Gas reservoir and hydrate reservoir collaborative development method, system and well group
Through the collaborative development method of gas reservoirs and hydrate reservoirs, using well groups for constant pressure production and pressure difference, the problem of low productivity of natural gas hydrate reservoirs developed by a single pressure reduction method has been solved, and the efficient development of natural gas hydrate reservoirs has been achieved.
Patent Information
- Application Number
- CN202310343706.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-03-31
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-03-31
AI Technical Summary
When developing natural gas hydrate reservoirs using a single depressurization method, the production capacity is low and it is difficult to achieve the minimum production capacity required for development. How to improve the development method to significantly increase the production capacity of natural gas hydrate reservoirs.
The method of collaborative development of gas reservoirs and hydrate reservoirs is adopted. The well group includes central wells and connecting wells, and the pressure difference is used to carry out constant pressure mining. First, a packer is installed at the bottom of the hydrate reservoir for the first round of mining, and then the packer is changed. The central well is used to carry out the second round of mining, and the free gas in the gas reservoir is used to carry heat energy to promote the decomposition of hydrates.
It greatly increases the gas production rate and decomposition rate of natural gas hydrate reservoirs, realizes the coordinated development of gas reservoirs and hydrate reservoirs, and increases the production capacity of natural gas hydrate reservoirs.
Smart Images

Figure CN118728346A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method, system and well group for coordinated development of a gas reservoir and a hydrate reservoir. Background Art
[0002] With the rapid economic development, the world's demand for oil and gas energy continues to increase, conventional oil and gas resources continue to decrease, and unconventional oil and gas resources have received widespread attention from all over the world. Natural gas hydrate is an ice-like solid crystal composed of natural gas and water molecules distributed in seabed sediments or terrestrial permafrost. Its combustion only produces carbon dioxide and water, and does not pollute the environment. It is a new type of green energy. The development methods of natural gas hydrate reservoirs mainly include pressure reduction method, thermal shock method, inhibitor injection method and CO2 replacement method. Among them, the thermal shock method, inhibitor injection method and CO2 replacement method all require the injection of fluids (hot water, inhibitors, CO2), so the cost is high, while the pressure reduction method does not require fluid injection and is currently the most likely development method. Summary of the invention
[0003] The inventor of the present invention found that the results of two test productions in the existing sea area showed that the production capacity of natural gas hydrate reservoirs was low when a single pressure reduction method was used to develop the natural gas hydrate reservoir, and it was difficult to achieve the minimum production capacity required for development. How to improve the development method and significantly increase the production capacity of natural gas hydrate reservoirs is a key issue that needs to be solved urgently. In view of the above problems, it is necessary for the present invention to propose a method, system and well group for the coordinated development of gas reservoirs and hydrate reservoirs to solve or partially solve the above problems. The technical solutions proposed by the present invention are as follows:
[0004] In a first aspect, the present invention provides a method for coordinated development of a gas reservoir and a hydrate reservoir, which is implemented by a well group, wherein the well group includes a central well and at least one connecting well arranged around the central well; the method includes:
[0005] A tubing is run between the hydrate reservoir and the gas reservoir;
[0006] Drilling the connecting well through the hydrate reservoir and the oil pipe to a first preset position of the gas reservoir, and performing perforations in the hydrate reservoir and the gas reservoir respectively;
[0007] Drilling the central well to a second preset position of the hydrate reservoir and performing perforations in the hydrate reservoir;
[0008] A packer is installed in the connecting well at a position corresponding to the bottom of the hydrate reservoir, and the connecting well and the central well are used to carry out a first round of constant pressure production, so that the hydrate in the hydrate reservoir is decomposed under the action of the pressure difference; wherein the bottom hole pressure during the first round of constant pressure production is less than the original pressure of the hydrate reservoir;
[0009] During the first round of constant pressure production, the gas production rates of the connecting well and the central well are monitored until the daily gas production of the central well and the connecting well decreases to a first preset gas production;
[0010] The packer is installed at a position corresponding to the top of the hydrate reservoir in the connecting well, and the central well is used for a second round of constant pressure production, so that the free gas in the gas reservoir can return to the hydrate reservoir along the connecting well under the pressure difference between the hydrate reservoir and the gas reservoir, and carry heat energy to promote the decomposition of hydrates; wherein the bottom hole pressure during the second round of constant pressure production is less than the original pressure of the hydrate reservoir;
[0011] During the second round of constant-pressure production, the gas production rate of the central well is monitored until the single-well daily gas production of the central well decreases to a second preset gas production, and then production is stopped.
