Cross-line hoisting method for ultra-large section of small-radius fabricated bridge

By using intelligent walking-type jacking hydraulic devices and jacking guide devices in the cross-line hoisting of super-large sections of small-radius prefabricated bridges, the problems of low construction efficiency, high safety risks, and large impact on existing lines in traditional methods are solved. , realizing an efficient and safe hoisting process, and is suitable for the construction of various small radius bridges.

CN118774032APending Publication Date: 2024-10-15CCCC SECOND PUBLIC BUREAU FIFTH ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410991403.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The traditional cross-line hoisting method for super-large sections of small-radius prefabricated bridges has problems such as low construction efficiency, high safety risks, and great impact on existing lines.

Method used

The small-radius prefabricated bridge super-large segment cross-line hoisting method is adopted, and through the cooperation of hoisting equipment and intelligent walking-type jacking hydraulic devices and jacking guide devices, precise control, strong adaptability, high degree of automation, and good stability are achieved. Cross-line hoisting ensures that the hoisting process is consistent with the bridge design parameters and adapts to construction with different turning radii.

Benefits of technology

It improves construction accuracy and safety, reduces construction risks, reduces the impact on existing lines, improves construction efficiency and hoisting stability, and is suitable for hoisting operations on a variety of small-radius bridges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118774032A_ABST
    Figure CN118774032A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of bridge construction, and particularly relates to a small-radius assembly type bridge super-large section overline hoisting method which comprises the following steps: step 1, preparation work: manufacturing bridge sections according to a bridge design drawing, and transporting the sections to a construction site; 2, hoisting equipment, and selecting proper tonnage and arm length of the hoisting equipment according to the weight and size of the bridge section; according to the overline hoisting method for the ultra-large section of the small-radius assembly type bridge, the steps 1-9 are set, and during overline hoisting construction operation of the ultra-large section of the small-radius assembly type bridge, hoisting equipment is matched with an intelligent walking type pushing hydraulic device and a pushing guide device; according to the hoisting method, accurate control is achieved, adaptability is high, the automation degree is high, stability is good, construction risks are reduced, construction precision is improved, and therefore the problems that an existing hoisting method is low in construction efficiency, high in safety risk and large in influence on existing lines are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a method for hoisting a super-large segment across a small-radius assembled bridge. Background Art

[0002] With the rapid development of urban transportation, small-radius prefabricated bridges are increasingly used in urban construction. In the construction process of small-radius prefabricated bridges, the cross-line hoisting of super-large sections is a technical difficulty. Traditional hoisting methods have problems such as low construction efficiency, high safety risks, and great impact on existing lines. Therefore, it is necessary to provide a small-radius prefabricated bridge super-large section cross-line hoisting method to solve the above problems. Summary of the invention

[0003] Based on the technical problems of low construction efficiency, high safety risk and great impact on existing lines in the existing lifting methods, the present invention proposes a small-radius prefabricated bridge super-large segment cross-line lifting method.

[0004] The present invention provides a method for hoisting a super-large segment across a small-radius assembled bridge, comprising the following steps:

[0005] Step 1: Preparation: Make bridge segments according to the bridge design drawings and transport the segments to the construction site;

[0006] Step 2: Select the appropriate lifting equipment tonnage and arm length according to the weight and size of the bridge segment;

[0007] Step 3: Setting the lifting points: Setting the lifting points on the bridge segments to ensure that the positions of the lifting points are consistent with the strength of the bridge structure;

[0008] Step 4: Lifting operation: Position the lifting equipment just above the bridge segment, adjust the arm length and angle of the equipment, and align the hook with the lifting point;

[0009] Step 5: Cross-line hoisting: After the bridge segment is lifted to a certain height, slowly move the hoisting equipment to make the bridge segment cross the existing line;

[0010] Step 6: Positioning and installation: Use the intelligent walking-type pushing hydraulic device and the pushing guide device to push the bridge segment through the upper bridge or other building obstacles, adjust its horizontal and vertical directions, ensure the accurate installation of the segment, and fix the bridge segment at the designated position after moving it to the designed position;

[0011] Step 7: Joint treatment: After the bridge segments are installed, joint treatment is performed to ensure that the connection between the segments is firm;

[0012] Step 8: Remove the temporary support. After the bridge segment is installed and the joints are processed, remove the temporary support so that the bridge segment can completely rely on its own structure to bear the load.

