Plastic concrete diaphragm wall joint structure

By using a reinforcing cage structure and metal reinforcing mesh in the joints of the plastic concrete cutoff wall, the problems of high energy consumption and complicated construction in the existing technology have been solved, achieving high-quality cutoff wall construction and improving the stability and durability of the cutoff wall.

CN118911181APending Publication Date: 2024-11-08WUHE COUNTY WATER CONSERVANCY CONSTR INSTALLATION CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411299517.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The construction of existing plastic concrete anti-seepage wall joints is energy-intensive and involves complicated equipment, making it difficult to guarantee construction quality and affecting the stability and durability of the anti-seepage wall.

Method used

A reinforced cage structure, including a ring sleeve, connecting pipe and vibration equipment, is adopted. Water pumping, grouting and vibration compaction methods are used to ensure the curing and compaction of concrete at the joint. Combined with metal reinforcement mesh and positioning pipe, the adhesion and stability of the joint are enhanced.

Benefits of technology

While reducing energy consumption, it significantly improves construction quality, ensures the stability and durability of the impermeable wall, reduces the risk of leakage, and simplifies the construction process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911181A_ABST
    Figure CN118911181A_ABST
Patent Text Reader

Abstract

The invention discloses a plastic concrete diaphragm wall joint structure, and relates to the technical field of hydraulic engineering, the plastic concrete diaphragm wall joint structure comprises a first diaphragm wall body and a second diaphragm wall body, a semicircular first through hole and a semicircular second through hole are formed in a seam between the first diaphragm wall body and the second diaphragm wall body, and a pouring cavity is formed between the first through hole and the second through hole; a reinforcing cage is arranged in the pouring cavity and comprises annular sleeves, a plurality of liquid penetrating holes are formed in the outer surfaces of the annular sleeves, every two adjacent annular sleeves communicate with each other through a plurality of communicating pipes, and a header pipe is arranged on the topmost annular sleeve. The method has the effects of obviously improving the construction quality of the concrete and ensuring the stability and durability of the anti-seepage wall body under the condition of ensuring that the energy consumption is reduced and the construction is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy projects, in particular to a plastic concrete anti-seepage wall joint structure. Background Art

[0002] At present, the core of earth-rock dam is the impermeable body. Many dam failures are mostly due to the damage or failure of the impermeable body, resulting in catastrophic consequences. Therefore, it is of great significance to improve the safety of the dam's impermeable body. In the earth-rock dam risk prevention and reinforcement projects, more than 80% use plastic concrete impermeable walls. Plastic concrete impermeable wall is a wall structure built by using plastic concrete materials, which is designed to effectively prevent the penetration of water or other fluids. This kind of wall has excellent anti-seepage performance and excellent durability, and is widely used in dams, basements, tunnels and other projects to maintain the stability and safety of the structure.

[0003] It is very necessary to install joints at the joints of two plastic concrete anti-seepage walls. Joints can effectively manage the deformation and stress between walls and prevent cracks caused by factors such as temperature changes and foundation settlement. At the same time, joints help maintain the overall anti-seepage effect of the wall and prevent moisture from penetrating from the joints, causing potential safety hazards. Therefore, the reasonable setting of joints is an important measure to ensure structural safety and effective anti-seepage.

[0004] For related technologies, reference may be made to the Chinese patent authorization announcement number CN115573394A, which discloses a construction process and application for treating joints of plastic concrete anti-seepage walls. In the joints of the anti-seepage walls of construction sections I and II of the cast anti-seepage walls, mechanical secondary drilling is used and then plastic concrete is poured. Compared with the existing construction technology, the method of drilling holes and then pouring plastic concrete can eliminate the construction interface (joint seam) and mud existing at the original construction joint, and the two adjacent walls are connected as a whole through the poured plastic concrete. At the same time, the infiltrative crystallization material in the plastic concrete has the functions of self-healing cracks and migrating infiltrative crystallization, which can effectively repair the new construction interface (joint seam) formed between the poured plastic concrete and the two adjacent walls, breaking through the technical bottleneck of easy leakage at the joint of the anti-seepage wall.

[0005] However, before the construction of each trench section of the anti-seepage wall, it is necessary to use external equipment to extract mud, and then use concrete pouring equipment for pouring, and use vibration equipment to remove bubbles in the concrete during the pouring process. In the joint construction process, not only are many equipments used, the energy consumption is high, but the construction is also cumbersome. It is difficult to significantly improve the construction quality of concrete while ensuring reduced energy consumption and convenient construction, resulting in a decrease in the stability and durability of the anti-seepage wall. Summary of the invention

[0006] The present application provides a plastic concrete anti-seepage wall joint structure, which can significantly improve the construction quality of concrete and ensure the stability and durability of the anti-seepage wall while ensuring reduced energy consumption and convenient construction.

