Safety protection device for rapid fixed installation of prestressed outer edge beam and use method

Through the design of retractable lifting platforms and clamping mechanisms, the problems of inconvenient installation and unsatisfactory protection effects of prefabricated prestressed outer edge beams are solved, and a convenient and safe construction platform is provided, suitable for installation occasions with different spacings.

CN118756982AInactive Publication Date: 2024-10-11CHINA MCC17 GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410977394.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-10-11
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing technology, it is inconvenient to install the side beams of prefabricated beams, it is inconvenient for construction workers to work on the side beams, and the protection effect is not ideal.

Method used

A safety protection device is designed that includes two columns, side beams, a support platform, a support rod, a protective net and a connecting rope. The platform is retractable, a protective net is set on the support rod, and a connecting ring is provided on the connecting rope. The mechanism is used to fix the columns and provide a stable and convenient construction platform.

Benefits of technology

It realizes the rapid fixed installation of side beams, provides a safer construction platform, improves the fixation of the protective net and connecting ropes, is suitable for installation occasions with different spacing, and is more convenient and safer to use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118756982A_ABST
    Figure CN118756982A_ABST
Patent Text Reader

Abstract

The invention discloses a safety protection device for rapid fixed installation of a prefabricated prestressed outer edge beam and a using method, and belongs to the technical field of construction protection, the safety protection device comprises an edge beam and two stand columns, the edge beam is arranged between the two stand columns, one side of each stand column is provided with a cantilever platform, and the length of the cantilever platform can be adjusted; the device further comprises two supporting rods, and a protective net is installed between the two supporting rods. And the clamping mechanisms are arranged at the two ends of the lifting platform and used for clamping the safety protection device on the two stand columns. The protective net and the connecting rope are fixedly wound around one of the supporting rods, control can be conducted according to the telescopic length of the sleeve plate and the connecting plate, the protective net can be suitable for different lengths, the sleeve plate and the connecting plate are fixed, meanwhile, the supporting rods on the sleeve plate can be fixed, the fixing steps are reduced, and use is more convenient and faster; and the sleeve plate and the connecting plate can be fixed to the stand column through cooperative use of the angle plate, the roller and the clamping block, and fixing is firmer and safer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction protection, and specifically relates to a safety protection device for fast fixing and installing prefabricated prestressed outer edge beams and a use method thereof. Background Art

[0002] At present, in existing large-scale construction sites, major building components, such as precast beams, are generally prefabricated in factories and then transported to the site for overall assembly. This can save the step of pouring concrete on site, increase construction speed, and reduce the number of on-site workers and equipment, saving costs and ensuring quality.

[0003] After the prefabricated beams are transported to the construction site, they are hoisted to the predetermined position by a large crane. After the main body of the building is connected, the workers move to the prefabricated beams for subsequent construction. Among them, the prefabricated beams after connection are high from the ground. In order to ensure the personal safety of the workers, during the construction process, the workers need to wear safety belts to avoid falling from high altitude.

[0004] After searching, the invention with announcement number CN112096091B discloses a safety protection device for prefabricated beam construction, including two protection poles and a safety rope, the two protection poles are respectively connected to the vertical steel bars at both ends of the prefabricated beam through a stable and adjustable connection mechanism; the stable and adjustable connection mechanism includes a connection seat and a triangular connection assembly, the upper end of the connection seat is fixedly connected to the bottom end of the protection pole; the triangular connection assembly includes a triangular connection sleeve, an adjustable connection piece and a fastening bolt, the triangular connection sleeve is vertically arranged below the connection seat, and the triangular connection sleeve includes a fixed sleeve and two movable sleeves; the adjustable connection piece includes a first adjustable connection piece and a second adjustable connection piece, one end of the first adjustable connection piece and the second adjustable connection piece is movably connected to the fixed sleeve, and the other end is fixedly connected to the two movable sleeves respectively. The safety protection device can not only achieve stable protection, but also has high protection strength.

