Automatic laying system and laying method for pipeline ultraviolet curing repair lining hose

The automated laying system solves the low manual operation efficiency and quality problems during the laying process of municipal drainage pipe lining hoses, realizes automatic folding and pulling monitoring, improves construction efficiency and quality, and reduces costs.

CN118775671AActive Publication Date: 2024-10-15CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410759314.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-13
Publication Date
2024-10-15
Estimated Expiration
2044-06-13

AI Technical Summary

Technical Problem

In the existing UV curing repair technology for municipal drainage pipelines, the laying process of lined hoses requires a lot of manual operations, resulting in low construction efficiency, high costs, and easy quality problems caused by improper manual operations. There is also a lack of control over the pulling speed and pulling force. Real-time monitoring can easily damage the lining pipe.

Method used

An automated laying system for pipeline UV curing repair lining hoses is designed, including automatic folding and conveying equipment, a pulling unit and a control unit. The automatic folding and conveying of the lining hoses are realized through the automated equipment, and real-time operation is performed during the conveying process. Monitor the pulling speed and pulling force to reduce manual operations and improve construction efficiency and quality.

Benefits of technology

It realizes the automated laying of lined hoses, significantly reduces labor costs, reduces wear and tear, ensures installation within normal parameters, improves construction quality and efficiency, and avoids construction accidents through highly integrated wireless interconnection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118775671A_ABST
    Figure CN118775671A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic laying system and laying method for a pipeline ultraviolet curing repair lining hose, and the automatic laying system comprises an automatic folding conveying device, a traction unit, a resistance reduction unit and a control unit. The automatic folding and conveying equipment comprises a support, a first horizontal conveying belt and a second horizontal conveying belt, the first horizontal conveying belt and the second horizontal conveying belt are arranged on the support front and back in the longitudinal direction, an elastic pressing roller is arranged above the first horizontal conveying belt, and a folding plate is arranged above the second horizontal conveying belt and in the transverse middle. The lining hose is automatically folded and conveyed through automatic equipment, and the traditional manual folding and conveying operation process is replaced; meanwhile, the tension meter and the tachometer are used for monitoring the tension and the installation speed of the lining hose in real time, it is guaranteed that the lining hose is installed within the normal parameter range, damage to the lining hose is avoided, the installation construction efficiency of the lining hose is improved, and the construction quality is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of municipal drainage pipeline repair, and in particular to an automatic laying system and method for laying an inner lining hose when a municipal drainage pipeline is repaired without excavation by using an ultraviolet light curing method. Background Art

[0002] Drainage pipes are responsible for the collection and transmission of rainwater and sewage in the entire urban area, and have a significant impact on the urban environment and residents' lives. In recent years, the country has attached increasing importance to the construction of urban drainage pipe networks. The use of non-excavation repair technology to repair old urban pipes can quickly restore the normal function of the pipes, reduce the impact on urban traffic and residents' lives, and have significant economic and social benefits.

[0003] The UV-CIPP repair technology is to place the lining hose soaked with photo-initiated resin into the pipe section to be repaired by pulling, use compressed air to open the lining hose and close to the inner wall of the old pipe, and then put an ultraviolet lamp inside the lining hose to cure the resin in the lining hose by ultraviolet light, forming a new pipe lining in the pipe, thereby repairing cracks, disconnections and other defects in the original pipe. This technology has the advantages of short construction time, good repair effect, continuous and smooth lining pipe, etc., and is widely used in pipeline repair projects.

[0004] The laying of the lining hose is a key link in the UV curing repair construction of pipelines. This process requires the lining hose with a length of 50 to 100m and a width of 1 to 2m to be pulled into the pipeline to be repaired smoothly and at a uniform speed. At present, the more common construction method is to first lay a plastic base film in the pipe section to be repaired, and arrange 2 to 4 people at the wellhead of the upstream inspection well to fold the lining hose into three equal parts in the width direction (that is, both the left and right sides along the width direction are folded toward the middle, one side presses the other side below, and the overall width becomes 1 / 3 of the original), so that the width of the lining hose is smaller than the wellhead diameter of the inspection well (usually 60 to 100cm), and then arrange 2 people at the wellhead of the downstream inspection well to pull the lining hose into the pipeline with a wire rope through a winch. During the pulling process, 6 to 8 people are arranged to lift the lining hose in the upstream inspection well and transport it into the inspection well to avoid the lining hose from being torn or scratched. It can be seen that 10 to 14 workers need to be arranged to construct the lining hose during the laying process, which consumes a lot of manpower, and the installation process is often slow due to poor cooperation among workers. At the same time, according to relevant standards, during the laying of the pipeline lining, the pulling speed shall not exceed 5m / min, and the pulling force shall not exceed the maximum pulling force that the lining hose can withstand. The existing construction process uses a winch to pull the entire section of the lining pipe through the pipeline to be repaired. The pulling process is manually controlled, and the pulling speed and pulling force are not monitored. It is easy to cause the pulling speed to be too fast and the pulling force to be too large, which will damage the lining pipe and cause losses to the pipeline repair construction.

[0005] Therefore, it is necessary to develop an automated laying system and method for UV-curing pipeline repair lining hoses, which can realize automatic folding and transportation of the lining hoses and monitor the pulling speed and tension of the lining hoses during transportation, thereby reducing quality problems caused by improper human operation during the installation of the lining hoses, improving the installation and construction efficiency of the lining hoses, and reducing the construction cost of trenchless pipeline repairs. Summary of the invention

[0006] The purpose of the present invention is to solve the shortcomings of the above-mentioned background technology and to provide an automatic laying system and method for the lining hose of pipeline UV curing repair, which can realize the automatic folding and transportation of the lining hose and monitor the pulling speed and pulling force of the lining hose during the transportation process, thereby reducing the quality problems caused by improper human operation during the installation of the lining hose, improving the installation and construction efficiency of the lining hose, and reducing the construction cost of non-excavation repair of the pipeline.

