BIM-based three-dimensional modeling and design method for full-reservoir-basin anti-seepage reservoir

The three-dimensional modeling method that combines the reservoir line, dam axis, and excavation line through BIM software solves the complexity problem of anti-seepage reservoir design in the entire reservoir basin, achieves fast and accurate reservoir model generation and parameter measurement, and improves design efficiency.

CN118734385APending Publication Date: 2024-10-01CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410667344.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-28
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

In pumped storage power stations, the design of the whole basin anti-seepage reservoir is complex and needs to consider multiple influencing factors, resulting in a large amount of design work and calculations, making it difficult to quickly form an optimal basin excavation design plan.

Method used

Using the BIM-based three-dimensional modeling and design method of the whole reservoir basin anti-seepage reservoir, through the 'three-line-in-one' rapid modeling method, the reservoir line, dam axis, and excavation line are combined to generate a reservoir model and read relevant parameters. Then analyze and optimize the design plan.

Benefits of technology

It achieves rapid and accurate generation of reservoir models and parameter measurements, simplifies the modification and optimization of design plans, improves reservoir design efficiency, and can quickly screen out optimized plans.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118734385A_ABST
    Figure CN118734385A_ABST
Patent Text Reader

Abstract

The invention discloses a BIM (Building Information Modeling)-based full-reservoir-basin anti-seepage reservoir three-dimensional modeling and design method. The method comprises the following steps: importing a three-dimensional terrain surface, selecting a dam elevation plane and drawing a closed positioning axis; making a dam profile to form a dam entity; a slope section is manufactured to form an excavation entity; a reservoir boundary surface is manufactured and swept along the positioning axis, a normal water storage level is reserved to a dead water level part, and a reservoir entity is formed; measuring model parameters, and outputting relevant parameters and calculation results; packaging the steps to form a universal template, setting a positioning line and a terrain surface as input conditions, setting a water level, a slope ratio and the like as variable parameters, modifying a reservoir model by adjusting the input conditions and the parameters, and selecting a reservoir arrangement mode with a better form according to a calculation result; according to the method, the reservoir three-dimensional model can be quickly established, the model adjustment is convenient, the scheme change is quick, the parameter measurement is comprehensive, the display effect is visual, the optimization scheme can be efficiently screened out, and the reservoir design efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of pumped storage power stations, and in particular relates to a BIM-based three-dimensional modeling and design method for a full-basin anti-seepage reservoir in a pumped storage power station. Background Art

[0002] In the anti-seepage design of pumped storage power station reservoirs, the whole reservoir basin anti-seepage is suitable for reservoirs with poor geological conditions, the groundwater level of the reservoir bank is lower than the normal water level of the reservoir, faults and structural belts are developed, and there are serious leakage problems in the whole reservoir basin. The main anti-seepage forms include reinforced concrete panel anti-seepage, asphalt concrete panel anti-seepage, geomembrane anti-seepage and clay blanket anti-seepage. The upper reservoir of the Shisanling Pumped Storage Power Station, the upper reservoir of the Yixing Pumped Storage Power Station, and many reservoirs under planning and construction in my country all adopt this anti-seepage form.

[0003] In order to meet the requirements of regulating reservoir capacity, pumped storage power stations generally need to expand the natural reservoir basin to obtain a part of the effective reservoir capacity, and use the excavated stones as dam filling materials and reservoir basin backfill to achieve the purpose of saving investment and protecting the environment. Reservoirs with full reservoir basin anti-seepage form require excavation around the reservoir bank, which requires a large amount of excavation and a large investment in anti-seepage panels. Therefore, choosing a suitable reservoir basin excavation plan is of great significance for full reservoir basin anti-seepage reservoirs.

[0004] The excavation volume of the full-basin anti-seepage reservoir is large, and the excavated slope needs to be combined with the dam slope to form a complete anti-seepage surface. It is also necessary to consider many influencing factors such as regulating reservoir capacity, water level amplitude requirements, earthwork balance, slope height restrictions, geological conditions, etc. Under the above influencing factors, designing a reasonable reservoir shape and water level can greatly optimize the engineering volume and investment of the reservoir. However, due to the complex engineering conditions and many influencing factors, the workload of the upper reservoir design and optimization is large, and the decision-making process is complex. The upper reservoir design optimization is a multi-objective optimization problem under complex conditions. How to quickly form the optimal reservoir excavation design scheme under the consideration of many influencing factors is a very challenging task, and the workload and calculation of conventional methods are very large. Therefore, it is urgent to propose a rapid modeling method for the full-basin anti-seepage reservoir based on a three-dimensional model, and based on the parameters read by the model, realize the rapid modification and decision-making of the excavation scheme. Summary of the invention

[0005] The purpose of the present invention is to provide a BIM-based three-dimensional modeling and design method for a full-basin anti-seepage reservoir, which combines the reservoir line, dam line and excavation line into a whole. Through the "three-line-in-one" rapid modeling method, the reservoir model can be quickly and accurately generated and the relevant parameters can be read, thereby analyzing and optimizing the design scheme.

