Production method and production system for glass curtain wall unit

Through conveyor lines and automated equipment, the production and quality inspection of frame structures and glass curtain wall units are completed in sequence during the production of glass curtain wall units, solving the problems of chaotic production processes and low efficiency, and achieving orderly production and high-efficiency glass curtain walls. Cell manufacturing.

CN118790748AInactive Publication Date: 2024-10-18ZHUHAI GREE INTELLIGENT EQUIP CO LTD +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411275234.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The production process of glass curtain wall units is chaotic, production efficiency is low, and manual labor intensity is high.

Method used

The conveyor line is used to transport the pallet tooling to the frame structure production station, quality inspection station, glass curtain wall unit production station and second quality inspection station in sequence. The production and quality of the frame structure are completed sequentially through automated equipment and operators. Inspect the production of glass curtain wall units, and set up a first quality inspection station and a second quality inspection station to promptly detect unqualified products and carry out repairs.

Benefits of technology

The production process of glass curtain wall units has been optimized to make the production process orderly and efficient, reduce the labor intensity of operators, and reduce the waste of materials and labor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118790748A_ABST
    Figure CN118790748A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of production of glass curtain wall units, and discloses a production method and system for a glass curtain wall unit, and the production method comprises the steps that a tray tool is lifted to the starting end of a conveying line body; the tray tool is conveyed to a frame structure manufacturing station through the conveying line body, and manufacturing of the frame structure is completed on the tray tool; the tray tool is conveyed to a first quality inspection station through the conveying line body, and quality inspection is conducted on the frame structure; the tray tool of the frame structure qualified in quality inspection is conveyed to a glass curtain wall unit manufacturing station through a conveying line body, and installation of glass and the frame structure is completed on the tray tool; and the tray tool is conveyed to a second quality inspection station through the conveying line body, quality inspection is conducted on the glass curtain wall units, the glass curtain wall units qualified in quality inspection are offline and put in storage, and the glass curtain wall units unqualified in quality inspection are repaired. According to the production method for the glass curtain wall unit, the production process is optimized, and the production procedures are orderly and convenient to execute.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of glass curtain wall unit production, and in particular to a production method and a production system for a glass curtain wall unit. Background Art

[0002] Glass curtain wall, as a beautiful and novel building wall decoration method, is usually used in the exterior of high-end office buildings, shopping malls, hotels, etc., to improve lighting and aesthetics through glass curtain wall decoration. Glass curtain wall is usually composed of several individual glass curtain wall units, which are generally assembled in the factory and then transported to the site for installation into glass curtain wall.

[0003] The assembly and production method of glass curtain wall units in factories is usually manual assembly, which results in chaotic production processes, low production efficiency and high labor intensity. Summary of the invention

[0004] In view of this, the present invention provides a production method and a production system for a glass curtain wall unit to solve the problems of chaotic production process and low production efficiency of the glass curtain wall unit.

[0005] In a first aspect, the present invention provides a method for producing a glass curtain wall unit, comprising: Lift the pallet tooling to the starting end of the conveyor line; The pallet tooling is conveyed to the frame structure manufacturing station through the conveyor line body, and the frame structure is manufactured on the pallet tooling; The pallet tooling is transported to the first quality inspection station through the conveyor line, and the frame structure is inspected; The pallet tooling of the frame structure that has passed the quality inspection is transported to the glass curtain wall unit production station through the conveyor line, and the installation of the glass and the frame structure is completed on the pallet tooling; The pallet tooling is transported to the second quality inspection station through the conveyor line, and the glass curtain wall units are quality inspected. The glass curtain wall units that pass the quality inspection are taken off the line and put into storage, while the glass curtain wall units that fail the quality inspection are repaired.

[0006] Beneficial effects: The pallet tooling is sequentially transported to the frame structure production station, the first quality inspection station, the glass curtain wall unit production station and the second quality inspection station through the conveyor line. The automated equipment and operators sequentially complete the frame structure production, quality inspection, glass curtain wall unit production and final quality inspection when the pallet tooling passes through different stations. There is no need for too much waiting time, and there will be no crossover of steps leading to confusion in the production process. The overall production process of the glass curtain wall unit is optimized, making the entire production process orderly and easy to execute, improving production efficiency, and reducing the labor intensity of operators. In addition, due to the setting of the first quality inspection station and the second quality inspection station, unqualified products can be discovered in time during the production process and repaired in time, avoiding the waste of materials, installation and labor caused by setting up quality inspection only in the last step.

[0007] In an optional embodiment, the step of lifting the pallet tooling to the starting end of the conveyor line body includes: The returning pallet tooling is lifted to the starting end of the conveyor line by the return machine; The cantilever of the pallet tooling is stretched to a corresponding extended position according to the order information of the glass curtain wall unit to be produced.

