Dustproof deslagging device for anchoring drilling machine
By designing a nitrogen foam slag discharge and dust collection mechanism on the anchoring drilling rig, the problem of slag and dust accumulation in the borehole is solved, dust protection and waste residue treatment are achieved, and construction safety and efficiency are improved.
Patent Information
- Application Number
- CN202410930574.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When existing anchor drilling rigs use high-pressure water to discharge slag, it is easy to accumulate slag and water in the borehole, leading to soaking and collapse of the hole wall. The lack of dust prevention measures affects the health of construction workers and the environment.
A dust-proof and slag-discharging device including a drilling mechanism, a dust-proof component and a slag-discharging mechanism is designed. It uses a combination of a nitrogen generator and a foam generator to spray nitrogen foam for dust protection and waste slag removal, and is equipped with a dust suction mechanism. Waste collection and treatment.
Effectively prevent dust from flying, prevent borehole collapse, reduce environmental pollution, improve construction efficiency, reduce the risk of waste water discharge, and reduce the risk of drill bit overheating.
Smart Images

Figure CN118728295A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of anchor drilling rigs, and in particular to a dust-proof and slag-discharging device for anchor drilling rigs. Background Art
[0002] Anchor drilling rig is a kind of engineering machinery equipment used for drilling and anchoring operations in the fields of construction, geological exploration and excavation. It is usually composed of drill rod, drill bit, drill rod connection device, drilling equipment and power system.
[0003] In the prior art, for example, a Chinese patent application CN114370238 A discloses an anchor drilling rig, which includes a main mast, an extension mast, and an anchor mechanism, wherein the extension mast is configured to be selectively connected to the main mast to form an extension mast mechanism, and the anchor mechanism is configured to be connected to the main mast or the extension mast mechanism. The anchor drilling rig has a standard anchoring mode and an extension anchoring mode, which can meet the drilling requirements of different depths, improve equipment utilization, reduce construction costs, and solve the defect of a single anchor drilling rig having poor adaptability due to a relatively fixed drilling depth.
[0004] However, in the above patent, although the device has a standard anchoring mode and an extended anchoring mode, which can meet the drilling needs of more different depths, improve equipment utilization, reduce construction costs, and solve the defect of poor adaptability of a single anchor drilling rig due to the relatively fixed drilling depth, the device is not equipped with a dust-proof and slag-discharging mechanism, which causes smoke and dust to spread on site, affecting the health of on-site construction workers, and the slag accumulated in the hole can easily cause the drill to get stuck. If high-pressure water is used for slag removal, it is easy to cause slag and water accumulation in the hole. Long-term immersion of the hole wall can cause the collapse of the drill hole, so a new dust-proof and slag-discharging device is needed. Summary of the invention
[0005] The purpose of the present invention is to provide a dust-proof and slag-removing device for an anchor drilling rig, so as to solve the problem proposed in the above background technology that using high-pressure water for slag removal can easily cause slag and water accumulation in the hole, and long-term immersion of the hole wall can cause the borehole to collapse.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a dust-proof and slag-discharging device for an anchor drilling rig, comprising a drilling mechanism, a dust-proof assembly is arranged at the bottom of the drilling mechanism, and a dust suction mechanism is fixedly connected to one side of the outer wall of the dust-proof assembly, and a slag-discharging mechanism is arranged at the top of the drilling mechanism, characterized in that: the drilling mechanism comprises a base, a connecting member is fixedly installed at the top of the base, a slide rail is movably arranged at the top of the connecting member, and a slider is movably embedded at one side of the outer wall of the slide rail, a reducer is fixedly installed at one side of the outer wall of the slider, and a motor is fixedly installed at the input end of the reducer, a drill rod is fixedly installed at the output end of the reducer, and a drill bit is fixedly connected to the bottom of the drill rod, and a group of spray holes are opened at the bottom of the drill bit, and a spiral plate is fixedly installed on the outer wall of the drill rod;
[0007] The slag discharge mechanism comprises a nitrogen generator, the output end of the nitrogen generator is fixedly connected to a gas flow meter, the output end of the gas flow meter is fixedly connected to a foam generator, the input end of the foam generator is fixedly connected to a liquid flow meter, the input end of the liquid flow meter is fixedly connected to a pump, and the bottom of the pump is fixedly connected to a foam box;
[0008] The foam generator includes a circular tube, and a water inlet end and an air inlet end are respectively arranged on both sides of the outer wall of the circular tube, the water inlet end is fixedly connected to the liquid flow meter, and the air inlet end is fixedly connected to the gas flow meter, an air suction net is arranged on the top of the water inlet end, a dispersion plate is arranged inside the circular tube, a discharge end is arranged at the bottom of the circular tube, and the output end of the discharge end is fixedly connected to a water pipe, and the output end of the water pipe is fixedly connected to the input end of the drill pipe.