[0012] In an optional embodiment, during the first round of constant-pressure production, the bottom hole pressure is 0.3 to 0.7 times the original pressure of the hydrate reservoir.
[0013] In an optional embodiment, the daily gas production of the central well and the connecting well is reduced to 500
[0014] 1000m 3 / d, the first round of constant pressure mining ends.
[0015] In an optional embodiment, the daily gas production in the central well is gradually reduced to 500-1000m 3 / d, the second round of constant pressure mining ends.
[0016] In an optional embodiment, during the second round of constant-pressure production, the bottom hole pressure is 0.3 to 0.7 times the original pressure of the hydrate reservoir.
[0017] In an optional embodiment, drilling the connecting well through the hydrate reservoir to a first preset position of the gas reservoir includes:
[0018] The connecting well penetrates the hydrate reservoir and is drilled to a distance from the top of the gas reservoir. Location.
[0019] In an optional embodiment, drilling the central well to a second preset position of the hydrate reservoir and performing perforation in the hydrate reservoir comprises:
[0020] The central well is drilled to a distance from the top of the hydrate reservoir. location and perforating in the hydrate reservoir.
[0021] In an optional embodiment, both the connecting well and the central well are completed by perforation, and each perforation point is spaced 5 to 10 m apart.
[0022] In an optional embodiment, the lowered oil pipe is made of heat-insulating material.
[0023] In an optional embodiment, the lowered oil pipe is made of glass fiber, and the thermal conductivity is less than 0.04 W / m·K.
[0024] In a second aspect, the present invention provides a gas reservoir and hydrate reservoir collaborative development system, which is implemented by a well group, wherein the well group includes a central well and at least one connecting well arranged around the central well;
[0025] The system comprises: an oil pipe lowering device, a perforating device, a production device and a gas production monitoring device;
[0026] The oil pipe lowering device is used to lower the oil pipe between the hydrate reservoir and the gas reservoir;
[0027] The perforating device is used to drill the connecting well through the hydrate reservoir and the oil pipe to a first preset position of the gas reservoir, and perform perforations in the hydrate reservoir and the gas reservoir respectively; and to drill the central well to a second preset position of the hydrate reservoir, and perform perforations in the hydrate reservoir;
[0028] The production device is used to install a packer at a position corresponding to the bottom of the hydrate reservoir in the connecting well, and use the connecting well and the central well to carry out a first round of constant-pressure production, so that the hydrate in the hydrate reservoir is decomposed under the action of the pressure difference; wherein the bottom hole pressure is less than the original pressure of the hydrate reservoir during the first round of constant-pressure production; and, the packer is installed at a position corresponding to the top of the hydrate reservoir in the connecting well, and the central well is used to carry out a second round of constant-pressure production, so that the free gas in the gas reservoir can return to the hydrate reservoir along the connecting well under the action of the pressure difference between the hydrate reservoir and the gas reservoir, and carry heat energy to promote the decomposition of the hydrate; wherein, during the second round of constant-pressure production, the bottom hole pressure is less than the original pressure of the hydrate reservoir, and the production is stopped;
[0029] The gas production monitoring device is used to monitor the gas production rate of the connecting well and the central well during the first round of constant-pressure production, until the daily gas production of the central well and the connecting well decreases to a first preset gas production; and, during the second round of constant-pressure production, monitor the gas production rate of the central well until the daily gas production of the central well decreases to a second preset gas production.
[0030] In a third aspect, the present invention provides a well group for collaborative development of a gas reservoir and a hydrate reservoir, comprising: a central well and at least one connecting well arranged around the central well, the connecting well penetrating the hydrate reservoir and being drilled to a first preset position of the gas reservoir, and the central well being drilled to a second preset position of the hydrate reservoir.
[0031] In an optional embodiment, the connecting well penetrates the hydrate reservoir and is drilled to a distance from the top of the gas reservoir. Location.
[0032] In an optional embodiment, the central well is drilled to a depth of 100 m from the top of the hydrate reservoir. Location.
