Ventilation and temperature control device for rice experiment greenhouse

By designing a ventilation and temperature control device in the rice test greenhouse and adjusting the hot air duct and cold air duct, the problem of inconvenient temperature regulation is solved, the stability and uniformity of temperature are achieved, and the success rate of rice temperature resistance test is ensured.

CN118901472AActive Publication Date: 2024-11-08YANGZHOU UNIV
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411312201.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-08
Estimated Expiration
2044-09-20

AI Technical Summary

Technical Problem

The temperature regulation of existing rice test greenhouses is inconvenient, and the ventilation method is inconvenient to operate manually, resulting in uneven temperatures and affecting the success rate of rice temperature resistance tests.

Method used

A ventilation and temperature control device for rice experiment greenhouses is designed, including insulation test sheds, ventilation ducts, temperature regulation components and temperature control components. By installing hot air ducts and cold air ducts on the top, the temperature regulation mobile pipes and temperature control pistons are adjusted. The ratio of hot and cold air can achieve real-time control and stability of temperature.

Benefits of technology

Effectively maintain the temperature stability in the test shed, avoid temperature floating, ensure the success rate of rice temperature resistance test, and solve the problem of uneven temperature at different locations through movable temperature adjustment pistons and independently set ventilation temperatures. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118901472A_ABST
    Figure CN118901472A_ABST
Patent Text Reader

Abstract

The invention discloses a rice experiment greenhouse ventilation temperature control device in the technical field of rice heat resistance test equipment, which comprises a heat preservation test shed, the top end of the heat preservation test shed is fixedly connected with a ventilation pipeline, the middle of the ventilation pipeline is fixedly sleeved with a cold air pipe, and temperature regulation partitions are uniformly connected between the ventilation pipeline and the cold air pipe; the interior of the ventilation pipeline is evenly divided into a plurality of temperature adjusting chambers through the temperature adjusting partitions, and air inlets are formed in the bottom ends of the temperature adjusting chambers. According to the invention, the temperature adjusting movable pipe is additionally arranged to control the proportion of cold air and hot air introduced into the cold air pipe and the hot air pipe, so that the temperature in the thermal insulation test shed is adjusted and controlled; the temperature adjusting movable pipe is additionally arranged to control the proportion of cold air and hot air introduced into the cold air pipe and the hot air pipe, so that the temperature in the heat preservation test shed is adjusted and controlled in real time; the bottom end of the temperature control pipe is sleeved with the movable temperature adjusting piston, so that the stable temperature can be freely adjusted according to test requirements during ventilation in the test greenhouse.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of rice heat resistance test equipment, in particular to a rice experimental greenhouse. Background Art

[0002] The purpose of the rice temperature resistance test is to determine the effect of high temperature or severe cold on the rice fruit set rate. Therefore, high requirements are placed on the temperature control and maintenance of the rice planting test greenhouse. The existing test greenhouse is just a simple plastic film and frame support structure with few internal facilities and no precise temperature control and insulation equipment. The temperature loss rate is high, which is not conducive to the conduct of the rice temperature resistance test. Therefore, to ensure the success of the test, the test greenhouse must be strictly temperature controlled and insulated. For the current traditional greenhouses, ventilation operations are to reserve several openings in advance between the top wall of the greenhouse and the insulation plastic film. When ventilation is needed, an opening is manually pulled between the insulation plastic film and the wall for ventilation.

[0003] The existing ventilation method is manually operated, and it is inconvenient to open and close; moreover, the temperature in the greenhouse cannot be regulated, and it is easy to cause the temperature in the greenhouse to change during the ventilation process, affecting the success rate of the rice temperature resistance test. In addition, in windless weather, even if the ordinary temperature regulating port is opened, the effect on the greenhouse is very small, and the ventilation efficiency is very low, and it is difficult to achieve a good ventilation effect; and the heat exchange efficiency at different positions in the test shed is inconsistent with the outside. The insulation effect of the middle section of the test shed is better, while the temperature loss at the two ends is faster, resulting in uneven temperature in the test shed. It is difficult to ensure the consistency of the temperature conditions of the rice temperature resistance test, which is not conducive to the conduct of the temperature resistance test. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a ventilation and temperature control device for a rice experimental greenhouse, which solves the problem of inconvenient temperature control in the greenhouse in the prior art.