[0009] Preferably, a first hydraulic rod is movably provided on one side of the outer wall of the connecting member, and the output end of the first hydraulic rod is movably connected to one side of the outer wall of the slide rail, a first guide wheel is slidably embedded in the bottom of the inner wall of the slide rail, a second guide wheel is fixedly installed on the top of the slide rail, a second hydraulic rod is fixedly installed inside the slide rail, and the output end of the second hydraulic rod is fixedly connected to one side of the outer wall of the first guide wheel, steel cables are fixedly installed on both sides of the outer wall of the sliding block, and the steel cables pass through the first guide wheel and the second guide wheel.
[0010] Preferably, the nitrogen generator includes a protective box, an air compressor and an air pump are fixedly installed on one side of the inner wall of the protective box, a nitrogen storage tank is fixedly installed on the other side of the outer wall of the protective box, two separation membranes are fixedly installed on the side opposite to the nitrogen storage tank, and the two separation membranes are fixedly connected to the output end of the air compressor, and the output ends of the two separation membranes are fixedly connected to the input end of the nitrogen storage tank, the output end of the nitrogen storage tank is fixedly connected to the input end of the air pump, the output end of the air pump is fixedly connected to an air pipe, and the output end of the air pipe is fixedly connected to the input end of the gas flowmeter.
[0011] Preferably, a liquid inlet end is arranged on the top of the foam box, and a top cover is arranged on the top of the liquid inlet end, and the liquid inlet end is used to transport the foam mixed liquid.
[0012] Preferably, the dustproof component includes an electric push rod, the output end of the electric push rod is fixedly connected to a rectangular plate, the bottom of the rectangular plate is fixedly connected to a dustproof cylinder, a group of baffles are movably inserted in the annular space of the dustproof cylinder, and each baffle is interlocked with each other, and a limit rod is fixedly inserted on the top of each baffle, and each limit rod is movably inserted on one side of the outer wall of the dustproof cylinder, the outer wall of each limit rod is movably sleeved with a spring, and a slag discharge end is provided on one side of the outer wall of the dustproof cylinder.
[0013] Preferably, a rubber pad is fixedly mounted on the bottom of a group of baffles, and each rubber pad fits each other and has the same shape and size.
[0014] Preferably, the top of the rectangular plate is fixedly connected to a bellows, the top of the bellows is fixedly installed with a connecting plate, and the connecting plate is fixedly installed on the bottom of the slide rail.
[0015] Preferably, the dust suction mechanism includes a dust cylinder, the top of the dust cylinder is fixedly connected to a protective cylinder, the interior of the protective cylinder is fixedly installed with a fixed frame, the outer wall of the fixed frame is fixedly installed with a group of fans, a filter bag is arranged inside the fixed frame, the bottom of the protective cylinder is fixedly connected to a wind cylinder, one side of the outer wall of the dust cylinder is fixedly connected to an air cylinder, a slag cylinder is arranged at the bottom of the dust cylinder, a sealing cover is arranged at the bottom of the slag cylinder, the input end of the dust cylinder is fixedly connected to a dust suction pipe, and the input end of the dust suction pipe is fixedly connected to the slag discharge end.
[0016] Preferably, a support frame is provided on the bottom fixed sleeve of the dust collection cylinder, a group of pulleys are provided on the bottom of the support frame, and a handle is provided on the outer wall fixed sleeve of the dust collection cylinder.
[0017] Preferably, the electric push rod is fixedly mounted on the bottom of the slide rail.
[0018] Compared with the prior art, the present invention has the following beneficial effects:
[0019] 1. In the present invention, by setting a slag discharge mechanism, the waste slag in the borehole can be discharged, and the slag discharge mechanism is composed of a nitrogen generator and a foam generator. The prepared foam liquid and nitrogen are respectively input into the foam generator. The foam liquid and the nitrogen are input in opposite directions. The nitrogen is multiple gases after passing through the dispersion plate to enhance the mixing effect and ensure the formation of stable and continuous foam. The mixed nitrogen foam enters the drill rod and is then sprayed out through the rotation of the drill bit. The nitrogen foam has good adhesion and buoyancy, which can effectively prevent dust from floating in the air, and then prevent dust from causing harm to the bodies of construction workers on site. In combination with the reverse spiral plate, the waste slag in the borehole can be quickly pushed to the ground to prevent the occurrence of drill jamming. In the slag discharge process, the nitrogen foam will not generate a large amount of washing wastewater or other liquid waste, which can not only effectively prevent the collapse of the borehole, but also reduce the risk of environmental pollution. This is very beneficial for environmentally sensitive areas or occasions where wastewater discharge needs to be avoided. The low-temperature nitrogen can cool the drill bit to prevent the drill bit from being damaged due to overheating during high-speed rotation.