[0006] To achieve the above objectives, the technical solution of the present invention is:

[0007] A BIM-based three-dimensional modeling and design method for a full-basin anti-seepage reservoir includes the following steps:

[0008] Step 1: Import the three-dimensional terrain surface of the pumped storage power station project area into the BIM software, preliminarily determine the dam crest elevation surface, and draw a closed curve on the dam crest elevation plane as a guide line;

[0009] Step 2: Select a point on the guide line, take the normal plane of the guide line at the point as the base plane, draw the dam outline on the base plane; sweep the outline along the guide line to draw the dam outline;

[0010] Step 3: Use the Boolean operation in the BIM software to segment the dam outline with the three-dimensional terrain surface in step 1, retain the part above the three-dimensional terrain surface, generate the dam entity, and measure the volume of the dam entity to obtain the dam filling volume parameters;

[0011] Step 4: Draw the excavation contour line on the basic plane of step 2. The part of the excavation contour line below the guide line coincides with the upstream contour line of the dam. The part of the excavation contour line above the guide line is drawn according to the slope excavation slope ratio. The excavation contour line is swept along the guide line to form the excavation slope contour.

[0012] Step 5: Use the Boolean operation in the BIM software to cut the excavation contour with the 3D terrain surface in step 1, retain the part below the 3D terrain surface, generate the excavation entity, measure the volume of the excavation entity to obtain the total volume parameters of the excavation, hide the excavation entity and retain the contour scanning surface to generate the excavation surface;

[0013] Step 6: Draw the reservoir boundary line on the basic plane of step 2. The reservoir boundary line coincides with the upstream contour line of the dam. Sweep along the guide line to generate a preliminary reservoir entity.

[0014] Step 7: Use the Boolean operation in the BIM software to cut the preliminary reservoir entity in step 6 with the three-dimensional terrain surface in step 1, retain the reservoir contour part above the three-dimensional terrain surface, and obtain the natural reservoir entity. The natural reservoir capacity parameters can be obtained by measuring the volume of the natural reservoir entity; use the normal water storage level surface and the dead water level surface to cut the preliminary reservoir entity in step 6, retain the part of the reservoir contour between the normal water storage level surface and the dead water level, and obtain the reservoir entity after excavation. The regulating storage capacity parameters of the final reservoir can be obtained by measuring the volume of the reservoir entity after excavation;

[0015] Step 8: Measure the finished model to obtain the characteristic parameters of the dam and reservoir, including the total excavation volume, dam filling volume, natural reservoir capacity, actual regulation capacity and other characteristic parameters. Substitute the characteristic parameters into the existing calculation formula, and use the calculated result as the basis for judging whether the current reservoir design scheme meets the engineering requirements. If the current reservoir design scheme meets the engineering requirements, the current design scheme can be adopted. If the current reservoir design scheme does not meet the engineering requirements, adjust the position of the guide line, and use the template program of step nine to repeat steps one to eight until the reservoir design scheme meets the engineering requirements.

[0016] Step 9: Encapsulate the finished model, use the three-dimensional terrain surface in step 1 and the guide line in step 2 as input conditions, water level, slope ratio, etc. as variable parameters, and the characteristic parameters and calculation results measured in step 8 as output conditions. Use the knowledge engineering template function of the BIM software to encapsulate the operations of steps 1 to 8 and generate a template program. The template program can repeatedly execute the encapsulated operation steps, adjust the input conditions and variable parameters to obtain the calculation results, and the calculation results are used as the basis for judging whether the current reservoir basin design meets the engineering requirements. The above template program is applicable to other full reservoir basin anti-seepage projects.

[0017] Furthermore, the guide line is a positioning axis formed by the reservoir line, the basin-shaped dam axis and the excavation line in the three-dimensional modeling of the full-basin anti-seepage reservoir.

[0018] Furthermore, in the step 2, a point is selected on the guide line, which is an arbitrary point selected on the guide line and is also the positioning point of the base plane and the dam contour line. The dam contour line is drawn on the base plane, which is to draw the planar contour line of the dam according to the designed dam height, dam top width and slope ratio. The planar contour line and guide line of the dam are selected in the BIM software, and then the sweep tool in the BIM software is selected to sweep the dam contour line along the guide line to obtain the three-dimensional contour of the dam.

