Control method for appointment discharging and heating of electric automobile

The user's travel plan is obtained through the Internet of Vehicles system and the battery is automatically preheated at the reservation time, which solves the problem that batteries cannot be preheated in cold environments in the prior art, and improves battery performance and user experience.

CN118906918APending Publication Date: 2024-11-08KAIRUI AUTOMOBILE TECHNOLOGY (ANHUI) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411092189.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-08

Smart Images

  • Figure CN118906918A_ABST
    Figure CN118906918A_ABST
Patent Text Reader

Abstract

The invention discloses an electric vehicle appointment discharge heating control method. The method comprises the steps that travel plan information of a user is acquired through a TSP platform and sent to a vehicle-mounted TBOX; and the vehicle-mounted TBOX calculates a wake-up time point of reserved heating based on the user travel plan information, wakes up the whole vehicle and controls the battery to be preheated after the reserved wake-up time point is reached. The method has the advantages that the battery is preheated in a mode of obtaining the reserved travel time point, so that automatic preheating after a travel plan is obtained is met; and furthermore, a memory function can be realized, the time of repeated travel is recorded, circulating preheating is performed every day, the user operation is further reduced, and the user experience is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of vehicle networking control, and in particular to a method for controlling scheduled discharge heating of an electric vehicle. Background Art

[0002] With the development of the automobile industry, the degree of vehicle networking is getting higher and higher, and people's requirements for the interaction of intelligent networked vehicles are also getting higher and higher. The vehicle networking system consists of the vehicle-mounted T-BOX, other vehicle controllers and the TSP platform. The vehicle-mounted T-BOX can transmit vehicle signals with other vehicle controllers, and can transmit vehicle signals to the TSP platform. The TSP platform can also transmit vehicle control instructions to other vehicle controllers through the T-BOX, and other vehicle controllers receive instructions to execute corresponding functions.

[0003] The existing Internet of Vehicles functions are generally remote controls for vehicles, which require real-time control and viewing. For example, the patent application number is 202011497569.5, which is a method for remotely starting a hydrogen fuel cell to turn on the air conditioner based on the Internet of Vehicles. It discloses the Internet of Vehicles control of the air conditioner by remotely turning on the air conditioner in the car through the Internet of Vehicles. However, this Internet of Vehicles method of controlling the components in the car cannot meet the demand for battery heating, because in the cold winter, the battery needs to be preheated to meet the requirements of battery performance, life, and endurance. The use of existing technology for control requires real-time operation and control by the user. If the heating control is operated late, the effect of preheating the battery in advance cannot be achieved, and the operation is required for each trip, which is time-consuming and labor-intensive, affecting the user experience. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide an electric vehicle scheduled discharge heating control method, which preheats the battery by obtaining the scheduled travel time point to meet the automatic preheating after the travel plan is known; further, a memory function can be realized to record the time of repeated travel and preheat in a daily cycle, further reducing user operations and improving user experience.

[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a method for controlling the scheduled discharge heating of an electric vehicle, comprising:

[0006] The user's travel plan information is collected through the TSP platform and sent to the on-board TBOX; the on-board TBOX calculates the wake-up time for scheduled heating based on the user's travel plan information, wakes up the entire vehicle and controls the battery for preheating when the scheduled wake-up time is reached.

[0007] The TPS platform obtains the travel plan information set by the user by interacting with the user's mobile phone app, where the travel plan information includes the scheduled travel time and the nature of the trip; the nature of the trip includes single validity or multiple validity; TBOX calculates the wake-up time point for the scheduled heating based on the scheduled travel time, and memorizes the wake-up time point according to whether the nature of the trip is single validity or multiple validity.

[0008] After receiving the travel plan information and completing the setting record, TBOX will feedback the status information of successful reservation and feedback it to the user's mobile app through TSP. If the mobile app does not receive the feedback status information within the specified time after the setting information is sent, it will be judged that the reservation has failed. At this time, the reservation failure information will be displayed and the information sent after the specified time will be ignored; at the same time, TBOX will collect and obtain the preheating status information in real time and feedback it to the user's mobile app in real time; the preheating status includes booking, preheating, and preheating ended.

[0009] The TSP platform receives travel plan information from the user's mobile app, then sends the travel plan information to TBOX in the form of event frames and receives feedback from TBOX and forwards it to the mobile app; the information received and sent by the TSP platform is stored in the TSP platform in the form of logs.