[0008] In an optional embodiment, the frame structure manufacturing station includes: a frame installation station, a first accessory installation station and a painting station in sequence; the pallet tooling is sequentially transported to the frame installation station, the first accessory installation station and the painting station under the drive of the conveyor line body; The process of completing the manufacturing of the frame structure on the pallet tooling includes: At the frame installation station, at least three frames are fixedly connected according to a preset shape to form a frame assembly; Installing a first accessory on the frame assembly at the first accessory installation station to form a frame structure, wherein the first accessory includes one or more of a back plate, a weir glass, and a window jade; The frame structure is cleaned at the painting station and a primer is applied after cleaning.

[0009] In an optional embodiment, the frame installation station includes a pre-installation station, a connection station, and a correction station, and the pallet tooling is sequentially transported to the pre-installation station, the connection station, and the correction station under the drive of the conveyor line body; The method of fixing and connecting at least three frames into a frame assembly according to a preset shape at the frame installation station includes: At the pre-installation station, at least three frames of the frame structure are picked up by the frame loading structure, and are sequentially loaded onto the pallet tooling according to the shape of the frame structure to complete the pre-installation of the frame structure; At the connection station, structural adhesive is applied to the butt joints of the angles of at least three pre-assembled frames, and the frames are butted in sequence, and fixedly connected by fasteners to form a frame assembly; At the correction station, the overflowed structural adhesive is corrected by scraping glue.

[0010] In an optional embodiment, the first accessory installation station includes: a back panel installation station, a process hole plugging station, a weir glass installation station and a window jade installation station; the tray tooling is sequentially transported to the back panel installation station, the process hole plugging station, the weir glass installation station and the window jade installation station under the drive of the conveyor line body; The step of installing the first accessory on the frame assembly at the first accessory installation station to form a frame structure includes: At the backboard installation station, the backboard is sucked by the backboard lifting equipment and placed on the corresponding position of the frame assembly, and the backboard is installed on the frame assembly by fasteners; At the process hole plugging station, the process holes reserved on the frame assembly are plugged by using a sealing plate in combination with structural adhesive; At the weir glass installation station, the weir glass is installed at the corresponding position of the frame assembly by means of a weir glass suction cup, and is sealed by means of a structural adhesive; At the window bead installation station, the slideway hinge on the window bead is connected to the frame assembly through fasteners to form a frame structure.

[0011] In an optional embodiment, the glass curtain wall unit manufacturing station includes: a glass installation station, a waterproofing station and a second accessory installation station, and the tray tooling is sequentially transported to the glass installation station, the waterproofing station and the second accessory installation station under the drive of the conveyor line body; The installation of the glass and frame structure on the pallet tooling includes: Assembling and fixing the glass and the frame structure at the glass installation station to preliminarily complete the production of the glass curtain wall unit; Performing waterproofing treatment on the glass and frame structure at the waterproofing station; The second accessory is installed on the glass curtain wall unit at the second accessory installation station, and the second accessory includes a buckle cover and an aluminum box.

[0012] In an optional embodiment, the glass installation station includes: a glass buckling station and a fixing station, and the tray tooling is sequentially transported to the glass buckling station and the fixing station under the drive of the conveyor line body; The step of assembling and fixing the glass and the frame structure at the glass installation station to preliminarily form a glass curtain wall unit includes: At the glass-fastening station, the glass is sucked and positioned by a suction fixture, positioning information is obtained by a visual system, and the glass and the frame structure are positioned and assembled according to the positioning information; At the fixed workstation, a first gluing position is planned according to the positioning information, and a gluing operation of the structural glue is completed according to the first gluing position by a three-axis manipulator to preliminarily complete the production of the glass curtain wall unit.

[0013] In an optional embodiment, the waterproof station includes: an assembly hole blocking station and a surface glue station, and the tray tooling is sequentially transported to the assembly hole blocking station and the surface glue station under the drive of the conveyor line body; The step of waterproofing the glass and the frame structure at the waterproofing station includes: At the assembly hole blocking station, a round rod and / or a bottom supporting rubber block is installed in the process hole of the glass curtain wall unit; At the surface glue station, a second gluing position is acquired through a visual system, and a three-axis manipulator completes the surface glue application operation according to the second gluing position.

[0014] In a second aspect, the present invention further provides a production system for a glass curtain wall unit, which is used to execute the above production method for a glass curtain wall unit.

[0015] In an optional embodiment, a pallet tooling is included, and the pallet tooling includes: chassis; The telescopic component is connected to the base frame. Two ends of the telescopic component in the first direction have an extended position extending from both sides of the base frame, and a retracted position retracted into the base frame.

