Method and equipment for automatically repairing photovoltaic line

Through automated photovoltaic line repair equipment, backup photovoltaic lines and repair routes are determined based on control terminal information, and automatic repair of photovoltaic lines is achieved, which solves the problem of low safety and efficiency of traditional repair methods, improves repair efficiency and safety, and reduces the energy consumption.

CN118899362AInactive Publication Date: 2024-11-05SHENZHEN DINGYU ELECTRIC TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410803387.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional photovoltaic line repair methods have problems of low safety and efficiency. Manual repair is dangerous and time-consuming. Traditional equipment can only be repaired on a single cable, and the repair task is limited.

Method used

Provide a method and equipment for automatic repair of photovoltaic lines. By receiving repair information sent by the control terminal, a backup photovoltaic lines and repair route are determined, and automated repair is performed using transportation equipment and repair devices to achieve automation, flexible scheduling and precise control.

Benefits of technology

It improves the safety and efficiency of photovoltaic line repair, ensures consistency and standardization of repair quality, shortens fault processing time, enhances the flexibility, reliability and maintainability of the system, and reduces energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899362A_ABST
    Figure CN118899362A_ABST
Patent Text Reader

Abstract

The invention discloses an automatic photovoltaic line repairing method and repairing equipment, and the method comprises the steps: determining a plurality of standby photovoltaic lines by the repairing equipment according to repairing information; determining a repair route according to the first position information and the second position information, and starting to move from a preset point location according to the repair route; a first instruction is sent to transportation equipment to transport the repairing device to a first to-be-repaired point; a second instruction is sent to the repairing device for first repairing operation; a third instruction is sent to the transportation equipment to transport the repairing device to a preset position; moving to a second to-be-repaired point according to the repairing route; a fourth instruction is sent to the transportation equipment so that the repairing device can be transported to the second to-be-repaired point; a fifth instruction is sent to the repairing device for second repairing operation; and a sixth instruction is sent to the transportation equipment, so that the repairing device is transported to the preset position and returns to the preset point position. Automation of photovoltaic line repairing is achieved, and safety and efficiency of photovoltaic line repairing are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of high-end equipment manufacturing, and in particular relates to a method and equipment for automated repair of photovoltaic lines. Background Art

[0002] As an important part of the solar photovoltaic system, the development trend of photovoltaic cable technology and products closely follows the innovation pace of the entire photovoltaic industry. As the demand for renewable energy continues to grow, the technology of photovoltaic cables will continue to advance to meet the needs of the global market. At the same time, it is inseparable from the detection and repair of photovoltaic cables. Photovoltaic cable (usually refers to solar photovoltaic cable) repair refers to the detection, maintenance and repair of cables in solar photovoltaic systems to ensure the reliability and efficiency of power transmission.

[0003] Generally, there are two repair methods. One is to perform repairs manually after detecting the point to be repaired. This method is dangerous for the repair personnel and takes too long. The other is to repair through repair equipment that can move on the photovoltaic line. This equipment is equipped with pulleys and can move on the photovoltaic line. It also includes some repair devices that can simply repair the photovoltaic line.

[0004] However, the above two methods have some defects. Since the photovoltaic line is a cable with a very large span, the traditional repair methods and repair equipment have certain limitations and are difficult to repair flexibly. If manual repair is used, the safety of the repair personnel will be reduced; if repair equipment is used, it can only repair on a single cable, and the amount of repair tasks that can be completed is limited, which reduces the efficiency of photovoltaic line repair. Therefore, the traditional repair method has the problems of low safety and efficiency. Summary of the invention

[0005] The present application provides a photovoltaic line automated repair method and repair equipment, which are used to realize the automation of photovoltaic line repair and improve the safety and efficiency of photovoltaic line repair.

[0006] In a first aspect, the present application provides a method for automated repair of a photovoltaic line, wherein a repair device determines a number of spare photovoltaic lines according to the repair information when it is determined that repair information sent by a control terminal is received, the repair information including first position information corresponding to a first point to be repaired and a second point to be repaired, a first photovoltaic line type, a first repair type, second position information, a second photovoltaic line type, and a second repair type, and the number of spare photovoltaic lines include a first spare photovoltaic line and a second spare photovoltaic line corresponding to the first photovoltaic line type and the second photovoltaic line type; The repair device determines a repair route according to the first position information and the second position information, and starts moving from a preset point according to the repair route; When the repair device determines that it has arrived at the first point to be repaired, the repair device sends a first instruction to the transportation device so that the transportation device transports the repair device to the first point to be repaired, and both the transportation device and the repair device are installed on the repair device; The repair device sends a second instruction to the repair device so that the repair device performs a first repair operation on the photovoltaic line at the first to-be-repaired point according to the first repair type, and the repair device includes a first spare photovoltaic line; After determining that the first repair operation is completed, the repair device sends a third instruction to the transportation device to enable the transportation device to transport the repair device to a preset position, where the preset position is on the repair device; After determining that the transport equipment and the transport device have arrived at the preset position, the repair equipment moves to the second point to be repaired according to the repair route; The repair device sends a fourth instruction to the transport device so that the transport device transports the repair device to the second point to be repaired; The repair device sends a fifth instruction to the repair device so that the repair device performs a second repair operation on the photovoltaic line at the second to-be-repaired point according to the second repair type, and the repair device includes a second spare photovoltaic line; After determining that the second repair operation is completed, the repair device sends a sixth instruction to the transportation device to enable the transportation device to transport the repair device to a preset position and return to the preset point.

