A hoisting and positioning tool for a bridge rotation system

By designing lifting and positioning tools for bridge rotary systems, using structures such as fixtures and locking rods, the problems of low construction efficiency and inconvenient positioning of ball hinges are solved, and the efficient, precise installation and stability of ball hinges are achieved, improving the efficiency, precision installation and stability of ball hinges are achieved. Construction efficiency.

CN118637474BActive Publication Date: 2024-11-08CHINA RAILWAY NO 3 GRP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411115419.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-08
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

The construction efficiency is low during the lifting and positioning process of the bridge rotary system, and the positioning of the ball hinge is inconvenient and laborious.

Method used

A lifting positioning tool for a bridge rotary body system is designed, including a first clamp and a second clamp for clamping on the outer circumference of the ball hinge, through a locking rod, a guide body, a spring, a curved clamp and a slide rod, etc. Structure to achieve accurate positioning and stable locking of the ball hinge, avoid ball hinge impacting the rebar, and improve installation efficiency and accuracy.

Benefits of technology

It improves the installation efficiency and accuracy of the ball hinge, simplifies the lifting and positioning operation, reduces the complexity of manual coordination, ensures the stability and precise position of the ball hinge, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118637474B_ABST
    Figure CN118637474B_ABST
Patent Text Reader

Abstract

The present invention proposes a hoisting and positioning tool for a bridge swivel system, which belongs to the technical field of bridge hoisting construction. The hoisting and positioning tool for the bridge swivel system includes a first clamp for clamping on the outer circumference of the ball joint, a ball sleeve is fixedly provided on the outer side of the first clamp, a rotating ball is embedded in the ball sleeve, a sleeve is fixedly provided at the bottom of the rotating ball, a second clamp for clamping on the outside of the threaded steel on the swivel support is provided at the bottom end of the sleeve, and the second clamp is rotatably installed at the bottom end of the sleeve in the height direction, a locking rod is provided at the top of the ball sleeve, a locking groove that radially penetrates the rotating ball is provided at the center of the rotating ball, a through hole for the locking rod to pass through is provided at the center of the top of the ball sleeve, and an opening for the sleeve to swing is provided at the bottom end of the ball sleeve. The present invention has the advantages of high hoisting precision of the ball joint in the bridge swivel system, high hoisting and lowering efficiency, and strong stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge hoisting construction, and in particular to a hoisting positioning tool for a bridge rotation system. Background Art

[0002] With the continuous innovation of science and technology, highway cross-line roundabout overpasses have been widely used in recent years. The turntable system is the core of the turntable bridge, and the installation accuracy of the turntable system is the key to whether the bridge can turn smoothly and be accurately positioned.

[0003] Turntable bridges usually use a rotating system with a swivel bearing as the central support and a ring slide as the auxiliary support. The turntable system consists of an upper turntable, legs, a swivel bearing, a ring slide, a rotating traction system, etc. The weight of the rotating system is transferred to the turntable by the swivel bearing, and the ring slide plays a stabilizing role.

[0004] The installation of the ball joint is the most important step in the entire swivel system, which is divided into two parts: the lower ball joint and the upper ball joint. Before installation, ensure that the reserved holes of the support pad stone and the surface of the support pad stone have been cleaned. Before installation, use a total station to lay out the cross axis of the ball joint and draw the outline of the ball joint on the pad stone. The lower ball joint is installed by crane.

[0005] During installation, the ball joint is placed according to the reserved ball joint outline. After the lower ball joint is installed, the total station is used to re-measure the deviation of the ball joint center coordinates, and then accurately adjusted to the specification range. Then an electronic level is used to measure the surrounding elevation, and the wedge-shaped steel plate prepared in advance is used to fine-tune the flatness of the top surface of the lower ball joint to ensure that the horizontal error of the top surface of the ball joint is no more than 1mm. After adjustment, the positioning plate is used to limit the position of the lower ball joint.