[0016] In an optional embodiment, the telescopic components have multiple groups, and the multiple groups of telescopic components are spaced apart along the second direction, and the first direction is perpendicular to the second direction; the pallet tooling also includes a side guard structure, which is connected to one end of a group of telescopic components along the first direction and is located on one side of the base frame along the second direction; the side guard structure includes a first baffle and a second baffle vertically connected, the first baffle extends along the first direction, and the second baffle extends along the second direction.

[0017] In an optional embodiment, each group of the telescopic components includes at least two telescopic parts, and the telescopic parts include a telescopic tube and a fixed rod, the fixed rod is fixedly connected to the base frame, one end of the telescopic tube is slidably mounted on the outside of the fixed rod, and the other end has the extended position and the retracted position; in each group of the telescopic components, the fixed rods of at least two of the telescopic parts extend in opposite directions.

[0018] In an optional embodiment, it also includes a conveyor line body, which is a double-layer roller line body, the upper layer is used to convey the pallet tooling from the starting end to the frame structure production station, the first quality inspection station, the glass curtain wall unit production station and the second quality inspection station in sequence; the lower layer is used to convey the pallet tooling back to the starting end after the cantilever is reset.

[0019] In an optional embodiment, it also includes a material transportation line and an AGV. The material transportation line is located on one side of the conveyor line body and is used to transport materials required for making glass curtain wall units. The AGV is used to transfer the materials to the material cache corresponding to each workstation on the conveyor line body. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the related technologies, the drawings required for use in the specific embodiments or the related technical descriptions will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0021] Figure 1 A first flow chart of a method for producing a glass curtain wall unit according to an embodiment of the present invention; Figure 2 A second flow chart of a method for producing a glass curtain wall unit according to an embodiment of the present invention; Figure 3 A third flow chart of a method for producing a glass curtain wall unit according to an embodiment of the present invention; Figure 4 A fourth flow chart of a method for producing a glass curtain wall unit according to an embodiment of the present invention; Figure 5 is a fifth flow chart of a method for producing a glass curtain wall unit according to an embodiment of the present invention; Figure 6 is a sixth flow chart of a method for producing a glass curtain wall unit according to an embodiment of the present invention; Figure 7 is a seventh flow chart of a method for producing a glass curtain wall unit according to an embodiment of the present invention; Figure 8 is an eighth flow chart of a method for producing a glass curtain wall unit according to an embodiment of the present invention; Fig. 9 is a schematic diagram of a production system for a glass curtain wall unit according to an embodiment of the present invention; Fig.10 A schematic diagram of a pallet tooling (retracted position) according to an embodiment of the present invention; Fig.11It is a schematic diagram of a pallet tooling (extended position) according to an embodiment of the present invention.

[0022] Description of reference numerals: 1. Pallet tooling; 101. Base frame; 102. Telescopic assembly; 121. Telescopic tube; 122. Fixed rod; 103. Sidewall structure; 1031. First sidewall; 1032. Second sidewall; 2. Conveyor line; 3. Pre-installation station; 4. Connection station; 5. Correction station; 6. Backboard installation station; 7. Process hole blocking station; 8. Weir glass installation station; 9. Window jade installation station; 10. Painting station; 11. First quality inspection station; 12. Glass buckling station; 13. Fixed station ; 14. Assembly hole plugging station; 15. Surface glue station; 16. Second accessory installation station; 17. Second quality inspection station; 18. Material transportation line; 19. Back panel material cache placement area; 20. Weir glass material cache placement area; 21. Window jade material cache placement area; 22. Glass material cache placement area; 23. Cover material cache placement area; 24. Aluminum box material cache placement area; 25. Cross-line ladder; 26. Return board machine; 27. First rework area; 28. Second rework area; 29. ​​Finished product warehouse. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0024] Combine the following Figures 1 to 11 , describing an embodiment of the present invention.

[0025] According to an embodiment of the present invention, on the one hand, a method for producing a glass curtain wall unit is provided, comprising: S1, lift the pallet tooling 1 to the starting end of the conveyor line 2; S2, conveying the pallet tooling 1 to the frame structure manufacturing station through the conveyor line 2, and completing the manufacturing of the frame structure on the pallet tooling 1; S3, conveying the pallet tooling 1 to the first quality inspection station 11 through the conveyor line 2, and performing quality inspection on the frame structure; S4, conveying the pallet tooling 1 of the frame structure that has passed the quality inspection to the glass curtain wall unit production station through the conveyor line 2, and completing the installation of the glass and the frame structure on the pallet tooling 1; S5. The pallet tooling 1 is conveyed to the second quality inspection station 17 through the conveyor line 2, and the glass curtain wall units are quality inspected. The glass curtain wall units that pass the quality inspection are taken offline and put into storage, and the glass curtain wall units that fail the quality inspection are repaired.