[0007] The technical solution of the present invention is: an automatic laying system for the lining hose of a pipeline UV curing repair, characterized in that it includes an automatic folding and conveying device, a pulling unit, a drag reduction unit, and a control unit.

[0008] The automatic folding and conveying equipment includes a bracket arranged near the wellhead of the upstream inspection well and a first horizontal conveyor belt and a second horizontal conveyor belt arranged on the bracket in the longitudinal direction. An elastic pressure roller is arranged above the first horizontal conveyor belt for elastically pressing the lining hose to convey it backwards. A folding plate is arranged above and in the middle of the second horizontal conveyor belt. A guide wheel group is arranged at the front end of the folding plate to guide the lining hose to the second horizontal conveyor belt. The bracket is provided with cantilever guide wheel groups on both sides of the folding plate for pressing down and folding the side of the lining hose. A speed measuring device is arranged above the rear end of the second horizontal conveyor belt to monitor the conveying speed of the lining hose in real time.

[0009] The pulling unit includes a pulling trolley with adjustable width located in the pipeline and a winch located at the wellhead of the downstream inspection well. The winch is provided with a steel wire rope for pulling the pulling trolley to move. The pulling trolley is provided with a force measuring device to monitor the pulling force in real time.

[0010] The drag reduction unit includes a plastic bottom film laid in the pipeline to be repaired, an upstream long-axis roller arranged at the bottom pipe opening of the upstream inspection well chamber, and a downstream long-axis roller arranged at the bottom pipe opening of the downstream inspection well chamber;

[0011] The control unit is connected with the automatic folding and conveying equipment and the pulling unit by signal.

[0012] Preferably, the bracket is provided with roller connecting rods along the longitudinal direction on both sides of the first horizontal conveyor belt, and multiple elastic pressure rollers are arranged at intervals along the longitudinal direction. Both ends of each elastic pressure roller are rotatably connected to the two roller connecting rods respectively, and the top of each roller connecting rod is vertically elastically connected to the bracket through a first spring.

[0013] Preferably, the folding plate includes a vertical plate and a horizontal plate connected up and down, the horizontal plate is an isosceles triangular plate arranged parallel to the second horizontal conveyor belt, the two waist sides of the horizontal plate are symmetrically arranged on both sides of the longitudinal center line of the second horizontal conveyor belt and connected backwards, the vertical plate is arranged along the longitudinal center line of the horizontal plate and the top is inclined backwards and downwards, and the vertical plate is fixedly connected to the bracket.

[0014] Furthermore, the first horizontal conveyor belt is arranged higher than the second horizontal conveyor belt and the lateral width of the first horizontal conveyor belt is greater than that of the second horizontal conveyor belt;

[0015] The guide wheel group includes a first guide wheel for guiding the lining hose downward and a second guide wheel behind and below the first guide wheel for guiding the lining hose to the second horizontal conveyor belt. The first guide wheel and the second guide wheel are arranged in pairs on both sides of the vertical plate and can rotate around a transverse axis. The first guide wheel and the second guide wheel are both located in front of the horizontal plate. The outer end of the first guide wheel, the outer end of the second guide wheel and the end of the bottom edge of the horizontal plate on the same side above the second horizontal conveyor belt are arranged inward in sequence along the transverse direction.

[0016] Preferably, the cantilever guide wheel assembly includes a first cantilever guide wheel and a second cantilever guide wheel arranged on one side of the folding plate, and the second cantilever guide wheel is located at the rear inner side of the first cantilever guide wheel;

[0017] The cantilever guide wheel group also includes a third cantilever guide wheel and a fourth cantilever guide wheel arranged on the other side of the guide folding plate, the fourth cantilever guide wheel is located on the rear inner side of the third cantilever guide wheel, and the second cantilever guide wheel is arranged in a transverse corresponding manner to the third cantilever guide wheel;

[0018] The first cantilever guide wheel, the second cantilever guide wheel, the third cantilever guide wheel and the fourth cantilever guide wheel are respectively connected to the bracket through a mounting seat and can be adjusted in the transverse and longitudinal directions.

[0019] Furthermore, the bracket is provided with longitudinal tracks on both sides of the second horizontal conveyor belt, each mounting seat can be longitudinally adjusted and installed on the corresponding longitudinal track, each mounting seat is provided with a transversely adjustable extension rod, and the first cantilever guide wheel, the second cantilever guide wheel, the third cantilever guide wheel, and the fourth cantilever guide wheel can be rotatably connected to the inner end of the extension rod on the corresponding mounting seat.

[0020] Preferably, the pulling trolley includes two half shells and a socket-type connector connecting the two half shells into a whole, the socket-type connector includes a connecting rod at the bottom of one half shell and extending transversely along the vehicle, a plurality of connecting rods are arranged at intervals along the longitudinal direction of the vehicle, a socket slot is provided at the bottom of the other half shell and each connecting rod is installed in the socket slot with an adjustable depth, and a retractable cylindrical cross bar is also provided between the upper parts of the two half shells for tying the starting end of the liner hose.

[0021] Furthermore, the pulling trolley also includes a pulling joint, and the force measuring device is arranged on the pulling joint. One end of the pulling joint is hinged to the two half shells one by one through two hinged rods, and the other end is connected to the wire rope on the winch. The force measuring device is connected to the control unit signal.

