traditional image processing method, the present invention adopts an adaptive high dynamic range image local tone mapping algorithm based on Retinex. The steps of using this algorithm and normalization processing are as follows: first, the image Represented as the object reflectivity and lighting component The product of: , in order to obtain the reflectivity of the object , the illumination component needs to be removed from the image ; Then use the multi-scale Retinex algorithm to estimate the illumination component by performing multi-scale Gaussian filtering on the image , and remove these estimated illumination components from the original image, for each scale , Gaussian filter is defined as follows: For each pixel , light component The estimate is: in, Represents the convolution operation; reflectivity The estimate is: R s ( x , y ) = log [ I ( x , y ) ] − log [ L s ( x , y ) ] The final reflectivity is the weighted average of reflectivity at each scale: in, is the weight for each scale; then, to improve the quality of the image, local tone mapping is performed on the image output by multi-scale Retinex, and the pixel value is adjusted based on the local contrast and brightness distribution of the image. The formula is: in, is the input image, For the output image, are the maximum and minimum values ​​of the input image respectively; finally, the pixel value of the image is adjusted to a standard range and the image is normalized. The normalization formula is: in, is the pixel value of the original image, is the normalized pixel value. After processing, the image details, color restoration and contrast are improved.

[0036] Considering the need to detect image information, the present invention combines Mask R-CNN and Cascade R-CNN, and introduces the Transformer module, which can significantly improve the accuracy and robustness of target detection and instance segmentation through multi-level optimization and global feature capture. This method can better adapt to complex scenes such as construction and provide higher quality detection results than traditional methods. The specific steps are to first use Swin Transformer to extract features, divide the image into 4×4 blocks, flatten each block into a vector, and then map the vector of each block to a high-dimensional feature space through a linear embedding layer; secondly, use multiple attention heads to process in parallel in different subspaces to capture more diverse feature representations: ,in represents dimension; Q, K, and V are Query, Key, and Value respectively. The Query vector plays the role of finding relevant information. The Key vector determines which input position information is most important for the current Query. The Value vector represents the information at each position that we think is valuable for subsequent processing. Then, we use the shift window technology to alternately divide the window and shift the calculation to capture the global information across windows, and then perform layer normalization to stabilize the training process.

[0037] Next, define the loss function ,in is the cross entropy loss, represents the Dice loss, is the weight coefficient; then use the AdamW optimizer for model training, AdamW optimizer: ,in are model parameters, is the learning rate, are respectively the exponentially weighted moving average of the momentum estimate and the squared gradient, is a stabilizing term to prevent division by zero, is the weight decay coefficient, and the learning rate and batch size hyperparameters are adjusted according to the performance of the model; next, the model is evaluated and tuned, and the average precision mean and intersection-over-union indicators are used to evaluate the model performance. The model hyperparameters are adjusted according to the evaluation results, and data enhancement and regularization are performed; then the trained model is used to segment the construction site image, and the area of ​​each target area is calculated according to the segmentation results. The number of pixels and image resolution conversion formula is used to convert the number of pixels into the actual area: ,in is the number of pixels in the target area, represents the pixel density of the image; finally, the total area of ​​the construction area is assumed to be , according to the area of ​​the completed part of the segmentation result Calculate construction progress percentage: .

[0038] Next, considering the need to acquire newly collected construction images in real time, online analysis of construction progress is performed. The present invention first generates a detailed construction progress report based on the actual situation of the current construction site, combined with historical data and current progress; then provides the construction progress report to project managers so that they can make decisions and adjust the construction plan in a timely manner; secondly, the analysis results are visualized to generate charts and images so that project managers can intuitively understand the construction progress and potential problems; finally, the current construction progress is compared with the original plan, progress deviations and possible causes of delays are identified, and improvement suggestions are provided.

[0039] Finally, it is necessary to conduct regular inspections of camera equipment. According to the inspection results, necessary maintenance and adjustments should be made to the cameras and network equipment, including cleaning the lens, replacing damaged parts, and adjusting the camera angle. According to the changes in construction progress and demand, deep learning models and algorithms should be updated regularly to ensure the accuracy and real-time performance of the models and algorithms. The results of each inspection and maintenance should be recorded to form a log for subsequent reference and tracking of equipment status. These methods can be used to obtain and analyze construction image data in real time, generate detailed construction progress reports and visualization results, help project managers make decisions and adjust construction plans in a timely manner, and improve the efficiency and accuracy of construction management.

