Steel pull rod anchoring system for anchoring main cable of suspension bridge and steel pull rod replacing method

By designing rod passages and locking components in the main cable anchoring system of the suspension bridge, the reliability and replaceability of the prestressed anchoring system are achieved, the problems of prestressed loss and safety hazards in the existing technology are solved, and the main cable is improved. The security of anchorage and the durability of steel tie rods.

CN118727595APending Publication Date: 2024-10-01DEYANG TIANYUAN HEAVY IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411053101.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The existing prestressed anchoring system in the form of a steel tie rod structure has safety hazards such as prestress loss and non-replacement during service, which affects the safety of the main cable anchorage.

Method used

A steel tie rod anchoring system for the main cable anchorage of the suspension bridge is designed. By forming a rod passage in the anchorage, the steel tie rods are inserted and the locking components are used for prestressed tension to ensure that the prestress will not be damaged due to dry shrinkage of the anchorage concrete. loss, and introduce dehumidifiers and sealing covers into the anchoring structure to achieve drying and replaceability of steel tie rods.

Benefits of technology

It effectively maintains the prestress, reduces the fatigue of the steel tie rods, ensures the safety of the main cable anchorage, delays the decrease in the durability of the steel tie rods, and reduces the impact of corrosion through drying and ventilation measures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118727595A_ABST
    Figure CN118727595A_ABST
Patent Text Reader

Abstract

The invention discloses a steel pull rod anchoring system for anchoring a main cable of a suspension bridge and a steel pull rod replacing method, the steel pull rod anchoring system comprises a cable strand connecting mechanism connected with a cable strand and a prestress anchoring mechanism anchored in an anchorage, and the cable strand connecting mechanism is connected to the tensioning end of the prestress anchoring mechanism through a connecting flat plate; the position, used for anchoring the prestress anchoring mechanism, of the anchorage is provided with a rod penetrating channel. The prestress anchoring mechanism is provided with steel pull rods, the steel pull rods are installed in the corresponding rod penetrating channels in a penetrating mode, the anchoring ends of the steel pull rods are connected with anchoring end locking assemblies at the rear anchoring ends of the corresponding rod penetrating channels, and the tensioning ends of the steel pull rods extend out of the corresponding rod penetrating channels and are connected with the connecting flat plate through the tensioning end locking assemblies. And an annular space in clearance fit is formed between the outer wall of the steel pull rod and the inner wall of the corresponding rod penetrating channel. The steel pull rods are anchored in the corresponding rod penetrating channels in the anchorage in a rod penetrating mode in a non-adhesive mode, on one hand, prestress tension can be reliably kept, and on the other hand, the steel pull rods can be replaced after stress is unloaded.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to suspension bridge main cable anchoring technology, specifically a steel tie rod anchoring system for anchoring the main cable of a suspension bridge, and a method for replacing the steel tie rod based on the steel tie rod anchoring system. Background Technology

[0002] In a suspension bridge structure, the main cable is the core load-bearing structure that bears the dynamic and static loads of the bridge. To ensure the reliable bearing capacity of the main cable for the dynamic and static loads of the bridge, the ends of the main cable are anchored to corresponding anchorages through an anchorage system after diverging. In other words, the main cable evenly distributes the load it bears to the corresponding anchorage through the anchorage system, and then the anchorage transfers the load to the foundation or rock mass to meet the overall load-bearing technical requirements of the suspension bridge structure.

[0003] Prestressed anchoring systems are one of the common anchoring structures used for the main cable anchoring of suspension bridges. They consist of a cable strand connection mechanism that connects the cable strands and a prestressed anchoring mechanism that anchors in the anchorage. The adjusting tie rod of the cable strand connection mechanism is connected to the tensioning end of the prestressed anchoring mechanism through a connecting plate. Examples of such technologies published in Chinese patent documents include "Anchorage Device for Main Cable Strands of Anchorage in Suspension Bridge" (Publication No. CN 110578296 A, Publication Date December 17, 2019), "Anchoring Structure and Construction Method of Replaceable Anchorage Anchoring System Tie Rod and Connector" (Publication No. CN114197337 A, Publication Date March 18, 2022), and "A Steel Anchor Rod Main Cable Anchoring Device for Suspension Bridges" (Publication No. CN 205242261 U, Publication Date May 18, 2016). Compared with traditional steel anchoring systems, prestressed anchoring systems have technical advantages such as smaller overall project size, less steel consumption, flexible layout, and convenient manufacturing and installation.

[0004] There are two structural forms for the anchorage of prestressed anchorage systems in anchorages. One is the steel strand anchorage structure, such as the technology in publication numbers CN 110578296 A and CN 114197337 A. The other is the steel tie rod anchorage structure, such as the technology in publication number CN205242261 U.

[0005] The prestressed anchoring system with steel strand structure is currently the most widely used prestressed anchoring system. It involves anchoring multiple steel strands into corresponding anchoring channels in the anchorage. The anchoring channels are then filled with grease using a vacuum grouting method to seal and protect the steel strands from corrosion. However, because the density of the grouting is difficult to guarantee, it can easily affect the durability of the seal and corrosion protection of the steel strands. Therefore, during later service, the steel strands need to be replaced based on their corrosion and aging condition. Furthermore, the multi-strand steel strand anchoring structure makes its prestressed stress structure relatively complex, leading to a more troublesome and technically challenging prestressing adjustment process. In other words, the installation and anchoring process, as well as the subsequent steel strand replacement process, are complex, technically difficult, and costly.

[0006] Prestressed anchoring systems with steel tie rod structures replace steel strands with a single, simple, and clearly defined steel tie rod, effectively solving the technical problem of complex force systems in the anchoring process of multi-strand steel strands. However, current prestressed anchoring systems with steel tie rod structures permanently anchor the steel tie rod into the anchorage, as in the technology published in CN 205242261 U. The steel tie rod is permanently anchored into the anchorage through connectors at the rear anchor end, a rear anchor plate, and spiral reinforcement, similar to traditional steel section anchoring systems. The corrosion protection of the steel anchor rod within the anchorage relies entirely on the durability of the protective layer on its outer surface, and it cannot be replaced. In the early stages after anchoring, the prestressing force of this type of anchoring structure can be guaranteed. However, in the later stages after anchoring, the gradual drying and shrinkage of the anchor concrete will lead to a serious loss of prestress, resulting in poor prestressing of the steel tie rod during service, which will adversely affect the safety of the main cable anchoring. In addition, under the continuous corrosion of water and other corrosive substances, as the outer protective layer of the steel tie rod gradually ages, corrosion of the steel tie rod is inevitable during service. In an anchoring structure that cannot be replaced, this directly increases the safety hazards of the bridge during service.

[0007] In the prior art possessed by the applicant, no technology has been disclosed that can effectively solve the service safety hazards of prestressed anchoring systems with steel tie rod structures. Based on the technical characteristics and existing technical problems of prestressed anchoring systems with steel tie rod structures, the applicant believes it is necessary to develop a prestressed anchoring system with steel tie rod structures that can reliably maintain prestress and is replaceable during service. Summary of the Invention

[0008] The technical objective of this invention is to provide a steel tie rod anchoring system for main cable anchoring of suspension bridges that reliably maintains prestress and allows for steel tie rod replacement during service, taking into account the special characteristics of the prestressed anchoring system with the aforementioned steel tie rod structure and the shortcomings of the prior art, as well as a method for replacing steel tie rods based on this steel tie rod anchoring system.

[0009] The technical objective of this invention is achieved through the following technical solution: a steel tie rod anchoring system for anchoring the main cable of a suspension bridge, comprising a cable strand connecting mechanism for connecting the cable strands and a prestressed anchoring mechanism for anchoring in the anchorage. The cable connection mechanism is connected to the tensioning end of the prestressed anchoring mechanism via a connecting plate; The anchor has a rod-through channel at the location used to anchor the prestressed anchoring mechanism; The prestressed anchoring mechanism has a steel tie rod, which is inserted into a corresponding through-rod channel. The anchoring end of the steel tie rod is connected to an anchoring end locking assembly at the rear anchoring end of the corresponding through-rod channel. The tensioning end of the steel tie rod extends out of the corresponding through-rod channel and is connected to the connecting plate through the tensioning end locking assembly. A clearance fit annular space is formed between the outer wall of the steel tie rod and the inner wall of the corresponding through-rod channel.