[0022] Furthermore, the control unit is signal-connected with the automatic folding and conveying equipment, the speed measuring device, the winch, and the force measuring device.

[0023] The present invention also provides a laying method of any of the above-mentioned pipeline UV-curing repair lining hose automatic laying systems, comprising the following steps:

[0024] S1. Pre-treatment of the pipeline to be repaired by plugging, diverting water and cleaning;

[0025] S2. Place the starting end of the lining hose in the automatic folding and conveying equipment and fold it manually to form it. Adjust and fix the folded starting end of the lining hose on the pulling trolley. Put the pulling trolley into the bottom of the upstream inspection well chamber. Install the plastic bottom film of the drag reduction unit. Fix the steel wire rope of the winch to the front end of the pulling trolley. Install the upstream long-axis roller and the downstream long-axis roller at the bottom pipe opening of the upstream inspection well chamber and the bottom pipe opening of the downstream inspection well chamber respectively.

[0026] S3. Control the automatic folding conveying equipment and winch to convey the lining hose and the pulling trolley at the same speed respectively. The speed measuring device monitors the conveying speed of the lining hose in real time, and the force measuring device monitors the traction force of the winch in real time. After the pulling trolley moves from the upstream inspection wellhead to the downstream inspection wellhead, remove the starting end of the lining hose from the pulling trolley, take out the pulling trolley from the inspection wellhead, remove the upstream long-axis roller and the downstream long-axis roller, pull out the plastic base film, and the lining hose is laid.

[0027] Preferably, in step S3, when it is monitored that the liner hose conveying speed is greater than the preset speed or the winch traction force is monitored to be greater than the preset traction force, the control unit alarms and shuts down the entire system.

[0028] Beneficial effects of the present invention

[0029] (1) Use automated equipment to automatically fold and transport the lining hose, replacing the traditional manual folding and transportation process, reducing labor costs and improving construction efficiency;

[0030] (2) Due to the use of automatic folding and conveying equipment, pulling trolleys, and long-axis rollers for the lining hose, the friction resistance during the installation of the lining hose is significantly reduced, and the wear of the lining hose during the installation process is greatly reduced;

[0031] (3) Use a speed measuring device (speed measuring wheel) and a force measuring device (tensile gauge) to monitor the installation speed and tension of the lining hose to ensure that the lining hose is installed within the normal parameter range, avoid damage to the lining hose, and improve the construction quality;

[0032] (4) The entire system is highly integrated and wirelessly interconnected, and can be centrally controlled through the control system. Equipment at upstream and downstream wellheads that are up to 100 meters apart can operate in a coordinated manner, avoiding construction accidents caused by long distances and poor communication.

[0033] (5) When the liner hose is located in the automatic folding and conveying equipment, it is first compressed and conveyed on the first horizontal conveyor belt, and the starting end is manually folded, and then the edge of the subsequent liner hose is stably folded by the cantilever guide wheel group. The lateral and longitudinal positions of each guide wheel in the cantilever guide wheel group can be adjusted. Therefore, the present invention can be applied to liner hoses of different widths and has a wide range of applications.

[0034] (6) The pulling trolley connects the two half shells into a whole through a socket-type connector. By adjusting the socket depth, the width of the pulling trolley can be adjusted to accommodate folded liner hoses of different widths. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 Schematic diagram of the automated laying system for UV-curing repair of pipeline lining hoses

[0036] Figure 2 A three-dimensional diagram of the automatic folding conveying equipment

[0037] Figure 3 Side view of automatic folding conveyor equipment (longitudinal)

[0038] Figure 4 Top view of automatic folding conveyor equipment

[0039] Figure 5 Three-dimensional diagram of the pulling trolley

[0040] Figure 6It is a schematic diagram of the bottom of the pulling trolley, in which: 1-automatic folding conveying equipment, 2-lined hose, 3-pulling trolley, 4-plastic bottom film, 5-winch, 7-upstream long axis roller, 6-downstream long axis roller, 8-upstream airbag, 9-downstream airbag, 10-control unit, 11-first horizontal conveyor belt, 12-pressing roller, 13-second horizontal conveyor belt, 14-folding plate (141-vertical plate 142-horizontal plate 143-first mounting plate 144-second mounting plate), 15-first guide wheel, 16-second guide wheel, 17-first cantilever guide wheel, 18-second cantilever guide wheel, 19-third cantilever guide wheel, 20-fourth cantilever guide wheel, 21-speed measuring wheel, 22-first stepper motor, 23-second stepper motor, 31-half shell, 32-connecting rod, 33-socket slot, 34-fixing bolt, 35-retractable cylindrical cross bar, 36-hinge rod, 37-roller, 38-tensile gauge, 39-pulling joint, 101-bracket 102-roller connecting rod 103-first spring 104-longitudinal rail 105-mounting seat 106-extension rod. DETAILED DESCRIPTION

[0041] In order to have a clearer understanding of the technical features and effects of the present invention, the present invention is described in detail below by taking the installation of a lining hose during the UV light curing repair construction of a rainwater pipe as an example in conjunction with the accompanying drawings.

[0042] The diameter of this rainwater pipe is 1.2m, the length is 60m, and the diameter of the inspection well mouth is 80cm. The width of the pipeline repair lining hose is 1.9m and the thickness is 2cm. In order to reduce the number of construction workers during the installation of the lining hose and ensure the normal installation of the lining hose, the pipeline UV curing repair lining hose automatic laying system described in this patent was used at the construction site.