[0019] Furthermore, in the step three, the dam outline is segmented using the three-dimensional terrain surface in the step one by selecting the three-dimensional terrain surface in the step one and the dam outline generated in the step two in the BIM software, and then selecting the Boolean operation cutting tool button in the BIM software, and the dam outline is segmented using the three-dimensional terrain surface, and the part above the three-dimensional terrain surface is retained to generate a dam entity.

[0020] Furthermore, the slope excavation ratio in step 4 is an excavation slope ratio determined by designers based on the lithology and bearing capacity of the geological rock mass.

[0021] Furthermore, in the step five, using the three-dimensional terrain surface in the step one to cut the excavation contour means selecting the three-dimensional terrain surface in the step one and the slope contour generated in the step four in the BIM software, and then selecting the Boolean operation cutting tool button in the BIM software, using the three-dimensional terrain surface to segment the slope contour, and retaining the part below the three-dimensional terrain surface to generate an excavation entity.

[0022] Furthermore, generating a preliminary reservoir entity in step six refers to selecting the reservoir boundary line and guide line in the BIM software, and then selecting the sweep tool in the BIM software to sweep the reservoir boundary line along the guide line to generate the reservoir shape, i.e., the preliminary reservoir entity.

[0023] Furthermore, obtaining the reservoir entity in step seven specifically includes selecting the three-dimensional terrain surface of step one and the preliminary reservoir entity generated in step six in the BIM software, then selecting the Boolean operation cutting tool button in the BIM software, using the three-dimensional terrain surface to segment the preliminary reservoir entity, and retaining the reservoir contour portion above the three-dimensional terrain surface to obtain the natural reservoir entity;

[0024] In the BIM software, select the normal water storage level and the preliminary reservoir entity generated in step six, select the Boolean operation cutting tool button in the BIM software, use the normal water storage level to split the preliminary reservoir entity, then select the dead water level and the preliminary reservoir entity generated in step six to repeat the same operation, retaining the part of the reservoir contour between the normal water storage level and the dead water level to obtain the reservoir entity after excavation.

[0025] Furthermore, the model parameters output in the BIM software in step eight include the dam volume, excavation volume, reservoir volume, and panel anti-seepage area. The model parameters are substituted into the existing reservoir capacity calculation formula, the stone quantity calculation formula for building the dam, the anti-seepage cost calculation formula, and the total reservoir investment calculation formula to calculate the reservoir capacity obtained according to the existing design scheme, and compare the calculated reservoir capacity with the reservoir capacity set in advance according to the project requirements to determine whether the designed reservoir capacity meets the project requirements; compare the excavated stone with the stone quantity required for building the reservoir basin dam to determine whether the excavated stone meets the requirements, calculate the anti-seepage cost and whether the total reservoir investment meets the project requirements according to the project requirements, and judge the pros and cons of the current reservoir basin design scheme based on the calculation results. If the current reservoir basin design scheme does not meet the project design requirements, repeat steps one to eight to redesign it.

[0026] Furthermore, the template program generated in step nine uses the three-dimensional terrain surface and guide line in steps one to eight as input conditions, water level, slope ratio, etc. as variable parameters, and the characteristic parameters and calculation results measured in step eight as output conditions. The knowledge engineering template function of the BIM software is used to encapsulate the operations of steps one to eight, generate a template program, and quickly obtain the calculation results by adjusting the input conditions and variable parameters. The calculation results are used as the basis for judging whether the current reservoir basin design scheme meets the engineering requirements. The above template program can be widely used in the modeling and design of the whole reservoir basin anti-seepage project.

[0027] The beneficial effects of the present invention are:

[0028] 1. The present invention combines the reservoir line, dam axis and excavation line into a guide line as a whole according to the layout characteristics of the whole reservoir basin anti-seepage. Through the rapid modeling method of the reservoir line, dam axis and excavation line "three lines in one", a three-dimensional reservoir model can be quickly established. The reservoir type can be changed by adjusting the position of the guide line. The model is convenient to adjust, the design scheme changes quickly, the reservoir parameters are measured comprehensively, and the reservoir model display effect is intuitive. The reservoir model can be generated quickly and accurately and the relevant parameters of the reservoir can be read. The reservoir capacity, anti-seepage cost, total investment and other results are calculated through the parameters. The design scheme is analyzed and optimized according to the calculated results. The reservoir design scheme of the present invention is quick to modify and the reservoir scheme design can be conveniently carried out.

[0029] 2. The template program produced by the present invention can quickly establish a three-dimensional model of a reservoir. The model is easy to adjust, the scheme changes quickly, the parameter measurement is comprehensive, the display effect is intuitive, and the calculation results can be output to judge the state of the reservoir. The optimized scheme can be efficiently screened out and can be widely used in the anti-seepage project of the entire reservoir basin, which is beneficial to improving the efficiency of reservoir design and optimizing the reservoir design scheme. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the three-dimensional terrain surface of the present invention.

