A connection structure of a large-span steel beam and a thick concrete shell hanging below and a construction method thereof

By setting steel bone beams and annular steel bars in the thick-shell concrete structure below the cantilever steel beam, and using auxiliary support parts, the problem of insufficient firmness of the thick-shell structure under the cantilever steel beam is solved, and large-span steel beams are realized The stable connection and shear resistance of the thick concrete shell on the lower hanging ensure the stability of the structure.

CN118814960BActive Publication Date: 2024-11-22SHANGHAI CONSTRUCTION FOURTH CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411315103.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-22
Estimated Expiration
2044-09-20

AI Technical Summary

Technical Problem

In the cantilever steel beam structure, the thick-shell concrete structure under the suspension section has a strong self-weight, and the single internal frame structure of the steel bar and concrete bonding cannot guarantee the firmness of the lower hanging structure, making it difficult to ensure the large span steel beam and lower hanging concrete Stable connection of thick shells.

Method used

By setting steel bone beams with ends fixed to the outside of the steel beam in the lower hanging thick shell, combining annular steel bars and support plates, and using auxiliary support parts such as bottom frames, support frames and vertical rods to provide more connection force and The shear resistance ensures that the steel bone beam acts as an internal support structure after the concrete solidifies, providing stable support for the lower hanging thick shell.

Benefits of technology

A stable connection between the large span steel beam and the thick shell of the lower concrete is achieved, providing good shear resistance, avoiding the downward deformation of the steel bone beam during suspension, and ensuring the overall stability of the structure after the concrete solidifies. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118814960B_ABST
    Figure CN118814960B_ABST
Patent Text Reader

Abstract

The invention discloses a connection structure of a large-span steel beam and a hanging concrete thick shell and a construction method thereof, belonging to the technical field of building construction. A steel frame beam is arranged in the hanging thick shell, and the steel frame beam is connected to the outer side of the steel beam, so as to provide an internal supporting skeleton structure for the hanging thick shell. The thick shell is supported on the inner side of the thick shell by an annular steel bar, and a support plate supports the thick shell on the steel frame beam, so that the steel frame beam becomes an internal supporting body in the structure. When concrete is poured and solidified, the steel frame beam, as an internal supporting structure, has good connection ability and shear resistance, provides support for the hanging thick shell structure, and ensures the stability of the connection between the large-span steel beam and the hanging concrete thick shell.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and in particular relates to a connection structure of a large-span steel beam and a hanging concrete thick shell and a construction method thereof. Background Art

[0002] With the diversification of building structures, there are now many cantilevered steel beam structures supported by columns. Figure 1 This structure is equipped with thick shell concrete structures of various shapes extending downward from the suspended section of the cantilever steel beam. This structure has a strong three-dimensional sense of space and a beautiful appearance. During the construction of this building, after the cantilever steel beam is installed, it is necessary to continue to install the thick shell concrete structure downward from the suspended section of the cantilever steel beam. Since the thick shell concrete structure has a strong deadweight and the supporting connection point is located at the bottom of the column and the cantilever steel beam, the single internal skeleton structure of the steel bar and the concrete bonding cannot guarantee the firmness of the hanging thick shell structure. Summary of the invention

[0003] In view of this, the object of the present invention is to provide a connection structure of a large-span steel beam and a hanging concrete thick shell and a construction method thereof, which provides more connection force and shear resistance by setting an internal steel beam structure.

[0004] In order to achieve the above object, the present invention provides the following technical solutions:

[0005] A connection structure between a large-span steel beam and a hanging thick concrete shell, comprising a plurality of steel beams whose ends are fixed on the outside of the steel beams, all of the steel beams are located inside the hanging thick shell, the plurality of steel beams are arranged in an array, the extension direction of the steel beams is parallel to the hanging thick shell, and also comprising a plurality of annular steel bars arranged along the extension direction of the hanging thick shell, the annular steel bars are supported on the inside of the hanging thick shell, a support plate is supported and connected between the steel beams and the annular steel bars; the hanging thick shell is filled with concrete.