[0043] like Figure 1-6 As shown, the automatic laying system for the pipeline UV curing repair lining hose provided by the present invention mainly includes the following parts: automatic folding and conveying equipment 1, a pulling unit, a drag reduction unit, and a control unit 10.

[0044] The automatic folding and conveying equipment 1 includes a support 101 arranged near the wellhead of the upstream inspection well, and a first horizontal conveyor belt 11 and a second horizontal conveyor belt 13 arranged on the support 101 along the longitudinal direction. An elastic pressure roller 12 is provided above the first horizontal conveyor belt 11 for elastically compressing the lining hose and conveying it backwards. A folding plate 14 is provided above the second horizontal conveyor belt 13 and in the middle of the horizontal direction. A guide wheel group is provided at the front end of the folding plate 14 to guide the lining hose to the second horizontal conveyor belt 13. The support 101 is provided with a cantilever guide wheel group on both sides of the folding plate 14 for pressing down and folding the side of the lining hose. A speed measuring device is provided above the rear end of the second horizontal conveyor belt 13 to monitor the conveying speed of the lining hose in real time. In this embodiment, the longitudinal direction is the transmission direction of the lining hose. The lining hose 2 is conveyed from front to back along the longitudinal direction. Figure 3 From left to right in the middle, horizontally Figure 3 Middle, upper and lower.

[0045] The material of the lining hose 2 is a conventional product produced by a lining hose manufacturer on the market. It is repeatedly folded into an S shape with a length of 2 to 3 meters and then stacked. It can save storage space and be placed in a wooden box to avoid light. The inlet of the first horizontal conveyor belt 11 of the automatic folding conveying device 1 faces the S-shaped stacked lining hose 2, and the outlet of the second horizontal conveyor belt 13 faces the manhole opening.

[0046] In the automatic folding conveying device 1, the first horizontal conveyor belt 11 is powered by the first stepper motor 22 on the bracket 101 to convey the lining hose 2 backward, and the second horizontal conveyor belt 13 is powered by the second stepper motor 23 on the bracket 101 to convey the lining hose 2 backward. The first horizontal conveyor belt 11 is arranged higher than the second horizontal conveyor belt 13 and the lateral width of the first horizontal conveyor belt 11 is greater than that of the second horizontal conveyor belt 13. The longitudinal center line of the first horizontal conveyor belt 11 is vertically corresponding to the longitudinal center line of the second horizontal conveyor belt 13. In this embodiment, the first horizontal conveyor belt 11 has a lateral width of 2m and a longitudinal length of 1m; the second horizontal conveyor belt 13 has a lateral width of 1m and a longitudinal length of 2m.

[0047] In the automatic folding conveying device 1, the specific configuration of the elastic pressure roller 12 is as follows: the bracket 101 is provided with roller connecting rods 102 on both sides of the first horizontal conveyor belt 11, the roller connecting rods 102 are horizontal rods arranged in the longitudinal direction, and multiple elastic pressure rollers 12 are arranged at equal intervals in the longitudinal direction (3 in this embodiment), and each elastic pressure roller 12 is arranged axially in the transverse direction and both ends are rotatable and correspondingly connected to the two roller connecting rods 102, and the top of each roller connecting rod 102 is vertically elastically connected to the bracket 101 through a first spring 103. In this embodiment, there are multiple first springs 103 on each roller connecting rod 102, which are arranged at equal intervals along the rod length. The two roller connecting rods 102 connect all the elastic pressure rollers 12 into a whole, and the lining hose 2 is evenly pressed against the first horizontal conveyor belt 11, so as to facilitate the smooth transportation of the lining hose 2 with a larger original width.

[0048] In the automatic folding conveying device 1, the specific structure of the folding plate 14 is as follows: the folding plate 14 includes a vertical plate 141 and a horizontal plate 142 connected up and down, the horizontal plate 142 is an isosceles triangle plate arranged parallel to the second horizontal conveyor belt 13 (the horizontal plate 142 is 2 to 3 cm away from the second horizontal conveyor belt 13 in vertical spacing), the two waists of the horizontal plate 142 are symmetrically arranged on both sides of the longitudinal center line of the second horizontal conveyor belt 13 and are connected backward (that is, the longitudinal center line of the horizontal plate 142 corresponds vertically to the longitudinal center line of the second horizontal conveyor belt 13), the vertical plate 141 is a vertical plate arranged along the longitudinal center line of the horizontal plate 142, the top is tilted backward and downward, and the top angle of the horizontal plate 142 exceeds the rear end of the vertical plate 141 backward. A first L-shaped mounting plate 143 is arranged on the top of the vertical plate 141 facing forward to be fixedly connected to the top of the bracket 101. When the lining hose 2 passes under the horizontal plate 142 during transportation on the second horizontal conveyor belt 13 , the two side edges are folded toward the vertical plate 141 , and the top of the vertical plate 141 is tilted downward and backward to facilitate the folded side edges to gradually fall close to the unfolded part of the lining hose 2 .