[0031] Figure 2 The positioning axis input for the present invention is a schematic diagram of a guide line.

[0032] Figure 3 It is a schematic diagram of the cross section of the dam of the present invention and its shape after scanning.

[0033] Figure 4 It is a schematic diagram of the dam model entity after terrain segmentation according to the present invention.

[0034] Figure 5 It is a schematic diagram of the excavation slope contour line and the swept shape of the present invention.

[0035] Figure 6 It is a schematic diagram of the slope excavation surface after the terrain surface is segmented according to the present invention.

[0036] Figure 7 It is a schematic diagram of the reservoir boundary line and reservoir entity of the present invention.

[0037] Figure 8 This is a physical schematic diagram of the invented natural reservoir.

[0038] Fig. 9 This is a schematic diagram of the three-dimensional model effect produced by the present invention.

[0039] Fig.10 This is a schematic diagram of the model parameter measurement, result calculation and solution selection of the present invention.

[0040] Among them: guide line 1; dam outline 2; dam outline 3; dam entity 4; three-dimensional terrain surface 5; excavation outline 6; excavation entity 7; excavation slope outline 8; slope excavation surface 9; reservoir basin slope excavation surface 91; reservoir bank slope excavation surface 92; reservoir boundary line 10; excavation reservoir entity 11; natural reservoir entity 12. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solutions and advantages of the invention clearer, the present invention is further described below with reference to the accompanying drawings.

[0042] In the present invention, the dam can be arranged according to the curved dam axis according to the terrain conditions and the shape of the reservoir. The dam closes the terrain gap to form a closed reservoir. Specifically, the upstream surface of the dam and the excavated slope of the reservoir basin form the periphery of the closed reservoir. The closed reservoir is used as an anti-seepage reservoir for the entire reservoir basin of a pumped-storage power station. The closed reservoir is generally an upper reservoir with a higher terrain and stronger rock leakage. In actual engineering applications, the closed reservoir, i.e., the anti-seepage reservoir for the entire reservoir basin of a pumped-storage power station, needs to be used in conjunction with another lower reservoir with a lower terrain. By connecting the water supply system of the upper and lower reservoirs and the reversible mixed flow unit of the underground plant, water is circulated and pumped and released between the upper and lower reservoirs to achieve the functions of pumped storage and water discharge for power generation.

[0043] The present invention adopts the excavation slope in the reservoir of the whole reservoir basin anti-seepage reservoir and the upstream slope of the dam to connect into a whole, the ring road around the reservoir and the dam top road surface are generally at the same elevation, the excavation line of the slope is the center line of the ring road around the reservoir, the axis of the dam is the center line of the dam top road surface, and the reservoir line is a closed curve formed by the excavation line and the dam axis. In actual engineering, when designing the whole reservoir basin anti-seepage reservoir, the "three-line integrated" positioning method is used, and the reservoir line, the dam axis and the excavation line are represented by an input line. By adjusting the shape and elevation of the input line, the shape of the entire reservoir can be adjusted synchronously. The design scheme of this method is as follows:

[0044] Step 1: If Figure 2As shown in FIG. 1 , the three-dimensional topographic surface 5 of the pumped storage power station project area is imported into the BIM software. The three-dimensional topographic surface 5 is as shown in FIG. Figure 1 As shown, the dam crest elevation surface is preliminarily determined, and a closed curve is drawn on the dam crest elevation plane as a guide line.

[0045] In actual engineering, it is necessary to excavate a basin-shaped reservoir at a higher location. After selecting the location for excavating the basin-shaped reservoir, the three-dimensional terrain data of the location of the proposed basin-shaped reservoir is imported into the BIM software to fit it into a three-dimensional terrain surface. The three-dimensional terrain data can be obtained using three-dimensional laser scanning measurement technology, or through electronic maps combined with geographic spatial data cloud. Obtaining three-dimensional terrain data is an existing technology and will not be described in detail here.

[0046] In the present invention, the reservoir line, the basin-shaped dam axis and the excavation line are represented by an input line, and the input line is the guide line 1 drawn in step one.

[0047] The shape and storage capacity of the reservoir to be built can be adjusted by adjusting the position and shape of the guide line 1.

[0048] Step 2: If Figure 3 As shown, a point is selected on the guide line 1, and the normal plane of the guide line 1 at the point is used as the base plane. The dam contour line 2 is drawn on the base plane; the dam contour line 2 is swept along the guide line 1 to form a dam contour 3.

[0049] Regarding selecting a point on the guide line 1, it is an arbitrary point selected on the guide line 1, and this point will become the positioning point of the base plane and the dam contour line.