[0007] By adopting the above technical solution, the repair equipment first receives the repair information sent by the control terminal, which includes key elements such as the location of the point to be repaired, the type of photovoltaic line, and the type of repair. Based on this information, the repair equipment can accurately determine the required spare photovoltaic line and plan the optimal repair route. During the movement, the repair equipment can flexibly dispatch transportation equipment and repair devices according to actual conditions to complete material transportation and fault repair. At the same time, since the selection and repair operations of spare photovoltaic lines are completed autonomously by the equipment, the consistency and standardization of the repair quality can be ensured, avoiding dangerous incidents caused by manual repair. In addition, the automation of the entire process has also greatly improved the repair efficiency, shortened the fault handling time, realized the automation of photovoltaic line repair, and improved the safety and efficiency of photovoltaic line repair.

[0008] In combination with some embodiments of the first aspect, in some embodiments, the repair device determines a repair route according to all the first position information and the second position information, and moves from a preset point according to the repair route, specifically including: The repair device obtains map information within a preset range, where the preset range is a circular area with a line connecting the first position information and the second position information as a diameter; The repair device determines several optional routes based on the map information; The repairing device determines the optional route with the shortest distance among several optional routes as the repairing route, and starts to move from a preset point according to the repairing route.

[0009] By adopting the above technical solutions, photovoltaic power stations are usually distributed in a large area, and the distances and road conditions between different points to be repaired vary greatly. The reasonable planning of the repair route is directly related to the repair efficiency and cost. The circular area connecting the points to be repaired is used as the boundary condition for route search. After obtaining the map information in the area, several optional routes are obtained through algorithm analysis, and the optimal route with the shortest distance is selected from them. While avoiding traversing the entire map, the optimal route in the local area can also be found, which improves the efficiency of photovoltaic line repair.

[0010] In combination with some embodiments of the first aspect, in some embodiments, when the repair device determines that it has arrived at the first point to be repaired, the repair device sends a first instruction to the transportation device so that the transportation device transports the repair device to the first point to be repaired, which specifically includes: When the repair device determines that it has arrived at the first point to be repaired, the first lock is unlocked, and the first lock is a structure for connecting the repair device to the transportation device; The repair device sends a first instruction to the transport device, so that the transport device connects to the repair device according to the initial instruction, and the first instruction includes the initial instruction and the transport instruction; After confirming that the transport device is connected to the repair device, the repair equipment unlocks the second lock to allow the transport device to transport the repair device to the first repair point according to the transport instruction. The second lock is a structure for connecting the repair equipment to the repair device.

[0011] By adopting the above technical solution, setting two lock structures and three interlocking instructions, the repair equipment can achieve precise control of the transportation equipment and the repair device. First, the repair equipment flexibly unlocks and locks the two locks according to the location of different points to be repaired. Secondly, the initial instructions, transportation instructions and repair instructions ensure the strictness of the action connection of the transportation equipment, avoiding conflicts and omissions. While improving work efficiency and accuracy, it also enhances the flexibility, reliability and maintainability of the system, providing a strong guarantee for the long-term stable operation of the photovoltaic power station.

[0012] In combination with some embodiments of the first aspect, in some embodiments, after the repair device determines that the transport device is connected to the repair device, unlocks the second lock to allow the transport device to transport the repair device to the first point to be repaired according to the transport instruction, the method further includes: The repair equipment determines the remaining power of the transport equipment; When determining that the remaining power is not greater than the preset power, the repair device sends a seventh instruction to the transport device to make the transport device return to the preset position; After determining that the transport device has arrived at the preset position, the repair device locks the first lock; The repair device turns on the discharge mode to charge the transport device.

[0013] By adopting the above technical solutions, the energy management mechanism of transportation equipment is improved. In practical applications, the endurance of transportation equipment directly affects the completion efficiency and success rate of repair tasks. Once the transportation equipment runs out of energy during the repair process, it will not only delay the progress of the repair, but also cause the equipment to be stranded outside, posing a safety hazard. By real-time monitoring of the remaining power of the transportation equipment and setting a preset power threshold, it can be recalled to the repair equipment for charging in time when the power is insufficient, thereby ensuring the normal operation of the transportation equipment to the maximum extent. The active energy replenishment method also avoids the blind operation of the transportation equipment at low power, effectively extending its service life. The charging position of the transportation equipment is set on the repair equipment, and the repair equipment is used to power it, which improves the charging efficiency and saves the energy storage space and cost of the transportation equipment itself. In addition, centralized energy supply is also conducive to the unified scheduling and optimization of the energy consumption of the transportation equipment by the repair equipment, while ensuring the repair efficiency and reducing the overall energy consumption.

[0014] In combination with some embodiments of the first aspect, in some embodiments, after the repair device starts the discharge mode to charge the transportation device, the method further includes: When determining that the remaining power is greater than the preset power, the repair device sends an eighth instruction to the transportation device to stop the transportation device.

[0015] By adopting the above technical solutions, during the automated repair process, the power supply stability of the transport equipment is one of the key factors to ensure the efficient completion of the task. When the remaining power of the transport equipment is higher than the preset threshold, the repair equipment sends a stop command to avoid energy waste and equipment loss, thereby maximizing the energy utilization of the equipment while meeting the repair task.

[0016] In combination with some embodiments of the first aspect, in some embodiments, after determining that the first repair operation is completed, the repair device sends a third instruction to the transportation device to enable the transportation device to transport the repair device to a preset position, specifically including: After determining that the first repair operation is completed, the repair device sends a ninth instruction to the transportation device to start the transportation device to operate; The repairing device sends a third instruction to the transporting device so that the transporting device transports the repairing device to a preset position.

[0017] By adopting the above technical solution, after the repair device completes the repair of the first repair point, it needs to return to the repair equipment in time to prepare for the next repair task. First, the repair device wakes up the transport equipment in standby state by sending a start instruction to ensure that it enters the working state and prepares for the subsequent transportation task. Secondly, the sending of the transportation instruction further clarifies the specific actions of the transport equipment, ensuring that the repair device can return to the repair equipment safely and accurately according to the preset path.