[0010] After receiving the travel plan information, the vehicle-mounted TBOX calculates the wake-up time point, and wakes up the vehicle to enter the preheating control process after the wake-up time point is reached; wherein calculating the wake-up time point includes:

[0011] If the scheduled travel time and the time on the day are set across days, TBOX will calculate the wake-up time by subtracting the estimated preheating duration from the travel time on the day of travel, and wake up the vehicle for preheating control after the wake-up time is reached;

[0012] If the scheduled travel time and the current time are on the same day, when the time difference between the current time and the scheduled travel time is less than the estimated preheating duration, the entire vehicle will be woken up immediately for preheating control; otherwise, the estimated heating duration will be subtracted from the travel time to obtain the target wake-up time point.

[0013] The estimated heating duration is calculated based on the battery temperature, battery charge, and distance to the travel destination.

[0014] The method further comprises

[0015] TBOX processes according to the set wake-up time point. If the vehicle is not in sleep mode after the wake-up time point is reached, TBOX directly sends a heating request. If the vehicle is in sleep mode at this time, TBOX wakes up the vehicle and sends a heating request at the same time. It sends a heating request start instruction to BMS. After TBOX sends the heating request, if it does not receive the preheating permission signal sent by VCU within the specified time, it stops sending the heating request and feeds back the end of preheating to the TSP platform.

[0016] If the preheating status signal fed back by the BMS is not received within the specified time, the preheating end signal is fed back to the TSP platform;

[0017] If TBOX receives the status of VCU & BMS within the specified time, it will feedback the corresponding status to the TSP platform.

[0018] The method also includes a vehicle controller VCU receiving a preheating request sent by the BMS and determining whether to send a preheating permission signal. When the VCU satisfies the following conditions at the same time: the vehicle is in the OFF gear, the door is in a closed state, the vehicle is in a stationary state, the preheating request signal from the BMS is received, the vehicle has no high-voltage fault affecting the upper voltage, and there is no gun insertion signal, the VCU sends a preheating permission signal to the BMS and the TBOX; after the BMS controls the main positive relay to close, the DCDC enable signal and the target voltage are sent to the DCDC; after the DCDC receives the enable and target voltage, it works and feeds back its own state and output voltage and current signals to the VCU;

[0019] During the preheating process, the preheating conditions are judged in time. The preheating conditions include:

[0020] ① The vehicle is not in OFF gear; ② Both doors are open; ③ The vehicle is not stationary; ④ The BMS stops sending the preheating request signal; ⑤ The vehicle has a high voltage fault; ⑥ A gun insertion signal is detected; ⑦ A heating timeout fault is received from the BMS;

[0021] If any preheating condition is met, the preheating is returned to normal. When the preheating is over, the VCU sends a report prohibiting the preheating instruction to the BMS and TBOX. At the same time, the VCU disconnects the DCDC enable and controls the BMS to disconnect the main positive and negative relays.

[0022] The method also includes that after waking up the whole vehicle, the BMS is awakened, and the BMS sends the self-test status and fault level to the VCU; the BMS receives the heating request sent by the TBOX and determines whether to send a preheating request to the VCU; if the BMS determines that the battery power is greater than the set power threshold, the temperature is lower than the set threshold and lasts for a set time, there is no discharge high-voltage fault, and the request signal sent by the TBOX is received, the BMS sends a preheating request to the VCU to obtain a preheating permission signal from the VCU; if the preheating permission feedback from the VCU is not received within the specified time, the preheating request is stopped: if the preheating permission signal feedback from the VCU is received, the BMS closes the main negative and pre-charging relays, and after the pre-charging is completed, the main positive relay is closed, the pre-charging relay is disconnected, and finally the heating relay is closed, and the BMS enters the scheduled heating state; at the same time, the main positive, pre-charging state, main negative, heating relay state and BMS state are fed back to the VCU, and the preheating state is fed back to the VCU and the TBOX.

[0023] The method also includes the BMS itself judging that preheating is over or receiving preheating prohibition from the VCU during preheating, directly disconnecting the PTC heating relay, and judging the current at the same time. If the current is less than the set value, the main negative and main positive relays are disconnected, and the corresponding relays and working status are fed back to the VCU.

[0024] The advantages of the present invention are: the battery is preheated by obtaining the scheduled travel time point to meet the automatic preheating requirements after the travel plan is known; further, a memory function can be realized to record the time of repeated travel and preheat the battery in a daily cycle, thereby further reducing user operations and improving user experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The following is a brief description of the contents expressed in the drawings of the present invention and the symbols in the drawings:

[0026] Figure 1 This is a system architecture diagram corresponding to the electric vehicle scheduled discharge heating control method of the present invention. DETAILED DESCRIPTION

[0027] The specific implementation of the present invention will be further explained in detail below by describing the optimal embodiment with reference to the accompanying drawings.

