Cast-in-place beam and slab concrete curing device and curing method for hub intercommunication extra-large bridge
By designing a device to wet the health and extrusion assembly, the sponge plate buffering adsorption and extrusion of the water slowly flows out, the problem of concrete surface damage caused by spraying and rushing out the water is solved, and the health effect is improved and cracked is avoided. and sanding phenomenon.
Patent Information
- Application Number
- CN202411227644.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-09-03
AI Technical Summary
During the spraying and wetting process of the concrete surface of the cast-in-place beam slab of the super bridge, the sprayed water liquid can easily lead to cracking and sanding on the concrete surface, affecting the health effect.
A device including wetting and health components, water injection components and extrusion components is designed. The water liquid is absorbed through the sponge plate and slowly flows out of the water liquid through the extrusion action to avoid damage to the concrete surface caused by direct spraying. The device uses a ratchet structure and an electromagnet to limit the reverse reset of the sponge plate and prevent the water from being extracted from negative pressure.
It effectively avoids cracks and sanding on the concrete surface, improves the health effect, and ensures the wetting and maintenance quality of the concrete surface.
Smart Images

Figure CN118911030A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of cast-in-place beam and slab construction of a hub interchange super-large bridge, and specifically relates to a cast-in-place beam and slab concrete curing device for a hub interchange super-large bridge. Background Art
[0002] After the pouring of the cast-in-place beam and slab concrete of the super-large bridge, the curing effect is used to achieve the effects of improving the strength of the concrete, improving the crack resistance of the concrete, and reducing the temperature difference between the inside and outside of the concrete. In the process of curing the cast-in-place beam and slab concrete of the super-large bridge, spray wetting is a common method. In the process of spray wetting on the surface of the cast-in-place beam and slab concrete of the super-large bridge, the water flushed out by the spraying directly contacts the concrete surface, which can easily cause cracks and sand on the concrete surface, affecting the curing effect.
[0003] In view of this, the present invention is proposed. Summary of the invention
[0004] In order to solve the above technical problems, the basic concept of the technical solution adopted by the present invention is:
[0005] A device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge, comprising a mobile vehicle body arranged on one side of a super-large bridge cast-in-place beam and slab body, and a mounting frame fixed to the upper end of the mobile vehicle body, wherein the upper end of the mounting frame is connected to a U-shaped frame through a steering assembly, and a wetting and curing assembly for wetting and curing the surface of the super-large bridge cast-in-place beam and slab body is arranged on the U-shaped frame;
[0006] The moistening and health care component includes a mounting seat, one side of the mounting seat is connected to a mounting plate via a connecting component, a sponge board is fixed to one side of the mounting plate, a water injection component for injecting water into the sponge board is provided on the mounting plate, and an extrusion component for extruding the mounting plate is provided on the mounting seat.
[0007] The water injection assembly includes a plurality of water injection pipes installed on a mounting plate, one end of each of the water injection pipes being arranged toward the upper end of the sponge board, a connecting pipe being arranged at the upper end of the mounting plate, one end of each of the water injection pipes being connected and fixed to the interior of the connecting pipe, and the connecting pipe being connected to the water outlet end of an external water pump via a hose.
[0008] The connecting assembly comprises a plurality of sleeves fixed on the mounting plate, each sleeve is slidably connected with a slide bar, one end of the slide bar is fixed to the mounting seat, and a spring is sleeved on the outer side of each sleeve.
[0009] The extrusion assembly comprises an installation groove opened on the installation seat, the installation groove is provided with a cam for extruding and pushing the installation plate, and the installation seat is provided with a driving assembly for driving the cam.
[0010] The driving assembly comprises a support frame fixed on a mounting seat, a driving shaft is rotatably connected to the support frame, the cam is fixed on the driving shaft, and a first motor for driving the driving shaft is mounted on the support frame.
[0011] The steering assembly includes a fixed plate fixed to the upper end of the mounting frame, the fixed plate is rotatably connected to a connecting shaft, a connecting plate is fixed on the connecting shaft, the connecting plate is fixed to one side of the U-shaped frame, a second motor for driving the connecting shaft is installed on the fixed plate, and an output end of the third motor is connected to a slider via a lead screw.