[0013] Step nine: Quality acceptance: Carry out quality acceptance on the bridge segments that have been hoisted. After passing the acceptance, proceed with subsequent construction.

[0014] Preferably, the jacking guide device in step six includes a guide connecting frame, one end of the guide connecting frame is provided with a first guide adjustment support frame and a second guide adjustment support frame, a plurality of the first guide adjustment support frames and a plurality of the second guide adjustment support frames are staggered, and one end of the second guide adjustment support frame away from one end of the guide connecting frame is provided with a climbing pier positioning support mechanism, and the climbing pier positioning support mechanism is used to climb the second guide adjustment support frame away from one end of the guide connecting frame onto the pier, so as to realize jacking guide support for the bridge segment.

[0015] Preferably, the inner walls of the multiple first guide adjustment support frames are rotatably connected to a rotating column via a bearing, and the four rotating columns are symmetrically distributed with the axis of the first guide adjustment support frame as the center, and the two ends of the rotating column respectively penetrate and extend to the upper surface and the lower surface of the first guide adjustment support frame.

[0016] Preferably, one end of the guide connection frame and both ends of the second guide adjustment support frame are slidably sleeved with the surface of the first guide adjustment support frame, and both ends of the plurality of rotating columns are respectively fixedly connected with one end of the guide connection frame and both ends of the second guide adjustment support frame;

[0017] The inner walls of the plurality of first guide and adjustment support frames are fixedly mounted with hollow rotary hydraulic cylinders, the plurality of hollow rotary hydraulic cylinders respectively correspond to the plurality of rotating columns, and the hollow rotating ends of the hollow rotary hydraulic cylinders are fixedly connected to the surfaces of the rotating columns.

[0018] Preferably, surfaces of the guide connecting frame, the first guide adjustment support frames, and the second guide adjustment support frames are all trapezoidal in shape.

[0019] Preferably, reinforcing beams are arranged above the guide connecting frame, the first guide adjustment support frame and the second guide adjustment support frame, and the inner walls of the plurality of reinforcing beams are rotatably connected with reinforcing columns through bearings, and the two reinforcing columns are symmetrically distributed with the axis of the reinforcing beam as the center.

[0020] Preferably, the surface of the reinforcing column is rotatably connected to the first reinforcing beam and the second reinforcing beam through bearings, and the surfaces of the plurality of the first reinforcing beams are fixedly connected to the upper surfaces of the guide connecting frame and the second guide adjustment support frame, respectively, and the surfaces of the plurality of the second reinforcing beams are fixedly connected to the upper surfaces of the plurality of the first guide adjustment support frames.

[0021] Preferably, the climbing pier positioning support mechanism includes a supporting hydraulic cylinder and a climbing pier frame, the two supporting hydraulic cylinders are fixedly mounted on the lower surface of the second guide adjustment support frame away from one end of the guide connecting frame, one end of the supporting hydraulic cylinder extends to the lower surface of the second guide adjustment support frame, the supporting hydraulic cylinder includes a supporting hydraulic rod, one end of the supporting hydraulic rod is fixedly connected to a support plate.

[0022] Preferably, the surface of the climbing frame is fixedly connected to the surface of the second guiding and adjusting support frame, and the inner wall of the climbing frame is fixedly connected with a mounting plate, and the two mounting plates are symmetrically distributed with the axis of the climbing frame as the center;

[0023] The inner wall of the second guide and adjustment support frame is rotatably connected to the driven support shaft via a bearing, the surface of the mounting plate is rotatably connected to the surface of the driven support shaft via a bearing, and a driven track wheel is fixedly mounted on the surface of the driven support shaft.

[0024] Preferably, the surface of the mounting plate is rotatably connected with a driving wheel shaft through a bearing, both ends of the driving wheel shaft penetrate and extend to the surface of the climbing frame, and a driving track wheel is fixedly installed on the surface of the driving wheel shaft, and the driving track wheel is drivingly connected with the driven track wheel through a track;

[0025] A reduction drive motor is fixedly mounted on the surface of the climbing frame, and an output end of the reduction drive motor is fixedly connected to one end of the driving wheel shaft.