[0010] The aforementioned technical measures address the unique characteristics of the prestressed anchorage system with the aforementioned steel tie rod structure. A through-rod channel is formed within the anchorage for the steel tie rod. The steel tie rod, inserted into the corresponding through-rod channel, has its anchoring and tensioning ends prestressed at the relative structural locations according to construction requirements via corresponding locking components. This prestressing is reliably maintained and is largely unaffected by the drying shrinkage of the anchorage concrete, thus reducing the adverse effects of alternating loads on the steel tie rod during cable installation and effectively reducing fatigue of the steel tie rod itself. Furthermore, the steel tie rod is anchored to the corresponding through-rod channel in the anchorage using a non-adhesive method. The steel tie rod does not form a permanent anchorage within the corresponding through-rod channel and is replaceable after unloading. Therefore, during service, any potential safety hazards arising from the steel tie rod can be addressed by disassembling and replacing it, which helps to reliably ensure the safety of the main cable anchorage.

[0011] As one of the preferred solutions, the anchoring end locking assembly mainly consists of an anchoring end spherical washer and an anchoring end nut. Under the locking force of the anchoring end nut, the anchoring end spherical washer abuts against the rear anchoring end of the rod passage. The anchor end spherical washer is provided with an anchor end vent hole 1. The outer end of the anchor end vent hole 1 is connected to a dehumidifier, and the inner end of the anchor end vent hole 1 is connected to the annular space between the steel tie rod and the rod passage. The dehumidifier is used to blow air from the anchoring end of the steel tie rod to the tensioning end for dehumidification.

[0012] The above-mentioned technical measures are based on the anchoring end locking assembly of the steel tie rod. Without affecting the anchoring structure of the steel tie rod, a dehumidifier is connected to blow dry air into the annulus of the rod passage to dehumidify the steel tie rod. This keeps the steel tie rod in the annulus of the rod passage dry and basically clean during service, reduces the corrosion caused by moisture and other corrosive substances to the steel tie rod, and prolongs the service life of the steel tie rod.

[0013] As one of the preferred solutions, the rear anchor end of the through-rod channel is connected to an anchor end that encloses the steel tie rod and an anchor end sealing cover of the anchor end locking assembly; The anchor end sealing cover is connected to the dehumidifier through a ventilation pipe, and the dehumidifier blows air into the anchor end sealing cover to dehumidify it.

[0014] The aforementioned technical measures use a sealing cover at the anchoring end to isolate the anchoring end structure of the steel tie rod, reducing the erosion of the steel tie rod anchoring end by moisture and other corrosive substances. Simultaneously, using the sealing cover at the anchoring end to connect the dehumidifier effectively reduces the technical difficulty of connecting the dehumidifier to the steel tie rod anchoring end, making it easier to implement. Furthermore, the sealing cover at the anchoring end acts as a relatively independent chamber, introducing dry air to dehumidify the anchoring end structure of the steel tie rod. This ensures that the anchoring end structure and the steel tie rod within the annular space of the rod insertion channel remain dry and basically clean during service, reducing the erosion caused by moisture and other corrosive substances and extending the service life of the steel tie rod.

[0015] Furthermore, the through-rod channel is composed of a pre-embedded through-tube embedded in the anchorage; The rear anchor end of the pre-embedded pipe is connected to a rear anchor end pre-embedded plate pre-embedded in the anchor. The steel tie rod installed inside the pre-embedded pipe passes through the rear anchor end pre-embedded plate, and the anchor end locking assembly connected to the anchor end of the steel tie rod abuts against the rear anchor end pre-embedded plate. An anchoring end vent hole two is formed between the outer wall of the steel tie rod and the inner hole of the rear anchor end embedded plate with clearance fit. The outer end of the anchoring end vent hole two is connected to the dehumidifier, and the inner end of the anchoring end vent hole two is connected to the annulus between the steel tie rod and the embedded pipe.

[0016] The aforementioned technical measures, on the one hand, facilitate the regular, accurate, reliable, and stable formation of the rod-through channels within the anchorage; on the other hand, the pre-embedded pipes form a permanent and robust anchoring structure within the anchorage; and thirdly, enable the installed steel tie rods to achieve reliable and stable prestressing tension on the pre-embedded pipes. Furthermore, combined with drying and ventilation, the durability of the steel tie rods during service is ensured.

[0017] Furthermore, the locking abutment of the anchoring end locking assembly abuts against the pre-embedded plate at the rear anchor end via a pressure sensor; The pressure sensor is used to dynamically acquire the locking force of the anchor end locking assembly and feed it back to the online monitoring controller; The steel tie rod, which is installed inside the pre-embedded pipe, passes through the pressure sensor. The outer wall of the steel tie rod and the inner hole of the pressure sensor form a clearance fit anchor end vent hole three. One end of the anchor end vent hole three is connected to the anchor end vent hole one on the anchor end spherical washer, and the other end of the anchor end vent hole three is connected to the anchor end vent hole two between the steel tie rod and the rear anchor end pre-embedded plate.

[0018] The aforementioned technical measures involve arranging pressure sensors at the anchoring end of the steel tie rod. These sensors dynamically collect data on the service stress state of the steel tie rod, thereby enabling dynamic monitoring of its service stress state. This ensures timely detection of any abnormal stress on the steel tie rod (such as loosening of the locking components or breakage of the steel tie rod), facilitating timely maintenance and replacement, and improving reliability. Furthermore, this is combined with drying and ventilation to ensure the durability of the steel tie rod during service.

[0019] As one of the preferred solutions, a support cylinder is connected between the front anchor end of the rod-through channel and the connecting plate. The steel tie rod installed in the rod-through channel passes through the support cylinder and the connecting plate; A second tensioning end vent is formed between the outer wall of the steel tie rod and the inner hole of the support cylinder with a clearance fit. The inner end of the second tensioning end vent connects to the annulus between the steel tie rod and the rod-through channel, and the outer end of the second tensioning end vent is used to discharge gas from the annulus. A tension end vent hole three is formed between the outer wall of the steel tie rod and the inner hole of the connecting plate with a clearance fit. The inner end of the tension end vent hole three is connected to the tension end vent hole two between the steel tie rod and the support cylinder. The outer end of the tension end vent hole three is used for the gas discharge in the annulus.

[0020] The aforementioned technical measures address the unique connection between the tensioning end of the steel tie rod and the connecting plate and cable strand connection mechanism. A support cylinder is used to support and position the connecting plate at the tensioning end of the steel tie rod. Firstly, this ensures reliable prestressing of the steel tie rod within the anchorage before cable strand installation, according to construction requirements. This reduces the adverse effects of alternating loads during cable strand installation and effectively lowers the fatigue level of the steel tie rod itself. Secondly, it reliably supports and protects the relative position of the adjusting tie rod of the connecting plate and cable strand connection mechanism with the anchorage, preventing positional interference and facilitating construction operations. Thirdly, regarding the steel tie rod's insertion structure and the aforementioned dry ventilation duct structure, a reliable air duct is formed at the tensioning end of the steel tie rod in conjunction with the corresponding structure. This allows the dry air discharged from the annular space of the insertion channel to effectively act on the tensioning end of the steel tie rod, keeping the tensioning end structure dry and basically clean during service. This reduces corrosion caused by moisture and other corrosive substances, extending the durability of the steel tie rod.

[0021] In the above technical measures, the connecting plate not only performs its transfer function, but also serves to tension the prestress of the steel tie rod and maintain the air passage.

[0022] Furthermore, the tensioning end locking assembly of the steel tie rod at the connecting plate mainly consists of a tensioning end spherical washer and a tensioning end nut. Under the locking force of the tensioning end nut, the tensioning end spherical washer abuts against the connecting plate. The tensioning end spherical washer is provided with four tensioning end vent holes; The inner end of the tensioning end vent hole four is connected to the tensioning end vent hole three between the steel tie rod and the connecting plate, and the outer end of the tensioning end vent hole four is used for the gas discharge in the annulus.