[0033] In a fourth aspect, the present invention provides an application of the coordinated development well group of a gas reservoir and a hydrate reservoir as described in the third aspect in the coordinated development of a gas reservoir and a hydrate reservoir.
[0034] Based on the above technical solution, the beneficial effects of the present invention compared with the prior art are as follows:
[0035] The method for coordinated development of gas reservoirs and hydrate reservoirs provided by the present invention comprises the following steps: installing a packer at a position corresponding to the bottom of the hydrate reservoir in the connected well, performing a first round of constant pressure production on the hydrate reservoir by using a well group, namely the connected well and the central well, and controlling the bottom hole pressure to be less than the original pressure of the hydrate reservoir during the first round of production pressure, so that the hydrate in the hydrate reservoir is decomposed under the action of the pressure difference, and the decomposed natural gas enters the wellbore through the perforated holes and is produced by the well group, and the pressure of the hydrate reservoir is continuously reduced; after the first round of production is completed, the position of the packer in the connected well is changed, and the packer is installed in the connected well. The center well is used for the second round of constant-pressure production at the position corresponding to the top of the hydrate reservoir, and the bottom hole pressure is controlled to be lower than the original pressure of the hydrate reservoir during the second round of constant-pressure production. After the first round of pressure-reducing production, due to the reduction of the hydrate reservoir pressure, the free gas in the gas reservoir can return to the hydrate reservoir along the connecting well under the action of the pressure difference between the hydrate reservoir and the gas reservoir, and carry heat energy to promote the decomposition of hydrates, which can greatly increase the gas production rate and hydrate decomposition rate of the gas reservoir, realize the coordinated development of gas reservoirs and hydrate reservoirs, and provide a new technical idea for greatly increasing the production capacity of natural gas hydrate reservoirs.
[0036] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention are realized and obtained by the structures particularly pointed out in the description, claims and drawings.
[0037] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below and described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 It is a schematic flow chart of a method for collaborative development of gas reservoirs and hydrate reservoirs provided in an embodiment of the present invention;
[0040] Figure 2 is a schematic diagram of a well group for depressurizing and developing a hydrate reservoir provided by an embodiment of the present invention;
[0041] Figure 3 It is a schematic diagram of a well group for jointly developing a hydrate reservoir and a gas reservoir by utilizing thermal energy of a gas reservoir provided by an embodiment of the present invention;
[0042] In the figure: 1, sea level; 2, connecting well; 3, central well; 4, gas reservoir; 5, natural gas flow direction; 6, cap rock; 7, hydrate reservoir; 8, packer; 9, oil pipe; 10, perforation point. DETAILED DESCRIPTION
[0043] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0044] Exemplary embodiments will be described in detail herein, examples of which are shown in the accompanying drawings. When the following description refers to the drawings, the same numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Instead, they are merely examples of devices and methods consistent with some aspects of the present invention as detailed in the appended claims.
[0045] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0046] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0047] Embodiment 1
[0048] The embodiment of the present invention provides a method for collaborative development of gas reservoirs and hydrate reservoirs, referring to Figure 2 As shown, a well group is used for implementation, wherein the well group includes a central well 3 and at least one connecting well 2 arranged around the central well 3; the connecting well 2 and the central well 3 penetrate the hydrate reservoir 7, the cap rock 6 and the sea level 1;
[0049] Reference Figure 1 As shown, the method includes:
[0050] S101, lowering the oil pipe 9 between the hydrate reservoir 7 and the gas reservoir 4;
[0051] In the embodiment of the present invention, according to the geological structure environment of the block, a natural gas hydrate reservoir 7 block with an underlying gas reservoir 4 is selected as a measure area, wherein the thickness of the hydrate reservoir 7 is not less than 15 m. After the measure area is selected, an oil pipe 9 is lowered between the selected hydrate reservoir 7 and the gas reservoir 4, and the oil pipe 9 is an insulated oil pipe.