[0020] 2. In the present invention, by setting up a dustproof component, the dust generated during the drilling process can be effectively prevented from leaking out, and the bottom of the dustproof component is composed of multiple groups of baffles. When the dustproof component contacts the ground or wall where a hole needs to be drilled, each baffle can be independently displaced upward, so a corresponding closed space can be formed according to the slope of the drilling position, so that the baffle can better fit the position of the drilled hole, thereby preventing dust from leaking out to the greatest extent.
[0021] 3. In the present invention, by setting up a dust suction mechanism, the waste residue discharged from the drill hole can be adsorbed and collected. After the drilling is completed, the collected waste residue is uniformly discharged to a designated location. In this way, the environment of the construction site can be kept from being polluted by the waste residue to the greatest extent, the cost and time of manual cleaning of the site can be reduced, and the efficiency of drilling can be greatly improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic structural diagram of a main view of a dust-proof and slag-discharging device for an anchor drilling rig according to the present invention;
[0023] Figure 2 It is a structural schematic diagram of a front view of a drilling mechanism in a dust-proof and slag-discharging device for an anchor drilling rig according to the present invention;
[0024] Figure 3 It is a structural schematic diagram of a drilling mechanism part in a dust-proof and slag-discharging device for an anchor drilling rig according to the present invention;
[0025] Figure 4 It is a structural schematic diagram of the drill bit disassembly in a dust-proof and slag-discharging device for an anchor drilling rig according to the present invention;
[0026] Figure 5 It is a schematic structural diagram of a cross-section of a dust-proof component in a dust-proof and slag-discharging device for an anchor drilling rig according to the present invention;
[0027] Figure 6 It is a schematic structural diagram of a front view of a slag discharge mechanism in a dust-proof slag discharge device for an anchor drilling rig according to the present invention;
[0028] Figure 7 It is a structural schematic diagram of a foam generator in a dust-proof and slag-discharging device for an anchor drilling rig according to the present invention;
[0029] Figure 8 It is a schematic diagram of the structure inside the nitrogen generator in a dust-proof and slag-discharging device for an anchor drilling rig according to the present invention;
[0030] Fig. 9 It is a structural schematic diagram of a dust suction mechanism in a dust prevention and slag removal device for an anchor drilling rig according to the present invention;
[0031] Fig.10 The present invention is a schematic structural diagram of a cross-section of a dust suction mechanism in a dust prevention and slag removal device for an anchor drilling rig.
[0032] In the figure: 1. drilling mechanism; 10. base; 11. connecting piece; 12. slide rail; 13. first hydraulic rod; 14. second hydraulic rod; 15. first guide wheel; 16. second guide wheel; 17. slide block; 18. steel cable; 19. reducer; 110. motor; 111. drill rod; 112. drill bit; 113. spray hole; 114. spiral plate; 2. dustproof component; 20. electric push rod; 21. rectangular plate; 22. dustproof cylinder; 23. baffle; 24. limit rod; 25. spring; 26. slag discharge end; 27. rubber pad; 28. bellows; 29. connecting plate; 3. slag discharge mechanism; 30. nitrogen generator; 300. protective box; 301. air compressor; 302. Nitrogen storage tank; 303. Separation membrane; 304. Air pump; 305. Air pipe; 306. Gas flow meter; 4. Foam generator; 40. Round pipe; 41. Water inlet end; 42. Air suction net; 43. Air inlet end; 44. Dispersion plate; 45. Discharge end; 46. Liquid flow meter; 47. Pump; 48. Foam box; 49. Water pipe; 410. Liquid inlet end; 411. Top cover; 5. Dust suction mechanism; 50. Dust suction cylinder; 51. Protective cylinder; 52. Fixed frame; 53. Fan; 54. Filter bag; 55. Air cylinder; 56. Air suction cylinder; 57. Slag cylinder; 58. Cover; 59. Dust suction pipe; 510. Support frame; 511. Pulley; 512. Handle. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] Embodiment 1
[0035] Reference Figure 1-Figure 10 As shown: a dust-proof and slag-discharging device for an anchor drilling rig, comprising a drilling mechanism 1, and a dust-proof component 2 is arranged at the bottom of the drilling mechanism 1, and a dust suction mechanism 5 is fixedly connected to one side of the outer wall of the dust-proof component 2, and a slag-discharging mechanism 3 is arranged on the top of the drilling mechanism 1, characterized in that: the drilling mechanism 1 comprises a base 10, a connecting member 11 is fixedly installed on the top of the base 10, a slide rail 12 is movably arranged on the top of the connecting member 11, and a slider 17 is movably embedded on one side of the outer wall of the slide rail 12, a reducer 19 is fixedly installed on one side of the outer wall of the slider 17, and a motor 110 is fixedly installed on the input end of the reducer 19, a drill rod 111 is fixedly installed on the output end of the reducer 19, and a drill bit 112 is fixedly connected to the bottom of the drill rod 111, and a group of spray holes 113 are opened at the bottom of the drill bit 112, and a spiral plate 114 is fixedly installed on the outer wall of the drill rod 111;
