Hydraulic main valve, hydraulic system and excavator

By adopting an integral casting structure and an independent proportional pilot solenoid valve on the hydraulic main valve, independent control and flow regeneration of the working link in large mining excavators are achieved, and the problems of poor control flexibility and large throttling losses are solved, which improves the The pressure level and compound action coordination meet the needs of high-pressure development.

CN118669383BActive Publication Date: 2024-11-19JIANGSU ADVANCED CONSTR MASCH INNOVATION CENT LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411156311.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-19
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

The existing hydraulic main valves have problems such as poor control flexibility, large throttling losses and low pressure levels in large mining excavators, which cannot meet the needs of high-pressure development.

Method used

The hydraulic main valve adopts an integral casting structure, and each main valve is equipped with an independent proportional pilot solenoid valve and regeneration working link to realize independent control and flow regeneration of each working link. The open center system and closed center system are realized by cutting the working link. to improve pressure bearing capacity and flow utilization rate.

Benefits of technology

It realizes independent control between each working link, reduces throttling losses, improves the coordination of pressure levels and compound actions, meets the needs of high-pressure development, and improves the flow utilization rate through the regeneration work link.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118669383B_ABST
    Figure CN118669383B_ABST
Patent Text Reader

Abstract

The invention discloses a hydraulic main valve, a hydraulic system and an excavator. The hydraulic main valve comprises a regeneration working link 1, a regeneration working link 2, a working link 3, a working link 4, a working link 5, a working link 6, a cut-off working link, a main oil passage, a middle oil passage and an oil return passage; the main oil passage is respectively connected with the oil inlets of the working link 3, the working link 4, the working link 5 and the working link 6, and the oil return passages of the working link 3, the working link 4, the working link 5 and the working link 6 are connected to the oil return passage; the middle oil passage is connected with the oil inlet of the cut-off working link after passing through the working link 3, the working link 4, the working link 5 and the working link 6, and the oil outlet of the cut-off working link is connected to the oil return passage; one of the two working oil outlets of the working link 3 is connected to the oil inlets of the regeneration working link 1 and the regeneration working link 2, the oil outlet of the regeneration working link 1 is connected to the other of the two working oil outlets of the working link 3, and the oil outlet of the regeneration working link 2 is connected to the oil inlet of the main valve; each working link control end is independently controlled by each proportional pilot solenoid valve.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of engineering machinery, and in particular relates to a hydraulic main valve, a hydraulic system and an excavator. Background Art

[0002] Large mining excavators have high requirements for hydraulic system impact resistance, pollution resistance and reliability due to their high pressure, large flow, long continuous operation time and harsh working environment. With the application of large mining excavators in heavy-duty operations in metal mines, their hydraulic systems are developing towards high pressure, and higher requirements are put forward for pressure level, flow level and reliability. In order to meet the large flow demand, a multi-pump multi-main valve hydraulic system is generally adopted. The same main valve is arranged with working links of different actuators. The same actuator is controlled by multiple working links to meet the large flow demand of single action and the coordination demand of compound action. There are currently two main solutions for the main valve. One is the main valve solution using an integral main valve plus an auxiliary valve, and the other is the main valve solution using multiple groups of plate-type main valves.

[0003] The integral main valve body in Scheme 1 is large in size, the casting structure is complex, the oil passages are arranged crosswise, and the casting and processing are difficult. At the same time, the main valve is highly specialized and has poor flexibility, and is only suitable for a specific system. Different working links of the same actuator are controlled by the same proportional pilot solenoid valve, and cannot be controlled separately. In addition, the oil inlet and return of the same working link are controlled by the same valve core, which is mutually coupled, resulting in large throttling losses and energy waste.

[0004] In Scheme 2, the main valve adopts a sheet casting scheme to reduce the difficulty and cost of processing and manufacturing. Each main valve is set with different working links. Multiple working links of the same actuator are arranged on different main valves. The flow priority scheme adopts a series and parallel combination of working links, relying on the valve core shoulder to control the on-off of the oil circuit, and the oil circuit form is single. The high-pressure and low-pressure areas between the sheet casting valve body are sealed by sealing rings, and the system pressure level is low, which is not suitable for the development trend of high pressure. Summary of the invention

[0005] Purpose: In view of at least one of the above technical problems, the present invention provides a hydraulic main valve, a hydraulic system and an excavator.

[0006] Technical solution: To solve the above technical problems, the technical solution adopted by the present invention is:

[0007] In a first aspect, a hydraulic main valve is provided, comprising a regeneration working link 1, a regeneration working link 2, a working link 3, a working link 4, a working link 5, a working link 6, a cut-off working link, an oil inlet, an oil return port, a main oil passage and a middle oil passage connected to the oil inlet, and an oil return oil passage connected to the oil return port;

[0008] The main oil passage is connected to the oil inlets of the working link 3, the working link 4, the working link 5 and the working link 6 respectively, and the oil return ports of the working link 3, the working link 4, the working link 5 and the working link 6 are connected to the oil return passage; the middle oil passage is connected to the oil inlet of the cut-off working link after passing through the working link 3, the working link 4, the working link 5 and the working link 6 in sequence, and the oil outlet of the cut-off working link is connected to the oil return passage, so as to realize the switching between the open center system and the closed center system through the cut-off working link;

[0009] One of the two working oil ports of the working link 3 is connected to the oil inlets of the regeneration working link 1 and the regeneration working link 2 respectively, the oil outlet of the regeneration working link 1 is connected to the other of the two working oil ports of the working link 3, and the oil outlet of the regeneration working link 2 is connected to the oil inlet of the hydraulic main valve;

[0010] The control end of the regeneration working link one is controlled by a proportional pilot solenoid valve one, the control end of the regeneration working link two is controlled by a proportional pilot solenoid valve two, the left and right control ends of the working link three are respectively controlled by a proportional pilot solenoid valve three and a proportional pilot solenoid valve four, the left and right control ends of the working link four are respectively controlled by a proportional pilot solenoid valve five and a proportional pilot solenoid valve six, the left and right control ends of the working link five are respectively controlled by a proportional pilot solenoid valve seven and a proportional pilot solenoid valve eight, the left and right control ends of the working link six are respectively controlled by a proportional pilot solenoid valve nine and a proportional pilot solenoid valve ten, and the control end of the cut-off working link is controlled by a proportional pilot solenoid valve eleven.

[0011] In some embodiments, the hydraulic main valve also includes a flow control valve, and the oil inlet of one of the working links three, four, five, and six is ​​connected to the main oil channel through the flow control valve, which is used to proportionally adjust the flow entering the corresponding working link by adjusting the flow control valve.

[0012] In some embodiments, the hydraulic main valve further includes a main overflow valve, and the return oil passage is connected to the return oil port through the main overflow valve.

[0013] In some embodiments, the hydraulic main valve further includes a load holding valve, and one of the working link three, working link four, working link five, and working link six is ​​connected to the corresponding working oil port through the load holding valve.

[0014] In some embodiments, the working link 3, working link 4, working link 5, and working link 6 are all three-position six-way valves, having a first working position, a middle position, and a second working position;

[0015] The regeneration working link 1, the regeneration working link 2 and the cut-off working link are all two-position two-way valves, having a first position and a second position. When located at the first position, the oil inlet and the oil outlet are connected; when located at the second position, the oil inlet and the oil outlet are not connected.

[0016] In some embodiments, the valve body of the hydraulic main valve adopts an integral casting structure, and the regeneration working link 1, regeneration working link 2, working link 3, working link 4, working link 5, working link 6, and cut-off working link are arranged on the valve body from front to back, wherein the regeneration working link 1 and the regeneration working link 2 are arranged in the same valve core hole.