[0005] The object of the present invention is achieved by: a ventilation and temperature control device for a rice experimental greenhouse, comprising: The insulation test shed has an air outlet at the bottom; The air duct assembly comprises a ventilation duct arranged at the top of the thermal insulation test shed, an air inlet connected to the thermal insulation test shed is arranged at the bottom of the ventilation duct, a cold air duct penetrating the thermal insulation test shed is arranged in the middle of the ventilation duct, hot air duct penetrating the thermal insulation test shed is arranged on both sides of the ventilation duct, the cold air duct and the hot air duct are connected via a temperature regulating pipe, and both sides of the temperature regulating pipe are connected to the temperature regulating port of the ventilation duct; The temperature control component comprises a temperature control movable tube arranged in the temperature control tube, wherein the temperature control movable tube is divided into a hot air tube section and a cold air tube section through a hot and cold partition in the middle, a hot air outlet matching the temperature control port is provided on the side of the hot air tube section, and a cold air outlet matching the temperature control port is provided on the side of the cold air tube section, and the temperature control component controls the temperature control movable tube to move to change the opening between the temperature control port and the hot air outlet and the cold air outlet to adjust the hot air and cold air inlet volume; The temperature control component includes a temperature control spring arranged between the end of the hot air pipe section and the hot air pipe, a temperature control tube is arranged at the bottom of the temperature control tube at the position of the temperature control movable tube, a temperature control piston is arranged in the temperature control tube, the top surface of the temperature control piston is processed into an inclined surface, and the bottom of the temperature control movable tube is processed with an inclined groove matching the top surface of the temperature control piston, and the temperature control movable tube is driven to move horizontally by the up and down movement of the temperature control piston, and the bottom of the temperature control tube is threadedly connected to a temperature control shaft, and the upper end of the temperature control shaft is connected to a temperature control turntable.

[0006] Furthermore, the ventilation duct is divided into a plurality of temperature-adjusting chambers by temperature-adjusting partitions, and each temperature-adjusting chamber corresponds to a temperature-adjusting pipe, a group of temperature-adjusting components, a group of temperature control components, and an air inlet.

[0007] Furthermore, the main material of the thermal insulation test shed is thermal insulation glass.

[0008] Furthermore, when the temperature regulating spring is not under stress, the temperature regulating movable pipe is located in the middle of the temperature regulating pipe, closer to the cold air pipe.

[0009] Furthermore, the length of the temperature-adjusting piston is longer than the height of the temperature-adjusting chamber.

[0010] Furthermore, the opening angle of the inclined groove at the bottom of the temperature-adjusting movable pipe is close to the high pressure side of the cold air pipe and close to the high pressure side of the hot air pipe.

[0011] Furthermore, one end of the two hot air pipes is connected to a hot air blower, and the other ends of the two hot air pipes are connected via a bent pipe.

[0012] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention installs a hot air duct on the top of the test greenhouse, and the circulating hot air in the duct has the effect of maintaining the temperature in the thermal insulation test greenhouse; by adding a temperature-adjusting movable control to control the ratio of cold and hot air introduced into the refrigeration air duct and the hot air duct, the temperature in the thermal insulation test greenhouse can be regulated; by adding a temperature-adjusting movable control to control the ratio of cold and hot air introduced into the refrigeration air duct and the hot air duct, the temperature in the thermal insulation test greenhouse can be regulated in real time; by sleeved with a movable temperature-adjusting piston at the bottom end of the temperature control pipe, the stable temperature during ventilation in the test greenhouse can be freely adjusted according to the test requirements.

[0013] 2. The present invention replaces the traditional plastic greenhouse with a test greenhouse made of insulating glass to reduce the temperature variation in the greenhouse during the temperature resistance test. At the same time, a hot air duct is installed on the top of the test greenhouse. The circulating hot air in the duct maintains the temperature in the thermal insulation test greenhouse, ensuring that the temperature in the thermal insulation test greenhouse is always maintained at the test temperature during the test, thereby avoiding the failure of the rice temperature resistance test caused by drastic temperature fluctuations in the thermal insulation test greenhouse.

[0014] 3. The present invention realizes real-time regulation of the temperature in the insulation test shed by setting a temperature-control room where the cold air duct and the hot air duct intersect in the ventilation duct, and by adding a temperature-control mobile control to control the ratio of cold and hot air entering the cooling air duct and the hot air duct, so as to maintain the test temperature required during the rice temperature resistance test and avoid the temperature drop in the test shed due to ventilation, which affects the results of the temperature resistance test.

