Current stress equalization method, medium and electronic equipment

The particle swarm algorithm optimizes the current stress balance of the DAB system, and solves the problem of uneven current stress in bidirectional DC transformers, achieving more efficient power distribution and system efficiency improvement.

CN118900039APending Publication Date: 2024-11-05WUHAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410949840.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

In a bidirectional DC transformer, the voltage difference between multiple energy storage units leads to uneven current stress between the dual active bridge converters, resulting in uneven heating and overall efficiency reduction, and a method is needed to reduce the current stress between DAB modules. and equalize it.

Method used

The particle swarm algorithm is used to solve the power distribution problem of the independent input parallel output system of the DAB system. By constructing the inductor peak current model and the current stress equalization objective function, the optimal output power of each DAB module is determined, and the optimal phase shift angle combination is turned on. Or turn off the switch tube to achieve current stress equalization.

Benefits of technology

The current stress difference between DAB modules is significantly reduced, and the overall life and efficiency of independent input parallel output systems are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118900039A_ABST
    Figure CN118900039A_ABST
Patent Text Reader

Abstract

The invention discloses a current stress equalization method, a medium and electronic equipment. The method comprises the following steps: constructing an inductance peak current actual value operation model of a single DAB module working in two working conditions of a buck mode and a boost mode respectively; constructing a current stress equalization objective function and constraint conditions according to the inductance peak current actual value operation model; solving the current stress equalization objective function based on constraint conditions by adopting a particle swarm algorithm to obtain the optimal output power of each DAB module, and determining a primary full-bridge circuit, a secondary full-bridge circuit and an optimal phase shift angle combination between the primary full-bridge circuit and the secondary full-bridge circuit according to the optimal output power of each DAB module. And switching tubes in the primary side full-bridge circuit and the secondary side full-bridge circuit are switched on or switched off according to the optimal phase shift angle combination, so that current stress balance of each DAB module is realized. Current stress balance between the DAB modules can be achieved, the service life of the whole independent input and parallel output system is prolonged, and the efficiency of the whole independent input and parallel output system is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of dual active bridge converters, and in particular to a current stress equalization method, a medium and an electronic device. Background Art

[0002] With the continuous development of new energy, bidirectional DC transformer technology has become more and more important, and it is widely used in electric vehicles, DC distribution networks, energy storage systems and other fields. Among bidirectional DC transformers, the Dual Active Bridge (DAB) converter has attracted the attention of many scholars due to its electrical isolation capability, high power density, large voltage conversion range and high efficiency.

[0003] In actual engineering, multiple energy storage units are usually controlled as a whole. For bidirectional DC converters, an independent input parallel output structure (Input Independent Output Parallel, IIOP) is formed, that is, the whole has a target output power value, and the master controller distributes the power to each energy storage unit. If the traditional power sharing strategy is adopted, due to the difference in voltage of each energy storage unit, the internal parameters of each dual active bridge converter are also different, so the working conditions of each dual active bridge converter are also quite different, resulting in different current stresses and uneven heating between dual active bridge converters, which reduces the overall efficiency. Therefore, how to reduce the current stress difference of each DAB module and make the current stress between DAB modules the most balanced is particularly important. Summary of the invention

[0004] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, the first object of the present invention is to provide a current stress balancing method, which uses a particle swarm algorithm to solve the power allocation problem of an independent input parallel output system composed of a dual active bridge converter, which can greatly reduce the current stress difference between DAB modules and improve the overall life and efficiency of the independent input parallel output system.

[0005] A second object of the present invention is to provide a computer-readable storage medium.

[0006] A third object of the present invention is to provide an electronic device.

[0007] To achieve the above object, the present invention is implemented through the following technical solutions:

[0008] A current stress balancing method is applied to a DAB system, wherein the DAB system comprises a plurality of DAB modules, the input ends of the plurality of DAB modules are not connected to each other and are independent input ends, the output ends of the plurality of DAB modules are connected in parallel, each DAB module comprises a first capacitor, a primary full-bridge circuit, a second capacitor, a secondary full-bridge circuit, an inductor and a transformer, the first capacitor is connected in parallel with the primary full-bridge circuit, the second capacitor is connected in parallel with the secondary full-bridge circuit, the inductor and the primary side coil of the transformer are connected in series to the midpoint of the two bridge arms of the primary full-bridge circuit, the secondary side coil of the transformer is connected to the midpoint of the two bridge arms of the secondary full-bridge circuit, the primary full-bridge circuit and the secondary full-bridge circuit are both composed of four switch tubes and corresponding anti-parallel diodes, and the method comprises:

[0009] Construct a calculation model of the actual value of the inductor peak current when a single DAB module works in buck mode and boost mode respectively;