[0005] However, similar protective equipment has the following disadvantages during use: when in use, the pull rod is installed on the side beam steel bar, and then protected by a safety lock, but after the side beam is installed, the steel bars at both ends are inside the column, making the side beam inconvenient to install, and people standing on the side beam are not convenient for construction of the building on the side beam, and the protective effect is not ideal. Summary of the invention

[0006] The technical problem to be solved by the present invention is: in view of the shortcomings of the prior art that a pull rod is installed on the steel bars of a side beam and then protected by a safety lock, but after the side beam is installed, the steel bars at both ends of the side beam are inside the column, making it inconvenient to install the side beam, and it is inconvenient for people to stand on the side beam to construct the building on the side beam, and the protection effect is not ideal. A safety protection device for quickly fixing and installing prefabricated prestressed external side beams and a method of use are provided to solve the problems mentioned in the background technology or achieve better technical effects.

[0007] In order to solve the above technical problems, the inventors have obtained the technical solution of the present invention through practice and summary. The present invention discloses a safety protection device for the rapid fixing and installation of prefabricated prestressed external edge beams, comprising two columns and edge beams, wherein the edge beams are arranged between the two columns, and a cantilever is arranged on one side of the columns, wherein the cantilever is arranged on one side of the two columns, and the length of the cantilever can be extended and retracted, and is used for two columns with different spacings, so as to provide a construction platform for construction personnel;

[0008] Two support rods, both of which are arranged on the platform, a protective net is arranged between the two support rods for protecting the construction workers, a connecting rope is connected to the top of the protective net for strengthening the protective net, a plurality of connecting rings are arranged on the connecting rope for buckling the safety belts of the construction workers, and one of the support rods can assist in reeling up the protective net and the connecting rope when the platform is stored;

[0009] The clamping mechanism is arranged on two upright posts at both ends of the platform and is used for clamping the device.

[0010] In a possible design, the platform includes a sleeve plate and a connecting plate, the connecting plate is slidably arranged in the sleeve plate, one of the support rods is fixedly arranged on the top of the connecting plate, and the other support rod is rotatably arranged on the top of the sleeve plate, the outer wall of the support rod is rotatably sleeved with a ring, and the outer wall of the support rod is sleeved with a torsion spring located in the ring, the two ends of the torsion spring are respectively fixedly connected to the outer wall of the support rod and the top of the sleeve plate to provide winding power for the support rod, and a fixing mechanism is arranged on the sleeve plate to fix the support rod and the connecting plate.

[0011] In a possible design, the fixing mechanism includes a pin that passes through and slides on the top of the sleeve plate, and the top of the connecting plate is provided with a plurality of limiting holes used in conjunction with the pin. The pin passes through the sleeve plate and is inserted into the limiting holes to fix the sleeve plate and the connecting plate.

[0012] In a possible design, the clamping mechanism includes two limit plates, one of which is tilted and fixed at one end of the sleeve plate, and a slot corresponding to the connecting plate is opened on one side of the other limit plate for positioning the limit plate, a bolt is penetrated through one side of the limit plate, and the bolt is threadedly connected to the connecting plate for further fixing the limit plate, an interference block is fixedly provided on one side of the two limit plates, a connecting block is fixedly provided on the top of the sleeve plate and the connecting plate, a third guide rod is slidably provided on one side of the connecting block, a clamping block is fixedly provided on one end of the third guide rod, a screw is threadedly provided on one side of the connecting block, and one end of the screw is fixedly connected to the clamping block.

[0013] In a possible design, a fixed block is fixedly provided at the middle portion above the sleeve plate, a sliding rod is slidably provided on one side of the fixed block, a first guide rod is fixedly provided on one side of the sliding rod, the first guide rod is slidably provided on one side of the fixed block, a first spring is sleeved on the outer wall of the first guide rod, one end of the first guide rod includes a limit block used in conjunction with the fixed block, for limiting the first guide rod, the two ends of the first spring are respectively fixedly connected to one side of the fixed block and one side of the sliding rod, an L-shaped rod is fixedly provided on the top of the sliding rod, a first interference portion corresponding to the support rod is provided on one side of the L-shaped rod, for increasing the contact area between the L-shaped rod and the support rod, a first wedge block is fixedly provided on one side of the sliding rod, and a second wedge block used in conjunction with the first wedge block is fixedly provided on one side of the pin.