[0049] In the automatic folding conveying device 1, the specific structure of the guide wheel group is as follows: the guide wheel group includes a first guide wheel 15 for guiding the lining hose downward and a second guide wheel 16 behind and below the first guide wheel 15 for guiding the lining hose to the second horizontal conveyor belt 13. The first guide wheel 15 and the second guide wheel 16 are arranged in pairs on both sides of the vertical plate 141 and can rotate around the transverse axis. The first guide wheel 15 and the second guide wheel 16 are both located in front of the horizontal plate 142. The outer end of the first guide wheel 15, the outer end of the second guide wheel 16, and the end of the bottom edge of the horizontal plate 142 on the same side above the second horizontal conveyor belt 13 are arranged inward in sequence along the transverse direction. In this embodiment, the vertical plate 141 exceeds the bottom edge of the horizontal plate 142 in the front, and the second guide wheel 16 is connected to the bottom of the front end of the vertical plate 141 in a rotatable manner around the transverse axis. The middle part of the vertical plate 141 extends forward to form a second mounting plate 144, and the first guide wheel 15 is connected to the second mounting plate 144 in a rotatable manner around the transverse axis. The first guide wheel 15 and the second guide wheel 16 jointly guide the lining hose 2 to the front end of the second horizontal conveyor belt 13, and the lining hose 2 passes under the horizontal plate 142 via the second horizontal conveyor belt 13. The outer ends of the first guide wheel 15 correspond to the two sides of the second horizontal conveyor belt 13, and the outer ends of the first guide wheel 15, the second guide wheel 16, and the bottom edge of the horizontal plate 142 are sequentially arranged inwardly in the transverse direction, so that the edges of both sides of the lining hose 2 are gradually folded inward when the lining hose 2 is transported backward.

[0050] In the automatic folding conveying device 1, the specific structure of the cantilever guide wheel group is as follows: it includes one side of the folding plate 14 in the transverse direction ( Figure 4 The first cantilever guide wheel 17 and the second cantilever guide wheel 18 are arranged on the upper side of the guide folding plate 14, the second cantilever guide wheel 18 is located on the inner side behind the first cantilever guide wheel 17 (that is, the second horizontal conveyor belt 13 is considered to be inside), and the second cantilever guide wheel 18 does not exceed the longitudinal center line of the second horizontal conveyor belt 13 in the lateral direction; the cantilever guide wheel group also includes a first cantilever guide wheel 17 and a second cantilever guide wheel 18 on the other side of the guide folding plate 14 ( Figure 4 The third cantilever guide wheel 19 and the fourth cantilever guide wheel 20 are arranged on the lower side of the folding plate 14. The fourth cantilever guide wheel 20 is located on the inner side of the rear of the third cantilever guide wheel 19. The second cantilever guide wheel 18 and the third cantilever guide wheel 19 are arranged in a horizontal direction corresponding to each other. The second cantilever guide wheel 18 and the third cantilever guide wheel 19 are both located behind the vertical plate 141 of the folding plate 14. In this embodiment, the first cantilever guide wheel 17 moves the right edge ( Figure 4 The upper side) is pressed down toward the vertical plate 141, and the second cantilever guide wheel 18 further positions the right edge of the lining hose 2, and the third cantilever guide wheel 19 positions the left edge of the lining hose 2 ( Figure 4 The lower side) is pressed above the right edge for folding, and the fourth cantilever guide wheel 20 further positions the left edge of the lining hose 2, so that the rear end of the second horizontal conveyor belt 13 outputs a stably folded three-part lining hose 2.

[0051] The first cantilever guide wheel 17, the second cantilever guide wheel 18, the third cantilever guide wheel 19, and the fourth cantilever guide wheel 20 are connected to the bracket 101 through the mounting seat 105 and can be adjusted horizontally and vertically. The bracket 101 is provided with longitudinal tracks 104 on both sides of the second horizontal conveyor belt 13. Each mounting seat 105 can be mounted on the longitudinal track 104 on the same side in a longitudinally adjustable manner. Each mounting seat 105 is penetrated with a laterally adjustable extension rod 106. The first cantilever guide wheel 17, the second cantilever guide wheel 18, the third cantilever guide wheel 19, and the fourth cantilever guide wheel 20 can be connected to the inner end of the extension rod 106 on the corresponding mounting seat 105 by rotating around the transverse axis. The main function of the cantilever guide wheel group is to position and guide the lining hose that is turned over and folded, so as to ensure the stable folding of the lining hose.

[0052] In the automatic folding conveying equipment 1, the speed measuring device is a speed measuring wheel 21, which is arranged in the horizontal middle above the rear end of the second horizontal conveyor belt 13. The upper end of the speed measuring wheel 21 is installed on the bracket. The speed measuring wheel 21 vertically elastically presses the lining hose 2 so that the conveying speed of the lining hose 2 can be measured. The speed measuring wheel 21 is connected to the control unit 10 signal.

[0053] The pulling unit includes a pulling trolley 3 with adjustable width located in the pipeline and a winch 5 located at the wellhead of the downstream inspection well. The winch 5 is provided with a wire rope for pulling the pulling trolley 3 to move. The pulling trolley 3 is provided with a force measuring device to monitor the pulling force in real time.

[0054] The specific structure of the pulling trolley 3 is as follows: the pulling trolley 3 includes two half shells 31 arranged side by side on the left and right sides and a socket-type connector connecting the two half shells 31 into a whole, two rollers 37 are arranged at the bottom of each half shell 31 along the forward direction of the vehicle, and the socket-type connector includes a connecting rod 32 extending in the transverse direction of the vehicle at the bottom of one half shell 31, and multiple connecting rods 32 are arranged at intervals along the longitudinal direction of the vehicle, and a socket slot 33 is provided at the bottom of the other half shell 31, and each connecting rod 32 is installed in the socket slot 33 with an adjustable depth. In this embodiment, each socket slot 33 is provided with a fixing bolt 34 near the notch for fixing the connecting rod 32. As a preferred solution, the fixing bolt 34 can directly press the connecting rod 32 upward into the socket slot 33, or screw holes can be arranged at intervals on the connecting rod 32, and the fixing bolt 34 is threadedly connected with the screw hole. The overall width of the pulling trolley 3 can be adjusted by adjusting the socket depth of the connecting rod 32 between the two half shells 31.