[0012] The inventors have found that, because the sponge board releases water when squeezed, a negative pressure will occur when it is reset, so that the surface concrete of the cast-in-place beam and slab of the super-large bridge is reversely extracted with water after being moistened, resulting in sand on the surface concrete. Therefore, based on the above embodiment, the following improvements are made:
[0013] The moistening and health care component also includes a side plate installed on the mounting plate and a feed plate installed on the outside of the sponge plate. The feed plate and the side plate are each provided with two groups. The two groups of side plates are arranged front and back along the movement direction of the moving body. The side plate is arranged on the side of the feed plate facing away from the sponge plate. A ratchet structure is arranged between the feed plate and the side plate. A T-shaped slide groove is arranged on the mounting plate. The interior of the T-shaped slide groove is connected to a T-shaped slider through a spring. The T-shaped slider is fixedly installed on the side plate. An electromagnet is installed in the T-shaped slide groove. An iron block corresponding to the position of the electromagnet is arranged on the T-shaped slider.
[0014] After the sponge plate contacts the surface of the cast-in-place beam and slab of the super-large bridge, as water is continuously squeezed out of the sponge plate, the ratchet structure will limit the reverse reset of the sponge plate, and thus there will be no negative pressure reverse extraction of water from the surface of the cast-in-place beam and slab of the super-large bridge; when the sponge plate is separated from the surface of the cast-in-place beam and slab of the super-large bridge and does not contact the surface of the cast-in-place beam and slab of the super-large bridge after reset, the electromagnet turns on (power is turned on to generate a magnetic field) to absorb the iron block until the sponge plate drives the feed plate to reset to its initial state.
[0015] A method for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge, the curing steps are as follows:
[0016] Step 1: Angle alignment
[0017] The second motor is started to drive the connecting shaft to rotate. During the rotation of the connecting shaft, the U-shaped frame is driven to rotate and adjust through the connection of the connecting plate. The rotation of the U-shaped frame drives the mounting seat, the mounting plate and the sponge plate to rotate synchronously. The sponge plate is rotated so that the sponge plate is flush with the outer surface of the cast-in-place beam and slab body of the super-large bridge.
[0018] Step 2: Align the start end
[0019] The mobile vehicle is placed at one end of the side of the cast-in-place beam and slab of the super-large bridge, so that the end of the sponge plate opposite to the moving direction is flush with the starting end of the cast-in-place beam and slab of the super-large bridge, and moves along the length direction of the cast-in-place beam and slab of the super-large bridge;
[0020] Step 3: Water injection
[0021] Through the pumping and pressure action of the water pump and the connecting action of the hose, the external water is transported toward the connecting pipe and flows out toward the sponge board through each water injection pipe, thereby completing the water injection into the sponge board;
[0022] Step 4: Moisturizing and Maintenance
[0023] The first motor starts to drive the cam on the driving shaft to rotate. During the rotation of the cam, the cam first abuts against the mounting plate, and then pushes the mounting plate to move toward one side of the cast-in-place beam and slab body of the super-large bridge, so that the sponge plate abuts against one side of the cast-in-place beam and slab body of the super-large bridge, and then squeezes the sponge plate. During the squeezing process, because the sponge plate abuts against one side surface of the cast-in-place beam and slab body of the super-large bridge, the water adsorbed on the sponge plate flows to one side surface of the cast-in-place beam and slab body of the super-large bridge, so as to moisten and maintain the cast-in-place beam and slab body of the super-large bridge;
[0024] The third motor starts to start when the sponge plate contacts the surface of the cast-in-place beam and slab of the super-large bridge, driving the slider to move in the opposite direction of the moving vehicle body, and the speed is equal to the speed of the moving vehicle body. When the sponge plate leaves the surface of the cast-in-place beam and slab of the super-large bridge, it starts to rotate in the opposite direction and moves to the initial position along the moving direction of the moving vehicle body, and needs to be reset before the sponge plate contacts the surface of the cast-in-place beam and slab of the super-large bridge next time.
