Cable operation and maintenance strategy optimization method based on machine learning
Through the cable operation and maintenance strategy optimization method based on machine learning, the operation inspection score and the convolutional neural network are used to predict the insulation resistance value, optimize the inspection plan of the aerial cable, solve the problem of resource waste caused by the increase of aerial cable inspection tasks, and improve the efficiency Maintenance efficiency and power system reliability.
Patent Information
- Application Number
- CN202411224039.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-10-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The installation cost of aerial cables is low, but with the advancement of urbanization, inspection tasks are increasing day by day. The existing technology mainly adopts regular inspection methods, which leads to human resource constraints and waste of resources, and ignores the regular inspection of undetermined cable risk differences. and decommissioning replacement programs.
Using a machine learning-based cable operation and maintenance strategy optimization method, by setting the target area and inspection cycle, the number of cable faults, detection data and operating indicators are obtained, the operation inspection score is calculated, the score is corrected, and maintenance needs are screened based on the preset risk threshold. of cables, establish a convolutional neural network model to predict the insulation resistance value, and optimize the inspection plan to reduce labor and time costs.
Effectively screen cables that need maintenance, reduce labor and time costs required for comprehensive maintenance, improve maintenance efficiency, deal with potential insulation problems early, and ensure the reliability and stability of the power system.
Smart Images

Figure CN118735141A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cable operation and maintenance, and in particular to a cable operation and maintenance strategy optimization method based on machine learning. Background Art
[0002] Cables are made of one or more mutually insulated conductors and an outer insulating protective layer, and are used to transmit electricity or information from one place to another. Cables are usually made of several or several groups of conductors (at least two in each group) twisted together, similar to the shape of a rope. Each group of conductors is insulated from each other and twisted around a center. The entire outer layer is covered with a highly insulating covering. Cable failures mainly include battery undervoltage, power failure, metering inaccuracy, power abnormality, clock error, communication failure, display failure, tripping / closing failure and appearance failure. In order to ensure the normal operation of the cable, professional technicians are required to regularly inspect the cable to detect cable failures in time and perform maintenance.
[0003] Compared with underground cables, the installation cost of overhead cables is usually lower because they do not require complicated excavation and laying work. Therefore, with the advancement of urbanization, a large number of overhead cables and cable lines have been put into operation, and the inspection tasks are increasing. However, most existing technologies use regular inspections to carry out power cable operation and maintenance. Regular inspections are bound to be constrained by human resources, and cable equipment has high reliability. Regular inspections and decommissioning and replacement plans that ignore the risk differences of pending cables will lead to a waste of manpower and resources. Summary of the invention
[0004] The purpose of the present invention is to provide a cable operation and maintenance strategy optimization method based on machine learning to solve the following technical problems: Compared with underground cables, the installation cost of overhead cables is usually lower because they do not require complicated excavation and laying work. Therefore, with the advancement of urbanization, a large number of overhead cables and cable lines have been put into operation, and the inspection tasks are increasing. However, most existing technologies use regular inspections to carry out power cable operation and maintenance. Regular inspections are bound to be constrained by human resources, and cable equipment has high reliability. Regular inspections and decommissioning and replacement plans that ignore the risk differences of pending cables will lead to a waste of manpower and resources.
[0005] The purpose of the present invention can be achieved through the following technical solutions: A cable operation and maintenance strategy optimization method based on machine learning includes the following steps: S1, set the target area and inspection cycle, obtain all cables in the target area and count the number of failures, detection data and operating indicators of any cable in the inspection cycle, the detection data is the resistance value R of the cable insulation material, and the operating indicators include the cable operating temperature, operating humidity and operating time; S2, divide the inspection cycle into n inspection cycles T, select any cable and obtain the number of failures J of the cable in any inspection cycle, and calculate according to the formula , the reference value J' of the cable is calculated, where k is the total number of cables, n' is the total number of operation and inspection cycles in which the fault occurs, and Jij represents the number of times the i-th cable fails in the j-th operation and inspection cycle; S3: Select any cable and calculate the time interval between the time when the cable fails during the inspection cycle and the last inspection cycle and mark it as t1, t2, ..., tm, determine the number of inspection cycles in which the number of times any cable fails is greater than or equal to the reference value and mark it as the reference number Q; according to the calculation formula Calculate the inspection score W of any cable i ; Among them, W i represents the inspection score of the ith cable, Q i represents the reference quantity of the ith cable, J i is the number of failures that occur in the i-th cable in any operation and inspection cycle; the operation and inspection score of the cable is corrected according to the detection data, and the cables whose corrected operation and inspection scores are greater than or equal to the preset risk threshold are used as target cables that need to be inspected in the next operation and inspection cycle.
