Graphite purification system and graphite purification method

By designing a high-temperature graphite purification furnace to use chlorine and hydrogen to burn to generate hydrogen chloride gas, the efficient removal of graphite impurities is achieved, and the pollution, time and corrosive problems in the existing technology are solved, and graphite purification efficiency and industrial added value are improved.

CN118908202APending Publication Date: 2024-11-08QINGDAO HYDROSHANG PRECISION MANUFACTURING CO LTD

Patent Information

Application Number
CN202411205493.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2024-06-27
Filing Date
2024-08-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Among the existing graphite purification technology, alkali acid method has serious pollution and low efficiency, high temperature method consumes a lot of energy, and the use of chlorine and hydrogen chloride in chlorinated roasting method is highly corrosive and toxic, making it difficult to achieve industrial production.

Method used

A high-temperature graphite purification furnace is designed to use the chlorine and hydrogen generated by electrolysis to generate high-temperature hydrogen chloride gas. By chlorideing impurities and evaporating within 500 degrees, high-purity purification of graphite is achieved, energy consumption is reduced and impurity removal rate is improved.

Benefits of technology

It effectively reduces the energy consumption of graphite purification process, improves the impurity removal rate of high-purity graphite, simplifies equipment design, avoids the corrosiveness of chlorine, and increases industrial added value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118908202A_ABST
    Figure CN118908202A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of graphite purification, and particularly relates to a graphite purification system and a graphite purification method. The graphite purification system comprises a gas combustion system positioned at the upstream and a graphite purification reaction system positioned at the midstream; the gas combustion system is in gas flow communication with the graphite purification system, so that hydrogen chloride generated by combustion of hydrogen and chlorine in the gas combustion system flows into the graphite purification system, and graphite is purified by removing oxides of elements such as silicon, aluminum and iron. Heat generated in the reaction process of hydrogen and chlorine can be fully utilized for heating the graphite furnace, and the industrial additional value of the reaction is increased. The high-temperature hydrogen chloride gas is used for purifying graphite and reacts with impurities in the graphite to generate low-boiling-point and volatile impurities, and the impurities are removed at a relatively low temperature, so that the graphite purification temperature can be reduced, and the energy consumption of graphite purification is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of graphite purification, and in particular relates to a graphite purification system and a graphite purification method. Background Art

[0002] In today's environment of resource strategic development, graphite, as one of the indispensable raw materials in the field of high-tech materials in the 21st century, occupies an important position in the national economic construction. my country's graphite resource reserves and production are both ranked first in the world. With the continuous development of science and technology, ordinary graphite can no longer meet the requirements of high-tech industries. The production and research of high-purity graphite has been put on the agenda and has gradually become a vital technology for the development of the world today. High-purity graphite is a graphite product with a carbon content of not less than 99.99%. High-purity graphite has a huge application market, especially in advanced refractory materials, military industry, electrodes in the battery industry, nuclear industry and other more sophisticated equipment and instruments. For example, nuclear graphite materials have extremely high requirements on the boron content and graphite purity in graphite. Lithium battery negative electrode graphite material, the purity of graphite has a great influence on the performance of lithium batteries, etc.

[0003] The preparation of high-purity graphite mainly includes alkali-acid method, chlorination roasting method and high-temperature method. The alkali-acid method uses a large amount of acid and alkali, which is seriously polluting and has low purification efficiency. It is only suitable for the initial purification of graphite. Although the high-temperature method can obtain high-purity graphite, it takes a long time, consumes a lot of energy, has high requirements for equipment, and is complicated to operate. Although the chlorination roasting method can achieve purification at low temperature, save energy and reduce consumption, chlorine and hydrogen chloride are highly corrosive and toxic, which is not convenient for production and transportation, and difficult to industrialize.

[0004] The inventors noticed that chlorine and hydrogen are often obtained by the chlor-alkali process in the field of chemical production. Generally, hydrogen chloride gas is generated by combustion, and liquid hydrogen chloride is obtained after cooling for the next step of chemical production, which requires a combustion system and a cooling system. In this process, the combustion of chlorine and hydrogen generates heat waste, and the reaction is relatively dangerous. Due to the limitations of the equipment and site required, this reaction cannot be well utilized to generate more economic value.

[0005] In order to solve the above problems, this application is proposed. Summary of the invention

[0006] This application cleverly utilizes the characteristics of high purity of chlorine and hydrogen produced by electrolysis, and high-temperature hydrogen chloride after combustion, and proposes a high-temperature graphite purification furnace design and a process for purifying graphite using hydrogen chloride gas. Impurities in general graphite, including iron oxide, silicon oxide, and aluminum oxide, can be volatilized and removed within 500 degrees after being converted into chlorides, thus providing a new idea for purifying graphite. This application is conducive to improving the industrial added value in the process of using hydrogen and chlorine gas to burn to generate hydrogen chloride, reducing the working conditions of graphite purification using high-temperature methods, reducing the energy consumption of the purification process, and improving the impurity removal rate of high-purity graphite.