[0052] S102, drilling the connecting well 2 through the hydrate reservoir 7 and the oil pipe 9 to a first preset position of the gas reservoir 4, and performing perforations in the hydrate reservoir 7 and the gas reservoir 4 respectively;
[0053] S103, drilling the central well 3 to a second preset position of the hydrate reservoir 7, and performing perforation in the hydrate reservoir 7;
[0054] S104. Reference Figure 2 As shown, a packer 8 is installed in the connecting well 2 at a position corresponding to the bottom of the hydrate reservoir 7, and the connecting well 2 and the central well 3 are used to carry out the first round of constant pressure production, so that the hydrate in the hydrate reservoir 7 is decomposed under the action of the pressure difference; wherein, the bottom hole pressure during the first round of constant pressure production is less than the original pressure of the hydrate reservoir;
[0055] The well group, i.e., the connecting well 2 and the central well 3, adopts constant pressure production. The bottom hole pressure is lower than the original pressure of the hydrate reservoir. Under the action of the pressure difference, the hydrate decomposes, and the decomposed natural gas enters the wellbore through the perforated holes and is produced by the well group (see Figure 2 Direction of natural gas flow in 5).
[0056] S105, during the first round of constant pressure production, monitoring the gas production rates of the connecting well 2 and the central well 3 until the daily gas production of the central well 3 and the connecting well 2 decreases to a first preset gas production;
[0057] S106, reference Figure 3 As shown, the packer 8 is installed at the position corresponding to the top of the hydrate reservoir 7 in the connecting well 2, and the central well 3 is used to carry out a second round of constant pressure production, so that the free gas in the gas reservoir 4 can return to the hydrate reservoir 7 along the connecting well 2 under the pressure difference between the hydrate reservoir 7 and the gas reservoir 4, and carry heat energy to promote the decomposition of hydrates; wherein, the bottom hole pressure during the second round of constant pressure production is less than the original pressure of the hydrate reservoir;
[0058] The packer 8 installed at the bottom of the hydrate reservoir 7 is used to separate the hydrate reservoir 7 from the gas reservoir 4 in the wellbore, and the packer 8 installed at the top of the hydrate reservoir 7 is used to separate the hydrate reservoir 7 from the top of the hydrate reservoir 7 in the wellbore. After the first round of depressurization development, the reservoir pressure, that is, the pressure of the hydrate reservoir 7, is reduced. By changing the position of the packer 8, a pressure difference can be formed between the hydrate reservoir 7 and the gas reservoir 4. The free gas in the gas reservoir 4 can return to the hydrate reservoir 7 along the connecting well 2 under the action of the pressure difference between the hydrate reservoir 7 and the gas reservoir 4, and at the same time carry heat energy to promote the decomposition of hydrates, so as to achieve the coordinated development of the gas reservoir 4 and the hydrate reservoir 7. The natural gas generated by the decomposition of hydrates and the free gas in the gas reservoir 4 return to the hydrate reservoir 7 and enter the wellbore through the perforated holes and are produced by the central well 3.
[0059] S107. During the second round of constant-pressure production, the gas production rate of the central well 3 is monitored until the single-well daily gas production of the central well 3 decreases to a second preset gas production, and then production is stopped.
[0060] In the embodiment of the present invention, the well group is used to exploit the gas reservoir 4 and the hydrate reservoir 7 to be exploited. According to the actual situation of the gas reservoir 4 and the hydrate reservoir 7 to be exploited, multiple well groups provided by the embodiment of the present invention can be arranged to jointly exploit the gas reservoir 4 and the hydrate reservoir 7 to be exploited, so as to improve the recovery efficiency of the gas reservoir 4 and the hydrate reservoir 7.
[0061] In the embodiment of the present invention, the number of the connecting wells 2 and the number of the central wells 3 arranged in the well group can be selected according to the actual situation of the gas reservoir 4 and the hydrate reservoir 7 to be mined, as long as the recovery rate of the gas reservoir 4 and the hydrate reservoir 7 can be better improved. In order to better illustrate the well group provided in the embodiment of the present invention, this embodiment is described in detail as follows for the sake of ease of understanding, taking the well group including two connecting wells 2 and one central well 3 as an example: Figure 2As shown, the two connected wells 2 are arranged around the central well 3. Before mining, three vertical wells are drilled to form a well group consisting of two connected wells and one central well.