[0050] Regarding drawing the dam outline 1 on the foundation plane, the cross-sectional outline of the dam is drawn according to the designed dam height, dam crest width and slope ratio, and the sweep tool is selected in the BIM software. Then, the cross-sectional outline and guide line 1 of the dam are selected, and the dam outline 2 is swept along the guide line to draw the three-dimensional outline of the dam.

[0051] Step 3: If Figure 4 As shown, using the Boolean operation in the BIM software, the three-dimensional terrain surface 5 in step one is used to segment the dam outline 3, and the portion above the three-dimensional terrain surface is retained to generate the dam entity 4. The dam filling volume parameters can be obtained by measuring the volume of the dam entity.

[0052] Select the Boolean operation cutting tool button in the BIM software, then select the three-dimensional terrain surface 5 in step one and the dam outline 3 generated in step two, use the three-dimensional terrain surface 5 to divide the dam outline 3, retain the part above the three-dimensional terrain surface 5, and generate the dam entity 4.

[0053] about Figure 4At the dotted line in the figure, the three-dimensional terrain surface 5 is used to segment the dam outline 3. The elevation of the natural terrain input at the dotted line is higher than the dam crest elevation. When the terrain surface is used for segmentation, these parts below the terrain surface will be cut off and represented by dotted lines. In the subsequent steps, excavation slopes will be generated. The elevation of the natural terrain input at other places, that is, the elevation of the non-dotted line, is lower than the dam crest elevation. When the terrain surface is used for segmentation, this part will be retained, which is the location where the dam will be built.

[0054] In actual engineering, when the original natural terrain slope that is higher than the dam crest elevation is used as the slope of a basin-shaped reservoir, reinforcement and support measures are required for the excavated slope.

[0055] Figure 4 In the figure, the excavation slope formed subsequently at the dotted line and the dam entity generated elsewhere, i.e., at the non-dotted line, are connected as a whole in the BIM software.

[0056] Step 4: If Figure 5 As shown, an excavation contour line 6 is drawn on the foundation plane in step 2. The portion of the excavation contour line 6 below the guide line 1 coincides with the upstream contour line of the dam, and the ring road coincides with the dam crest. The portion of the excavation contour line 6 above the guide line 1 is drawn according to the designed excavation slope ratio of the slope. The excavation contour line 6 is scanned along the guide line 1 to form an excavation slope contour 8.

[0057] In the present invention, the slope excavation ratio is a stable excavation slope ratio selected by designers based on the lithology and bearing capacity of the geological rock mass.

[0058] Select the sweep tool in the BIM software, then select the excavation contour line 6 and the guide line 1, and sweep the excavation contour line 6 along the guide line 1 to obtain the excavation slope contour 8.

[0059] Step 5: If Figure 6 As shown, using the Boolean operation in the BIM software, the three-dimensional terrain surface 5 in step one is used to cut the excavation slope contour 8, and the part below the three-dimensional terrain surface 5 is retained to generate the excavation entity 7. The excavation entity 7 is hidden, and only the contour sweep surface is retained to generate the slope excavation surface 9. The slope excavation surface 9 includes the excavation surface 91 inside the reservoir basin and the excavation surface 92 above the reservoir basin. The total volume parameter of the excavation can be obtained by measuring the volume of the excavation entity.

[0060] In the BIM software, select the Boolean operation cutting tool button, then select the three-dimensional terrain surface 5 in step one and the excavation slope contour 8 generated in step four, and use the three-dimensional terrain surface 5 to segment the excavation slope contour 8, retaining the part below the three-dimensional terrain surface 5, and then generate the excavation entity 7. The excavation entity 7 is the shape of the rock mass to be excavated in the natural terrain, which will form a part of the reservoir after excavation to increase the reservoir capacity.

[0061] The excavation entity 7 is hidden, and only the contour sweep surface is retained to generate the slope excavation surface 9, and a reservoir can be formed by excavating along the slope excavation surface 9.

[0062] Figure 6 The dotted line in the figure is the axis of the dam. Because the natural terrain elevation input at the dotted line is lower than the elevation of the dam crest, the part of contour 8 above the terrain surface will be cut off when the terrain surface is divided, which is represented by a dotted line. This position is the dam entity generated in step 3.

[0063] Step 6: Similarly, draw the reservoir boundary line 10 on the basic plane of step 2. The reservoir boundary line 10 coincides with the upstream contour line of the dam. Sweep along the guide line 1 to generate a preliminary reservoir entity.

[0064] Select the sweep tool in the BIM software, then select the reservoir boundary line 10 and the guide line 1, and sweep the reservoir boundary line 10 along the guide line 1 to generate a preliminary reservoir entity.