[0040] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A construction progress supervision and management method based on deep learning, characterized in that: The following steps are involved: S1, first use the camera to collect images, and transmit the collected images to the server in real time for classification and storage; S2, then use the Retinex-based adaptive high dynamic range image local tone mapping algorithm and normalization processing to pre-process the image to improve the image quality and contrast, making subsequent target detection more accurate; S3. Secondly, Mask R-CNN and Cascade R-CNN are combined to detect the construction progress of the target, improving the speed and accuracy of target detection; S4, then acquire the newly acquired images in real time, perform online analysis, compare and evaluate the analysis results with the construction plan, and generate a detailed progress report; S5. Finally, regularly check the operating status of cameras and network equipment, and update models and algorithms according to changes in construction progress and demand. The steps of preprocessing the image using the Retinex-based adaptive high dynamic range image local tone mapping algorithm and normalization processing in step S2 are: S21. First, the image I(x, y) is expressed as the product of the object reflectivity R(x, y) and the illumination component L(x, y): I(x, y) = R(x, y)·L(x, y). In order to obtain the object reflectivity R(x, y), the illumination component L(x, y) needs to be removed from the image. S22. Then use the multi-scale Retinex algorithm to estimate the illumination component L(x, y) by performing multi-scale Gaussian filtering on the image, and remove these estimated illumination components from the original image. For each scale s, the Gaussian filter G(x, y, s) is defined as follows: For each pixel (x, y), the illumination component L s The estimate of (x,y) is: L s (x,y)=I(x,y)*G(x,y,s) where * represents the convolution operation; reflectivity R s The estimate of (x,y) is: R s (x,y)=log[I(x,y)]-log[L s (x, y)] The final reflectivity R(x, y) is the weighted average of the reflectivity at each scale: Among them, ω s is the weight for each scale; S23, then improve the quality of the image, perform local tone mapping on the image output by multi-scale Retinex, and adjust the pixel value based on the local contrast and brightness distribution of the image. The formula is: Among them, I in (x, y) is the input image, I out (x,y) is the output image, max(I in ), min(I in ) are the maximum and minimum values ​​of the input image respectively; S24. Finally, the pixel value of the image is adjusted to a standard range, and the image is normalized. The normalization formula is: Among them, I(x,y) is the pixel value of the original image, I norm (x,y) is the normalized pixel value. The step S3 combines the Mask R-CNN and Cascade R-CNN methods to gradually refine the detection and segmentation results in a cascade manner, and introduces the Transformer module to capture more global context information to calculate the final construction progress. The specific implementation steps are as follows: S31. First, use Swin Transformer to extract features, divide the image into 4×4 blocks, flatten each block into a vector, and then map the vector of each block to a high-dimensional feature space through a linear embedding layer; S32. Secondly, multiple attention heads are used to process in parallel in different subspaces to capture more diverse feature representations: where d k Represents dimension; Q, K, and V are Query, Key, and Value respectively. The Query vector plays the role of finding relevant information. The Key vector determines which input position information is most important for the current Query. The Value vector represents the information at each position that we think is valuable for subsequent processing. S33, then use the shift window technique to alternately divide the window and shift the calculation, so as to capture the global information across windows, and then perform layer normalization to stabilize the training process; S34, then define the loss function μ = αμ corss-entropy +βμ Dice , where μ corss-entropy is the cross entropy loss, μ Dice represents Dice loss, α, β are weight coefficients; S35, then use the AdamW optimizer to train the model, AdamW optimizer: where θ t are model parameters, η is the learning rate, are the exponentially weighted moving averages of momentum estimation and gradient squares, ε is a stabilization term to prevent division by zero, λ is a weight decay coefficient, and the learning rate and batch size hyperparameters are adjusted according to the performance of the model; S36, then perform model evaluation and tuning, use the average precision mean and intersection-over-union ratio indicators to evaluate model performance, adjust model hyperparameters based on the evaluation results, and perform data enhancement and regularization processing; S37. Then, the trained model is used to segment the construction site image, and the area of ​​each target area is calculated according to the segmentation result. The pixel number and image resolution conversion formula are used to convert the pixel number into the actual area: Where N pixels is the number of pixels in the target area, and PPI represents the pixel density of the image; S38, the total area of ​​the final construction area A total , according to the area A of the completed part in the segmentation result completed Calculate construction progress percentage:

2. A construction progress supervision and management method based on deep learning according to claim 1, characterized in that: The specific implementation process of step S4 for online analysis of construction progress for prediction and evaluation is as follows: S41. First, generate a detailed construction progress report based on the actual situation of the current construction site, combined with historical data and current progress; S42 then provides construction progress reports to project managers so that timely decisions can be made and construction plans adjusted; S43. Secondly, the analysis results are visualized to generate charts and images so that project managers can intuitively understand the construction progress and potential problems; S44. Finally, compare the current construction progress with the original plan, identify progress deviations and causes of delays, and provide improvement suggestions.