[0018] In combination with some embodiments of the first aspect, in some embodiments, after determining that the transport equipment and the transport device have arrived at the preset position, the repair equipment moves to the second point to be repaired according to the repair route, specifically including: After the repair device determines that the transport device and the transport device have arrived at the preset position, the second lock is locked; The repair device turns on the charging mode to charge the repair device; The repair equipment moves to the second repair point according to the repair route.

[0019] By adopting the above technical solution, after the repair device and the transport equipment return to the repair equipment, they need to restore their status and replenish energy in time to ensure the normal implementation of subsequent repair tasks. The locking mechanism and the charging mechanism form a set of efficient and reliable equipment maintenance solutions. First, by locking the second lock, the repair equipment and the transport equipment form a stable physical connection, ensuring the safety of the equipment during movement, and also facilitating the repair equipment to centrally control and monitor the status of the two sub-devices. Secondly, using the time window during the movement, the repair equipment can also replenish the energy of the repair device to ensure that it has sufficient energy reserves when performing the next repair task. The energy consumption of each sub-device is balanced and optimized, and the energy utilization rate is improved without affecting the repair efficiency.

[0020] In a second aspect, an embodiment of the present application provides a repair device for automatically repairing photovoltaic lines, the repair device comprising: one or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code comprises computer instructions, and one or more processors call the computer instructions to enable the repair device to execute the method described in the first aspect and any possible implementation method of the first aspect.

[0021] In a third aspect, an embodiment of the present application provides a computer-readable storage medium, comprising instructions, which, when executed on a repair device, enable the repair device to execute the method described in the first aspect and any possible implementation of the first aspect.

[0022] In a fourth aspect, an embodiment of the present application provides a computer program product, characterized in that when the computer program product is run on a repair device, the repair device executes the method described in any possible implementation manner in the first aspect.

[0023] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. The present application provides a method for automated repair of photovoltaic lines. The repair equipment first receives the repair information sent by the control terminal. The information includes key elements such as the location of the point to be repaired, the type of photovoltaic line, and the type of repair. Based on this information, the repair equipment can accurately determine the required spare photovoltaic lines and plan the optimal repair route. During the movement, the repair equipment can flexibly dispatch transportation equipment and repair devices according to actual conditions to complete material transportation and fault repair. At the same time, since the selection and repair operations of spare photovoltaic lines are completed autonomously by the equipment, the consistency and standardization of the repair quality can be ensured, avoiding dangerous incidents caused by manual repairs. In addition, the automation of the entire process also greatly improves the repair efficiency, shortens the fault handling time, realizes the automation of photovoltaic line repair, and improves the safety and efficiency of photovoltaic line repair.

[0024] 2. The present application provides a method for automated repair of photovoltaic lines, which sets two locking structures and three interlocking instructions to achieve precise control of the repair equipment over the transportation equipment and the repair device. First, the repair equipment flexibly unlocks and locks the two locks according to the locations of different points to be repaired. Secondly, the initial instructions, transportation instructions, and repair instructions ensure the tightness of the movement connection of the transportation equipment, avoiding conflicts and omissions. While improving work efficiency and accuracy, it also enhances the flexibility, reliability, and maintainability of the system, providing a strong guarantee for the long-term stable operation of photovoltaic power stations.

[0025] 3. The present application provides a method for automated repair of photovoltaic lines, which improves the energy management mechanism of transportation equipment. In practical applications, the endurance of transportation equipment directly affects the completion efficiency and success rate of repair tasks. Once the transportation equipment runs out of energy during the repair process, it will not only delay the repair progress, but may also cause the equipment to be stranded outside, posing a safety hazard. By real-time monitoring of the remaining power of the transportation equipment and setting a preset power threshold, it can be recalled to the repair equipment for charging in time when the power is insufficient, thereby ensuring the normal operation of the transportation equipment to the greatest extent. The active energy replenishment method also avoids the transportation equipment from blindly working at low power, effectively extending its service life. The charging position of the transportation equipment is set on the repair equipment, and the repair equipment is used to power it, which improves the charging efficiency and saves the energy storage space and cost of the transportation equipment itself. In addition, centralized energy supply is also conducive to the unified scheduling and optimization of the energy consumption of the transportation equipment by the repair equipment, while ensuring the repair efficiency and reducing the overall energy consumption. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a flow chart of a method for automated repair of photovoltaic lines in an embodiment of the present application; Figure 2This is another flow chart of a method for automated repair of photovoltaic lines in an embodiment of the present application; Figure 3 It is a schematic diagram of the physical device structure of a repair device for automated repair of photovoltaic lines in an embodiment of the present application. DETAILED DESCRIPTION

[0027] The terms used in the following embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to be used as limitations to the present application. As used in the specification and appended claims of the present application, the singular expressions "one", "a kind of", "said", "above", "the" and "this" are intended to also include plural expressions, unless there is a clear indication to the contrary in the context. It should also be understood that the term "and / or" used in the present application refers to any or all possible combinations comprising one or more listed items.

[0028] In the following, the terms "first" and "second" are used for descriptive purposes only and are not to be understood as suggesting or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features, and in the description of the embodiments of the present application, unless otherwise specified, "plurality" means two or more.

[0029] The following describes an application scenario of this application: In a large photovoltaic power station, thousands of photovoltaic modules are connected into a huge array, and the electricity is collected and transmitted to the substation through photovoltaic lines. These photovoltaic lines are several kilometers long, passing through rugged mountains, dense jungles and vast deserts. However, due to harsh environmental conditions and long-term outdoor exposure, photovoltaic lines are inevitably prone to various faults and losses, such as damaged insulation, loose joints, broken wires, etc. If these problems are not discovered and repaired in time, not only will the power transmission efficiency be reduced, but it may also cause serious safety accidents such as fire and electric shock.