[0036] The slag discharge mechanism 3 includes a nitrogen generator 30, the output end of the nitrogen generator 30 is fixedly connected to a gas flow meter 306, the output end of the gas flow meter 306 is fixedly connected to a foam generator 4, the input end of the foam generator 4 is fixedly connected to a liquid flow meter 46, the input end of the liquid flow meter 46 is fixedly connected to a pump 47, and the bottom of the pump 47 is fixedly connected to a foam box 48;
[0037] The foam generator 4 includes a circular tube 40, and a water inlet end 41 and an air inlet end 43 are respectively arranged on both sides of the outer wall of the circular tube 40, the water inlet end 41 is fixedly connected to the liquid flow meter 46, and the air inlet end 43 is fixedly connected to the gas flow meter 306, an air suction net 42 is arranged on the top of the water inlet end 41, a dispersion plate 44 is arranged inside the circular tube 40, a discharge end 45 is arranged at the bottom of the circular tube 40, and the output end of the discharge end 45 is fixedly connected to a water pipe 49, and the output end of the water pipe 49 is fixedly connected to the input end of the drill pipe 111, and the nitrogen generator 30 includes a protective box 300, an air compressor 301 and an air pump 304 are fixedly installed on one side of the inner wall of the protective box 300, and the outer wall of the protective box 300 is fixed on the other side. A nitrogen storage tank 302 is fixedly installed, and two separation membranes 303 are fixedly installed on the opposite side of the nitrogen storage tank 302, and the two separation membranes 303 are fixedly connected to the output end of the air compressor 301, and the output ends of the two separation membranes 303 are fixedly connected to the input end of the nitrogen storage tank 302, the output end of the nitrogen storage tank 302 is fixedly connected to the input end of the air pump 304, the output end of the air pump 304 is fixedly connected with an air pipe 305, and the output end of the air pipe 305 is fixedly connected to the input end of the gas flow meter 306, a liquid inlet end 410 is arranged on the top of the foam box 48, and a top cover 411 is arranged on the top of the liquid inlet end 410, and the liquid inlet end 410 is used to transport the foam mixture.
[0038] The effect achieved by the entire embodiment 1 is that when the pump 47 is started, the foam mixture is extracted from the foam box 48, and the foam mixture passes through the liquid flow meter 46 and finally enters the circular tube 40. When the foam mixture flows through the water inlet end 41, a diffuse atomized jet is formed. This process generates negative pressure around the liquid. The negative pressure causes the surrounding air to be sucked in. Under the action of the air suction net 42, the air is divided into many small portions and mixed with the foam mixture to form foam. At the same time, the air compressor 301 is started, and the air compressor 301 compresses the compressed air. The gas is transported to the separation membrane 303. The separation membrane 303 is usually a polymer membrane or a ceramic membrane. These membranes have specific molecular permeability and can selectively allow oxygen molecules to pass through, while preventing nitrogen and other impurity molecules from passing through. During the membrane separation process, oxygen molecules and other impurities will pass through the membrane, while nitrogen will be blocked on the other side of the membrane. Therefore, the gas collected from the outlet of the membrane separation nitrogen generator 30 is high-purity nitrogen. The nitrogen will be uniformly stored in the nitrogen storage tank 302. At this time, the air pump 304 can be started to transport the nitrogen outward. The nitrogen enters the circular tube 40 through the gas flow meter 306. The foam mixture and the nitrogen are input in opposite directions. The nitrogen is multiple streams of gas after passing through the dispersion plate 44 to enhance the mixing effect and ensure the formation of stable and continuous foam. The nitrogen foam enters the drill rod 111 through the water pipe 49 and is finally ejected through the spray hole 113 of the drill bit 112. The ejected nitrogen foam has good adhesion and buoyancy, which can effectively prevent dust from floating in the air, thereby preventing dust from causing harm to the construction workers on site. The spiral plate 114 and the The rotation direction of the drill rod 111 is opposite, so during the rotation of the drill rod 111, the waste slag in the borehole can be quickly pushed to the ground to prevent the drill from getting stuck. The nitrogen foam will not produce a large amount of water washing wastewater or other liquid waste during the slag removal process, which can not only effectively prevent the borehole from collapsing, but also reduce the risk of environmental pollution. This is very beneficial for environmentally sensitive areas or occasions where wastewater discharge needs to be avoided. The low-temperature nitrogen can cool the drill bit 112 to prevent the drill bit 112 from being damaged due to overheating during high-speed rotation.