[0015] 4. The present invention sleeves a movable temperature-adjusting piston on the bottom end of the temperature control tube, so that the stable temperature during ventilation in the test greenhouse can be freely adjusted according to the test requirements. At the same time, the ventilation temperature at different positions can be set independently to avoid the problem of uneven temperature at different positions in the test greenhouse caused by inconsistent heat exchange efficiency with the outside, so that the test greenhouse is more in line with the test requirements of rice temperature resistance test. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0017] Figure 1 It is a schematic cross-sectional view of the ventilation structure of the present invention.

[0018] Figure 2 It is a schematic diagram of the overall structure of the present invention.

[0019] Figure 3 For the present invention Figure 1 A partial enlarged schematic diagram of the structure at point A in the middle.

[0020] Figure 4 It is a vertical cross-sectional schematic diagram of the overall structure of the present invention.

[0021] Figure 5 It is an oblique cross-sectional schematic diagram of the overall structure of the present invention.

[0022] Figure 6 For the present invention Figure 4 A partial enlarged schematic diagram of the structure at point B in the middle.

[0023] Figure 7 For the present invention Figure 4 A partial enlarged schematic diagram of the structure at point C in the middle.

[0024] In the figure: 1. Insulation test shed; 2. Ventilation duct; 21. Temperature control partition; 22. Air inlet; 3. Cold air duct; 31. Cold air blower; 4. Heating room; 41. Hot air blower; 5. Hot air duct; 6. Temperature control pipe; 61. Temperature control spring; 62. Temperature control pipe; 63. Temperature control piston; 7. Temperature control movable pipe; 71. Hot and cold partition; 72. Hot air outlet; 73. Cold air outlet; 8. Air outlet; 9. Temperature control shaft; 91. Temperature control piston; 92. Temperature control turntable. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] A rice experimental greenhouse ventilation and temperature control device as shown in the figure includes a heat-insulating test shed 1. The main material of the heat-insulating test shed 1 is heat-insulating glass, which not only ensures normal light exposure of rice in the heat-insulating test shed 1, but also greatly improves the temperature maintenance effect in the shed, ensuring the experimental temperature environment of the rice heat resistance test. A ventilation duct 2 is fixedly connected to the top of the heat-insulating test shed 1, a cold air duct 3 is fixedly sleeved in the middle of the ventilation duct 2, and a temperature-adjusting partition 21 is evenly connected between the ventilation duct 2 and the cold air duct 3. The temperature-adjusting partition 21 evenly divides the ventilation duct 2 into a plurality of temperature-adjusting chambers. An air inlet 22 connected to the inside of the heat-insulating test shed 1 is provided at the bottom of the temperature-adjusting chamber. A heating chamber 4 is fixedly connected to one side of the outside of the heat-insulating test shed 1. A heating device is installed in the heating room 4 to heat the air entering the heating room 4. A hot air blower 41 is fixedly installed on one side of the heating room 4. The hot air blower 41 pumps external air into the heating room 4 for heating and heating. Hot air pipes 5 are fixedly connected to both sides of the ventilation duct 2. One end of the two hot air pipes 5 is connected through a bend pipe, and the other ends of the two hot air pipes 5 are connected to the heating device in the heating room 4. The warm air generated in the heating room 4 is circulated in the hot air pipes 5, thereby achieving insulation in the insulation test shed 1, which has the effect of maintaining the temperature in the insulation test shed 1, ensuring that the temperature in the insulation test shed 1 is always maintained at the test temperature during the test, and avoiding the failure of the rice temperature resistance test due to drastic temperature fluctuations in the insulation test shed 1.