[0062] The well group designed by the present invention, which consists of a connecting well 2 and a central well 3, is used to first reduce the pressure of the natural gas hydrate reservoir 7 for exploitation. The reservoir pressure is continuously reduced, and the position of the packer 8 in the connecting well 2 is changed. The free gas in the gas reservoir 4 can return to the natural gas hydrate reservoir 7 along the connecting well 2 under the action of the pressure difference, and at the same time carry heat energy to promote the decomposition of hydrates, thereby realizing the coordinated development of the gas reservoir 4 and the hydrate reservoir 7.
[0063] The method for collaborative development of gas reservoirs and hydrate reservoirs provided in an embodiment of the present invention can be applied to the exploitation of natural gas hydrate reservoirs with underlying gas reservoirs. Through a well group consisting of connected wells and central wells, the thermal energy of the gas reservoir is used to promote the depressurization and development of production capacity of the natural gas hydrate reservoir. Specifically, a packer is installed in a connected well at a position corresponding to the bottom of the hydrate reservoir, and the first round of constant-pressure production of the hydrate reservoir is carried out using a well group, i.e., a connected well and a central well, and the bottom hole pressure during the first round of production is controlled to be less than the original pressure of the hydrate reservoir, so that the hydrate in the hydrate reservoir is decomposed under the action of the pressure difference, and the decomposed natural gas enters the wellbore through the perforated holes and is produced by the well group, and the pressure of the hydrate reservoir is continuously reduced; after the first round of production, the position of the packer in the connected well is changed, and the packer is installed at a position corresponding to the top of the hydrate reservoir in the connected well, and the second round of constant-pressure production is carried out using the central well, and the bottom hole pressure during the second round of constant-pressure production is controlled to be less than the original pressure of the hydrate reservoir. After the first round of pressure reduction production, due to the reduction in the pressure of the hydrate reservoir, the free gas in the gas reservoir can return to the hydrate reservoir along the connected well under the action of the pressure difference between the hydrate reservoir and the gas reservoir, and at the same time carry heat energy to promote the decomposition of hydrates, which can greatly increase the gas production rate and hydrate decomposition rate of the gas reservoir, realize the coordinated development of the gas reservoir and the hydrate reservoir, and provide a new technical idea for greatly increasing the production capacity of the natural gas hydrate reservoir.
[0064] In a specific embodiment, during the first round of constant pressure production, the bottom hole pressure is 0.30.7 times the original pressure of the hydrate reservoir.
[0065] In a specific embodiment, the daily gas production of the central well 3 and the connecting well 2 is reduced to 500
[0066] 1000m 3 / d, the first round of constant pressure mining ends.
[0067] In a specific embodiment, the daily gas production of the central well 3 is gradually reduced to 500-1000m 3 / d, the second round of constant pressure mining ends.
[0068] In a specific embodiment, during the second round of constant-pressure production, the bottom hole pressure is 0.3 to 0.7 times the original pressure of the hydrate reservoir.
[0069] In a specific embodiment, drilling the connecting well 2 through the hydrate reservoir 7 to a first preset position of the gas reservoir 4 includes:
[0070] The connecting well 2 penetrates the hydrate reservoir 7 and is drilled to a distance from the top of the gas reservoir 4. Location.
[0071] In a specific embodiment, drilling the central well 3 to the second preset position of the hydrate reservoir 7 and performing perforation in the hydrate reservoir 7 includes:
[0072] The central well 3 is drilled to a distance from the top of the hydrate reservoir 7. location and perforating was performed in the hydrate reservoir 7.
[0073] In a specific embodiment, the connecting well 2 and the central well 3 are both completed by perforation, and each perforation point is spaced 5 to 10 m apart.
[0074] In a specific embodiment, the lowered oil pipe 9 is made of heat-insulating material. The oil pipe 9 is made of heat-insulating material to reduce the loss of heat carried by free gas in the gas reservoir.
[0075] In a specific embodiment, the lowered oil pipe 9 is made of glass fiber, and the thermal conductivity is less than 0.04 W / m·K.