[0039] Embodiment 2
[0040] according to Figure 1-Figure 3 and Figure 5As shown, a first hydraulic rod 13 is movably arranged on one side of the outer wall of the connecting member 11, and the output end of the first hydraulic rod 13 is movably connected to one side of the outer wall of the slide rail 12, a first guide wheel 15 is slidably embedded at the bottom of the inner wall of the slide rail 12, a second guide wheel 16 is fixedly installed on the top of the slide rail 12, a second hydraulic rod 14 is fixedly installed inside the slide rail 12, and the output end of the second hydraulic rod 14 is fixedly connected to one side of the outer wall of the first guide wheel 15, steel cables 18 are fixedly installed on both sides of the outer wall of the slider 17, and the steel cables 18 pass through the first guide wheel 15 and the second guide wheel 16, and the dustproof component 2 includes an electric push rod 20, the output end of the electric push rod 20 is fixedly connected to a rectangular plate 21, and the bottom of the rectangular plate 21 is fixedly connected to a dustproof cylinder 22 A group of baffles 23 are movably inserted in the annular space of the dustproof cylinder 22, and each baffle 23 is interlocked with each other, and a limiting rod 24 is fixedly inserted on the top of each baffle 23, and each limiting rod 24 is movably inserted on one side of the outer wall of the dustproof cylinder 22, and a spring 25 is movably sleeved on the outer wall of each limiting rod 24, and a slag discharge end 26 is provided on one side of the outer wall of the dustproof cylinder 22, a group of baffles 23 are fixedly installed with rubber pads 27 at the bottom, and each rubber pad 27 is fitted with each other, and each rubber pad 27 is equal in shape and size, and a bellows 28 is fixedly connected to the top of the rectangular plate 21, and a connecting plate 29 is fixedly installed on the top of the bellows 28, and the connecting plate 29 is fixedly installed at the bottom of the slide rail 12.
[0041] The effect achieved by the entire embodiment 2 is that, by starting the first hydraulic rod 13, the rotation angle of the slide rail 12 can be adjusted, so that the slide rail 12 can be adjusted to a suitable angle as needed to facilitate drilling, and the motor 110 is started. Under the action of the reducer 19, the drill rod 111 is driven to rotate, and when the drill rod 111 rotates, the drill bit 112 is driven to rotate. At this time, starting the second hydraulic rod 14 will push the first guide wheel 15 forward, and under the connection of the steel cable 18, the slider 17 is driven forward, and then the drill rod 111 is driven forward. Therefore, the drill bit 112 can achieve the effect of drilling during high-speed rotation, and the drill bit 112 can achieve the effect of drilling during drilling. Before drilling the hole, start the electric push rod 20, which can push the dustproof cylinder 22 forward until the baffle 23 fits the drilled hole. Since the baffle 23 is divided into multiple parts, each baffle 23 can move up and down under the action of the limit rod 24, and can also form a corresponding closed space according to the slope of the drilled hole position, so that the baffle 23 can better fit the drilled hole position. With the cooperation of the rubber pad 27, dust leakage can be prevented to the greatest extent, and the bellows 28 can prevent dust from drifting away from the top of the dustproof component 2. When the drilling is completed and the dustproof component 2 is lifted, the baffle 23 can be pushed to the previous position under the action of the spring 25.