[0006] During the alignment process of the ball joint hoisting in the swivel system, the position adjustment of the ball joint relies on the cooperation of the ground workers and the crane driver, which leads to slow adjustment and calibration. Not only is the construction efficiency low, but the hoisting alignment operation is also inconvenient, time-consuming and laborious. Summary of the invention

[0007] In order to solve the technical problem of low construction efficiency during the hoisting and positioning process of the existing bridge rotation system, the present invention proposes a hoisting and positioning tool for the bridge rotation system.

[0008] The technical solution of the present invention is achieved in this way:

[0009] The present invention provides a hoisting and positioning tooling for a bridge rotation system, including a first fixture for clamping on the outer circumference of a spherical hinge. A spherical sleeve is fixedly arranged on the outer side of the first fixture. A rotating ball is embedded inside the spherical sleeve. A sleeve is fixedly arranged at the bottom of the rotating ball. A second fixture for clamping on the outside of a threaded steel bar on a rotating body support is arranged at the bottom end of the sleeve. The second fixture is rotatably installed at the bottom end of the sleeve in the height direction. When the second fixture is perpendicular to the sleeve, the end of the second fixture facing the sleeve abuts against the side surface of the sleeve. A locking rod is arranged at the top end of the spherical sleeve. A locking groove penetrating the rotating ball in the radial direction is opened at the center of the rotating ball. A through hole for the locking rod to penetrate is arranged at the center of the top end of the spherical sleeve. An open end for the swinging of the sleeve is arranged at the bottom end of the spherical sleeve. When the sleeve is perpendicular to the first fixture, the locking rod can be inserted into the locking groove.

[0010] Further, a guiding body is arranged at the top end of the spherical sleeve. The bottom end of the locking rod is inserted into the guiding body in the height direction. A first spring is arranged between the top end of the guiding body and the locking rod. The first spring provides a downward pulling force for the locking rod.

[0011] Further, an "L"-shaped through groove is opened on the surface of the spherical sleeve. The bottom end of the vertical part of the through groove is communicated with the open end. The size of the through groove is adapted to the outer diameter of the sleeve. When the sleeve is located in the horizontal part of the through groove, the sleeve is within the range of the spherical sleeve in the height direction.

[0012] Further, the first fixture includes an upper clamping plate, a lower clamping plate and a clamping bolt. The upper clamping plate has an "L"-shaped structure. The outer end of the lower clamping plate is slidably installed on the vertical part of the upper clamping plate in the height direction. The clamping bolt is threadedly installed on the upper clamping plate. The bottom end of the clamping bolt passes through the upper clamping plate and is rotatably connected to the top surface of the lower clamping plate.

[0013] Further, the second fixture includes a connecting plate, two arc-shaped clamping plates, two tail rods and two locking plates. The connecting plate has a "C" shape. The two ends of the connecting plate are respectively rotatably connected to both sides of the sleeve. A through groove is opened in the middle of the connecting plate. The two arc-shaped clamping plates are arranged in a cross shape. A rotating shaft is arranged in the through groove. The cross parts of the two arc-shaped clamping plates are rotatably sleeved outside the rotating shaft. Tail rods are fixedly connected to the tail ends of the two arc-shaped clamping plates. Two locking plates are arranged inside the connecting plate. When the two arc-shaped clamping plates are in a state of clamping the threaded steel bar, the two tail rods are clamped by the two locking plates.

[0014] Further, a sliding rod capable of axially displacing is arranged inside the sleeve. The two locking plates are fixedly installed on the sliding rod. A second spring is arranged between the bottom end of the sleeve and the sliding rod.

[0015] Furthermore, a sleeve is provided at the bottom of the sleeve, a side of the sleeve facing the arc-shaped clamping plate is flat, two ends of the connecting plate are rotatably mounted on both sides of the sleeve, the tail rod is located in the sleeve, the second spring is arranged at the bottom end of the sleeve, and the bottom end of the sliding rod extends out of the sleeve.

[0016] Furthermore, a sliding groove is provided at the center of the sleeve and passes through both ends thereof, the top end of the sliding groove is connected to the locking groove, the sliding rod is provided in the sliding groove, and the sliding rod can push the locking rod inserted in the locking groove out of the locking groove by upward displacement.