[0010] Constructing a current stress balancing objective function and a current stress balancing constraint condition according to the actual value calculation model of the inductor peak current;

[0011] A particle swarm algorithm is adopted to solve the current stress balancing objective function based on the current stress balancing constraint condition to obtain the optimal output power of each DAB module, and the optimal phase shift angle combination of the primary full-bridge circuit and the secondary full-bridge circuit and therebetween is determined according to the optimal output power of each DAB module, and the switch tubes in the primary full-bridge circuit and the secondary full-bridge circuit are turned on or off according to the optimal phase shift angle combination to achieve current stress balancing of each DAB module, wherein the phase shift angle combination includes an external phase shift angle of the primary and secondary full-bridge circuits, an internal phase shift angle of the primary full-bridge circuit, and an internal phase shift angle of the secondary full-bridge circuit, and the two working conditions include a heavy load condition and a light load condition.

[0012] Preferably, the construction of the actual value calculation model of the inductor peak current of a single DAB module operating in two working conditions, namely, in the buck mode and the boost mode, comprises:

[0013] Construct the transmission power model of a single DAB module under two working conditions and the inductor peak current model under two working conditions: buck mode and boost mode.

[0014] The KKT algorithm objective function is established with the inductor peak current model, and the KKT algorithm objective function is solved according to the equality constraints constructed according to the given normalized transmission power and the inequality constraints constructed by the phase shift angle combination constraints under the two working conditions, so as to obtain the phase shift angle combination that can minimize the inductor peak current in the two working conditions of buck mode and boost mode, and substitute the phase shift angle combination that can minimize the inductor peak current into the inductor peak current model of the two working conditions of buck mode and boost mode, so as to construct the actual value calculation model of the inductor peak current of a single DAB module working in the two working conditions of buck mode and boost mode respectively.

[0015] Preferably, the current stress balancing objective function is constructed according to the actual value calculation model of the inductor peak current, including:

[0016] Establishing an inductor peak current function of the inductor peak current with respect to a given transmission power according to the inductor peak current actual value operation model;

[0017] The current stress balancing objective function is constructed according to the inductor peak current function of each DAB module; wherein the current stress balancing objective function is expressed as the difference between the maximum value and the minimum value of the inductor peak current function of each DAB module.

[0018] Preferably, the current stress balance constraint condition is expressed as follows:

[0019]

[0020] Among them, P j represents the transmission power of the jth DAB module, n represents the transformer ratio, V j represents the input voltage of the jth DAB module, V2 represents the output voltage of the DAB system, f represents the switching frequency of the DAB module, L j represents the inductance value of the jth DAB module, P e Indicates the rated power of the DAB module, I pj represents the inductor peak current of the jth DAB module, I max Indicates the maximum safe inductor peak current, P N represents the transmission power of the Nth DAB module, P total It represents the target output power of the DAB system, and N is the number of DAB modules.

[0021] Preferably, the solution steps of the particle swarm algorithm include:

[0022] Set the population size, the position vector and the velocity vector of each particle in the population; wherein the position vector includes the output power values ​​of all DAB modules, and the velocity vector includes the output power value change speed of all DAB modules;

[0023] Set the particle position and velocity update expressions, and set the particle initial position and velocity based on the target output power of the DAB system;

[0024] Iteratively update the particle position and velocity based on the set particle position and velocity update expressions and the particle initial position and velocity to obtain the particle position and velocity of the current iteration, where the particle velocity is used to characterize the speed of particle position change;

[0025] Determine whether the particle position of the current iteration meets the current stress equilibrium constraint condition. If so, obtain the individual optimal position based on the historical iteration situation;

[0026] Obtain the optimal position of the population, determine whether the individual optimal position after the current iteration is close to the optimal position of the population, and if so, and the number of iterations reaches the maximum number of iterations, output the individual optimal position after the current iteration, wherein the position vector corresponding to the individual optimal position after the current iteration includes the optimal output power of all DAB modules.

[0027] Preferably, when the particle position of the current iteration does not satisfy the current stress balance constraint condition, and the individual optimal position also does not satisfy the current stress balance constraint condition, a penalty function is introduced to determine the particle position parameters of the next iteration.

[0028] Preferably, when the particle position and individual optimal position of the current iteration both meet the current stress equilibrium constraint condition, the distance between the particle position and individual optimal position of the current iteration and the population optimal position is compared, and the position parameter with the smallest distance is taken to enter the next round of iteration.