[0006] As a further solution of the present invention: In S3, the specific process of correcting the operation and inspection score is as follows: S11, select any cable, divide the operating temperature and operating humidity into units of operation and inspection cycle T, calculate the average operating temperature t and average operating humidity h in each operation and inspection cycle T in turn, generate a time-ordered average operating temperature sequence and an average operating humidity sequence, accumulate all values in the sequence every other operation and inspection cycle, and obtain an accumulated operating temperature value and an accumulated operating humidity value; S12, establish a convolutional neural network and input the operation index accumulated value and the corresponding insulation material resistance value sequence into the convolutional neural network for training, the operation index accumulated value includes the operation temperature accumulated value, the operation humidity accumulated value and the operation time, generate a mapping model of the corresponding relationship between the operation index accumulated value and the insulation resistance value; obtain the average accumulated speed of the operation temperature and the operation humidity of any cable and calculate the operation index accumulated value at the end point of the next inspection cycle in the future, input the operation index accumulated value of the next inspection cycle into the mapping model, and output the predicted insulation resistance value R'; S13, according to the calculation formula W'=W*{1+γ / (R'-Rf) m}The modified operation and inspection score is calculated, where γ and m are preset coefficients and Rf is the critical insulation resistance value of any cable.
[0007] As a further solution of the present invention: in S13, if the predicted insulation resistance value R' of any cable is less than or equal to the corresponding critical insulation resistance value Rf, the operation and inspection score of the cable will not be updated, and the cable will be taken as a cable that needs to be inspected in the next maintenance cycle.
[0008] As a further solution of the present invention: the process of establishing the mapping model is: With the accumulated value of operating temperature, accumulated value of operating humidity and operating time as the horizontal coordinates and the resistance value of the insulating material as the vertical coordinate, a plane rectangular coordinate system is established to perform one-dimensional regression fitting and generate a one-dimensional regression fitting function formula: Rj=atj+d1, Rj=chj+d2, Rj=eyj+d3; Among them, j∈1,...,n, a, c, e, d1, d2, d3 are function parameters, and the values of the function parameters are calculated according to the accumulated values of the actual operating indicators.
[0009] As a further solution of the present invention: Another method for determining the target cable specifically includes: A broken line is established to show the change of the insulation material resistance value with the operating time Y. When the absolute value of the slope of any broken line is greater than the preset threshold, the current operating temperature and operating humidity of the cable are compared with the historical data. If the comparison difference is less than or equal to the preset threshold, the cable is calibrated as the target cable.
[0010] As a further solution of the present invention: in S3, when the inspection and maintenance scores of all cables are less than the preset risk threshold, all cables are sorted according to the corresponding inspection and maintenance scores. The larger the inspection and maintenance score, the higher the ranking. The first M cables in the sorting are selected as the cables that need to be inspected in the next inspection and maintenance cycle, and M is a preset number value.
[0011] As a further solution of the present invention: if there are two or more cables with the same operation and inspection scores, they are sorted according to the time the cables have been used, and the longer the time they have been used, the higher the ranking.
[0012] As a further solution of the present invention: when a cable fails and needs to be replaced during the inspection cycle, the cable does not participate in the subsequent steps and is taken as a cable that needs to be repaired in the next maintenance cycle.
[0013] Beneficial effects of the present invention: In the present invention, the target area and inspection cycle are set, and the monitoring data within the inspection cycle is obtained to provide a basis for subsequent comprehensive analysis; it can be understood that after the cable inspection, if the time of the fault is shorter than the time of the inspection, it means that the inspection should be carried out in the next maintenance cycle; then, the reference quantity is determined; it can be understood that the reference value is calculated based on the number of times all cables fail during the maintenance cycle, which can reflect the overall operation stability of the cable to determine the situation where the frequency of cable failures during the maintenance cycle exceeds the normal range; finally, the operation and inspection score is calculated, and it can be understood that the operation and inspection score is actually the cable operation stability, and it can be understood that recording the number of cable failures helps to identify cables with frequent problems. These cables may have design defects, installation problems or abnormal operating environments, requiring more detailed inspections and maintenance. At the same time, in the actual operation of the actual cable, it can be determined that the insulation capacity of the cable and the failure rate of the cable are usually negatively correlated. That is to say, cables with stronger insulation capacity usually have lower failure rates, whereas cables with weaker insulation capacity may have higher failure rates. Therefore, the cable operation and inspection score is corrected according to the actual insulation capacity of the cable, and the corresponding cable is judged whether it needs to be repaired in the next maintenance cycle according to the corrected score. The present invention can screen cables that need to be repaired, reduce the manpower cost and time cost required for comprehensive maintenance, and improve maintenance efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] The present invention will be further described below in conjunction with the accompanying drawings.