[0017] Furthermore, the ball sleeve is provided with a hook and a pressure rod, the outer end of the hook is rotatably mounted on the side of the ball sleeve, the pressure rod is slidably mounted on the ball sleeve in the height direction, the top end of the pressure rod is rotatably connected to the locking rod through a connecting rod, and the middle part of the connecting rod is rotatably mounted on the ball sleeve, and the pressure rod drives the inner end of the hook to be laterally sleeved on the threaded steel bar by moving downward.

[0018] The present invention has the following beneficial effects:

[0019] After applying the hoisting and positioning tooling of the bridge swivel system of the present invention, the centering operation of the ball joint in the swivel system is more convenient, and the ball joint is directly locked and fixed after centering. In addition, when the ball joint is lowered in the centering state, it is effectively prevented from hitting the threaded steel bar, so as to better protect the ball joint. After the ball joint is lowered into place, the ball joint can be more conveniently leveled to improve the installation efficiency and accuracy of the ball joint. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the present invention when the ball joint is lowered;

[0021] Figure 2 The present invention Figure 1 Enlarged view of point A in the middle;

[0022] Figure 3 The present invention Figure 1 Enlarged view of point B in the middle;

[0023] Figure 4 It is an overall schematic diagram of the present invention;

[0024] Figure 5 It is a schematic diagram of a ball sleeve of the present invention;

[0025] Figure 6 It is a schematic diagram of the rotating ball and sleeve of the present invention;

[0026] Figure 7 is a schematic diagram of the slide bar and the locking plate of the present invention;

[0027] Figure 8 is a schematic diagram of the sliding groove of the present invention;

[0028] Fig. 9 It is a schematic diagram of the rotating ball and the sleeve after being cut open;

[0029] Fig.10 Schematic diagram of the second clamp of the present invention.

[0030] In the figure: 1. first clamp; 1.1. upper clamp; 1.2. lower clamp; 1.3. clamping bolt; 2. ball sleeve; 3. rotating ball; 4. sleeve; 5. second clamp; 5.1. connecting plate; 5.2. arc clamp; 5.3. tail rod; 5.4. locking plate; 6. locking rod; 7. locking groove; 8. through hole; 9. open mouth; 10. guide body; 11. first spring; 12. through groove; 13. sliding rod; 14. second spring; 15. sleeve; 16. sliding groove; 17. sleeve hook; 18. pressure rod; 18.1. first rod body; 18.2. second rod body; 18.3. third rod body; 19. connecting rod. DETAILED DESCRIPTION

[0031] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] refer to Figure 1 , Figure 2 , Figure 5 and Figure 6 The embodiment provides a lifting and positioning tool for a bridge swivel system, comprising a first clamp 1 for clamping on the outer circumference of a ball joint, a ball sleeve 2 is fixedly provided on the outer side of the first clamp 1, a rotating ball 3 is embedded in the interior of the ball sleeve 2, a sleeve 4 is fixedly provided at the bottom of the rotating ball 3, and a second clamp 5 for clamping on the outside of the threaded steel on the swivel support is provided at the bottom end of the sleeve 4, the second clamp 5 is rotatably installed at the bottom end of the sleeve 4 in the height direction, and when the second clamp 5 is perpendicular to the sleeve 4, the second clamp 5 abuts against the side of the sleeve 4 at one end facing the sleeve 4, a locking rod 6 is provided at the top of the ball sleeve 2, a locking groove 7 radially penetrating the rotating ball 3 is provided at the center of the rotating ball 3, a through hole 8 for the locking rod 6 to pass through is provided at the center of the top of the ball sleeve 2, and an opening 9 for the sleeve 4 to swing is provided at the bottom end of the ball sleeve 2, and when the sleeve 4 is perpendicular to the first clamp 1, the locking rod 6 can be inserted into the locking groove 7.

[0033] By providing the ball sleeve 2 and the rotating ball 3, the sleeve 4 can swing with the center of the ball sleeve 2 as the fulcrum, and the sleeve 4 can rotate with its own axial direction as the center. By providing the locking rod 6 and the locking groove 7, when the sleeve 4 is in a vertical state, the locking groove 7 and the locking rod 6 are aligned. At this time, the sleeve 4 can be locked in the vertical state by inserting the locking rod 6 into the locking groove 7.

