Drainage equipment for comprehensive land improvement to prevent blockage
By designing anti-blocking drainage equipment for comprehensive land remediation, and using the cooperation of drainage pipes and electric hatches, the problem of drainage failure caused by filter blockage has been solved, stable drainage and debris removal have been achieved, and sewer blockage and equipment damage have been avoided. .
Patent Information
- Application Number
- CN202411087403.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-08-09
AI Technical Summary
When the filter screen of the existing drainage equipment is blocked, the drainage mechanism cannot be cleared quickly because it is not cleaned in time, and the drainage work cannot be carried out due to failure.
A kind of anti-blocking drainage equipment for comprehensive land remediation is designed, including drainage wells, well covers, slag storage boxes, drainage pipes, slag buckets, guide tubes, electric cabin doors and electric actuators. Through the drainage pipe and electric cabin The cooperation of the door enables stable drainage even when the slag bucket is blocked, and through the cooperative work of the electric hatch and the connection block, debris on the slag bucket is removed to avoid blockage.
It is realized that even when the slag bucket is blocked, the drainage well can still drain water stably, preventing debris from entering the sewer and blocking it, improving drainage efficiency and equipment reliability, and reducing debris retention and equipment wear.
Smart Images

Figure CN118639730B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of land reclamation equipment, and in particular to a drainage device for comprehensive land reclamation to prevent blockage. Background Art
[0002] In the process of land reclamation, it is generally necessary to set up drainage equipment to prevent water accumulation in low-lying areas on rainy days. The existing drainage equipment is to set a filter on the drainage mechanism and a corresponding cleaning mechanism. When the filter is blocked, the cleaning mechanism starts to work. If the filter is not cleaned in time, the accumulated water cannot be effectively drained through the drainage mechanism, and the drainage mechanism cannot be dredged quickly, resulting in failure of the drainage mechanism and inability to perform drainage work. Summary of the invention
[0003] The technical problems of the present invention are:
[0004] In order to overcome the shortcomings of the prior art that the filter screen is not cleaned in time, the drainage mechanism cannot be quickly unblocked, resulting in failure of the drainage mechanism and inability to perform drainage work, the present invention provides a blockage-proof drainage device for comprehensive land improvement.
[0005] The technical solution is: a kind of anti-blockage drainage equipment for comprehensive land improvement, including a drainage well and a well cover; the drainage well is detachably connected to the well cover, and the well cover is provided with a drainage port; it also includes a slag storage box, a box cover, a drainage pipe and a slag blocking bucket; the drainage well is connected to a plurality of slag storage boxes; each slag storage box is detachably connected to a box cover; each slag storage box is connected to a plurality of drainage pipes; a filter is provided at the pipe mouth of each drainage pipe; all the drainage pipes are connected to the drainage well together; and a slag blocking bucket is connected in the drainage well.
[0006] Furthermore, the manhole cover is configured as a spherical top.
[0007] Furthermore, it also includes a guide tube and an electric cabin door; the guide tube is fixedly connected to the inner side of the drainage well; the guide tube is funnel-shaped; the guide tube is installed with a plurality of electric cabin doors; each electric cabin door cooperates with a slag storage box; the electric cabin door is used to move the slag on the slag bucket to the slag storage box.
[0008] Furthermore, the connection position between the drainage pipe and the slag storage box is higher than the highest position where the electric hatch and the slag storage box are in rotational contact.
[0009] Furthermore, a plurality of filter holes are provided on the electric hatch.
[0010] Furthermore, when the electric hatch is located in the drainage well and is in a horizontal state, there is a fitting gap between two adjacent electric hatches.
[0011] Furthermore, bristles are provided at the matching gaps between two adjacent electric hatches.
[0012] Furthermore, it also includes an electric actuator I and a connecting block; a plurality of electric actuators I are installed in the drainage well; a connecting block is fixedly connected to each electric actuator I; all the connecting blocks are connected to the slag bucket; the slag bucket is slidably connected to the drainage well.
[0013] Furthermore, it also includes a crossbeam and an electric actuator II; the crossbeam is fixed in the drainage well; the electric actuator II is installed on the crossbeam; the slag bucket is composed of a deformable frame and a net; the telescopic part of the electric actuator II is connected to the deformable frame of the slag bucket.