[0007] The present application provides a plastic concrete anti-seepage wall joint structure, which adopts the following technical solution: A plastic concrete anti-seepage wall joint structure comprises a first anti-seepage wall and a second anti-seepage wall, wherein a semicircular first through hole and a second through hole are arranged at the joint between the first anti-seepage wall and the second anti-seepage wall, a casting cavity is formed between the first through hole and the second through hole, a reinforcement cage is arranged inside the casting cavity, the reinforcement cage comprises an annular sleeve, a plurality of liquid permeable holes are arranged on the outer surface of the annular sleeve, the annular sleeve is provided with a plurality of holes, two adjacent annular sleeves are connected by a plurality of connecting pipes, and a main pipe is arranged on the topmost annular sleeve.

[0008] By adopting the above technical scheme, a reinforcement cage is suspended inside the casting cavity, and the main pipe on the reinforcement cage is connected to the external pumping equipment, grouting equipment and vibration equipment respectively, so as to respectively realize the functions of pumping out the accumulated water in the casting cavity, reinforcing the joint between the first anti-seepage wall and the second anti-seepage wall with the solidified plastic concrete, and vibrating and compacting the plastic concrete. In short, by suspending the reinforcement cage and connecting different joints, during the joint construction process, the construction quality of concrete can be significantly improved while ensuring reduced energy consumption and convenient construction, thereby ensuring the stability and durability of the anti-seepage wall.

[0009] Preferably, overflow holes are provided on the inner walls of the first through hole of the first anti-seepage wall and the second through hole of the second anti-seepage wall, and a plurality of overflow holes are provided along the longitudinal direction of the first anti-seepage wall and the second anti-seepage wall.

[0010] By adopting the above technical solution, the overflow hole is set to effectively control the water flow and guide the water flow, thereby preventing water pressure from accumulating at the joints, thereby reducing the possibility of leakage.

[0011] Preferably, positioning tubes are passed through the overflow holes of the first anti-seepage wall and the second anti-seepage wall.

[0012] By adopting the above technical solution and setting a positioning pipe in the overflow hole, excess water can be effectively guided and discharged, while also providing convenience for subsequent maintenance and monitoring.

[0013] Preferably, the inner and outer surfaces of the first anti-seepage wall and the second anti-seepage wall are both provided with metal reinforcement meshes, and the metal reinforcement meshes span the joint between the first anti-seepage wall and the second anti-seepage wall.

[0014] By adopting the above technical solution, the metal reinforcement mesh can be tightly combined with concrete or other materials through its own mesh structure, thereby enhancing the adhesion of the joint between the first anti-seepage wall and the second anti-seepage wall, and can effectively resist erosion caused by water flow and soil settlement and displacement.

[0015] Preferably, the outer end of the positioning tube passes through the mesh of the metal reinforcement mesh.

[0016] By adopting the above technical solution, the positioning tube provides additional support and stability by passing through the mesh of the metal reinforcement mesh, which helps to maintain the shape and position of the entire structure and prevent displacement caused by external forces.

[0017] Preferably, the metal reinforcement mesh is made of galvanized metal material.

[0018] By adopting the above technical solution, galvanizing is to cover the surface of the metal with a layer of zinc to protect the steel from oxidation; the zinc layer can react with moisture and oxygen in the air to form a passivation film to prevent internal metal corrosion.

[0019] Preferably, spring-shaped reinforcing ribs are provided inside the annular sleeve.

[0020] By adopting the above technical solution and providing spring-shaped reinforcing ribs, the compressive and tensile strengths of the annular sleeve can be effectively improved, thereby enhancing the stability of the overall structure.

[0021] Preferably, the connecting tube is connected to an extension tube, the cross section of the extension tube changes evenly from one end to the other and forms an enlarged end and a reduced end at both ends respectively, and the enlarged end of the extension tube is connected to the connecting tube.

[0022] By adopting the above technical solution, during the process of pouring plastic concrete into the main pipe, the plastic concrete will pass through the expanded end of the extension tube and continue to fill the internal cavity of the extension tube. By setting the expanded end and the reduced end, the fluid-like poured plastic concrete can enter and exit more smoothly.

[0023] Preferably, the narrowed end of the extension tube passes through the joint between the first anti-seepage wall and the second anti-seepage wall, the mesh of the metal reinforcement net in sequence, and spreads on the inner and outer surfaces of the first anti-seepage wall and the second anti-seepage wall.