[0014] In a possible design, a plurality of equidistant positioning holes are formed on the outer wall of the support rod, and a positioning column used in conjunction with the positioning holes is fixedly provided on one side of the first abutting portion.

[0015] In a possible design, the outer wall sliding sleeve of the connecting rope is provided with a sliding ring corresponding to the connecting ring, and the connecting ring is fixed on the sliding ring so that the position of the connecting ring can be adjusted as needed.

[0016] In a possible design, a waist-shaped hole is provided on one side of the limiting plate, a second guide rod is fixedly provided in the waist-shaped hole, a sliding column is slidably sleeved on the outer wall of the second guide rod, a roller is rotatably provided on the outer wall of the sliding column, a second interference portion corresponding to the roller is provided on one side of the interference block, a second spring is sleeved on the outer wall of the second guide rod, two ends of the second spring are respectively fixedly connected to the side close to the sliding column and the waist-shaped hole, and the roller can be limited by the second interference portion during the clamping process, and the bottom of the sleeve plate and the connecting plate are fixedly provided with angle plates that interfere with the column, so as to increase the contact area between the platform and the column.

[0017] The present application also discloses a method for using a safety protection device for fast fixing and installing prefabricated prestressed outer edge beams. When in use, the connecting plate is pulled outward until the limit plates at both ends correspond to the two uprights, which can drive the protection net and the connecting rope to extend at the same time, and drive the support rod on the sleeve plate to rotate, and then the pin column is inserted into the sleeve plate and extended into the positioning hole on the connecting plate. During the insertion process, the second wedge block will resist the movement of the first wedge block, and the movement of the first wedge block can drive the sliding rod to move. The movement of the sliding rod can drive the L-shaped rod to move closer to the support rod until the positioning column in the first resisting portion is inserted into the corresponding positioning hole, at which time the support rod can be fixed;

[0018] Then, the device is hoisted onto the column by a crane, and the limit plate on one side of the sleeve plate is fitted to the side of the corresponding column until it moves to a suitable height. Then, the other limit plate is clamped on one side of the connecting plate and fixed by bolts. Then, the screw rod is turned. During the rotation of the screw rod, it can move on the connecting block and drive the clamping block to one side of the column. When the clamping block contacts the column, it continues to move and can drive the sliding column to move in the waist-shaped hole through the roller until the roller contacts the platform. At this time, the sleeve plate and the connecting plate can be fixed on one side of the two columns, and the angle plate can contact one side of the column, thereby further limiting the height of the sleeve plate and the connecting plate.

[0019] Then the construction workers stand on the cover plate and the connecting plate, and then buckle the safety belt buckle on the corresponding connecting ring to carry out the construction;

[0020] When it is necessary to adjust the height of the safety protection device, hang the crane hook on the connecting ring, and then tighten the hook; turn the screw to drive the clamp to reset and move. At this time, the roller resets and moves under the action of the second spring, away from the second resistance part, and the limit plate separates from the two columns. Then start the crane to drive the safety protection device to move upward. After moving into place, fix it again.

[0021] In order to provide greater stability, after the cantilever is matched with the column, it is often necessary to add inclined supports to the column or add vertical supports to the ground to further ensure the horizontal state and stability and safety of the cantilever.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] In the present invention, the protective net and the connecting rope are fixedly wound around one of the support rods, and can be controlled according to the telescopic length of the sleeve plate and the connecting plate, so that it can be suitable for use environments with different lengths, and the support rod on the sleeve plate can be fixed while the sleeve plate and the connecting plate are fixed, so that the fixing steps are reduced and the use is more convenient;

[0024] In the present invention, the sleeve plate and the connecting plate can be fixed on the column by using the angle plate, the roller and the clamping block, so as to realize a three-point fixing method, so that the fixing is more firm, and the plate will not fall down during use, so the use is safer;

[0025] In the present invention, a connecting ring is provided on the connecting rope so that the safety belt can be buckled and the crane hook can be hung on the connecting ring, so that one ring can be used for multiple purposes, which can not only protect the construction personnel but also facilitate the movement of the device driven by the crane.