[0017] In a second aspect, the present invention further provides a hydraulic system, comprising a first main pump, a second main pump, a third main pump, a first travel motor, a second travel motor, a first boom cylinder, a second boom cylinder, a bucket cylinder, a stick cylinder, a swing motor and the hydraulic main valve described in the first aspect, wherein the hydraulic main valve comprises a first main valve, a second main valve and a third main valve;

[0018] The regeneration working link 1 of the first main valve is the regeneration working link 1 of bucket 1, the regeneration working link 2 of the first main valve is the regeneration working link 2 of bucket 1, the working link 3 of the first main valve is the working link 1 of bucket 1, the working link 4 of the first main valve is the first walking working link, the working link 5 of the first main valve is the working link 2 of arm 2, the working link 6 of the first main valve is the working link 1 of boom 1, and the cut-off working link of the first main valve is the first cut-off working link;

[0019] The regeneration working link 1 of the second main valve is the regeneration working link 1 of the bucket arm 1, the regeneration working link 2 of the second main valve is the regeneration working link 2 of the bucket arm 1, the working link 3 of the second main valve is the working link 1 of the bucket arm, the working link 4 of the second main valve is the second walking working link, the working link 5 of the second main valve is the working link 2 of the bucket, the working link 6 of the second main valve is the working link 2 of the boom, and the cut-off working link of the second main valve is the second cut-off working link;

[0020] The regeneration working link 1 of the third main valve is the regeneration working link 1 of the boom 3, the regeneration working link 2 of the third main valve is the regeneration working link 2 of the boom 3, the working link 3 of the third main valve is the working link 3 of the boom 3, the working link 4 of the third main valve is the swing working link, the working link 5 of the third main valve is the working link 3 of the bucket 3, the working link 6 of the third main valve is the working link 3 of the dipper rod, and the cut-off working link of the third main valve is the third cut-off working link;

[0021] The oil outlet of the first main pump is connected to the oil inlet of the first main valve, the oil outlet of the second main pump is connected to the oil inlet of the second main valve, and the oil outlet of the third main pump is connected to the oil inlet of the third main valve;

[0022] The bucket 1 working link, bucket 2 working link and bucket 3 working link are respectively connected to the bucket cylinder through the working oil port;

[0023] The first travel working link is connected to the first travel motor through the working oil port; the second travel working link is connected to the second travel motor through the working oil port; the rotary working link is connected to the rotary motor through the working oil port;

[0024] The second working link of the bucket arm, the first working link of the bucket arm, and the third working link of the bucket arm are respectively connected to the bucket arm cylinder through the working oil port;

[0025] The first boom working link, the second boom working link and the third boom working link are respectively connected to the first boom oil cylinder and the second boom oil cylinder through working oil ports.

[0026] According to a third aspect, an excavator is provided with the hydraulic system according to the second aspect.

[0027] Beneficial effects: The hydraulic main valve, hydraulic system and excavator provided by the present invention, all the working links on each main valve are controlled by an independent proportional pilot solenoid valve, realizing decoupling of the control between each link; each main valve is provided with a cut-off working link, which can realize the switching between the open center system and the closed center system; the main valve is provided with a regeneration working link 1 and a regeneration working link 2, and when the boom / bucket / arm is lowered, the flow of the large chamber / small chamber can be regenerated to the small chamber / large chamber through the regeneration working link 1, thereby increasing the regeneration capacity, and at the same time, it can be regenerated to the main oil circuit through the regeneration working link 2 for use by other working links, and the regeneration working link 1 and the regeneration working link 2 are independently controlled, and the regeneration flow is allocated on demand to realize full utilization of the flow; the main valve adopts an integral casting structure, and cast iron solids are filled between each working link to avoid the sealing structure of the sheet-type structure sealing ring, effectively improving the pressure bearing capacity of the main valve, with a high pressure level, conforming to the development trend of high pressure. The main valve is modularly designed, based on the same valve body, and realizes different functions of the main valve by externally connecting different logic valves and control blocks.

[0028] The system is equipped with multiple hydraulic pumps to meet the ultra-large flow requirements of mining excavators; the main pump adopts an electric proportional variable pump, which controls the displacement and power of the main pump through current, so that the total power of the power system can be distributed to different main valves on demand, thereby improving the freedom of flow distribution; working links of different actuators are arranged on each main valve, so that one main pump can preferentially control a certain actuator, and different actuators can be independently controlled to improve the coordination of compound actions; the flow control valve is used to proportionally control the oil inlet of the working link, and the working link is mainly responsible for the return oil control, so as to realize independent control of the oil inlet and return, reduce the return oil loss, and improve the controllability of the whole machine; multiple main valves are set up to realize the combination of rotation and getting on the car, in which one of the main valves supplies oil for the rotation alone, and the other two main valves supply oil for the getting on the car, and the open system is used to realize independent rotation, without the need for additional closed pumps and closed motors, thereby reducing system costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 is a schematic diagram of a hydraulic system according to an embodiment of the present invention;

[0030] Figure 2 is a schematic diagram of a first main valve according to an embodiment of the present invention;

[0031] Figure 3 is a schematic diagram of a second main valve according to an embodiment of the present invention;

[0032] Figure 4 is a schematic diagram of a third main valve according to an embodiment of the present invention;

[0033] Figures 5 to 7 is a schematic structural diagram of a third main valve according to an embodiment of the present invention;

[0034] Figure 8 According to an embodiment of the present invention Figure 5 Schematic diagram of the AA section;

[0035] Fig. 9 According to an embodiment of the present invention Figure 6 Schematic diagram of the BB section.

[0036] Reference numerals: oil tank 1, power system 2, first main pump 3, second main pump 4, third main pump 5, second travel motor 9, first travel motor 10, first boom cylinder 11, second boom cylinder 12, bucket cylinder 13, arm cylinder 14, swing motor 15,

[0037] First main valve 6: bucket one regeneration working link 1 601, bucket one regeneration working link 2 602, bucket one working link 603, first walking working link 604, bucket rod two working link 605, boom one working link 606, first cut-off working link 607, first proportional pilot solenoid valve 1 608, first proportional pilot solenoid valve 2 609, first proportional pilot solenoid valve 3 610, first proportional pilot solenoid valve 4 611, first proportional pilot solenoid valve 5 612, first proportional pilot solenoid valve 6 613, first proportional pilot solenoid valve 7 614, first proportional pilot solenoid valve 8 615, first proportional pilot solenoid valve 9 616, first proportional pilot solenoid valve 10 617, first proportional pilot solenoid valve 11 618, first main relief valve 619, first check valve 1 620, first check valve Valve 2 621, first check valve 3 622, first check valve 4 623, first flow control valve 624, first check valve 5 625, first priority valve 626, first load holding valve 627; oil inlet P1 of the first main valve, oil return R1 of the first main valve, pilot oil inlet 1 Pf1, pilot oil inlet 2 Pf2, pilot oil return 1 Dr1, pilot oil return 2 Dr2, pilot oil return 3 Dr3, pilot oil return 4 Dr4, control oil port 1 Pna1, control oil port 2 Pna2, first group of working oil port 1 Ac1, first group of working oil port 2 Bc1, second group of working oil port 1 Atr, second group of working oil port 2 Btr, third group of working oil port 1 Aa2, third group of working oil port 2 Ba2, fourth group of working oil port 1 Ab, fourth group of working oil port 2 Bb;

[0038] Second main valve 7: arm regeneration working link 1 701, arm regeneration working link 2 702, arm 1 working link 703, second walking working link 704, bucket 2 working link 705, boom 2 working link 706, second cut-off working link 707, second proportional pilot solenoid valve 1 708, second proportional pilot solenoid valve 2 709, second proportional pilot solenoid valve 3 710, second proportional pilot solenoid valve 4 711, second proportional pilot solenoid valve 5 712, second proportional pilot solenoid valve 6 713, second proportional pilot solenoid valve 714, second proportional pilot solenoid valve 8 715, second proportional pilot solenoid valve 9 716, second proportional pilot solenoid valve 10 717, second proportional pilot solenoid valve 11 718, second main relief valve 719 , second one-way valve one 720, second one-way valve two 721, second flow control valve 722, second one-way valve three 723, second load holding valve 724, second one-way valve four 725, second one-way valve five 726, second one-way valve six 727; oil inlet P2 of the second main valve, oil return port R2 of the second main valve, pilot oil inlet three Pf3, pilot oil inlet four Pf4, pilot oil return port five Dr5, pilot oil return port six Dr6, pilot oil return port seven Dr7, control oil port three Pna3, fifth group working oil port one Aa1, fifth group working oil port two Ba1, sixth group working oil port one Atl, sixth group working oil port two Btl, seventh group working oil port one Ac2, seventh group working oil port two Bc2, eighth group working oil port Ab2;

[0039] The third main valve 8: boom three regeneration working link 1 801, boom three regeneration working link 2 802, boom three working link 803, swing working link 804, bucket three working link 805, stick three working link 806, third cut-off working link 807, third proportional pilot solenoid valve 1 808, third proportional pilot solenoid valve 2 809, third proportional pilot solenoid valve 3 810, third proportional pilot solenoid valve 4 811, third proportional pilot solenoid valve 5 812, third proportional pilot solenoid valve 6 813, third proportional pilot solenoid valve 7 814, third proportional pilot solenoid valve 815, third proportional pilot solenoid valve 9 816, third proportional pilot solenoid valve 10 817, third proportional pilot solenoid valve 11 818, third main relief valve 819, third check valve 1 820, third check valve 2 821, second priority valve 822, third load holding valve 823, The third check valve three 824, the third priority valve 825, the third flow control valve 826, the third check valve four 827, the fourth load holding valve 828; the oil inlet P3 of the third main valve, the oil return port R3 of the third main valve, the pilot oil inlet five Pf5, the pilot oil inlet six Pf6, the pilot oil return port eight Dr8, the pilot oil return port nine Dr9, the pilot oil return port ten Dr10, the pilot oil return port eleven Dr11, the pilot oil return port twelve Dr12, the pilot oil return port thirteen Dr13, the control oil port four Pna4, the control oil port five Pna5, the control oil port six Pna6, the ninth group of working oil port one Ab3, the ninth group of working oil port two Bb3, the tenth group of working oil port one As, the tenth group of working oil port two Bs, the eleventh group of working oil port one Ac3, the eleventh group of working oil port two Bc3, the twelfth group of working oil port one Aa3, the twelfth group of working oil port two Ba3;

