A method for calculating pile foundation bearing parameters based on penetration testing technology

Through the method based on the pile-soil Coulomb friction principle, the ultimate friction resistance and ultimate end resistance of the pile foundation are calculated, and the problem of insufficient applicability and scientificity of the calculation method of pile foundation bearing parameters in the existing technology is solved, and more accurate and a wide range of pile foundation design applications.

CN118657006BActive Publication Date: 2024-11-12CHINA RAILWAY DESIGN GRP CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411149684.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-12
Estimated Expiration
2044-08-21

AI Technical Summary

Technical Problem

The existing pile foundation bearing parameter calculation method based on touch detection technology is insufficient in terms of applicability and scientificity, especially in new sites and new soils, and it is overly dependent on empirical formulas and lacks physical significance.

Method used

Using the method based on the pile-soil Coulomb friction principle, the ultimate side friction resistance and the ultimate end resistance of the pile foundation are calculated through the touch detection data, and the correlation between the touch detection penetration resistance and the pile foundation bearing parameters are established to directly reflect the touch detection data. Correlation with the ultimate bearing capacity of pile foundation.

Benefits of technology

The calculation results of this method are relatively accurate and are suitable for a wide range of pile foundation design fields, making up for the lack of empiricality of traditional methods, and significantly improved applicability and scientificity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118657006B_ABST
    Figure CN118657006B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for calculating pile foundation bearing parameters based on penetration testing technology, including: S1, performing penetration testing at the pile position to obtain original penetration testing data; S2, calculating soil bulk density, internal friction angle and self-weight stress according to cone tip resistance; S3, calculating pile foundation lateral friction resistance according to pile foundation size; S4, calculating pile end resistance at the bottom of the pile foundation; S5, calculating pile foundation bearing parameters. The method establishes a correlation between penetration testing resistance and pile foundation bearing parameters unit lateral friction resistance and unit end resistance, which directly reflects the correlation between penetration testing data and ultimate bearing capacity of pile foundation. The ultimate lateral friction resistance and ultimate end resistance that can be exerted by the pile foundation can be directly calculated using penetration testing data, which makes up for the deficiency of traditional methods that rely too much on empirical formulas. The method is simple, easy to operate, time-saving and efficient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the research field of pile foundation bearing parameter calculation in engineering survey, and in particular to a pile foundation bearing parameter calculation method based on penetration testing technology. Background Art

[0002] Deep penetration sounding has been widely used in engineering surveys due to its advantages of continuous data acquisition, fast survey speed, and the ability to consider the true stress level of the soil. The continuous test data obtained from deep penetration sounding can obtain continuous pile foundation bearing parameters along the depth. Compared with the conventional drilling, which only has a unique pile foundation bearing parameter for the single layer of soil to be tested, the continuous pile foundation bearing parameters obtained based on deep penetration sounding are more accurate and reasonable. Therefore, the calculation method of pile foundation bearing parameters based on penetration sounding technology is of great significance to pile foundation engineering.

[0003] At present, the main methods for calculating pile foundation bearing parameters based on penetration testing technology include empirical formula method and semi-empirical formula method considering pile foundation bearing performance. Among them, the empirical formula method is mainly used in China. The empirical formula method establishes an empirical formula between the cone tip resistance and side resistance obtained by penetration testing and the pile foundation bearing parameters. This method is highly empirical, and the characteristic parameters in the formula do not have physical meaning. It is not applicable to new sites and new soils, and has certain limitations. The semi-empirical formula method considering pile foundation bearing performance has not been studied enough and is only applicable to soft clay in the Gulf of Mexico, Northern Europe and other regions. However, silty clay and silt are commonly distributed in my country's terrestrial and marine soils, so its applicability is low. At present, the calculation method of pile foundation bearing parameters based on penetration testing technology has significant deficiencies in applicability and scientificity. Summary of the invention

[0004] In view of the problems existing in the background technology, the present invention provides a pile foundation bearing parameter calculation method based on penetration testing technology with strong versatility and high accuracy.