[0029] Preferably, when the particle position of the current iteration does not satisfy the current stress equilibrium constraint condition, and the individual optimal position satisfies the current stress equilibrium constraint condition, the individual optimal position is taken to enter the next round of iteration; when the particle position of the current iteration satisfies the current stress equilibrium constraint condition, and the individual optimal position does not satisfy the current stress equilibrium constraint condition, the particle position of the current iteration is taken to enter the next round of iteration.

[0030] To achieve the above object, a second aspect of the present invention provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned current stress equalization method is implemented.

[0031] To achieve the above objectives, the third aspect of the present invention provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the current stress balancing method described above is implemented.

[0032] The present invention has at least the following technical effects:

[0033] The present invention provides a current stress balancing method, which first constructs an actual value calculation model of the inductor peak current of a single DAB module working in two working conditions, namely, a buck mode and a boost mode, and then constructs a current stress balancing objective function and a current stress balancing constraint condition according to the actual value calculation model of the inductor peak current, and then adopts a particle swarm algorithm to solve the current stress balancing objective function based on the current stress balancing constraint condition to obtain the optimal output power of all DAB modules, and then determines the primary full-bridge circuit and the secondary full-bridge circuit and the optimal phase shift angle combination therebetween according to the optimal output power of all DAB modules, and turns on or off the switch tubes in the primary full-bridge circuit and the secondary full-bridge circuit according to the optimal phase shift angle combination, so as to realize the current stress balancing of each DAB module. The present invention can solve the power distribution problem of the independent input parallel output system composed of dual active bridge converters by constructing the current stress balancing objective function and the current stress balancing constraint condition, and by adopting the above-mentioned particle swarm algorithm, which can greatly reduce the current stress difference between DAB modules and improve the overall life and efficiency of the independent input parallel output system.

[0034] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 Schematic diagram of the structure of an independent input parallel output system according to an embodiment of the present invention.

[0036] Figure 2 FIG. 4 is a schematic diagram of the structure of a DAB module according to an embodiment of the present invention.

[0037] Figure 3 Flow chart of a current stress equalization method according to an embodiment of the present invention.

[0038] Figure 4 Schematic diagram of the iterative process of particle swarm algorithm.

[0039] Figure 5 Schematic diagram of the inductor peak current of three DAB modules under power sharing.

[0040] Figure 6 Schematic diagram of the inductor peak current of the three DAB modules after the particle swarm algorithm is allocated. DETAILED DESCRIPTION

[0041] The present embodiment is described in detail below, and examples of the embodiment are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0042] A current stress equalization method, a medium, and an electronic device according to the present embodiment are described below with reference to the accompanying drawings.

[0043] Figure 1 Schematic diagram of the structure of an independent input parallel output system according to an embodiment of the present invention. Figure 2 FIG. 4 is a schematic diagram of the structure of a DAB module according to an embodiment of the present invention.

[0044] like Figure 1 and Figure 2 As shown, the independent input parallel output system is composed of N dual active bridge converters, namely DAB modules, each DAB module includes an input side DC support capacitor, namely a first capacitor C1, an output side DC support capacitor, namely a second capacitor C2, a primary full bridge circuit H1, a secondary full bridge circuit H2, an inductor L and a transformer T (the transformer ratio is n:1), wherein the primary and secondary full bridge circuits are both composed of four groups of switch tubes and their corresponding anti-parallel diodes. The primary full bridge circuit H1 is composed of a first switch tube S1 and a first anti-parallel diode D1, a second switch tube S2 and a second anti-parallel diode D2, a third switch tube S3 and a third anti-parallel diode D3, and a fourth switch tube S4 and a fourth anti-parallel diode D4. The secondary full bridge circuit H2 is composed of a fifth switch tube S5 and a fifth anti-parallel diode D5, a sixth switch tube S6 and a sixth anti-parallel diode D6, a seventh switch tube S7 and a seventh anti-parallel diode D7, and an eighth switch tube S8 and an eighth anti-parallel diode D8. The DC support capacitor on the left side of the jth DAB module of the independent input parallel output system is connected to the corresponding input power supply V inj The DC support capacitor on the right is connected in parallel to the load, and V2 is the output voltage.

[0045] Define f as the switching frequency of the DAB module, T S is the switching period, T hS is half a switching cycle. Assuming that the on and off time of the switch in the DAB module are both 50%, D0T hS is the time difference of the driving signal between S1 and S5, that is, the external shift phase angle between the primary and secondary full-bridge circuits is D0; D1T hS is the time difference of the driving signal between S1 and S4, that is, the internal phase shift angle of the primary full-bridge circuit is D1; ​​D2T hS is the time difference between the drive signals of S5 and S8, that is, the internal phase shift angle of the secondary full-bridge circuit is D2. AB 、VCD They are respectively the voltage between the midpoints of the primary full-bridge circuit and the voltage between the midpoints of the secondary full-bridge circuit.