[0040] The first oil passage Ⅰ, the second oil passage Ⅱ, the third oil passage Ⅲ, the fourth oil passage Ⅳ, the fifth oil passage V, the sixth oil passage VI, the seventh oil passage VII, the eighth oil passage VIII, the ninth oil passage IX, and the tenth oil passage X. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is by no means intended to limit the present invention and its application or use. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] Unless otherwise specifically stated, the relative arrangement, numerical expressions and numerical values ​​of the parts and steps set forth in these embodiments do not limit the scope of the present invention. Meanwhile, it should be understood that, for ease of description, the sizes of the various parts shown in the accompanying drawings are not drawn according to actual proportional relationships. The technology, methods and equipment known to those of ordinary skill in the relevant art may not be discussed in detail, but in appropriate cases, the technology, methods and equipment should be considered as a part of the specification. In all examples shown and discussed here, any specific value should be interpreted as being merely exemplary, rather than as a limitation. Therefore, other examples of exemplary embodiments may also include different values. It should be noted that similar reference numerals and letters represent similar items in the following drawings, and therefore, once a certain item is defined in an accompanying drawing, it does not need to be further discussed in subsequent drawings.

[0043] In the description of the present invention, "several" means more than one, "many" means more than two, "greater than", "less than", "exceed", etc. are understood to exclude the number itself, and "above", "below", "within", etc. are understood to include the number itself. If there is a description of "first" or "second", it is only used for the purpose of distinguishing the technical features, and cannot be understood as indicating or implying the relative importance or implicitly indicating the number of the indicated technical features or implicitly indicating the order of the indicated technical features.

[0044] In the description of the present invention, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0045] Currently, large-scale mining excavators use a hydraulic system of multiple pumps + multi-plate main valves. The multi-pump configuration meets the large flow requirements of mining excavators. The main valve adopts a solution of an integral main valve and an auxiliary valve in parallel or a solution of multiple plate main valves. Different working links of the same actuator are arranged on different main valves, and these working links are controlled by the same pilot.

[0046] The hydraulic system and main valve of current large mining excavators often have the following shortcomings:

[0047] 1. Multiple working links of the same actuator are set on different main valves. Multiple working links work in reverse direction at the same time, and independent control of different working links cannot be achieved, resulting in poor coordination of actions;

[0048] 2. The working links of the same actuator are switched at the same time, resulting in large system throttling losses;

[0049] 3. The oil inlet and return of the same working link are controlled by the same valve core. When one of them needs a small opening, the other can only open a small opening as well, which is mutually coupled and results in large throttling losses.

[0050] 4. The rotary working joint is coupled with other working joints, or flow distribution is performed by setting a priority valve, which makes compound action debugging difficult and coordination poor; or a closed independent rotary system is used, which increases system costs;

[0051] 5. The preferred solution adopts serial and parallel working connection, relying on the valve core shoulder to control the oil circuit on and off, and the oil circuit form is single;

[0052] 6. The traditional sheet-cast valve body has a low system pressure level and cannot meet the development needs of high pressure.

[0053] To this end, the present application provides a hydraulic main valve, a hydraulic system and an excavator, wherein all the working links on each main valve are controlled by an independent proportional pilot solenoid valve to achieve decoupling of the control between the links; a cut-off working link is set on each main valve to realize the switching between the open center system and the closed center system; a regeneration working link 1 and a regeneration working link 2 are set on the main valve, and when the boom / bucket / arm is lowered, the flow of the large chamber / small chamber can be regenerated to the small chamber / large chamber through the regeneration working link 1 to increase the regeneration capacity, and at the same time, it can be regenerated to the main oil circuit through the regeneration working link 2 for use by other working links, and the regeneration working link 1 and the regeneration working link 2 are independently controlled, and the regeneration flow is allocated on demand to achieve full utilization of the flow; the main valve adopts an integral casting structure, and cast iron solids are filled between the working links to avoid the sealing structure of the sheet-type structure sealing ring, effectively improve the pressure bearing capacity of the main valve, and the pressure level is high, which conforms to the development trend of high pressure. The main valve is modularly designed, based on the same valve body, and different functions of the main valve are realized by externally connecting different logic valves and control blocks.

[0054] Embodiment 1: This embodiment provides a hydraulic main valve, including a regenerative working link 1, a regenerative working link 2, a working link 3, a working link 4, a working link 5, a working link 6, a cut-off working link, an oil inlet, an oil return port, a main oil passage and a middle oil passage connected to the oil inlet, and an oil return oil passage connected to the oil return port;

[0055] The main oil passage is connected to the oil inlets of the working link 3, the working link 4, the working link 5 and the working link 6 respectively, and the oil return ports of the working link 3, the working link 4, the working link 5 and the working link 6 are connected to the oil return passage; the middle oil passage is connected to the oil inlet of the cut-off working link after passing through the working link 3, the working link 4, the working link 5 and the working link 6 in sequence, and the oil outlet of the cut-off working link is connected to the oil return passage, so as to realize the switching between the open center system and the closed center system through the cut-off working link;

[0056] One of the two working oil ports of the working link 3 is connected to the oil inlets of the regeneration working link 1 and the regeneration working link 2 respectively, the oil outlet of the regeneration working link 1 is connected to the other of the two working oil ports of the working link 3, and the oil outlet of the regeneration working link 2 is connected to the oil inlet of the hydraulic main valve;

[0057] The control end of the regeneration working link one is controlled by a proportional pilot solenoid valve one, the control end of the regeneration working link two is controlled by a proportional pilot solenoid valve two, the left and right control ends of the working link three are respectively controlled by a proportional pilot solenoid valve three and a proportional pilot solenoid valve four, the left and right control ends of the working link four are respectively controlled by a proportional pilot solenoid valve five and a proportional pilot solenoid valve six, the left and right control ends of the working link five are respectively controlled by a proportional pilot solenoid valve seven and a proportional pilot solenoid valve eight, the left and right control ends of the working link six are respectively controlled by a proportional pilot solenoid valve nine and a proportional pilot solenoid valve ten, and the control end of the cut-off working link is controlled by a proportional pilot solenoid valve eleven.

[0058] In some embodiments, the hydraulic main valve also includes a flow control valve, and the oil inlet of one of the working links three, four, five, and six is ​​connected to the main oil channel through the flow control valve, which is used to proportionally adjust the flow entering the corresponding working link by adjusting the flow control valve.

[0059] In some embodiments, the hydraulic main valve further includes a main overflow valve, and the return oil passage is connected to the return oil port through the main overflow valve.

[0060] In some embodiments, the hydraulic main valve further includes a load holding valve, and one of the working link three, working link four, working link five, and working link six is ​​connected to the corresponding working oil port through the load holding valve.

[0061] In some embodiments, the working link 3, working link 4, working link 5, and working link 6 are all three-position six-way valves, having a first working position, a middle position, and a second working position;

[0062] The regeneration working link 1, the regeneration working link 2 and the cut-off working link are all two-position two-way valves, having a first position and a second position. When located at the first position, the oil inlet and the oil outlet are connected; when located at the second position, the oil inlet and the oil outlet are not connected.

[0063] In some embodiments, the valve body of the hydraulic main valve adopts an integral casting structure, and the regeneration working link 1, regeneration working link 2, working link 3, working link 4, working link 5, working link 6, and cut-off working link are arranged on the valve body from front to back, wherein the regeneration working link 1 and the regeneration working link 2 are arranged in the same valve core hole.