[0007] In a first aspect, the present application provides a graphite purification system, the graphite purification system comprising: a gas combustion system located upstream, a graphite purification system located midstream;

[0008] The gas combustion system is connected to the graphite purification system by gas flow so that the hydrogen chloride generated by the combustion of hydrogen and chlorine in the gas combustion system can flow to the graphite purification system to purify the graphite.

[0009] In the present application, the direction of the gas flow in the graphite purification system is recorded as from upstream to downstream.

[0010] Preferably, the gas combustion system comprises: a combustion chamber, a chlorine gas inlet and a hydrogen gas inlet located upstream of the combustion chamber, and an igniter located in the combustion chamber;

[0011] The graphite purification system comprises: a graphite furnace having a cavity, and a gas outlet located downstream of the cavity of the graphite furnace.

[0012] Preferably, a mixing chamber is further arranged upstream of the combustion chamber, a gas mixing baffle is arranged in the mixing chamber, and an anti-backfire baffle is arranged between the gas mixing baffle and the combustion chamber.

[0013] Preferably, a baffle with holes is provided on the upper part of the cavity of the graphite furnace to allow gas to pass through and block solid powder.

[0014] Preferably, the gas combustion system and graphite purification system are of integrated design:

[0015] A removable distribution plate is provided between the combustion chamber and the graphite furnace silo, and through holes are provided on the removable distribution plate to allow gas to pass through and block solid powder;

[0016] A graphite discharge port is arranged at the lower part of the combustion chamber.

[0017] Preferably, the gas combustion system and graphite purification system are split designs:

[0018] The gas combustion system and the graphite purification system are connected via a graphite lined pipeline;

[0019] A graphite discharge port is arranged at the lower part of the graphite purification system.

[0020] Preferably, the graphite purification system further comprises: a gas purification system located downstream;

[0021] The gas purification system comprises: a graphite collecting furnace and a hydrogen chloride purification furnace located downstream of the graphite collecting furnace;

[0022] The graphite collecting furnace is configured to collect the purified graphite discharged from the graphite purification system and discharge the gas containing impurities and hydrogen chloride into the hydrogen chloride purification furnace;

[0023] The hydrogen chloride purification furnace is configured to condense impurities in the gas and discharge purified hydrogen chloride.

[0024] Preferably, the combustion chamber is an inverted cone-shaped structure, a heat-insulating layer is provided on the periphery of the combustion chamber and / or the graphite furnace, and a heating device is provided outside the cavity of the graphite furnace.

[0025] Preferably, the chlorine gas inlet and hydrogen gas inlet and outlet are all provided with gas one-way valves.

[0026] The graphite furnace body is made of graphite, and the combustion chamber is also surrounded by a graphite outer wall.

[0027] A second aspect of the present application provides a graphite purification method, which uses the graphite purification system according to any one of the first aspects, and the method comprises:

[0028] Hydrogen and chlorine are introduced into the gas combustion system to burn and generate hydrogen chloride gas and release heat. The hydrogen chloride gas flows into the graphite purification system to purify the graphite. The generated impurity gas is discharged from the outlet to obtain purified graphite.

[0029] The hydrogen chloride in the exhaust gas of the graphite purification system is recovered and utilized.

[0030] The third aspect of the present application provides use of the graphite purification system described in the first aspect for preparing hydrogen chloride using hydrogen and chlorine as raw materials and recovering heat.

[0031] Preferably, after the hydrogen chloride reacts with the impure graphite, the excess hydrogen chloride is purified downstream to remove impurities before being used as a chemical raw material.

[0032] Compared with the prior art, this application has the following beneficial effects:

[0033] 1. This application can make full use of the heat generated during the reaction of hydrogen and chlorine for heating the graphite furnace and increase the industrial added value of the reaction. High-temperature hydrogen chloride gas is used to purify graphite, and reacts with impurities in the graphite to generate low-melting and boiling point, volatile impurities, which are removed at a lower temperature. This can reduce the temperature of graphite purification, greatly reduce the energy consumption of graphite purification, and enhance the removal rate of graphite impurities. The hydrogen chloride gas is fully in contact with the graphite powder, which improves the removal rate of impurities.

[0034] 2. In the preferred solution, the gas combustion system and the graphite purification system are designed as an integrated system, a removable distribution plate is provided between the combustion chamber and the graphite furnace silo, and the removable distribution plate is provided with through holes to allow gas to pass through and block solid powder; a graphite powder discharge port is provided at the lower part of the combustion chamber. This can simplify the equipment and reduce the floor space.

[0035] 3. In the preferred solution, the gas combustion system and the graphite purification system are designed as separate parts, which can avoid the phenomenon of uneven graphite powder purification effect caused by unstable gas combustion and output a stable high-temperature hydrogen chloride gas flow. Figure 2 The independent combustion chamber makes chlorine and hydrogen react to produce hydrogen chloride gas, and outputs a stable high-temperature hydrogen chloride gas flow. Figure 1 The function of the integrated graphite furnace with a combustion chamber shown is to react with graphite powder and remove impurities in the graphite powder.