[0026] The beneficial effects of the present invention are:

[0027] 1. By setting steps one to nine, during the hoisting construction of super-large sections of small-radius prefabricated bridges across the line, the hoisting equipment cooperates with the intelligent crawler-type jacking hydraulic device and the jacking guide device to achieve precise control, strong adaptability, high degree of automation, good stability, reduced construction risks and improved construction accuracy, thereby solving the problems of low construction efficiency, high safety risks and great impact on existing lines in the existing hoisting methods.

[0028] 2. By setting up the jacking guide device, when in use, the hollow rotary hydraulic cylinder is used to adjust the rotation of the guide connecting frame and the second guide adjustment support frame to achieve accurate matching of the turning radius of the bridge, ensure that the lifting process is consistent with the bridge design parameters, and adapt to the construction of bridges with different turning radii. It has high flexibility and is suitable for lifting operations of various small-radius bridges. At the same time, the crawler design allows the second guide adjustment support frame to move smoothly to the top of the bridge pier, improving construction efficiency and safety. Finally, the use of the supporting hydraulic cylinder provides stable support to ensure the stability of the super-large segment during the lifting process, reduce shaking and deviation during construction, and thus achieve better results in the cross-line lifting construction of super-large segments of small-radius prefabricated bridges. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 A schematic diagram of a method for hoisting a super-large segment across a small-radius assembled bridge proposed by the present invention;

[0030] Figure 2 A top view of the guide connecting frame structure of a small-radius assembled bridge super-large segment cross-line hoisting method proposed by the present invention;

[0031] Figure 3 A three-dimensional diagram of the second guide and adjustment support frame structure of a small-radius assembled bridge super-large segment cross-line hoisting method proposed by the present invention;

[0032] Figure 4 A three-dimensional diagram of the climbing pier frame structure of a small-radius prefabricated bridge super-large segment cross-line hoisting method proposed by the present invention.

[0033] In the figure: 1. guide connecting frame; 2. first guide adjustment support frame; 3. second guide adjustment support frame; 4. rotating column; 5. hollow rotary hydraulic cylinder; 6. reinforced cross beam; 7. reinforced column; 8. first reinforced beam frame; 9. second reinforced beam frame; 10. supporting hydraulic cylinder; 1001. supporting hydraulic rod; 1002. supporting plate; 11. climbing pier frame; 1101. mounting plate; 1102. driven support shaft; 1103. driven track wheel; 1104. driving wheel shaft; 1105. driving track wheel; 1106. reduction drive motor. DETAILED DESCRIPTION

[0034] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0035] Reference Figure 1-Figure 4 A method for hoisting a super-large segment span of a small-radius assembled bridge comprises the following steps:

[0036] Step 1: Preparation: Make bridge segments according to the bridge design drawings and transport them to the construction site. Build temporary supports at the construction site to support and fix the bridge segments.

[0037] Step 2: Select appropriate lifting equipment, such as crawler crane, truck crane, etc. According to the weight and size of the bridge segment, select the appropriate lifting equipment tonnage and arm length.

[0038] Step 3: Set the lifting points on the bridge segments and ensure that the lifting point positions are consistent with the strength of the bridge structure. The lifting point positions should take into account the weight distribution of the bridge segments and the stability during the lifting process.

[0039] Step 4: Lifting operation: Position the lifting equipment just above the bridge segment, adjust the arm length and angle of the equipment, and align the hook with the lifting point. Slowly lift the hook to lift the bridge segment off the ground. During the lifting process, the bridge segment should be kept stable to avoid collision and damage.

[0040] Step 5: Cross-line hoisting: After the bridge segment is lifted to a certain height, slowly move the hoisting equipment to make the bridge segment cross the existing line. During the cross-line process, pay close attention to the safe distance between the bridge segment and the existing line to ensure that no collision occurs.

[0041] Step 6: Positioning and installation: Use the intelligent walking hydraulic pushing device and the pushing guide device to push the bridge segment through the upper bridge or other building obstacles, adjust its horizontal and vertical directions, and ensure the accurate installation of the segment. After moving the bridge segment to the designed position, fix the bridge segment at the designated position.