[0064] In some specific embodiments, Figure 2The figure shows a schematic diagram of the first main valve 6 as an embodiment of the hydraulic main valve, on which the first main valve 6 is provided with a bucket-one regeneration working link 1 601, a bucket-one regeneration working link 2 602, a bucket-one working link 603, a first walking working link 604, a bucket-two working link 605, a boom-one working link 606, a first cutting-off working link 607, a first proportional pilot solenoid valve 1 608, a first proportional pilot solenoid valve 2 609, a first proportional pilot solenoid valve 3 610, a first proportional pilot solenoid valve 4 611, and a first proportional pilot solenoid valve 5 612, the first proportional pilot solenoid valve six 613, the first proportional pilot solenoid valve seven 614, the first proportional pilot solenoid valve eight 615, the first proportional pilot solenoid valve nine 616, the first proportional pilot solenoid valve ten 617, the first proportional pilot solenoid valve eleven 618, the first main overflow valve 619, the first check valve one 620, the first check valve two 621, the first check valve three 622, the first check valve four 623, the first flow control valve 624, the first check valve five 625, the first priority valve 626, and the first load holding valve 627. In addition, there are also provided: an oil inlet P1 of the first main valve, an oil return port R1 of the first main valve, a pilot oil inlet 1 Pf1, a pilot oil inlet 2 Pf2, a pilot oil return port 1 Dr1, a pilot oil return port 2 Dr2, a pilot oil return port 3 Dr3, a pilot oil return port 4 Dr4, a control oil port 1 Pna1, a control oil port 2 Pna2, a first group of working oil ports 1 Ac1, a first group of working oil ports 2 Bc1, a second group of working oil ports 1 Atr, a second group of working oil ports 2 Btr, a third group of working oil ports 1 Aa2, a third group of working oil ports 2 Ba2, a fourth group of working oil ports 1 Ab, a fourth group of working oil ports 2 Bb, wherein the fourth group of working oil ports 1 Ab and the fourth group of working oil ports 2 Bb are used to supply oil to the first boom cylinder 11 and the second boom cylinder 12, and the first group of working oil ports 1 Ac1 and the first group of working oil ports 2 Bc1 are used to supply oil to the bucket cylinder 13. The second group of working oil ports Atr and the second group of working oil ports Btr are used to supply oil to the first travel motor 10. The oil inlet P1 of the first main valve is connected to the oil inlet of the bucket working link 603 through the first check valve 3 622, connected to the first travel working link 604 through the first check valve 4 623, connected to the oil inlet of the bucket working link 605 through the first flow control valve 624 and the first check valve 5 625, connected to the oil inlet of the boom working link 606 through the first priority valve 626, and directly connected to the oil inlet of the first cut-off working link 607, and the oil outlet of the first cut-off working link 607 is connected to the return oil port R1 of the first main valve. The boom working link 606 is connected to the fourth group of working oil ports Ab or the fourth group of working oil ports Bb through the first load holding valve 627.The oil return port R1 of the first main valve, the oil return ports of the bucket 1 working link 603, the first walking working link 604, the arm 2 working link 605, the arm 1 working link 606 and the oil outlet of the first cut-off working link 607 are all connected to the oil return channel, and the oil return channel is connected to the oil inlet P1 of the first main valve through the first main relief valve 619;.

[0065] The first group of working oil ports 1 Ac1 is connected to the small chamber of bucket cylinder 13, the first group of working oil ports 2 Bc1 is connected to the large chamber of bucket cylinder 13, and at the same time, the first group of working oil ports 1 Ac1 is connected to bucket regeneration working link 1 601, and then connected to the first group of working oil ports 2 Bc1 through the first one-way valve 1 620; at the same time, the first group of working oil ports 1 Ac1 is connected to bucket regeneration working link 2 602, and connected to the oil inlet P1 of the first main valve through the first one-way valve 2 621. The second group of working oil ports 1 Atr and the second group of working oil ports 2 Btr are connected to the first travel motor 10, the third group of working oil ports 1 Aa2 is connected to the small chamber of boom cylinder 14, the third group of working oil ports 2 Ba2 is connected to the large chamber of boom cylinder 14, the fourth group of working oil ports 1 Ab is connected to the large chambers of the first boom cylinder 11 and the second boom cylinder 12, and the fourth group of working oil ports 2 Bb is connected to the small chambers of the first boom cylinder 11 and the second boom cylinder 12.

[0066] In some specific embodiments, Figure 3The second main valve 7 is a schematic diagram of another embodiment of the hydraulic main valve. The second main valve 7 is provided with a bucket arm regeneration working link 1 701, a bucket arm regeneration working link 2 702, a bucket arm working link 1 703, a second walking working link 704, a bucket 2 working link 705, a boom 2 working link 706, a second cut-off working link 707, a second proportional pilot solenoid valve 1 708, a second proportional pilot solenoid valve 2 709, a second proportional pilot solenoid valve 3 710, a second proportional pilot solenoid valve 4 711, a second proportional pilot solenoid valve 5 712, and a second proportional pilot solenoid valve 6 713, second proportional pilot solenoid valve seven 714, second proportional pilot solenoid valve eight 715, second proportional pilot solenoid valve nine 716, second proportional pilot solenoid valve ten 717, second proportional pilot solenoid valve eleven 718, second main relief valve 719, second one-way valve one 720, second one-way valve two 721, second flow control valve 722, second one-way valve three 723, second load holding valve 724, second one-way valve four 725, second one-way valve five 726, second one-way valve six 727. Also provided are: the oil inlet P2 of the second main valve, the oil return port R2 of the second main valve, the pilot oil inlet three Pf3, the pilot oil inlet four Pf4, the pilot oil return port five Dr5, the pilot oil return port six Dr6, the pilot oil return port seven Dr7, the control oil port three Pna3, the fifth group of working oil port one Aa1, the fifth group of working oil port two Ba1, the sixth group of working oil port one Atl, the sixth group of working oil port two Btl, the seventh group of working oil port one Ac2, the seventh group of working oil port two Bc2, and the eighth group of working oil port Ab2. The oil inlet P2 of the second main valve is connected to the oil outlet of the second main pump 4, and the oil inlet P2 of the second main valve is connected to the first working link 703 of the bucket arm through the second flow control valve 722 and the second check valve 3 723, connected to the second walking working link 704 through the second check valve 4 725, connected to the second working link 705 of the bucket through the second check valve 5 726, connected to the second working link 706 of the boom through the second check valve 6 727, and connected to the second cutting working link 707. The first working link 703 of the bucket arm is connected to the fifth group of working oil port 1 Aa1 through the second load holding valve 724. The fifth group of working oil ports Aa1 is connected to the small chamber of the arm cylinder 14, the fifth group of working oil ports Ba1 is connected to the large chamber of the arm cylinder 14, and the fifth group of working oil ports Aa1 is connected to the arm regeneration working link 1 701, connected to the fifth group of working oil ports Ba1 through the second one-way valve 720, the fifth group of working oil ports Aa1 is connected to the bucket regeneration working link 2 702, and connected to the oil inlet P2 through the second one-way valve 2 721. The sixth group of working oil ports Atl and the sixth group of working oil ports Btl are connected to the second travel motor, the seventh group of working oil ports Ac2 is connected to the small chamber of the bucket cylinder 13, the seventh group of working oil ports Bc2 is connected to the large chamber of the bucket cylinder 13, and the eighth group of working oil ports Ab2 is connected to the first boom cylinder 11 and the second boom cylinder 12 large chamber.