[0023] The above-mentioned technical measures target the insertion structure of the steel tie rod and the aforementioned dry ventilation duct structure. While maintaining its basic locking function, the relative structure at the tensioning end of the steel tie rod reliably forms an air duct, so that the dry air discharged from the annulus of the insertion channel can effectively act on the tensioning end of the steel tie rod. This keeps the tensioning end structure of the steel tie rod dry and basically clean during service, reduces the corrosion caused by moisture and other corrosive substances to the steel tie rod, and prolongs the service life of the steel tie rod.

[0024] Furthermore, the connecting plate is connected to a tensioning end sealing cover that surrounds the tensioning end of the steel tie rod and the tensioning end locking assembly on the side opposite to the rod channel. The tensioning end sealing cover is used to collect the gas blown from the anchoring end. The tensioning end sealing cover is provided with an exhaust port, which is used to discharge the gas inside the tensioning end sealing cover.

[0025] The aforementioned technical measures use a sealing cover at the tensioning end to isolate the tensioning end structure of the steel tie rod, reducing the erosion of the tensioning end by moisture and other corrosive substances. Simultaneously, the sealing cover collects the dry air discharged from the anchoring end, allowing it to function as a relatively independent chamber to gather and guide the dry air, dehumidifying the tensioning end structure of the steel tie rod. This ensures the complete dryness of the entire steel tie rod, reducing erosion caused by moisture and other corrosive substances, and extending the service life of the steel tie rod.

[0026] Furthermore, the through-rod channel is composed of a pre-embedded through-tube embedded in the anchorage; The front anchor end of the pre-embedded pipe is connected to a front anchor end pre-embedded plate pre-embedded in the anchor. The steel tie rod installed inside the pre-embedded pipe passes through the pre-embedded plate at the front anchor end, and the support cylinder installed at the tension end of the steel tie rod abuts against the pre-embedded plate at the front anchor end. A tension end vent hole one is formed between the outer wall of the steel tie rod and the inner hole of the pre-embedded plate at the front anchor end with a clearance fit. The inner end of the tension end vent hole one is connected to the annulus between the steel tie rod and the pre-embedded pipe. The outer end of the tension end vent hole one is used to discharge the gas in the annulus to the tension end vent hole two between the steel tie rod and the support cylinder.

[0027] The aforementioned technical measures, on the one hand, facilitate the regular, accurate, reliable, and stable formation of the rod-through channels within the anchorage; on the other hand, the pre-embedded pipes form a permanent and robust anchoring structure within the anchorage; and thirdly, enable the installed steel tie rods to achieve reliable and stable prestressing tension on the pre-embedded pipes. Furthermore, combined with drying and ventilation, the durability of the steel tie rods during service is ensured.

[0028] As one of the preferred options, the steel tie rod is an extended structure, consisting of at least two tie rod sections joined together axially; The two adjacent tie rod sections, tie rod section one and tie rod section two, are connected together by a common thread in the same extension nut. Tie rod section one is connected to a lock nut one that locks the extension nut, and tie rod section two is connected to a lock nut two that locks the extension nut.

[0029] The above technical measures address the characteristics of ultra-long (approximately 30m) prestressed anchorage systems within anchorages during main cable anchorage construction, and the current situation where conventional steel tie rods are difficult to meet the required dimensions. At least two steel tie rods are reliably axially extended using extension nuts and anti-loosening nuts to meet the stress requirements and achieve the ultra-long anchorage requirements of prestressed anchorage systems within anchorages.

[0030] A method for replacing the steel tie rods in the above-mentioned steel tie rod anchoring system for the main cable of a suspension bridge, the method comprising the following steps: Step 1. Unload the cable strands anchored to the old steel tie rod at the replacement position; Step 2. Disassemble the relative structures of the tensioning end of the old steel tie rod, including the tensioning end sealing cover, tensioning end locking assembly, connecting plate, and support cylinder; Step 3. Disassemble the relative structures of the old steel tie rod anchoring end, including the anchoring end sealing cover, anchoring end locking assembly, and pressure sensor; Step 4. Remove the old steel tie rod from the front / rear anchor chamber of the anchorage; Step 5. Install a new, corrosion-resistant steel tie rod to replace the old one from the front anchor chamber of the anchorage; Step 6. Position the newly installed steel tie rod; Assemble a pressure sensor and an anchorage locking assembly at the anchorage end of the new steel tie rod; Step 7. Assemble the support cylinder, connecting plate, and tensioning end locking assembly at the tensioning end of the new steel tie rod; Step 8. Adjust the prestressing of the new steel tie rod; Step 9. Apply anchoring load to the corresponding cable strands on the new steel tie rod; Step 10. Perform anti-corrosion treatment on the relative structure of the anchoring end and tensioning end of the new steel tie rod; Step 11. Assemble the anchor end sealing cover at the anchor end of the new steel tie rod, and assemble the tension end sealing cover at the tensioning end of the new steel tie rod.

[0031] The above replacement method is based on the steel tie rod anchoring system, which enables the steel tie rod to be inserted into the corresponding through-rod channel in the anchorage without adhesion. During service, the steel tie rod can be disassembled and replaced as there are potential safety hazards, which helps to reliably ensure the safety of the main cable anchorage.

[0032] The beneficial technical effects of this invention are as follows: The above-mentioned technical measures address the unique characteristics of the prestressed anchorage system with the aforementioned steel tie rod structure. A through-rod channel for the steel tie rod is formed within the anchorage. The steel tie rod, inserted into the corresponding through-rod channel, has its anchoring end and tensioning end prestressed at the relative structural position according to construction technical requirements via corresponding locking components. This prestressing is essentially not lost due to the drying shrinkage of the anchorage concrete, and is reliably maintained. This reduces the adverse effects of alternating loads on the steel tie rod during cable installation and effectively reduces the fatigue of the steel tie rod itself.

[0033] In addition, the steel tie rod is anchored in the corresponding through-rod channel in the anchorage in a non-adhesive manner. The steel tie rod does not form a permanent anchorage in the corresponding through-rod channel and can be replaced after the load is unloaded. Therefore, during service, if there are any potential safety hazards in the steel tie rod, it can be disassembled and replaced, which helps to reliably ensure the safety of the main cable anchorage.

[0034] Based on the non-adhesive, non-permanent anchoring of the steel tie rod, the insertion structure of the steel tie rod forms a complete air passage that allows the dry air discharged by the dehumidifier to flow along the anchoring end of the steel tie rod from the tensioning end. This enables the steel tie rod in service to be dried and dehumidified from the anchoring end to the tensioning end, ensuring the integrity of the entire steel tie rod's drying process, reducing the corrosion caused by moisture and other corrosive substances to the steel tie rod, and extending the service life of the steel tie rod. Attached Figure Description

[0035] Figure 1 This is a schematic diagram of one structure of the present invention.

[0036] Figure 2 for Figure 1 Enlarged view of the middle anchoring end.

[0037] Figure 3 for Figure 1 A magnified view of a section of the joint of the steel tie rod.

[0038] Figure 4 for Figure 1 A magnified view of a portion of the tensioning end.

[0039] Figure 5 This is a reference diagram showing one usage state of the present invention.

[0040] The symbols in the diagram mean: 1—Anchorage; 1-1—Front anchor chamber; 1-2—Rear anchor chamber; 2—Pre-embedded pipe; 21—Rear anchor end pre-embedded plate; 22—Front anchor end pre-embedded plate; 23—Rear anchor end spiral reinforcement; 24—Front anchor end spiral reinforcement; 25—Anchoring end vent hole two; 26—Tensioning end vent hole one; 3—Connecting plate; 31—Tensioning end vent hole three; 4—Adjusting tie rod; 41—Rear end locking assembly; 42—Front end locking assembly; 5—Steel tie rod; 51—Tie rod section one; 52—Tie rod section two; 53—Anchoring end locking assembly; 531—Anchoring end spherical washer; 532—Anchoring 533—Anchor end vent hole one; 54—Tensioning end locking assembly; 541—Tensioning end spherical washer; 542—Tensioning end nut; 543—Tensioning end vent hole four; 55—Extension nut; 56—Anti-loosening nut one; 57—Anti-loosening nut two; 6—Anchor end sealing cover; 7—Support cylinder; 71—Tensioning end vent hole two; 8—Tensioning end sealing cover; 81—Exhaust port; 9—Anchor head; 10—Ventilation pipe; 11—Strand; 12—Annular space; 13—Pressure sensor; 131—Anchor end vent hole three; A—Strand connection mechanism; B—Prestressed anchoring mechanism. Detailed Implementation

[0041] This invention relates to suspension bridge main cable anchorage technology, specifically a steel tie rod anchorage system for suspension bridge main cable anchorage, and a method for replacing the steel tie rod based on this steel tie rod anchorage system. The main technical solution of this invention will be specifically described below with reference to several embodiments. Embodiment 1 is illustrated in conjunction with the accompanying drawings—that is… Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 The technical solution of the present invention will be clearly and thoroughly explained; although other embodiments are not shown in separate drawings, their main structure can still be referred to the drawings of Embodiment 1.