[0028] This embodiment is to automatically control the vehicle's battery preheating and heating control through the customer's scheduled travel information, and utilize the vehicle's Internet of Vehicles and heating system when preheating the vehicle; the vehicle end includes TBOX, VCU, BMS, DCDC, and PTC heater, etc.; the cloud is equipped with a TSP service platform, which provides cloud services and signal forwarding and log storage functions; the user end includes the user's mobile phone app, which can display the status information of the preheating process and facilitate the user to enter relevant travel information or automatically obtain relevant travel information. The connection relationship between the modules involved is as follows: Figure 1 As shown, the user app is connected to the TSP platform through the mobile Internet, the TSP platform and TBOX establish a communication connection through the Internet of Vehicles, and the communication between TBOX and VCU, BMS, etc. is established using the vehicle CAN network.

[0029] This embodiment provides a method for controlling scheduled discharge heating of an electric vehicle, comprising:

[0030] The user's travel plan information is collected through the TSP platform and sent to the on-board TBOX; the on-board TBOX calculates the wake-up time for scheduled heating based on the user's travel plan information, wakes up the entire vehicle and controls the battery for preheating when the scheduled wake-up time is reached.

[0031] The TPS platform obtains the travel plan information set by the user by interacting with the user's mobile phone app, where the travel plan information includes the scheduled travel time and the nature of the trip; the nature of the trip includes single-time validity or multiple-time validity; in order to fully meet the user's control needs, the interaction here refers to the travel plan information manually set and input by the user; the travel time and the nature of the trip are both entered by the user through the app; then uploaded to the TSP platform through the mobile phone app, and then sent to TBOX. The on-board TBOX calculates the wake-up time point for the scheduled heating based on the scheduled travel time, and starts to wake up the vehicle before the travel time to preheat the battery in advance, so that the battery has been preheated when the user's travel time is met. The single-time and multiple-time valid travel natures are manually entered by the user. The user sets the data according to his or her travel plan. For example, the travel time for commuting is multiple-time valid, while an occasional self-driving tour or going to the mall is a single-time valid travel plan. TBOX memorizes the wake-up time point according to the single-time or multiple-time valid travel nature. If it is single-time valid, no other operations will be performed after the preheating is completed; if it is multiple-time valid, TBOX memorizes and stores the calculated wake-up time point, and repeatedly starts the wake-up and preheats the battery at the wake-up time point set every day.

[0032] After receiving the travel plan information and completing the setting record, TBOX will feedback the status information of successful reservation and feedback it to the user's mobile app through TSP. After receiving the preheating information sent by the mobile app, TBOX will feedback the setting success information, so that the user can understand the setting status in time. If the mobile app does not receive the feedback status information within the specified time after the setting information is sent, it will be judged as a reservation failure. At this time, the reservation failure information will be displayed and the information sent after the specified time will be ignored; at the same time, TBOX will collect and obtain the preheating status information in real time and feedback it to the user's mobile app in real time; the preheating status includes booking, preheating, and preheating ended; after TBOX receives the setting information, it will feedback the setting success signal, and feedback the status signals such as booking, preheating, and preheating ended according to the current status, so that users can check at any time.

[0033] The TSP platform receives travel plan information from the user's mobile app, then sends the travel plan information to TBOX in the form of event frames and receives feedback from TBOX and forwards it to the mobile app; the information received and sent by the TSP platform is stored in the TSP platform in the form of logs, which is convenient for users to obtain, view and trace back.

[0034] After receiving the travel plan information, the on-board TBOX calculates the wake-up time point, and wakes up the vehicle to enter the preheating control process after the wake-up time point is reached; the calculation of the wake-up time point includes: if the scheduled travel time and the current time are set across days, that is, the scheduled travel time and the current time are not on the same day, then the TBOX calculates the wake-up time point by subtracting the estimated preheating duration from the travel time on the travel day, and wakes up the entire vehicle for preheating control after the wake-up time point is reached;

[0035] If the scheduled travel time and the current time are on the same day, when the time difference between the current time and the scheduled travel time is less than the estimated preheating duration, the entire vehicle will be woken up immediately for preheating control; otherwise, the estimated heating duration will be subtracted from the travel time to obtain the target wake-up time point.

[0036] In this embodiment, the estimated preheating duration includes an experience time T1 and a calculation time T2. The experience time T1 is a preset time requirement for battery preheating in most cases. After receiving the travel plan information, the on-board TBOX first uses the experience time T1 to calculate the experience estimated wake-up time point. The calculation of the experience estimated wake-up time point includes: if the scheduled travel time and the current time are set across days, that is, the scheduled travel time and the current time are not on the same day, then the TBOX calculates the experience estimated wake-up time point by subtracting the experience time T1 from the travel time on the travel day, and then records the time point and starts to wake up the vehicle after reaching the experience estimated wake-up time point to determine whether to start preheating;

[0037] If the scheduled travel time and the current time are on the same day, when the time difference between the current time and the scheduled travel time is less than the estimated preheating duration, the entire vehicle will be woken up immediately for preheating control; otherwise, the travel time will be subtracted from the experienced time T1 to obtain the empirically estimated wake-up time point.