[0046] Figure 3 FIG. 1 is a flow chart of a current stress balancing method according to an embodiment of the present invention. Figure 3 As shown, the method includes:

[0047] Step S1: constructing an actual value calculation model of the inductor peak current of a single DAB module operating in two working conditions: a buck mode and a boost mode.

[0048] Among them, the actual value calculation model of the inductor peak current of a single DAB module working in two working conditions, namely, the buck mode and the boost mode, is constructed, including:

[0049] Construct a transmission power model of a single DAB module working under two working conditions and an inductor peak current model working under the buck mode and the boost mode respectively; establish the KKT algorithm objective function based on the inductor peak current model, solve the KKT (constrained optimization method) algorithm objective function according to the equality constraints constructed by the given normalized transmission power and the inequality constraints constructed by the phase shift angle combination constraints under the two working conditions, and obtain the phase shift angle combination that can minimize the inductor peak current under the buck mode and the boost mode. Substitute the phase shift angle combination that can minimize the inductor peak current into the inductor peak current model under the buck mode and the boost mode to construct the actual value calculation model of the inductor peak current of a single DAB module working under the buck mode and the boost mode respectively.

[0050] In this embodiment, a mathematical expression of the phase shift angle when the inductor peak current of a single DAB module is the smallest can be established. In this embodiment, the time domain model of the DAB module under triple phase shifting can be analyzed first to obtain the DAB module transmission power and the inductor peak current model, and then a constrained optimization algorithm (KKT) is used to optimize the inductor peak current under a given per-unit transmission power, and the mathematical expression of the phase shift angle optimized in the full range and the actual value expression of the inductor peak current, that is, the actual value operation model of the inductor peak current, are obtained.

[0051] Specifically, first, for different working conditions generated by different constraints of the three phase shift angles, the different time domain models of the DAB module under triple phase shift modulation are analyzed, and the transmission power model of a single DAB module working under two working conditions and the inductor peak current model working in the buck mode and boost mode are calculated. The reference current is defined as V1 / 8fL, the reference power is nV1V2 / 8fL, and the voltage conversion ratio k of the DAB module is calculated as nV2 / V1, where V1 is the input voltage of the DAB module and V2 is the output voltage of the DAB system. The transmission power and the inductor peak current are normalized, and the buck mode is defined as k≤1, the boost mode is defined as k>1, the heavy load condition of the DAB module is condition 1, and the light load condition is condition 2. The combined constraints of the phase shift angles under the two conditions are:

[0052]

[0053] The normalized transmission power model of working condition 1 is:

[0054]

[0055] The normalized transmission power model of working condition 2 is:

[0056]

[0057] Among them, p mode1 is the normalized transmission power of the DAB module in working condition 1, p mode2 is the normalized transmission power of working condition 2.

[0058] In the buck mode, the per-unit value of the inductor peak current under the two working conditions, that is, the inductor peak current model, is:

[0059] i buck =-2D1+4kD0+2kD2-2k+2 (4)

[0060] In the boost mode, the per-unit value of the inductor peak current under the two working conditions, that is, the inductor peak current model, is:

[0061] i boost =-2D1+4D0+4D2-2kD2+2k-2 (5)

[0062] Among them, i buck is the per-unit value of the inductor peak current under two working conditions in the buck mode, i boost is the per unit value of the inductor peak current under two working conditions in boost mode.

[0063] Furthermore, based on the constrained optimization method, the inductor peak current model is used as the objective function, the equality constraints constructed by the given per-unit transmission power, and the inequality constraints constructed by the phase shift angle combination constraints under the two working conditions are used to solve the phase shift angle combination under the minimum inductor peak current. Taking working condition 1 under k≤1 as an example, its KKT formula can be expressed as:

[0064]

[0065] Among them, Q is the objective function of the KKT algorithm, λ is the KKT algorithm factor, p is the given normalized transmission power, and μ1 to μ8 are the coefficients of the eight phase shift angle combination constraints.

[0066] In buck mode, the optimal solution for the phase shift angle combination that can minimize the inductor peak current under conditions 1 and 2 is:

[0067]

[0068]

[0069] In boost mode, the optimal solution for the phase shift angle combination that can minimize the inductor peak current in operating conditions 1 and 2 is:

[0070]

[0071] Furthermore, by substituting the phase shift angle combination of the two working conditions into the inductor peak current model of the two working conditions in the buck mode and the boost mode, the actual value calculation model of the inductor peak current in the full range after the optimization of a single DAB module can be obtained as follows:

[0072]

[0073] Among them, I p is the actual value of the inductor peak current of a single DAB module.