[0006] Furthermore, it also includes an auxiliary support part, which includes a base frame fixed on the top of the steel beam, the base frame extending outward from the steel beam to provide a support frame, the end of the support frame is provided with a welding seat, a vertical welding hole is opened on the welding seat, and also includes a vertical rod, the vertical rod is slidably arranged in the welding hole, the upper end of the vertical rod is threadedly connected with a pre-positioning cylinder, the lower end of the vertical rod is provided with a fixing part, the fixing part is fixed to the upper side of the middle section of the steel frame beam, and the vertical rod is inserted into the lower hanging thick shell to be connected with the steel frame beam.

[0007] The fixing part includes a base fixed to the lower end of the vertical rod, the bottom end of the base extends downwardly to be provided with an axle seat, and a rotating plate is rotatably provided on the axle seat, and the rotating shaft of the rotating plate is located in the middle of the rotating plate, and two threaded columns are threadedly connected to the base, and the two threaded columns respectively abut against the two sides of the rotating shaft of the rotating plate, and clamping blocks with an L-shaped cross-section are also slidably provided on both sides of the rotating plate, and fixing screws are respectively threadedly connected to the two sides of the rotating plate, and the fixing screws pass through the clamping blocks and then are threadedly connected to the rotating plate. A protruding block is also provided on the top of the clamping block, and a tightening screw is threadedly connected to the protruding block. When fixing the steel frame beam, the tightening screw abuts against the top side of the steel frame beam, and the clamping block is supported on the bottom and outer side of the steel frame beam. By adjusting the two threaded columns, the angle of the rotating plate changes, which drives the angle of the steel frame beam to change.

[0008] Furthermore, a flange ring is provided at the end of the support frame, the welding seat is vertically slidably arranged on the top of the flange ring, a plurality of pre-tightening screws are threadedly connected to the flange ring, and the pre-tightening screws are pressed upward against the bottom side of the welding seat.

[0009] Furthermore, a plurality of shear nails are distributed and fixed on the outer side of the steel beam.

[0010] A construction method for connecting a large-span steel beam with a thick concrete shell hanging below, using the above-mentioned large-span steel beam and a thick concrete shell connecting structure, the steps of which are as follows:

[0011] S1. Fix the base frame on the steel beam, extend the support frame on the base frame, insert the vertical rod, and fix it through the pre-positioning tube;

[0012] S2. Cut the butt joint surface at one end of the steel frame and clamp the steel beam through the fixing part;

[0013] S3, adjusting the height of the pre-positioning cylinder, adjusting the inclination angle of the rotating plate and the position of the steel frame at the fixing part, so that the steel frame contacts the butt joint surface of the steel beam;

[0014] S4, welding the butt joints between the steel beam and the steel frame beam and welding between the weld base and the vertical rod;

[0015] S5. Turn the pre-tightening screw to provide an upward pre-tightening force for the steel beam;

[0016] S6. Install the support plate and environmental reinforcement in sequence, and weld the contact points of the environmental reinforcement, support plate and steel beam;

[0017] S7, install the lower hanging thick shell;

[0018] S8, pouring concrete in the thick shell;

[0019] S9. After the concrete solidifies, cut the vertical bars exposed outside the thick shell and remove the remaining auxiliary support parts.

[0020] The beneficial effects of the present invention are:

[0021] 1. The present invention arranges a steel beam in the lower hanging thick shell, and the steel beam is connected to the outer side of the steel beam to provide an internal support skeleton structure for the lower hanging thick shell, and is supported on the inner side of the thick shell by annular steel bars. The support plate supports the thick shell on the steel beam, so that the steel beam becomes an internal support body in this structure. When pouring concrete and the concrete solidifies, the steel beam serves as an internal support structure with good connection ability and shear resistance, provides support for the lower hanging thick shell structure, and ensures the stability of the connection between the large-span steel beam and the lower hanging concrete thick shell.