[0015] Figure 1 It is a flow chart of a cable operation and maintenance strategy optimization method based on machine learning of the present invention. DETAILED DESCRIPTION
[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0017] See also Figure 1 As shown, the present invention is a cable operation and maintenance strategy optimization method based on machine learning, comprising the following steps: S1, set the target area and inspection cycle, obtain all cables in the target area and count the number of failures, detection data and operating indicators of any cable in the inspection cycle, the detection data is the resistance value R of the cable insulation material, and the operating indicators include the cable operating temperature, operating humidity and operating time; S2, divide the inspection cycle into n inspection cycles T, select any cable and obtain the number of failures J of the cable in any inspection cycle, and calculate according to the formula , the reference value J' of the cable is calculated, where k is the total number of cables, n' is the total number of operation and inspection cycles in which the fault occurs, and Jij represents the number of times the i-th cable fails in the j-th operation and inspection cycle; S3: Select any cable and calculate the time interval between the time when the cable fails during the inspection cycle and the last inspection cycle and mark it as t1, t2, ..., tm, determine the number of inspection cycles in which the number of times any cable fails is greater than or equal to the reference value and mark it as the reference number Q; according to the calculation formula Calculate the inspection score W of any cable i ; Among them, W i represents the inspection score of the ith cable, Q i represents the reference quantity of the ith cable, J i is the number of failures that occur in the i-th cable in any operation and inspection cycle; the operation and inspection score of the cable is corrected according to the detection data, and the cables whose corrected operation and inspection scores are greater than or equal to the preset risk threshold are used as target cables that need to be inspected in the next operation and inspection cycle.
[0018] In the present invention, the target area and inspection cycle are set, and the monitoring data within the inspection cycle is obtained to provide a basis for subsequent comprehensive analysis; it can be understood that after the cable inspection, if the time of the fault is shorter than the time of the inspection, it means that the maintenance should be carried out in the next maintenance cycle; then, the reference quantity is determined; it can be understood that the reference value is calculated based on the number of times all cables fail during the maintenance cycle, which can reflect the overall fault situation of the cable to determine the situation where the frequency of cable failures during the maintenance cycle exceeds the normal range; finally, the operation and inspection score is calculated, and it can be understood that the operation and inspection score is actually the cable operation failure, and it can be understood that recording the number of cable failures helps to identify cables with frequent problems. These cables may have design defects, installation problems or abnormal operating environments, and require more detailed inspections and maintenance. At the same time, in the actual operation of the actual cable, it can be determined that the insulation capacity of the cable and the failure rate of the cable are usually negatively correlated. In other words, cables with stronger insulation capacity usually have lower failure rates, and conversely, cables with poorer insulation capacity have higher failure rates. Therefore, the cable operation inspection score is corrected according to the cable detection data, and the corresponding cable is judged whether it needs to be inspected in the next maintenance cycle according to the corrected score. The present invention can screen the cables that need to be inspected, reduce the manpower cost and time cost required for comprehensive inspection, and improve the inspection efficiency.
[0019] In a preferred embodiment of the present invention, in S3, the specific process of correcting the operation and inspection score is: S11, select any cable, divide the operating temperature and operating humidity into units of operation and inspection cycle T, calculate the average operating temperature t and average operating humidity h in each operation and inspection cycle T in turn, generate a time-ordered average operating temperature sequence and an average operating humidity sequence, accumulate all values in the sequence every other operation and inspection cycle, and obtain an accumulated operating temperature value and an accumulated operating humidity value; S12, establish a convolutional neural network and input the operation index accumulated value and the corresponding insulation material resistance value sequence into the convolutional neural network for training, the operation index accumulated value includes the operation temperature accumulated value, the operation humidity accumulated value and the operation time, generate a mapping model of the corresponding relationship between the operation index accumulated value and the insulation resistance value; obtain the average accumulated speed of the operation temperature and the operation humidity of any cable and calculate the operation index accumulated value at the end point of the next inspection cycle in the future, input the operation index accumulated value of the next inspection cycle into the mapping model, and output the predicted insulation resistance value R'; S13, according to the calculation formula W'=W*{1+γ / (R'-Rf) m}The modified operation and inspection score is calculated, where γ and m are preset coefficients and Rf is the critical insulation resistance value of any cable.