[0025] Among them, after the sponge board contacts the surface of the cast-in-place beam and slab of the super-large bridge, as the mounting plate continues to be squeezed by the cam, the sponge board is compressed in one direction through the ratchet structure between the feed plate and the side plate. When the sponge board is separated from the surface of the cast-in-place beam and slab of the super-large bridge and does not contact the surface of the cast-in-place beam and slab of the super-large bridge after reset, the electromagnet starts to absorb the iron block until the sponge board drives the feed plate to reset to the initial state.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] The in-situ beam and slab concrete curing device for the hub interchange super-large bridge of the present invention wets and maintains the in-situ beam and slab body of the hub interchange super-large bridge through the mutual cooperation of the wetting and curing components, the water injection components and the extrusion components. During the maintenance process, the water flushed out by the spraying is first buffered and adsorbed by the sponge plate and then slowly flows out under the action of extrusion, so as to avoid the phenomenon of cracking and sanding on the concrete surface caused by the directly sprayed water, thereby improving the curing effect.
[0028] The specific implementation modes of the present invention are further described in detail below in conjunction with the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In the attached picture:
[0030] Figure 1 It is a schematic diagram of the overall appearance structure of the present invention.
[0031] Figure 2 It is a schematic diagram of the structures of the wetting and health-care component, the steering component and the water injection component of the present invention.
[0032] Figure 3 It is a schematic diagram of the structure of the connection assembly of the present invention.
[0033] Figure 4 It is a schematic diagram of the structure of the extrusion assembly and the driving assembly of the present invention.
[0034] Figure 5 It is a schematic diagram of the installation of the slider of the present invention.
[0035] Figure 6 This is a positional relationship diagram of the slider, mounting seat and U-shaped frame of the present invention.
[0036] Figure 7 This is a positional relationship diagram of the side plates and the feed plate of the present invention.
[0037] Figure 8 This is a connection diagram of the side panels, feed plate and mounting plate of the present invention.
[0038] In the figure: 1-the main body of the cast-in-place beam and slab of the super-large bridge; 2-the moving vehicle body; 3-the mounting frame; 4-the U-shaped frame; 401-the third motor; 402-the guide rail; 403-the slider; 501-the fixed plate; 502-the connecting shaft; 503-the connecting plate; 504-the second motor; 601-the mounting seat; 602-the mounting plate; 603-the sponge plate; 604-the side plate; 605-the feed plate; 606-the T-shaped slide groove; 607-the T-shaped slider; 608-the electromagnet; 609-the iron block; 701-the water injection pipe; 702-the connecting pipe; 703-the hose; 801-the sleeve; 802-the slide rod; 803-the spring; 901-the mounting groove; 902-the cam; 1001-the support frame; 1002-the driving shaft; 1003-the first motor. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The following embodiments are used to illustrate the present invention.
[0040] like Figures 1 to 4As shown, a device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge comprises a mobile vehicle body 2 arranged on one side of a cast-in-place beam and slab body 1 of the super-large bridge, and also comprises a mounting frame 3 fixed to the upper end of the mobile vehicle body 2, wherein the upper end of the mounting frame 3 is connected to a U-shaped frame 4 through a steering assembly, and a wetting curing assembly for wetting and curing the surface of the cast-in-place beam and slab body 1 of the super-large bridge is arranged on the U-shaped frame 4;
[0041] The moistening and health-care component includes a mounting seat 601, one side of the mounting seat 601 is connected to a mounting plate 602 through a connecting component, a sponge plate 603 is fixed to one side of the mounting plate 602, a water injection component for injecting water into the sponge plate 603 is provided on the mounting plate 602, and an extrusion component for extruding the mounting plate 602 is provided on the mounting seat 601;
[0042] The wetting and curing components, water injection components and extrusion components cooperate with each other to carry out wetting and maintenance of the cast-in-place beam and slab body 1 of the super-large bridge. During the maintenance process, the sprayed water is first buffered and adsorbed by the sponge board 603 and then slowly flows out under the action of extrusion, thereby avoiding the phenomenon of cracking and sanding on the concrete surface caused by the direct spraying of water, thereby improving the curing effect.
[0043] The water injection assembly includes multiple water injection pipes 701 installed on the mounting plate 602, one end of each water injection pipe 701 is arranged toward the upper end of the sponge board 603, and a connecting pipe 702 is arranged at the upper end of the mounting plate 602. One end of each water injection pipe 701 is connected and fixed to the interior of the connecting pipe 702, and the connecting pipe 702 is connected to the water outlet end of an external water pump through a hose 703; through the pumping action of the water pump and the connecting action of the hose 703, the external water is transported toward the connecting pipe 702 and flows out toward the sponge board 603 through each water injection pipe 701.