[0038] After TBOX reaches the empirically estimated wake-up time, TBOX obtains the battery temperature and power of the current vehicle in real time, and then calculates the calculation time T2 based on the battery temperature, battery power, and distance to the travel destination. If T2 is greater than T1 at this time, the battery preheating control process is immediately started, and the BMS, VCU controller DCDC, PTC and other components are started to heat the battery; otherwise, the battery preheating control process is started after the empirically estimated wake-up time is delayed by T1-T2 time. The purpose of this is to better meet the heating and preheating completion and just reach the travel time. Since the battery heating duration is controlled by the temperature, power and destination distance, it is necessary to consider the combined effects of the three to set the calculation time T2. First, the time t1 required to heat from the current temperature to the target temperature can be calculated based on the battery preheating MAP, T2 = t1*k; where k is a coefficient, the battery range is estimated based on the battery power, and then the battery range is compared with the mileage between the vehicle's origin and destination. If the battery range is greater than the mileage between the vehicle's origin and destination, K takes a value of 1; otherwise, the value of k is controlled based on the distance difference between the battery range and the mileage between the vehicle's origin and destination; the larger the distance difference, the smaller the value of k, and the value of k is between 0-1. In this way, the preheating time can be limited while considering the mileage, and the battery preheating control can be performed while meeting user needs as much as possible.

[0039] In this embodiment, a car battery heating function is developed by using the vehicle networking system, which mainly includes the vehicle VCU, T-BOX, BMS, and TSP platform. For customers, the car battery heating can be directly completed in the car, which greatly improves the user's winter car experience.

[0040] This function includes vehicle VCU, T-BOX, BMS and other controllers and TSP platform.

[0041] The main functions of the APP are as follows:

[0042] 1. Send the user-set scheduled travel time (24-hour system, hours and minutes), scheduled heating start request, and single or repeated valid information to the TSP platform, and the following information will be displayed on the APP;

[0043] Prompt the customer to start the status: the vehicle is not in the charging state and ensure that the vehicle has sufficient power;

[0044] Functional impact: affects SOC and driving range;

[0045] Recommended heating time: more than half an hour

[0046] Current setting status: single valid or repeated valid;

[0047] Among them, prompting customers about the activation status, function impact, recommended heating time, and current setting status should be displayed on the interface during the function activation and setting process. After the customer agrees, the instruction will be sent to the TSP platform. After the setting is completed, the current setting status: single validity or repeated validity and setting success or setting failure and other information need to be fed back to the customer;

[0048] 2. The user's mobile app receives TSP's reservation success and feeds back the reservation success to the customer on the APP interface. If the user does not receive TSP's feedback signal within 5 seconds after setting the reservation heating on the APP, the reservation failure message will be displayed. If the feedback signal is received after the 5s timeout, the APP will not process it. The user needs to re-set it through the APP before the reservation heating setting status can be fed back to the customer;

[0049] 3. The APP receives the preheating or preheating end status from the TSP platform and displays the corresponding information to the customer;

[0050] The main functions of the TSP platform are as follows:

[0051] 1. Receive the scheduled travel time (24-hour system, hours and minutes) and scheduled heating start request sent by the APP, which is valid for single or repeated use;

[0052] 2. Send the scheduled travel time (24-hour system, hour & minute), scheduled heating start request and single or repeated valid information to TBOX in the form of event frames;

[0053] 3. All information received and sent by TSP to APP and TBOX needs to be displayed in the TSP platform in the form of logs (platform remote function logs);

[0054] 4. TSP receives the reservation setting success information from TBOX and forwards it to the user app;

[0055] 5. Receive the preheating or preheating end status of TBOX and feedback it to the APP, which will display this information to the user;

[0056] The main functions of T-BOX are as follows:

[0057] Receive the scheduled travel time (24-hour system, hours and minutes), scheduled heating start request and single or repeated validity information sent by the TSP platform (single or repeated validity requires TBOX to have a memory function); TBOX processes hours and minutes as follows:

[0058] ① Cross-day settings: If the travel time minus the current time is less than 0, TBOX will get the wake-up time point by subtracting the heating duration from the time of the next day, and wake up the vehicle at the time point. If the information settings received by TBOX are repeated and valid, the calculation result will be memorized and woken up every day; (for example: the travel time is 9 o'clock on the n+1 day of a month, and the current time is 8 o'clock on the nth day, then 8:00-9:00 on the nth day is less than 0, and the TBOX wake-up time is 8:00-90min on the n+1th day = 6:30 wake-up, where 90min is the preheating duration);

[0059] ② Non-cross-day settings: 0 ≤ travel time minus current time ≤ heating time, TBOX immediately starts the heating request; travel time minus current time > heating time, TBOX uses travel time minus heating time as the target time to wake up the vehicle; (e.g.: n 9:00-7:30 > 0, TBOX wake-up time is n 9:00-90min = 7:30 wake-up)

[0060] TBOX will feed back the successful reservation heating setting information to the TSP platform, and the TSP platform will forward it to the user app;

[0061] TBOX processes according to the set wake-up time point. When the wake-up time point is reached; ① The whole vehicle is not in sleep: TBOX directly sends a heating request; ② The whole vehicle is in sleep: TBOX wakes up the whole vehicle and sends a heating request at the same time; sends a heating request TBOX_RemoteHeatRequest:ON (TBOX remote heating request start signal) (TBOX_RemoteHeatRequest:ON means the heating request starts, TBOX_RemoteHeatRequest:OFF means the heating request is closed) to BMS, sends a heating start request to VCU, and then receives the VCU feedback signal whether heating is allowed; that is, after TBOX sends a heating request, if it does not receive the preheating permission signal VCU_RemoteHeatAllow:Allow (VCU_Remote heating: heating is allowed) sent by VCU within 13s, it stops sending the heating request, and then feeds back the end of preheating to the TSP platform;

[0062] If the preheating status BMS_RemoteHeatSts:ON (BMS_remote heating operation: on) is not received from the BMS within 15 seconds, the preheating end is fed back to the TSP platform;

[0063] If TBOX receives the status information of VCU and BMS within the specified time, it will feedback the corresponding status to the TSP platform: ①BMS_RemoteHeatSts (BMS_remote heating working status) status bit is 01, which means preheating; ②BMS_RemoteHeatSts (BMS_remote heating working status) status bit is 10, which means preheating is finished; that is, after receiving the BMS_RemoteHeatSts (BMS_remote heating working status) status bit information sent by BMS, when the status information is 10 or 01, different preheating result status information is fed back to TSP respectively, and TSP forwards it to the user app for display.

[0064] The main functions of VCU are as follows:

[0065] 1. VCU receives BMS, DCDC, MCU status signals and fault signals, the signals are BMS_WorkingMode: Waiting (BMS_working mode: waiting), BMS_DischrgActiveFaultLevel (BMS_charging activity fault level), DCDC_OperatingMode: Standby (DCDC_operating mode: standby), DCDC_FaultLevel (DCDC_fault level), MCU_FaultLevel (MCU_fault level);

[0066] 2. Receive the preheating request BMS_RequestRemoteHeat:Request sent by BMS;

[0067] 3. The VCU determines that the following conditions are met at the same time: ① The vehicle is in the OFF gear; ② Both doors are closed (if there is a signal from the front cabin or the back door, it is also considered as a judgment condition); ③ The vehicle is stationary; ④ The preheating request signal from the BMS is received; ⑤ The vehicle has no high-voltage fault that affects the upper voltage; ⑥ There is no gun insertion signal; After the above conditions are met at the same time, the VCU sends a preheating permission signal:

[0068] 4. After the above conditions are met at the same time, it is determined that the conditions for allowing preheating are met, so at this time VCU sends a preheating permission signal VCU_RemoteHeatAllow:Allow (pre-heating permission signal) to BMS and TBOX;

[0069] 5. 50ms after the BMS main positive relay is closed, VCU sends DCDC enable and target voltage VCU_DCDCstCtrlReq:Enabled (VCU_DCDC enable signal) and VCU_DCDCTargetVolt:14V (VCU_DCDC target voltage: 14V) to DCDC. DCDC starts working according to the received information and feeds back its own status and output voltage and current signals;

[0070] 6. VCU receives DCDC feedback of its own status and output voltage and output current DCDC_OperatingMode: Working, DCDC_OutputVolt, DCDC_OutputCrnt;

[0071] 7. During the preheating process, if the VCU determines that any of the following conditions are met: ① The vehicle is not in the OFF gear; ② Both doors are open (if there is a signal from the front cabin or the back door, it will also be used as a judgment condition); ③ The vehicle speed is not 0km / h / the speed is lost; ④ The BMS stops sending the preheating request signal; ⑤ The vehicle has a high voltage fault; ⑥ The gun insertion signal is detected; ⑦ The heating timeout fault sent by the BMS is received; If any of the conditions are met, the exit process will be entered: After exiting the preheating process, the current preheating process ends and will not be entered again;

[0072] 8. After the preheating process is completed, the VCU sends a preheating prohibition command signal VCU_RemoteHeatAllow:NoAllow (VCU_Remote heating allowed: not allowed) to the BMS&TBOX respectively, which is used to issue a preheating prohibition command to the BMS and TBOX to end the preheating.