[0065] Step 7: If Figure 7 As shown, using the Boolean operation in the BIM software, the three-dimensional terrain surface 5 in step 1 is used to cut the preliminary reservoir entity in step 6, and the preliminary reservoir entity part above the three-dimensional terrain surface 5 is retained to obtain the natural reservoir entity. The natural reservoir entity is as shown in FIG. Figure 8 As shown; measuring the volume of the natural reservoir entity can obtain the natural reservoir capacity parameters; using the normal water level and the dead water level to cut the preliminary reservoir entity in step 6, retaining the part between the normal water level and the dead water level of the reservoir contour, the reservoir entity 11 can be obtained. The overall three-dimensional effect of the completed reservoir is as follows Fig. 9 shown.

[0066] Regarding using the three-dimensional terrain surface in step 17 to cut the reservoir outline, specifically select the Boolean operation cutting tool button in the BIM software, then select the three-dimensional terrain surface 5 in step 1 and the preliminary reservoir entity generated in step 6, and use the three-dimensional terrain surface 5 to divide the preliminary reservoir entity, and retain the preliminary reservoir entity part above the three-dimensional terrain surface, which is the natural reservoir entity.

[0067] In the BIM software, select the Boolean operation cutting tool button, select the normal water level and the preliminary reservoir entity, use the normal water level to segment the preliminary reservoir entity, and retain the part below the normal water level. Repeat the above steps, that is, select the Boolean operation cutting tool button in the BIM software, select the dead water level, and use the dead water level to segment the preliminary reservoir entity below the retained normal water level, and retain the part above the dead water level, so as to obtain the excavated reservoir entity 11. The volume of the excavated reservoir entity can be measured to obtain the final reservoir regulation storage capacity parameters.

[0068] Step 8: Measure the prepared model to obtain the characteristic parameters of the dam and reservoir, including the total excavation volume, dam filling volume, natural reservoir capacity, actual regulation capacity and other characteristic parameters. Substitute the characteristic parameters into the existing calculation formula and use the calculated results as the basis for judging whether the reservoir capacity meets the requirements, whether the excavated stone meets the requirements, and calculate the anti-seepage cost, total reservoir investment, etc., based on which the pros and cons of the current reservoir design scheme are judged.

[0069] In BIM software, output parameters such as dam volume, excavation volume, reservoir volume, and panel anti-seepage area can be obtained. The output parameters such as dam volume, excavation volume, reservoir volume, and panel anti-seepage area are substituted into the existing reservoir capacity calculation formula, the stone quantity calculation formula for building the dam, the anti-seepage cost calculation formula, the total reservoir investment calculation formula, etc., to calculate the reservoir capacity obtained according to the existing design scheme, and compare the calculated reservoir capacity with the reservoir capacity set in advance according to the project requirements to determine whether the designed reservoir capacity meets the project requirements; compare the excavated stone with the stone quantity required for building the reservoir basin dam to determine whether the excavated stone meets the requirements. According to the project requirements, the excavated stone quantity should meet the construction requirements, and calculate whether the anti-seepage cost, the total reservoir investment, etc. meet the project requirements, and judge the pros and cons of the current reservoir basin design scheme on this basis; if the current reservoir basin design scheme does not meet the project design requirements, the template program of step nine should be used to repeat steps one to eight for redesign.

[0070] Step 9: Encapsulate the finished model, use the three-dimensional terrain surface in step 1 and the guide line in step 2 as input conditions, water level, slope ratio, etc. as variable parameters, and the characteristic parameters and calculation results measured in step 8 as output conditions. Use the knowledge engineering template function of the BIM software to encapsulate the operations of steps 1 to 8 and generate a template program. The template program can repeatedly execute the encapsulated operation steps, adjust the input conditions and variable parameters to obtain the calculation results, and the calculation results are used as the basis for judging whether the current reservoir basin design meets the engineering requirements. The above template program can be widely used in the modeling and design of the whole reservoir basin anti-seepage project.

[0071] In the present invention, the model built in step eight is encapsulated, and the input parameters of the encapsulated model are set as the guide line coordinates, and the output parameters are set as the basis for judging the reservoir basin design scheme. The adjustable parameters include water level, dam shape, excavation slope ratio, etc. By adjusting the position of the guide line and the water level elevation, different design schemes and parameters can be quickly obtained. The different design schemes and parameters of the corresponding design schemes are as follows: Fig.10As shown; the reservoir capacity, the amount of stone required for building the dam, the cost of anti-seepage, the total investment of the reservoir and other structures are calculated based on the parameters of different design schemes, and the reservoir capacity, the amount of stone required for building the dam, the cost of anti-seepage, the total investment of the reservoir and other results obtained by different design schemes are compared, and after comparison, the design scheme that meets the engineering requirements is selected, that is, after comparison, the appropriate reservoir line, dam line position and water level can be selected. Therefore, in the present invention, after encapsulating the model built in step eight, the reservoir model is modified by adjusting the positioning line in the input conditions, the water level and slope ratio in the variable parameters, and the reservoir layout with a better shape can be selected according to the calculation results.