[0026] The pallet tooling 1 is sequentially conveyed to the frame structure production station, the first quality inspection station 11, the glass curtain wall unit production station and the second quality inspection station 17 by the conveyor line 2. The automated equipment and operators sequentially complete the frame structure production, quality inspection, glass curtain wall unit production and final quality inspection when the pallet tooling 1 passes through different stations. There is no need for too much waiting time, and there will be no crossover of steps leading to confusion in the production process. The overall production process of the glass curtain wall unit is optimized, making the entire production process orderly and easy to execute, improving production efficiency, and reducing the labor intensity of operators. In addition, due to the setting of the first quality inspection station 11 and the second quality inspection station 17, unqualified products can be found in time during the production process and repaired in time, avoiding the waste of materials, installation and labor caused by setting up quality inspection only in the last step.

[0027] Specifically, a first rework area 27 is provided on one side of the first quality inspection station 11, and frame structures that fail the quality inspection are transported to the first rework area 27, and frame structures that pass the quality inspection are further transported to the glass curtain wall unit manufacturing station. A finished product warehouse 29 and a second rework area 28 are also provided near the second quality inspection station 17, and glass curtain wall units that pass the quality inspection are transported to the finished product warehouse 29, and glass curtain wall units that fail the quality inspection are transported to the rework area.

[0028] In one embodiment, the step of lifting the pallet tool 1 to the starting end of the conveyor line 2 includes: S101, lifting the returned pallet tooling 1 to the starting end of the conveyor line 2 by the return plate machine 26; S102 , stretching the cantilever of the pallet tooling 1 to a corresponding extended position according to the order information of the glass curtain wall unit to be produced.

[0029] The returned pallet tooling 1 is lifted to the starting end of the conveyor line 2 by the return plate machine 26, so as to realize the automatic recovery and loading of the pallet tooling 1; the cantilever of the pallet tooling 1 is stretched to the corresponding extended position according to the order information of the glass curtain wall unit to be produced, so as to adapt to the production of glass curtain wall units of different sizes.

[0030] Specifically, the cantilever of the reflowed pallet tooling 1 can be reset to the retracted position by the operator at the place of reflow. The conveyor line body 2 is a double-layer roller line body, the upper layer is used to convey the pallet tooling 1 from the starting end to the frame structure production station, the first quality inspection station 11, the glass curtain wall unit production station and the second quality inspection station 17 in sequence; the lower layer is used to convey the pallet tooling 1 back to the starting end after the cantilever is reset. The stretching and resetting of the cantilever can be manually operated by an operator or by a robot. In this embodiment, manual operation is preferred.

[0031] In one embodiment, the frame structure manufacturing station includes: a frame installation station, a first accessory installation station and a painting station 10 in sequence; the pallet tooling 1 is sequentially transported to the frame installation station, the first accessory installation station and the painting station 10 under the drive of the conveyor line 2; The process of completing the manufacturing of the frame structure on the pallet tooling 1 includes: S201, at the frame installation station, fixing and connecting at least three frames according to a preset shape to form a frame assembly; S202, installing a first accessory on the frame assembly at the first accessory installation station to form a frame structure, wherein the first accessory includes one or more of a back plate, a weir glass, and a window jade; S203, cleaning the frame structure at the painting station 10, and applying primer after cleaning.

[0032] First, the frame is connected into a frame assembly according to a preset shape, and then the first accessory is installed on the frame assembly to form a frame structure. The frame structure is then cleaned and primed to complete the entire frame structure manufacturing process, so that the production process of the entire frame structure manufacturing process is clear and orderly, and the production efficiency is high.

[0033] In one embodiment, the frame installation station includes a pre-installation station 3, a connection station 4, and a correction station 5, and the pallet tooling 1 is sequentially conveyed to the pre-installation station 3, the connection station 4, and the correction station 5 under the drive of the conveyor line 2; The method of fixing and connecting at least three frames into a frame assembly according to a preset shape at the frame installation station includes: S2011, taking at least three frames of the frame structure at the pre-installation station 3 through the frame loading structure, and sequentially loading them onto the pallet tooling 1 according to the shape of the frame structure to complete the pre-installation of the frame structure; S2012, applying structural adhesive to the butt joints of the angles of at least three pre-assembled frames at the connecting station 4, then butting them together in sequence, and fixing them together with fasteners to form a frame assembly; S2013, scraping and correcting the overflowed structural adhesive at the correction station 5.