[0074] Step S2: constructing a current stress balancing objective function and current stress balancing constraint conditions according to the actual value calculation model of the inductor peak current.

[0075] Among them, a current stress balancing objective function is constructed according to an actual value operation model of the inductor peak current, including: establishing an inductor peak current function of the inductor peak current with respect to a given transmission power according to the actual value operation model of the inductor peak current; constructing a current stress balancing objective function according to the inductor peak current function of each DAB module; wherein the current stress balancing objective function is expressed as the difference between the maximum value and the minimum value of the inductor peak current function of each DAB module.

[0076] In this embodiment, the inductance of each DAB module can be measured, the input voltage of each DAB module can be sampled, and a current stress balancing objective function is established according to an actual value calculation model of the inductor peak current. The current stress balancing objective function is the difference between the maximum and minimum values ​​of the inductor peak current in all DAB modules.

[0077] Specifically, the series inductance and transformer leakage inductance of the input side can be measured by bridge measurement at the operating switching frequency of the DAB module, written into the controller, and the input voltage of each DAB module on the input side can be measured in real time.

[0078] Furthermore, according to the actual value calculation model of the inductor peak current, the inductor peak current function f(P g ), then the current stress balance objective function in the independent input parallel output system can be expressed as:

[0079] g(P g1 ,P g2 ...P gN )=max(f(P g1 ),f(P g2 )...f(P gN ))-min(f(P g1 ),f(P g2 )...f(P gN ))(12)

[0080] Among them, g(P g1 ,P g2 ...P gN ) represents the current stress balance objective function, P g1 ,P g2 ...P gN It represents the transmission power allocated to each of the N DAB modules, that is, the given transmission power of the N DAB modules, P gN represents the given transmission power of the Nth DAB module, f(P gN ) represents the inductor peak current function of the Nth DAB module, max represents the maximum value, min represents the minimum value, and N is the number of DAB modules.

[0081] The current stress balance constraint condition is expressed as follows:

[0082]

[0083] Among them, P j represents the transmission power of the jth DAB module, n represents the transformer ratio, V j represents the input voltage of the jth DAB module, L j represents the inductance value of the jth DAB module, Pe Indicates the rated power of the DAB module, I pj represents the inductor peak current of the jth DAB module, I max Indicates the maximum safe inductor peak current, P N represents the transmission power of the Nth DAB module, P total Indicates the target output power of the DAB system.

[0084] Among them, the first three items of formula (13) are inequality constraint sub-conditions in the current stress balance constraint condition, which are involved in the subsequent penalty function. The first inequality item in formula (13) indicates that the transmission power of each DAB module cannot exceed the maximum transmission power of the DAB module in theory, the second item indicates that the transmission power of the DAB module cannot exceed 1.1 times the rated power, and the third item indicates that the inductor peak current of the DAB module cannot exceed the maximum safe inductor peak current to ensure the safety of the equipment. The equality constraint indicates that the sum of the transmission powers of N DAB modules is the target output power value.

[0085] Step S3: Using a particle swarm algorithm, the current stress balance objective function is solved based on the current stress balance constraint condition to obtain the optimal output power of each DAB module, and the optimal phase shift angle combination of the primary full-bridge circuit and the secondary full-bridge circuit and therebetween is determined according to the optimal output power of each DAB module, and the switch tubes in the primary full-bridge circuit and the secondary full-bridge circuit are turned on or off according to the optimal phase shift angle combination to achieve current stress balance of each DAB module.

[0086] The solution steps of the particle swarm algorithm include: setting the population size, the position vector and the velocity vector of each particle in the population; wherein the position vector includes the output power values ​​of all DAB modules, and the velocity vector includes the change speed of the output power values ​​of all DAB modules; setting the particle position and velocity update expressions, and setting the particle initial position and initial velocity based on the target output power of the DAB system; iteratively updating the particle position and velocity based on the set particle position and velocity update expressions and the particle initial position and initial velocity to obtain the particle position and velocity of the current iteration, wherein the particle velocity is used to characterize the speed of change of the particle position; judging whether the particle position of the current iteration meets the current stress equilibrium constraint condition, and if so, obtaining the individual optimal position based on the historical iteration situation; obtaining the optimal position of the population, judging whether the individual optimal position after the current iteration is close to the optimal position of the population, and if so, and the number of iterations reaches the maximum number of iterations, outputting the individual optimal position after the current iteration, wherein the position vector corresponding to the individual optimal position after the current iteration includes the optimal output power of all DAB modules.