[0044] The connecting assembly includes a plurality of sleeves 801 fixed on the mounting plate 602, each sleeve 801 is slidably connected with a slide rod 802, one end of the slide rod 802 is fixed to the mounting seat 601, and a spring 803 is sleeved on the outer side of each sleeve 801; the movement of the mounting plate 602 after being subjected to force is guided by the plurality of sleeves 801 and the slide rod 802, and the resetting movement of the mounting plate 602 after movement is facilitated by the springs 803.
[0045] The extrusion assembly includes a mounting groove 901 opened on the mounting seat 601, and a cam 902 for extruding and pushing the mounting plate 602 is arranged on the mounting groove 901, and a driving assembly for driving the cam 902 is arranged on the mounting seat 601; the cam 902 is driven to rotate by the driving assembly, and during the rotation of the cam 902, the cam 902 is abutted against the mounting plate 602, pushing the mounting plate 602 to move.
[0046] The driving assembly includes a support frame 1001 fixed on the mounting base 601, a driving shaft 1002 is rotatably connected to the support frame 1001, a cam 902 is fixed on the driving shaft 1002, and a first motor 1003 for driving the driving shaft 1002 is installed on the support frame 1001; the first motor 1003 facilitates the driving of the cam 902 on the driving shaft 1002 to rotate.
[0047] The steering assembly includes a fixed plate 501 fixed to the upper end of the mounting frame 3, the fixed plate 501 is rotatably connected with a connecting shaft 502, a connecting plate 503 is fixed to the connecting shaft 502, the connecting plate 503 is fixed to one side of the U-shaped frame 4, and a second motor 504 for driving the connecting shaft 502 is installed on the fixed plate 501; the connecting shaft 502 is driven to rotate by the second motor 504, and during the rotation of the connecting shaft 502, the U-shaped frame 4 is driven to perform steering adjustment through the connecting effect of the connecting plate 503.
[0048] During the wetting and curing operation of the cast-in-place beam and slab body 1 of the super-large bridge, the U-shaped frame 4 is driven to rotate and adjust through the rotating assembly. The mounting seat 601, the mounting plate 602 and the sponge plate 603 are driven to rotate synchronously through the rotation of the U-shaped frame 4. The sponge plate 603 is rotated so that the sponge plate 603 is flush with the outer surface of the cast-in-place beam and slab body 1 of the super-large bridge, which is convenient for the subsequent more sufficient wetting and curing operation;
[0049] After the steering adjustment, the sponge plate 603 is injected with water through the water injection component by moving the mobile body 2. The injected water is adsorbed on the sponge plate 603, and the sponge plate 603 is against one side of the cast-in-place beam and slab body 1 of the super-large bridge. The mounting plate 602 is squeezed by the extrusion component. In the process of squeezing, since the sponge plate 603 is against one side surface of the cast-in-place beam and slab body 1 of the super-large bridge, the water adsorbed on the sponge plate 603 flows to one side surface of the cast-in-place beam and slab body 1 of the super-large bridge through the squeezing effect of the mounting plate 602, so as to moisten and maintain the cast-in-place beam and slab body 1 of the super-large bridge. In the process of maintenance, the water flushed out by the sponge plate 603 is first buffered and adsorbed and then slowly flows out under the squeezing effect, so as to avoid the cracking and sanding of the concrete surface caused by the directly sprayed water, thereby improving the curing effect.
[0050] like Figures 5 to 8 As shown, the inventors have found that, based on the above embodiment, in order to ensure that the sponge board 603 does not move relative to the cast-in-place beam and slab body 1 of the super-large bridge during the wetting and maintenance operation, the following improvements are made:
[0051] The U-shaped frame 4 is provided with a third motor 401 and two guide rails 402 arranged in parallel with the moving direction of the moving vehicle body 2. Slide blocks 403 are slidably matched in the two guide rails 402. The slide blocks 403 are installed on the side of the mounting seat 601 facing away from the mounting plate 602. The output end of the third motor 401 is connected to the slide block 403 through a lead screw. The third motor 401 drives the slide block 403 to move along the guide rail 402 through the lead screw.
[0052] By turning on the third motor 401 when the sponge board 603 contacts the cast-in-place beam and slab body 1 of the super-large bridge, and moving at a constant speed opposite to the movement direction of the mobile vehicle 2, the sponge board 603 is relatively stationary during the process of contacting the cast-in-place beam and slab body 1 of the super-large bridge, thereby avoiding relative movement in the direction of the wetting and maintenance path, which may cause sand on the surface.