[0034] The frame loading structure realizes automatic loading of the frame and places each frame on the pallet tooling 1 according to a preset shape, so as to facilitate the subsequent connection between the frames; at the connection station 4, the operator can manually apply structural glue to the joint of the angles of at least three frames, and fix the connection through fasteners. The operator does a relatively simple job, which is time-consuming and labor-saving, and has high production efficiency; at the correction station 5, the operator scrapes the overflowed structural glue to ensure the cleanliness of the frame structure. At the frame installation station, the combination of machine automation and manual labor completes the production of the frame structure, realizes the orderly production of the frame structure, and has high production efficiency.

[0035] In a specific embodiment, the frame structure is a rectangular frame, and the frame loading structure is a robot. There may be two robots, which are respectively arranged on both sides of the conveyor line body 2. Each robot can load and place two frames. In this embodiment, the fasteners may be fastening structures such as screws and bolts.

[0036] In one embodiment, the first accessory installation station includes: a back panel installation station 6, a process hole plugging station 7, a weir glass installation station 8 and a window jade installation station 9; the tray tooling 1 is sequentially transported to the back panel installation station 6, the process hole plugging station 7, the weir glass installation station 8 and the window jade installation station 9 under the drive of the conveyor line body 2; The step of installing the first accessory on the frame assembly at the first accessory installation station to form a frame structure includes: S2021, at the back panel installation station 6, the back panel is sucked by a back panel lifting device and placed on a corresponding position of the frame assembly, and the back panel is installed on the frame assembly by fasteners; S2022, at the process hole plugging station 7, the process hole reserved on the frame assembly is plugged by a sealing plate combined with a structural adhesive; S2023, at the weir glass installation station 8, installing the weir glass at a corresponding position of the frame assembly by means of a weir glass suction cup, and sealing it by means of a structural adhesive; S2024. At the window bead installation station 9, the slide hinge on the window bead is connected to the frame assembly through fasteners to form a frame structure.

[0037] The tray tooling 1 is driven by the conveyor line 2 and sequentially transported to the back panel installation station 6, the process hole plugging station 7, the weir glass installation station 8 and the window jade installation station 9, so as to sequentially perform back panel installation, weir glass installation and window jade installation at the back panel installation station 6, the process hole plugging station 7, the weir glass installation station 8 and the window jade installation station 9. The production process is clear, and mutual interference between processes can be avoided, and repeated installation can also be avoided. The back panel is installed with the help of back panel hoisting equipment, and the weir glass is installed by weir glass suction cup, which simplifies the installation difficulty and improves production efficiency.

[0038] Specifically, in this embodiment, the fasteners may be fastening structures such as screws and bolts.

[0039] In one embodiment, the glass curtain wall unit manufacturing station includes: a glass installation station, a waterproofing station and a second accessory installation station 16, and the tray tooling 1 is sequentially transported to the glass installation station, the waterproofing station and the second accessory installation station 16 under the drive of the conveyor line body 2; The installation of the glass and frame structure on the pallet tooling 1 includes: S401, assembling and fixing the glass and the frame structure at the glass installation station to preliminarily complete the production of the glass curtain wall unit; S402, performing waterproofing treatment on the glass and frame structure at the waterproofing station; S403: Install a second accessory on the glass curtain wall unit at the second accessory installation station 16, wherein the second accessory includes a buckle cover and an aluminum box.

[0040] The glass and frame structure are installed first, then waterproofed, and finally the second accessory is installed, so that the production process of the entire glass curtain wall unit is clear and orderly, with high production efficiency.

[0041] In one embodiment, the glass installation station includes: a glass buckling station 12 and a fixing station 13, and the tray tool 1 is sequentially conveyed to the glass buckling station 12 and the fixing station 13 under the drive of the conveyor line 2; The step of assembling and fixing the glass and the frame structure at the glass installation station to preliminarily form a glass curtain wall unit includes: S4011, at the glass-fastening station 12, the glass is sucked and positioned by a suction fixture, positioning information is obtained by a visual system, and the glass and the frame structure are positioned and assembled according to the positioning information; S4012: At the fixed workstation 13, a first gluing position is planned according to the positioning information, and a gluing operation of the structural glue is completed according to the first gluing position by a three-axis manipulator to preliminarily complete the production of the glass curtain wall unit.

[0042] By using a suction fixture to suck the glass for positioning, the difficulty of production can be reduced. By obtaining positioning information through a visual system, better positioning can be performed, further reducing the difficulty of positioning and assembly between the glass and the frame structure, simplifying the assembly steps, and avoiding glass damage. The first gluing position is planned by installing the positioning information, and the gluing operation of the structural glue is completed according to the first gluing by a three-axis manipulator, avoiding glue overflow or glue leakage in some positions, making the initial production of the glass curtain wall unit fully automated.