[0034] During the ball joint lifting operation, the construction workers will first install a circle of threaded steel on the swivel support according to the preset position of the ball joint. During the lowering process of the ball joint, the threaded steel will be used to limit the ball joint to ensure the lifting accuracy of the ball joint.

[0035] After applying the lifting and positioning tooling of the bridge swivel system of this embodiment, the first clamp 1 is clamped on the outer circumference of the ball joint. When the ball joint is lifted above the swivel support and has not entered the range of the threaded steel bar, the second clamp 5 is used to hold the threaded steel bar. At this time, the sleeve 4 is in an inclined state.

[0036] Specifically, during the implementation process, multiple lifting and positioning tools of the bridge rotation system provided in this embodiment can be set up at the same time. Then, the construction personnel adjust the position of the ball joint by using a crane. After the ball joint position is calibrated, the sleeve 4 is in a vertical state. At this time, the locking rod 6 is inserted into the locking groove 7 to lock the sleeve 4. Then, the threaded steel and the lifting and positioning tools of the bridge rotation system provided in this embodiment are used to calibrate and position the lowered ball.

[0037] During the process of lowering the ball joint, the second clamp 5 slides downward on the outside of the threaded steel bar to ensure that the ball joint does not hit the threaded steel bar during lowering, thereby protecting the ball joint and the swivel support. In addition, it also ensures the accuracy of the ball joint hoisting operation. Compared with the existing technology that relies on the cooperation of multiple people to lower, observe and calibrate the ball joint hoisting operation, it is more simple, stable, reliable and efficient.

[0038] refer to Figure 2 , a guide body 10 is provided at the top of the ball sleeve 2, and the bottom end of the locking rod 6 is inserted into the guide body 10 in the height direction. A first spring 11 is provided between the top of the guide body 10 and the locking rod 6, and the first spring 11 provides a downward pulling force for the locking rod 6. When the ball joint has not yet been aligned with the preset installation position, the sleeve 4 is in an inclined state. At this time, the locking groove 7 and the through hole 8 are in a staggered state. Under the action of the first spring 11, the bottom end of the locking rod 6 is supported on the surface of the rotating ball 3. In the process of adjusting the position of the ball joint by the crane, when the position of the ball joint is aligned with the preset installation position, the sleeve 4 switches from the inclined state to the vertical state, and the locking groove 7 moves to the bottom of the locking rod 6. Under the action of the first spring 11, the locking rod 6 will automatically be inserted into the locking groove 7 to maintain the position of the ball joint.

[0039] refer to Figure 2, a through groove 12 in the shape of "L" is formed on the surface of the ball sleeve 2. The bottom end of the vertical part of the through groove 12 communicates with the open end 9, and the size of the through groove 12 is adapted to the outer diameter of the sleeve 4. When the sleeve 4 is located in the horizontal part of the through groove 12, the sleeve 4 is within the range of the ball sleeve 2 in the height direction. By providing the through groove 12, during the process of lowering the ball hinge, after the ball hinge enters the deformed steel bar, in order to prevent the second fixture 5 from supporting on the rotating body support and causing the ball hinge to be unable to be lowered further, the second fixture 5 can be first loosened, then the second fixture 5 can be swung outward, and the sleeve 4 can be displaced along the through groove 12, so that the sleeve 4 can be adjusted to the horizontal state. In this way, the second fixture 5 and the sleeve 4 can be moved away from the area below the ball hinge, facilitating the complete lowering of the ball hinge.

[0040] Reference Figure 4 , the first fixture 1 includes an upper clamping plate 1.1, a lower clamping plate 1.2 and a clamping bolt 1.3. The upper clamping plate 1.1 has an "L" - shaped structure. The outer end of the lower clamping plate 1.2 is slidably mounted on the vertical part of the upper clamping plate 1.1 in the height direction. The clamping bolt 1.3 is threadedly mounted on the upper clamping plate 1.1, and the bottom end of the clamping bolt 1.3 passes through the upper clamping plate 1.1 and is rotatably connected to the top surface of the lower clamping plate 1.2. The height of the bottom end of the vertical part of the upper clamping plate 1.1 is less than the height of the bottom end of the circumferential surface of the rotating ball 3.