[0030] Traditional manual inspection and repair methods are not up to the task when facing such a large-scale photovoltaic line network. Maintenance personnel need to walk through rugged terrain, which takes a lot of time and energy to reach the fault point for inspection and repair. Working in extreme weather such as hot, cold, and windy weather also poses great challenges to the health and life safety of maintenance personnel. Even if the repair equipment can move and operate on a single photovoltaic line, it still needs to be frequently installed, disassembled, and transferred when facing complex lines, which is inefficient. More importantly, these devices cannot be remotely controlled and monitored in real time, and maintenance personnel still need to operate manually on site, making it difficult to completely get rid of the threat of dangerous environments. Or repairs can be carried out through repair equipment that can move on photovoltaic lines. This equipment is equipped with pulleys and can move on photovoltaic lines. It also includes some repair devices that can simply repair photovoltaic lines. Since photovoltaic lines are a very long span of cables, traditional repair methods and repair equipment have certain limitations and are difficult to repair flexibly. If manual repair is used, the safety of the repair personnel will be reduced; if repair equipment is used, it can only be repaired on a single cable, and the amount of repair tasks that can be completed is limited, which reduces the efficiency of photovoltaic line repair. Therefore, the traditional repair method has the problems of low safety and efficiency.

[0031] The present application provides a method and equipment for automated repair of photovoltaic lines, which realizes the automation of photovoltaic line repair and improves the safety and efficiency of photovoltaic line repair. Figure 1 , a method for automatic repair of photovoltaic lines in an embodiment of the present application is described: See also Figure 1 , which is a flow chart of a method for automated repair of photovoltaic lines in an embodiment of the present application.

[0032] S101, when the repair device determines that the repair information sent by the control terminal is received, the repair device determines a number of spare photovoltaic lines according to the repair information; The repair device is installed with a repair device and a transport device. The function of the transport device is to transport the repair device to a designated location, and then transport the repair device to the repair device after the repair device completes the repair. The repair device is a carrier that carries the repair device and the transport device. It has a certain transportation function and can also supply power to the repair device and the transport device. When the repair device determines that it has received the repair information sent by the control terminal, it determines a number of spare photovoltaic lines according to the repair information. The repair information includes the first position information corresponding to the first point to be repaired and the second point to be repaired, the first photovoltaic line type, the first repair type, the second position information, the second photovoltaic line type, and the second repair type. The several spare photovoltaic lines include the first spare photovoltaic line and the second spare photovoltaic line corresponding to the first photovoltaic line type and the second photovoltaic line type. The first spare photovoltaic line and the second spare photovoltaic line are wires used to repair photovoltaic lines. The first spare photovoltaic line and the second spare photovoltaic line are determined according to the first photovoltaic line type and the second photovoltaic line type.

[0033] The repair equipment first confirms that it has received the repair information from the control terminal. The repair information is the key to guiding the entire repair process, which includes the specific location of the repair point (such as GPS coordinates), the model and specifications of the damaged photovoltaic line, the type of repair required, and many other parameters. Taking a photovoltaic power station as an example, the first repair point is located at 120°12'34.56" east longitude and 30°12'34.56" north latitude. The damaged photovoltaic line is the YJV22-350mm² model, and the joint needs to be re-fixed; the second repair point is located at 120°18'22.44" east longitude and 30°15'45.18" north latitude. The damaged photovoltaic line is the ZR-YJV32-470mm² model, and a 2-meter-long cable needs to be replaced. Based on this information, the repair equipment automatically matches the corresponding model and quantity of spare photovoltaic lines, such as one YJV22-350mm² cable and one ZR-YJV32-470mm² cable, and loads them onto the repair device to prepare for subsequent repair operations. By accurately identifying the location of the repair point and the required materials, the repair equipment realizes the intelligent scheduling of repair resources and improves the efficiency and accuracy of repair.

[0034] S102, the repair device determines a repair route according to the first position information and the second position information, and starts moving from a preset point according to the repair route; After everything is ready, the repair device determines a repair route according to the first position information and the second position information, and starts to move from a preset point according to the repair route. The preset point is the starting point for the repair device to start moving. Specifically, the repair device obtains map information within a preset range. The preset range is a circular area with a connecting line of the first position information and the second position information as a diameter. The repair device determines several optional routes based on the map information; The repairing device determines the optional route with the shortest distance among several optional routes as the repairing route, and starts to move from a preset point according to the repairing route.

[0035] After determining the repair task and the required resources, the repair equipment begins to plan the route. It first obtains map information within the circular area with the line connecting the two points to be repaired as the diameter, including terrain, obstacles, roads and other data. For example, if a repair task for a photovoltaic power station in a mountainous area is obtained, the circular area contains multiple geographical elements such as mountains, woods, roads and photovoltaic arrays. Based on this information, the repair equipment automatically generates several optional routes, each of which strives to reach the two repair points within the shortest distance. For example, Route A is 1.2km long and passes through the No. 1 maintenance road and the photovoltaic branch road; Route B is 1.5km long and passes through the No. 2 maintenance road and the main road; Route C is 1.1km long and passes through the photovoltaic array and the woods. After comparing the distance, passability and other factors of each route through an intelligent algorithm, the repair equipment selects the optimal route C as the final repair route. At the same time, the repair equipment will also consider its own maneuverability and adopt adaptive movement strategies in narrow and rugged sections, such as using a crawler walking mechanism and automatically adjusting the chassis height to ensure the passability and stability of the entire process. After the route is selected, the repair equipment starts from a preset starting point (such as a parking warehouse).