[0055] In this embodiment, a retractable cylindrical cross bar 35 is further provided between the upper parts of the two half shells 31 for tying the starting end of the liner hose. As a preferred solution, the retractable cylindrical cross bar 35 can be an inner tube and an outer tube that are laterally movably sleeved, and the outer ends of the inner tube and the outer tube are respectively fixed to the two half shells 31. When the pulling trolley 3 is adjusted in width through the connecting rod 32, it is sufficient to ensure that the inner ends of the inner and outer tubes are always sleeved. The retractable cylindrical cross bar 35 can adapt to various widths of the pulling trolley 3 after adjustment.

[0056] The pulling trolley 3 also includes a pulling joint 39, the end of the pulling joint 39 near the upstream is hinged to the two half shells 31 one by one through two hinged rods 36, and the end near the downstream is connected to the wire rope on the winch 5. Both ends of the hinged rod 36 are hinged to the pulling joint 39 and the half shells 31. The force measuring device is a tension gauge 38, which is arranged on the pulling joint 39, and the tension gauge 38 is connected to the control unit 10 by signal. The winch 5 is an adjustable speed winch, and the start and stop of the winch and the pulling speed can be remotely controlled by the control unit 10. The wire rope on the winch 5 is connected to the pulling joint 39 of the pulling trolley 3 to pull the pulling trolley 3. The tension gauge 38 can monitor the tension borne by the pulling joint 39 in real time and transmit it to the control unit 10.

[0057] When the pulling trolley 3 is in use, first adjust the width of the trolley according to the width of the folded lining hose and the diameter of the inspection well mouth, then put the starting end of the folded lining hose 2 into the pulling trolley 3, and fold it in half 20 to 30 cm in length after passing through the middle retractable cylindrical cross bar 35, and then use a rope to tie and fix the folded lining hose, so as to fix the starting end of the lining hose 2 on the pulling trolley 3.

[0058] The drag reduction unit includes a plastic base film 4 laid in the pipeline to be repaired, an upstream long-axis roller 7 set at the bottom pipe opening of the upstream inspection well chamber, and a downstream long-axis roller 6 set at the bottom pipe opening of the downstream inspection well chamber. The plastic base film 4 is a PE plastic film with a thickness of 0.5-1mm, a width of 1m, and a length the same as the pipe section to be repaired. When in use, the plastic base film 4 is laid flat in the cleaned pipeline to be repaired, and the lining hose is placed on the plastic base film for pulling to avoid wear and scratches on the surface of the lining hose. The upstream long-axis roller 7 and the downstream long-axis roller 6 are long-axis rollers with a length of 0.6-1m and a roller diameter of 10cm. They are placed horizontally at the bottom pipe opening of the upstream inspection well chamber and the bottom pipe opening of the downstream inspection well chamber, respectively, to guide the lining hose transportation and reduce friction.

[0059] The control unit 10 is a handheld control device that establishes a communication connection with the automatic folding and conveying equipment of the liner hose, the pulling trolley and the winch 5 through wireless transmission, that is, the control unit 10 is connected to the first stepper motor 22, the second stepper motor 23, the speed measuring device (speed measuring wheel 21) on the automatic folding and conveying equipment 1, and the winch 5 and the force measuring device (tensile meter 38) on the pulling trolley 3 through signals.

[0060] The laying method of the above pipeline UV curing repair liner hose automatic laying system has the following steps.

[0061] S1. Pre-process the pipe to be repaired by plugging, diverting water and cleaning. The specific operations are as follows:

[0062] First, the rainwater pipes in the inspection wells upstream and downstream of the pipe section to be repaired are blocked with upstream airbags 8 and downstream airbags 9 to isolate the pipe section to be repaired, and the water from the upstream pipe is drained with a water pump. Then, a sewage cleaning and suction truck is used to pre-treat the pipe to be repaired, clean out the sludge and sewage accumulated in the pipe, and clean the inner wall of the pipe with clean water. After pre-treatment, the inner wall of the pipe is inspected with a CCTV pipe inspection robot to ensure that the inner wall of the pipe is clean and free of attachments.

[0063] S2. Preparation for laying of lining hose, the specific operations are as follows:

[0064] First, the automatic folding and conveying device 1 for lining hose and the pulling trolley 3 are placed on the ground at the wellhead of the upstream inspection well, and the winch 5 is placed near the wellhead of the downstream inspection well. The starting end of the lining hose 2 is placed in the automatic folding and conveying device 1 and manually folded and formed. Specifically, in this embodiment, the starting end of the lining hose is placed in the first horizontal conveyor belt 11 of the front half of the automatic folding and conveying device 1, and is pressed with the pressing roller 12. The first horizontal conveyor belt 11 of the automatic folding and conveying device 1 is controlled by a handheld control device to slowly convey the lining hose 2 through the front horizontal conveyor belt 11 and enter between the folding plate 14 and the second horizontal conveyor belt 13. At this time, the starting end of the lining hose 2 is manually folded and formed - the two sides are manually turned up toward the folding plate 14 and the positions of the first cantilever guide wheel 17, the second cantilever guide wheel 18, the third cantilever guide wheel 19, and the fourth cantilever guide wheel 20 are adjusted to press down and position the folded edge of the lining hose 2, so as to ensure that the lining hose 2 input later is automatically folded in the form of three equal parts according to the set folding shape. The folded liner hose 2 is conveyed from the second horizontal conveyor belt 13 in the rear half, and contacts the speed measuring wheel 21 at the outlet to measure the conveying speed of the liner hose.