[0022] Second, by setting a base frame fixedly supported on the top of the steel beam, the base frame suspends the vertical rod through the support frame, and the vertical rod is fixedly connected to the steel beam. This connection method provides stable support for the steel beam, and the downward length of the vertical rod is adjusted by the pre-positioning cylinder to adjust the hanging height of the steel beam. When the steel beam and the steel beam are connected, the steel beam is close to the steel beam by moving up the vertical rod and fixing the pre-positioning cylinder, so as to provide support for the welding of the steel beam. This structure can remain in the thick shell with the pouring of concrete, and the final steel beam is embedded by cutting the vertical rod part extending out of the thick shell. This structure provides installation support and positioning support for the steel beam before the concrete is poured and solidified, so as to replace the suspension equipment and the fixed bracket to avoid the downward movement and deformation of the steel beam during the suspension process.

[0023] Other advantages, objectives and features of the present invention will be described in the following description and will be apparent to those skilled in the art to some extent, or those skilled in the art may be taught from the practice of the present invention. The objectives and other advantages of the present invention may be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to make the purpose, technical solution and beneficial effects of the present invention clearer, the present invention provides the following drawings for illustration:

[0025] Figure 1 This is a schematic diagram of the completion of the construction of the steel beam and the lower hanging thick shell in the prior art;

[0026] Figure 2 This is a schematic diagram of the construction of a steel beam and a lower hanging thick shell according to an embodiment of the present invention;

[0027] Figure 3 This is a cross-sectional view of the construction of the steel beam and the lower hanging thick shell according to an embodiment of the present invention;

[0028] Figure 4 for Figure 3 A magnified schematic diagram of point A;

[0029] Figure 5 for Figure 4An enlarged schematic diagram of point B;

[0030] Figure 6 It is a structural schematic diagram of a fixing part according to an embodiment of the present invention;

[0031] The markings in the attached drawings are as follows: 1. Steel beam; 2. Lower hanging thick shell; 3. Steel frame beam; 31. Shear nails; 4. Annular reinforcement; 5. Support plate; 6. Auxiliary support part; 61. Base frame; 62. Support frame; 63. Welding seat; 631. Welding hole; 64. Vertical rod; 65. Pre-positioning cylinder; 66. Fixed part; 661. Base; 662. Axle seat; 663. Turn plate; 664. Threaded column; 665. Clamping block; 666. Fixing screw; 667. Raised block; 668. Tightening screw; 67. Flange ring; 68. Pre-tightening screw. DETAILED DESCRIPTION

[0032] like Figure 1 to Figure 6 As shown, the present invention discloses a connection structure of a large-span steel beam and a thick concrete shell hanging below, such as Figure 3 As shown, it includes a plurality of steel beams 3 whose ends are fixed on the outside of the steel beam 1, all of the steel beams 3 are located inside the lower hanging thick shell 2, and the plurality of steel beams 3 are arranged in an array, and the extension direction of the steel beams 3 is parallel to the lower hanging thick shell 2. It also includes a plurality of annular steel bars 4 arranged along the extension direction of the lower hanging thick shell 2, and the annular steel bars 4 are supported on the inner side of the lower hanging thick shell 2, and a support plate 5 is supported and connected between the steel beams 3 and the annular steel bars 4; the lower hanging thick shell 2 is filled with concrete.

[0033] This structure, by arranging a steel frame beam 3 in the lower hanging thick shell 2, the steel frame beam 3 is connected to the outer side of the steel beam 1, to provide an internal support skeleton structure for the lower hanging thick shell 2, and is supported on the inner side of the thick shell by the annular steel bar 4, and the support plate 5 supports the thick shell on the steel frame beam 3, so that the steel frame beam 3 becomes the internal support body in this structure. When pouring concrete and the concrete solidifies, the steel frame beam 3 serves as an internal support structure with good connection ability and shear resistance, providing support for the lower hanging thick shell structure, and ensuring the stability of the connection between the large-span steel beam and the lower hanging concrete thick shell.