[0026] In the present invention, the cantilever is configured to be retractable and can drive the protective net to extend when it is opened, so that it can be used in installation occasions with different distances. At the same time, the device can be fixed on the column by angle plates, rollers and clamps, so that it is fixed more firmly and will not affect the installation and construction of the side beams, making it more convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0028] Figure 1 A schematic diagram of the three-dimensional structure of a safety protection device for quick fixing and installing prefabricated prestressed outer edge beams after installation, as proposed by the present invention;

[0029] Figure 2 A schematic diagram of the three-dimensional structure of a safety protection device for rapid fixing and installation of prefabricated prestressed outer edge beams proposed by the present invention;

[0030] Figure 3 A schematic diagram of a cantilever connection structure of a safety protection device for quick fixed installation of prefabricated prestressed outer edge beams proposed by the present invention;

[0031] Figure 4 A schematic diagram of a latch structure of a safety protection device for fast fixing and installing a prefabricated prestressed outer edge beam proposed by the present invention;

[0032] Figure 5 A schematic diagram of the structure of a limit plate of a safety protection device for fast fixing and installing a prefabricated prestressed outer edge beam proposed by the present invention;

[0033] Figure 6 A schematic structural diagram of a limit plate of a safety protection device for fast fixing and installing a prefabricated prestressed outer edge beam proposed by the present invention from another perspective;

[0034] Figure 7This is a schematic diagram of the clamping block structure of a safety protection device for rapid fixing and installation of prefabricated prestressed outer edge beams proposed by the present invention.

[0035] In the figure: 1. column; 2. side beam; 3. platform; 4. support rod; 5. protection net; 6. connecting rope; 7. sleeve plate; 8. connecting plate; 9. angle plate; 10. limit plate; 11. bolt; 12. sliding ring; 13. connecting ring; 14. sliding rod; 15. L-shaped rod; 16. first contact part; 17. sleeve ring; 18. torsion spring; 19. positioning hole; 20. fixing block; 21. first guide rod; 22. limit block; 23. first spring; 24. pin; 25. first wedge block; 26. second wedge block; 27. waist-shaped hole; 28. second guide rod; 29. ​​sliding column; 30. second spring; 31. contact block; 32. roller; 33. second contact part; 34. slot; 35. clamping block; 36. third guide rod; 37. connecting block; 38. screw; 39. limit hole. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0037] The application principle of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0038] Example 1

[0039] Reference Figure 1-Figure 7 A safety protection device for quick fixed installation, which is used in the field of protection, comprises: two columns 1 and a side beam 2, the side beam 2 is arranged between the two columns 1, a platform 3 is arranged on one side of the column 1, the platform 3 is arranged on one side of the two columns 1, and the length of the platform 3 can be extended and retracted, and is used for two columns 1 with different spacings, providing a construction platform for construction workers;

[0040] Two support rods 4, both support rods 4 are arranged on the platform 3, a protective net 5 is arranged between the two support rods 4 for protecting the construction workers, a connecting rope 6 is arranged at the top of the protective net 5 for strengthening the protective net 5, a plurality of connecting rings 13 are arranged on the connecting rope 6 for buckling the safety belts of the construction workers, and one of the support rods 4 can assist in winding up the protective net 5 and the connecting rope 6 when the platform 3 is stored;

[0041] In different situations, the length of the side beam 2 is different, so the length of the platform 3 can be extended to be consistent with the length of the side beam, and the length of the connecting rope 6 and the protective net 5 can be selected as needed.

[0042] A clamping mechanism is provided on two columns 1 at both ends of the cantilever 3 for clamping the safety protection device. By arranging the clamping mechanism at both ends of the cantilever 3, the safety protection device can be clamped on the two columns 1, and the length of the cantilever 3 can be adjusted, and can be suitable for two columns 1 with different spacings. A protective net 5 and a connecting rope 6 are provided on the cantilever 3 to protect the construction workers, and a connecting ring 13 is provided on the connecting rope 6 to enable the safety lock to be connected to the connecting ring 13, which can further improve the safety of the construction workers.