[0076] In order to better illustrate the method for coordinated development of gas reservoirs and hydrate reservoirs provided in the embodiment of the present invention, this embodiment is described through a specific embodiment for ease of understanding, and the specific steps include:
[0077] S201. According to the geological structure environment of the block, a natural gas hydrate reservoir 7 block with an underlying gas reservoir 4 is selected as a measure area, wherein the thickness of the hydrate reservoir 7 is not less than 15 m;
[0078] S202, reference Figure 2 As shown, two connecting wells 2 and a central well 3 are drilled, wherein the connecting well 2 penetrates the hydrate reservoir 7 and is drilled to a depth of 1.5 m from the top of the gas reservoir 4. Position, and perforation is performed in the hydrate reservoir 7 and the gas reservoir 4 respectively. The oil pipe 9 is made of glass fiber with a thermal conductivity of less than 0.04W / m·K. The central well 3 is drilled to a distance from the top of the hydrate reservoir Perforate at the location, with each perforation point 10 being 5m apart;
[0079] S203, reference Figure 2As shown, a packer 8 is installed at a position corresponding to the bottom of the hydrate reservoir in the two connected wells 2;
[0080] S204, reference Figure 2 As shown, the well group (i.e., two connected wells 2 and central well 3) adopts constant pressure production, and the bottom hole pressure is 0.5 times the original pressure of the hydrate reservoir. Under the action of the pressure difference, the hydrate decomposes, and the decomposed natural gas enters the wellbore through the perforated holes and is produced by the well group;
[0081] S205. Continuously record the gas production rate. When the daily gas production of a single well decreases to 1000m 3 / d, change the position of packer 8, refer to Figure 3 As shown, the packers 8 in the two connected wells 2 are installed to the position corresponding to the top of the hydrate reservoir, and the central well 3 is used for constant pressure production. The bottom hole pressure is 0.5 times the original pressure of the hydrate reservoir. After the pressure reduction development, the pressure of the hydrate reservoir is reduced, and the free gas in the gas reservoir 4 can return to the hydrate reservoir 7 along the connected well 2 under the action of the pressure difference, and at the same time carry heat energy to promote the decomposition of the hydrate reservoir 7, so as to realize the coordinated development of the gas reservoir 4 and the hydrate reservoir 7;
[0082] S206, such as Figure 2 As shown in the figure, the gas production rate is continuously recorded. When the gas production of the central well decreases to 1000m3 per day, 3 / d, stop mining.
[0083] Embodiment 2
[0084] Based on the same inventive concept, an embodiment of the present invention further provides a method for coordinated development of a gas reservoir and a hydrate reservoir, which is implemented by a well group, wherein the well group includes a central well 3 and at least one connecting well 2 arranged around the central well 3;
[0085] The system comprises: an oil pipe lowering device, a perforating device, a production device and a gas production monitoring device;
[0086] The oil pipe lowering device is used to lower the oil pipe 9 between the hydrate reservoir 7 and the gas reservoir 4;
[0087] The perforating device is used to drill the connecting well 2 through the hydrate reservoir 7 and the oil pipe 9 to a first preset position of the gas reservoir 4, and perform perforations in the hydrate reservoir 7 and the gas reservoir 4 respectively; and drill the central well 3 to a second preset position of the hydrate reservoir 7, and perform perforations in the hydrate reservoir 7;
[0088] The production device is used to install a packer 8 at a position corresponding to the bottom of the hydrate reservoir 7 in the connecting well 2, and use the connecting well 2 and the central well 3 to perform a first round of constant pressure production, so that the hydrate in the hydrate reservoir 7 decomposes under the action of the pressure difference; wherein the bottom hole pressure is less than the original pressure of the hydrate reservoir during the first round of constant pressure production; and, install the packer 8 to a position corresponding to the top of the hydrate reservoir 7 in the connecting well 2, and use the central well 3 to perform a second round of constant pressure production, so that the free gas in the gas reservoir 4 can return to the hydrate reservoir 7 along the connecting well 2 under the action of the pressure difference between the hydrate reservoir 7 and the gas reservoir 4, and carry heat energy to promote the decomposition of the hydrate; wherein, during the second round of constant pressure production, the bottom hole pressure is less than the original pressure of the hydrate reservoir, and the production is stopped;
[0089] The gas production monitoring device is used to monitor the gas production rate of the connecting well 2 and the central well 3 during the first round of constant-pressure production, until the single-well daily gas production of the central well 3 and the connecting well 2 decreases to the first preset gas production; and, during the second round of constant-pressure production, monitor the gas production rate of the central well 3 until the single-well daily gas production of the central well 3 decreases to the second preset gas production.