[0042] It should be noted that the accompanying drawings of this invention are schematic, and unnecessary details have been simplified to clarify the technical objectives of this invention, so as to avoid obscuring the technical solutions contributed by this invention to the prior art. Furthermore, the terms "approximately" or "basically" used below to refer to quantities or fit relationships mean that reasonable assembly and processing errors are allowed in the industry, and do not literally describe absolute quantities or fit relationships.

[0043] Example 1 See Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the present invention is a steel tie rod anchoring system for anchoring the main cable of a suspension bridge, which includes a cable strand connection mechanism A for connecting the cable strands 11 and a prestressed anchoring mechanism B for anchoring in the anchorage 1.

[0044] The cable strand connection mechanism A mainly consists of two adjusting rods 4 and an anchor head 9. The anchor head 9 is used to anchor the corresponding cable strands 11 of the main cable. Both ends of the anchor head 9 have through holes for the corresponding adjusting rods 4 to pass through. The two adjusting rods 4 are correspondingly inserted into the through holes of the anchor head 9. The front end of the adjusting rod 4 on the front side of the anchor head 9 is threadedly connected to a front locking assembly 42, including washers, nuts, etc.; the rear end of the adjusting rod 4 on the rear side of the anchor head 9 is threadedly connected to a rear locking assembly 41, including spherical washers, nuts, etc.

[0045] The prestressed anchoring mechanism B has a steel tie rod 5. This steel tie rod 1 is an extended structure designed to meet the technical requirements of anchoring construction; it is composed of two tie rod sections axially joined together. Specifically, the joint ends of tie rod section 1 51 and tie rod section 2 52 are threaded together within the same extension nut 55. A locking nut 56 is connected to tie rod section 1 51 to abut and lock the extension nut 55, and a locking nut 57 is connected to tie rod section 2 52 to abut and lock the extension nut 55. The extension nut 55, locking nuts 56 and 57 constitute the part with the largest outer diameter of the entire steel tie rod 5. The rear end of the steel tie rod 5 serves as the anchoring end, and is threadedly connected to an anchoring end locking assembly 53, including an anchoring end spherical washer 531 and an anchoring end nut 532, etc.; the front end of the steel tie rod 5 serves as the tensioning end, and is threadedly connected to a tensioning end locking assembly 54, including a tensioning end spherical washer 541 and a tensioning end nut 542, etc.

[0046] The aforementioned cable-stayed connection mechanism A uses the connecting plate 3 as an adapter and is connected to the tensioning end of the aforementioned prestressed anchoring mechanism B. Specifically, the middle area of ​​the connecting plate 3 has a through hole for the steel tie rod 5 of the prestressed anchoring mechanism B to pass through, and the two ends of the connecting plate 3 have through holes for the two adjusting tie rods 4 of the cable-stayed connection mechanism A to pass through. The two adjusting tie rods 4 of the cable-stayed connection mechanism A are correspondingly inserted into the through holes at both ends of the connecting plate 3 and are locked by the rear locking assembly 41 on the rear side of the connecting plate 3 (the side facing the anchor 1); the tensioning end of the steel tie rod 5 of the prestressed anchoring mechanism B is correspondingly inserted into the through hole in the middle of the connecting plate 3 and is locked by the tensioning end locking assembly 54 on the front side of the connecting plate 3 (the side opposite to the anchor 1).

[0047] The aforementioned prestressed anchoring mechanism B is anchored in anchorage 1 according to the following structure.

[0048] Specifically, at the designated location for anchoring the prestressed anchoring mechanism B, the anchor 1 has a pre-embedded through-tube 2 forming a through-rod channel for the steel tie rod 5 to be inserted. The pre-embedded through-tube 2 is a steel pipe with an inner diameter larger than the maximum outer diameter of the steel tie rod 5 (i.e., the portion at the extension nut 55, anti-loosening nut 1 56, and anti-loosening nut 2 57) pre-embedded in the anchor 1. The anchor 1 has a front anchor chamber 1-1 and a rear anchor chamber 1-2. The front end of the through-rod channel is connected to the front anchor chamber 1-1, and the rear end is connected to the rear anchor chamber 1-2. If the steel pipe constituting the pre-embedded through-tube 2 is insufficient in size, at least two steel pipes can be axially fixed and joined together for lengthening.

[0049] To ensure the anchoring of the steel tie rod 5, a rear anchor end embedded plate 21 is fixedly connected to the rear anchor end of the pre-embedded pipe 2. The rear anchor end embedded plate 21 is pre-embedded in the inner and outer surfaces of the anchor 1 and exposed at the rear anchor chamber, serving as the anchoring abutment of the steel tie rod 5 and the connection base for the anchoring end sealing cover 6 described below. To ensure the installation of the steel tie rod 5, the inner hole size of the rear anchor end embedded plate 21 should be larger than the maximum outer diameter of the steel tie rod 5 (i.e., the part where the extension nut 55 and the anti-loosening nut 1 56 and anti-loosening nut 2 57 are located). A front anchor end embedded plate 22 is fixedly connected to the front anchor end of the pre-embedded pipe 2. The front anchor end embedded plate 22 is pre-embedded in the inner and outer surfaces of the anchor 1 and exposed at the front anchor chamber, serving as the tensioning abutment of the tensioning end of the steel tie rod 5 - that is, the connection base of the support cylinder 7 described below; in order to ensure the steel tie rod 5 is installed, the inner hole size of the front anchor end embedded plate 22 should be larger than the maximum outer diameter on the steel tie rod 5 (that is, the part where the extension nut 55 and the anti-loosening nut 1 56 and anti-loosening nut 2 57 are located).

[0050] To ensure the firmness of the pre-embedded pipe 2 anchored in the anchor 1, the inner side of the rear anchor end pre-embedded plate 21 is connected with the anchor end spiral bar 23 wrapped around the outer periphery of the pre-embedded pipe 2, and the inner side of the front anchor end pre-embedded plate 22 is connected with the tension end spiral bar 24 wrapped around the outer periphery of the pre-embedded pipe 2, and the spiral bar is embedded in the anchor 1.

[0051] The steel tie rod 5 of the prestressed anchoring mechanism B is inserted into the corresponding through-rod channel in the anchor 1, i.e., the pre-embedded through-tube 2. Under the tensioning positioning of the anchoring end structure and the tensioning end structure described below, an annular space 12 with clearance fit is formed between the outer wall of the steel tie rod 5 and the inner wall of the corresponding pre-embedded through-tube 2.

[0052] An anchoring end of the steel tie rod 5 is connected to the rear anchoring end of the corresponding pre-embedded conduit 2, and is fitted with an anchoring end locking assembly 53. As described above, the anchoring end locking assembly 53 mainly consists of an anchoring end spherical washer 531 and an anchoring end nut 532. Under the locking force of the anchoring end nut 532, the anchoring end spherical washer 531 should ideally abut against the rear anchoring end pre-embedded plate 21 of the pre-embedded conduit 2. However, in order to enable timely dynamic monitoring of the stress performance of the steel tie rod 5, a pressure sensor 13 is installed between the anchoring end spherical washer 531 of the anchoring end locking assembly 53 and the rear anchoring end pre-embedded plate 21. That is, the anchoring end spherical washer 531 of the anchoring end locking assembly 53 abuts against the rear anchoring end pre-embedded plate 21 through the pressure sensor 13. The pressure sensor 13 is used to dynamically acquire the locking force of the anchoring end locking assembly 53 and provide real-time feedback to the online monitoring controller.