[0036] S103, when the repair device determines that it has arrived at the first point to be repaired, the repair device sends a first instruction to the transportation device so that the transportation device transports the repair device to the first point to be repaired; When determining that the repair device has arrived at the first point to be repaired, the repair device sends a first instruction to the transportation device so that the transportation device transports the repair device to the first point to be repaired.

[0037] For example, the repair equipment uses high-precision positioning systems, such as RTK-GPS or visual SLAM, to confirm the relative relationship between its own position and the point to be repaired in real time. Once the distance between the two is less than the preset threshold (such as 1 meter), it is considered that the repair equipment has arrived at the target point. Taking the actual repair task of a photovoltaic power station as an example, the repair equipment identifies the features of the first point to be repaired (such as the broken line Tower01) through visual positioning, and continues to approach the point until the distance between the two is less than 0.5 meters. After confirming the arrival, the repair equipment sends the first instruction to the transportation equipment, such as "StartDelivery, Location: Tower01, Distance: 1.5m", instructing the transportation equipment to accurately deliver the repair device to the designated location. The transportation equipment can use a variety of methods such as tracks and slings to safely and efficiently transfer the repair device from the repair equipment to the vicinity of the point to be repaired. For example, a 10-meter telescopic sling is used to vertically lower a 200kg repair tool kit to the foot of the faulty tower.

[0038] S104, the repair equipment sends a second instruction to the repair device so that the repair device performs a first repair operation on the photovoltaic line at the first point to be repaired according to the first repair type; When the repair equipment determines that the repair device has arrived at the first point to be repaired, it sends a second instruction to the repair device to enable the repair device to perform a first repair operation on the photovoltaic line at the first point to be repaired according to the first repair type. At this time, the repair device contains a first spare photovoltaic line for repairing the first point to be repaired.

[0039] After the repair device successfully arrives at the first repair point, the repair equipment immediately sends a second instruction to it to start the specific repair operation. This instruction carries a wealth of repair parameters, such as "StartRepair, Type: Joint, Material: YJV22-350mm², Length: 0.2m", which clearly instructs the repair device to re-fix the joint, using a spare cable of the YJV22-350mm² model with an operation length of 0.2 meters. Based on these parameters, the repair device automatically selects the corresponding tools and materials, such as hydraulic crimping pliers, waterproof insulating tape, etc., and carries out repairs according to the optimal operation process. Taking the loosening of the photovoltaic line joint as an example, the repair device first uses a robotic arm to clamp and fix the photovoltaic line, then uses a cutting tool to remove the damaged joint and cable, and then uses a crimping pliers to reliably connect the new joint and cable, and finally uses insulating tape for waterproof sealing. The entire process is highly automated, the operation accuracy can reach 0.1mm, and the repair quality is reliably guaranteed.

[0040] S105. After determining that the first repair operation is completed, the repair device sends a third instruction to the transportation device to enable the transportation device to transport the repair device to a preset location; After determining that the first repair operation is completed, the repair device sends a third instruction to the transportation device to enable the transportation device to transport the repair device to a preset position, where the preset position is on the repair device. Specifically: after determining that the first repair operation is completed, the repair device sends a ninth instruction to the transportation device to enable the transportation device to start operation; The repairing device sends a third instruction to the transporting device so that the transporting device transports the repairing device to a preset position.

[0041] After completing the repair work at the first repair point, the repair equipment needs to recover the repair device in time to prepare for the transfer to the next repair point. At this time, the repair equipment sends a third instruction to the transportation equipment, such as "FinishDelivery, Location: Tower01, Target: Vehicle01", instructing the transportation equipment to transport the repair device from the repair point back to the preset position on the repair equipment. For example, the transportation equipment uses a sling to lift the repair tool kit from the bottom of the tower to the 2-meter-high repair equipment compartment, and fixes it at the A-2 position of the tool storage rack. During the recovery process, the transportation equipment needs to operate smoothly to avoid collisions between the repair device and the tower, cables, etc., while also ensuring its own movement stability and safety.

[0042] S106, after determining that the transport equipment and the transport device have arrived at the preset position, the repair equipment moves to the second point to be repaired according to the repair route; When the repair device and transport equipment safely return to the preset position on the repair device, the repair device can set off to the second repair point. During the journey, the repair device strictly follows the previously planned optimal route, such as Route C that crosses the photovoltaic array and the woods, and uses its own flexibility to smoothly and efficiently pass through various complex terrains.

[0043] S107, the repair device sends a fourth instruction to the transportation device so that the transportation device transports the repair device to the second point to be repaired; When the repair equipment arrives at the second repair point, a new round of repair work begins. Similar to the first repair point, the repair equipment first confirms the relative relationship between its own position and the repair point through precise positioning. If the distance between the two is less than 0.8 meters, it is considered to have reached the target area. Then, the repair equipment sends the fourth instruction to the transportation equipment, such as "StartDelivery, Location: ZR-YJV32-470mm², Distance: 1.2m", instructing the transportation equipment to accurately deliver the repair device carrying the second spare cable to the designated location. For example, the transportation equipment uses a telescopic robotic arm to smoothly extend the repair tool kit equipped with the ZR-YJV32-470mm² cable along the guide rail to a height of 1.2 meters above the ground, and facilitate the repair device to start operation.

[0044] S108, the repairing device sends a fifth instruction to the repairing apparatus so that the repairing apparatus performs a second repair operation on the photovoltaic line at the second point to be repaired according to the second repair type; When the repair equipment determines that the repair device has arrived at the second point to be repaired, it sends a fifth instruction to the repair device to enable the repair device to perform a second repair operation on the photovoltaic line at the second point to be repaired according to the second repair type. At this time, the repair device contains a second spare photovoltaic line for repairing the second point to be repaired.