[0024] By adopting the above-mentioned technical solution, the extension tube is passed through the joint between the first anti-seepage wall and the second anti-seepage wall, which can effectively fill and seal the gap in the joint, reduce the possibility of moisture penetration, and improve the overall anti-seepage performance. The extension tube is combined with the metal reinforcement mesh to help evenly distribute the reinforcement material on the wall surface, enhance the structural strength and stability of the anti-seepage wall, and avoid cracking and deformation.

[0025] Preferably, the extension tube is a flexible structure in the shape of a broken line.

[0026] By adopting the above technical solution, after the plastic concrete is injected, the folded line portion of the extension tube is pulled straight to a straight state, and this characteristic enables the concrete to effectively cover the total area of ​​the joint and the wall.

[0027] In summary, this application has the following beneficial effects: 1. By hanging a reinforcement cage inside the casting cavity, and connecting the main pipe on the reinforcement cage to the external pumping equipment, grouting equipment and vibration equipment, the accumulated water in the casting cavity can be extracted, the solidified plastic concrete can be used to reinforce the joint between the first anti-seepage wall and the second anti-seepage wall, and the plastic concrete can be vibrated to compact the plastic concrete. In short, by hanging the reinforcement cage and connecting different joints, during the joint construction process, the construction quality of the concrete can be significantly improved while ensuring reduced energy consumption and convenient construction, thereby ensuring the stability and durability of the anti-seepage wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 Schematic diagram of the overall structure of the plastic concrete anti-seepage wall joint structure in this embodiment; Figure 2 Schematic diagram of the explosion structure between the first anti-seepage wall and the second anti-seepage wall in this embodiment; Figure 3 is a schematic diagram of the explosion structure between the first anti-seepage wall and the positioning pipe in this embodiment; Figure 4 Schematic diagram of the internal structure of the reinforcement cage in this embodiment; Explanation of the reference numerals: 1. first anti-seepage wall; 2. second anti-seepage wall; 3. first through hole; 4. second through hole; 5. overflow hole; 6. positioning tube; 7. slot; 8. reinforcing plug plate; 9. metal reinforcement mesh; 10. reinforcement cage; 1001. annular sleeve; 1002. liquid permeable hole; 1003. connecting pipe; 1004. main pipe; 11. extension pipe. DETAILED DESCRIPTION

[0029] The present application is further described in detail below in conjunction with the accompanying drawings. It is necessary to point out here that the following specific implementation methods are only used to further illustrate the present application and cannot be understood as limiting the scope of protection of the present application. Technical personnel in this field can make some non-essential improvements and adjustments to the present application based on the above application content. Example

[0030] The present invention discloses a plastic concrete anti-seepage wall joint structure, such as Figure 1As shown, it includes a first anti-seepage wall 1 and a second anti-seepage wall 2. When the wall strength of the first anti-seepage wall 1 and the second anti-seepage wall 2 is greater than 80% of the design strength, holes are opened at the joints between the first anti-seepage wall 1 and the second anti-seepage wall 2, wherein the size of the openings is smaller than the wall thickness of the first anti-seepage wall 1 and the second anti-seepage wall 2, and semicircular first through holes 3 and second through holes 4 are formed on the walls of the first anti-seepage wall 1 and the second anti-seepage wall 2, respectively. The provision of the first through holes 3 and the second through holes 4 helps to disperse material stress and reduce stress concentration at the joints, thereby reducing the risk of cracks; and can increase the mechanical connection between the two, thereby improving the anti-seepage performance at the joints.

[0031] like Figure 2 and Figure 3 As shown, then, an overflow hole 5 is formed on the inner wall of the first through hole 3 and the second through hole 4 of the first anti-seepage wall 1 and the second anti-seepage wall 2 by drilling. The overflow hole 5 can effectively control the water flow and guide the water flow through the pipeline to prevent the water pressure from accumulating at the joints, thereby reducing the possibility of leakage; a number of overflow holes 5 are arranged at equal intervals along the longitudinal direction of the walls of the first anti-seepage wall 1 and the second anti-seepage wall 2, and the insides of the overflow holes 5 of the first anti-seepage wall 1 and the second anti-seepage wall 2 are penetrated by positioning tubes 6. The positioning tubes 6 are arranged in the overflow holes 5, which can effectively guide and discharge excess water, and also provide convenience for subsequent maintenance and monitoring; the positioning tubes 6 are made of stainless steel, and the positioning tubes 6 made of stainless steel have good strength and are used to improve the overall strength of the first anti-seepage wall 1 and the second anti-seepage wall 2.