[0020] In another preferred embodiment of the present invention, in said S13, if there is any cable whose predicted insulation resistance value R' is less than or equal to the critical insulation resistance value Rf, the operation and inspection score of the cable is not updated, and the cable is taken as a cable that needs to be inspected in the next maintenance cycle.
[0021] By marking cables with predicted insulation resistance values below the critical value as requiring maintenance, potential insulation problems can be dealt with first to avoid safety accidents caused by cable failures. Unnecessary updates to the inspection scores of cables that have been identified as requiring maintenance are avoided, thereby focusing resources on cables that need to be handled immediately, improving the efficiency of maintenance work, and early inspection of problematic cables can reduce the risk of failures and ensure the reliability and stability of the power system.
[0022] In another preferred embodiment of the present invention, the process of establishing the mapping model is: With the accumulated value of operating temperature, accumulated value of operating humidity and operating time as the horizontal coordinates and the resistance value of the insulating material as the vertical coordinate, a plane rectangular coordinate system is established to perform one-dimensional regression fitting and generate a one-dimensional regression fitting function formula: Rj=atj+d1, Rj=chj+d2, Rj=eyj+d3; Among them, j∈1,...,n, a, c, e, d1, d2, d3 are function parameters, and the values of the function parameters are calculated according to the accumulated values of the actual operating indicators.
[0023] In another preferred embodiment of the present invention, another method for determining the target cable specifically includes: A broken line is established to show the change of the insulation material resistance value with the operating time Y. When the absolute value of the slope of any broken line is greater than the preset threshold, the current operating temperature and operating humidity of the cable are compared with the historical data. If the comparison difference is less than or equal to the preset threshold, the cable is calibrated as the target cable.
[0024] In another preferred embodiment of the present invention, in S3, when the inspection and maintenance scores of all cables are less than the preset risk threshold, all cables are sorted according to the corresponding inspection and maintenance scores. The larger the inspection and maintenance score, the higher the ranking. The first M cables in the sorting are selected as the cables that need to be inspected in the next inspection and maintenance cycle, and M is a preset number value.
[0025] In another preferred embodiment of the present invention, if there are two or more cables with the same operation and inspection scores, they are sorted according to the time the cables have been in use, and the longer the time they have been in use, the higher the ranking.
[0026] Cables that have been in use for longer have generally experienced more workloads and potential aging, and may be at a higher risk of failure, so the longer they are in use, the higher they are ranked.
[0027] In another preferred embodiment of the present invention, when a cable fails and needs to be replaced during the inspection cycle, the cable does not participate in the subsequent steps and is taken as a cable that needs to be repaired in the next maintenance cycle.
[0028] Since the faulty cable has been replaced in the current inspection cycle, it does not participate in the subsequent steps, which can avoid duplication of work and waste of resources. The replaced cable will be included in the next maintenance cycle for inspection, which can ensure that the current stage of cable problems can be handled in each maintenance cycle, and plans can be made for future maintenance cycles to avoid omissions.
[0029] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A cable operation and maintenance strategy optimization method based on machine learning, characterized in that: The following steps are involved: S1, set the target area and inspection cycle, obtain all cables in the target area and count the number of failures, detection data and operating indicators of any cable in the inspection cycle, the detection data is the resistance value R of the cable insulation material, and the operating indicators include the cable operating temperature, operating humidity and operating time; S2, divide the inspection cycle into n inspection cycles T, select any cable and obtain the number of failures J of the cable in any inspection cycle, and calculate according to the formula , the reference value J' of the cable is calculated, where k is the total number of cables, n' is the total number of operation and inspection cycles in which the fault occurs, and Jij represents the number of times the i-th cable fails in the j-th operation and inspection cycle; S3: Select any cable and calculate the time interval between the time when the cable fails during the inspection cycle and the last inspection cycle and mark it as t1, t2, ..., tm, determine the number of inspection cycles in which the number of times any cable fails is greater than or equal to the reference value and mark it as the reference number Q; according to the calculation formula Calculate the inspection score W of any cable i ; Among them, W i represents the inspection score of the ith cable, Q i represents the reference quantity of the ith cable, J i is the number of failures that occur in the i-th cable in any operation and inspection cycle; The inspection and maintenance score of the cable is corrected based on the detection data, and the cables whose inspection and maintenance scores are greater than or equal to the preset risk threshold after correction are used as target cables that need to be inspected in the next inspection and maintenance cycle.