[0053] The tensioning end of the steel tie rod 5 extends to the front anchor end corresponding to the pre-embedded pipe 2, and passes through the connecting plate 3 to connect to the tensioning end locking assembly 54, that is, it is connected to the connecting plate 3 through the tensioning end locking assembly 54. As described above, the tensioning end locking assembly 54 mainly consists of a tensioning end spherical washer 541 and a tensioning end nut 542. Under the locking force of the tensioning end nut 542, the tensioning end spherical washer 541 abuts against the side of the connecting plate 3 opposite to the anchor 1. Of course, in order to ensure the tensioning of the steel tie rod 5, a support cylinder 7 is fitted in the area where the steel tie rod 5 passes through the front anchor end of the pre-embedded pipe 2. The rear end of the support cylinder 7 abuts and is fixed to the outer surface of the pre-embedded plate 22 of the front anchor end of the pre-embedded pipe 2, and the front end of the support cylinder 7 abuts and is fixed to the rear surface of the connecting plate 3, so that the connecting plate 3 is relatively far away from the anchor 1. The support cylinder 7 is used as the force transmission structure to perform prestressing tensioning on the steel tie rod 5 at the connecting plate 3.

[0054] In the above-mentioned steel tie rod 5 installation and anchoring structure, the steel tie rod 5 and the pre-embedded pipe 2 are not bonded together, but are installed in an annular structure. In order to reduce the corrosion of the steel tie rod 5 by water vapor and other corrosive substances during service and delay service durability, a drying and ventilation duct is also added to the above-mentioned steel tie rod 5 installation structure.

[0055] Specifically, an anchor end sealing cover 6 is fixedly connected to the outer side of the aforementioned rear anchor end embedded plate 21. This cover fully encloses the anchor end of the steel tie rod 5, the anchor end locking assembly 53, and the pressure sensor 13. Under the enclosure of the anchor end sealing cover 6, the anchor end of the steel tie rod 5 that passes through the embedded pipe 2 and related structures are not exposed. A ventilation pipe 10 is connected to the anchor end sealing cover 6. The upstream end of the ventilation pipe 10 is connected to a dehumidifier installed in the rear anchor chamber 1-2 of the anchor 1. That is, the anchor end sealing cover 6 is connected to the dehumidifier installed in the rear anchor chamber 1-2 through the ventilation pipe 10, and the dehumidifier blows air into the anchor end sealing cover 6 to dehumidify.

[0056] At least one, usually evenly distributed, vent holes 533 are provided around the circumference of the aforementioned anchor-end spherical washer 531. A clearance fit is formed between the inner hole of the anchor-end spherical washer 531 and the steel tie rod 5, and this clearance also constitutes the vent holes 533. The outer ends of each vent hole 533 arranged around the circumference of the anchor-end spherical washer 531 are exposed inside the anchor-end sealing cover 6, thus connecting the dehumidifier through the anchor-end sealing cover 6. The inner end of the vent hole 533, which forms a clearance fit between the inner hole of the anchor-end spherical washer 531 and the steel tie rod 5, serves to connect with the annular space 12 between the steel tie rod 5 and the pre-embedded pipe 2. However, due to the presence of the pressure sensor 13 and the rear anchor-end pre-embedded plate 21, this connection is indirect, not direct. The vent holes on the aforementioned anchor-end spherical washer can also be formed at an angle, with the outer end exposed inside the anchor-end sealing cover and the inner end directly connecting to the inner surface near the inner hole, without passing through the inner hole; alternatively, they can be formed with an L-shaped bend, with the outer end exposed inside the anchor-end sealing cover and the inner end exposed on the inner surface near the inner hole, without passing through the inner hole. Of course, the aforementioned vent hole structure that passes through the inner hole is simpler and easier to implement, and does not affect the stress on the anchor-end spherical washer. The formation of multiple vent holes around the circumference of the anchor-end spherical washer allows the drying air to enter in multiple streams and in a basically uniform manner, which is beneficial to the uniformity of the flow of drying air on the surface of the steel tie rod.

[0057] The inner hole of the pressure sensor 13 is larger than the steel tie rod 5 through which it is installed. Therefore, a clearance fit is formed between the outer wall of the steel tie rod 5 and the inner hole of the pressure sensor 13 to create an anchoring end vent hole three 131. One end of the anchoring end vent hole three 131 is connected to the anchoring end vent hole one 533 at the anchoring end spherical washer 531, and the other end of the anchoring end vent hole three 131 is used to connect with the annulus 12 between the steel tie rod 5 and the pre-embedded pipe 2. Of course, due to the presence of the rear anchoring end pre-embedded plate 21, the connection should be indirect rather than direct, that is, the other end of the anchoring end vent hole three 131 is connected to the anchoring end vent hole two 25 between the steel tie rod 5 and the rear anchoring end pre-embedded plate 21.

[0058] The inner hole of the aforementioned rear anchor end embedded plate 21 is larger than the steel tie rod 5 that is inserted through it. Therefore, a clearance fit is formed between the outer wall of the steel tie rod 5 that passes through it and the inner hole of the rear anchor end embedded plate 21 to form an anchor end vent hole 25. The outer end of the anchor end vent hole 25 is connected to the anchor end vent hole 3 131 at the aforementioned pressure sensor 13, and the inner end of the anchor end vent hole 25 is connected to the annular space 12 between the aforementioned steel tie rod 5 and the embedded pipe 2.

[0059] Through the anchor end vent hole 533 at the anchor end spherical washer 531, the anchor end vent hole 131 at the pressure sensor 13, and the anchor end vent hole 25 at the rear anchor end embedded plate 21, the inner cavity of the anchor end sealing cover 6 is connected to the annular space 12 between the steel tie rod 5 and the embedded pipe 2, and the dry air output by the dehumidifier can be blown from the anchor end of the steel tie rod 5 to the tensioning end for dehumidification.

[0060] In order to allow the drying air in the annulus 12 between the steel tie rod 5 and the pre-embedded pipe 2 to be discharged, the drying ventilation duct also has the following tension end structure.

[0061] The inner hole of the aforementioned front anchor end embedded plate 22 is larger than the steel tie rod 5 that is inserted. Therefore, a tension end vent hole 26 with a clearance fit is formed between the outer wall of the steel tie rod 5 that passes through it and the inner hole of the front anchor end embedded plate 22. The inner end of the tension end vent hole 26 is connected to the annulus 12 between the steel tie rod 5 and the embedded pipe 2. The outer end of the tension end vent hole 26 is used to discharge the gas in the annulus 12. Therefore, it should be connected to the external environment on the front side of the anchor 1. Of course, due to the presence of the support cylinder 7, connecting plate 3, tension end locking assembly 54, and tension end sealing cover 8, the connection should be indirect rather than direct. Therefore, the outer end of the tension end vent hole 26 is used to discharge the gas in the annulus 12 into the tension end vent hole 71 between the steel tie rod 5 and the support cylinder 7.

[0062] The inner hole of the support cylinder 7 is larger than the steel tie rod 5 through which it is inserted. Therefore, a tension end vent hole 2 71 with clearance fit is formed between the outer wall of the steel tie rod 5 and the inner hole of the support cylinder 7. The inner end of the tension end vent hole 2 71 is connected to the tension end vent hole 26 at the pre-embedded plate 22 at the front anchor end. The outer end of the tension end vent hole 2 71 is used to discharge the gas in the annulus 12 and is connected to the tension end vent hole 31 at the connecting plate 3 described below.

[0063] The inner hole of the connecting plate 3 is larger than the steel tie rod 5 through which it is inserted. Therefore, a tension end vent hole 31 with clearance fit is formed between the outer wall of the steel tie rod 5 and the inner hole of the connecting plate 3. The inner end of the tension end vent hole 31 is connected to the tension end vent hole 71 at the support cylinder 7. The outer end of the tension end vent hole 31 is used to discharge the gas in the annulus 12 and is connected to the tension end vent hole 543 at the tension end spherical washer 541.