[0053] The inventors have found that, because the sponge board 603 releases water when squeezed, a negative pressure will occur when it is reset, so that the surface concrete of the cast-in-place beam and slab body 1 of the super-large bridge is reversely extracted with water after being moistened, resulting in sand on the surface concrete. Therefore, based on the above embodiment, the following improvements are made:
[0054] The moistening and health care component also includes a side plate 604 installed on the mounting plate 602 and a feed plate 605 installed on the outside of the sponge plate 603. The feed plate 605 and the side plate 604 are each provided with two groups. The two groups of side plates 604 are arranged front and back along the movement direction of the mobile body 2. The side plate 604 is arranged on the side of the feed plate 605 that is away from the sponge plate 603. A ratchet structure is arranged between the feed plate 605 and the side plate 604. A T-shaped slide groove 606 is arranged on the mounting plate 602. The interior of the T-shaped slide groove 606 is connected to a T-shaped slider 607 through a spring. The T-shaped slider 607 is fixedly installed on the side plate 604. An electromagnet 608 is installed in the T-shaped slide groove 606. An iron block 609 corresponding to the position of the electromagnet 608 is arranged on the T-shaped slider 607.
[0055] After the sponge plate 603 contacts the surface of the cast-in-place beam and slab body 1 of the super-large bridge, as the sponge plate 603 is continuously squeezed to release water, the ratchet structure will limit the reverse reset of the sponge plate 603, and thus there will be no negative pressure reverse extraction of moisture on the surface of the cast-in-place beam and slab body 1 of the super-large bridge; when the sponge plate 603 is separated from the surface of the cast-in-place beam and slab body 1 of the super-large bridge and does not contact the surface of the cast-in-place beam and slab body 1 of the super-large bridge after reset, the electromagnet 608 is turned on (energized to generate a magnetic field) to attract the iron block 609 until the sponge plate 603 drives the feed plate 605 to reset to its initial state.
[0056] A method for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge, the curing steps are as follows:
[0057] Step 1: Angle alignment
[0058] The second motor 504 is started to drive the connecting shaft 502 to rotate. During the rotation of the connecting shaft 502, the U-shaped frame 4 is driven to rotate and adjust through the connection effect of the connecting plate 503. The rotation of the U-shaped frame 4 drives the mounting seat 601, the mounting plate 602 and the sponge plate 603 to rotate synchronously. The sponge plate 603 is rotated so that the sponge plate 603 is flush with the outer surface of the cast-in-place beam and slab body 1 of the super-large bridge;
[0059] Step 2: Align the start end
[0060] The mobile vehicle 2 is placed at one end of the side of the cast-in-place beam and slab body 1 of the super-large bridge, so that one end of the sponge plate 603 opposite to the moving direction is flush with the starting end of the cast-in-place beam and slab body 1 of the super-large bridge, and moves along the length direction of the cast-in-place beam and slab body 1 of the super-large bridge;
[0061] Step 3: Water injection
[0062] Through the pumping action of the water pump and the connection action of the hose 703, the external water is transported toward the connecting pipe 702 and flows out toward the sponge board 603 through each water injection pipe 701, so that the sponge board 603 is filled with water;
[0063] Step 4: Moisturizing and Maintenance
[0064] The first motor 1003 is started to drive the cam 902 on the driving shaft 1002 to rotate. During the rotation of the cam 902, the cam 902 first abuts against the mounting plate 602, and then pushes the mounting plate 602 to move toward one side of the cast-in-place beam and slab body 1 of the super-large bridge, so that the sponge plate 603 abuts against one side of the cast-in-place beam and slab body 1 of the super-large bridge, and then squeezes the sponge plate 603. During the squeezing process, because the sponge plate 603 abuts against one side surface of the cast-in-place beam and slab body 1 of the super-large bridge, the water adsorbed on the sponge plate 603 flows to one side surface of the cast-in-place beam and slab body 1 of the super-large bridge, and the cast-in-place beam and slab body 1 of the super-large bridge is moistened and maintained;
[0065] The third motor 401 starts to start when the sponge plate 603 contacts the surface of the cast-in-place beam and slab body 1 of the super-large bridge, driving the slider 403 to move in the opposite direction of the moving vehicle body 2, and the speed is equal to the speed of the moving vehicle body 2. When the sponge plate 603 leaves the surface of the cast-in-place beam and slab body 1 of the super-large bridge, it starts to rotate in the opposite direction, moves to the initial position along the moving direction of the moving vehicle body 2, and needs to be reset before the sponge plate 603 contacts the surface of the cast-in-place beam and slab body 1 of the super-large bridge next time;
[0066] Among them, after the sponge board 603 contacts the surface of the cast-in-place beam and slab body 1 of the super-large bridge, as the mounting plate 602 continues to be squeezed by the cam 902, the sponge board 603 is compressed in one direction through the ratchet structure between the feed plate 605 and the side plate 604. When the sponge board 603 is separated from the surface of the cast-in-place beam and slab body 1 of the super-large bridge and does not contact the surface of the cast-in-place beam and slab body 1 of the super-large bridge after resetting, the electromagnet 608 turns on the adsorption iron block 609 until the sponge board 603 drives the feed plate 605 to reset to the initial state.