[0045] This step is similar to step S104 and will not be described in detail here.

[0046] S109. After determining that the second repair operation is completed, the repair device sends a sixth instruction to the transportation device to enable the transportation device to transport the repair device to a preset position and return to the preset point.

[0047] This step is similar to step S105. The repair device can return along the original repair route or set a new route, which is not limited here.

[0048] The above embodiments have the following beneficial effects: The repair equipment first receives the repair information sent by the control terminal, which includes key elements such as the location of the point to be repaired, the type of photovoltaic line, and the type of repair. Based on this information, the repair equipment can accurately determine the required spare photovoltaic line and plan the optimal repair route. During the movement, the repair equipment can flexibly dispatch transportation equipment and repair devices according to actual conditions to complete material transportation and fault repair. At the same time, since the selection and repair operations of spare photovoltaic lines are completed autonomously by the equipment, the consistency and standardization of the repair quality can be ensured, avoiding dangerous incidents caused by manual repair. In addition, the automation of the entire process has greatly improved the repair efficiency, shortened the fault handling time, realized the automation of photovoltaic line repair, and improved the safety and efficiency of photovoltaic line repair.

[0049] Photovoltaic power stations are usually distributed over a large area. The distances and road conditions between different repair points vary greatly. The reasonable planning of repair routes is directly related to the repair efficiency and cost. The circular area connecting the repair points is used as the boundary condition for route search. After obtaining the map information in the area, several optional routes are obtained through algorithm analysis, and the shortest optimal route is selected from them. While avoiding traversing the entire map, the optimal route in the local area can also be found, which improves the efficiency of photovoltaic line repair.

[0050] After returning to the repair equipment, the repair device and the transport equipment need to be restored to their status and replenished with energy in a timely manner to ensure the normal implementation of subsequent repair tasks. The locking mechanism and the charging mechanism form an efficient and reliable equipment maintenance solution. First, by locking the second lock, the repair equipment and the transport equipment form a stable physical connection, ensuring the safety of the equipment during movement, and also facilitating the repair equipment to centrally control and monitor the status of the two sub-devices. Secondly, using the time window during the movement, the repair equipment can also replenish the energy of the repair device to ensure that it has sufficient energy reserves when performing the next repair task. The energy consumption of each sub-device is balanced and optimized, and the energy utilization rate is improved without affecting the repair efficiency.

[0051] After the repair device completes the repair of the first repair point, it needs to return to the repair equipment in time to prepare for the next repair task. First, the repair device wakes up the transport equipment in standby mode by sending a start command to ensure that it enters the working state and prepares for the subsequent transportation task. Secondly, the sending of the transportation command further clarifies the specific actions of the transport equipment, ensuring that the repair device can return to the repair equipment safely and accurately according to the preset path.

[0052] In the above embodiment, the locking structure is described, and its main function is to fix the repair device and other devices. After the repair device returns to the preset position, it may need to be recharged. Figure 2 , the processing method after the repair is completed in the embodiment of the present application is described: See also Figure 2 , is another flow chart of a method for automated repair of photovoltaic lines in an embodiment of the present application.

[0053] S201, when the repair device determines that it has reached the first point to be repaired, unlocking the first lock; When the repairing device determines that it has arrived at the first point to be repaired, it unlocks the first lock, which is a structure for connecting the repairing device to the transportation device.

[0054] When the repair equipment successfully arrives at the first repair point, it needs to work with the transport equipment and the repair device. First, the repair equipment unlocks the first lock connected to the transport equipment to create conditions for the movement and delivery of the transport equipment. The first lock adopts an electromagnetic adsorption design with a locking force of up to 1000N. It usually firmly connects the repair equipment and the transport equipment to ensure that both are stable and reliable; when unlocking, it only needs to apply a reverse current to the electromagnet to quickly disengage within 0.5 seconds for easy separation. Taking the actual repair task of a photovoltaic power station as an example, when the GPS positioning of the repair equipment shows that it has reached the first repair point at 120°12'34.56" east longitude and 30°12'34.56" north latitude, the repair equipment automatically cuts off the electromagnetic adsorption circuit of the first lock and sets the status bit of the lock to "Open" to complete reliable unlocking. The unlocked transport equipment can move flexibly within a radius of 2 meters to prepare for the next docking operation.

[0055] The specific form of the lock may be a physical lock or an electromagnetic adsorption lock, etc., which is not limited here.

[0056] S202, the repair device sends a first instruction to the transport device, so that the transport device connects to the repair device according to the initial instruction; The repair device sends a first instruction to the transportation device, so that the transportation device connects to the repair device according to the initial instruction. The first instruction includes the initial instruction and the transportation instruction.

[0057] After unlocking the first lock, the repair device controls the transport device to dock with the repair device. It sends the first instruction to the transport device through wireless communication to pass the various parameters of the docking operation. The first instruction is encapsulated in JSON format and includes two parts: the initial instruction defines the starting conditions for docking, such as the initial position of the repair device, the starting coordinates of the transport device, etc.; the transport instruction defines the motion parameters of the docking process, such as the motion speed, acceleration, deceleration, etc. of the transport device. For example, the initial instruction defines that the repair device is initially located 1.5 meters in front of the repair device, 0.8 meters to the right, and facing 45°, and the transport device is initially located 1.2 meters in front of the repair device and 0.5 meters to the right; the transport instruction defines that the transport device moves at a speed of 0.2m / s, an acceleration of 0.05m / s², and a deceleration of 0.08m / s². Based on these parameters, the transport device automatically plans an optimal path from the starting point to the repair device, and accurately controls its own motion state, ultimately achieving fast and smooth docking with the repair device, with a docking accuracy better than ±1cm.