[0036] 4. In the preferred solution, the gas combustion system and the graphite purification system are split-type designs, which can avoid the phenomenon of uneven purification effect of graphite powder due to unstable gas combustion, and output a stable high-temperature hydrogen chloride gas flow. In addition, the independent combustion chamber can be used in conjunction with a spouted bed graphite furnace. The spouted graphite furnace can make the graphite powder tumble more violently when reacting with hydrogen chloride gas, have better contact with the reaction gas, and shorten the reaction time.

[0037] 5. In the preferred solution, volatile substances such as ferric chloride are removed by purification in the downstream, and the hydrogen chloride therein can still be used for other chemical reactions such as addition.

[0038] 6. The graphite purification system is designed as a fluidized bed reactor, which can make the hydrogen chloride gas fully contact with the graphite powder and improve the removal rate of impurities in the graphite. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a schematic diagram of the structure of a graphite purification furnace with a distribution plate and a combustion chamber, showing the state of graphite powder tumbling in the graphite furnace.

[0040] Figure 2 This is a schematic diagram of the structure of an independent gas combustion chamber.

[0041] Figure 3This is a schematic diagram of the structure of a spouted bed graphite furnace, showing the state of graphite powder tumbling in the graphite furnace.

[0042] Figure 4 This is a graph showing the relationship between the holding time in a graphite furnace and the purity of graphite.

[0043] Figure 5 Schematic diagram of the graphite purification system.

[0044] List of reference numerals:

[0045] 1. First feed inlet valve, 2. feed inlet, 3. graphite furnace silo, 4. first gas one-way valve, 5. first gas outlet, 6. first heating coil, 7. first graphite furnace wall, 8. second gas one-way valve, 9. carrier gas / hydrogen pipeline, 10. removable distribution plate, 11. third gas one-way valve, 12. carrier gas / chlorine pipeline, 13. first electric spark igniter, 14. first combustion chamber, 15. first discharge valve, 16. discharge pipeline, 17. fourth gas one-way valve; 18. chlorine gas inlet; 19. hydrogen gas inlet; 20. gas premixing chamber; 21. gas mixing baffle; 2 2; anti-backfire baffle; 23, second combustion chamber; 24, second electric spark igniter; 25, second graphite furnace wall; 26, first insulation layer; 27, first temperature probe; 28, first gas outlet, 29, gas inlet; 30, second feed inlet valve; 31, second feed inlet; 32, reaction chamber; 33, second discharge outlet valve; 34, fifth gas one-way valve; 35, second heating coil; 36, second temperature probe; 37, third temperature probe; 38, third graphite furnace wall; 39, second insulation layer; 40, perforated baffle; 41, second gas outlet; 42, discharge port; 43, graphite powder. DETAILED DESCRIPTION

[0046] The present application is further described in detail below in conjunction with embodiments.

[0047] Those skilled in the art will appreciate that the following examples are only used to illustrate the present application and should not be considered to limit the scope of the present application. If no specific techniques or conditions are specified in the examples, the techniques or conditions described in the literature in the art or the product specifications are used. If the manufacturer of the materials or equipment used is not specified, they are all conventional products that can be purchased.

[0048] Those skilled in the art will appreciate that, unless expressly stated otherwise, the singular forms "a", "an", "said" and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present application refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof. It should be understood that when we refer to an element as being "connected" to another element, it may be directly connected to the other element, or there may be intermediate elements. In addition, the "connection" used herein may include wireless connections.

[0049] In the description of this application, unless otherwise specified, "plurality" means two or more. The terms "inside", "upper", "lower", etc. indicate positions or state relationships based on the positions or state relationships shown in the drawings, which are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operate in a specific position, and therefore cannot be understood as limiting this application.

[0050] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "provided with" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in this application are understood according to specific circumstances.

[0051] It will be understood by those skilled in the art that, unless otherwise defined, all terms used herein, including technical and scientific terms, have the same meaning as those generally understood by those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in common dictionaries should be understood to have meanings consistent with the meanings in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless defined as herein.

[0052] The "range" disclosed in the present application is defined in the form of a lower limit and an upper limit, and a given range is defined by selecting a lower limit and an upper limit, and the selected lower limit and upper limit define the boundaries of the particular range. The range defined in this way can be inclusive or exclusive of the end values, and can be arbitrarily combined, that is, any lower limit can be combined with any upper limit to form a range. For example, if a range of 60 to 120 and 80 to 110 is listed for a particular parameter, it is understood that a range of 60 to 110 and 80 to 120 is also expected. In addition, if the minimum range values ​​1 and 2 are listed, and if the maximum range values ​​3, 4 and 5 are listed, the following ranges can all be expected: 1 to 3, 1 to 4, 1 to 5, 2 to 3, 2 to 4 and 2 to 5. In the present application, unless otherwise specified, the numerical range "a to b" represents an abbreviation of any real number combination between a and b, where a and b are both real numbers. For example, the numerical range "0-5" means that all real numbers between "0-5" are listed in this document, and "0-5" is just an abbreviation of these numerical combinations. In addition, when a parameter is expressed as an integer ≥ 2, it is equivalent to disclosing that the parameter is, for example, an integer of 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, etc.