Claims
1. A device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge, comprising: A movable vehicle body (2) arranged on one side of a cast-in-place beam and slab body (1) of a super-large bridge; A mounting frame (3) is fixed to the upper end of the mobile vehicle body (2), the upper end of the mounting frame (3) is connected to a U-shaped frame (4) via a steering assembly, and a wetting and curing assembly for wetting and curing the surface of the cast-in-place beam and slab body (1) of the extra-large bridge is provided on the U-shaped frame (4); The moistening and health-care component comprises a mounting seat (601), one side of the mounting seat (601) is connected to a mounting plate (602) via a connecting component, a sponge plate (603) is fixed to one side of the mounting plate (602), a water injection component for injecting water into the sponge plate (603) is provided on the mounting plate (602), and a squeezing component for squeezing the mounting plate (602) is provided on the mounting seat (601).
2. The device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge according to claim 1, characterized in that: The water injection assembly comprises a plurality of water injection pipes (701) mounted on a mounting plate (602), one end of each of the water injection pipes (701) being arranged toward the upper end of the sponge plate (603), a connecting pipe (702) being arranged at the upper end of the mounting plate (602), one end of each of the water injection pipes (701) being connected and fixed to the interior of the connecting pipe (702), and the connecting pipe (702) being connected to the water outlet end of an external water pump via a hose (703).
3. The device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge according to claim 2, characterized in that: The connection assembly comprises a plurality of sleeves (801) fixed on a mounting plate (602), each sleeve (801) being slidably connected to a slide rod (802), one end of the slide rod (802) being fixed to a mounting seat (601), and a spring (803) being sleeved on the outer side of each sleeve (801).
4. The device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge according to claim 3, characterized in that: The extrusion assembly comprises a mounting groove (901) provided on the mounting seat (601), a cam (902) for extruding and pushing the mounting plate (602) is provided on the mounting groove (901), and a driving assembly for driving the cam (902) is provided on the mounting seat (601).
5. The device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge according to claim 4, characterized in that: The driving assembly comprises a support frame (1001) fixed on a mounting seat (601), a driving shaft (1002) being rotatably connected to the support frame (1001), the cam (902) being fixed on the driving shaft (1002), and a first motor (1003) for driving the driving shaft (1002) being installed on the support frame (1001).
6. The device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge according to claim 5, characterized in that: The steering assembly comprises a fixed plate (501) fixed to the upper end of the mounting frame (3), a connecting shaft (502) being rotatably connected to the fixed plate (501), a connecting plate (503) being fixed to the connecting shaft (502), the connecting plate (503) being fixed to one side of the U-shaped frame (4), and a second motor (504) for driving the connecting shaft (502) being installed on the fixed plate (501).
7. The device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge according to claim 6, characterized in that: The U-shaped frame (4) is provided with a third motor (401) and two guide rails (402) arranged in the direction of movement of the parallel moving vehicle body (2); a slider (403) is slidably fitted in the two guide rails (402); the slider (403) is mounted on a side of the mounting seat (601) facing away from the mounting plate (602); and the output end of the third motor (401) is connected to the slider (403) via a lead screw.