[0072] Finally, it should be noted that the contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field. The above description is only the preferred embodiment of the present invention and is not used to limit the present invention. Although the present invention is described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions recorded in the aforementioned embodiments, or to replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A BIM-based three-dimensional modeling and design method for a full-basin anti-seepage reservoir, characterized in that: The following steps are involved: Step 1: Import the three-dimensional topographic surface of the pumped storage power station project area into the BIM software (5), preliminarily determine the dam crest elevation surface, and draw a closed curve on the dam crest elevation plane as a guide line (1); Step 2: Select a point on the guide line (1), take the normal plane of the guide line (1) at the point as the base plane, and draw the dam contour line (2) on the base plane; sweep the dam contour line (2) along the guide line (1) to form a dam contour (3); Step 3: Use the Boolean operation in the BIM software to segment the dam outline (3) with the three-dimensional terrain surface (5) in step 1, retain the part above the three-dimensional terrain surface, generate the dam entity (4), and measure the volume of the dam entity to obtain the dam filling volume parameters; Step 4: Draw an excavation contour line (6) on the foundation plane of step 2, wherein the portion of the excavation contour line (6) below the guide line (1) coincides with the upstream contour line of the dam, and the portion of the excavation contour line (6) above the guide line (1) is drawn according to the slope excavation ratio, and the excavation contour line (6) is swept along the guide line (1) to form an excavation slope contour (8); Step 5: Use the Boolean operation in the BIM software to cut the excavation slope contour (8) with the three-dimensional terrain surface (5) in step 1, retain the part below the three-dimensional terrain surface (5), generate the excavation entity (7), hide the excavation entity (7) and retain the contour sweep surface to generate the excavation surface (9), and measure the volume of the excavation entity to obtain the total volume parameter of the excavation; Step 6: Draw a reservoir boundary line (10) on the basic plane of step 2, the reservoir boundary line (10) coincides with the upstream contour line of the dam, and scan along the guide line (1) to generate a preliminary reservoir entity; Step 7: Using the Boolean operation in the BIM software, the preliminary reservoir entity in step 6 is cut with the three-dimensional terrain surface (5) in step 1, and the preliminary reservoir entity part above the three-dimensional terrain surface (5) is retained to obtain a natural reservoir entity (12). The natural reservoir capacity parameters can be obtained by measuring the volume of the natural reservoir entity; the preliminary reservoir entity in step 6 is cut with the normal water storage level surface and the dead water level surface, and the part of the reservoir contour between the normal water storage level surface and the dead water level is retained to obtain the reservoir entity after excavation (11). The regulating storage capacity parameters of the final reservoir can be obtained by measuring the volume of the reservoir entity after excavation; Step 8: Measure the prepared model to obtain characteristic parameters of the dam and reservoir, including the total excavation volume, the dam filling volume, the natural reservoir capacity, and the actual regulated reservoir capacity. Substitute the characteristic parameters into the existing calculation formula, and use the calculated result as the basis for judging whether the current reservoir design scheme meets the engineering requirements. If the current reservoir design scheme meets the engineering requirements, the current design scheme can be adopted. If the current reservoir design scheme does not meet the engineering requirements, adjust the position of the guide line (1), and use the template program of step 9 to repeat steps 1 to 8 until the reservoir design scheme meets the engineering requirements. Step nine: Encapsulate the finished model, use the three-dimensional terrain surface in step one and the guide line in step two as input conditions, the water level and slope ratio as variable parameters, and the characteristic parameters and calculation results measured in step eight as output conditions. Use the knowledge engineering template function of the BIM software to encapsulate the operations of steps one to eight and generate a template program. The template program can repeatedly execute the encapsulated operation steps, and the calculation results can be obtained by adjusting the input conditions and variable parameters. The calculation results are used as the basis for judging whether the current reservoir basin design scheme meets the engineering requirements.

2. The method for three-dimensional modeling and designing of a full-basin anti-seepage reservoir based on BIM according to claim 1 is characterized in that: The guide line (1) is a positioning axis formed by integrating the reservoir line, the basin-shaped dam axis and the excavation line in the three-dimensional modeling of the full-basin anti-seepage reservoir.

3. The method for three-dimensional modeling and designing of a full-basin anti-seepage reservoir based on BIM according to claim 1 is characterized in that: In the step 2, a point is selected on the guide line (1), which is an arbitrary point selected on the guide line (1). The point is used as a positioning point for the base plane and the dam outline. The dam outline (2) is drawn on the base plane, which is a planar cross-sectional contour line of the dam according to the designed dam height, dam crest width and slope ratio. A sweep tool is selected in the BIM software, and then the cross-sectional contour line of the dam and the guide line (1) are selected, and the dam outline (2) is swept along the guide line to form a three-dimensional contour of the dam.