[0027] See also Figure 3-4A temperature regulating pipe 6 is fixedly connected to the inner side of the hot air pipe 5. The temperature regulating pipe 6 is connected to the cold air pipe 3 after passing through the temperature regulating room. A temperature regulating movable pipe 7 is movably sleeved in the middle of the temperature regulating pipe 6. The temperature regulating movable pipe 7 is divided into a hot air pipe section and a cold air pipe section through a hot and cold partition 71 in the middle. A hot air outlet 72 matching the temperature regulating port is opened on the side of the hot air pipe section, and a cold air outlet 73 matching the temperature regulating port is opened on the side of the cold air pipe section. A temperature regulating spring 61 is fixedly installed on one side of the temperature regulating movable pipe 7. The other end of the temperature regulating spring 61 is fixedly connected to the hot air pipe 5. When the temperature regulating spring 61 is not stressed, the temperature regulating movable pipe 7 is located in the middle of the temperature regulating pipe 6, which is biased towards the cold air pipe 3. A hot and cold partition 71 is fixedly connected in the middle of the temperature regulating movable pipe 7, which is used to isolate the hot air from the hot air pipe 5 side and the cold air from the cold air pipe 3 side. A hot air outlet 72 and a cold air outlet 73 are respectively provided on the side of the shed 1, the hot air outlet 72 is located on the outer side of the hot and cold partition 71, and the cold air outlet 73 is located on the inner side of the hot and cold partition 71. A temperature regulating port connected to the temperature regulating room is provided at the temperature regulating pipe 6 corresponding to the hot air outlet 72 and the cold air outlet 73. Under normal ventilation conditions, the warm air introduced from the hot air duct 5 and the cold air introduced from the cold air duct 3 are respectively mixed in the ventilation duct 2 through the hot air outlet 72 and the hot air outlet 72 provided on the temperature regulating mobile pipe 7, and then introduced into the insulation test shed 1 through the air inlet 22 to avoid the problem that the external cold air directly enters during the ventilation process, which causes the temperature in the insulation test shed 1 to drop, and the test failure caused by lowering the test temperature. Air outlets 8 are provided at the bottom of both sides of the insulation test shed 1 for discharging the exhaust gas in the insulation test shed 1.

[0028] See also Figure 5-6The bottom end of the temperature regulating tube 6 is fixedly connected with a temperature control tube 62, and the top of the temperature control tube 62 is connected to the temperature regulating tube 6. The bottom end of the temperature controlling tube 62 passes through the temperature regulating room and extends into the thermal insulation test shed 1. The middle of the temperature controlling tube 62 is movably sleeved with a temperature regulating piston 63. The length of the temperature regulating piston 63 is longer than the height of the temperature regulating room to ensure that the detection end of the temperature controlling tube 62 is completely in the thermal insulation test shed 1. The top surface of the temperature regulating piston 63 is an inclined surface. The bottom of the temperature regulating movable tube 7 is provided with an inclined groove with the same inclination as the top surface of the temperature regulating piston 63, and the opening angle of the inclined groove is close to the high pressure side of the cold air pipe 3 and close to the hot air pipe 5 side. When the temperature at the temperature regulating tube 6 in the thermal insulation test shed 1 is higher than the temperature required for the test, the air at the bottom of the temperature regulating piston 63 in the temperature controlling tube 62 heats up and expands, pushing the temperature regulating piston 63 upward, and its inclined top surface pushes the temperature regulating movable tube 7 to move toward the hot air pipe 5 side, so that the hot air outlet 72 is close to the side of the temperature regulating tube 6 The area facing the opened temperature regulating port is reduced, the area facing the cold air outlet 73 and the temperature regulating port is increased, the warm air flow rate is reduced, and the cold air volume is increased, thereby reducing the temperature of the mixed gas in the temperature regulating room. The temperature entering the thermal insulation test shed 1 at the air inlet 22 of the temperature regulating room is reduced, so that the temperature there drops to the test temperature. On the contrary, when the temperature at the temperature control tube 62 in the thermal insulation test shed 1 is too low, the air pressure at the bottom end of the temperature control tube 62 is insufficient to support the weight of the temperature regulating piston 63, so that the temperature regulating piston 63 slides downward, and the temperature regulating spring 61 pushes the temperature regulating movable tube 7 to slide toward the side of the cold air pipe 3, so that the area facing the hot air outlet 72 and the temperature regulating port opened on the side of the temperature regulating tube 6 is increased, and the area facing the cold air outlet 73 and the temperature regulating port is reduced, the warm air flow rate is increased, and the cold air volume is reduced, thereby ensuring that the temperature entering the thermal insulation test shed 1 at the air inlet 22 of the temperature regulating room rises, so that the temperature there rises back to the test temperature.