[0067] In some specific embodiments, Figure 4The third main valve 8 is a schematic diagram of another embodiment of the hydraulic main valve. The third main valve 8 is provided with a boom three-regeneration working link 1 801, a boom three-regeneration working link 2 802, a boom three-regeneration working link 803, a swing working link 804, a bucket three-regeneration working link 805, a bucket rod three-regeneration working link 806, a third cut-off working link 807, a third proportional pilot solenoid valve 1 808, a third proportional pilot solenoid valve 2 809, a third proportional pilot solenoid valve 3 810, a third proportional pilot solenoid valve 4 811, a third proportional pilot solenoid valve 5 812, a third proportional pilot solenoid valve 6 813, a third proportional pilot solenoid valve 7 814, a third proportional pilot solenoid valve 815, a third proportional pilot solenoid valve 816, a third proportional pilot solenoid valve 817, a third proportional pilot solenoid valve 818, a third proportional pilot solenoid valve 819, a third proportional pilot solenoid valve 9 9 Third proportional pilot solenoid valve seven 814, third proportional pilot solenoid valve eight 815, third proportional pilot solenoid valve nine 816, third proportional pilot solenoid valve ten 817, third proportional pilot solenoid valve eleven 818, third main overflow valve 819, third check valve one 820, third check valve two 821, second priority valve 822, third load holding valve 823, third check valve three 824, third priority valve 825, third flow control valve 826, third check valve four 827, fourth load holding valve 828. Also provided are: the oil inlet P3 of the third main valve, the oil return port R3 of the third main valve, the pilot oil inlet five Pf5, the pilot oil inlet six Pf6, the pilot oil return port eight Dr8, the pilot oil return port nine Dr9, the pilot oil return port ten Dr10, the pilot oil return port eleven Dr11, the pilot oil return port twelve Dr12, the pilot oil return port thirteen Dr13, the control oil port four Pna4, the control oil port five Pna5, the control oil port six Pna6, the ninth group of working oil port one Ab3, the ninth group of working oil port two Bb3, the tenth group of working oil port one As, the tenth group of working oil port two Bs, the eleventh group of working oil port one Ac3, the eleventh group of working oil port two Bc3, the twelfth group of working oil port one Aa3, the twelfth group of working oil port two Ba3. The oil inlet P3 of the third main valve is connected to the oil outlet of the third main pump 5, and the oil inlet P3 of the third main valve is connected to the boom three-working link 803 via the second priority valve 822, connected to the swing working link 804 via the third check valve three 824, connected to the bucket three-working link 805 via the third priority valve 825, connected to the arm three-working link 806 via the third flow control valve 826 and the third check valve four 827, and connected to the third cut-off working link 807. The boom three-working link 803 is connected to the oil port Ab3 via the third load holding valve 823, and the arm three-working link 806 is connected to the oil port Aa3 via the fourth load holding valve 828. The ninth group of working oil ports Ab3 is connected to the large chambers of the first boom cylinder 11 and the second boom cylinder 12, the ninth group of working oil ports Bb3 is connected to the small chambers of the first boom cylinder 11 and the second boom cylinder 12, at the same time, the ninth group of working oil ports Ab3 is connected to the boom three regeneration working link 1 801, and is connected to the ninth group of working oil ports Bb3 via the third one-way valve 1 820, the ninth group of working oil ports Ab3 is connected to the boom three regeneration working link 2 802, and is connected to the oil inlet P3 via the third one-way valve 2 821.The tenth group of working oil ports As and the tenth group of working oil ports Bs are connected to the rotary motor 15, the eleventh group of working oil ports Ac3 is connected to the small cavity of the bucket cylinder 13, the eleventh group of working oil ports Bc3 is connected to the large cavity of the bucket cylinder 13, the twelfth group of working oil ports Aa3 is connected to the small cavity of the arm cylinder 14, and the twelfth group of working oil ports Ba3 is connected to the large cavity of the arm cylinder 14.

[0068] The structure of the hydraulic main valve is described by taking the third main valve 8 as an example. Figure 5 , Figure 6 , Figure 7 They are respectively the front, bottom and side structural schematic diagrams of the third main valve 8, Figure 8 and Fig. 9 The figure shows the cross-sectional schematic diagram of two surfaces of the third main valve 8. The valve body adopts an integral casting structure, and the valve body is arranged from front to back in sequence: the first three-regeneration working link 801 of the boom, the second three-regeneration working link 802 of the boom, the third working link 803 of the boom, the rotation working link 804, the third working link 805 of the bucket, the third working link 806 of the arm, and the third cutting working link 807. Among them, the first three-regeneration working link 801 of the boom and the second three-regeneration working link 802 of the boom are arranged in the same valve core hole. The longitudinal section structure of each working link is similar, such as Figure 8 As shown. The valve body is provided with the first oil passage I, the second oil passage II, the third oil passage III, the fourth oil passage IV and the fifth oil passage V. The oil reaches the first oil passage I and the fifth oil passage V directly from the oil inlet P3 of the third main valve. The oil reaches the three working links 803 of the boom, the three working links 804 of the rotary working link 805 of the bucket and the three working links 806 of the dipper arm through the first oil passage I. The three working links 803 of the boom, the three working links 804 of the rotary working link 805 of the bucket and the three working links 806 of the dipper arm are connected in parallel. When any one of the working links is switched to work, the fifth oil passage V is closed. The oil at the first oil passage I can push open the second priority valve 822 to reach the second oil passage II, and reach the ninth group of working oil ports Ab3 or the ninth group of working oil ports Bb3 under the control of the valve core of the three working links 803 of the boom, so as to control the extension or retraction of the first boom cylinder and the second boom cylinder. The second priority valve 822 can proportionally adjust the opening size from the first oil passage I to the second oil passage II under the action of the pilot control signal of the control oil port six Pna6, thereby limiting the amount of oil entering the first boom cylinder and the second boom cylinder.

[0069] In addition, the valve body is also provided with the sixth oil passage VI, the seventh oil passage VII, the eighth oil passage VIII, the ninth oil passage IX and the tenth oil passage X. The sixth oil passage VI is connected to the ninth group of working oil ports Ab3 via the third oil passage III and the third load holding valve 823, and the sixth oil passage VI is connected to the eighth oil passage VIII via the seventh oil passage VII. The boom three-regeneration working link 1 801 controls the size of the connection area between the sixth oil passage VI and the ninth oil passage IX, and the boom three-regeneration working link 2 802 controls the size of the connection area between the eighth oil passage VIII and the tenth oil passage X. The ninth oil channel IX is connected to the ninth group of working oil ports 2 Bb3 via the third one-way valve 1 820, and the tenth oil channel X is connected to the first oil channel I via the third one-way valve 2 821. When the boom is lowered, the third load holding valve 823 opens, and the oil in the large chamber of the first boom cylinder and the second boom cylinder reaches the boom three-regeneration working link 1 801 and the boom three-regeneration working link 2 802 at the same time via the ninth group of working oil ports 1 Ab3, the third oil channel III, the sixth oil channel VI, the seventh oil channel VII, and the eighth oil channel VIII. Under the control of the third proportional pilot solenoid valve 1 808 and the third proportional pilot solenoid valve 2 809, the amount of regenerated oil to the small chamber of the first boom cylinder, the second boom cylinder and the first oil channel I is adjusted.

[0070] To summarize, the present application adopts an integral cast structure main valve, and working links of different actuators are arranged on each main valve. Each working link of each main valve is independently controlled by a corresponding proportional pilot solenoid valve. Different working links of the same actuator can be independently controlled to avoid coupling, and the control is flexible, thereby improving the coordination of compound actions. An open system is used to achieve independent rotation, which is decoupled from the on-board action and reduces the difficulty of debugging. Different working links of the same actuator can switch directions at the same time according to different working conditions, and the system throttling loss is small. The flow priority scheme of the plug-in logic valve is adopted to achieve priority combination according to different working conditions, and the oil channel forms are diverse. An independent dual regeneration oil channel is set in the valve to recycle the potential energy of the actuator. A mid-position cut-off function is set to realize bypass auxiliary control and reduce system impact. The mid-position cut-off valve can realize preheating function and can better adapt to low-temperature working environment. The main valve adopts an integral cast valve body with a high pressure rating, which conforms to the development trend of high pressure.

[0071] Embodiment 2: Based on embodiment 1, this embodiment provides a hydraulic system, such as Figure 1 As shown, it includes a first main pump 3, a second main pump 4, a third main pump 5, a first travel motor 10, a second travel motor 9, a first boom cylinder 11, a second boom cylinder 12, a bucket cylinder 13, a stick cylinder 14, a swing motor 15 and three hydraulic main valves, wherein the hydraulic main valves include a first main valve 6, a second main valve 7 and a third main valve 8;

[0072] The regeneration working link 1 of the first main valve is the bucket 1 regeneration working link 1 601, the regeneration working link 2 of the first main valve is the bucket 1 regeneration working link 2 602, the working link 3 of the first main valve is the bucket 1 working link 603, the working link 4 of the first main valve is the first walking working link 604, the working link 5 of the first main valve is the arm 2 working link 605, the working link 6 of the first main valve is the boom 1 working link 606, and the cut-off working link of the first main valve is the first cut-off working link 607;

[0073] The regeneration working link 1 of the second main valve is the arm 1 regeneration working link 1 701, the regeneration working link 2 of the second main valve is the arm 1 regeneration working link 2 702, the working link 3 of the second main valve is the arm 1 working link 703, the working link 4 of the second main valve is the second walking working link 704, the working link 5 of the second main valve is the bucket 2 working link 705, the working link 6 of the second main valve is the boom 2 working link 706, and the cut-off working link of the second main valve is the second cut-off working link 707;

[0074] The regeneration working link 1 of the third main valve is the boom three regeneration working link 1 801, the regeneration working link 2 of the third main valve is the boom three regeneration working link 2 802, the working link 3 of the third main valve is the boom three working link 803, the working link 4 of the third main valve is the swing working link 804, the working link 5 of the third main valve is the bucket three working link 805, the working link 6 of the third main valve is the arm three working link 806, and the cut-off working link of the third main valve is the third cut-off working link 807;

[0075] The oil outlet of the first main pump 3 is connected to the oil inlet P1 of the first main valve, the oil outlet of the second main pump 4 is connected to the oil inlet P2 of the second main valve, and the oil outlet of the third main pump 5 is connected to the oil inlet P3 of the third main valve;

[0076] The bucket 1 working link 603, bucket 2 working link 705, and bucket 3 working link 805 are respectively connected to the bucket cylinder 13 through the working oil ports;

[0077] The first travel working link 604 is connected to the first travel motor 10 through the working oil port; the second travel working link 704 is connected to the second travel motor 9 through the working oil port; the rotary working link 804 is connected to the rotary motor 15 through the working oil port;

[0078] The arm 2 working link 605, arm 1 working link 703, and arm 3 working link 806 are respectively connected to the arm cylinder 14 through the working oil ports;

[0079] The boom 1 working link 606 , boom 2 working link 706 , and boom 3 working link 803 are respectively connected to the first boom cylinder 11 and the second boom cylinder 12 through working oil ports.