[0064] Around the circumference of the aforementioned tensioning end spherical washer 541, at least one, typically evenly distributed circumferential tensioning end vent holes 543 are provided. A clearance fit is formed between the inner hole of the tensioning end spherical washer 541 and the steel tie rod 5, and this clearance also constitutes the tensioning end vent holes 543. The outer ends of each tensioning end vent hole 543 arranged circumferentially around the tensioning end spherical washer 541 are exposed within the tensioning end sealing cover 8, thereby connecting to the external environment via the tensioning end sealing cover 8. The inner ends of the tensioning end vent holes 543, which form a clearance fit between the inner hole of the tensioning end spherical washer 541 and the steel tie rod 5, are used to communicate with the tensioning end vent holes 31 at the aforementioned connecting plate 3. The vent holes on the aforementioned tensioning end spherical washer can also be formed at an angle, with the outer end exposed inside the tensioning end sealing cover and the inner end directly connecting to the inner surface near the inner hole, without passing through the inner hole; alternatively, they can be formed with an L-shaped bending structure, with the outer end exposed inside the tensioning end sealing cover and the inner end exposed on the inner surface near the inner hole, without passing through the inner hole. Of course, the aforementioned vent hole structure that passes through the inner hole is simpler and easier to implement, and does not affect the stress on the tensioning end spherical washer. The formation of multiple vent holes around the circumference of the tensioning end spherical washer allows the drying air to be discharged in multiple streams and in a basically uniform manner, which is beneficial to the uniformity of the flow of drying air on the surface of the steel tie rod.

[0065] At the front of the aforementioned connecting plate 3, a tensioning end sealing cover 8 is fixedly connected, which can fully enclose the tensioning end of the steel tie rod 5 and the tensioning end locking assembly 54. Under the enclosure of the tensioning end sealing cover 8, the tensioning end of the steel tie rod 5 protruding from the connecting plate 3 and related structures are not exposed. The tensioning end sealing cover 8 serves to collect the gas blown from the anchoring end, and the aforementioned drying air passage structure keeps the steel tie rod 5 dry and intact. An exhaust port 81 is provided on the tensioning end sealing cover 8, which is used to discharge the gas collected inside the tensioning end sealing cover 8.

[0066] Through the tension end vent hole 26 at the pre-embedded plate 22 at the front anchor end, the tension end vent hole 71 at the support cylinder 7, the tension end vent hole 31 at the connecting plate 3, and the tension end vent hole 543 at the spherical gasket 541 at the tension end, the inner cavity of the tension end sealing cover 8 is connected to the annular space 12 between the steel tie rod 5 and the pre-embedded pipe 2. The dry air blown from the anchor end to the tension end for dehumidification is discharged through the tension end sealing cover 8.

[0067] When the steel tie rods of the aforementioned suspension bridge main cable anchorage steel tie rod system are found to be damaged, or when technical assessment indicates that replacement is necessary, they shall be replaced according to the following replacement procedure: Step 1. Using cable connection mechanism A, first unload the cable strand 11 anchored to the old steel tie rod that was being replaced; Of course, the bridge should be closed for maintenance at this time; Step 2. Disassemble the relative structures of the tensioning end of the old steel tie rod, including the tensioning end sealing cover 8, the tensioning end locking assembly 54, the connecting plate 3, and the support cylinder 7 in sequence; Step 3. Disassemble the relative structures of the old steel tie rod anchoring end, including the anchoring end sealing cover 6, the anchoring end locking assembly 53 and the pressure sensor 13 in sequence; Step 4. Hoist and remove the old steel tie rod from Step 3 from the front anchor chamber 1-1 of anchor 1; Step 5. Hoist and install a new, corrosion-resistant steel tie rod to replace the old steel tie rod from the front anchor chamber 1-1 of anchor 1; Corrosion protection treatment for new steel tie rods includes, but is not limited to: - Apply epoxy zinc-rich primer to the smooth rod surface and threaded parts; - After the extension is completed, wrap the steel tie rods at both ends of the extension nut assembly with petrolatum tape or asphalt tape to form a conical transition, and scrape polysulfide sealant. At the same time, wrap high-strength glass cloth, apply two layers of polysulfide sealant to the surface of the glass cloth, and shape it smooth. Step 6. Perform preliminary positioning of the newly installed steel tie rod; Pressure sensor 13 and anchor end locking assembly 53 are sequentially assembled at the anchor end of the new steel tie rod; Step 7. Assemble the support cylinder 7, connecting plate 3, and tension end locking assembly 54 sequentially at the tensioning end of the new steel tie rod; Step 8. Adjust the prestressing of the new steel tie rod; Typically, before installing cable 11, the new steel tie rod is tensioned to 1.2 times the design load to reduce the impact of alternating loads on the new steel tie rod and reduce the fatigue of the new steel tie rod itself; Step 9. Anchor the corresponding cable strand 11 on the new steel tie rod using cable strand connection mechanism A; Step 10. Perform anti-corrosion treatment on the relative structures of the anchoring end and tensioning end of the new steel tie rod, including but not limited to: - Apply polysulfide sealant to seal the space between the embedded plate, washer, nut, and external thread of the nut; - Perform degreasing and rust removal treatment on both ends of the exposed screw; - Grind the outer surfaces of the nut and washer, and then spray with super wear-resistant epoxy paint; Step 11. Assemble the anchor end sealing cover 6 at the anchor end of the new steel tie rod, and assemble the tension end sealing cover 8 at the tension end of the new steel tie rod.

[0068] Example 2 This invention relates to a steel tie rod anchoring system for anchoring the main cable of a suspension bridge, which includes a cable strand connection mechanism for connecting the cable strands and a prestressed anchoring mechanism for anchoring in the anchorage.

[0069] The cable strand connection mechanism mainly consists of two adjusting rods and an anchor head. The anchor head is used to anchor the corresponding cable strands of the main cable, and both ends of the anchor head have through holes for the corresponding adjusting rods to pass through. The two adjusting rods are correspondingly inserted into the through holes of the anchor head. The front end of the adjusting rod on the front side of the anchor head is threadedly connected to a front locking assembly, including washers and nuts; the rear end of the adjusting rod on the rear side of the anchor head is threadedly connected to a rear locking assembly, including spherical washers and nuts.

[0070] The prestressed anchoring mechanism includes a steel tie rod. This steel tie rod, designed to meet the technical requirements of anchoring construction, is an extended structure, composed of two tie rod sections axially joined together. Specifically, the joint ends of tie rod section one and tie rod section two are threadedly connected to the same extension nut. Tie rod section one has a locking nut one that abuts and locks the extension nut, and tie rod section two has a locking nut two that abuts and locks the extension nut. The extension nut, locking nut one, and locking nut two constitute the largest outer diameter section of the entire steel tie rod. The rear end of the steel tie rod serves as the anchoring end, threadedly connected to an anchoring end locking assembly, including an anchoring end spherical washer and an anchoring end nut; the front end of the steel tie rod serves as the tensioning end, threadedly connected to a tensioning end locking assembly, including a tensioning end spherical washer and a tensioning end nut.

[0071] The aforementioned cable-strand connection mechanism uses a connecting plate as an adapter, connecting to the tensioning end of the aforementioned prestressed anchoring mechanism. Specifically, the connecting plate has through holes in the middle area for the steel tie rods of the prestressed anchoring mechanism to pass through, and through holes at both ends of the connecting plate for the two adjusting tie rods of the cable-strand connection mechanism to pass through. The two adjusting tie rods of the cable-strand connection mechanism are correspondingly inserted into the through holes at both ends of the connecting plate and locked by the rear locking assembly on the rear side of the connecting plate (facing the anchorage); the tensioning end of the steel tie rod of the prestressed anchoring mechanism is correspondingly inserted into the through hole in the middle of the connecting plate and locked by the tensioning end locking assembly on the front side of the connecting plate (opposite to the anchorage).

[0072] The aforementioned prestressed anchoring mechanism is anchored in the anchorage according to the following structure.

[0073] Specifically, the anchorage is used as the setting position for anchoring the prestressed anchorage mechanism. A through-tube is pre-embedded to form a through-rod channel for the steel tie rod to be inserted. This pre-embedded through-tube is a steel pipe with an inner diameter larger than the maximum outer diameter of the steel tie rod (i.e., the portion at the extension nut and anti-loosening nut one and anti-loosening nut two), pre-embedded within the anchorage. The anchorage has a front anchor chamber and a rear anchor chamber, with the front end of the through-tube connected to the front anchor chamber and the rear end connected to the rear anchor chamber. If the steel pipe constituting the pre-embedded through-tube is insufficient in size, at least two steel pipes can be axially fixed and joined together for lengthening.