[0058] S203, after determining that the transport device is connected to the repair device, the repair device unlocks the second lock to allow the transport device to transport the repair device to the first point to be repaired according to the transport instruction; After confirming that the transport device is connected to the repair device, the repair equipment unlocks the second lock to allow the transport device to transport the repair device to the first repair point according to the transport instruction. The second lock is a structure for connecting the repair equipment to the repair device.

[0059] After the repair device is successfully loaded onto the transport equipment, the transport equipment can start and deliver it accurately to the fault point. To ensure that the repair device can be smoothly detached from the repair device, the second lock needs to be unlocked in time. The second lock uses an electric-controlled locking mechanism similar to the first lock, which can be automatically locked and released under the control of the repair equipment. For example, when the repair equipment confirms that the transport equipment has been reliably connected to the repair device and the locking force reaches the standard value, it sends an unlocking command to the second lock "Release the B-type bolt, opening angle 90°, feedback threshold 2mm". After the second lock receives the command, the internal electric bolt quickly withdraws and completely detaches from the lock body within 0.2 seconds. At the same time, the matching displacement sensor detects the opening degree in real time to ensure that the 90° indicator is reached. With the help of this microsecond-level response actuator and highly sensitive sensor, the second lock can be unlocked in an orderly manner within hundreds of milliseconds, accurately releasing the repair device from the repair equipment, clearing the way for subsequent fixed-point delivery. The second lock can also have an overload protection function. When it detects that the pin is stuck or external force is interfering, it will activate the emergency release mechanism, such as a pneumatic push rod, to force unlocking within 50 milliseconds, effectively avoiding accidents such as damage to the lock or blockage of the repair device.

[0060] S204: When the repair device determines that the remaining power is not greater than the preset power, the repair device sends a seventh instruction to the transport device to return the transport device to the preset position; As the repair operation continues, the power of the transport device itself is also continuously consumed. When the repair device detects that the remaining power of the transport device drops to a preset threshold, such as below 30%, the seventh instruction is sent to the transport device to return the transport device to the preset position.

[0061] S205, after determining that the transport device has arrived at the preset position, the repair device locks the first lock buckle, and the repair device starts the discharge mode to charge the transport device; When the transport equipment returns safely to the docking point, the transport equipment needs to be charged as soon as possible. At this time, the repair equipment will control the first lock to re-lock and reliably fix the transport equipment on its own body. For example, when the position sensor of the repair equipment detects that the relative distance between the transport equipment and itself is less than 5cm and the angle deviation is less than 1°, it is considered that the docking is in place, and a locking instruction is sent to the first lock "Extend the A-type bolt, screw in to a depth of 5cm, and the locking torque is 100N·m". The lock actuator presses the bolt into the lock hole within 0.5 seconds and automatically adjusts the locking force to 100N·m. After locking is completed, the repair equipment immediately starts the charging mode.

[0062] S206: When determining that the remaining power is greater than the preset power, the repair device sends an eighth instruction to the transportation device to stop the transportation device.

[0063] If the repair device determines that the remaining power is greater than the preset power, it sends the eighth instruction to the transportation device to stop the transportation device. This can effectively reduce the energy consumption of the transportation device and ensure that the transportation device can transport the repair device to the preset location.

[0064] The above embodiments have the following beneficial effects: Two lock structures and three interlocking instructions are set up to achieve precise control of the transport equipment and the repair device by the repair equipment. First, the repair equipment flexibly unlocks and locks the two locks according to the location of different points to be repaired. Secondly, the initial instructions, transportation instructions and repair instructions ensure the strictness of the action connection of the transport equipment, avoiding conflicts and omissions. While improving work efficiency and accuracy, it also enhances the flexibility, reliability and maintainability of the system, providing a strong guarantee for the long-term stable operation of the photovoltaic power station.

[0065] Improved the energy management mechanism of transportation equipment. In practical applications, the endurance of transportation equipment directly affects the completion efficiency and success rate of repair tasks. Once the transportation equipment runs out of energy during the repair process, it will not only delay the progress of the repair, but also cause the equipment to be stranded outside, posing a safety hazard. By real-time monitoring of the remaining power of the transportation equipment and setting a preset power threshold, it can be recalled to the repair equipment for charging in time when the power is insufficient, thereby ensuring the normal operation of the transportation equipment to the greatest extent. The active energy replenishment method also avoids the blind operation of the transportation equipment at low power, effectively extending its service life. The charging position of the transportation equipment is set on the repair equipment, and the repair equipment is used to power it, which improves the charging efficiency and saves the energy storage space and cost of the transportation equipment itself. In addition, centralized energy supply is also conducive to the unified scheduling and optimization of the energy consumption of the transportation equipment by the repair equipment, while ensuring the repair efficiency and reducing the overall energy consumption.

[0066] During the automated repair process, the power supply stability of the transport equipment is one of the key factors to ensure the efficient completion of the task. When the remaining power of the transport equipment is higher than the preset threshold, the repair equipment sends a stop command to avoid energy waste and equipment loss, thereby maximizing the energy utilization of the equipment while meeting the repair task.

[0067] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

[0068] As used in the above embodiments, the term "when..." may be interpreted to mean "if..." or "after..." or "in response to determining..." or "in response to detecting...", depending on the context. Similarly, the phrases "upon determining..." or "if (the stated condition or event) is detected" may be interpreted to mean "if determining..." or "in response to determining..." or "upon detecting (the stated condition or event)" or "in response to detecting (the stated condition or event)", depending on the context.