[0053] If not otherwise specified, all embodiments and optional embodiments of the present application can be combined with each other to form a new technical solution. If not otherwise specified, all technical features and optional technical features of the present application can be combined with each other to form a new technical solution. If not otherwise specified, all steps of the present application can be performed sequentially or randomly, preferably sequentially. For example, the method includes steps (a) and (b), indicating that the method may include steps (a) and (b) performed sequentially, or may include steps (b) and (a) performed sequentially. For example, the method may further include step (c), indicating that step (c) may be added to the method in any order, for example, the method may include steps (a), (b) and (c), or may include steps (a), (c) and (b), or may include steps (c), (a) and (b), etc.

[0054] If there is no special explanation, the "include" and "comprising" mentioned in this application are open-ended or closed-ended. For example, the "include" and "comprising" may mean that other components not listed may also be included or only the listed components may be included or only the listed components may be included.

[0055] If not specifically stated, in this application, the term "or" is inclusive. For example, the phrase "A or B" means "A, B, or both A and B".

[0056] Example 1- Figure 1 Use alone

[0057] like Figure 1 A graphite purification system includes: a gas combustion system located upstream and a graphite purification system located downstream. The gas combustion system and the graphite purification system are an integrated graphite furnace with a combustion chamber.

[0058] The integrated graphite furnace with combustion chamber includes the following parts: The upper part of the integrated graphite furnace with combustion chamber is a graphite furnace, which includes: a graphite furnace silo 3 for the reaction of graphite and hydrogen chloride gas, and a first graphite furnace wall 7 for preventing the corrosive gas hydrogen chloride from corroding the equipment. The outer wall of the first graphite furnace wall 7 is provided with a first heating coil 6 for heating. The lower part of the integrated graphite furnace with combustion chamber is a first combustion chamber 14 for the combustion of chlorine and hydrogen. The first combustion chamber 14 has a combustion cavity.

[0059] A removable distribution plate 10 is provided between the combustion chamber and the graphite furnace silo 3. The removable distribution plate 10 is provided with through holes to allow gas to pass through and block solid powder. A graphite discharge port is provided at the lower part of the combustion chamber to connect to the discharge pipe 16.

[0060] A chlorine inlet is provided at the lower part of the combustion chamber to connect with the carrier gas / chlorine pipeline 12. A hydrogen inlet is provided at the lower part of the combustion chamber to connect with the carrier gas / hydrogen pipeline 9. A first electric spark igniter 13 is provided in the combustion chamber. The combustion chamber is in an inverted cone shape, and the bottom of the inverted cone is connected with a discharge pipeline, and a first discharge port valve 15 is provided on the discharge pipeline. A second gas one-way valve 8 is provided on the carrier gas / hydrogen pipeline 9. A third gas one-way valve 11 is provided on the carrier gas / chlorine pipeline 12.

[0061] An outlet pipe is provided on the top of the graphite furnace silo 3, and a first gas one-way valve 4 and a first outlet 5 are provided on the outlet pipe. A feed pipe with a certain inclination angle is connected to the middle of the outlet pipe. A feed port 2 and a first feed port valve 1 are provided on the feed pipe.