[0080] In some embodiments, the hydraulic system also includes an oil tank 1 and a power system 2, and the output end of the power system 2 drives and connects the first main pump 3, the second main pump 4, and the third main pump 5 respectively; the oil inlets of the first main pump 3, the second main pump 4, and the third main pump 5 are respectively connected to the oil tank 1, and the oil return ports of the first main pump 3, the second main pump 4, and the third main pump 5 are respectively connected to the oil tank 1.

[0081] A first flow control valve 624 is arranged between the second boom working link 605 and the main oil channel on the first main valve 6, a second flow control valve 722 is arranged between the first boom working link 703 and the main oil channel on the second main valve 7, and a third flow control valve 826 is arranged between the third boom working link 806 and the main oil channel on the third main valve 8. The first flow control valve 624, the second flow control valve 722, and the third flow control valve 826 can proportionally adjust the flow entering the second boom working link 605, the first boom working link 703, and the third boom working link 806.

[0082] In some embodiments, a first load holding valve 627 is provided between the boom one working link 606 and the boom working oil port of the first main valve 6, and a third load holding valve 823 is provided between the boom three working link 803 and the boom working oil port of the third main valve 8;

[0083] A second load holding valve 724 is provided between the first boom working link 703 and the boom working oil port of the second main valve 7 , and a fourth load holding valve 828 is provided between the third boom working link 806 and the boom working oil port of the third main valve 8 .

[0084] In some embodiments, the first main valve 6 further includes a first priority valve 626 , and the main oil passage of the first main valve 6 is connected to the oil inlet of the boom-first working link 606 via the first priority valve 626 .

[0085] In some embodiments, the third main valve 8 also includes a second priority valve 822 and a third priority valve 825. The main oil channel of the third main valve 8 is connected to the oil inlet of the boom three-working link 803 via the second priority valve 822, and the main oil channel of the third main valve 8 is connected to the oil inlet of the bucket three-working link 805 via the third priority valve 825.

[0086] In some embodiments, the first walking working link 604 and the second walking working link 704, when in the middle position, the middle oil inlet and the middle oil outlet are connected, and the first oil port and the second oil port are both connected to the oil return port; when in the first working position, the middle oil inlet and the middle oil outlet are not connected, the oil inlet is connected to the first oil port, and the second oil port is connected to the oil return port; when in the second working position, the middle oil inlet and the middle oil outlet are not connected, the oil inlet is connected to the second oil port, and the first oil port is connected to the oil return port.

[0087] In some embodiments, when the bucket one working link 603, the bucket two working link 705, the rotary working link 804, the arm two working link 605, the arm one working link 703, the arm three working link 806, the boom one working link 606, and the boom three working link 803 are in the middle position, only the middle oil inlet is connected to the middle oil outlet; when they are in the first working position, the middle oil inlet is connected to the middle oil outlet, the oil inlet is connected to the first oil port, and the second oil port is connected to the oil return port; when they are in the second working position, the middle oil inlet is connected to the middle oil outlet, the oil inlet is connected to the second oil port, and the first oil port is connected to the oil return port.

[0088] In some embodiments, when the bucket three working links 805 and the boom two working links 706 are in the middle position, only the middle oil inlet and the middle oil outlet are connected; when they are in the first working position, the middle oil inlet and the middle oil outlet are connected, and the oil inlet is connected to the first oil port; when they are in the second working position, the middle oil inlet and the middle oil outlet are connected, and the first oil port is connected to the oil return port.

[0089] In this embodiment, the first oil port of the second boom working link 706 is connected to the large chambers of the first boom cylinder 11 and the second boom cylinder 12 through the eighth group of working oil ports Ab2.

[0090] The working process of the hydraulic system includes:

[0091] A first cut-off working link 607 is provided on the first main valve 6, a second cut-off working link 707 is provided on the second main valve 7, and a third cut-off working link 807 is provided on the third main valve 8, so as to realize the switching between the open center system and the closed center system, and the opening degrees of the first cut-off working link 607, the second cut-off working link 707 and the third cut-off working link 807 can be independently controlled by the first proportional pilot solenoid valve 11 618, the second proportional pilot solenoid valve 11 718 and the third proportional pilot solenoid valve 11 818 respectively. When the whole machine is just started, the main pump outputs a small amount of flow, and the first cut-off working joint 607, the second cut-off working joint 707, and the third cut-off working joint 807 open a small opening, relying on the valve port throttling to achieve a rapid increase in oil temperature and quickly enter the working state; when there is a working joint working normally, the cut-off valve core is completely closed to reduce the flow directly returning to the oil tank through the return oil port, so that all the oil enters the working joint and improves the oil utilization rate; when there is no actuator action, the cut-off working joint is opened to achieve the flow of a small amount of oil in the open center system, and improve the response speed of the main pump and system when there is action. When the first cut-off working joint 607, the second cut-off working joint 707, and the third cut-off working joint 807 are completely closed, it can be switched to a closed center system.

[0092] When the boom descends, the boom three working links 803 work in the left position under the action of the third proportional pilot solenoid valve three 810, the first boom cylinder 11 and the second boom cylinder 12 take oil into the small chamber, and return oil to the large chamber, and the oil in the large chamber reaches the boom three working links 803, the boom three regeneration working links one 801 and the boom three regeneration working links two 802 at the same time through the ninth group of working oil ports one Ab3 and the opened third load holding valve 823. The oil reaching the boom three working links 803 returns to the oil tank, and the boom three regeneration working links 1 801 and the boom three regeneration working links 2 802 respectively work in the left position under the action of the third proportional pilot solenoid valve 1 808 and the third proportional pilot solenoid valve 2 809. The oil reaching the boom three regeneration working links 1 801 reaches the small chambers of the first boom cylinder 11 and the second boom cylinder 12 through the third one-way valve 1 820 and the working oil port Bb3 to realize flow regeneration; the oil reaching the boom three regeneration working links 2 802 reaches the oil inlet P3 of the third main valve through the third one-way valve 2 821, that is, reaches the main oil channel, and can be used by other working links on the third main valve 8. At the same time, the boom three-regeneration working link 1 801 and the boom three-regeneration working link 2 802 can proportionally adjust the opening amount under the action of the third proportional pilot solenoid valve 1 808 and the third proportional pilot solenoid valve 2 809, and reasonably distribute the flow of regeneration to the first boom cylinder, the second boom cylinder small chamber and the main oil channel of the third main valve.

[0093] It is worth noting that the boom-one working link 606 on the first main valve 6 can realize that when the boom is lowered, the flow of the first boom oil cylinder and the second boom oil cylinder large cavity is regenerated to the first boom oil cylinder and the second boom oil cylinder small cavity through the valve core. However, due to the large flow of the mining excavator, the regeneration area in the valve core is limited, which will cause a lot of flow waste. Under the action of the boom-three regeneration working link 1 801 of the third main valve 8, the regeneration channel in the valve is increased, the flow regeneration rate is improved, and the energy consumption is effectively reduced.

[0094] Similarly, the bucket one regeneration working link 601 set on the first main valve 6 and the bucket two working link 705 set on the second main valve 7 can realize the double regeneration of the flow in the small chamber of the bucket cylinder 13 to the large chamber of the bucket cylinder 13 and the main oil channel of the oil inlet P1 of the first main valve when the bucket is retracted; the arm one regeneration working link 701 set on the second main valve 7 and the arm two working link 605 set on the first main valve 6 can realize the double regeneration of the flow in the small chamber of the arm cylinder 14 to the large chamber of the arm cylinder 14 and the main oil channel of the second main valve when the arm is retracted.