[0043] In one embodiment, the waterproof station includes: an assembly hole plugging station 14 and a surface glue station 15, and the pallet tooling 1 is sequentially conveyed to the assembly hole plugging station 14 and the surface glue station 15 under the drive of the conveying line body 2; The step of waterproofing the glass and the frame structure at the waterproofing station includes: S4021, at the assembly hole blocking station 14, a round rod and / or a bottom supporting rubber block is installed in the process hole of the glass curtain wall unit; S4022. At the surface glue station 15, a second gluing position is obtained through a visual system, and a three-axis manipulator is used to complete the surface glue application operation according to the second gluing position.

[0044] The operator manually installs the round rod and / or the bottom glue block in the process hole of the glass curtain wall unit to seal the process hole to achieve the effect of aesthetics and waterproofing. The three-axis manipulator automatically applies the surface glue according to the second gluing position to achieve the effect of sealing and waterproofing.

[0045] In this embodiment, the conveyor line 2 conveys the pallet tooling 1 from the starting end to the pre-installation station 3, the connection station 4, the correction station 5, the backboard installation station 6, the process hole blocking station 7, the river glass installation station 8, the window jade installation station 9, the painting station 10, the first quality inspection station 11, the glass buckle station 12, the fixing station 13, the assembly hole blocking station 14, the surface glue station 15, the second accessory installation station 16 and the second quality inspection station 17 in sequence; cross-line ladders 25 are also provided between some stations. In this embodiment, by optimizing the production and assembly process for the glass curtain wall unit, the conveyor line 2 is used to cooperate with the pallet tooling 1, the return plate machine 26, the manipulator and the robot and other automated equipment combined with the AGV to transfer materials to realize the automated production and assembly of the glass curtain wall unit.

[0046] According to an embodiment of the present invention, on the other hand, a production system for a glass curtain wall unit is provided, which is used to execute the production method for a glass curtain wall unit.

[0047] In one embodiment, a pallet tooling 1 is included, and the pallet tooling 1 includes a base frame 101 and a telescopic assembly 102; the telescopic assembly 102 is connected to the base frame 101, and the two ends of the telescopic assembly 102 in a first direction have an extended position extending from both sides of the base frame 101, and a retracted position retracted into the base frame 101.

[0048] The pallet tooling 1 is provided with a telescopic assembly 102 , and the telescopic assembly 102 has an extended position and a retracted position, so that the pallet tooling 1 can be applied to the production of glass curtain wall units of different sizes.

[0049] In one embodiment, the telescopic components 102 have multiple groups, and the multiple groups of telescopic components 102 are spaced apart along the second direction, and the first direction is perpendicular to the second direction; the pallet tooling 1 also includes a side guard structure 103, and the side guard structure 103 is connected to one end of a group of telescopic components 102 along the first direction, and is located on one side of the base frame 101 along the second direction; the side guard structure 103 includes a first side guard 1031 and a second side guard 1032 that are vertically connected, and the first side guard 1031 extends along the first direction, and the second side guard 1032 extends along the second direction.

[0050] The arrangement of the retaining edge structure 103 can be used for positioning in both the first direction and the second direction, thereby ensuring the accuracy of the production of the glass curtain wall unit.

[0051] In one embodiment, each group of the telescopic components 102 includes at least two telescopic parts, and the telescopic parts include a telescopic tube 121 and a fixed rod 122. The fixed rod 122 is fixedly connected to the base frame 101, and one end of the telescopic tube 121 is slidably mounted on the outside of the fixed rod 122, and the other end has the extended position and the retracted position; in each group of the telescopic components 102, the fixed rods 122 of at least two of the telescopic parts extend in opposite directions.

[0052] Each telescopic assembly 102 includes at least two telescopic members, and the fixing rods 122 of the at least two telescopic members extend in opposite directions, and can extend on both sides of the first direction of the base frame 101 to adjust the size of the telescopic assembly 102 to adapt to the production of glass curtain wall units of different sizes. The telescopic member includes a telescopic tube 121 and a fixing rod 122, and has a simple structure and is easy to adjust.

[0053] In one embodiment, it also includes a conveyor line body 2, which is a double-layer roller line body. The upper layer is used to convey the pallet tooling 1 from the starting end to the frame structure manufacturing station, the first quality inspection station 11, the glass curtain wall unit manufacturing station and the second quality inspection station 17 in sequence; the lower layer is used to convey the pallet tooling 1 back to the starting end after the cantilever is reset.

[0054] The upper layer of the double-layer roller line can be used to transport the pallet tooling 1 to each workstation for the production of glass curtain wall units; the larger lower layer of the double-layer roller line can be used to transport the used pallet tooling 1 back to the starting end for the next use, wherein, before transporting back to the starting end, the cantilever of the pallet tooling 1 can be reset first to facilitate transportation.