[0042] Furthermore, the intelligent walking hydraulic jacking device is a jacking device specially used for combined structure bridges. This device is suitable for the construction of various bridge structures such as steel box girders and truss girders. The intelligent walking hydraulic jacking device has the characteristics of XYZ three-axis synchronous control, which can accurately control the position of the bridge deck beam during the bridge erection process and fine-tune the components to the specified position.

[0043] The intelligent walking type jacking hydraulic device is mainly composed of a jacking device, a hydraulic pump station, a control system and pipelines. The jacking device includes a sliding box and a sliding plate structure, a vertical hydraulic jack, a translation hydraulic jack and a deviation correction device. The hydraulic pump station is responsible for energy conversion and is composed of a variable frequency motor, a hydraulic pump, a distributor, a heat dissipation device, a safety device, a control system, etc.

[0044] The jacking guide device includes a guiding connecting frame 1, one end of which is provided with a first guiding and adjusting support frame 2 and a second guiding and adjusting support frame 3, a plurality of first guiding and adjusting support frames 2 and a plurality of second guiding and adjusting support frames 3 are staggeredly distributed, and a climbing pier positioning support mechanism is provided at one end of a second guiding and adjusting support frame 3 away from one end of the guiding connecting frame 1, and the climbing pier positioning support mechanism is used to climb the second guiding and adjusting support frame 3 away from one end of the guiding connecting frame 1 onto the bridge pier, so as to realize jacking guiding support for the bridge segment.

[0045] The inner walls of multiple first guide adjustment support frames 2 are rotatably connected to a rotating column 4 through bearings. The four rotating columns 4 are symmetrically distributed with the axis of the first guide adjustment support frame 2 as the center, and the two ends of the rotating column 4 respectively penetrate and extend to the upper surface and lower surface of the first guide adjustment support frame 2.

[0046] One end of the guide connecting frame 1 and both ends of the second guide adjusting support frame 3 are slidably connected to the surface of the first guide adjusting support frame 2, and both ends of the multiple rotating columns 4 are fixedly connected to one end of the guide connecting frame 1 and both ends of the second guide adjusting support frame 3 respectively.

[0047] The inner walls of the multiple first guide adjustment support frames 2 are fixedly mounted with hollow rotary hydraulic cylinders 5 , which respectively correspond to the multiple rotating columns 4 , and the hollow rotating ends of the hollow rotary hydraulic cylinders 5 are fixedly connected to the surfaces of the rotating columns 4 .

[0048] When in use, the hollow rotary hydraulic cylinder 5 drives the rotating column 4, thereby driving the guide connecting frame 1 and the second guide adjustment support frame 3 to rotate around the axis of the rotating column 4, and adjusting the angle between the guide connecting frame 1 and the second guide adjustment support frame 3 and the first guide adjustment support frame 2, so as to adjust the guiding arc of the entire jacking guide device, so that it is suitable for bridges with different radii to carry out bridge segment jacking assembly construction.

[0049] Furthermore, the surfaces of the guiding connection frame 1 , the plurality of first guiding adjustment support frames 2 , and the plurality of second guiding adjustment support frames 3 are all in a trapezoidal shape.

[0050] A reinforcing crossbeam 6 is arranged above the guide connecting frame 1, the first guide adjustment support frame 2 and the second guide adjustment support frame 3. The inner walls of the multiple reinforcing crossbeams 6 are rotatably connected with reinforcing columns 7 through bearings. The two reinforcing columns 7 are symmetrically distributed with the axis of the reinforcing crossbeam 6 as the center.

[0051] The surfaces of the reinforcing column 7 are rotatably connected to the first reinforcing beam 8 and the second reinforcing beam 9 through bearings, the surfaces of the multiple first reinforcing beams 8 are fixedly connected to the upper surfaces of the guide connecting frame 1 and the second guide adjustment support frame 3, and the surfaces of the multiple second reinforcing beams 9 are fixedly connected to the upper surfaces of the multiple first guide adjustment support frames 2.

[0052] When in use, the guide connecting frame 1, the first guide adjustment support frame 2 and the second guide adjustment support frame 3 are connected and strengthened by the reinforced cross beam 6, the first reinforced beam frame 8 and the second reinforced beam frame 9, so as to achieve a better effect of jacking and guiding the bridge segment.