[0095] When the boom is in single action: the oil of the first main pump 3 passes through the oil inlet P1 of the first main valve and the first priority valve 626. At this time, there is no pilot oil in the control oil port 2 Pna2, and the first priority valve 626 is in a fully open state. The oil reaches the boom working link 606, and the first proportional pilot solenoid valve 9 616 and the first proportional pilot solenoid valve 10 617 control the boom working link 626 to work in the left, middle and right working positions, thereby controlling the oil to reach the fourth group of working oil ports 1 Ab or the fourth group of working oil ports 2 Bb; the oil of the second main pump 4 passes through the oil inlet P2 of the second main valve and the second check valve 6 727 to reach the boom working link 706, and the second proportional pilot solenoid valve 9 716 and the second proportional pilot solenoid valve 10 717 control the boom working link 706 to work in the left, middle and right working positions, thereby controlling whether the oil reaches the working oil port group 8 working oil port Ab2; the oil of the third main pump 5 passes through the third The oil inlet P3 of the main valve and the second priority valve 822, at this time, the control oil port four Pna4 has no pilot oil, the second priority valve 822 is in a fully open state, and the oil reaches the boom three working joint 803, the third proportional pilot solenoid valve three 810 and the third proportional pilot solenoid valve four 811 control the boom three working joint 803 to work in the left, middle and right working positions, and then control the oil to reach the ninth group of working oil ports one Ab3 or the ninth group of working oil ports two Bb3; the oil at the fourth group of working oil ports one Ab, the eighth group of working oil ports Ab2 and the ninth group of working oil ports one Ab3 merge and reach the large chamber of the first boom cylinder 11 and the second boom cylinder 12, and the oil at the fourth group of working oil ports two Bb and the ninth group of working oil ports two Bb3 merge and reach the small chamber of the first boom cylinder 11 and the second boom cylinder 12, controlling the extension or retraction of the first boom cylinder 11 and the second boom cylinder 12. The first boom cylinder 11 and the second boom cylinder 12 can obtain the combined flow of the first main pump 3, the second main pump 4 and the third main pump 5 at most to meet the needs of rapid action. At the same time, the displacement of the three pumps can also be adjusted separately to output the appropriate amount of oil required for the cylinder movement speed.

[0096] At the same time, the first boom cylinder and the second boom cylinder are controlled by three working joints arranged on different main valves. The three working joints are independently controlled by six proportional pilot solenoid valves, and each working joint is independent of each other. When the boom is lowered, in order to prevent air suction, it is generally necessary to increase the return oil back pressure. In the traditional scheme, two or three boom working joints are controlled by the same pilot, resulting in the mutual coupling of the opening of the oil inlet and return oil ports on the same working joint valve core. If the return oil back pressure needs to be increased, the return oil opening must be reduced, which is inevitably accompanied by a reduction in the oil inlet opening, which increases the pressure loss of the oil inlet and increases the energy consumption of the whole machine. In this scheme, the opening degrees of the three working links of the boom can be adjusted independently. The working link 606 of the first boom is mainly responsible for oil inlet control. The opening degree is larger to reduce pressure loss. At the same time, the large cavity flow rate can be regenerated to the small cavity through the valve core structure; the working link 706 of the second boom mainly controls the return oil of the large cavity of the cylinder. The return oil can be independently adjusted to a very small opening, and sufficient back pressure can be provided according to the load to prevent cavitation; the working link 803 of the third boom assists in adjusting the overall working performance and improves the controllability. At the same time, the regeneration of the large cavity flow rate to the small cavity is realized through the third regeneration working link 801 of the boom.

[0097] The overall working process of the bucket and boom single action is the same as that of the boom.

[0098] Compound movements:

[0099] Rotation + boarding combination: In order to optimize the flow distribution during the combined action of rotation and boarding, the scheme of setting a priority valve or adopting an independent closed rotary system is often adopted, which increases the complexity and cost of the system. In this scheme, the third main pump 5 can supply oil to the rotary working link 804 alone, and the first main pump 3 and the second main pump 4 can supply oil to the boarding alone or simultaneously, realizing the decoupling of rotation and boarding, optimizing the control performance, and reducing the difficulty of debugging.

[0100] Arm + bucket compound: a first flow control valve 624 is arranged at the front end of the second working link 605 of the arm on the first main valve 6, a second flow control valve 722 is arranged at the front end of the first working link 703 of the arm on the second main valve 7, a third flow control valve 826 is arranged at the front end of the third working link 806 of the arm on the third main valve 8, and the first flow control valve 624, the second flow control valve 722 and the third flow control valve 826 can proportionally adjust the flow rate passing through them under the action of the oil inlet Pna1, the third Pna3 and the sixth Pna6 to realize the oil inlet control of the arm working link. When the arm and bucket are in composite motion, the flow entering the arm cylinder 14 can be adjusted by adjusting the opening of the first flow control valve 624, the second flow control valve 722, and the third flow control valve 826. The opening of the first flow control valve 624 on the first main valve 6 is adjusted to be smaller, so that the first main pump 3 mainly supplies oil to the bucket cylinder 13, the second main pump 4 and the second main valve 7 mainly supply oil to the arm cylinder 14, and the third main valve 8 proportionally adjusts the flow entering the arm cylinder and the bucket cylinder by adjusting the opening of the third flow control valve 826 and the third priority valve 825 before the bucket three-working joint 805. In this way, the coordination of the composite motion of the arm + bucket is achieved.

[0101] The same goes for other compound movements.

[0102] On the other hand, since the first flow control valve 624, the second flow control valve 722, and the third flow control valve 826 can proportionally adjust the flow entering the second boom working link 605, the first boom working link 703, and the third boom working link 806, the three working links do not need to control the oil inlet through throttling, but are mainly responsible for oil return control. The opening can be made larger, increasing the oil return area to reduce the return oil pressure loss, thereby realizing independent control of the oil inlet and return.

[0103] It is worth noting that: the first main pump 3, the second main pump 4, and the third main pump 5 adopt electric proportional variable pumps, which can distribute the engine power to the three main pumps through the controller current signal, thereby increasing the flexibility of the system flow distribution.

[0104] In summary, the present application provides a multi-pump-multi-main valve independently controlled hydraulic system and main valve suitable for large-scale mining excavators with ultra-high pressure and ultra-large flow. The system mainly includes a power system, multiple main pumps, multiple integral main valves, actuator cylinders and motors, etc. Multiple hydraulic pumps are set to meet the ultra-large flow requirements of mining excavators; the main pump adopts an electric proportional variable pump, and the displacement and power of the main pump are controlled by current, so that the total power of the power system is distributed to different main valves as needed, thereby improving the freedom of flow distribution; all working links on each main valve are controlled by an independent proportional pilot solenoid valve to achieve decoupling of control between links; working links of different actuators are arranged on each main valve, so that a main pump can preferentially control a certain actuator, and different actuators can be independently controlled to improve the coordination of compound actions; the flow control valve is used to proportionally control the oil inlet of the working link, and the working link is mainly responsible for the return oil control, so as to achieve independent control of the inlet and return oil and reduce the return oil loss; multiple main valves are set to realize that one of the main valves is separately used when rotating and getting on the vehicle. The main valve is used for rotary oil supply, and the other two main valves are used for oil supply to the vehicle. An open system is used to achieve independent rotation, and there is no need to add additional closed pumps and closed motors, which reduces system costs. Regeneration working links 1 and 2 are set on the main valve. When the boom / bucket / arm is lowered, the flow of the large chamber / small chamber can be regenerated to the small chamber / large chamber through the regeneration working link 1, thereby increasing the regeneration capacity. At the same time, it can be regenerated to the main oil circuit through the regeneration working link 2 for use by other working links. The regeneration working link 1 and the regeneration working link 2 are independently controlled, and the regeneration flow is distributed as needed to achieve full utilization of the flow. The main valve adopts an integral casting structure, and cast iron entities are filled between the working links to avoid the sealing structure of the sheet-type structure sealing ring, effectively improving the pressure-bearing capacity of the main valve, with a high pressure rating, in line with the development trend of high pressure.

[0105] Embodiment 3: This embodiment provides an excavator equipped with the hydraulic system described in Embodiment 2.

[0106] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the protection content of the present invention.