[0041] During the process of lowering the ball hinge in the deformed steel bar, first move the sleeve 4 and the second fixture 5 to the outside of the ball hinge, and then lower the ball hinge. When the ball hinge is lowered to the lowest position, the upper clamping plate 1.1 supports on the rotating body support. At this time, the height of each part of the ball hinge can be adjusted by rotating the clamping bolt 1.3 to achieve the leveling operation of the ball hinge. Then, a steel plate is inserted between the outer circumference of the ball hinge and the rotating body support to support the ball hinge, and then the first fixture 1 is removed from the ball hinge, and the hoisting operation of the ball hinge can be completed.

[0042] Reference Figure 4 、 Figure 7 and Fig.10 , the second fixture 5 includes a connecting plate 5.1, two arc - shaped clamping plates 5.2, two tail rods 5.3 and two locking plates 5.4. The connecting plate 5.1 is in the shape of "匚". The two ends of the connecting plate 5.1 are respectively rotatably connected to both sides of the sleeve 4. A through groove is formed in the middle of the connecting plate 5.1. The two arc - shaped clamping plates 5.2 are arranged in a cross - shape. A rotating shaft is arranged in the through groove, and the cross - parts of the two arc - shaped clamping plates 5.2 are rotatably sleeved outside the rotating shaft. The tail ends of the two arc - shaped clamping plates 5.2 are fixedly connected with tail rods 5.3 respectively. Two locking plates 5.4 are arranged in the connecting plate 5.1. When the two arc - shaped clamping plates 5.2 are in a state of clamping the deformed steel bar, the two tail rods 5.3 are clamped by the two locking plates 5.4.

[0043] The locking plate 5.4 is displaced upward so that the locking plate 5.4 can be separated from the two tail rods 5.3. At this time, the two arc-shaped clamps 5.2 can be opened or closed manually. After closing the two arc-shaped clamps 5.2, the two locking plates 5.4 are displaced downward so that the two locking plates 5.4 can clamp and limit the two tail rods 5.3 from the outside of the two tail rods 5.3, thereby maintaining the second clamp 5 in a state of holding the threaded steel bar tightly. In this state, the ball joint is lowered, and the threaded steel bar can be used to provide guidance and limit for the lowering of the ball joint, so as to prevent the ball joint from hitting the threaded steel bar during the lowering process.

[0044] refer to Figure 3 A slide bar 13 capable of axial displacement is arranged in the sleeve 4 , and the two locking plates 5.4 are fixedly mounted on the slide bar 13 . A second spring 14 is arranged between the bottom end of the sleeve 4 and the slide bar 13 .

[0045] Specifically, in the initial state, the second clamp 5 is in a closed state. During use, the slide bar 13 is first pushed upward, at which time the second spring 14 is compressed, so that the locking plate 5.4 is separated from the tail rod 5.3, and then the arc clamping plate 5.2 is manually operated to control the arc clamping plate 5.2 to unfold and then put on the threaded steel bar, and then the slide bar 13 is released. Under the action of the second spring 14, the slide bar 13 drives the locking plate 5.4 to lock the arc clamping plate 5.2.

[0046] refer to Figure 4 A casing 15 is provided at the bottom of the sleeve 4, and one side of the casing 15 facing the arc-shaped clamping plate 5.2 is a plane. The two ends of the connecting plate 5.1 are rotatably mounted on both sides of the casing 15, and the tail rod 5.3 is located in the casing 15. The second spring 14 is arranged at the bottom end of the casing 15. The bottom end of the slide bar 13 extends out of the casing 15. When the second clamp 5 is perpendicular to the sleeve 4, the middle part of the connecting plate 5.1 facing one end of the sleeve 4 contacts the sleeve 4 to limit the maximum angle of the second clamp 5 to be perpendicular to the sleeve 4.

[0047] Through such an arrangement, after the sleeve 4 is in a vertical state, the locking rod 6 cooperates with the locking groove 7 to limit the top end of the sleeve 4, and the second clamp 5 is limited by the sleeve shell 15 and the upward friction provided by the threaded steel bar, so that it can maintain a vertical state with the sleeve 4. The cooperation of multiple lifting and positioning tooling of the bridge swivel system can effectively prevent the deviation of the ball joint and ensure that the ball joint is stably lowered to the side.