2. The cable operation and maintenance strategy optimization method based on machine learning according to claim 1 is characterized in that: In S3, the specific process of correcting the operation and inspection score is as follows: S11, select any cable, divide the operating temperature and operating humidity into units of operation and inspection cycle T, calculate the average operating temperature t and average operating humidity h in each operation and inspection cycle T in turn, generate a time-ordered average operating temperature sequence and an average operating humidity sequence, accumulate all values in the sequence every other operation and inspection cycle, and obtain an accumulated operating temperature value and an accumulated operating humidity value; S12, establish a convolutional neural network and input the operation index accumulated value and the corresponding insulation material resistance value sequence into the convolutional neural network for training, the operation index accumulated value includes the operation temperature accumulated value, the operation humidity accumulated value and the operation time, generate a mapping model of the corresponding relationship between the operation index accumulated value and the insulation resistance value; obtain the average accumulated speed of the operation temperature and the operation humidity of any cable and calculate the operation index accumulated value at the end point of the next inspection cycle in the future, input the operation index accumulated value of the next inspection cycle into the mapping model, and output the predicted insulation resistance value R'; S13, according to the calculation formula W'=W*{1+γ / (R'-Rf) m }The modified operation and inspection score W' is calculated, where γ and m are preset coefficients, and Rf is the critical insulation resistance value of any cable.
3. The cable operation and maintenance strategy optimization method based on machine learning according to claim 2 is characterized in that: In S13, if the predicted insulation resistance value R' of any cable is less than or equal to the critical insulation resistance value Rf, the operation and inspection score of the cable is not updated, and the cable is regarded as a cable that needs to be inspected in the next maintenance cycle.
4. The cable operation and maintenance strategy optimization method based on machine learning according to claim 2 is characterized in that: The process of establishing the mapping model is as follows: With the accumulated value of operating temperature, accumulated value of operating humidity and operating time as the horizontal coordinates and the resistance value of the insulating material as the vertical coordinate, a plane rectangular coordinate system is established to perform one-dimensional regression fitting and generate a one-dimensional regression fitting function formula: Rj=atj+d1, Rj=chj+d2, Rj=eyj+d3; Among them, j∈1,...,n, a, c, e, d1, d2, d3 are function parameters, and the values of the function parameters are calculated according to the accumulated values of the actual operating indicators.
5. The cable operation and maintenance strategy optimization method based on machine learning according to claim 1 is characterized in that: Another method of determining the target cable specifically includes: A broken line is established to show the change of the insulation material resistance value with the operating time Y. When the absolute value of the slope of any broken line is greater than the preset threshold, the current operating temperature and operating humidity of the cable are compared with the historical data. If the comparison difference is less than or equal to the preset threshold, the cable is calibrated as the target cable.
6. The cable operation and maintenance strategy optimization method based on machine learning according to claim 1 is characterized in that: In S3, when the inspection and maintenance scores of all cables are less than the preset risk threshold, all cables are sorted according to the corresponding inspection and maintenance scores. The larger the inspection and maintenance score, the higher the ranking. The first M cables in the sorting are selected as the cables that need to be inspected in the next inspection and maintenance cycle, and M is a preset number value.
7. The cable operation and maintenance strategy optimization method based on machine learning according to claim 6 is characterized in that: If there are two or more cables with the same operation and inspection scores, they will be sorted according to the time the cables have been in use. The longer the cables have been in use, the higher the ranking.
8. The cable operation and maintenance strategy optimization method based on machine learning according to claim 1 is characterized in that: When a cable fails and needs to be replaced during the inspection cycle, it will not be involved in the subsequent steps and will be considered as a cable that needs to be repaired during the next maintenance cycle.
Citation Information
Patent Citations
Intelligent equipment inspection method and system based on fault prediction and image recognition
CN117373144A
Intelligent test method and system for insulation performance of motor
CN118112415A
Fault diagnosis method and system for electric energy meter in electric energy metering box
CN118501797A
Diagnosis method of power cable when power cable is repaired
JP2009300275A
Cited By
Campus security equipment diagnosis system based on Internet of Things
CN119476726A
Power cable heating state monitoring and fault prediction method based on artificial intelligence
CN119669731A
Artificial Intelligence-Based Method for Monitoring the Heating State and Predicting Faults of Power Cables
CN119669731B