[0005] To this end, the present invention adopts the following technical solutions:

[0006] A method for calculating pile foundation bearing parameters based on penetration testing technology comprises the following steps:

[0007] S1, conduct a penetration test at the pile position to obtain the original penetration data;

[0008] Arrange the sounding holes at the project site and set the sounding hole depth to , the collection interval is ; Get the depth of the probe hole The penetration cone resistance within the range and the friction resistance of the probe side ;

[0009] S2, cone tip resistance obtained based on S1 Calculate soil bulk density as it changes with burial depth , the internal friction angle changes with the burial depth and the self-weight stress varying with the sampling depth ;

[0010] S3, calculate the pile foundation side friction according to the pile foundation size:

[0011] Get the depth of pile foundation into the soil , Pile foundation radius ; Use the acquisition spacing The buried part of the pile foundation is divided into pile nodes, then: ;Will As the number of the pile node, , ;

[0012] The pile node is calculated by the following formula The lateral friction of pile foundation :

[0013] ;

[0014] in, For pile nodes The pile foundation correction factor at ; For pile nodes The distance from the bottom of the pile;

[0015] is the pile node obtained based on the penetration cone tip resistance The pile circumferential normal stress at ,

[0016] in:

[0017] For the pile node Cone tip resistance at the same burial depth;

[0018] is the horizontal resistance coefficient, ; For the pile node Internal friction angle at the same burial depth; For the pile node Deadweight stress at the same sampling depth; For the pile node The external friction angle of the soil at the same burial depth, ;

[0019] S4, calculate the pile end resistance at the bottom of the pile foundation :

[0020] The pile end resistance at the bottom of the pile foundation is the pile node The pile end resistance at is calculated by the following formula:

[0021] ;

[0022] in, Above the pile bottom and below the bottom of the pile The weighted average of all the cone tip resistances within the range; is the internal friction angle at the bottom of the pile foundation;

[0023] S5, calculate pile foundation bearing parameters:

[0024] The side friction resistance of the whole pile body is calculated using the method of S3 and combined with the pile end resistance obtained by S4 to obtain the pile foundation bearing parameters and output them.

[0025] In step S2:

[0026] when hour, ;

[0027] when hour, ;

[0028] when hour, ;

[0029] ;

[0030] in, For burial depth The cone tip resistance at For burial depth The internal friction angle of the soil at For burial depth The soil bulk density at

[0031] The self-weight stress at different sampling depths is calculated by the following formula: :

[0032] ;

[0033] in, is the collection depth, is the collection spacing An integer multiple of .

[0034] Preferably, .

[0035] The pile foundation bearing parameter calculation method of the present invention is based on the pile-soil Coulomb friction principle and uses penetration data to calculate the ultimate side friction resistance and ultimate end resistance that the pile foundation can exert.

[0036] Compared with the prior art, the present invention has the following beneficial effects:

[0037] 1. The method of the present invention establishes the correlation between the penetration resistance of the penetration test, the unit side friction resistance and the unit end resistance of the pile foundation bearing parameters based on the pile-soil Coulomb friction principle, which directly reflects the correlation between the penetration test data and the ultimate bearing capacity of the pile foundation. The ultimate side friction resistance and ultimate end resistance that can be exerted by the pile foundation can be directly calculated using the penetration test data, which makes up for the deficiency of the traditional method that over-relies on empirical formulas;

[0038] 2. This method is simple, easy, time-saving and efficient. The calculated unit side friction and unit end resistance of the pile foundation are close to the actual bearing capacity of the pile foundation. The calculation is relatively accurate and can be widely used in the field of pile foundation design in my country. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 is a flow chart of the method of the present invention.

[0040] Figure 2 is a graph of the resistance curve of the probe cone tip in an embodiment of the present invention;

[0041] Figure 3 is a graph of the friction resistance of the probe side in an embodiment of the present invention;

[0042] Figure 4 It is a comparison diagram between the pile foundation bearing parameter curve obtained by the embodiment of the present invention and the measured results. DETAILED DESCRIPTION

[0043] The technical solution of the present invention is described in detail below in conjunction with the accompanying drawings and embodiments. Example

[0044] The method of the present invention is used to calculate the pile foundation bearing capacity parameters of a pile foundation engineering site. The pile foundation engineering site is a very thick Quaternary stratum, and the landform type is mainly tidal flat landform, which has the characteristics of alternating marine and terrestrial deposition. Its lithology is mainly composed of silty clay and silt, and its distribution is relatively stable.