[0062] During the specific operation, open the first feed inlet valve 1, and add the raw material to be processed, 40um diameter graphite powder, and the purity of the graphite powder is 91.3%, into the graphite furnace silo 3 through the feed inlet 2. The height of the graphite powder added cannot exceed 1 / 5 of the overall height of the graphite furnace silo 3. After the addition is completed, close the first feed inlet valve 1, open the first gas one-way valve 4, so that the gas generated in the furnace can be discharged to the outside through the first outlet 5. Use the first heating coil 6 to heat the temperature of the first graphite furnace wall 7 to above 500°C, and the increase rate is 10°C / min. During the heating process, open the second gas one-way valve 8, and pass a small flow of 2m through the carrier gas / hydrogen pipeline 9. 3 / h nitrogen with a purity of 99.99% or argon with a purity of 99.99% etc. The carrier gas blows up the graphite powder in the furnace through the internal holes of the removable distribution plate 10, so that the graphite powder is heated evenly, and the impurity gases such as oxygen in the furnace are emptied to ensure the purity of the reaction gas. After reaching the heating temperature and the concentration of oxygen in the tail gas is less than 1000ppm, the next step of operation is entered. A certain proportion of hydrogen is introduced into the carrier gas / hydrogen pipeline 9, and the flow rate of hydrogen is 1m 3 / h, increase the carrier gas velocity to 3m 3 / h, open the third gas one-way valve 11, and inject carrier gas and chlorine into the furnace through the chlorine / carrier gas pipeline 12. The carrier gas flow rate is 3m 3 / h, the flow rate of chlorine is 1m 3 / h. After the first gas outlet 5 can detect hydrogen and chlorine at the same time, the first spark igniter 13 is used to ignite the hydrogen and chlorine mixture in the furnace, and the gas generates hydrogen chloride gas in the first combustion chamber 14 made of graphite. The hydrogen chloride gas is carried into the graphite furnace bin by the carrier gas, and reacts with the graphite powder at high temperature to convert the high melting and boiling point silicon dioxide, aluminum oxide, iron oxide, and ferroferric oxide impurities in the graphite into low melting and boiling point silicon chloride, aluminum chloride, ferric chloride, ferrous chloride, etc. And through a slightly excess of chlorine, ferrous chloride can also be converted into ferric chloride with a lower melting and boiling point, and the gas is discharged from the first gas outlet 5. After the heat preservation reaction for 4 hours, the supply of hydrogen and chlorine is turned off, and the supply of nitrogen is retained at a rate of 3m 3 / h, the heating is stopped, and the low melting and boiling point chlorides are volatilized in the high temperature graphite furnace and discharged from the first gas outlet 5, leaving high purity graphite with a purity of 99.993%. The cooling rate is 8℃min -1 After cooling to room temperature, close the second gas one-way valve 8 and the third gas one-way valve 11 to stop the introduction of the carrier gas. Open the first outlet valve 15, remove the removable distribution plate 10, and discharge the graphite powder through the outlet pipe 16. After the graphite powder is discharged, close the first outlet valve 15 and insert the removable distribution plate 10.

[0063] After the gas discharged from the first gas outlet 5 is cooled, the chloride impurities with low melting and boiling points can be separated from the gaseous substance, and then the remaining hydrogen chloride gas in the gaseous substance can be collected and recycled.

[0064] Example 2- Figure 1 and Figure 2 Combined use

[0065] A graphite purification system comprises: a gas combustion system located upstream and a graphite purification system located downstream; the gas combustion system and the graphite purification system are connected by gas flow so that hydrogen chloride generated by the combustion of hydrogen and chlorine in the gas combustion system can flow into the graphite purification system to purify the graphite.

[0066] In this embodiment, the gas combustion system and the graphite purification system are of split design: the gas combustion system and the graphite purification system are connected via a graphite lined pipe; a graphite discharge port is provided at the bottom of the graphite purification system.

[0067] The gas combustion system of this embodiment is Figure 2 The independent combustion chamber shown includes the following main parts: a second combustion chamber 23 for gas reaction combustion, and a gas premixing chamber 20 located below the combustion chamber 23 and used for premixing gas. The second combustion chamber 23 is surrounded by a second graphite furnace wall 25. An anti-flashback baffle 22 is arranged between the second combustion chamber 23 and the gas premixing chamber 20. A plurality of staggered gas mixing baffles 21 are arranged in the gas premixing chamber 20. One end of the gas mixing baffle 21 is fixed to the inner wall of the gas premixing chamber 20. A second electric spark igniter 24 for igniting the reaction is arranged in the second combustion chamber 23. A first insulation layer 26 for heat preservation is arranged on the outer periphery of the second graphite furnace wall 25. A chlorine gas inlet 18 and a hydrogen gas inlet 19 are arranged below the gas premixing chamber 20, and a fourth gas one-way valve 17 is arranged at the chlorine gas inlet 18. A gas one-way valve is also arranged on the hydrogen gas inlet 19. The pipelines connected to the chlorine gas inlet 18 and the hydrogen gas inlet 19 are at a certain angle to the gas premixing chamber 20 so that the chlorine gas and the hydrogen gas enter the gas premixing chamber 20 from the oblique lower left and oblique lower right, respectively, and are initially mixed in the interactive space at the bottom of the gas premixing chamber 20. A first gas outlet 28 is arranged above the second combustion chamber 23. The inner cavity of the second combustion chamber 23 is substantially octagonal. A first temperature probe 27 is arranged at the upper part of the second combustion chamber 23.

[0068] The graphite purification system of this embodiment is Figure 1 The one-piece graphite furnace with combustion chamber shown. Figure 1 The first spark igniter 13 in does not have to be used.

[0069] Figure 2 The first gas outlet 28 of the independent combustion chamber shown in FIG. Figure 1 The carrier gas / chlorine gas pipeline 12 or the carrier gas / hydrogen gas pipeline 9 of the integrated graphite furnace with combustion chamber is connected by a graphite pipeline with a thermal insulation layer to transport the hydrogen chloride gas produced by the independent combustion chamber to Figure 1 An integrated graphite furnace with a combustion chamber is shown.