[0107] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A hydraulic main valve, characterized in that: It includes a regeneration working link 1, a regeneration working link 2, a working link 3, a working link 4, a working link 5, a working link 6, a cut-off working link, an oil inlet, an oil return port, a main oil passage and a middle oil passage connected with the oil inlet, and an oil return oil passage connected with the oil return port; The main oil passage is connected to the oil inlets of the working link 3, the working link 4, the working link 5 and the working link 6 respectively, and the oil return ports of the working link 3, the working link 4, the working link 5 and the working link 6 are connected to the oil return passage; the middle oil passage is connected to the oil inlet of the cut-off working link after passing through the working link 3, the working link 4, the working link 5 and the working link 6 in sequence, and the oil outlet of the cut-off working link is connected to the oil return passage, so as to realize the switching between the open center system and the closed center system through the cut-off working link; One of the two working oil ports of the working link 3 is connected to the oil inlets of the regeneration working link 1 and the regeneration working link 2 respectively, the oil outlet of the regeneration working link 1 is connected to the other of the two working oil ports of the working link 3, and the oil outlet of the regeneration working link 2 is connected to the oil inlet of the hydraulic main valve; The control end of the regeneration working link one is controlled by a proportional pilot solenoid valve one, the control end of the regeneration working link two is controlled by a proportional pilot solenoid valve two, the left and right control ends of the working link three are respectively controlled by a proportional pilot solenoid valve three and a proportional pilot solenoid valve four, the left and right control ends of the working link four are respectively controlled by a proportional pilot solenoid valve five and a proportional pilot solenoid valve six, the left and right control ends of the working link five are respectively controlled by a proportional pilot solenoid valve seven and a proportional pilot solenoid valve eight, the left and right control ends of the working link six are respectively controlled by a proportional pilot solenoid valve nine and a proportional pilot solenoid valve ten, and the control end of the cut-off working link is controlled by a proportional pilot solenoid valve eleven.

2. The hydraulic main valve according to claim 1, characterized in that: It also includes a flow control valve, and the oil inlet of one of the working links three, four, five and six is ​​connected to the main oil channel through the flow control valve, which is used to adjust the flow entering the corresponding working link by adjusting the ratio of the flow control valve.

3. The hydraulic main valve according to claim 1, characterized in that: It also includes a main overflow valve, and the oil return passage is connected to the oil return port through the main overflow valve.

4. The hydraulic main valve according to claim 1, characterized in that: The working connection 3, working connection 4, working connection 5 and working connection 6 are all three-position six-way valves, having a first working position, a middle position and a second working position; The regeneration working link 1, the regeneration working link 2 and the cut-off working link are all two-position two-way valves, having a first position and a second position. When located at the first position, the oil inlet and the oil outlet are connected; when located at the second position, the oil inlet and the oil outlet are not connected.

5. The hydraulic main valve according to claim 1, characterized in that: The valve body of the hydraulic main valve adopts an integral casting structure, and the regeneration working link 1, the regeneration working link 2, the working link 3, the working link 4, the working link 5, the working link 6, and the cut-off working link are arranged on the valve body from front to back, wherein the regeneration working link 1 and the regeneration working link 2 are arranged in the same valve core hole.

6. A hydraulic system, characterized in that: It comprises a first main pump (3), a second main pump (4), a third main pump (5), a first travel motor (10), a second travel motor (9), a first boom cylinder (11), a second boom cylinder (12), a bucket cylinder (13), a stick cylinder (14), a slewing motor (15), and a hydraulic main valve according to any one of claims 1 to 5, wherein the hydraulic main valve comprises a first main valve (6), a second main valve (7), and a third main valve (8); The regeneration working link 1 of the first main valve is the bucket 1 regeneration working link 1 (601), the regeneration working link 2 of the first main valve is the bucket 1 regeneration working link 2 (602), the working link 3 of the first main valve is the bucket 1 working link (603), the working link 4 of the first main valve is the first travel working link (604), the working link 5 of the first main valve is the arm 2 working link (605), the working link 6 of the first main valve is the boom 1 working link (606), and the cut-off working link of the first main valve is the first cut-off working link (607); The regeneration working link 1 of the second main valve is the arm 1 regeneration working link 1 (701), the regeneration working link 2 of the second main valve is the arm 1 regeneration working link 2 (702), the working link 3 of the second main valve is the arm 1 working link (703), the working link 4 of the second main valve is the second travel working link (704), the working link 5 of the second main valve is the bucket 2 working link (705), the working link 6 of the second main valve is the boom 2 working link (706), and the cut-off working link of the second main valve is the second cut-off working link (707); wherein the regeneration working link 1 of the third main valve is the boom three regeneration working link 1 (801), the regeneration working link 2 of the third main valve is the boom three regeneration working link 2 (802), the working link 3 of the third main valve is the boom three working link (803), the working link 4 of the third main valve is the swing working link (804), the working link 5 of the third main valve is the bucket three working link (805), the working link 6 of the third main valve is the arm three working link (806), and the cut-off working link of the third main valve is the third cut-off working link (807); The oil outlet of the first main pump (3) is connected to the oil inlet of the first main valve, the oil outlet of the second main pump (4) is connected to the oil inlet of the second main valve, and the oil outlet of the third main pump (5) is connected to the oil inlet of the third main valve; The bucket 1 working link (603), bucket 2 working link (705), and bucket 3 working link (805) are respectively connected to the bucket cylinder (13) via working oil ports; The first travel working link (604) is connected to the first travel motor (10) via a working oil port; the second travel working link (704) is connected to the second travel motor (9) via a working oil port; the rotary working link (804) is connected to the rotary motor (15) via a working oil port; The bucket arm second working link (605), bucket arm first working link (703), and bucket arm third working link (806) are respectively connected to the bucket arm oil cylinder (14) through the working oil ports; The first boom working link (606), the second boom working link (706), and the third boom working link (803) are respectively connected to the first boom oil cylinder (11) and the second boom oil cylinder (12) through working oil ports.

7. The hydraulic system according to claim 6, characterized in that: The first main pump (3), the second main pump (4) and the third main pump (5) are all electric proportional variable pumps, which can adjust the displacement and power according to the control current, so as to achieve the distribution of the total power of the power system to the corresponding main valves as needed.

8. The hydraulic system according to claim 6, characterized in that: A first flow control valve (624) is arranged between the second working link (605) of the boom and the main oil channel on the first main valve (6), a second flow control valve (722) is arranged between the first working link (703) of the boom and the main oil channel on the second main valve (7), and a third flow control valve (826) is arranged between the third working link (806) of the boom and the main oil channel on the third main valve (8). The first flow control valve (624), the second flow control valve (722) and the third flow control valve (826) are capable of proportionally adjusting the flow rates entering the second working link (605), the first working link (703) of the boom and the third working link (806) of the boom.

9. The hydraulic system according to claim 6, characterized in that: A first load holding valve (627) is provided between the boom first working link (606) and the boom working oil port of the first main valve (6), and a third load holding valve (823) is provided between the boom third working link (803) and the boom working oil port of the third main valve (8); A second load holding valve (724) is provided between the first boom working link (703) and the boom working oil port of the second main valve (7), and a fourth load holding valve (828) is provided between the third boom working link (806) and the boom working oil port of the third main valve (8).

10. The hydraulic system according to claim 6, characterized in that: The first main valve (6) further comprises a first priority valve (626), and a main oil passage of the first main valve (6) is connected to an oil inlet of a boom first working link (606) via the first priority valve (626).

11. The hydraulic system according to claim 6, characterized in that: The third main valve (8) further comprises a second priority valve (822) and a third priority valve (825); the main oil passage of the third main valve (8) is connected to the oil inlet of the boom three-working joint (803) via the second priority valve (822); the main oil passage of the third main valve (8) is connected to the oil inlet of the bucket three-working joint (805) via the third priority valve (825).

12. The hydraulic system according to claim 6, characterized in that: When the first walking working link (604) and the second walking working link (704) are in the middle position, the middle oil inlet and the middle oil outlet are connected, and the first oil port and the second oil port are both connected to the oil return port; when they are in the first working position, the middle oil inlet and the middle oil outlet are not connected, the oil inlet and the first oil port are connected, and the second oil port is connected to the oil return port; when they are in the second working position, the middle oil inlet and the middle oil outlet are not connected, the oil inlet and the second oil port are connected, and the first oil port is connected to the oil return port.

13. The hydraulic system according to claim 6, characterized in that: When the bucket one working unit (603), the bucket two working unit (705), the slewing working unit (804), the arm two working unit (605), the arm one working unit (703), the arm three working unit (806), the boom one working unit (606), and the boom three working unit (803) are in the middle position, only the middle oil inlet is connected to the middle oil outlet; when they are in the first working position, the middle oil inlet is connected to the middle oil outlet, the oil inlet is connected to the first oil port, and the second oil port is connected to the oil return port; when they are in the second working position, the middle oil inlet is connected to the middle oil outlet, the oil inlet is connected to the second oil port, and the first oil port is connected to the oil return port.

14. The hydraulic system according to claim 6, characterized in that: When the bucket three working joints (805) and the boom two working joints (706) are in the middle position, only the middle oil inlet and the middle oil outlet are connected; when they are in the first working position, the middle oil inlet and the middle oil outlet are connected, and the oil inlet and the first oil port are connected; when they are in the second working position, the middle oil inlet and the middle oil outlet are connected, and the first oil port and the oil return port are connected.

15. An excavator, characterized in that: A hydraulic system according to any one of claims 6 to 14 is provided.