[0045] like Figure 1 As shown, the specific steps are as follows:

[0046] S1, conduct a penetration test at the pile position to obtain the original penetration data;

[0047] According to the geotechnical engineering investigation technical outline, the sounding holes are arranged at the project site, and the depth of the sounding holes is set to , the collection interval is ; Obtain the original data of site penetration, including the penetration cone tip resistance and the friction resistance of the probe side .

[0048] In this embodiment, the depth of the probe hole is , collection spacing The curve of the resistance of the probe tip is as follows: Figure 2 As shown in the figure, the curve of the friction resistance on the probing side is as follows: Figure 3 As shown; taking the first 3m as an example to briefly describe the calculation process of the present invention, the data of the first 3m is shown in Table 1;

[0049] Table 1 Cone tip resistance and side friction resistance data for 0~3m burial depth

[0050] Buried Depth Cone tip resistance Lateral friction Buried Depth Cone tip resistance Lateral friction Buried Depth Cone tip resistance Lateral friction 0.1 2.93 1.44 1.1 2.21 1.37 2.1 4.42 4.61 0.2 2.69 2.57 1.2 2.24 1.72 2.2 4.54 4.51 0.3 2.66 3.17 1.3 2.21 2.78 2.3 3.09 4.65 0.4 2.57 3.1 1.4 2.36 3.7 2.4 1.6 5.21 0.5 2.48 2.96 1.5 3.36 4.23 2.5 1.39 5.81 0.6 2.36 2.07 1.6 4.75 3.66 2.6 1.36 5.95 0.7 2.36 2.04 1.7 4.87 3.34 2.7 1.09 5.39 0.8 2.24 2.04 1.8 4.45 4.01 2.8 1.06 5.42 0.9 1.96 2.11 1.9 4.6 4.15 2.9 1.36 5.78 1.0 1.9 2.11 2.0 4.33 4.54 3.0 1.3 6.13

[0051] In the table, the unit of cone tip resistance is The unit of lateral friction is .

[0052] S2, calculate the soil bulk density, internal friction angle and self-weight stress based on the cone tip resistance:

[0053] According to the cone tip resistance at each position , calculate soil bulk density and soil internal friction angle ,have:

[0054] hour, ;

[0055] hour, ;

[0056] hour, ;

[0057] ;

[0058] in, For burial depth Cone tip resistance , For burial depth The internal friction angle of soil , For burial depth Soil density .

[0059] In the above embodiment, taking the buried depth of 0.5m as an example, Soil bulk density ; Friction angle of soil .

[0060] The soil bulk density and internal friction angle of 0-3m are calculated according to the above calculation method. The results are shown in Table 2.

[0061] Table 2 Bulk density and internal friction angle of 0~3m burial depth

[0062] Buried Depth Soil bulk density Internal friction angle Buried Depth Soil bulk density Internal friction angle Buried Depth Soil bulk density Internal friction angle 0.1 20.41 32.07 1.1 19.87 31.23 2.1 21.22 33.28 0.2 20.24 31.81 1.2 19.89 31.27 2.2 21.28 33.36 0.3 20.22 31.78 1.3 19.87 31.23 2.3 20.51 32.22 0.4 20.16 31.68 1.4 19.99 31.43 2.4 19.27 30.28 0.5 20.09 31.57 1.5 20.68 32.47 2.5 19.01 29.86 0.6 19.99 31.43 1.6 21.37 33.50 2.6 18.97 29.80 0.7 19.99 31.43 1.7 21.42 33.57 2.7 18.58 29.14 0.8 19.89 31.27 1.8 21.23 33.30 2.8 18.53 29.06 0.9 19.64 30.88 1.9 21.30 33.40 2.9 18.97 29.80 1 19.59 30.78 2 21.18 33.22 3 18.89 29.66

[0063] In the table, the unit of soil bulk density is ; The unit of internal friction angle is .

[0064] According to the calculated soil bulk density, the self-weight stress at different sampling depths is calculated by the following formula: :

[0065]

[0066] in, is the collection depth, and the collection depth is the collection spacing An integer multiple of ;

[0067] In the above embodiment, Take the following example to calculate the acquisition depth: Soil self-weight stress:

[0068] ;

[0069] Calculate the burial depth according to the above calculation method The soil self-weight stress is shown in Table 3.