[0043] The platform 3 includes a sleeve plate 7 and a connecting plate 8, and the connecting plate 8 is slidably arranged in the sleeve plate 7, one of the support rods 4 is fixedly arranged on the top of the connecting plate 8, and the other support rod 4 is rotatably arranged on the top of the sleeve plate 7. The outer wall of the support rod 4 is rotatably sleeved with a ring 17, and the outer wall of the support rod 4 is sleeved with a torsion spring 18 located in the ring 17, and the two ends of the torsion spring 18 are respectively fixedly connected to the outer wall of the support rod 4 and the top of the sleeve plate 7, providing auxiliary winding power for the support rod 4; a fixing mechanism is arranged on the sleeve plate 7 for fixing the support rod 4 and the connecting plate 8, and the length of the platform 3 can be adjusted through the movable connection between the sleeve plate 7 and the connecting plate 8, and when the sleeve plate 7 and the connecting plate 8 are contracted, the support rod 4 on the sleeve plate 7 can assist in winding up the protective net 5 and the connecting rope 6 under the action of the torsion spring 18, so that it can assist in adjusting the length of the protective net 5 according to the length of the sleeve plate 7 and the connecting plate 8, and after the adjustment is completed, it can be adjusted accordingly through the fixing mechanism.

[0044] The clamping mechanism includes two limit plates 10, one of which is fixedly arranged at one end of the sleeve plate 7, and a slot 34 corresponding to the connecting plate 8 is provided on one side of the other limit plate 10 for positioning the limit plate 10. A bolt 11 is provided through one side of the limit plate 10, and the bolt 11 is threadedly connected to the connecting plate 8 for further fixing the limit plate 10. An abutment block 31 is fixedly arranged on one side of the two limit plates 10, and a connecting block 37 is fixedly arranged on the top of the sleeve plate 7 and the connecting plate 8. The connecting block A third guide rod 36 is slidably provided on one side of 37, and a clamping block 35 is fixedly provided at one end of the third guide rod 36. A screw rod 38 is threadedly provided on one side of the connecting block 37, and one end of the screw rod 38 is fixedly connected to the clamping block 35. The screw rod 38 can be moved on the connecting block 37 by rotating the screw rod 38. During the movement, the clamping block 35 can be driven to approach or move away from the column 1, so that it can cooperate with the abutment block 31 to clamp the column 1, thereby supporting the sleeve plate 7 and the connecting plate 8, and the clamping is convenient.

[0045] The fixing mechanism includes a pin 24 that passes through and slides on the top of the sleeve plate 7. A plurality of limiting holes 39 that cooperate with the pin 24 are opened on the top of the connecting plate 8. The pin 24 passes through the sleeve plate 7 and is inserted into the limiting holes 39 to fix the sleeve plate 7 and the connecting plate 8. By inserting the pin 24 into the sleeve plate 7 and extending it to the limiting holes 39 on the connecting plate 8, the telescopic length of the sleeve plate 7 and the connecting plate 8 can be fixed. During use, the sleeve plate 7 and the connecting plate 8 will not move relative to each other, thereby improving safety during use.

[0046] A fixed block 20 is fixedly provided in the middle of the upper part of the sleeve plate 7, a sliding rod 14 is slidably provided on one side of the fixed block 20, a first guide rod 21 is installed on one side of the sliding rod 14, the first guide rod 21 is slidably provided on one side of the fixed block 20, a first spring 23 is sleeved on the outer wall of the first guide rod 21, one end of the first guide rod 21 includes a limit block 22 used in conjunction with the fixed block 20 for limiting the first guide rod 21, and the two ends of the first spring 23 are fixedly connected to one side of the fixed block 20 and one side of the sliding rod 14, respectively.