[0087] In this embodiment, the number of DAB modules, the input voltage, inductance and total target output power of each DAB module can be input first, and then the parameters of the particle swarm algorithm can be set. According to the preset parameters, multiple initial solutions of the current stress balance objective function are generated. As multiple individuals of the population, the population searches for the optimal solution according to the current stress balance objective function until the conditions are met.

[0088] Specifically, the number of DAB modules, the input voltage of each DAB module, the inductance, and the total target output power can be input. Further, the parameters of the particle swarm algorithm are set. Assume that the population size of the particles, i.e., the number of particles, is m, and the position vector X of particle i in N (N represents the number of DAB modules) dimension is i It can be expressed as X i =(x i,1 ,x i,2 ...,x i,N ), x i,N is the output power of the Nth DAB module of the ith particle, and the velocity vector V of each particle in N dimensions i It can be expressed as V i =(v i,1 ,v i,2 ...,v i,N ), v i,N is the output power change speed of the Nth DAB module of the ith particle. The update formula of the particle position and speed can be expressed as:

[0089]

[0090] in, represents the velocity of the ith particle after the h+1th iteration, ω represents the inertia weight, represents the velocity of the ith particle after the hth iteration, and also represents the velocity of the ith particle after the current iteration. c1 and c2 represent the first and second acceleration constants, r1 and r2 represent the first and second random numbers between (0,1), and F i h represents the optimal position of the individual after the hth iteration, represents the position of the i-th particle after the h-th iteration, represents the optimal position of the population after the hth iteration, represents the position of the i-th particle after the h+1-th iteration.

[0091] Furthermore, the particles are initialized so that the coordinates of the particles in each dimension are (0, P total) on the random number. Then, update the position and speed of the particles, according to the update formula, update the position and speed of all particles, obtain the particle position and speed of the current iteration, and then judge whether the particle position of the current iteration meets the current stress balance constraint, and make all particles close to the optimal solution of the group. Specifically, if the particle position of the current iteration meets the current stress balance constraint, then the individual optimal position is obtained based on the historical iteration situation, and it is judged whether the individual optimal position after the current iteration is close to the optimal position of the population. If so, and the number of iterations reaches the maximum number of iterations, then the loop is jumped out to output the individual optimal position after the current iteration, wherein the position vector corresponding to the individual optimal position after the current iteration includes the optimal output power of all DAB modules. If the maximum number of iterations is not reached, then according to whether the particle position and individual optimal position of the current iteration meet the current stress balance constraint, and when the current stress balance constraint is not met, a penalty function is introduced, and the particle position parameters of the next iteration are selected for the next iteration.

[0092] In this embodiment, when the optimal output power of each DAB module is obtained, the normalized transmission power in formula (7)-(10) can be converted according to the optimal output power of each DAB module and the reference power, and then substituted into (7)-(10) to determine the optimal phase shift angle combination of the primary full-bridge circuit and the secondary full-bridge circuit and therebetween. Then, according to the optimal phase shift angle combination, the switch tubes in the primary full-bridge circuit and the secondary full-bridge circuit are turned on or off, so as to achieve current stress balance of each DAB module.

[0093] As described above, for particles that do not satisfy the current stress balance constraint, the current iteration and the historical iteration can be compared and a penalty function can be introduced to select the particle position parameters for the next iteration.

[0094] First, the inequality constraint conditions in formula (13), i.e., the first three terms, can be rewritten as a ≤0, T a is the inequality constraint subcondition difference function, for example, the first term in formula (13) a represents the a-th inequality constraint sub-condition, a=1,2...,l, l represents the number of inequality constraint sub-condition items, and obviously in formula (13), l is 3. The penalty function in this embodiment can be expressed as:

[0095]

[0096] Among them, e a is the penalty function value corresponding to the a-th inequality constraint sub-condition, e total is the total penalty function value of the particle position, that is, the sum of the penalty function values ​​corresponding to all inequality constraint subconditions, e lis the penalty function value corresponding to the lth inequality constraint sub-condition.

[0097] For example, when the particle position satisfies the first inequality constraint condition, When , e1 is 0, which means there is no penalty term. When the particle position also satisfies the second inequality constraint condition, P is satisfied. j ≤1.1P e When , e2 is 0. If the second inequality constraint condition is not satisfied, e2 is T2, that is, P j -1.1P e , from which the total penalty function value e of the particle position can be obtained total .

[0098] Therefore, according to whether the particle's position in the current iteration and the individual optimal position meet the current stress equilibrium constraint, it can be divided into the following four cases:

[0099] (1) If the particle position of the current iteration satisfies the current stress equilibrium constraint and the individual optimal position also satisfies the current stress equilibrium constraint, the distance between the particle position of the current iteration and the individual optimal position and the population optimal position is compared, and the position parameter with the smallest distance is taken to enter the next iteration.