[0014] Furthermore, it also includes an electric annular guide rail, an electric slider, an electric actuator III, a pin sleeve and a pin; an electric annular guide rail is installed in the drainage well; a plurality of electric sliders are slidably connected to the electric annular guide rail; each electric slider is installed with an electric actuator III; each electric actuator III telescopic part is fixedly connected with a pin sleeve; a groove is opened in the pin sleeve; a plurality of pins are fixedly connected to the slag bucket; the pin sleeve cooperates with the pin; the slag bucket is slidably connected to all the connecting blocks; the groove of the pin sleeve is cooperated with the pin sleeve, and then cooperated with the movement of the electric slider to drive the slag bucket to rotate; the telescopic part of the electric actuator II is rotatably connected to the deformable skeleton of the slag bucket.
[0015] The beneficial effects are as follows: 1. The present invention sets a number of drainage pipes, and a large amount of debris enters the drainage well with the water, causing the slag bucket to intercept a large amount of debris in a short time, and the slag bucket is blocked. The drainage well can also drain water through the drainage pipe, and cooperate with two vertical electric hatches. The electric hatches can filter the debris floating in the water through the filter holes thereon, thereby preventing some debris from floating on the liquid surface, and the floating debris also enters the slag storage box, causing the pipe mouth of the drainage pipe to be blocked, thereby achieving that even when the slag bucket is blocked, the drainage well can still drain water stably, and avoid debris from entering the sewer and causing the problem of sewer blockage.
[0016] 2. Transfer the debris bucket and the garbage on it to the lowest point where the slag box is connected to the drainage well, and then control the rotation of the two electric doors to push the debris intercepted on the slag bucket into the slag box until the electric doors rotate 90° and lift the middle part of the slag bucket upward so that the slag bucket is in an upward arched state, so that the debris on the slag bucket is transferred to the edge of the slag bucket, and then control the rotation of the electric doors to fully scrape the debris on the slag bucket into the slag box. At this time, the operator only needs to open the upper part of the slag box to remove the debris, thereby realizing the removal of the debris intercepted on the slag bucket and effectively avoiding the slag bucket being blocked by garbage and debris, resulting in the problem of failure to drain water smoothly.
[0017] 3. By controlling the slag bucket to rotate on the three connecting blocks, the electric hatch can be used to remove debris from the slag bucket, reducing the possibility of the slag bucket being blocked.
[0018] The present invention also has the following effects:
[0019] The manhole cover has a spherical top, which effectively increases the area of the manhole cover drainage port and improves drainage efficiency. Moreover, the spherical top will not completely block the drainage port of the manhole cover when the manhole cover is covered with debris, causing the problem of drainage failure.
[0020] There is a matching gap between two adjacent electric doors, so that when the electric door blocks the drainage well, the matching gap and the filter holes on the electric door jointly drain water, and bristles are provided at the movable end of the electric door, so that when the electric door contacts the slag box, the inner wall of the slag box is also brushed to reduce the debris trapped on the inner wall of the slag box. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram of the three-dimensional structure of the anti-clogging land comprehensive improvement drainage device of the present invention;
[0022] Figure 2 A cross-sectional view of the anti-clogging land comprehensive improvement drainage device of the present invention;
[0023] Figure 3 This is a schematic diagram of the slag bucket of the present invention in an arched state;
[0024] Figure 4 It is a schematic diagram of the installation position of the pin sleeve of the present invention;
[0025] Figure 5 It is a schematic diagram of the cooperation between the pin sleeve and the pin of the present invention.
[0026] The names and serial numbers of the parts in the figure are: 1-drainage well, 2-well cover, 3-slag storage box, 4-box cover, 5-drainage pipe, 6-slag bucket, 7-guide tube, 8-electric hatch, 101-electric actuator I, 102-connecting block, 103-crossbeam, 104-electric actuator II, 201-electric annular guide rail, 202-electric slider, 203-electric actuator III, 204-pin sleeve, 205-pin. DETAILED DESCRIPTION
[0027] The technical solution of the present invention is further described below in conjunction with the accompanying drawings.
[0028] Embodiment 1
[0029] A drainage device for preventing blockage and comprehensive land improvement, according to Figure 1-Figure 5 As shown, it includes a drainage well 1 and a water well cover 2; the drainage well 1 is detachably connected to the water well cover 2, and a drainage port is opened on the water well cover 2;
[0030] It also includes a slag storage box 3, a box cover 4, a drainage pipe 5 and a slag blocking bucket 6; the drainage well 1 is connected to two slag storage boxes 3 distributed on the left and right; each slag storage box 3 is detachably connected to a box cover 4; each slag storage box 3 is connected to at least six drainage pipes 5 arranged in front and behind; the pipe mouth of each drainage pipe 5 is provided with a filter; all the drainage pipes 5 are connected to the drainage well 1 together; and a slag blocking bucket 6 is connected to the drainage well 1.