[0048] refer to Figure 8 and Fig. 9The center of the sleeve 4 is provided with a sliding groove 16 that passes through both ends thereof, and the top of the sliding groove 16 is connected to the locking groove 7. The sliding rod 13 is arranged in the sliding groove 16, and the sliding rod 13 can push the locking rod 6 inserted in the locking groove 7 out of the locking groove 7 by moving upward. By moving the sliding rod 13 upward, the locking plate 5.4 is separated from the tail rod 5.3, and the second clamp 5 is unlocked. At the same time, the sliding rod 13 pushes the locking rod 6 out of the locking groove 7, unlocking the rotating ball 3 and the ball sleeve 2, so as to adjust the direction of the sleeve 4.

[0049] refer to Figure 1 and Figure 2 A hook 17 and a pressure rod 18 are provided on the ball sleeve 2. The outer end of the hook 17 is rotatably mounted on the side of the ball sleeve 2. The pressure rod 18 is slidably mounted on the ball sleeve 2 in the height direction. The top end of the pressure rod 18 is rotatably connected to the locking rod 6 through a connecting rod 19, and the middle part of the connecting rod 19 is rotatably mounted on the ball sleeve 2. The pressure rod 18 drives the inner end of the hook 17 to cover the threaded steel from the side by moving downward.

[0050] Specifically, the distance between the hook 17 and the bottom end of the slide bar 13 is less than the length of the threaded steel bar exposed from the swivel support, and the hook 17 is already within the range of the threaded steel bar before the bottom end of the slide bar 13 contacts the swivel support. When the bottom end of the slide bar 13 pushes the locking rod 6 upward, the locking rod 6 drives the pressure rod 18 to descend through the connecting rod 19. At this time, the pressure rod 18 squeezes the hook 17 toward the threaded steel bar, so that the hook 17 can effectively cover the threaded steel bar, so that in the subsequent lowering process of the ball joint, the hook 17 can play a role in stabilizing the ball joint.

[0051] When performing ball joint lifting operations:

[0052] The first step is to hoist the ball joint above the swivel support and keep the height of the ball joint greater than the top height of the threaded steel bar.

[0053] In the second step, the construction personnel squeeze the slide bar 13 upward, so that the slide bar 13 moves upward in the sleeve 4, and pulls the locking plate 5.4 upward away from the position of the tail rod 5.3. After that, the construction personnel manually operate the arc clamping plate 5.2, put the two arc clamping plates 5.2 on the threaded steel bars and pinch them tightly, and then release the slide bar 13, so that the locking plate 5.4 locks the arc clamping plate 5.2 during the reset of the slide bar 13.

[0054] In the third step, the construction personnel operate the first clamp 1 and clamp the first clamp 1 to the outer circumference of the ball joint. At this time, the position of the ball joint is not aligned with the installation position, so that the sleeve 4 is in an inclined state.

[0055] Step 4: Use a crane to adjust the position of the ball joint, and correct the position of the high pipes one by one, so that the sleeves 4 on the hoisting and positioning tooling of all bridge swivel systems are in a vertical state. When the sleeve 4 is in a vertical state, the locking rod 6 is automatically inserted into the locking groove 7 under the action of the first spring 11, locking the top of the sleeve 4. At the same time, the second clamp 5 is in abutment with the side opposite to the sleeve 4.

[0056] At this time, by using the vertical state of each sleeve 4, it can be determined that the ball joint is located directly above the preset installation position and is aligned with the center of the area surrounded by a circle of threaded steel bars on the swivel support.

[0057] Step 5: Use a crane to start lowering the ball joint. During the lowering process, the second clamp 5 slides downward on the surface of the threaded steel bar to guide and stabilize the ball joint.

[0058] Before the bottom end of the slide bar 13 contacts the swivel support, the hook 17 is already within the range of the threaded steel bar.