[0034] In a further solution, Figure 2 , Figure 3 and Figure 4As shown, it also includes an auxiliary support part 6, which includes a base frame 61 fixed on the top of the steel beam 1, and the base frame 61 extends outward from the steel beam 1 to be provided with a support frame 62, and a welding seat 63 is provided at the end of the support frame 62, and a vertical welding hole 631 is provided on the welding seat 63, and also includes a vertical rod 64 with a diameter smaller than the welding hole 631, and the vertical rod 64 is slidably arranged in the welding hole 631, and the upper end of the vertical rod 64 is threadedly connected with a pre-positioning tube 65, and the pre-positioning tube 65 is supported on the upper side of the welding seat 63, and the lower end of the vertical rod 64 is provided with a fixing part 66, and the fixing part 66 is fixed to the upper side of the middle section of the steel frame beam 3, and the vertical rod 64 penetrates into the lower hanging thick shell 2 and is connected with the steel frame beam 3.

[0035] In this structure, a base frame 61 is provided which is fixedly supported on the top of the steel beam 1. The base frame 61 suspends a vertical rod 64 through a support frame 62. The vertical rod 64 is fixedly connected to the steel beam 3. This connection method provides stable support for the steel beam 3. The downward length of the vertical rod 64 is adjusted by the pre-positioning cylinder 65 to adjust the hanging height of the steel beam 3. When the steel beam 3 and the steel beam 1 are connected, the steel beam 3 is made close to the steel beam 1 by moving the vertical rod 64 upward and fixing the pre-positioning cylinder 65, so as to provide support for the welding of the steel beam 3. This structure can remain in the thick shell as the concrete is poured. The part of the vertical rod 64 extending out of the thick shell is cut to complete the final embedding of the steel beam 3. Before the concrete is poured and solidified, this structure provides installation support and positioning support for the steel beam 3 to replace the suspension equipment and the fixed bracket to avoid the downward movement and deformation of the steel beam 3 during the suspension process.

[0036] In a further solution, Figure 5 and Figure 6 As shown, the fixing portion 66 includes a base 661 fixed to the lower end of the vertical rod 64, and a shaft seat 662 is extended downward from the bottom end of the base 661. A rotating plate 663 is rotatably provided on the shaft seat 662. The rotating shaft of the rotating plate 663 is located in the middle of the rotating plate 663. Two threaded columns 664 are threadedly connected to the base 661. The two threaded columns 664 are respectively against the positions on both sides of the rotating shaft of the rotating plate 663. Clamping blocks 665 with L-shaped cross sections are also slidably provided on both sides of the rotating plate 663. A fixing screw 666 is threadedly connected, and the fixing screw 666 passes through the clamping block 665 and is then threadedly connected to the rotating plate 663. A protruding block 667 is also provided on the top of the clamping block 665, and a tightening screw 668 is threadedly connected to the protruding block 667. When fixing the steel frame beam 3, the tightening screw 668 presses against the top side of the steel frame beam 3, and the clamping block 665 is supported on the bottom and outer side of the steel frame beam 3. By adjusting the two threaded columns 664, the angle of the rotating plate 663 changes, which drives the angle of the steel frame beam 3 to change.

[0037] This structure is used to clamp the steel beam 3 with an I-shaped cross-section. It is clamped and supported on both sides and the bottom of the upper plate of the steel beam 3 by two L-shaped clamping blocks 665, and is clamped on the top side of the steel beam 3 by a tightening screw 668 threadedly connected to the raised block 667. Through multi-party clamping, the fixing part 66 is fixed to the middle section of the upper side of the steel beam 3, and by adjusting the two threaded columns 664, the fixed inclination angle of the rotating plate 663 is changed to fix the inclination angle of the steel beam 3 to a direction parallel to the lower hanging thick shell 2. This fixing part 66 can adjust the position and angle of the suspension of the steel beam 3 to ensure that the steel beam 3 is finally in close contact with the steel pipe and maintained at the required angle and position.