[0031] It also includes a guide tube 7 and an electric hatch 8; the guide tube 7 is bolted to the upper inner side of the drainage well 1; the guide tube 7 is funnel-shaped; two left-right symmetrical electric hatches 8 are installed at the lower part of the guide tube 7; each electric hatch 8 cooperates with a slag storage box 3; the electric hatch 8 is used to move the slag on the slag bucket 6 to the slag storage box 3.
[0032] The electric door 8 is provided with a plurality of filter holes.
[0033] It also includes an electric actuator Ⅰ101 and a connecting block 102; three circular array electric actuators Ⅰ101 are installed in the drainage well 1; the electric actuator Ⅰ101 is an electric push rod; each electric actuator Ⅰ101 is fixed with a connecting block 102; all the connecting blocks 102 are connected to the slag bucket 6; the slag bucket 6 is slidably connected to the drainage well 1.
[0034] It also includes a crossbeam 103 and an electric actuator II 104; the crossbeam 103 is bolted inside the drainage well 1; the electric actuator II 104 is installed in the middle of the crossbeam 103; the electric actuator II 104 is an electric push rod; the slag bucket 6 is composed of a deformable frame and a net; the telescopic part of the electric actuator II 104 is connected to the deformable frame of the slag bucket 6.
[0035] The working steps of the above embodiment are:
[0036] The electric door 8, the electric actuator I 101 and the electric actuator II 104 are all connected to a power source.
[0037] First, the device is installed in a low-lying location in land reclamation that requires drainage, and the lower part of the device is connected to the sewer, and the upper part of the device is flush with the ground. Then the water on the ground enters the drainage well 1 through the drain port on the well cover 2, and then the water continues to flow downward. When the water passes through the slag bucket 6, the slag bucket 6 can block the debris and garbage in the water and keep it on the slag bucket 6, while the water continues to flow downward through the slag bucket 6 and enter the sewer.
[0038] When the slag bucket 6 is blocked by a large amount of weeds, garbage and other debris, the water filtering capacity of the slag bucket 6 decreases, resulting in the water inlet rate of the drainage well 1 being greater than the drainage rate. At this time, water accumulates in the drainage well 1, and the liquid level in the drainage well 1 rises. The water in the drainage well 1 enters the slag storage boxes 3 on the left and right sides, and then as the liquid level in the slag storage boxes 3 rises to the pipe mouth position of the drainage pipe 5, the water in the slag storage boxes 3 is drained to the lower part of the drainage well 1 through the drainage pipe 5 with a filter, and then enters the sewer. Therefore, when a large amount of drainage is needed on the ground, a large amount of debris enters the drainage well 1 with the water, resulting in the slag bucket 6 intercepting a large amount of debris in a short time. The slag bucket 6 is temporarily blocked, and the drainage well 1 can still be drained through the drainage pipe 5. Therefore, even when the slag bucket 6 is blocked, the drainage well 1 can still drain stably and avoid debris entering the sewer, causing the problem of sewer blockage.
[0039] Among them, Figure 2 As shown, the two electric hatches 8 are rotated to a vertical state, and the two electric hatches 8 are respectively blocked at the connection point between a slag storage box 3 and the drainage well 1. The electric hatches 8 can filter the floating debris in the water through the filter holes thereon, thereby preventing some debris from floating on the liquid surface when the liquid level in the drainage well 1 rises, and when the water enters the slag storage box 3, the floating debris also enters the slag storage box 3, causing the pipe mouth of the drainage pipe 5 to be blocked.