[0059] Step 6: As the ball joint is lowered, after the bottom end of the slide bar 13 contacts the swivel support, it will be forced to move upward. During the upward displacement of the slide bar 13, the slide bar 13 first drives the locking plate 5.4 to disengage from the tail rod 5.3 area, so that the arc clamping plate 5.2 is unlocked. Then it enters the locking groove 7 to push the locking rod 6 out of the locking groove 7. During the upward displacement of the locking rod 6, the connecting plate 5.1 rotates and drives the pressing plate to move downward. The pressing plate causes the hook 17 to cover the threaded steel bar, and continues to guide and stabilize the subsequent lowering of the ball joint.

[0060] Step 7. Since the locking rod 6 is disengaged from the locking groove 7 and the locking plate 5.4 is disengaged from the tail rod 5.3, the arc clamping plate 5.2 can be directly manually operated to open the two arc clamping plates 5.2, and then the sleeve 4 is directly rotated outward so that the sleeve 4 is in a horizontal state after moving in the through groove 12, and then the ball joint is continued to be lowered until the bottom end of the upper clamping plate 1.1 is supported on the swivel support.

[0061] Step 8. After the bottom end of the upper clamp 1.1 is supported on the swivel support, the height of the lower clamp 1.2 can be controlled by turning the clamp bolt 1.3, and the height of the ball joint can be directly controlled by the first clamp 1 to level the ball joint. After the ball joint is leveled, a steel plate is placed between the ball joint and the swivel support for support. Then the first clamp 1 is directly loosened and the hoisting and positioning tooling of the bridge swivel system is completely pulled out of the ball joint.

[0062] refer to Figure 2The pressure rod 18 includes a first rod body 18.1, a second rod body 18.2 and a third rod body 18.3. The first rod body 18.1 is slidably installed on the side of the ball sleeve 2 in the height direction, the second rod body 18.2 is fixedly installed on one side of the first rod body 18.1, and the second rod body 18.2 is in a vertical state. The top end of the third rod body 18.3 is fixedly connected to the bottom end of the second rod body 18.2, and the bottom end of the third rod body 18.3 is in an outwardly inclined state.

[0063] In the initial state, the third rod 18.3 is located outside the hook 17. When the pressure rod 18 moves downward, the third rod 18.3 presses the hook 17 inward. When the second rod 18.2 contacts the outer surface of the hook 17, the hook 17 is locked.

[0064] In summary, after applying the lifting and positioning tooling of the bridge swivel system provided in this embodiment to assist in the lifting operation of the ball joint, the threaded steel on the swivel support is used to facilitate the centering, lowering and leveling of the ball joint.

[0065] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A hoisting and positioning tool for a bridge rotation system, characterized in that: The invention comprises a first clamp (1) for clamping on the outer circumference of a ball joint, a ball sleeve (2) is fixedly arranged on the outer side of the first clamp (1), a rotating ball (3) is embedded in the interior of the ball sleeve (2), a sleeve (4) is fixedly arranged on the bottom of the rotating ball (3), a second clamp (5) for clamping on the outside of a threaded steel bar on a swivel support is arranged at the bottom end of the sleeve (4), the second clamp (5) is rotatably mounted on the bottom end of the sleeve (4) in the height direction, and when the second clamp (5) is perpendicular to the sleeve (4), the second One end of the clamp (5) facing the sleeve (4) abuts against the side surface of the sleeve (4); a locking rod (6) is provided at the top end of the ball sleeve (2); a locking groove (7) radially penetrating the rotating ball (3) is provided at the center of the rotating ball (3); a through hole (8) for the locking rod (6) to pass through is provided at the center of the top end of the ball sleeve (2); an opening (9) for the sleeve (4) to swing is provided at the bottom end of the ball sleeve (2); when the sleeve (4) is perpendicular to the first clamp (1), the locking rod (6) can be inserted into the locking groove (7).

2. The hoisting and positioning tooling for a bridge rotation system according to claim 1, characterized in that: A guide body (10) is arranged at the top end of the ball sleeve (2), and the bottom end of the locking rod (6) is inserted into the guide body (10) in the height direction. A first spring (11) is arranged between the top end of the guide body (10) and the locking rod (6), and the first spring (11) provides a downward pulling force for the locking rod (6).