[0038] In a further solution, Figure 4 As shown, a flange ring 67 is provided at the end of the support frame 62, and the welding seat 63 is vertically slidably arranged on the top of the flange ring 67. A plurality of pre-tightening screws 68 are threadedly connected to the flange ring 67, and the pre-tightening screws 68 are pressed upward against the bottom side of the welding seat 63.

[0039] By providing a flange ring 67 for supporting the welding seat 63 and a pre-tightening screw 68 for moving the welding seat 63 upward, a certain pre-tightening force can be provided to the welded steel beam 3 to offset the downward deformation of the steel beam 3 caused by gravity before the concrete solidifies.

[0040] In a further solution, Figure 6 As shown, a plurality of shear nails 31 are distributed and fixed on the outer side of the steel beam 3. By setting the shear nails 31, after the concrete solidifies, the steel beam 3 is tightly connected to the concrete, thereby improving the overall stability of the concrete in the thick shell. Furthermore, shear nails 31 can also be set on the concrete casting surface of the steel beam 1 and the inner side of the thick shell.

[0041] The present invention also discloses a construction method for connecting a large-span steel beam with a thick concrete shell hanging below. The method adopts the above-mentioned large-span steel beam and a thick concrete shell connecting structure, and the steps are as follows:

[0042] S1. Fix the base frame 61 on the steel beam 1. Extend the support frame 62 on the base frame 61, insert the vertical rod 64, and fix it through the pre-positioning tube 65;

[0043] S2, cutting the butt joint surface of one end of the steel frame, and clamping the steel beam 3 by the fixing part 66;

[0044] S3, adjusting the height of the pre-positioning cylinder 65, adjusting the inclination angle of the rotating plate 663 and the position of the steel frame on the fixing part 66, so that the steel frame contacts the butt joint surface of the steel beam 1;

[0045] S4, welding the butt surfaces of the steel beam 1 and the steel frame beam 3 and welding between the welding seat 63 and the vertical rod 64;

[0046] S5, turning the pre-tightening screw to provide an upward pre-tightening force to the steel beam 3;

[0047] S6, sequentially install the support plate 5 and the environmental steel bar, and weld the contact points of the environmental steel bar, the support plate 5 and the steel beam 3;

[0048] S7, install the lower hanging thick shell 2;

[0049] S8, pouring concrete in the thick shell;

[0050] S9. After the concrete solidifies, the vertical rods 64 exposed outside the thick shell are cut, and the remaining auxiliary support parts 6 are disassembled.

[0051] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.

Claims

1. A connection structure between a large-span steel beam and a thick concrete shell hanging below. Features: The invention comprises a plurality of steel beams (3) whose ends are fixed on the outside of a steel beam (1), all of the steel beams (3) are located inside a lower hanging thick shell (2), the plurality of steel beams (3) are arranged in an array, the extension direction of the steel beams (3) is parallel to the lower hanging thick shell (2), and a plurality of annular steel bars (4) are arranged along the extension direction of the lower hanging thick shell (2), the annular steel bars (4) are supported on the inside of the lower hanging thick shell (2), and a support plate (5) is supported and connected between the steel beams (3) and the annular steel bars (4); the lower hanging thick shell (2) is filled with concrete; and an auxiliary support portion (6) is also included, the auxiliary support portion (6) comprising a support plate (5) fixed on the steel beam (1) and a support plate (5) connected between the steel beams (3) and the annular steel bars (4) 1) a bottom frame (61) at the top, the bottom frame (61) extending outwardly from the steel beam (1) and provided with a support frame (62), the end of the support frame (62) being provided with a welding seat (63), the welding seat (63) being provided with a vertical welding hole (631), and also comprising a vertical rod (64), the vertical rod (64) being slidably arranged in the welding hole (631), the upper end of the vertical rod (64) being threadedly connected with a pre-positioning cylinder (65), the lower end of the vertical rod (64) being provided with a fixing portion (66), the fixing portion (66) being fixed to the upper side of the middle section of the steel beam (3), the vertical rod (64) being inserted into the lower hanging thick shell (2) and connected to the steel beam (3).