[0042] Embodiment 3
[0043] according to Figure 1 and Fig. 9 , Fig.10 As shown, the dust suction mechanism 5 includes a dust suction cylinder 50, the top of the dust suction cylinder 50 is fixedly connected to a protective cylinder 51, the interior of the protective cylinder 51 is fixedly installed with a fixed frame 52, the outer wall of the fixed frame 52 is fixedly installed with a group of fans 53, a filter bag 54 is arranged inside the fixed frame 52, the bottom of the protective cylinder 51 is fixedly connected to a wind cylinder 55, one side of the outer wall of the dust suction cylinder 50 is fixedly connected to an air suction cylinder 56, a slag cylinder 57 is arranged at the bottom of the dust suction cylinder 50, and a sealing cover 58 is arranged at the bottom of the slag cylinder 57, the input end of the dust suction cylinder 50 is fixedly connected to a dust suction pipe 59, and the input end of the dust suction pipe 59 is fixedly connected to the slag discharge end 26, the bottom of the dust suction cylinder 50 is fixedly sleeved with a support frame 510, the bottom of the support frame 510 is arranged with a group of pulleys 511, the outer wall of the dust suction cylinder 50 is fixedly sleeved with a handle 512, and the electric push rod 20 is fixedly installed at the bottom of the slide rail 12.
[0044] The effect achieved by the entire embodiment 3 is that by starting the fan 53, a strong suction force can be generated in the dust cylinder 50, and the suction force is transmitted to the dust cylinder 22 through the dust suction pipe 59. The waste residue in the dust cylinder 22 can be sucked into the dust cylinder 50 through the dust suction pipe 59, and then dropped into the residue cylinder 57 for unified collection. After the drilling is completed, under the action of the pulley 511, the entire dust suction mechanism 5 can be pushed to the garbage disposal site, and then the cover 58 can be opened to discharge the waste residue in the residue cylinder 57. In this way, the environment of the construction site can be kept from being polluted by waste residue to the greatest extent, the cost and time of manual cleaning of the site can be reduced, and the efficiency of drilling can be greatly improved.
[0045] The method of use and working principle of the device: When in use, the entire drilling mechanism 1 is fixedly installed on the designated frame through the base 10, and then moved to the position where the hole needs to be drilled. After the movement is completed, the first hydraulic rod 13 is started to adjust the rotation angle of the slide rail 12, so that the slide rail 12 can be adjusted to a suitable angle as needed to facilitate drilling. Before drilling, the electric push rod 20 is started, and the electric push rod 20 can push the dust cylinder 22 forward until the baffle 23 fits the drilling hole. Since the baffle 23 is divided into multiple parts, each baffle 23 can move up and down under the action of the limit rod 24, and can also form a corresponding closed space according to the slope of the drilling position, so that the baffle 23 can better fit the drilling position, on the rubber pad 27, dust can be prevented from leaking out to the greatest extent, and the bellows 28 can prevent dust from drifting out from the top of the dustproof component 2. The motor 110 is started, and the drill rod 111 is driven to rotate under the action of the reducer 19. When the drill rod 111 rotates, the drill bit 112 is driven to rotate. At this time, the second hydraulic rod 14 is started, and the first guide wheel 15 is pushed forward. Under the connection of the steel cable 18, the slider 17 is driven forward, and then the drill rod 111 is driven forward. Therefore, the drill bit 112 can achieve the effect of drilling during high-speed rotation. When drilling, the pump 47 is started to extract the foam mixture from the foam box 48, and the foam mixture passes through the liquid flow meter 46 and finally enters the round pipe 4. 0, when the foam mixture flows through the water inlet end 41, a diffused atomized jet is formed. This process generates negative pressure around the liquid. The negative pressure causes the surrounding air to be sucked in. Under the action of the air suction net 42, the air is divided into many small portions and mixed with the foam mixture to form foam. At the same time, the air compressor 301 is started. The air compressor 301 delivers the compressed air to the separation membrane 303. The separation membrane 303 usually adopts a polymer membrane or a ceramic membrane. These membranes have specific molecular permeability and can selectively allow oxygen molecules to pass through, while preventing nitrogen and other impurity molecules from passing through. In the membrane separation process, oxygen molecules and other impurities will pass through the membrane, while nitrogen is blocked on the other side of the membrane. Therefore, the nitrogen generator 30 is separated from the membrane. The gas collected at the outlet is high-purity nitrogen, which will be uniformly stored in the nitrogen storage tank 302. At this time, the air pump 304 is started to transport the nitrogen outward, and the nitrogen enters the circular tube 40 through the gas flow meter 306. The foam mixture and the nitrogen are input in opposite directions. The nitrogen is multiple streams of gas after passing through the dispersion plate 44 to enhance the mixing effect and ensure the formation of stable and continuous foam. The nitrogen foam then enters the drill rod 111 through the water pipe 49, and is finally sprayed out through the