[0073] 9. When preheating is finished, VCU disconnects DCDC enable VCU_DCDCstCtrlReq:Disable (before disconnecting DCDC enable, related accessories need to be disconnected in sequence):

[0074] 10. Receive the DCDC feedback status DCDC_OperatingMode (DCDC_operating mode), monitor the DCDC working mode in real time to determine whether the DCDC has completed the disconnection and stopped working;

[0075] 11. At the same time, since the BMS will control the preheating to stop, disconnect the relay and other operations after receiving the preheating prohibition command signal, the VCU receives the relay and working status BMS_PTCSts:Disconnect (BMS_PTC connection prohibited), BMS_NegBattContSts:Disconnect (BMS_main positive relay: connection prohibited), BMS_PosBattContSts:Disconnect (BMS_main negative relay: connection prohibited), BMS_WorkingMode (BMS working mode), BMS_RemoteHeatWorkSts (BMS_remote heating) fed back by the BMS through BMS interactive communication; after the BMS main positive and main negative relays are disconnected, the VCU sends the discharge command MCU_ActiveDischargeCmd:Active (MCU_activate discharge command: discharge) to the MCU, and the motor controller MCU executes the discharge command and feeds back the bus voltage;

[0076] 13. VCU receives the bus voltage MCU_DC-Link_Volt fed back by MCU;

[0077] The main functions of DCDC are as follows:

[0078] 1. After DCDC is awakened, it feeds back its own status and fault level DCDC_OperatingMode:Stand by (DCDC_operating mode: standby) and DCDC_FaultLevel (DCDC_fault level) to VCU;

[0079] 2. DCDC feeds back its own status and output voltage and output current DCDC_OperatingMode:Working (DCDC_operation mode: working), DCDC_OutputVolt (DCDC_output voltage), DCDC_OutputCrnt (DCDC_output current) to VCU;

[0080] 3. Receive the DCDC disconnection enable signal VCU_DCDCstCtrlReq:Disable (VCU_DCDC control request: disable) sent by VCU;

[0081] 4. Feedback its own working status DCDC_OperatingMode (should jump to StandBy after disconnecting the enable) to VCU;

[0082] The main functions of the motor controller MCU are as follows:

[0083] 1. After the MCU is awakened, it feeds back its own fault level MCU_FaultLevel (MCU_fault level) to the VCU;

[0084] 2. Receive the discharge command MCU_ActiveDischargeCmd:Active (MCU_discharge command: activate) sent by VCU to MCU;

[0085] 3. Feedback bus voltage MCU_DC-Link_Volt to VCU; (If MCU fails to discharge actively, it will enter passive discharge)

[0086] The main functions of BMS are as follows:

[0087] 1. After the BMS is awakened, it feeds back the self-test status and fault level BMS_WorkingMode:Waiting (BMS_working mode: waiting) and BMS_DischrgActiveFaultLevel (BMS_self-test status fault level) to the VCU;

[0088] 2. Receive the heating request TBOX_RemoteHeatRequest:ON sent by TBOX;

[0089] 3. BMS determines that the following conditions are met at the same time: ①SOC≥30%; ②Tmin<-4℃&lasting>10s; ③No impact on discharge high voltage fault level (discharge fault level>2 impact); ④No gun plug signal;

[0090] ⑤TBOX_RemoteHeatRequest:ON (TBOX_remote heating request: on). If the above conditions are met at the same time, BMS sends a preheating request (with a higher priority than smart power replenishment. From smart power replenishment to scheduled heating, only the heating relay needs to be closed without powering on and off again). If the preheating permission from VCU is not received within 3s, the preheating request will be stopped:

[0091] 4. BMS sends a preheating request BMS_RemoteHeatSts:Request (TBOX_ remote heating request: request) to VCU, and VCU feeds back a corresponding signal whether it is allowed;

[0092] 5. BMS receives the preheating permission signal VCU_RemoteHeatAllow:Allow sent by VCU (VCU_Remote heating permission: Allow);