[0047] An L-shaped rod 15 is fixedly provided on the top of the sliding rod 14, and a first abutting portion 16 corresponding to the support rod 4 is opened on one side of the L-shaped rod 15, which is used to increase the contact area between the L-shaped rod 15 and the support rod 4. A first wedge block 25 is fixedly provided on one side of the sliding rod 14, and a second wedge block 26 used in conjunction with the first wedge block 25 is fixedly provided on one side of the pin column 24. During the process of plugging in the pin column 24, the second wedge block 26 will abut against the movement of the first wedge block 25. When the first wedge block 25 moves, it can drive the sliding rod 14 to move, so that one end of the L-shaped rod 15 abuts against the outer wall of the support rod 4, so that it can limit the support rod 4, and can effectively prevent the protective net 5 and the connecting rope 6 from causing the support rod 4 to rotate slightly when subjected to force.

[0048] Example 2

[0049] refer to Figure 1-Figure 7 , improved on the basis of Example 1: a safety protection device for quick fixing and installation of prefabricated prestressed outer edge beams, which is applied to the field of construction protection, a plurality of equidistant positioning holes 19 are opened on the outer wall of the support rod 4, and a positioning column used in conjunction with the positioning hole 19 is fixed on one side of the first resistance portion 16. The positioning hole 19 and the positioning column can further increase the limiting effect between the support rod 4 and the L-shaped rod 15 through the coordinated use of the positioning hole 19, so that the support rod 4 will not rotate.

[0050] A waist-shaped hole 27 is provided on one side of the limiting plate 10, and a second guide rod 28 is fixedly provided in the waist-shaped hole 27. A sliding column 29 is slidably sleeved on the outer wall of the second guide rod 28, and a roller 32 is rotatably provided on the outer wall of the sliding column 29. A second abutment portion 33 corresponding to the roller 32 is provided on one side of the abutment block 31. A second spring 30 is sleeved on the outer wall of the second guide rod 28. The two ends of the second spring 30 are respectively fixedly connected to the sliding column 29 and the side close to the waist-shaped hole 27. During the clamping process, the roller 32 can be limited by the second abutment portion 33; the bottom of the sleeve plate 7 and the connecting plate 8 are fixedly provided with an angle plate 9 that abuts against the column 1, which is used to increase In order to increase the contact area between the platform 3 and the column 1, during the process of the clamping block 35 and the abutment block 31 clamping the column 1, the roller 32 rotates until the roller 32 abuts against the second abutment portion 33, so that the roller 32 can be limited. During use, the roller 32 will not rotate. At the same time, the contact area between the platform 3 and the column 1 can be increased by the angle plate 9, which can further improve the stability. When the clamping block 35 is away from the column 1, the roller 32 can be reset under the action of the second spring 30, so that the roller 32 can roll on one side of the column 1, thereby reducing the friction between the abutment block 31 and the column 1 during the movement, making the movement smoother.

[0051] The outer wall sliding sleeve of the connecting rope 6 is provided with a sliding ring 12 corresponding to the connecting ring 13. The connecting ring 13 is fixed on the sliding ring 12, and the position of the connecting ring 13 can be adjusted as needed. Through the setting of the sliding ring 12, the connecting ring 13 can be set on the connecting rope 6, and the position of the connecting ring 13 can be adjusted as needed through the sliding ring 12, which makes it more flexible to use.

[0052] Example 3

[0053] A method for using a safety protection device for fast fixing and installing a prefabricated prestressed outer edge beam. When in use, the connecting plate is pulled outward until the limit plates at both ends correspond to the two upright posts, which can drive the protection net and the connecting rope to extend at the same time, and drive the support rod on the sleeve plate to rotate, and then the pin column is inserted into the sleeve plate and extended into the positioning hole on the connecting plate. During the insertion process, the second wedge block will resist the movement of the first wedge block, and the movement of the first wedge block can drive the sliding rod to move. The movement of the sliding rod can drive the L-shaped rod to move closer to the support rod until the positioning column in the first resisting portion is inserted into the corresponding positioning hole, at which time the support rod can be fixed;

[0054] Then, the device is hoisted onto the column by a crane, and the limit plate on one side of the sleeve plate is fitted to the side of the corresponding column until it moves to a suitable height. Then, the other limit plate is clamped on one side of the connecting plate and fixed by bolts. Then, the screw rod is turned. During the rotation of the screw rod, it can move on the connecting block and drive the clamping block to one side of the column. When the clamping block contacts the column, it continues to move and can drive the sliding column to move in the waist-shaped hole through the roller until the roller contacts the platform. At this time, the sleeve plate and the connecting plate can be fixed on one side of the two columns, and the angle plate can contact one side of the column, thereby further limiting the height of the sleeve plate and the connecting plate.