[0074] To ensure the anchoring of the steel tie rod, a rear anchor end embedded plate is fixedly connected to the rear anchor end of the pre-embedded pipe. This rear anchor end embedded plate is embedded inside the anchorage, with its outer surface exposed at the rear anchor chamber. It serves as the anchoring contact for the steel tie rod anchoring end and the connection basis for the anchoring end sealing cover described below. To ensure the steel tie rod is installed, the inner diameter of the rear anchor end embedded plate should be larger than the maximum outer diameter of the steel tie rod (i.e., the location of the extension nut and anti-loosening nut one and anti-loosening nut two). A front anchor end embedded plate is fixedly connected to the front anchor end of the pre-embedded pipe. This front anchor end embedded plate is embedded inside the anchorage, with its outer surface exposed at the front anchor chamber. It serves as the tensioning contact for the steel tie rod tensioning end—i.e., the connection basis for the support cylinder described below. To ensure the steel tie rod is installed, the inner diameter of the rear anchor end embedded plate should be larger than the maximum outer diameter of the steel tie rod (i.e., the location of the extension nut and anti-loosening nut one and anti-loosening nut two).

[0075] To ensure the firmness of the pre-embedded pipe anchorage within the anchorage, the inner side of the rear anchorage pre-embedded plate is connected to an anchorage end spiral bar that is wrapped around the outer perimeter of the pre-embedded pipe, and the inner side of the front anchorage pre-embedded plate is connected to a tension end spiral bar that is wrapped around the outer perimeter of the pre-embedded pipe. The spiral bars are embedded into the anchorage.

[0076] The steel tie rods of the prestressed anchoring mechanism are inserted into the corresponding rod-through channels in the anchorage—that is, the pre-embedded tubes. Under the tensioning positioning of the anchoring end structure and the tensioning end structure described below, a clearance fit annular space is formed between the outer wall of the steel tie rod and the inner wall of the corresponding pre-embedded tube.

[0077] The anchoring end of the steel tie rod is connected to the rear anchoring end of the corresponding pre-embedded conduit, and is fitted with an anchoring end locking assembly. As described above, the anchoring end locking assembly mainly consists of an anchoring end spherical washer and an anchoring end nut. Under the locking force of the anchoring end nut, the anchoring end spherical washer should ideally abut against the rear anchoring end pre-embedded plate of the pre-embedded conduit. However, in order to enable timely dynamic monitoring of the stress performance of the steel tie rod, a pressure sensor is installed between the anchoring end spherical washer of the anchoring end locking assembly and the rear anchoring end pre-embedded plate. That is, the anchoring end spherical washer of the anchoring end locking assembly abuts against the rear anchoring end pre-embedded plate through the pressure sensor. The pressure sensor is used to dynamically acquire the locking force of the anchoring end locking assembly and provide real-time feedback to the online monitoring controller.

[0078] The tensioning end of the steel tie rod extends to the front anchor end corresponding to the pre-embedded pipe and passes through the connecting plate to connect to the tensioning end locking assembly, i.e., it is connected to the connecting plate through the tensioning end locking assembly. As mentioned above, the tensioning end locking assembly mainly consists of a tensioning end spherical washer and a tensioning end nut. Under the locking force of the tensioning end nut, the tensioning end spherical washer abuts against the side of the connecting plate opposite to the anchor. Of course, in order to ensure the tensioning of the steel tie rod, a support cylinder is fitted in the area where the steel tie rod passes through the front anchor end of the pre-embedded pipe. The rear end of the support cylinder abuts and is fixed to the outer surface of the pre-embedded plate of the front anchor end of the pre-embedded pipe, and the front end of the support cylinder abuts and is fixed to the rear surface of the connecting plate, so that the connecting plate is relatively far away from the anchor. The support cylinder also serves as a force transmission structure to perform prestressing tensioning on the steel tie rod at the connecting plate.

[0079] When the steel tie rods of the aforementioned suspension bridge main cable anchorage steel tie rod system are found to be damaged, or when technical assessment indicates that replacement is necessary, they shall be replaced according to the following replacement procedure: Step 1. Using the cable strand connection mechanism, first unload the cable strands anchored to the old steel tie rod being replaced; Of course, the bridge should be closed for maintenance at this time; Step 2. Disassemble the relative structures of the tensioning end of the old steel tie rod, including the tensioning end locking assembly, connecting plate, and support cylinder in sequence; Step 3. Disassemble the relative structures of the old steel tie rod anchoring end, including the anchoring end locking assembly and the pressure sensor in sequence; Step 4. Hoist and remove the old steel tie rod from Step 3 from the front anchor chamber of the anchorage; Step 5. Hoist and install the new, corrosion-resistant steel tie rod to replace the old one from the front anchor chamber of the anchorage; Corrosion protection treatment for new steel tie rods includes, but is not limited to: - Apply epoxy zinc-rich primer to the smooth rod surface and threaded parts; - After the extension is completed, wrap the steel tie rods at both ends of the extension nut assembly with petrolatum tape or asphalt tape to form a conical transition, and scrape polysulfide sealant. At the same time, wrap high-strength glass cloth, apply two layers of polysulfide sealant to the surface of the glass cloth, and shape it smooth. Step 6. Perform preliminary positioning of the newly installed steel tie rod; A pressure sensor and an anchorage locking assembly are sequentially assembled at the anchorage end of the new steel tie rod; Step 7. Assemble the support cylinder, connecting plate, and tensioning end locking assembly sequentially at the tensioning end of the new steel tie rod; Step 8. Adjust the prestressing of the new steel tie rod; Typically, before cable installation, the new steel tie rod is tensioned to 1.2 times the design load to reduce the impact of alternating loads on the new steel tie rod and reduce the fatigue of the new steel tie rod itself. Step 9. Anchor the corresponding cable strands on the new steel tie rod using the cable strand connection mechanism; Step 10. Perform anti-corrosion treatment on the relative structures of the anchoring end and tensioning end of the new steel tie rod, including but not limited to: - Apply polysulfide sealant to seal the space between the embedded plate, washer, nut, and external thread of the nut; - Perform degreasing and rust removal treatment on both ends of the exposed screw; - Grind the outer surfaces of the nut and washer, and then spray with ultra-wear-resistant epoxy paint.

[0080] Example 3 The rest of the content of this embodiment is the same as that of embodiment 1 or 2, except that: After removing the pressure sensor at the anchoring end, the stress performance of the steel tie rod is observed through manual inspection.

[0081] Example 4 The rest of the content of this embodiment is the same as that of embodiment 1 or 2, except that: When removing the old steel tie rod from the rod-through channel of the anchor, the steel tie rod is pulled out from the rear anchor chamber of the anchor. Due to the limited space in the rear anchor chamber, each section of steel tie rod that protrudes is cut off, until the steel tie rod is completely removed from the corresponding rod-through channel.

[0082] The above embodiments are only used to illustrate the present invention and are not intended to limit it.

[0083] Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that modifications can still be made to the above embodiments, or equivalent substitutions can be made to some of the technical features; and these modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the present invention.

Claims

1. A steel tie rod anchoring system for anchoring a main cable of a suspension bridge, comprising a cable strand connecting mechanism (A) for connecting cable strands (11) and a prestressed anchoring mechanism (B) anchored in an anchor (1); The cable strand connection mechanism (A) is connected to the tensioning end of the prestressed anchor mechanism (B) via a connection plate (3); Features: The anchor (1) is provided with a rod-penetrating passage at a position for anchoring the prestressed anchor mechanism (B); The prestressed anchoring mechanism (B) comprises a steel tie rod (5), wherein the steel tie rod (5) is inserted into a corresponding rod-penetrating channel, wherein the anchoring end of the steel tie rod (5) is connected to an anchoring end locking assembly (53) at the rear anchoring end of the corresponding rod-penetrating channel, and the tensioning end of the steel tie rod (5) extends out of the corresponding rod-penetrating channel and is connected to the connecting plate (3) via the tensioning end locking assembly (54), and an annular space (12) with a clearance fit is formed between the outer wall of the steel tie rod (5) and the inner wall of the corresponding rod-penetrating channel.