[0093] 6. After receiving the permission signal from VCU, BMS closes the main negative and pre-charge relays. After the pre-charge is completed, the main positive relay is closed, the pre-charge relay is disconnected, and finally the heating relay is closed, and BMS enters the scheduled heating state; at the same time, the main positive, pre-charge state, main negative, heating relay state and BMS state BMS_NegBattContSts:Connect (BMS_main positive relay: connected), BMS_PrechargeSts:PrechargeSuccess (BMS_precharge: pre-charge successful), BMS_PTCSts:Connect (BMS_PTC: connected), BMS_PosBattContSts:Connect (BMS_main negative relay: connected), BMS_WorkingMode (BMS_working mode) are fed back to VCU;

[0094] 7. After preheating starts, the BMS sends the preheating status BMS_RemoteHeatSts (BMS_remote heating) to the VCU&TBOX, and feeds back the corresponding preheating status information; the BMS_RemoteHeatSts (BMS_remote heating) status bit sending logic definition:

[0095] 00: Default value (send this status bit when ① no preheating request or ② no preheating permission)

[0096] 01: Preheating (This status bit is sent when ① there is a preheating request & ② there is a preheating permission & ③ the battery heating relay is closed)

[0097] 10: Preheating is finished (① When the preheating request or preheating permission signal changes from yes to no: yes → no and ② When the battery heating relay is disconnected, this status bit is sent and jumps to the 00 status bit after sending 5 frames)

[0098] 8. During the preheating process, if the BMS determines that any of the following conditions are met:

[0099] ①SOC<25%;

[0100] ②Tmin>10℃ and lasts>10s;③The discharge high voltage fault level occurs (discharge fault level>2 impact);④No gun plug signal;⑤Receive preheating prohibition from VCU;⑥Receive TBOX to stop sending preheating request;After any condition is met, BMS determines that the preheating condition is not met, if it does not receive VCU preheating prohibition instruction within 3s, it will delay 5s to disconnect the high voltage relay and go to the next high voltage process;

[0101] 9. BMS determines that preheating is over or receives preheating prohibition from VCU during preheating, directly disconnects the PTC heating relay, and determines the current at the same time. If the current is less than 1A, the main negative and main positive relays are disconnected, and the corresponding relays and working status BMS_PTCSts:Disconnect(BMS_PTC: Disconnect), BMS_NegBattContSts:Disconnect(BMS_Main Positive Relay: Disconnect), BMS_PosBattContSts:Disconnect(BMS_Main Negative Relay: Disconnect), BMS_WorkingMode(BMS_Working Mode), BMS_RemoteHeatWorkSts(BMS_Remote Heating System) are fed back to VCU; judging whether the current is greater than 1A is to avoid relay sticking due to power-off under load. If it is greater than 1A, it needs to be discharged, and if it is greater than 1A, discharge control is required.

[0102] Obviously, the specific implementation of the present invention is not limited to the above-mentioned methods. As long as various non-substantial improvements are made using the method concept and technical solution of the present invention, they are all within the protection scope of the present invention.

Claims

1. A method for controlling electric vehicle scheduled discharge heating, characterized in that: include: Collect the user's travel plan information through the TSP platform and send it to the vehicle-mounted TBOX; The on-board TBOX calculates the scheduled heating wake-up time based on the user's travel plan information, wakes up the entire vehicle and controls the battery for preheating when the scheduled wake-up time is reached.

2. The method for controlling the scheduled discharge heating of an electric vehicle according to claim 1, characterized in that: The TPS platform obtains the travel plan information set by the user by interacting with the user's mobile phone app, where the travel plan information includes the scheduled travel time and the nature of the trip; the nature of the trip includes single validity or multiple validity; TBOX calculates the wake-up time point for the scheduled heating based on the scheduled travel time, and memorizes the wake-up time point according to whether the nature of the trip is single validity or multiple validity.

3. The method for controlling the scheduled discharge heating of an electric vehicle according to claim 1, characterized in that: After receiving the travel plan information and completing the setting record, TBOX will feedback the status information of successful reservation and feedback it to the user's mobile app through TSP. If the mobile app does not receive the feedback status information within the specified time after the setting information is sent, it will be judged that the reservation has failed. At this time, the reservation failure information will be displayed and the information sent after the specified time will be ignored; at the same time, TBOX will collect and obtain the preheating status information in real time and feedback it to the user's mobile app in real time; the preheating status includes booking, preheating, and preheating ended.

4. A method for controlling the scheduled discharge heating of an electric vehicle as claimed in any one of claims 1 to 3, characterized in that: The TSP platform receives the travel plan information from the user's mobile app, then sends the travel plan information to TBOX in the form of event frames and receives the feedback information from TBOX and forwards it to the mobile app; The information received and sent by the TSP platform is stored in the TSP platform in the form of logs.