[0055] Then the construction workers stand on the cover plate and the connecting plate, and then buckle the safety belt buckle on the corresponding connecting ring to carry out the construction;

[0056] When it is necessary to adjust the height of the safety protection device, hang the crane hook on the connecting ring, and then tighten the hook; turn the screw to drive the clamp to reset and move. At this time, the roller resets and moves under the action of the second spring, away from the second resistance part, and the limit plate separates from the two columns. Then start the crane to drive the safety protection device to move upward. After moving into place, fix it again.

[0057] In order to provide greater stability, after the cantilever is matched with the column, it is often necessary to add inclined supports to the column or add vertical supports to the ground to further ensure the horizontal state and stability and safety of the cantilever.

[0058] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive in all respects, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention.

[0059] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A safety protection device for fast fixing and installing prefabricated prestressed outer edge beams, comprising an edge beam and two columns, Features: The side beam is arranged between two columns, a platform is arranged on one side of the column, the platform is installed on the same side of the two columns, and the length of the platform can be extended; It also includes two support rods, both of which are installed on the platform, a protective net is installed between the two support rods, the top of the protective net is connected to a connecting rope, and the connecting rope is provided with a plurality of connecting rings, and one of the support rods can assist in rolling up the protective net and the connecting rope when the platform is stored; It also includes a clamping mechanism, which is arranged on two columns at both ends of the platform and is used to clamp the safety protection device.

2. A safety protection device for quick fixing and installation of prefabricated prestressed outer edge beams according to claim 1, Features: The platform includes a sleeve plate and a connecting plate, the connecting plate is slidably arranged in the sleeve plate, one of the support rods is fixedly arranged on the top of the connecting plate, and the other support rod is rotatably arranged on the top of the sleeve plate, the outer wall of the support rod is rotatably sleeved with a ring, and the outer wall of the support rod is sleeved with a torsion spring located in the ring, the two ends of the torsion spring are respectively fixedly connected to the outer wall of the support rod and the top of the sleeve plate to provide winding power for the support rod, and a fixing mechanism is arranged on the sleeve plate to fix the support rod and the connecting plate.

3. A safety protection device for quick fixing and installation of prefabricated prestressed outer edge beams according to claim 2, Features: The fixing mechanism includes a pin which passes through and slides on the top of the sleeve plate. The top of the connecting plate is provided with a plurality of limiting holes which cooperate with the pin. The pin passes through the sleeve plate and is inserted into the limiting holes to fix the sleeve plate and the connecting plate.

4. A safety protection device for quick fixing and installation of prefabricated prestressed outer edge beams according to claim 1, Features: The clamping mechanism includes two limit plates, one of which is tilted and fixed at one end of the sleeve plate, and a slot corresponding to the connecting plate is opened on one side of the other limit plate for positioning the limit plate; a bolt is penetrated through one side of the limit plate, and the bolt is threadedly connected to the connecting plate for further fixing the limit plate, and an interference block is fixedly provided on one side of the two limit plates, and a connecting block is fixedly provided on the top of the sleeve plate and the connecting plate, a third guide rod is slidably provided on one side of the connecting block, a clamping block is fixedly provided on one end of the third guide rod, and a screw is threadedly provided on one side of the connecting block, and one end of the screw is fixedly connected to the clamping block.