4. The method for three-dimensional modeling and designing of a full-basin anti-seepage reservoir based on BIM according to claim 1 is characterized in that: In the step 3, the dam outline (3) is segmented using the three-dimensional terrain surface (5) in the step 1 by selecting a Boolean operation cutting tool button in the BIM software, then selecting the three-dimensional terrain surface (5) in the step 1 and the dam outline (3) generated in the step 2, and segmenting the dam outline (3) using the three-dimensional terrain surface (5), and retaining the portion above the three-dimensional terrain surface (5) to generate the dam entity (4).

5. The method for three-dimensional modeling and designing of a full-basin anti-seepage reservoir based on BIM according to claim 1 is characterized in that: The excavation slope ratio of the slope in step 4 is selected by the designer based on the lithology and bearing capacity of the geological rock mass.

6. The method for three-dimensional modeling and designing of a full-basin anti-seepage reservoir based on BIM according to claim 1 is characterized in that: In the step 5, cutting the excavation slope contour (8) with the three-dimensional terrain surface (5) in the step 1 means selecting the Boolean operation cutting tool button in the BIM software, then selecting the three-dimensional terrain surface (5) in the step 1 and the excavation slope contour (8) generated in the step 4, using the three-dimensional terrain surface (5) to segment the excavation slope contour (8), and retaining the part below the three-dimensional terrain surface (5) to generate the excavation entity (7).

7. The method for three-dimensional modeling and designing of a full-basin anti-seepage reservoir based on BIM according to claim 1 is characterized in that: Generating the reservoir outline in step 6 refers to selecting a sweep tool in the BIM software, then selecting the reservoir boundary line (10) and the guide line (1), and sweeping the reservoir boundary line (10) along the guide line (1) to generate a preliminary reservoir entity.

8. The method for three-dimensional modeling and designing of a full-basin anti-seepage reservoir based on BIM according to claim 1 is characterized in that: The step 7 of obtaining the reservoir entity specifically includes selecting the Boolean operation cutting tool button in the BIM software, selecting the three-dimensional terrain surface (5) of the step 1 and the preliminary reservoir entity generated in the step 6, using the three-dimensional terrain surface (5) to segment the reservoir contour, retaining the reservoir contour portion above the three-dimensional terrain surface, and obtaining the natural reservoir entity (11); In the BIM software, select the Boolean operation cutting tool button in the BIM software, then select the normal water storage level and the preliminary reservoir entity generated in step six, use the normal water storage level to split the preliminary reservoir entity, and retain the part of the reservoir outline below the normal water storage level. Repeat the above steps, and use the dead water level to split the preliminary reservoir entity instead, and retain the part above the dead water level to obtain the reservoir entity after excavation.

9. The method for three-dimensional modeling and designing of a full-basin anti-seepage reservoir based on BIM according to claim 1, characterized in that: The model characteristic parameters output in the BIM software in step eight include the total excavation volume, the dam filling volume, the natural reservoir capacity, and the actual regulation capacity. The characteristic parameters are substituted into the existing reservoir capacity calculation formula, the stone quantity calculation formula for building the dam, the anti-seepage cost calculation formula, and the total reservoir investment calculation formula to calculate the reservoir capacity obtained according to the existing design scheme, and compare the calculated reservoir capacity with the reservoir capacity set in advance according to the project requirements to determine whether the designed reservoir capacity meets the project requirements; compare the excavated stone with the stone quantity required for building the reservoir basin dam to determine whether the excavated stone meets the requirements, calculate the anti-seepage cost and whether the total reservoir investment meets the project requirements according to the project requirements, and judge the pros and cons of the current reservoir basin design scheme according to the calculation results. If the current reservoir basin design scheme does not meet the project design requirements, repeat steps one to eight using the template program of step nine to redesign.

10. The method for three-dimensional modeling and designing of a full-basin anti-seepage reservoir based on BIM according to claim 1, characterized in that: The template program generated in step nine uses the three-dimensional terrain surface and guide lines in steps one to eight as input conditions, the water level and slope ratio as variable parameters, and the calculation results as output conditions. The knowledge engineering template function of the BIM software is used to encapsulate the operations of steps one to eight, and a template program is generated. The calculation results are obtained by adjusting the input conditions and variable parameters. The calculation results are used as the basis for judging whether the current reservoir basin design scheme meets the engineering requirements.

Citation Information

Cited By

  • Transition connection structure and method for inclined reservoir bottom of reservoir basin and slope of small-radius turning section

    CN121161787A