[0070] Figure 2 The specific working mode of the independent combustion chamber shown is as follows:

[0071] Open the fourth gas one-way valve 17, and evacuate the air in the furnace by injecting inert gas into the chlorine inlet 18. Then inject chlorine through the chlorine inlet 18 and hydrogen through the hydrogen inlet 19. The gas injection speed is 1m / s. 3 / h, the two gases are fully mixed in the gas premixing chamber 20 through the gas mixing baffle 21, and then enter the second combustion chamber 23 through the anti-flashback baffle 22 and ventilate for 5 minutes. After the inert gas in the second combustion chamber 23 is discharged, the second spark igniter 24 is used to ignite the reaction to generate high-temperature hydrogen chloride gas, and release a large amount of heat, so that the reaction gas is in a high-temperature state. The second graphite furnace wall 25 prevents the high-temperature corrosive hydrogen chloride gas from corroding the furnace wall. The first insulation layer 26 is used to insulate the furnace. During combustion, the anti-flashback baffle 22 can prevent the flame in the second combustion chamber 23 from entering the gas premixing chamber 20. The first temperature probe 27 is used to monitor the combustion temperature in the furnace, and the high-temperature hydrogen chloride gas is discharged to the first outlet 28. Figure 1 An integrated graphite furnace with a combustion chamber is shown.

[0072] Figure 1 The specific working mode of the integrated graphite furnace with combustion chamber shown is as follows:

[0073] First, prepare the graphite furnace: open the first feed inlet valve 1, add graphite powder into the graphite furnace silo 3 through the feed inlet 2, close the first feed inlet valve 1, the graphite powder is located on the removable distribution plate 10 in the graphite furnace silo 3, pass nitrogen or argon or other carrier gas into the graphite furnace through the carrier gas chlorine pipeline 12, and ventilate for 20 minutes to exhaust the air in the furnace.

[0074] Then Figure 2 The high temperature hydrogen chloride gas produced by the reaction of hydrogen and chlorine in the independent combustion chamber shown in the figure is discharged through the first gas outlet 28 and the Figure 1 The carrier gas / hydrogen pipeline 9 enters the graphite furnace silo 3, and the inert carrier gas is continuously introduced into the graphite furnace silo 3 through the carrier gas / chlorine pipeline 12, with a ventilation speed of 3m 3 / h, so that the graphite powder in the graphite furnace silo 3 tumbles and presents a bulk sulfide state, which is fully in contact with the high-temperature hydrogen chloride gas for reaction. After the gas enters, the first heating coil 6 is activated to raise the temperature in the furnace to 500°C, reaching the reaction temperature. The reaction ends after 4 hours. After the reaction ends, the heating coil 6 is first turned off to stop Figure 2 The supply of hydrogen and chlorine in the independent combustion chamber shown in the figure is controlled by introducing nitrogen or argon or other protective gases from the chlorine inlet 18 and the hydrogen inlet 19. The reaction in the second combustion chamber 23 stops because the supply of the reaction gas stops. The nitrogen or argon or other protective gases enter the first gas outlet 28 and the carrier gas / hydrogen pipeline 9 connected thereto. Figure 1The graphite powder in the graphite furnace silo 3 can be withdrawn after the temperature in the graphite furnace silo 3 returns to room temperature. The specific method is to close the second gas one-way valve 8 and the third gas one-way valve 11, open the first discharge port valve 15, and withdraw the removable distribution plate 10, and the graphite powder falls into the discharge pipe 16 under the action of gravity.

[0075] This embodiment adopts a design of combining an independent combustion chamber with a graphite purification furnace with a distribution plate and a combustion chamber, which can avoid the phenomenon of uneven graphite powder purification effect caused by unstable gas combustion. Figure 2 The independent combustion chamber makes chlorine and hydrogen react to produce hydrogen chloride gas, and outputs a stable high-temperature hydrogen chloride gas flow. Figure 1 The function of the integrated graphite furnace with a combustion chamber shown is to react with graphite powder and remove impurities in the graphite powder.

[0076] Example 3- Figure 2 and Figure 3 Combined use

[0077] A graphite purification system comprises: a gas combustion system located upstream and a graphite purification system located downstream; the gas combustion system and the graphite purification system are connected by gas flow so that hydrogen chloride generated by the combustion of hydrogen and chlorine in the gas combustion system flows into the graphite purification system to purify the graphite.

[0078] In this embodiment, the gas combustion system and the graphite purification system are of split design: the gas combustion system and the graphite purification system are connected via a graphite lined pipe; a graphite discharge port is provided at the bottom of the graphite purification system.

[0079] The gas combustion system is Figure 2 The specific structure of the independent combustion chamber shown is as described in Example 2.

[0080] The graphite purification system is Figure 3 A spouted bed graphite furnace is shown.