[0069] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented using software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions. When the computer program instructions are loaded and executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions may be transmitted from a website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., coaxial cable, optical fiber, digital subscriber line) or wireless (e.g., infrared, wireless, microwave, etc.) means. The computer-readable storage medium may be any available medium that a computer can access or a data storage device such as a server or data center that includes one or more available media integrated. The available medium may be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium (e.g., a solid-state hard disk), etc.

[0070] Those skilled in the art can understand that to implement all or part of the processes in the above-mentioned embodiments, the processes can be completed by computer programs to instruct related hardware, and the programs can be stored in computer-readable storage media. When the programs are executed, they can include the processes of the above-mentioned method embodiments. The aforementioned storage media include: ROM or random access memory RAM, magnetic disk or optical disk and other media that can store program codes.

Claims

1. A method for automated repair of photovoltaic lines, characterized in that: include: The repair device determines a number of spare photovoltaic lines according to the repair information when it is determined that the repair information sent by the control terminal is received, wherein the repair information includes first position information corresponding to a first point to be repaired and a second point to be repaired, a first photovoltaic line type, a first repair type, second position information, a second photovoltaic line type, and a second repair type, and the number of spare photovoltaic lines include a first spare photovoltaic line and a second spare photovoltaic line corresponding to the first photovoltaic line type and the second photovoltaic line type; The repair device determines a repair route according to the first position information and the second position information, and starts moving from a preset point according to the repair route; When the repair device determines that it has arrived at the first point to be repaired, the repair device sends a first instruction to the transportation device so that the transportation device transports the repair device to the first point to be repaired, and the transportation device and the repair device are both installed on the repair device; The repair device sends a second instruction to the repair device to make the repair device perform a first repair operation on the photovoltaic line at the first to-be-repaired point according to the first repair type, and the repair device contains the first spare photovoltaic line; After determining that the first repair operation is completed, the repair device sends a third instruction to the transportation device to enable the transportation device to transport the repair device to a preset position, where the preset position is on the repair device; After determining that the transport equipment and the transport device have arrived at the preset position, the repair equipment moves to the second point to be repaired according to the repair route; The repair device sends a fourth instruction to the transport device to enable the transport device to transport the repair device to the second point to be repaired; The repair device sends a fifth instruction to the repair device to cause the repair device to perform a second repair operation on the photovoltaic line at the second to-be-repaired point according to the second repair type, and the repair device contains the second spare photovoltaic line; After determining that the second repair operation is completed, the repair device sends a sixth instruction to the transportation device to enable the transportation device to transport the repair device to the preset position and return to the preset point.

2. The method according to claim 1, characterized in that The repair device determines a repair route according to all the first position information and the second position information, and starts moving from a preset point according to the repair route, specifically including: The repair device acquires map information within a preset range, where the preset range is a circular area with a line connecting the first position information and the second position information as a diameter; The repair device determines a number of optional routes based on the map information; The repair device determines the optional route with the shortest distance among the several optional routes as the repair route, and starts to move from the preset point according to the repair route.

3. The method according to claim 1, characterized in that When the repair device determines that it has arrived at the first point to be repaired, the repair device sends a first instruction to the transportation device so that the transportation device transports the repair device to the first point to be repaired, specifically including: When the repair device determines that it has reached the first point to be repaired, the first lock is unlocked, and the first lock is a structure for connecting the repair device to the transportation device; The repair device sends a first instruction to the transport device, so that the transport device connects to the repair device according to the initial instruction, wherein the first instruction includes the initial instruction and the transport instruction; After determining that the transport device is connected to the repair device, the repair equipment unlocks the second lock to allow the transport device to transport the repair device to the first repair point according to the transport instruction. The second lock is a structure for connecting the repair equipment to the repair device.

4. The method according to claim 3, characterized in that After the repair device determines that the transport device is connected to the repair device, unlocks the second lock to allow the transport device to transport the repair device to the first repair point according to the transport instruction, the method further includes: The repair device determines the remaining power of the transport device; When determining that the remaining power is not greater than the preset power, the repair device sends a seventh instruction to the transport device to make the transport device return to the preset position; After determining that the transport device has reached the preset position, the repair device locks the first lock buckle; The repair device starts a discharge mode to charge the transport device.

5. The method according to claim 4, characterized in that After the repair device starts the discharge mode to charge the transport device, the method further includes: When determining that the remaining power is greater than the preset power, the repair device sends an eighth instruction to the transportation device to stop the transportation device.

6. The method according to claim 1 or 5, characterized in that: After determining that the first repair operation is completed, the repair device sends a third instruction to the transportation device to enable the transportation device to transport the repair device to a preset position, specifically including: After determining that the first repair operation is completed, the repair device sends a ninth instruction to the transportation device to enable the transportation device to start operation; The repairing device sends the third instruction to the transporting device so that the transporting device transports the repairing device to the preset position.

7. The method according to claim 1, characterized in that After determining that the transport equipment and the transport device have arrived at the preset position, the repair equipment moves to the second point to be repaired according to the repair route, specifically including: After the repairing device determines that the transporting device and the transporting apparatus have arrived at the preset position, locking the second lock buckle; The repair device starts the charging mode to charge the repair device; The repairing equipment moves to the second point to be repaired according to the repairing route.

8. A repair device for automated repair of photovoltaic lines, characterized in that: The repair equipment comprises: One or more processors and a memory; the memory is coupled to the one or more processors, the memory is used to store computer program code, the computer program code includes computer instructions, and the one or more processors call the computer instructions to enable the repair device to perform the method as described in any one of claims 1-7.

9. A computer-readable storage medium comprising instructions, characterized in that: When the instruction is executed on a repair device, the repair device is caused to execute the method according to any one of claims 1 to 7.

10. A computer program product, characterized in that When the computer program product runs on a repair device, the repair device is caused to perform the method according to any one of claims 1 to 7.