[0053] The climbing pier positioning support mechanism includes a supporting hydraulic cylinder 10 and a climbing pier frame 11. The two supporting hydraulic cylinders 10 are fixedly installed on the lower surface of the second guide adjustment support frame 3 away from one end of the guide connecting frame 1. One end of the supporting hydraulic cylinder 10 extends to the lower surface of the second guide adjustment support frame 3. The supporting hydraulic cylinder 10 includes a supporting hydraulic rod 1001, and one end of the supporting hydraulic rod 1001 is fixedly connected to a supporting plate 1002.

[0054] The surface of the climbing frame 11 is fixedly connected to the surface of the second guiding and adjusting support frame 3 , and the inner wall of the climbing frame 11 is fixedly connected with a mounting plate 1101 , and the two mounting plates 1101 are symmetrically distributed with the axis of the climbing frame 11 as the center.

[0055] The inner wall of the second guide and adjustment support frame 3 is rotatably connected to the driven support shaft 1102 via a bearing, the surface of the mounting plate 1101 is rotatably connected to the surface of the driven support shaft 1102 via a bearing, and a driven track wheel 1103 is fixedly mounted on the surface of the driven support shaft 1102.

[0056] The surface of the mounting plate 1101 is rotatably connected to a driving wheel shaft 1104 via a bearing, both ends of the driving wheel shaft 1104 penetrate and extend to the surface of the climbing frame 11, and a driving track wheel 1105 is fixedly installed on the surface of the driving wheel shaft 1104, and the driving track wheel 1105 is transmission-connected to the driven track wheel 1103 via a track.

[0057] A reduction drive motor 1106 is fixedly installed on the surface of the climbing frame 11 , and an output end of the reduction drive motor 1106 is fixedly connected to one end of the driving wheel shaft 1104 .

[0058] When in use, the driving wheel shaft 1104 is driven to rotate by the reduction drive motor 1106, and the driving wheel shaft 1104 drives the driving track wheel 1105 to rotate, and the driving track wheel 1105 drives the track and the driven track wheel 1103 to rotate. When the bridge segment is pushed and guided, since the distance between the piers is usually large, the entire pushing and guiding device is usually long. When the first guide adjustment support frame 2 and the second guide adjustment support frame 3 extend from one pier to another, under the action of gravity and gravitation, the entire device will sag downward during the movement, causing the second guide adjustment support frame 1 far away from one end of the guide connecting frame 1 to move downward. The support frame 3 cannot fall directly onto the pier. Therefore, during the guiding process, when the second guiding and adjusting support frame 3 away from one end of the guiding connecting frame 1 approaches the pier, after the track contacts the pier, the driving motor is driven by the reduction gear to drive the active wheel shaft 1104 to rotate, driving the active track wheel 1105 to rotate, and the active track wheel 1105 drives the track and the driven track wheel 1103 to rotate, driving the second guiding and adjusting support frame 3 to move to the top of the pier, and then the supporting hydraulic rod 1001 in the supporting hydraulic cylinder 10 is extended to drive the supporting plate 1002 to contact the upper surface of the pier, so as to position and support the entire device.

[0059] Furthermore, the working principle of the jacking and guiding device is as follows: when the bridge segment is jacked and guided, first, according to the turning radius of the bridge, the hollow rotary hydraulic cylinder 5 is used to drive the guide connecting frame 1 and the second guide adjustment support frame 3 to rotate, so as to adjust the guide radius of the entire device. After the adjustment is completed, during the guiding process, when the second guide adjustment support frame 3 away from one end of the guide connecting frame 1 approaches the bridge pier, after the track contacts the bridge pier, the driving motor is driven by the reduction gear to drive the active wheel shaft 1104 to rotate, and the active track wheel 1105 is driven to rotate. The active track wheel 1105 drives the track and the driven track wheel 1103 to rotate, and drives the second guide adjustment support frame 3 to move to the top of the bridge pier, and then the support hydraulic rod 1001 in the support hydraulic cylinder 10 is extended to drive the support plate 1002 to contact the upper surface of the bridge pier, so as to position and support the entire device.