spray hole 113 of the drill bit 112. The sprayed nitrogen foam has good adhesion and buoyancy, which can effectively prevent dust from floating in the air, thereby preventing dust from causing harm to the bodies of construction workers on site. The spiral plate 114 rotates in the opposite direction to the drill rod 111.Therefore, during the rotation of the drill rod 111, the waste residue in the borehole can be quickly pushed to the ground to prevent the drill from getting stuck. By starting the fan 53, a strong suction force can be generated in the dust suction cylinder 50, and the suction force is transmitted to the dustproof cylinder 22 through the dust suction pipe 59. The waste residue in the dustproof cylinder 22 can be sucked into the dust suction cylinder 50 through the dust suction pipe 59, and then dropped into the slag cylinder 57 for unified collection. After the drilling is completed, the entire dust suction mechanism 5 can be pushed to the garbage disposal site under the action of the pulley 511, and the dust suction mechanism 5 can be pushed to the garbage disposal site. Then, the cover 58 can be opened to discharge the waste residue in the slag cylinder 57, so that the environment of the construction site can be kept from being affected to the greatest extent. The pollution of waste residue can also reduce the cost and time of manual cleaning site, greatly improving the efficiency of drilling. In the process of removing residue, nitrogen foam will not produce a large amount of washing wastewater or other liquid waste, which can not only effectively prevent the collapse of the drilling hole, but also reduce the risk of environmental pollution. This is very beneficial for environmentally sensitive areas or occasions where wastewater discharge needs to be avoided. The low-temperature nitrogen can cool the drill bit 112 to prevent the drill bit 112 from being damaged due to overheating during high-speed rotation. When the drilling is completed and the dustproof component 2 is lifted, the baffle 23 can be pushed to the previous position under the action of the spring 25. In summary, the problems raised in the above background are solved.
[0046] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A dust-proof and slag-discharging device for an anchor drilling rig, comprising a drilling mechanism (1), wherein a dust-proof assembly (2) is arranged at the bottom of the drilling mechanism (1), and a dust-absorbing mechanism (5) is fixedly connected to one side of the outer wall of the dust-proof assembly (2), and a slag-discharging mechanism (3) is arranged at the top of the drilling mechanism (1), characterized in that: The drilling mechanism (1) comprises a base (10), a connecting member (11) is fixedly installed on the top of the base (10), a slide rail (12) is movably arranged on the top of the connecting member (11), and a slider (17) is movably embedded on one side of the outer wall of the slide rail (12), a reducer (19) is fixedly installed on one side of the outer wall of the slider (17), and a motor (110) is fixedly installed on the input end of the reducer (19), a drill rod (111) is fixedly installed on the output end of the reducer (19), and a drill bit (112) is fixedly connected to the bottom of the drill rod (111), and a group of spray holes (113) are opened at the bottom of the drill bit (112), and a spiral plate (114) is fixedly installed on the outer wall of the drill rod (111); The slag discharge mechanism (3) comprises a nitrogen generator (30), the output end of the nitrogen generator (30) is fixedly connected to a gas flow meter (306), the output end of the gas flow meter (306) is fixedly connected to a foam generator (4), the input end of the foam generator (4) is fixedly connected to a liquid flow meter (46), the input end of the liquid flow meter (46) is fixedly connected to a pump (47), and the bottom of the pump (47) is fixedly connected to a foam box (48); The foam generator (4) comprises a circular tube (40), and a water inlet end (41) and an air inlet end (43) are respectively arranged on both sides of the outer wall of the circular tube (40), the water inlet end (41) is fixedly connected to a liquid flow meter (46), and the air inlet end (43) is fixedly connected to a gas flow meter (306), an air suction net (42) is arranged on the top of the water inlet end (41), a dispersion plate (44) is arranged inside the circular tube (40), a discharge end (45) is arranged at the bottom of the circular tube (40), and the output end of the discharge end (45) is fixedly connected to a water pipe (49), and the output end of the water pipe (49) is fixedly connected to the input end of the drill pipe (111).
2. The dust-proof and slag-discharging device for an anchor drilling rig according to claim 1, characterized in that: A first hydraulic rod (13) is movably arranged on one side of the outer wall of the connecting member (11), and the output end of the first hydraulic rod (13) is movably connected to one side of the outer wall of the slide rail (12); a first guide wheel (15) is slidably embedded in the bottom of the inner wall of the slide rail (12); a second guide wheel (16) is fixedly installed on the top of the slide rail (12); a second hydraulic rod (14) is fixedly installed inside the slide rail (12), and the output end of the second hydraulic rod (14) is fixedly connected to one side of the outer wall of the first guide wheel (15); steel cables (18) are fixedly installed on both sides of the outer wall of the sliding block (17), and the steel cables (18) pass through the first guide wheel (15) and the second guide wheel (16).