[0081] The spouted bed graphite furnace includes: a reaction chamber 32 in a third graphite furnace wall 38. A second heating coil 35 and a second insulation layer 39 are arranged on the outer periphery of the third graphite furnace wall 38. The lower part of the reaction chamber 32 is inverted conical, and the upper part is cylindrical. A second temperature probe 36 is arranged on the inverted conical part. A third temperature probe 37 is arranged on the cylindrical part. A discharge port 42 is connected directly below the bottom of the reaction chamber 32, and a second discharge port valve 33 is arranged at the discharge port 42. The bottom of the reaction chamber 32 is also connected to an air inlet 29 through an inclined pipeline obliquely below, and a fifth gas one-way valve 34 is arranged at the air inlet 29. The upper part of the reaction chamber 32 is connected to a second feed port 31 through an inclined pipeline obliquely above. A second feed port valve 30 is arranged at the second feed port 31. A perforated baffle 40 is arranged on the upper part of the reaction chamber 32 to allow gas to pass through and block solid powder. The perforated baffle 40 is located above the second feed port 31. A second gas outlet 41 is disposed above the perforated baffle 40. A gas one-way valve may also be disposed at the second gas outlet 41.

[0082] The specific connection method is as follows: the first air outlet 28 of the independent combustion chamber is connected to the air inlet 29 in the spouted bed graphite furnace using a pipeline with a graphite lining and a thermal insulation layer.

[0083] The specific work is as follows: the preparation work before the spouted bed graphite furnace reaction is: open the second feed inlet valve 30, close the second discharge outlet valve 33, and add the graphite powder to be treated into the reaction chamber 32 through the second feed inlet 31. Figure 2 Inert gas such as nitrogen, argon, etc. is injected into the air inlet 18 of the independent combustion chamber to discharge the air in the independent combustion chamber. The gas will pass through the connecting pipe, through the first air outlet 28 of the independent combustion chamber and the air inlet 29 in the spouted bed graphite furnace, and inject inert gas into the graphite furnace to discharge the air in the graphite furnace. The ventilation time is 10 minutes to ensure that there is no impurity gas such as oxygen in the combustion chamber and the graphite furnace.

[0084] The specific operation during the reaction is as follows: open the fifth gas one-way valve 34 in the graphite furnace in the manner of Example 3 to Figure 2The hydrogen and chlorine in the independent combustion chamber react to produce stable high-temperature hydrogen chloride gas, which enters the graphite furnace reaction chamber 32 through the first gas outlet 28 of the independent combustion chamber and the gas inlet 29 in the spouted bed graphite furnace. The second heating coil 35 is started, and the real-time temperature of the bottom and middle of the furnace is monitored by the second temperature probe 36 and the third temperature probe 37, and the graphite furnace is heated to 500°C as a whole. The third graphite furnace wall 36 is used to prevent the high-temperature corrosive hydrogen chloride gas from leaking out, and the second insulation layer 39 is used to maintain the temperature in the furnace. There is a perforated baffle 40 at the top of the furnace to prevent the graphite powder in the furnace from leaking out. Impurities in the graphite powder can be removed after a reaction time of 4 hours. After the reaction is completed, stop supplying hydrogen and chlorine, and continue to supply inert gas nitrogen or argon, discharge the hydrogen chloride gas in the independent combustion chamber and the spouted bed graphite furnace, stop heating the second heating coil 35, and when the temperature in the graphite furnace drops to room temperature, close the fourth one-way valve 17 in the independent combustion chamber, open the discharge port 42, and clear the graphite powder in the furnace.

[0085] In this embodiment, the independent combustion chamber is used in conjunction with a spouted bed graphite furnace. The spouted graphite furnace can make the graphite powder tumble more violently when reacting with the hydrogen chloride gas, thereby achieving better contact with the reaction gas and a shorter reaction time.

[0086] Example 4

[0087] A graphite purification system comprises: a graphite reaction system located upstream including a gas combustion system and a graphite purification system, and a gas purification system located downstream; the graphite reaction system and the gas purification system are connected by gas flow to flow the graphite in the graphite reaction system that has fully reacted with hydrogen chloride into the gas purification system to purify the hydrogen chloride gas.

[0088] In this embodiment, the graphite reaction system and the gas purification system are connected through a graphite lined pipeline; the graphite reaction system includes Figure 2 The gas combustion chamber and Figure 3 A spouted bed graphite furnace is shown.

[0089] The gas purification system includes: a graphite collecting furnace, a hydrogen chloride purification furnace and a hydrogen chloride collecting chamber from upstream to downstream.

[0090] The specific connection method is as follows: the gas outlet of the graphite reaction system is connected to the gas inlet in the graphite collecting furnace using a pipe with a graphite lining and a thermal insulation layer, and the gas outlet of the graphite collecting furnace is connected to the gas inlet in the hydrogen chloride purification furnace using a pipe with a graphite lining and a thermal insulation layer.

[0091] Both the graphite collection furnace and the hydrogen chloride purification furnace can be set to have one side for air inlet and another side for air outlet, so as to collect solids. Both the graphite collection furnace and the hydrogen chloride purification furnace can be set in parallel to improve the collection and purification efficiency.