[0060] By setting up a pushing guide device, when in use, the hollow rotary hydraulic cylinder 5 is used to adjust the rotation of the guide connecting frame 1 and the second guide adjustment support frame 3 to achieve accurate matching of the turning radius of the bridge, ensure that the lifting process is consistent with the bridge design parameters, and adapt to the construction of bridges with different turning radii. It has high flexibility and is suitable for lifting operations of various small-radius bridges. At the same time, the crawler design allows the second guide adjustment support frame 3 to be smoothly moved to the top of the bridge pier, thereby improving construction efficiency and safety. Finally, the use of the supporting hydraulic cylinder 10 provides stable support, ensures the stability of the super-large segment during the lifting process, reduces shaking and deviation during construction, and thus achieves a better effect of carrying out cross-line lifting construction operations of super-large segments of small-radius prefabricated bridges.

[0061] Step 7: Joint treatment: After the bridge segments are installed, joint treatment is performed to ensure that the connection between the segments is firm. According to the design requirements, appropriate joint materials and construction techniques are used for treatment.

[0062] Step 8: Remove the temporary supports. After the bridge segments are installed and the joints are processed, remove the temporary supports so that the bridge segments can completely rely on their own structure to bear the load.

[0063] Step 9: Quality acceptance: Conduct quality acceptance on the hoisted bridge segments to ensure that they meet the design and specification requirements. After acceptance, proceed with subsequent construction.

[0064] By setting steps one to nine, during the hoisting construction of super-large sections across the line of a small-radius prefabricated bridge, the hoisting equipment cooperates with the intelligent crawler-type jacking hydraulic device and the jacking guide device to achieve precise control, strong adaptability, high degree of automation, good stability, reduced construction risks and improved construction accuracy, thereby solving the problems of low construction efficiency, high safety risks and great impact on existing lines in existing hoisting methods.

[0065] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for hoisting a super-large segment across a small-radius assembled bridge, characterized in that: The following steps are involved: Step 1: Preparation: Make bridge segments according to the bridge design drawings and transport the segments to the construction site; Step 2: Select the appropriate lifting equipment tonnage and arm length according to the weight and size of the bridge segment; Step 3: Setting the lifting points: Setting the lifting points on the bridge segments to ensure that the positions of the lifting points are consistent with the strength of the bridge structure; Step 4: Lifting operation: Position the lifting equipment just above the bridge segment, adjust the arm length and angle of the equipment, and align the hook with the lifting point; Step 5: Cross-line hoisting: After the bridge segment is lifted to a certain height, slowly move the hoisting equipment to make the bridge segment cross the existing line; Step 6: Positioning and installation: Use the intelligent walking-type pushing hydraulic device and the pushing guide device to push the bridge segment through the upper bridge or other building obstacles, adjust its horizontal and vertical directions, ensure the accurate installation of the segment, and fix the bridge segment at the designated position after moving it to the designed position; Step 7: Joint treatment: After the bridge segments are installed, joint treatment is performed to ensure that the connection between the segments is firm; Step 8: Remove the temporary support. After the bridge segment is installed and the joints are processed, remove the temporary support so that the bridge segment can completely rely on its own structure to bear the load. Step nine: Quality acceptance: Carry out quality acceptance on the bridge segments that have been hoisted. After passing the acceptance, proceed with subsequent construction.

2. The method for hoisting a super-large segment across a small-radius assembled bridge according to claim 1, characterized in that: The jacking guide device in step six comprises a guide connecting frame (1), one end of which is provided with a first guide adjustment support frame (2) and a second guide adjustment support frame (3), a plurality of the first guide adjustment support frames (2) and a plurality of the second guide adjustment support frames (3) are staggeredly distributed, and one end of the second guide adjustment support frame (3) away from one end of the guide connecting frame (1) is provided with a climbing pier positioning support mechanism, and the climbing pier positioning support mechanism is used to climb the second guide adjustment support frame (3) away from one end of the guide connecting frame (1) onto the bridge pier, so as to realize jacking guide support for the bridge segment.

3. The method for hoisting a super-large segment across a small-radius assembled bridge according to claim 2 is characterized in that: The inner walls of the plurality of first guide and adjustment support frames (2) are rotatably connected to a rotating column (4) via bearings; the four rotating columns (4) are symmetrically distributed with the axis of the first guide and adjustment support frame (2) as the center; and the two ends of the rotating column (4) respectively penetrate and extend to the upper surface and the lower surface of the first guide and adjustment support frame (2).