[0100] (2) When the particle position of the current iteration does not satisfy the current stress equilibrium constraint, the individual optimal position satisfies the current stress equilibrium constraint, and the individual optimal position parameters are taken to enter the next round of iteration.

[0101] (3) The particle position of the current iteration satisfies the current stress equilibrium constraint, but the individual optimal position does not satisfy the current stress equilibrium constraint. The particle position parameters of the current iteration are taken to enter the next iteration.

[0102] (4) If the particle position of the current iteration does not satisfy the current stress equilibrium constraint, and the individual optimal position does not satisfy the current stress equilibrium constraint, then select e total Smaller position parameters go into the next iteration.

[0103] The present invention adopts this method to verify the independent input parallel output system composed of three DAB modules. The corresponding input voltages of the three DAB modules are 650V, 800V, and 950V, the inductances are 14μH, 16μH, and 18μH, the transformer ratio is 1, the switching frequency is 20kHz, the output voltage is 780V, and the total target output power is 300kW. The population size is 25, the maximum number of iterations is 50, the inertia weight is 0.8, and the acceleration constant is 2.05. The power allocated to the three DAB modules given by the particle swarm algorithm is 76kW, 133kW, and 90kW respectively. The current stress balance between the three DAB modules can be achieved through the allocated power.

[0104] Figure 4 It is a schematic diagram of the iterative process of the particle swarm algorithm. Figure 4 It can be seen that the particle swarm algorithm can converge quickly.

[0105] Figure 5 Figure 1 is a schematic diagram of the inductor peak current of three DAB modules under power sharing. Figure 5 It can be seen from the figure that when the parameters of the DAB modules are quite different, the current stress is seriously uneven.

[0106] Figure 6 Schematic diagram of the inductor peak current of the three DAB modules after the particle swarm algorithm is allocated. Figure 6 It can be seen that the values ​​are basically the same, which effectively improves the life of the system and the overall efficiency.

[0107] In summary, the present invention provides a current stress balancing method, which first constructs an actual value calculation model of the inductor peak current of a single DAB module working in two working conditions, namely, a buck mode and a boost mode, and then constructs a current stress balancing objective function and a current stress balancing constraint condition according to the actual value calculation model of the inductor peak current, and then adopts a particle swarm algorithm to solve the current stress balancing objective function based on the current stress balancing constraint condition to obtain the optimal output power of all DAB modules, and then determines the primary full-bridge circuit and the secondary full-bridge circuit and the optimal phase shift angle combination therebetween according to the optimal output power of all DAB modules, and turns on or off the switch tubes in the primary full-bridge circuit and the secondary full-bridge circuit according to the optimal phase shift angle combination, so as to realize the current stress balancing of each DAB module. The present invention can solve the power distribution problem of the independent input parallel output system composed of dual active bridge converters by constructing the current stress balancing objective function and the current stress balancing constraint condition, and by adopting the above-mentioned particle swarm algorithm, which can greatly reduce the current stress difference between DAB modules and improve the overall life and efficiency of the independent input parallel output system.

[0108] Furthermore, the present invention also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the above-mentioned current stress equalization method is implemented.

[0109] Furthermore, the present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the above-mentioned current stress equalization method is implemented.

[0110] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0111] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.

Claims

1. A current stress equalization method, characterized in that: Applied to a DAB system, the DAB system comprises a plurality of DAB modules, the input ends of the plurality of DAB modules are not connected to each other and are all independent input ends, the output ends of the plurality of DAB modules are connected in parallel, each DAB module comprises a first capacitor, a primary full-bridge circuit, a second capacitor, a secondary full-bridge circuit, an inductor and a transformer, the first capacitor is connected in parallel with the primary full-bridge circuit, the second capacitor is connected in parallel with the secondary full-bridge circuit, the inductor and the primary side coil of the transformer are connected in series to the midpoint of the two bridge arms of the primary full-bridge circuit, the secondary side coil of the transformer is connected to the midpoint of the two bridge arms of the secondary full-bridge circuit, the primary full-bridge circuit and the secondary full-bridge circuit are both composed of four switch tubes and corresponding anti-parallel diodes, and the method comprises: Construct a calculation model of the actual value of the inductor peak current when a single DAB module works in buck mode and boost mode respectively; Constructing a current stress balancing objective function and a current stress balancing constraint condition according to the actual value calculation model of the inductor peak current; A particle swarm algorithm is adopted to solve the current stress balancing objective function based on the current stress balancing constraint condition to obtain the optimal output power of each DAB module, and the optimal phase shift angle combination of the primary full-bridge circuit and the secondary full-bridge circuit and therebetween is determined according to the optimal output power of each DAB module, and the switch tubes in the primary full-bridge circuit and the secondary full-bridge circuit are turned on or off according to the optimal phase shift angle combination to achieve current stress balancing of each DAB module, wherein the phase shift angle combination includes an external phase shift angle of the primary and secondary full-bridge circuits, an internal phase shift angle of the primary full-bridge circuit, and an internal phase shift angle of the secondary full-bridge circuit, and the two working conditions include a heavy load condition and a light load condition.