2. The connection structure of the long-span steel beam and the thick concrete shell hanging below according to claim 1, Features: The fixing portion (66) comprises a base (661) fixed to the lower end of the vertical rod (64); a shaft seat (662) is extended downward from the bottom end of the base (661); a rotating plate (663) is rotatably provided on the shaft seat (662); a rotating shaft of the rotating plate (663) is located in the middle of the rotating plate (663); two threaded columns (664) are threadedly connected to the base (661); the two threaded columns (664) are respectively against the positions on both sides of the rotating shaft of the rotating plate (663); clamping blocks (665) with an L-shaped cross section are also slidably provided on both sides of the rotating plate (663); and the two sides of the rotating plate (663) are respectively threadedly connected to the rotating plate (663). A fixing screw (666) is threadedly connected to the clamping block (665), and the fixing screw (666) passes through the clamping block (665) and is then threadedly connected to the rotating plate (663). A protruding block (667) is also provided at the top of the clamping block (665), and a tightening screw (668) is threadedly connected to the protruding block (667). When the steel frame beam (3) is fixed, the tightening screw (668) is pressed against the top side of the steel frame beam (3), and the clamping block (665) is supported on the bottom side and the outer side of the steel frame beam (3). When the two threaded columns (664) are adjusted, the angle of the rotating plate (663) changes, thereby driving the angle of the steel frame beam (3) to change.

3. The connection structure of the long-span steel beam and the thick concrete shell hanging below according to claim 2, Features: A flange ring (67) is provided at the end of the support frame (62), the welding seat (63) is vertically slidably arranged on the top of the flange ring (67), and a plurality of pre-tightening screws (68) are threadedly connected to the flange ring (67), and the pre-tightening screws (68) are pressed upward against the bottom side of the welding seat (63).

4. The connection structure of the long-span steel beam and the lower-hanging concrete thick shell according to claim 3, Features: A plurality of shear-resistant nails (31) are distributed and fixed on the outer side of the steel beam (3).

5. A construction method for connecting a large-span steel beam with a thick concrete shell hanging below, using a large-span steel beam and a thick concrete shell connection structure as claimed in any one of claims 1 to 4, and the steps are as follows: S1, fixing a base frame (61) on the steel beam (1), extending a support frame (62) on the base frame (61), passing through a vertical rod (64), and fixing it through a pre-positioning cylinder (65); S2, cutting the butt joint surface of one end of the steel frame, and clamping the steel frame beam (3) by the fixing part (66); S3, adjusting the height of the pre-positioning cylinder (65), adjusting the inclination angle of the rotating plate (663) and the position of the steel frame on the fixing portion (66), so that the steel frame contacts the butt joint surface of the steel beam (1); S4, welding the butt joints between the steel beam (1) and the steel frame beam (3) and welding between the welding seat (63) and the vertical rod (64); S5, turning the pre-tightening screw to provide an upward pre-tightening force to the steel beam (3); S6, sequentially installing the support plate (5) and the environmental steel bars, and welding the contact points between the environmental steel bars, the support plate (5) and the steel beam (3); S7, installing the lower hanging thick shell (2); S8, pouring concrete in the thick shell; S9. After the concrete solidifies, the vertical rods (64) exposed outside the thick shell are cut, and the remaining auxiliary support parts (6) are disassembled.