[0090] In the embodiment of the present invention, the method for collaborative development of gas reservoirs and hydrate reservoirs corresponds to the method for collaborative development of gas reservoirs and hydrate reservoirs described in the above embodiment one. Its specific implementation process can refer to the process of development using the method for collaborative development of gas reservoirs and hydrate reservoirs in the above embodiment one, and the repeated parts will not be repeated here.
[0091] Embodiment 3
[0092] Based on the same inventive concept, the present invention also provides a well group for collaborative development of a gas reservoir and a hydrate reservoir, comprising: a central well 3 and at least one connecting well 2 arranged around the central well 3, the connecting well 2 penetrates the hydrate reservoir 7 and is drilled to a first preset position of the gas reservoir 4, and the central well 3 is drilled to a second preset position of the hydrate reservoir 7.
[0093] In a specific embodiment, the connecting well 2 penetrates the hydrate reservoir 7 and is drilled to a distance from the top of the gas reservoir 4. Location.
[0094] In a specific embodiment, the central well 3 is drilled to a depth of 100 m from the top of the hydrate reservoir 7. Location.
[0095] In the embodiment of the present invention, the gas reservoir and hydrate reservoir collaborative development well group corresponds to the gas reservoir and hydrate reservoir collaborative development method described in the above embodiment one. Its specific layout and application process can refer to the process of development using the gas reservoir and hydrate reservoir collaborative development method in the above embodiment one. The repeated parts will not be repeated here.
[0096] In this document, relational terms such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. The orientation or position relationship indicated by the terms "upper", "lower", etc. is based on the orientation or position relationship shown in the accompanying drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0097] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict. The present invention is not limited to any single aspect, any single embodiment, or any combination and / or permutation of these aspects and / or embodiments. Each aspect and / or embodiment of the present invention can be used alone, or in combination with one or more other aspects and / or other embodiments.
[0098] Finally, it should be noted that the above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims
1. A method for collaborative development of gas reservoirs and hydrate reservoirs, characterized in that: The method is implemented by using a well group, wherein the well group includes a central well and at least one connecting well arranged around the central well; the method includes: A tubing is run between the hydrate reservoir and the gas reservoir; Drilling the connecting well through the hydrate reservoir and the oil pipe to a first preset position of the gas reservoir, and performing perforations in the hydrate reservoir and the gas reservoir respectively; Drilling the central well to a second preset position of the hydrate reservoir and performing perforations in the hydrate reservoir; A packer is installed in the connecting well at a position corresponding to the bottom of the hydrate reservoir, and the connecting well and the central well are used to carry out a first round of constant pressure production, so that the hydrate in the hydrate reservoir is decomposed under the action of the pressure difference; wherein the bottom hole pressure during the first round of constant pressure production is less than the original pressure of the hydrate reservoir; During the first round of constant pressure production, the gas production rates of the connecting well and the central well are monitored until the daily gas production of the central well and the connecting well decreases to a first preset gas production; The packer is installed at a position corresponding to the top of the hydrate reservoir in the connecting well, and the central well is used for a second round of constant pressure production, so that the free gas in the gas reservoir can return to the hydrate reservoir along the connecting well under the pressure difference between the hydrate reservoir and the gas reservoir, and carry heat energy to promote the decomposition of hydrates; wherein the bottom hole pressure during the second round of constant pressure production is less than the original pressure of the hydrate reservoir; During the second round of constant-pressure production, the gas production rate of the central well is monitored until the single-well daily gas production of the central well decreases to a second preset gas production, and then production is stopped.
2. The method for coordinated development of gas reservoirs and hydrate reservoirs according to claim 1, characterized in that: During the first round of constant-pressure production, the bottom hole pressure was 0.3 to 0.7 times the original pressure of the hydrate reservoir.
3. The method for coordinated development of gas reservoirs and hydrate reservoirs according to claim 1, characterized in that: The daily gas production of the central well and the connecting well is gradually reduced to 500-1000m 3 / d, the first round of constant pressure mining ends.
4. The method for coordinated development of gas reservoirs and hydrate reservoirs according to claim 1, characterized in that: The daily gas production of the central well is gradually reduced to 500-1000m 3 / d, the second round of constant pressure mining ends.
5. The method for coordinated development of gas reservoirs and hydrate reservoirs according to claim 1, characterized in that: During the second round of constant-pressure production, the bottom hole pressure is 0.3 to 0.7 times the original pressure of the hydrate reservoir.