5. A safety protection device for rapid fixing and installation of prefabricated prestressed outer edge beams according to claim 4, Features: A fixed block is fixedly provided on the middle part above the sleeve plate, and a sliding rod is slidably provided on one side of the fixed block, and a first guide rod is fixedly provided on one side of the sliding rod, and the first guide rod is slidably provided on one side of the fixed block, and a first spring is sleeved on the outer wall of the first guide rod, and one end of the first guide rod includes a limit block used in conjunction with the fixed block, for limiting the first guide rod, and the two ends of the first spring are respectively fixedly connected to one side of the fixed block and one side of the sliding rod, and the top of the sliding rod is fixedly provided with an L-shaped rod, and one side of the L-shaped rod is provided with a first interference portion corresponding to the support rod, for increasing the contact area between the L-shaped rod and the support rod, and a first wedge block is fixedly provided on one side of the sliding rod, and a second wedge block used in conjunction with the first wedge block is fixedly provided on one side of the pin.

6. A safety protection device for fast fixing and installing prefabricated prestressed outer edge beams according to claim 5, Features: The outer wall of the support rod is provided with a plurality of equidistant positioning holes, and one side of the first abutting portion is fixedly provided with a positioning column used in conjunction with the positioning holes.

7. A safety protection device for fast fixing and installing prefabricated prestressed outer edge beams according to claim 1, Features: The outer wall sliding sleeve of the connecting rope is provided with a sliding ring corresponding to the connecting ring, and the connecting ring is fixed on the sliding ring.

8. A safety protection device for fast fixing and installing prefabricated prestressed outer edge beams according to claim 4, Features: A waist-shaped hole is provided on one side of the limiting plate, a second guide rod is fixedly provided in the waist-shaped hole, a sliding column is slidably sleeved on the outer wall of the second guide rod, a roller is rotatably provided on the outer wall of the sliding column, a second interference part corresponding to the roller is provided on one side of the interference block, a second spring is sleeved on the outer wall of the second guide rod, two ends of the second spring are respectively fixedly connected to the side close to each other of the sliding column and the waist-shaped hole, the roller can be limited by the second interference part during the clamping process, and the bottom of the sleeve plate and the connecting plate are fixedly provided with angle plates that interfere with the column.

9. A method for using a safety protection device for fast fixing and installing a prefabricated prestressed outer edge beam, comprising the safety protection device for fast fixing and installing a prefabricated prestressed outer edge beam according to any one of claims 1 to 8, Features: When in use, pull the connecting plate outward until the limit plates at both ends correspond to the two upright posts, drive the protective net and the connecting rope to extend at the same time, and drive the support rod on the sleeve plate to rotate, and then insert the pin into the sleeve plate and extend it into the positioning hole on the connecting plate. During the insertion process, the second wedge block contacts the movement of the first wedge block, and the movement of the first wedge block can drive the sliding rod to move. The movement of the sliding rod can drive the L-shaped rod to move closer to the support rod until the positioning column in the first contacting part is inserted into the corresponding positioning hole, thereby fixing the support rod; The device is hoisted onto the column by a crane, and the limit plate on one side of the sleeve plate is fitted to the side of the corresponding column until it moves to a suitable height. Then the other limit plate is clamped on one side of the connecting plate and fixed by bolts. Then the screw is rotated. During the rotation of the screw, it can move on the connecting block and drive the clamping block to one side of the column. When the clamping block contacts the column, it continues to move and can drive the sliding column to move in the waist-shaped hole through the roller until the roller contacts the platform. At this time, the sleeve plate and the connecting plate are fixed to one side of the two columns, and the angle plate can contact one side of the column, so as to further limit the height of the sleeve plate and the connecting plate. The construction workers then stand on the cover plate and the connecting plate, then buckle the safety belt on the corresponding connecting ring and carry out construction.

10. A method for using a safety protection device for rapid fixing and installation of prefabricated prestressed outer edge beams according to claim 9, Features: When the height of the safety protection device needs to be adjusted, hang the crane hook on the connecting ring and then tighten the hook; rotate the screw to drive the clamp to reset and move. At this time, the roller resets and moves under the action of the second spring, away from the second resistance part, and the limit plate separates from the two columns. Then start the crane to drive the safety protection device to move upward. After moving into place, fix it again.