[0092] The specific work is as follows: the graphite reaction furnace is heated to 500°C to react the graphite material with hydrogen chloride. After 4 hours of reaction, the flow rate of hydrogen chloride gas is increased to blow the graphite powder after the reaction into the graphite collection furnace; the graphite collection furnace is heated to 350°C, which ensures that impurities will not condense, collects high-purity graphite solids after the reaction, and the impurities after the reaction and excess hydrogen chloride continue to enter the hydrogen chloride purification furnace in the form of gas; the hydrogen chloride purification furnace is a cooling furnace, maintaining the temperature at 20°C, and the high-temperature impurities silicon chloride, aluminum chloride, ferric chloride and other gases obtained by the reaction are precipitated by cooling and condensing, and the impurity solids are collected, and the excess hydrogen chloride enters the hydrogen chloride collection chamber in the form of gas to collect high-purity hydrogen chloride gas, which can be used as a raw material for other chemical reactions, or dissolved in water to prepare hydrochloric acid.

[0093] In this embodiment, the graphite reaction system and the gas purification system are designed in a split type, and high-purity graphite is obtained while collecting chloride impurities after the reaction, so that high-purity hydrogen chloride gas can be obtained for further reaction. High-purity graphite powder is continuously collected in the graphite collection furnace, so new graphite powder to be purified can be continuously input into the graphite reaction system to achieve continuous reaction.

Claims

1. A graphite purification system, It is characterized in that The graphite purification system comprises: a gas combustion system located upstream, and a graphite purification system located midstream; The gas combustion system is connected to the graphite purification system by gas flow so that the hydrogen chloride generated by the combustion of hydrogen and chlorine in the gas combustion system can flow to the graphite purification system to purify the graphite.

2. The graphite purification system according to claim 1, It is characterized in that The gas combustion system comprises: a combustion chamber, a chlorine gas inlet and a hydrogen gas inlet located upstream of the combustion chamber, and an igniter located in the combustion chamber; The graphite purification system comprises: a graphite furnace having a cavity, and a gas outlet located downstream of the cavity of the graphite furnace.

3. The graphite purification system according to claim 2, It is characterized in that A mixing chamber is also arranged upstream of the combustion chamber, a gas mixing baffle is arranged in the mixing chamber, and an anti-backfire baffle is arranged between the gas mixing baffle and the combustion chamber; A baffle with holes is arranged on the upper part of the cavity of the graphite furnace to allow gas to pass through and block solid powder.

4. The graphite purification system according to claim 2, It is characterized in that The gas combustion system and graphite purification system are integrated designs: A removable distribution plate is provided between the combustion chamber and the graphite furnace silo, and through holes are provided on the removable distribution plate to allow gas to pass through and block solid powder; A graphite powder discharge port is arranged at the lower part of the combustion chamber.

5. The graphite purification system according to claim 2, It is characterized in that The gas combustion system and graphite purification system are split-type designs: The gas combustion system and the graphite purification system are connected via a graphite lined pipeline; A graphite powder discharge port is arranged at the lower part of the graphite purification system.

6. The graphite purification system according to claim 1, It is characterized in that The graphite purification system also includes: a gas purification system located downstream; The gas purification system comprises: a graphite collecting furnace and a hydrogen chloride purification furnace located downstream of the graphite collecting furnace; The graphite collecting furnace is configured to collect the purified graphite discharged from the graphite purification system and discharge the gas containing impurities and hydrogen chloride into the hydrogen chloride purification furnace; The hydrogen chloride purification furnace is configured to condense impurities in the gas and discharge purified hydrogen chloride.

7. The graphite purification system according to claim 1, It is characterized in that The combustion chamber is an inverted cone structure, the combustion chamber and / or the outer periphery of the graphite furnace are provided with a heat preservation layer, and a heating device is provided outside the cavity of the graphite furnace; The chlorine gas inlet and hydrogen gas inlet and outlet are all provided with gas one-way valves.

8. A method for purifying graphite, It is characterized in that Using the graphite purification system according to any one of claims 1 to 7, the method comprises: Hydrogen and chlorine are introduced into the gas combustion system to burn and generate hydrogen chloride gas and release heat. The hydrogen chloride gas flows into the graphite purification system to purify the graphite. The generated impurity gas is discharged from the outlet to obtain purified graphite.

9. Use of the graphite purification system according to claim 1 for preparing hydrogen chloride using hydrogen and chlorine as raw materials and recovering heat.

10. The use according to claim 9, It is characterized in that After the hydrogen chloride reacts with the impurity-containing graphite, the excess hydrogen chloride is purified downstream to remove impurities and then used as a chemical raw material.

Citation Information

Patent Citations

  • Method and device for preparing hydrochloric acid and purifying quartz sand

    CN106219488A

  • Chloridizing roasting and purification method for graphite

    CN111137884A

  • Chlorinating fluidizing furnace for purifying natural flaky graphite

    CN2335953Y

  • A method for the chemical purification of natural graphite

    GB748018A

Cited By

  • High-temperature purification furnace control system and method

    CN120780050A