[0029] See also Figure 7 , an adjusting port is provided at the bottom of the temperature control tube 62, and a temperature adjustment shaft 9 is threadedly connected through the adjusting port, a temperature adjustment piston 91 is fixedly connected to the top of the temperature adjustment shaft 9, and a temperature adjustment dial 92 is fixedly connected to the bottom of the temperature adjustment shaft 9. The height of the temperature adjustment piston 91 in the temperature control tube 62 is adjusted by rotating the temperature adjustment dial 92, thereby adjusting the air pressure in the temperature control tube 62, and then adjusting the initial position of the temperature adjustment movable tube 7, so that the ventilation device can set different stable temperatures to ensure the temperature requirements under different tests, thereby being suitable for rice temperature resistance tests under different stable temperatures, wherein each group of temperature adjustment dials 92 can be connected by a linkage chain, thereby realizing synchronous adjustment of multiple groups of temperature adjustment shafts 9 to improve the adjustment efficiency, and the flow ratios of the hot air outlets 72 and the cold air outlets 73 at various locations in the insulation test shed 1 can also be independently adjusted to adapt to the changes in different heat loss rates at different positions in the insulation test shed 1, and avoid the problem of uneven temperature in the insulation test shed 1 caused by the heat loss at both ends of the insulation test shed 1 being higher than the heat loss at the middle position of the insulation test shed 1.

[0030] The working principle of the method of the present invention is as follows: When in use, the cold air blower 31 and the hot air blower 41 are turned on, so that the outdoor air enters the thermal insulation test shed 1 through the cold air duct 3 and the hot air duct 5 respectively, and the heating device in the heating room 4 is turned on, so that the gas passing through the hot air duct 5 is heated by the heating device, and the warm air circulates at the top of the thermal insulation test shed 1 through the hot air duct 5, thereby improving the thermal insulation effect of the thermal insulation test shed 1. At the same time, the warm air in the hot air duct 5 passes through the temperature regulating pipe 6 to one side of the temperature regulating mobile pipe 7, and enters the temperature regulating room through the hot air outlet 72. The cold air in the cold air duct 3 passes through the temperature regulating pipe 6 to the other side of the temperature regulating mobile pipe 7, and passes through the cold air outlet 72. The outlet 73 enters the temperature-controlled room, the two gases mix and are injected into the heat-insulating test shed 1 through the air inlet 22, and the excess exhaust gas is discharged outward through the air outlet 8. The temperature-control dial 92 is turned to adjust the height of the temperature-control piston 91, thereby pushing the temperature-control piston 63 to adjust the stable position of the temperature-control moving pipe 7 in the temperature-control pipe 6, so that the gas flow at the hot air outlet 72 and the cold air outlet 73 meets the test temperature requirements. After the adjustment is completed, the temperature in the heat-insulating test shed 1 can be stabilized to the temperature required for the test. When the temperature at the temperature-control pipe 6 in the heat-insulating test shed 1 is higher than the temperature required for the test, the temperature-controlling piston 62 in the temperature-control pipe 62 is moved to the temperature control pipe 63. The air at the bottom of the plug 63 heats up and expands, pushing the temperature regulating piston 63 upward, and its inclined top surface pushes the temperature regulating movable pipe 7 to move toward the hot air pipe 5, thereby reducing the area of ​​the hot air outlet 72 facing the temperature regulating port opened on the side of the temperature regulating pipe 6, and increasing the area of ​​the cold air outlet 73 facing the temperature regulating port, the warm air flow rate decreases, and the cold air volume increases, thereby reducing the temperature of the mixed gas in the temperature regulating room. The temperature of the air inlet 22 of the temperature regulating room entering the insulation test shed 1 is reduced, so that the temperature there drops to the test temperature. Conversely, when the temperature at the temperature control tube 62 in the insulation test shed 1 is too low, the temperature control tube 62 The air pressure at the bottom end of 62 is not enough to support the weight of the temperature regulating piston 63, so that the temperature regulating piston 63 slides downward, and the temperature regulating spring 61 pushes the temperature regulating movable tube 7 to slide toward the side of the cold air pipe 3, so that the area directly facing the hot air outlet 72 and the temperature regulating port opened on the side of the temperature regulating tube 6 increases, and the area directly facing the cold air outlet 73 and the temperature regulating port decreases, the warm air flow rate increases, and the cold air volume decreases, thereby ensuring that the temperature of the heat preservation test shed 1 at the air inlet 22 of the temperature control room rises, so that the temperature there rises to the test temperature, thereby ensuring that the temperature required for the rice temperature resistance test is always maintained at all places in the heat preservation test shed 1.