6. The method for coordinated development of gas reservoirs and hydrate reservoirs according to claim 1, characterized in that: The step of drilling the connecting well through the hydrate reservoir to a first preset position of the gas reservoir comprises: The connecting well penetrates the hydrate reservoir and is drilled to a distance from the top of the gas reservoir. Location.
7. The method for coordinated development of gas reservoirs and hydrate reservoirs according to claim 1, characterized in that: The step of drilling the central well to a second preset position of the hydrate reservoir and performing perforation in the hydrate reservoir comprises: The central well is drilled to a distance from the top of the hydrate reservoir. location and perforating in the hydrate reservoir.
8. The method for coordinated development of gas reservoirs and hydrate reservoirs according to any one of claims 1 to 7, characterized in that: The connecting well and the central well are both completed by perforation, and each perforation point is spaced 5 to 10 meters apart.
9. The method for coordinated development of gas reservoirs and hydrate reservoirs according to any one of claims 1 to 7, characterized in that: The lowered oil pipe is made of heat-insulating material.
10. The method for coordinated development of gas reservoirs and hydrate reservoirs according to claim 9, characterized in that: The oil pipe is made of glass fiber, and the thermal conductivity is less than 0.04W / m·K.
11. A gas reservoir and hydrate reservoir collaborative development system, characterized in that: The method is implemented by using a well group, wherein the well group includes a central well and at least one connecting well arranged around the central well; The system comprises: an oil pipe lowering device, a perforating device, a production device and a gas production monitoring device; The oil pipe lowering device is used to lower the oil pipe between the hydrate reservoir and the gas reservoir; The perforating device is used to drill the connecting well through the hydrate reservoir and the oil pipe to a first preset position of the gas reservoir, and perform perforations in the hydrate reservoir and the gas reservoir respectively; and to drill the central well to a second preset position of the hydrate reservoir, and perform perforations in the hydrate reservoir; The production device is used to install a packer at a position corresponding to the bottom of the hydrate reservoir in the connecting well, and use the connecting well and the central well to carry out a first round of constant-pressure production, so that the hydrate in the hydrate reservoir is decomposed under the action of the pressure difference; wherein the bottom hole pressure is less than the original pressure of the hydrate reservoir during the first round of constant-pressure production; and, the packer is installed at a position corresponding to the top of the hydrate reservoir in the connecting well, and the central well is used to carry out a second round of constant-pressure production, so that the free gas in the gas reservoir can return to the hydrate reservoir along the connecting well under the action of the pressure difference between the hydrate reservoir and the gas reservoir, and carry heat energy to promote the decomposition of the hydrate; wherein, during the second round of constant-pressure production, the bottom hole pressure is less than the original pressure of the hydrate reservoir, and the production is stopped; The gas production monitoring device is used to monitor the gas production rate of the connecting well and the central well during the first round of constant-pressure production, until the daily gas production of the central well and the connecting well decreases to a first preset gas production; and, during the second round of constant-pressure production, monitor the gas production rate of the central well until the daily gas production of the central well decreases to a second preset gas production.
12. A well group for collaborative development of gas reservoirs and hydrate reservoirs, characterized in that: include: A central well and at least one connecting well arranged around the central well, the connecting well penetrates the hydrate reservoir and is drilled to a first preset position of the gas reservoir, and the central well is drilled to a second preset position of the hydrate reservoir.
13. The gas reservoir and hydrate reservoir coordinated development well group according to claim 12, characterized in that: The connecting well penetrates the hydrate reservoir and is drilled to a distance from the top of the gas reservoir. Location.
14. The gas reservoir and hydrate reservoir coordinated development well group according to claim 12, characterized in that: The central well is drilled to a distance from the top of the hydrate reservoir Location.
15. Use of the coordinated development well group of a gas reservoir and a hydrate reservoir as claimed in any one of claims 12 to 14 in the coordinated development of a gas reservoir and a hydrate reservoir.
Citation Information
Patent Citations
Exploitation method for sea bed gas hydrate
CN101672177A
Producing gaseous hydrocarbons from hydrate capped reservoirs
CN102124184A
Hydrate mining method and mining device based on reservoir stability