[0040] In the above description, after the slag bucket 6 is blocked by debris, the drainage can be carried out through the drainage pipe 5, but the drainage capacity of the drainage pipe 5 is limited and cannot completely replace the drainage of the drainage well 1. Therefore, it is necessary to remove the debris from the slag bucket 6 in time. At this time, the staff needs to cooperate to control the rotation of the two electric hatches 8, such as Figure 3 As shown, the two electric hatches 8 are rotated into the drainage well 1. At this time, the water on the ground can continue to be discharged into the drainage well 1. The water is filtered through the filter holes on the electric hatches 8, and the debris is intercepted on the electric hatches 8. Then, the three electric actuators I 101 and one electric actuator II 104 are controlled to extend synchronously, and each of them drives a connecting block 102 to move upward synchronously. All the connecting blocks 102 jointly drive the slag bucket 6 and the debris on it to move upward. When the slag bucket 6 moves to the lowest point of the connection between the slag storage box 3 and the drainage well 1 When the slag bucket 6 stops moving, the two electric hatches 8 are controlled to rotate, and the debris on the electric hatches 8 also slides onto the slag bucket 6. During the rotation of the two electric hatches 8, the debris intercepted on the slag bucket 6 is pushed into the slag storage box 3 until the electric hatches 8 rotate 180°. At this time, the operator only needs to open the box cover 4, and then remove the debris on the electric hatches 8 from the upper opening of the slag storage box 3, and then control the slag bucket 6 to move downward, and the slag bucket 6 drives the debris to move downward together, and the electric hatches 8 resume as usual. Figure 3The state shown is shown, and then the above operation is repeated to control the slag bucket 6 to move upward, the electric hatch 8 moves the debris to the slag storage box 3, and then the staff takes the debris away, thereby realizing the removal of the debris intercepted on the slag bucket 6, and effectively avoiding the slag bucket 6 being completely blocked, resulting in the problem of being unable to drain water.
[0041] In order to avoid too much debris and garbage intercepted on the slag bucket 6, causing excessive working pressure on the deformable frame of the slag bucket 6 and the bag net, the slag bucket 6 is Figure 2 The utility model discloses that the slag bucket 6 of the present invention is the slag bucket 6 of the present invention, and the utility model relates to the slag bucket 6 of the present invention. Figure 3 The slag bucket 6 is in the arched state shown in the figure, so that the debris in the middle of the slag bucket 6 is transferred to the edge of the slag bucket 6. At this time, the electric hatch 8 is controlled to rotate to effectively scrape the debris on the left and right sides of the slag bucket 6 into the slag storage box 3, and then the electric actuator II 104 is controlled to contract to pull the middle of the slag bucket 6 down, so that the slag bucket 6 returns to the state as shown in the figure. Figure 2 The concave state shown in the figure, at this time, the debris and garbage on the front and rear sides of the slag bucket 6 that have not been scraped away will gather again in the middle of the slag bucket 6, and then the electric actuator Ⅱ104 is controlled to extend, and the above operation is repeated to effectively remove the debris and garbage on the slag bucket 6, avoiding the slag bucket 6 being blocked by debris and garbage, resulting in the problem of failure to drain water smoothly.
[0042] On the basis of the above technical effects, the present invention also has the following advantages:
[0043] First, the manhole cover 2 has a spherical top, which effectively increases the area of the drainage port of the manhole cover 2 compared to a flat top, thereby improving drainage efficiency. Furthermore, when the manhole cover 2 with a spherical top is covered with debris, the drainage port of the manhole cover 2 will not be completely blocked, resulting in a problem of being unable to drain water.
[0044] Second, the highest position of the rotational contact between the electric hatch 8 and the slag storage box 3 is still lower than the connection position between the drainage pipe 5 and the slag storage box 3, so that when the electric hatch 8 is used to clean the debris on the slag bucket 6, the drainage function of the drainage pipe 5 is not affected. When the slag bucket 6 is partially cleaned, the liquid level in the drainage well 1 is lowered, and the filter holes of the electric hatch 8 also filter the debris on it, the weight of the debris is reduced, and the work intensity of the staff to pick up the debris is reduced.
[0045] Third, when two adjacent electric doors 8 are located in the drainage well 1 and are in a horizontal state, there is a fitting gap between the two adjacent electric doors 8, so that when the electric door 8 blocks the drainage well 1, the fitting gap and the filter holes on the electric door 8 are used together to drain water, and bristles are arranged at the fitting gaps between the two adjacent electric doors 8. The bristles cooperate with the rotation of the electric door 8 to transfer debris and garbage upward, and also enable the electric door 8 to brush the inner wall of the slag box 3 when it contacts with the slag box 3, thereby reducing the accumulation of debris on the inner wall of the slag box 3, and the electric door 8 is in contact with the slag bucket 6 through the bristles of the electric door 8, thereby effectively reducing the wear of the slag bucket 6, and the electric door 8 will not contact the middle part of the slag bucket 6 in the arched state.