3. The dust-proof and slag-discharging device for an anchor drilling rig according to claim 2, characterized in that: The nitrogen generator (30) comprises a protection box (300), an air compressor (301) and an air pump (304) are fixedly mounted on one side of the inner wall of the protection box (300), a nitrogen storage tank (302) is fixedly mounted on the other side of the outer wall of the protection box (300), two separation membranes (303) are fixedly mounted on the side opposite to the nitrogen storage tank (302), and both of the two separation membranes (303) are fixedly connected to the output end of the air compressor (301), while the output ends of the two separation membranes (303) are fixedly connected to the input end of the nitrogen storage tank (302), the output end of the nitrogen storage tank (302) is fixedly connected to the input end of the air pump (304), the output end of the air pump (304) is fixedly connected to an air pipe (305), and the output end of the air pipe (305) is fixedly connected to the input end of a gas flow meter (306).
4. The dust-proof and slag-discharging device for an anchor drilling rig according to claim 3, characterized in that: A liquid inlet end (410) is arranged on the top of the foam box (48), and a top cover (411) is arranged on the top of the liquid inlet end (410), and the liquid inlet end (410) is used to transport the foam mixed liquid.
5. The dust-proof and slag-discharging device for an anchor drilling rig according to claim 4, characterized in that: The dustproof component (2) comprises an electric push rod (20), the output end of the electric push rod (20) is fixedly connected to a rectangular plate (21), the bottom of the rectangular plate (21) is fixedly connected to a dustproof cylinder (22), a group of baffles (23) are movably inserted in the annular space of the dustproof cylinder (22), and each baffle (23) is interlocked with each other, and a limiting rod (24) is fixedly inserted at the top of each baffle (23), and each limiting rod (24) is movably inserted on one side of the outer wall of the dustproof cylinder (22), and the outer wall of each limiting rod (24) is movably sleeved with a spring (25), and a slag discharge end (26) is provided on one side of the outer wall of the dustproof cylinder (22).
6. The dust-proof and slag-discharging device for an anchor drilling rig according to claim 5, characterized in that: A rubber pad (27) is fixedly mounted on the bottom of each of the baffles (23), and each of the rubber pads (27) fits each other, and each of the rubber pads (27) is equal in shape and size.
7. The dust-proof and slag-discharging device for an anchor drilling rig according to claim 6, characterized in that: The top of the rectangular plate (21) is fixedly connected to a bellows (28), the top of the bellows (28) is fixedly mounted with a connecting plate (29), and the connecting plate (29) is fixedly mounted on the bottom of the slide rail (12).
8. The dust-proof and slag-discharging device for an anchor drilling rig according to claim 7, characterized in that: The dust suction mechanism (5) comprises a dust suction cylinder (50), the top of the dust suction cylinder (50) is fixedly connected to a protective cylinder (51), a fixed frame (52) is fixedly installed inside the protective cylinder (51), a group of fans (53) are fixedly installed on the outer wall of the fixed frame (52), a filter bag (54) is arranged inside the fixed frame (52), the bottom of the protective cylinder (51) is fixedly connected to a wind cylinder (55), one side of the outer wall of the dust suction cylinder (50) is fixedly connected to an air suction cylinder (56), a slag cylinder (57) is arranged at the bottom of the dust suction cylinder (50), a sealing cover (58) is arranged at the bottom of the slag cylinder (57), the input end of the dust suction cylinder (50) is fixedly connected to a dust suction pipe (59), and the input end of the dust suction pipe (59) is fixedly connected to a slag discharge end (26).
9. The dust-proof and slag-discharging device for an anchor drilling rig according to claim 8, characterized in that: The bottom of the dust collection cylinder (50) is fixedly sleeved with a support frame (510), a group of pulleys (511) are arranged at the bottom of the support frame (510), and the outer wall of the dust collection cylinder (50) is fixedly sleeved with a handle (512).
10. The dust-proof and slag-discharging device for an anchor drilling rig according to claim 9, characterized in that: The electric push rod (20) is fixedly mounted on the bottom of the slide rail (12).
Citation Information
Patent Citations
Anchoring drilling machine
CN114370238A
Cited By
Drilling and cleaning integrated coal seam drilling device and using method
CN119844005A
An integrated drilling and cleaning device for coal seam boreholes and its usage method
CN119844005B