8. The device for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge according to claim 7, characterized in that: The moistening and health care component further comprises a side plate (604) mounted on the mounting plate (602) and a feed plate (605) mounted on the outside of the sponge plate (603), wherein the feed plate (605) and the side plate (604) are each provided with two groups, and the two groups of side plates (604) are arranged front and rear along the moving direction of the moving body (2), and the side plate (604) is arranged on the side of the feed plate (605) facing away from the sponge plate (603), and the feed plate (605) ) and the side plate (604), a ratchet structure is arranged between the mounting plate (602), a T-shaped slide groove (606) is arranged on the mounting plate (602), a T-shaped slider (607) is connected to the inside of the T-shaped slide groove (606) via a spring, the slider (607) is fixedly mounted on the side plate (604), an electromagnet (608) is installed in the T-shaped slide groove (606), and an iron block (609) corresponding to the position of the electromagnet (608) is arranged on the T-shaped slider (607).
9. A method for curing cast-in-place beam and slab concrete of a hub interchange super-large bridge, characterized in that: Using the curing device as claimed in claim 8, the curing steps are as follows: Step 1: Angle alignment The second motor (504) is started to drive the connecting shaft (502) to rotate. During the rotation of the connecting shaft (502), the U-shaped frame (4) is driven to rotate and adjust through the connection function of the connecting plate (503). The rotation of the U-shaped frame (4) drives the mounting seat (601), the mounting plate (602) and the sponge plate (603) to rotate synchronously. The sponge plate (603) is rotated so that the sponge plate (603) is flush with the outer surface of the cast-in-place beam and slab body (1) of the super-large bridge; Step 2: Align the start end The mobile vehicle (2) is placed at one end of the side of the cast-in-place beam and slab body (1) of the super-large bridge, so that the end of the sponge plate (603) opposite to the moving direction is flush with the starting end of the cast-in-place beam and slab body (1) of the super-large bridge, and moves along the length direction of the cast-in-place beam and slab body (1) of the super-large bridge; Step 3: Water injection Through the pumping action of the water pump and the connecting action of the hose (703), the external water is transported toward the connecting pipe (702) and flows out toward the sponge board (603) through each water injection pipe (701), thereby completing the water injection into the sponge board (603); Step 4: Moisturizing and Maintenance The first motor (1003) is started to drive the cam (902) on the driving shaft (1002) to rotate. During the rotation of the cam (902), the cam (902) first abuts against the mounting plate (602), and then pushes the mounting plate (602) to move toward one side of the cast-in-place beam and slab body (1) of the extra-large bridge, so that the sponge plate (603) abuts against one side of the cast-in-place beam and slab body (1) of the extra-large bridge, and then squeezes the sponge plate (603). During the squeezing process, because the sponge plate (603) abuts against one side surface of the cast-in-place beam and slab body (1) of the extra-large bridge, the water adsorbed on the sponge plate (603) flows to one side surface of the cast-in-place beam and slab body (1) of the extra-large bridge, so as to moisten and maintain the cast-in-place beam and slab body (1) of the extra-large bridge; The third motor (401) starts to start when the sponge plate (603) contacts the surface of the cast-in-place beam and slab body (1) of the extra-large bridge, driving the slider (403) to move in the opposite direction of the moving vehicle body (2), and the speed is equal to the speed of the moving vehicle body (2); when the sponge plate (603) leaves the surface of the cast-in-place beam and slab body (1) of the extra-large bridge, it starts to rotate in the opposite direction, moves along the moving direction of the moving vehicle body (2) to the initial position, and needs to be reset before the sponge plate (603) contacts the surface of the cast-in-place beam and slab body (1) of the extra-large bridge next time; After the sponge plate (603) contacts the surface of the cast-in-place beam and slab body (1) of the extra-large bridge, as the mounting plate (602) continues to be squeezed by the cam (902), the sponge plate (603) is compressed in one direction through the ratchet structure between the feed plate (605) and the side plate (604). When the sponge plate (603) is separated from the surface of the cast-in-place beam and slab body (1) of the extra-large bridge and does not contact the surface of the cast-in-place beam and slab body (1) of the extra-large bridge after reset, the electromagnet (608) turns on the adsorption iron block (609) until the sponge plate (603) drives the feed plate (605) to reset to the initial state.
Citation Information
Patent Citations
English course auxiliary teaching device
CN107578725A
Concrete uniform watering water-saving device for building construction
CN111188503A
Spray wetting type concrete curing system
CN111452203A
Concrete curing box
CN112622010A
Columnar concrete structure curing device
CN209633324U