[0055] In one embodiment, it also includes a material transportation line 18 and an AGV. The material transportation line 18 is located on one side of the conveyor line body 2 and is used to transport materials required for making glass curtain wall units. The AGV is used to transfer materials to material caches corresponding to each workstation on the conveyor line body 2.

[0056] The material transport line 18 cooperates with the AGV to transport the required materials of the glass curtain wall unit to the corresponding material buffer, so as to facilitate retrieval during the production process.

[0057] Specifically, between the material transport line 18 and the conveying line body 2, there may be included a backboard material cache placement area 19, a river glass material cache placement area 20, a window jade material cache placement area 21, a glass material cache placement area 22, a cover material cache placement area 23 and an aluminum box material cache placement area 24.

[0058] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the present application.

Claims

1. A method for producing a glass curtain wall unit, characterized in that: include: Lifting the pallet tooling (1) to the starting end of the conveyor line (2); The pallet tooling (1) is conveyed to a frame structure production station via a conveyor line (2), and the frame structure is produced on the pallet tooling (1); The pallet tooling (1) is conveyed to a first quality inspection station (11) via a conveyor line (2), and a quality inspection is performed on the frame structure; The pallet tooling (1) of the frame structure that has passed the quality inspection is transported to the glass curtain wall unit production station through the conveyor line (2), and the installation of the glass and the frame structure is completed on the pallet tooling (1); The pallet tooling (1) is transported to the second quality inspection station (17) by the conveyor line (2), and the glass curtain wall units are quality inspected. The glass curtain wall units that pass the quality inspection are taken offline and put into storage, and the glass curtain wall units that fail the quality inspection are repaired. The frame structure manufacturing stations sequentially include: a frame installation station, a first accessory installation station and a painting station (10); the pallet tooling (1) is sequentially transported to the frame installation station, the first accessory installation station and the painting station (10) under the drive of the conveyor line (2); The process of completing the production of the frame structure on the pallet tooling (1) comprises: At the frame installation station, at least three frames are fixedly connected according to a preset shape to form a frame assembly; Installing a first accessory on the frame assembly at the first accessory installation station to form a frame structure, wherein the first accessory includes one or more of a back plate, a weir glass, and a window jade; The frame structure is cleaned at the painting station (10), and a primer is applied after cleaning.

2. The method for producing a glass curtain wall unit according to claim 1, characterized in that: The method of lifting the pallet tooling (1) to the starting end of the conveyor line body (2) comprises: The returned pallet tooling (1) is lifted to the starting end of the conveyor line (2) by a return plate machine (26); The cantilever of the pallet tooling (1) is stretched to a corresponding extended position according to the order information of the glass curtain wall unit to be produced.

3. The method for producing a glass curtain wall unit according to claim 1, characterized in that: The frame installation station comprises a pre-installation station (3), a connection station (4), and a correction station (5); the pallet tooling (1) is sequentially transported to the pre-installation station (3), the connection station (4), and the correction station (5) under the drive of the conveyor line body (2); The method of fixing and connecting at least three frames into a frame assembly according to a preset shape at the frame installation station includes: At the pre-installation station (3), at least three frames of the frame structure are picked up by a frame loading structure, and are sequentially loaded onto the pallet tooling (1) according to the shape of the frame structure, so as to complete the pre-installation of the frame structure; At the connection station (4), structural adhesive is applied to the butt joints of the angles of at least three pre-assembled frames, and the frames are butted in sequence, and fixedly connected by fasteners to form a frame assembly; At the correction station (5), the overflowed structural adhesive is corrected by scraping glue.

4. The method for producing a glass curtain wall unit according to claim 1, characterized in that: The first accessory installation station comprises: a back panel installation station (6), a process hole plugging station (7), a weir glass installation station (8) and a window jade installation station (9); the tray tooling (1) is sequentially transported to the back panel installation station (6), the process hole plugging station (7), the weir glass installation station (8) and the window jade installation station (9) under the drive of the conveyor line body (2); The step of installing the first accessory on the frame assembly at the first accessory installation station to form a frame structure includes: At the back panel installation station (6), the back panel is sucked by a back panel lifting device and placed on a corresponding position of the frame assembly, and the back panel is installed on the frame assembly by fasteners; At the process hole blocking station (7), the process holes reserved on the frame assembly are blocked by using a sealing plate in combination with structural adhesive; At the weir glass installation station (8), the weir glass is installed at a corresponding position of the frame assembly by means of a weir glass suction cup, and is sealed by means of a structural adhesive; At the window bead installation station (9), the slide hinge on the window bead is connected to the frame assembly via fasteners to form a frame structure.