[0070] Table 3 Soil self-weight stress table at buried depth

[0071] Collection Depth Soil self-weight stress Collection Depth Soil self-weight stress Collection Depth Soil self-weight stress 0.1 2.04 1.1 22.01 2.1 42.83 0.2 4.07 1.2 24.00 2.2 44.95 0.3 6.09 1.3 25.99 2.3 47.00 0.4 8.10 1.4 27.99 2.4 48.93 0.5 10.11 1.5 30.059 2.5 50.83 0.6 12.11 1.6 32.19 2.6 52.73 0.7 14.11 1.7 34.339 2.7 54.59 0.8 16.10 1.8 36.459 2.8 56.44 0.9 18.06 1.9 38.59 2.9 58.34 1 20.02 2 40.70 3 60.23

[0072] In the table, the unit of soil self-weight stress is .

[0073] S3, calculate the pile foundation side friction according to the pile foundation size:

[0074] Get the depth of pile foundation into the soil , the unit is ; Pile foundation radius , the unit is ; Use the acquisition interval The buried part of the pile foundation is divided into pile nodes, then: ;Will As the number of the pile node, , .

[0075] The pile node is calculated by the following formula The lateral friction of pile foundation :

[0076]

[0077] in, The unit is ;

[0078] For pile nodes The pile foundation correction factor at ; For pile nodes The distance from the bottom of the pile in ,

[0079] is the pile node obtained based on the penetration cone tip resistance The normal stress of the pile at ,have:

[0080] ,

[0081] in:

[0082] For the pile node Cone tip resistance at the same burial depth;

[0083] is the horizontal resistance coefficient, ;

[0084] For the pile node Internal friction angle at the same burial depth ;

[0085] For the pile node Deadweight stress at the same sampling depth;

[0086] For the pile node The external friction angle of the soil at the same burial depth, .

[0087] In the above embodiment, the depth of the pile foundation into the soil , pile radius , .

[0088] Depth The lateral friction of the pile foundation here for:

[0089]

[0090] The side friction resistance of pile foundation of 0~3m is calculated according to the above calculation method, as shown in Table 4.

[0091] Table 4 Side friction of pile foundation with burial depth of 0~3m

[0092] depth Pile side friction depth Pile side friction depth Pile side friction 0.1 34.06 1.1 12.20 2.1 42.16 0.2 23.32 1.2 15.32 2.2 41.25 0.3 28.72 1.3 24.73 2.3 41.72 0.4 28.00 1.4 33.00 2.4 45.48 0.5 26.66 1.5 38.41 2.5 50.50 0.6 18.57 1.6 33.80 2.6 51.68 0.7 18.29 1.7 30.85 2.7 46.64 0.8 18.22 1.8 36.82 2.8 46.90 0.9 18.69 1.9 38.12 2.9 50.20 1 18.64 2 41.53 3 53.20

[0093] In the table, the unit of pile foundation side friction is .

[0094] S4, calculate the pile end resistance at the bottom of the pile foundation :

[0095] The pile end resistance at the bottom of the pile foundation is the pile node The pile end resistance at is calculated by the following formula:

[0096]

[0097] In the formula, Above the pile bottom and the following The weighted average of all cone tip resistances within the range, in units of .

[0098] Therefore, in the above embodiment, the pile bottom and the following The cone tip resistance within the range is shown in Table 5.

[0099] Table 5

[0100] / m <![CDATA[ q c / MPa]]> / m <![CDATA[ q c / MPa]]> / m <![CDATA[ q c / MPa]]> / m <![CDATA[ q c / MPa]]> 41 1.73 43.1 18.95 45.2 10.69 47.3 7.96 41.1 1.59 43.2 11.64 45.3 14.69 47.4 5.04 41.2 1.57 43.3 11.77 45.4 4.58 47.5 4.88 41.3 1.54 43.4 8.28 45.5 7.18 47.6 4.10 41.4 2.71 43.5 5.44 45.6 9.45 47.7 3.86 41.5 2.01 43.6 9.21 45.7 6.76 47.8 3.70 41.6 5.42 43.7 8.49 45.8 5.09 47.9 3.44 41.7 1.33 43.8 5.29 45.9 4.64 48 3.20 41.8 2.42 43.9 4.34 46 3.26 48.1 3.37 41.9 6.63 44 5.42 46.1 2.86 48.2 3.13 42 7.07 44.1 7.90 46.2 2.76 48.3 3.21 42.1 3.32 44.2 5.52 46.3 2.35 48.4 3.21 42.2 2.22 44.3 5.47 46.4 2.15 48.5 3.37 42.3 1.52 44.4 9.44 46.5 2.16 48.6 3.71 42.4 1.96 44.5 3.92 46.6 2.15 48.7 3.75 42.5 12.36 44.6 10.74 46.7 2.25 48.8 3.95 42.6 1.77 44.7 15.57 46.8 2.27 48.9 4.57 42.7 6.60 44.8 20.11 46.9 2.44 49 3.94 42.8 2.58 44.9 3.85 47 3.74 42.9 9.26 45 3.26 47.1 6.88 43 24.32 45.1 12.52 47.2 5.56