[0065] Adjust the width of the pulling trolley 3, place the folded lining hose 2 into the pulling trolley 3, pass the starting end of the lining hose 2 around the retractable cylindrical cross bar 35 in the pulling trolley, and tie it with a rope to fix the lining hose 2 on the pulling trolley 3, and then place the pulling trolley 3 into the bottom of the upstream inspection well chamber.

[0066] Tie the starting end of the plastic bottom film 4 to the CCTV pipeline inspection robot, and use the CCTV pipeline inspection robot to pull the plastic bottom film 4 from the upstream inspection well mouth to the downstream inspection well mouth to complete the laying of the plastic bottom film 4. Then tie the wire rope hook of the winch 5 to the CCTV pipeline inspection robot, and the CCTV pipeline inspection robot pulls the wire rope from the downstream inspection well to the upstream inspection well, remove the wire rope hook and connect and fix it with the pulling joint 39 of the pulling trolley 3, and take out the CCTV pipeline inspection robot. Then install the upstream long-axis drum 7 and the downstream long-axis drum 6 at the bottom pipe mouth of the upstream inspection well chamber and the bottom pipe mouth of the downstream inspection well chamber respectively. The winch 5 tightens the rope to make the lining hose 2, the pulling trolley 3, and the wire rope tensioned, and complete the preparation work after ensuring that all links are correct.

[0067] S3, automatic laying of lining hose, the specific operations are as follows:

[0068] The handheld control device is used to control the automatic folding conveying device 1 (the first stepper motor 22, the second stepper motor 23) and the winch 5 to convey and pull the trolley 3 at the same speed. The speed measuring wheel 21 on the automatic folding conveying device 1 monitors the conveying speed of the liner hose 2 in real time. When the conveying speed is detected to be greater than the preset speed (for example, 5m / s), the handheld control device will alarm and require the system to shut down; the dynamometer 38 on the trolley 3 monitors the traction force of the winch 5 in real time. When the traction force is detected to be greater than the preset traction force (generally the maximum value allowed by the liner hose), the handheld control device will alarm and require the system to shut down.

[0069] When the pulling trolley 3 moves from the upstream inspection well mouth to the downstream inspection well mouth, the starting end of the lining hose is unloaded from the pulling trolley, and the pulling trolley is taken out from the inspection well mouth. Finally, the upstream long axis roller 7 and the downstream long axis roller 6 are removed, and the plastic bottom film 4 is pulled out, and the lining hose is laid.

Claims

1. An automatic laying system for UV-curing repair lining hoses of pipelines. It is characterized in that It comprises an automatic folding and conveying device (1), a pulling unit, a drag reduction unit and a control unit (10), The automatic folding and conveying equipment (1) comprises a support (101) arranged near the wellhead of an upstream inspection well, and a first horizontal conveyor belt (11) and a second horizontal conveyor belt (13) arranged on the support (101) in the longitudinal direction. An elastic pressure roller (12) is provided above the first horizontal conveyor belt (11) for elastically pressing the lining hose and conveying it backwards. A folding plate (14) is provided above and in the middle of the second horizontal conveyor belt (13). A guide wheel group is provided at the front end of the folding plate (14) to guide the lining hose to the second horizontal conveyor belt (13). The support (101) is provided with a cantilever guide wheel group on both sides of the folding plate (14) for pressing down and folding the side of the lining hose. A speed measuring device is provided above the rear end of the second horizontal conveyor belt (13) to monitor the conveying speed of the lining hose in real time. The pulling unit comprises a pulling trolley (3) located in the pipeline and having an adjustable width, and a winch (5) located at the wellhead of the downstream inspection well, wherein the winch (5) is provided with a steel wire rope for pulling the pulling trolley (3) to move, and the pulling trolley (3) is provided with a force measuring device for real-time monitoring of the pulling tension; The drag reduction unit comprises a plastic bottom membrane (4) laid in the pipeline to be repaired, an upstream long-axis roller (7) arranged at the bottom pipe opening of the upstream inspection well chamber, and a downstream long-axis roller (6) arranged at the bottom pipe opening of the downstream inspection well chamber; The control unit (10) is connected to the automatic folding and conveying equipment (1) and the pulling unit signal.

2. The automatic laying system for the pipeline UV curing repair lining hose as claimed in claim 1, It is characterized in that The support (101) is provided with roller connecting rods (102) along the longitudinal direction on both sides of the first horizontal conveyor belt (11); a plurality of elastic pressure rollers (12) are arranged at intervals along the longitudinal direction; both ends of each elastic pressure roller (12) are rotatably connected to the two roller connecting rods (102); and the top of each roller connecting rod (102) is vertically elastically connected to the support (101) via a first spring (103).

3. The automatic laying system for the pipeline UV curing repair lining hose according to claim 1, It is characterized in that The folding plate (14) comprises a vertical plate (141) and a horizontal plate (142) connected up and down, the horizontal plate (142) is an isosceles triangular plate arranged parallel to the second horizontal conveyor belt (13), the two waist sides of the horizontal plate (142) are symmetrically arranged on both sides of the longitudinal center line of the second horizontal conveyor belt (13) and are connected backwards, the vertical plate (141) is arranged along the longitudinal center line of the horizontal plate (142) and the top is inclined backwards and downwards, and the vertical plate (141) is fixedly connected to the bracket (101).