2. The current stress equalization method according to claim 1, characterized in that: The construction of the actual value calculation model of the inductor peak current of a single DAB module working in two working conditions, namely, in the buck mode and the boost mode, comprises: Construct the transmission power model of a single DAB module under two working conditions and the inductor peak current model under two working conditions: buck mode and boost mode. The KKT algorithm objective function is established with the inductor peak current model, and the KKT algorithm objective function is solved according to the equality constraints constructed according to the given normalized transmission power and the inequality constraints constructed by the phase shift angle combination constraints under the two working conditions, so as to obtain the phase shift angle combination that can minimize the inductor peak current in the two working conditions of buck mode and boost mode, and substitute the phase shift angle combination that can minimize the inductor peak current into the inductor peak current model of the two working conditions of buck mode and boost mode, so as to construct the actual value calculation model of the inductor peak current of a single DAB module working in the two working conditions of buck mode and boost mode respectively.

3. The current stress equalization method according to claim 1, characterized in that: The constructing of a current stress balancing objective function according to the actual value calculation model of the inductor peak current includes: Establishing an inductor peak current function of the inductor peak current with respect to a given transmission power according to the inductor peak current actual value operation model; The current stress balancing objective function is constructed according to the inductor peak current function of each DAB module; wherein the current stress balancing objective function is expressed as the difference between the maximum value and the minimum value of the inductor peak current function of each DAB module.

4. The current stress equalization method according to claim 1, characterized in that: The current stress balance constraint condition is expressed as follows: Among them, P j represents the transmission power of the jth DAB module, n represents the transformer ratio, V j represents the input voltage of the jth DAB module, V2 represents the output voltage of the DAB system, f represents the switching frequency of the DAB module, L j represents the inductance value of the jth DAB module, P e Indicates the rated power of the DAB module, I pj represents the inductor peak current of the jth DAB module, I max Indicates the maximum safe inductor peak current, P N represents the transmission power of the Nth DAB module, P total It represents the target output power of the DAB system, and N is the number of DAB modules.

5. The current stress equalization method according to claim 1, characterized in that: The solution steps of the particle swarm algorithm include: Set the population size, the position vector and the velocity vector of each particle in the population; wherein the position vector includes the output power values ​​of all DAB modules, and the velocity vector includes the output power value change speed of all DAB modules; Set the particle position and velocity update expressions, and set the particle initial position and velocity based on the target output power of the DAB system; Iteratively update the particle position and velocity based on the set particle position and velocity update expressions and the particle initial position and velocity to obtain the particle position and velocity of the current iteration, where the particle velocity is used to characterize the speed of particle position change; Determine whether the particle position of the current iteration meets the current stress equilibrium constraint condition. If so, obtain the individual optimal position based on the historical iteration situation; Obtain the optimal position of the population, determine whether the individual optimal position after the current iteration is close to the optimal position of the population, and if so, and the number of iterations reaches the maximum number of iterations, output the individual optimal position after the current iteration, wherein the position vector corresponding to the individual optimal position after the current iteration includes the optimal output power of all DAB modules.

6. The current stress equalization method according to claim 5, characterized in that: When the particle position of the current iteration does not meet the current stress equilibrium constraint, and the individual optimal position also does not meet the current stress equilibrium constraint, a penalty function is introduced to determine the particle position parameters of the next iteration.

7. The current stress equalization method according to claim 5, characterized in that: When the particle position and individual optimal position of the current iteration both meet the current stress equilibrium constraint, the distance between the particle position and individual optimal position of the current iteration and the optimal position of the population is compared, and the position parameter with the smallest distance is taken to enter the next round of iteration.

8. The current stress equalization method according to claim 5, characterized in that: When the particle position of the current iteration does not meet the current stress equilibrium constraint, and the individual optimal position meets the current stress equilibrium constraint, the individual optimal position is taken to enter the next round of iteration; when the particle position of the current iteration meets the current stress equilibrium constraint, and the individual optimal position does not meet the current stress equilibrium constraint, the particle position of the current iteration is taken to enter the next round of iteration.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the current stress equalization method according to any one of claims 1 to 8 is implemented.

10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the computer program, the current stress equalization method according to any one of claims 1 to 8 is implemented.