[0046] Second embodiment
[0047] On the basis of the first embodiment, according to Figure 1 , Figure 2 , Figure 4 and Figure 5 As shown, it also includes an electric annular guide rail 201, an electric slider 202, an electric actuator III 203, a pin sleeve 204 and a pin 205; an electric annular guide rail 201 is installed in the drainage well 1; the electric annular guide rail 201 is slidably connected to two symmetrically arranged electric sliders 202; each electric slider 202 is respectively installed with an electric actuator III 203; the electric actuator III 203 is an electric push rod; each electric actuator III 203 telescopic part is fixedly connected to a pin sleeve 204; a groove is opened in the pin sleeve 204; four annular array pins 205 are fixedly connected to the slag bucket 6; the pin sleeve 204 cooperates with the pin 205; the slag bucket 6 is slidably connected to all the connecting blocks 102; the groove of the pin sleeve 204 is sleeved and matched with the pin 205, and then cooperated with the movement of the electric slider 202 to drive the slag bucket 6 to rotate; the telescopic part of the electric actuator II 104 is rotatably connected to the deformable skeleton of the slag bucket 6.
[0048] The working steps of the above embodiment are:
[0049] On the basis of the first embodiment, considering that the rotation of the electric hatch 8 can only scrape the debris on the left and right sides of the slag bucket 6 into the slag storage box 3, the debris on the front and rear sides of the slag bucket 6 needs to be cleared by changing the concave and upward arched states of the slag bucket 6. At this time, the slag bucket 6 is located at the lowest point where the slag storage box 3 and the drainage well 1 are connected, and the scraping of the debris on the slag bucket 6 has been completed once by the rotation of the electric hatch 8, and then the electric hatch 8 is restored to the original state. Figure 5 The state shown is then controlled by extending the two electric actuators III 203, synchronously driving the corresponding pin sleeves 204 to move downward until the groove of the pin sleeve 204 is sleeved on the pin 205, and the pin sleeve 204 contacts the upper surface of the slag bucket 6, and then the two electric sliders 202 are controlled to slide on the electric annular guide rail 201 together, synchronously driving the electric actuator III 203 and the corresponding parts thereon to move, so that the slag bucket 6 rotates on all the connecting blocks 102 until the slag bucket 6 stops after rotating 90°. At this time, the debris on the front and rear sides of the original slag bucket 6 is transformed into slag blocking. The debris on the left and right sides of the bucket 6 are removed, and the two electric actuators III 203 are controlled to contract, so that the pin sleeve 204 is separated from the corresponding pin 205. At this time, when the electric door 8 is controlled to rotate, the remaining debris on the slag bucket 6 is scraped off, and then the two electric actuators III 203 are controlled to extend, the pin sleeve 204 cooperates with the corresponding pin 205, and the electric slider 202 is controlled to reset, and then the slag bucket 6 is controlled to rotate back to the initial state. At this time, only a small amount of debris remains on the slag bucket 6. Repeat the above process to quickly remove the debris on the slag bucket 6 and reduce the possibility of the slag bucket 6 being blocked.
[0050] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A drainage device for comprehensive land improvement to prevent blockage, comprising a drainage well (1) and a well cover (2); the drainage well (1) is detachably connected to the well cover (2), and a drainage outlet is provided on the well cover (2); Its characteristics are: It also comprises a slag storage box (3), a box cover (4), a drainage pipe (5) and a slag blocking bucket (6); the drainage well (1) is connected to a plurality of slag storage boxes (3); each slag storage box (3) is detachably connected to a box cover (4); each slag storage box (3) is connected to a plurality of drainage pipes (5); a filter screen is provided at the pipe opening of each drainage pipe (5); all the drainage pipes (5) are connected to the drainage well (1); and a slag blocking bucket (6) is connected inside the drainage well (1); It also includes a guide tube (7) and an electric door (8); the guide tube (7) is fixedly connected to the inner side of the drainage well (1); the guide tube (7) is funnel-shaped; the guide tube (7) is equipped with a plurality of electric doors (8); each electric door (8) is matched with a slag storage box (3); the electric door (8) is used to move the slag on the slag bucket (6) to the slag storage box (3); It also includes an electric actuator I (101) and a connection block (102); a plurality of electric actuators I (101) are installed in the drainage well (1); a connection block (102) is fixedly connected to each electric actuator I (101); all the connection blocks (102) are connected to the slag bucket (6); the slag bucket (6) is slidably connected to the drainage well (1); It also includes a crossbeam (103) and an electric actuator II (104); the crossbeam (103) is fixedly connected in the drainage well (1); the crossbeam (103) is installed with the electric actuator II (104); the slag bucket (6) is composed of a deformable frame and a net; the telescopic part of the electric actuator II (104) is connected to the deformable frame of the slag bucket (6); In order to prevent excessive debris from being intercepted on the slag bucket (6), which would cause excessive working pressure on the deformable frame and the net of the slag bucket (6), the slag bucket (6) is concave downward, so that the debris gathers in the middle of the slag bucket (6). The debris is densely piled in the middle of the slag bucket (6) and loosened at the edge of the slag bucket (6), which is conducive to the drainage of the slag bucket (6) and effectively prolongs the working time of the normal drainage of the slag bucket (6). The electric actuator II (104) is against the middle of the deformable frame of the slag bucket (6) to support the middle of the slag bucket (6) to prevent excessive debris from being intercepted, which would cause the deformable frame and the net of the slag bucket (6) to be crushed. By controlling the extension of the three electric actuators I (101) and the electric actuator II (104), the connecting blocks (102) are synchronously driven to move upward, and all the connecting blocks (102) jointly drive the slag bucket (6) and the debris on it to move upward. When the slag bucket (6) moves to the lowest point where the slag storage box (3) is connected to the drainage well 1, the three electric actuators I (101) are controlled to stop extending, while the electric actuator II (104) continues to extend, pushing up the middle part of the slag bucket (6), so that the variable frame of the slag bucket (6) is deformed, and the slag bucket (6) is in an arched state, so that the debris in the middle of the slag bucket (6) is transferred to the edge of the slag bucket (6). At this time, the electric hatch (8) is controlled to rotate to effectively scrape the debris on the left and right sides of the slag bucket (6) into the slag storage box (3), and then the electric actuator II (104) is controlled to contract and pull the middle part of the slag bucket (6) downward, so that the slag bucket (6) returns to the concave state. At this time, the debris and garbage on the front and rear sides of the slag bucket (6) that have not been scraped away gather again in the middle part of the slag bucket (6), and then the electric actuator II (104) is controlled to extend, and the above operation is repeated.
2. A drainage device for comprehensive land improvement to prevent blockage according to claim 1, Its characteristics are: The water well cover (2) is configured as a spherical top.
3. The anti-blocking drainage equipment for comprehensive land improvement according to claim 1, Its characteristics are: The communication position between the drainage pipe (5) and the slag storage box (3) is higher than the highest position of the electric hatch (8) in rotational contact with the slag storage box (3).
4. The anti-blocking drainage equipment for comprehensive land improvement according to claim 1, Its characteristics are: The electric hatch (8) is provided with a plurality of filter holes.
5. The anti-blocking drainage equipment for comprehensive land improvement according to claim 1, Its characteristics are: When the electric hatches (8) are located in the drainage well (1) and are in a horizontal state, a matching gap exists between two adjacent electric hatches (8).
6. The anti-blocking drainage device for comprehensive land improvement according to claim 5, Its characteristics are: Brushes are provided at the matching gaps between two adjacent electric hatches (8).
7. The anti-blocking drainage equipment for comprehensive land improvement according to claim 1, Its characteristics are: The invention also comprises an electric annular guide rail (201), an electric slider (202), an electric actuator III (203), a pin sleeve (204) and a pin (205); the electric annular guide rail (201) is installed in the drainage well (1); the electric annular guide rail (201) is slidably connected to a plurality of electric sliders (202); each electric slider (202) is respectively installed with an electric actuator III (203); each telescopic portion of each electric actuator III (203) is respectively fixedly connected with a pin sleeve (204); 4); a groove is formed in the pin sleeve (204); a plurality of pins (205) are fixedly connected to the slag bucket (6); the pin sleeve (204) cooperates with the pins (205); the slag bucket (6) is slidably connected to all the connecting blocks (102); the groove of the pin sleeve (204) is sleeved and matched with the pins (205), and then the electric slider (202) is moved to drive the slag bucket (6) to rotate; the telescopic part of the electric actuator II (104) is rotatably connected to the deformable frame of the slag bucket (6).
Citation Information
Patent Citations
Water conservancy project drainage equipment for gardens
CN213836955U
Anti-blocking drainage equipment for municipal road
CN214783025U