5. A method for controlling the scheduled discharge heating of an electric vehicle as claimed in any one of claims 1 to 3, characterized in that: After receiving the travel plan information, the vehicle-mounted TBOX calculates the wake-up time point, and wakes up the vehicle to enter the preheating control process after the wake-up time point is reached; The calculation of the wake-up time point includes: If the scheduled travel time and the time on the day are set across days, TBOX will calculate the wake-up time by subtracting the estimated preheating duration from the travel time on the day of travel, and wake up the vehicle for preheating control after the wake-up time is reached; If the scheduled travel time and the current time are on the same day, when the time difference between the current time and the scheduled travel time is less than the estimated preheating duration, the vehicle will be immediately awakened for preheating control; Otherwise, the target wake-up time is obtained by subtracting the estimated heating duration from the travel time.

6. The method for controlling the scheduled discharge heating of an electric vehicle as claimed in claim 5, characterized in that: The estimated heating duration is calculated based on the battery temperature, battery charge, and distance to the travel destination.

7. A method for controlling the scheduled discharge heating of an electric vehicle as claimed in any one of claims 1 to 3, characterized in that: The method further comprises TBOX processes according to the set wake-up time point. If the vehicle is not in sleep mode after the wake-up time point is reached, TBOX directly sends a heating request. If the vehicle is in sleep mode at this time, TBOX wakes up the vehicle and sends a heating request at the same time. It sends a heating request start instruction to BMS. After TBOX sends the heating request, if it does not receive the preheating permission signal sent by VCU within the specified time, it stops sending the heating request and feeds back the end of preheating to the TSP platform. If the preheating status signal fed back by the BMS is not received within the specified time, the preheating end signal is fed back to the TSP platform; If TBOX receives the status of VCU & BMS within the specified time, it will feedback the corresponding status to the TSP platform.

8. An electric vehicle scheduled discharge heating control method as claimed in any one of claims 1 to 3, characterized in that: The method also includes a vehicle controller VCU receiving a preheating request sent by the BMS and determining whether to send a preheating permission signal. When the VCU satisfies the following conditions at the same time: the vehicle is in the OFF gear, the door is in a closed state, the vehicle is in a stationary state, the preheating request signal from the BMS is received, the vehicle has no high-voltage fault affecting the upper voltage, and there is no gun insertion signal, the VCU sends a preheating permission signal to the BMS and the TBOX; after the BMS controls the main positive relay to close, the DCDC enable signal and the target voltage are sent to the DCDC; after the DCDC receives the enable and target voltage, it works and feeds back its own state and output voltage and current signals to the VCU; During the preheating process, the preheating conditions are judged in time. The preheating conditions include: ① The vehicle is not in OFF gear; ② Both doors are open; ③ The vehicle is not stationary; ④ The BMS stops sending the preheating request signal; ⑤ The vehicle has a high voltage fault; ⑥ A gun insertion signal is detected; ⑦ A heating timeout fault is received from the BMS; If any preheating condition is met, the preheating is returned to normal. When the preheating is over, the VCU sends a report prohibiting the preheating instruction to the BMS and TBOX. At the same time, the VCU disconnects the DCDC enable and controls the BMS to disconnect the main positive and negative relays.

9. A method for controlling the scheduled discharge heating of an electric vehicle as claimed in any one of claims 1 to 3, characterized in that: The method also includes that after waking up the whole vehicle, the BMS is awakened, and the BMS sends the self-test status and fault level to the VCU; the BMS receives the heating request sent by the TBOX and determines whether to send a preheating request to the VCU; if the BMS determines that the battery power is greater than the set power threshold, the temperature is lower than the set threshold and lasts for a set time, there is no discharge high voltage fault, and receives the request signal sent by the TBOX, the BMS sends a preheating request to the VCU to obtain a preheating permission signal from the VCU; If the preheating permission is not received from VCU within the specified time, the preheating request will be stopped: if the preheating permission signal is received from VCU, the BMS will close the main negative and pre-charging relays. After the pre-charging is completed, the main positive relay will be closed, the pre-charging relay will be disconnected, and finally the heating relay will be closed, and the BMS will enter the scheduled heating state; at the same time, the main positive, pre-charging state, main negative, heating relay state and BMS state will be fed back to the VCU, and the preheating state will be fed back to the VCU and TBOX.

10. An electric vehicle scheduled discharge heating control method as claimed in any one of claims 1 to 3, characterized in that: The method also includes the BMS itself judging that preheating is over or receiving preheating prohibition from the VCU during preheating, directly disconnecting the PTC heating relay, and judging the current at the same time. If the current is less than the set value, the main negative and main positive relays are disconnected, and the corresponding relays and working status are fed back to the VCU.