4. The automatic laying system for the pipeline UV curing repair lining hose as claimed in claim 3, It is characterized in that The first horizontal conveyor belt (11) is arranged higher than the second horizontal conveyor belt (13), and the lateral width of the first horizontal conveyor belt (11) is greater than that of the second horizontal conveyor belt (13); The guide wheel group comprises a first guide wheel (15) for guiding the lining hose downwards and a second guide wheel (16) located below and behind the first guide wheel (15) for guiding the lining hose onto the second horizontal conveyor belt (13); the first guide wheel (15) and the second guide wheel (16) are arranged in pairs on both sides of the vertical plate (141) and can rotate around a transverse axis; the first guide wheel (15) and the second guide wheel (16) are located in front of the horizontal plate (142); the outer end of the first guide wheel (15), the outer end of the second guide wheel (16) and the bottom edge of the horizontal plate (142) on the same side above the second horizontal conveyor belt (13) are arranged inwards in sequence along the transverse direction.

5. The automatic laying system for the pipeline UV curing repair lining hose as claimed in claim 1, It is characterized in that The cantilever guide wheel assembly comprises a first cantilever guide wheel (17) and a second cantilever guide wheel (18) arranged on one side of the folding plate (14), wherein the second cantilever guide wheel (18) is located at the rear inner side of the first cantilever guide wheel (17); The cantilever guide wheel assembly further comprises a third cantilever guide wheel (19) and a fourth cantilever guide wheel (20) arranged on the other side of the guide folding plate (14); the fourth cantilever guide wheel (20) is located on the rear inner side of the third cantilever guide wheel (19); the second cantilever guide wheel (18) and the third cantilever guide wheel (19) are arranged in a transversely corresponding manner; The first cantilever guide wheel (17), the second cantilever guide wheel (18), the third cantilever guide wheel (19), and the fourth cantilever guide wheel (20) are each connected to the bracket (101) via a mounting seat (105) and can be adjusted in the transverse and longitudinal directions.

6. The automatic laying system for the pipeline UV curing repair lining hose as claimed in claim 5, It is characterized in that The bracket (101) is provided with longitudinal tracks (104) on both sides of the second horizontal conveyor belt (13); each mounting seat (105) can be mounted on the corresponding longitudinal track (104) in a longitudinally adjustable manner; each mounting seat (105) is provided with a transversely adjustable extension rod (106); the first cantilever guide wheel (17), the second cantilever guide wheel (18), the third cantilever guide wheel (19), and the fourth cantilever guide wheel (20) can be rotatably connected to the inner end of the extension rod (106) on the corresponding mounting seat (105).

7. The automatic laying system for the pipeline UV curing repair lining hose as claimed in claim 1, It is characterized in that The pulling trolley (3) comprises two half shells (31) and a socket-type connector connecting the two half shells (31) into a whole, wherein the socket-type connector comprises a connecting rod (32) extending in the transverse direction of the vehicle at the bottom of one half shell (31), and a plurality of connecting rods (32) are arranged at intervals in the longitudinal direction of the vehicle, and a socket slot (33) is provided at the bottom of the other half shell (31) and each connecting rod (32) is installed in the socket slot (33) with an adjustable depth, and a retractable cylindrical cross bar (35) is also provided between the upper parts of the two half shells (31) for tying the starting end of the liner hose.

8. The automatic laying system for the pipeline UV curing repair lining hose as claimed in claim 7, It is characterized in that The pulling trolley (3) further comprises a pulling joint (39), the force measuring device being arranged on the pulling joint (39), one end of the pulling joint (39) being hinged to the two half shells (31) in a one-to-one correspondence via two hinged rods (36), and the other end being connected to a steel wire rope on a winch (5), and the force measuring device being connected to a control unit (10) by signal.

9. A laying method of the automatic laying system for the pipeline UV curing repair lining hose as claimed in any one of claims 1 to 8, It is characterized in that The following steps are involved: S1. Pre-treatment of the pipeline to be repaired by plugging, diverting water and cleaning; S2, placing the starting end of the lining hose (2) in the automatic folding and conveying equipment (1) and folding it manually, adjusting the width of the pulling trolley (3), fixing the folded starting end of the lining hose (2) on the pulling trolley (3), placing the pulling trolley (3) at the bottom of the upstream inspection well chamber, installing the plastic bottom film (4) of the drag reduction unit, fixing the steel wire rope of the winch (5) to the pulling trolley (3), and installing the upstream long-axis roller (7) and the downstream long-axis roller (6) at the bottom pipe opening of the upstream inspection well chamber and the bottom pipe opening of the downstream inspection well chamber respectively; S3, control the automatic folding conveying equipment (1) and the winch (5) to convey the lining hose (2) and the pulling trolley (3) at the same speed respectively, and monitor the conveying speed of the lining hose (2) in real time through the speed measuring device, and monitor the traction force of the winch (5) in real time through the force measuring device. After the pulling trolley (3) moves from the wellhead of the upstream inspection well to the wellhead of the downstream inspection well, remove the starting end of the lining hose (2) from the pulling trolley (3), and take out the pulling trolley (3) from the wellhead of the inspection well, remove the upstream long-axis roller (7) and the downstream long-axis roller (6), and pull out the plastic base film (4), and the laying of the lining hose (2) is completed.

10. The laying method of the automatic laying system for the pipeline UV curing repair lining hose according to claim 9, It is characterized in that In step S3, when it is detected that the conveying speed of the liner hose (2) is greater than the preset speed or the traction force of the winch (5) is greater than the preset traction force, the control unit (10) issues an alarm and shuts down the entire system.

Citation Information

Patent Citations

  • CIPP ultraviolet curing repair construction method

    CN110735992A

  • Ultraviolet curing repairing hose folding device

    CN216235133U

  • Traction folding device for double-sided clamping ultraviolet curing lining hose

    CN216661285U

  • Automatic folding and conveying device for pipeline lining hose

    CN217102428U

  • Napkin folding device

    DE102009060965A1