2. According to claim 1, the steel tie rod anchoring system for anchoring the main cable of a suspension bridge, Features: The anchor end locking assembly (53) is mainly composed of an anchor end spherical washer (531) and an anchor end nut (532). Under the locking force of the anchor end nut (532), the anchor end spherical washer (531) abuts against the rear anchor end of the rod penetration channel. The anchor end spherical washer (531) is provided with an anchor end vent hole 1 (533), the outer end of the anchor end vent hole 1 (533) is connected to the dehumidifier, and the inner end of the anchor end vent hole 1 (533) is connected to the annular space (12) between the steel tie rod (5) and the rod penetration channel; The dehumidifier is used to blow air and dehumidify from the anchoring end to the tensioning end of the steel tension rod (5).

3. The steel tie rod anchoring system for anchoring the main cable of a suspension bridge according to claim 1 or 2, Features: The rear anchor end of the rod-penetrating channel is connected to an anchor end sealing cover (6) that surrounds the anchor end of the steel pull rod (5) and the anchor end locking assembly (53); The anchor end sealing cover (6) is connected to the dehumidifier via a ventilation pipe (10), and the dehumidifier blows air into the anchor end sealing cover (6) to remove moisture.

4. According to claim 3, the steel tie rod anchoring system for anchoring the main cable of a suspension bridge, Features: The rod penetration channel is composed of a pre-buried penetration pipe (2) pre-buried in the anchor (1); The rear anchor end of the embedded through-tube (2) is connected to a rear anchor end embedded plate (21) embedded in the anchor (1); The steel tie rod (5) inserted into the embedded through-tube (2) passes through the rear anchor end embedded plate (21), and the anchor end locking assembly (53) connected to the anchor end of the steel tie rod (5) abuts against the rear anchor end embedded plate (21); An anchor end vent hole 2 (25) with a clearance fit is formed between the outer wall of the steel tie rod (5) and the inner hole of the rear anchor end embedded plate (21); the outer end of the anchor end vent hole 2 (25) is connected to the dehumidifier, and the inner end of the anchor end vent hole 2 (25) is connected to the annular space (12) between the steel tie rod (5) and the embedded through pipe (2).

5. According to claim 4, the steel tie rod anchoring system for anchoring the main cable of a suspension bridge, Features: The locking butt top of the anchor end locking assembly (53) abuts against the rear anchor end embedded plate (21) via a pressure sensor (13); The pressure sensor (13) is used to dynamically collect the locking force of the anchor end locking assembly (53) and provide feedback to the online monitoring controller; The steel tie rod (5) inserted into the embedded through-tube (2) passes through the pressure sensor (13), and an anchor end vent hole three (131) with a clearance fit is formed between the outer wall of the steel tie rod (5) and the inner hole of the pressure sensor (13), one end of the anchor end vent hole three (131) is connected to the anchor end vent hole one (533) on the anchor end spherical washer (531), and the other end of the anchor end vent hole three (131) is connected to the anchor end vent hole two (25) between the steel tie rod (5) and the rear anchor end embedded plate (21).

6. The steel tie rod anchoring system for anchoring the main cable of a suspension bridge according to claim 1 or 2, Features: A support tube (7) is connected between the front anchor end of the rod-penetrating channel and the connecting plate (3); The steel pull rod (5) inserted into the rod-penetrating channel passes through the support tube (7) and the connecting plate (3); A tensioning end vent hole (71) with a clearance fit is formed between the outer wall of the steel tie rod (5) and the inner hole of the support tube (7), the inner end of the tensioning end vent hole (71) is connected to the annulus (12) between the steel tie rod (5) and the rod-penetrating channel, and the outer end of the tensioning end vent hole (71) is used to discharge the gas in the annulus (12); A tensioning end vent hole three (31) with a clearance fit is formed between the outer wall of the steel tie rod (5) and the inner hole of the connecting plate (3); the inner end of the tensioning end vent hole three (31) is connected to the tensioning end vent hole two (71) between the steel tie rod (5) and the supporting tube (7); the outer end of the tensioning end vent hole three (31) is used to discharge the gas in the annulus (12).

7. The steel tie rod anchoring system for anchoring the main cable of a suspension bridge according to claim 6, Features: The tensioning end locking assembly (54) of the steel tie rod (5) at the connecting plate (3) is mainly composed of a tensioning end spherical washer (541) and a tensioning end nut (542). Under the locking force of the tensioning end nut (542), the tensioning end spherical washer (541) abuts against the connecting plate (3); The tensioning end spherical washer (541) is provided with a tensioning end vent hole four (543); The inner end of the tensioning end vent hole four (543) is connected to the tensioning end vent hole three (31) between the steel tie rod (5) and the connecting plate (3), and the outer end of the tensioning end vent hole four (543) is used to discharge the gas in the annulus (12).

8. The steel tie rod anchoring system for anchoring the main cable of a suspension bridge according to claim 7, Features: A tensioning end sealing cover (8) that surrounds the tensioning end of the steel tension rod (5) and the tensioning end locking assembly (54) is connected to the connecting plate (3) on the side opposite to the rod penetration channel, and the tensioning end sealing cover (8) is used to collect the gas blown from the anchoring end; An exhaust port (81) is provided on the tensioning end sealing cover (8), and the exhaust port (81) is used to discharge gas in the tensioning end sealing cover (8).

9. The steel tie rod anchoring system for anchoring the main cable of a suspension bridge according to claim 6, Features: The rod penetration channel is composed of a pre-buried penetration pipe (2) pre-buried in the anchor (1); The front anchor end of the pre-buried through-tube (2) is connected to a front anchor end pre-buried plate (22) pre-buried in the anchor (1); The steel tie rod (5) inserted into the embedded through-tube (2) passes through the front anchor end embedded plate (22), and the support tube (7) inserted into the tensioning end of the steel tie rod (5) abuts against the front anchor end embedded plate (22); A tensioning end vent hole 1 (26) with a clearance fit is formed between the outer wall of the steel tie rod (5) and the inner hole of the front anchor end embedded plate (22); the inner end of the tensioning end vent hole 1 (26) is connected to the annulus (12) between the steel tie rod (5) and the embedded through-tube (2); the outer end of the tensioning end vent hole 1 (26) is used to discharge the gas in the annulus (12) to the tensioning end vent hole 2 (71) between the steel tie rod (5) and the support tube (7).

10. The steel tie rod anchoring system for anchoring the main cable of a suspension bridge according to claim 1, Features: The steel tie rod (1) is an extended structure, formed by at least two tie rod sections axially butted together; The butt ends of two adjacent sections of the pull rod section 1 (51) and the pull rod section 2 (52) are threadedly connected together in the same extension nut (55), and the pull rod section 1 (51) is connected to a lock nut 1 (56) for locking the extension nut (55), and the pull rod section 2 (52) is connected to a lock nut 2 (57) for locking the extension nut (55).

11. A method for replacing a steel tie rod of a steel tie rod anchoring system for anchoring a main cable of a suspension bridge according to any one of claims 1 to 10, It is characterized in that The steel tie rod replacement method comprises the following steps: Step 1. Anchor and unload the cable strand (11) anchored by the old steel tie rod at the replacement position; Step 2. Disassemble the relative structure of the tensioning end of the old steel tie rod, including the tensioning end sealing cover (8), the tensioning end locking assembly (54), the connecting plate (3), and the support tube (7); Step 3. Disassemble the relative structure of the anchor end of the old steel tie rod, including the anchor end sealing cover (6), the anchor end locking assembly (53), and the pressure sensor (13); Step 4. Pull out the old steel tie rod from step 3 from the front anchor chamber (1-1) / rear anchor chamber (1-2) of the anchor (1); Step 5. Install a new steel tie rod that has been treated with corrosion protection to replace the old steel tie rod from the front anchor chamber (1-1) of the anchor (1); Step 6. Position the installed new steel tie rod; Assembling a pressure sensor (13) and an anchor end locking assembly (53) at the anchor end of the new steel tie rod; Step 7. Assemble the support tube (7), the connecting plate (3), and the tension end locking assembly (54) at the tension end of the new steel tie rod; Step 8. Adjust the prestressing force of the new steel tie rod; Step 9. Anchor loading of the corresponding cable strand (11) is performed on the new steel tie rod; Step 10. Perform anti-corrosion treatment on the relative structures of the anchor end and the tension end of the new steel tie rod; Step 11. Assemble the anchor end sealing cover (6) at the anchor end of the new steel tie rod, and assemble the tension end sealing cover (8) at the tension end of the new steel tie rod.