3. The hoisting and positioning tooling for a bridge rotation system according to claim 1, characterized in that: The surface of the ball sleeve (2) is provided with an L-shaped through groove (12), the bottom end of the vertical portion of the through groove (12) is connected to the opening (9), the size of the through groove (12) is adapted to the outer diameter of the sleeve (4), and when the sleeve (4) is located in the transverse portion of the through groove (12), the sleeve (4) is located within the range of the ball sleeve (2) in the height direction.

4. The hoisting and positioning tooling for a bridge rotation system according to claim 1, characterized in that: The first clamp (1) comprises an upper clamp (1.1), a lower clamp (1.2) and a clamping bolt (1.3); the upper clamp (1.1) is in an "L"-shaped structure; the outer end of the lower clamp (1.2) is slidably mounted on the vertical portion of the upper clamp (1.1) in the height direction; the clamping bolt (1.3) is threadedly mounted on the upper clamp (1.1); and the bottom end of the clamping bolt (1.3) passes through the upper clamp (1.1) and is rotatably connected to the top surface of the lower clamp (1.2).

5. The hoisting and positioning tooling for a bridge rotation system according to claim 3, characterized in that: The second fixture (5) includes a connecting plate (5.1), two arc-shaped clamping plates (5.2), two tail rods (5.3) and two locking plates (5.4). The connecting plate (5.1) is in a "C" shape. The two ends of the connecting plate (5.1) are respectively rotatably connected to both sides of the sleeve (4). A through groove is provided in the middle of the connecting plate (5.1). The two arc-shaped clamping plates (5.2) are arranged in a cross shape. A rotating shaft is provided in the through groove, and the cross parts of the two arc-shaped clamping plates (5.2) are rotatably sleeved outside the rotating shaft. The tail ends of the two arc-shaped clamping plates (5.2) are fixedly connected with tail rods (5.3). Two locking plates (5.4) are arranged in the connecting plate (5.1). When the two arc-shaped clamping plates (5.2) are in a state of clamping the ribbed steel, the two tail rods (5.3) are clamped by the two locking plates (5.4).

6. The hoisting and positioning tooling for a bridge rotation system according to claim 5, characterized in that: A sliding rod (13) capable of axially displacing is arranged in the sleeve (4). The two locking plates (5.4) are fixedly installed on the sliding rod (13). A second spring (14) is arranged between the bottom end of the sleeve (4) and the sliding rod (13).

7. The hoisting and positioning tooling for a bridge rotation system according to claim 6, characterized in that: A housing (15) is arranged at the bottom of the sleeve (4). The side surface of the housing (15) facing the arc-shaped clamping plate (5.2) is a plane. The two ends of the connecting plate (5.1) are respectively rotatably installed on both sides of the housing (15). The tail rod (5.3) is located inside the housing (15). The second spring (14) is arranged at the bottom end of the housing (15). The bottom end of the sliding rod (13) extends out of the housing (15).

8. The hoisting and positioning tool for a bridge rotation system according to claim 7, characterized in that: A sliding groove (16) penetrating through both ends is arranged at the center of the sleeve (4). The top end of the sliding groove (16) is communicated with the locking groove (7). The sliding rod (13) is arranged in the sliding groove (16), and the sliding rod (13) can push out the locking rod (6) inserted into the locking groove (7) from the locking groove (7) through upward displacement.

9. The hoisting and positioning tool for a bridge rotation system according to claim 8, characterized in that: A hook (17) and a pressing rod (18) are arranged on the ball sleeve (2). The outer end of the hook (17) is rotatably installed on the side surface of the ball sleeve (2). The pressing rod (18) is slidably installed on the ball sleeve (2) in the height direction. The top end of the pressing rod (18) is rotatably connected to the locking rod (6) through a connecting rod (19), and the middle part of the connecting rod (19) is rotatably installed on the ball sleeve (2). The pressing rod (18) drives the inner end of the hook (17) to laterally sleeve the ribbed steel through downward displacement.

Citation Information

Cited By

  • Bridge flat-turning towing and counterweight control system

    CN122899117A