4. The method for hoisting a super-large segment across a small-radius assembled bridge according to claim 3 is characterized in that: One end of the guide connection frame (1) and both ends of the second guide adjustment support frame (3) are slidably sleeved with the surface of the first guide adjustment support frame (2), and both ends of the plurality of rotating columns (4) are respectively fixedly connected with one end of the guide connection frame (1) and both ends of the second guide adjustment support frame (3); A hollow rotary hydraulic cylinder (5) is fixedly mounted on the inner walls of the plurality of first guide and adjustment support frames (2); the plurality of hollow rotary hydraulic cylinders (5) respectively correspond to the plurality of rotating columns (4); and the hollow rotary ends of the hollow rotary hydraulic cylinders (5) are fixedly connected to the surfaces of the rotating columns (4).

5. The method for hoisting a super-large segment across a small-radius assembled bridge according to claim 4 is characterized in that: The surfaces of the guide connection frame (1), the plurality of the first guide adjustment support frames (2), and the plurality of the second guide adjustment support frames (3) are all in a trapezoidal shape.

6. The method for hoisting a super-large segment across a small-radius prefabricated bridge according to claim 5 is characterized in that: A reinforcing crossbeam (6) is arranged above the guide connecting frame (1), the first guide adjustment support frame (2) and the second guide adjustment support frame (3); the inner walls of the plurality of reinforcing crossbeams (6) are rotatably connected to reinforcing columns (7) via bearings; and the two reinforcing columns (7) are symmetrically distributed with the axis of the reinforcing crossbeam (6) as the center.

7. The method for hoisting a super-large segment across a small-radius prefabricated bridge according to claim 6 is characterized in that: The surfaces of the reinforcing columns (7) are rotatably connected to the first reinforcing beams (8) and the second reinforcing beams (9) via bearings; the surfaces of the plurality of the first reinforcing beams (8) are fixedly connected to the upper surfaces of the guide connecting frame (1) and the second guide adjustment support frame (3); and the surfaces of the plurality of the second reinforcing beams (9) are fixedly connected to the upper surfaces of the plurality of the first guide adjustment support frames (2).

8. The method for hoisting a super-large segment across a small-radius assembled bridge according to claim 7 is characterized in that: The pier climbing positioning support mechanism comprises a support hydraulic cylinder (10) and a pier climbing frame (11); the two support hydraulic cylinders (10) are fixedly mounted on the lower surface of the second guide adjustment support frame (3) away from one end of the guide connection frame (1); one end of the support hydraulic cylinder (10) extends to the lower surface of the second guide adjustment support frame (3); the support hydraulic cylinder (10) comprises a support hydraulic rod (1001); one end of the support hydraulic rod (1001) is fixedly connected to a support plate (1002).

9. The method for hoisting a super-large segment across a small-radius assembled bridge according to claim 8, characterized in that: The surface of the climbing frame (11) is fixedly connected to the surface of the second guiding and adjusting support frame (3), and the inner wall of the climbing frame (11) is fixedly connected with a mounting plate (1101), and the two mounting plates (1101) are symmetrically distributed with the axis of the climbing frame (11) as the center; The inner wall of the second guide and adjustment support frame (3) is rotatably connected to the driven support shaft (1102) via a bearing, the surface of the mounting plate (1101) is rotatably connected to the surface of the driven support shaft (1102) via a bearing, and a driven track wheel (1103) is fixedly mounted on the surface of the driven support shaft (1102).

10. A method for hoisting a super-large segment across a small-radius assembled bridge according to claim 9, characterized in that: The surface of the mounting plate (1101) is rotatably connected to a driving wheel shaft (1104) via a bearing, both ends of the driving wheel shaft (1104) penetrate and extend to the surface of the climbing frame (11), and a driving track wheel (1105) is fixedly mounted on the surface of the driving wheel shaft (1104), and the driving track wheel (1105) is transmission-connected to the driven track wheel (1103) via a track; A reduction drive motor (1106) is fixedly mounted on the surface of the climbing frame (11), and an output end of the reduction drive motor (1106) is fixedly connected to one end of the driving wheel shaft (1104).