5. The method for producing a glass curtain wall unit according to any one of claims 1 to 4, characterized in that: The glass curtain wall unit manufacturing station comprises: a glass installation station, a waterproofing station and a second accessory installation station (16); the tray tooling (1) is sequentially transported to the glass installation station, the waterproofing station and the second accessory installation station (16) under the drive of the conveyor line body (2); The installation of the glass and frame structure on the pallet tooling (1) comprises: Assembling and fixing the glass and the frame structure at the glass installation station to preliminarily complete the production of the glass curtain wall unit; Performing waterproofing treatment on the glass and frame structure at the waterproofing station; A second accessory is installed on the glass curtain wall unit at the second accessory installation station (16), wherein the second accessory comprises a buckle cover and an aluminum box.

6. The method for producing a glass curtain wall unit according to claim 5, characterized in that: The glass installation station comprises: a glass fastening station (12) and a fixing station (13), and the tray tooling (1) is sequentially transported to the glass fastening station (12) and the fixing station (13) under the drive of the conveyor line body (2); The step of assembling and fixing the glass and the frame structure at the glass installation station to preliminarily form a glass curtain wall unit includes: At the glass-fastening station (12), the glass is sucked and positioned by a suction fixture, positioning information is acquired by a visual system, and the glass and the frame structure are positioned and assembled according to the positioning information; At the fixed workstation (13), a first gluing position is planned according to the positioning information, and a gluing operation of the structural glue is completed according to the first gluing position by a three-axis manipulator, so as to preliminarily complete the production of the glass curtain wall unit.

7. The method for producing a glass curtain wall unit according to claim 5, characterized in that: The waterproofing station comprises: an assembly hole blocking station (14) and a surface glue station (15); the pallet tooling (1) is sequentially transported to the assembly hole blocking station (14) and the surface glue station (15) under the drive of the conveyor line body (2); The step of waterproofing the glass and the frame structure at the waterproofing station includes: At the assembly hole blocking station (14), a round rod and / or a bottom supporting rubber block is installed in the process hole of the glass curtain wall unit; At the surface glue station (15), a second glue application position is acquired through a visual system, and a three-axis manipulator completes the surface glue application operation according to the second glue application position.

8. A production system for glass curtain wall units, characterized in that: Used to carry out the production method for a glass curtain wall unit according to any one of claims 1 to 7.

9. The production system for glass curtain wall units according to claim 8, characterized in that: The invention comprises a pallet tool (1), wherein the pallet tool (1) comprises: Base frame (101); A telescopic component (102) is connected to the base frame (101); two ends of the telescopic component (102) in a first direction have an extended position extending out of two sides of the base frame (101), and a retracted position retracted into the base frame (101).

10. The production system for glass curtain wall units according to claim 9, characterized in that: The telescopic components (102) include a plurality of groups, and the plurality of groups of telescopic components (102) are spaced apart along a second direction, and the first direction is perpendicular to the second direction; the pallet tooling (1) further includes a side guard structure (103), the side guard structure (103) is connected to one end of a group of telescopic components (102) along the first direction, and is located at one side of the base frame (101) along the second direction; the side guard structure (103) includes a first baffle and a second baffle that are vertically connected, the first baffle extending along the first direction, and the second baffle extending along the second direction.

11. The production system for glass curtain wall units according to claim 9, characterized in that: Each group of the telescopic components (102) comprises at least two telescopic parts, the telescopic parts comprising a telescopic tube (121) and a fixed rod (122), the fixed rod (122) being fixedly connected to the base frame (101), one end of the telescopic tube (121) being slidably sleeved on the outside of the fixed rod (122), and the other end having the extended position and the retracted position; in each group of the telescopic components (102), the fixed rods (122) of at least two of the telescopic parts extend in opposite directions.

12. The production system for glass curtain wall units according to claim 8, characterized in that: It also includes a conveyor line body (2), the conveyor line body (2) being a double-layer roller line body, the upper layer being used to sequentially convey the pallet tooling (1) from the starting end to the frame structure manufacturing station, the first quality inspection station (11), the glass curtain wall unit manufacturing station and the second quality inspection station (17); and the lower layer being used to convey the pallet tooling (1) back to the starting end after the cantilever is reset; And / or, it also includes a material transport line (18) and an AGV, wherein the material transport line (18) is located on one side of the conveyor line body (2) and is used to transport materials required for manufacturing the glass curtain wall unit, and the AGV is used to transfer the materials to a material buffer corresponding to each workstation on the conveyor line body (2).

Citation Information

Patent Citations

  • Unit-typed curtain wall plate comprehensive machining treatment technology

    CN111042405A

  • Intelligent assembling system for unit curtain wall

    CN112160471A

  • Tray

    CN211392053U

  • Automatic glass assembling device for unit curtain wall and assembling system

    CN213837795U

  • Anti-toppling cargo carrying tray

    CN216469177U