[0101] Pile end resistance at the bottom of the pile

[0102] S5, calculate pile foundation bearing parameters:

[0103] The lateral friction resistance of the entire pile body is calculated using the S3 method as the unit lateral friction resistance of the pile foundation, and the pile end resistance obtained by S4 is used as the unit end resistance; the unit end resistance and unit lateral friction resistance are combined to obtain the pile foundation bearing parameters and output them.

[0104] In the above embodiment, the pile side friction resistance of the whole pile with a length of 45m is calculated and then combined with the result of S4, and the obtained result is compared with the result obtained from the on-site pile test. Figure 4 shown.

[0105] Depend on Figure 4It can be seen that the results calculated by the method of the present invention are close to the measured results, which verifies the rationality and reliability of the method of the present invention.

Claims

1. A method for calculating pile foundation bearing parameters based on penetration testing technology, characterized in that: The following steps are involved: S1, conduct a penetration test at the pile position to obtain the original penetration data; Arrange the sounding holes at the project site and set the sounding hole depth to , the collection interval is ; Get the depth of the probe hole The penetration cone resistance within the range and the friction resistance of the probe side ; S2, cone tip resistance obtained based on S1 Calculate soil bulk density as it changes with burial depth , the internal friction angle changes with the burial depth and the self-weight stress varying with the sampling depth ; S3, calculate the pile foundation side friction according to the pile foundation size: Get the depth of pile foundation into the soil , Pile foundation radius ; Use the acquisition spacing The pile foundation of the buried part is divided into pile nodes, then: ;Will As the number of the pile node, , ; The pile node is calculated by the following formula The lateral friction of pile foundation : ; in, For pile nodes The pile foundation correction factor at ; For pile nodes The distance from the bottom of the pile; is the pile node obtained based on the penetration cone tip resistance The pile circumferential normal stress at , in: For the pile node Cone tip resistance at the same burial depth; is the horizontal resistance coefficient, ; For the pile node Internal friction angle at the same burial depth; For the pile node Deadweight stress at the same sampling depth; For the pile node The external friction angle of the soil at the same burial depth, ; S4, calculate the pile end resistance at the bottom of the pile foundation : The pile end resistance at the bottom of the pile foundation is the pile node The pile end resistance at is calculated by the following formula: ; in, Above the pile bottom and below the bottom of the pile The weighted average of all the cone tip resistances within the range; is the internal friction angle at the bottom of the pile foundation; S5, calculate pile foundation bearing parameters: The side friction resistance of the whole pile body is calculated using the method of S3 and combined with the pile end resistance obtained by S4 to obtain the pile foundation bearing parameters and output them.

2. The method for calculating pile foundation bearing parameters based on penetration testing technology according to claim 1 is characterized in that: In S2: when hour, ; when hour, ; when hour, ; ; in, For burial depth The cone tip resistance at For burial depth The internal friction angle of the soil at For burial depth The soil bulk density at The self-weight stress at different sampling depths is calculated by the following formula: : ; in, is the collection depth, is the collection spacing An integer multiple of .

3. The method for calculating pile foundation bearing parameters based on penetration testing technology according to claim 1 is characterized in that: 。

Citation Information

Patent Citations

  • Method for fabricating large full-capacity tank pile foundation of liquefied natural gas

    CN102677692A

  • Method for determining pile foundation bearing capacity after pile slipping

    CN103938660A

  • Bearing capacity analysis method for pre-drilled pile sinking foundation in dam area

    CN111680341A

  • Method for calculating pressure of soil between double-row piles of foundation pit on pile side on the basis of natural source surface waves

    WO2024032522A1