[0031] The above embodiments are only used to help understand the method and core idea of ​​the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made to the present invention without departing from the principles of the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

Claims

1. A ventilation and temperature control device for a rice experimental greenhouse. It is characterized in that include: A heat-insulating test shed (1) having an air outlet (8) at the bottom; An air duct assembly comprises a ventilation duct (2) arranged at the top of a thermal insulation test shed (1), an air inlet (22) connected to the thermal insulation test shed (1) being provided at the bottom of the ventilation duct (2), a cold air duct (3) penetrating the thermal insulation test shed (1) being provided at the middle of the ventilation duct (2), hot air ducts (5) penetrating the thermal insulation test shed (1) being provided on both sides of the ventilation duct (2), the cold air duct (3) and the hot air duct (5) being connected via a temperature regulating pipe (6), and both sides of the temperature regulating pipe (6) being connected to the temperature regulating port of the ventilation duct (2); The temperature control component comprises a temperature control movable tube (7) arranged in a temperature control tube (6), wherein the temperature control movable tube (7) is divided into a hot air tube (5) section and a cold air tube (3) section via a hot and cold partition (71) in the middle, a hot air outlet (72) cooperating with the temperature control port is provided on the side of the hot air tube (5) section, and a cold air outlet (73) cooperating with the temperature control port is provided on the side of the cold air tube (3) section, and the temperature control component controls the temperature control movable tube (7) to move and change the opening between the temperature control port and the hot air outlet (72) and the cold air outlet (73) to achieve the regulation of the hot air and cold air inlet volume; The temperature control component comprises a temperature control spring (61) arranged between the end of the hot air pipe (5) section and the hot air pipe (5); a temperature control pipe (62) is arranged at the bottom of the temperature control pipe (6) at the position of the temperature control movable pipe (7); a temperature control piston (91) (63) is arranged in the temperature control pipe (62); the top surface of the temperature control piston (91) (63) is processed into an inclined surface; the bottom of the temperature control movable pipe (7) is processed with an inclined groove matching the top surface of the temperature control piston (91) (63); the temperature control movable pipe (7) is driven to move horizontally by the up and down movement of the temperature control piston (91) (63); the bottom of the temperature control pipe (62) is threadedly connected to a temperature control shaft (9); the upper end of the temperature control shaft (9) is connected to a temperature control turntable (92).

2. A rice experimental greenhouse ventilation and temperature control device according to claim 1, It is characterized in that The ventilation duct (2) is divided into a plurality of temperature-adjusting chambers by a temperature-adjusting partition (21), and each temperature-adjusting chamber corresponds to a temperature-adjusting pipe (6), a group of temperature-adjusting components, a group of temperature-controlling components, and an air inlet (22).

3. A rice experimental greenhouse ventilation and temperature control device according to claim 1 or 2, It is characterized in that The main material of the thermal insulation test shed (1) is thermal insulation glass.

4. A ventilation and temperature control device for a rice experimental greenhouse according to claim 1 or 2, It is characterized in that When the temperature regulating spring (61) is in a state without being stressed, the temperature regulating movable tube (7) is located in the middle of the temperature regulating tube (6) on the side of the cold air tube (3).

5. A ventilation and temperature control device for a rice experimental greenhouse according to claim 1 or 2, It is characterized in that The length of the temperature control piston (91) (63) is longer than the height of the temperature control chamber.

6. A ventilation and temperature control device for a rice experimental greenhouse according to claim 1 or 2, It is characterized in that The opening angle of the inclined groove at the bottom of the temperature-adjusting movable pipe (7) is such that the high pressure side is close to the cold air pipe (3) and the high pressure side is close to the hot air pipe (5).

7. A ventilation and temperature control device for a rice experimental greenhouse according to claim 1 or 2, It is characterized in that One end of the two hot air pipes (5) is connected to a hot air blower (41), and the other ends of the two hot air pipes (5) are connected via a bend pipe.

Citation Information

Patent Citations

  • Sunlight greenhouse intelligent temperature control system

    CN105145184A

  • Greenhouse temperature and humidity adjusting equipment based on planting of melons, fruits and vegetables

    CN110249864A

  • Intelligent temperature adjusting system of grain dryer

    CN110470127A

  • Switch cabinet capable of adaptively adjusting temperature and humidity and adjusting method thereof

    CN114744494A

  • Solar heating heat preservation warmhouse booth

    CN206744039U