[0032] like Figure 2 and Figure 3As shown, the inner walls of the first through hole 3 and the second through hole 4 of the first anti-seepage wall 1 and the second anti-seepage wall 2 are provided with a slot 7 extending vertically downward in the longitudinal direction, and the slot 7 is connected to the overflow hole 5. The design of the slot 7 being connected to the overflow hole 5 provides a path, allowing the effectiveness of the anti-seepage wall to be enhanced under the osmotic pressure of water flow and the like; the arrangement of the slot 7 enables the inserted reinforcing plug plate 8 to effectively withstand the pressure from the water flow; after the positioning tube 6 is inserted, the reinforcing plug plate 8 is inserted downward toward the inside of the slot 7, so that the positioning tube 6 is fixed inside the overflow hole 5, which can not only fix the positioning tube 6 The position of the slot 7 also provides additional structural support to ensure the stability of the positioning tube 6 inside the overflow hole 5; the insertion of the reinforcing plug plate 8 evenly disperses the external force, so that the penetration pressure is no longer concentrated on a certain point, reducing the risk of local damage to the wall material, thereby enhancing the overall safety of the structure; the insertion of the reinforcing plug plate 8 can effectively fix the positioning tube 6, reduce the displacement or deformation caused by external factors, and improve the overall stability of the anti-seepage wall; through the design of the slot 7, the overall anti-seepage effect is significantly improved; when water flows infiltrate, the existence of the slot 7 forms an additional barrier, which enhances the anti-seepage function.

[0033] like Figure 2 and Figure 3 As shown, the inner and outer surfaces of the first anti-seepage wall 1 and the second anti-seepage wall 2 are both provided with metal reinforcement meshes 9, which provide additional tensile strength and can withstand external forces such as soil pressure and water pressure to prevent the wall from cracking or deforming when subjected to force. The metal reinforcement mesh 9 spans the joint between the first anti-seepage wall 1 and the second anti-seepage wall 2; the metal reinforcement mesh 9 can be tightly combined with concrete or other materials through its mesh structure to enhance the adhesion of the joint between the first anti-seepage wall 1 and the second anti-seepage wall 2; this adhesion can effectively resist erosion caused by water flow and soil settlement and displacement; the external force applied at the joint, such as soil pressure and water pressure, can be more evenly dispersed and transmitted through the metal reinforcement mesh 9, reducing local stress concentration; this uniform distribution of stress helps prevent wall cracking or displacement at the joint, thereby resisting possible water erosion and soil displacement.

[0034] like Figure 2 and Figure 3 As shown, the metal reinforcement mesh 9 is made of galvanized steel. Galvanizing is to cover the surface of the steel with a layer of zinc to protect the steel from oxidation. The zinc layer can react with moisture and oxygen in the air to form a passivation film to prevent internal steel corrosion.

[0035] like Figure 2 and Figure 3As shown, the outer end of the positioning tube 6 passes through the mesh of the metal reinforcement net 9. The positioning tube 6 provides additional support and stability by passing through the mesh of the metal reinforcement net 9, which helps to maintain the shape and position of the entire structure and prevent displacement due to external force. Moreover, the presence of the positioning tube 6 can effectively disperse the force applied to the metal reinforcement net 9, and transmit the external force to other structural components through the positioning tube 6, thereby reducing the burden of a single component and ensuring the overall stability of the structure. In addition, the positioning tube 6 can be used as a reference point to facilitate construction and adjustment, especially in situations where rapid positioning and alignment are required, to ensure the relatively correct position information of each part and simplify the construction process.

[0036] like Figure 3 and Figure 4 As shown, a casting cavity is formed between the first through hole 3 and the second through hole 4, and a reinforcement cage 10 is provided inside the casting cavity. The reinforcement cage 10 is used to extract groundwater in the casting cavity and reinforce the two first impermeable walls 1 and the second impermeable walls 2. Specifically, the reinforcement cage 10 includes an annular sleeve 1001, and the outer surface of the annular sleeve 1001 is provided with a plurality of liquid permeable holes 1002. The annular sleeve 1001 is provided with a plurality of holes from top to bottom. The adjacent two annular sleeves 1001 are connected by a connecting pipe 1003. The connecting pipes 1003 are distributed at equal angles around the central axis of the annular sleeve 1001. The top annular sleeve 1001 is provided with a main pipe 1 004. When in use, the construction workers first sink the reinforcement cage 10 into the interior of the casting cavity, and connect the main pipe 1004 to the external pumping equipment. Through the pumping equipment, negative pressure can be formed inside the annular sleeve 1001 and the connecting pipe 1003. The generation of negative pressure prompts the liquid in the casting cavity to be discharged through the permeable hole 1002 and then through the connecting pipe 1003; by pumping, the excess groundwater in the casting cavity is removed; in addition, the reinforcement cage 10 structure sunk into the casting cavity can provide physical support during the casting process to prevent the surrounding soil from sinking or moving; once the liquid is effectively pumped out, the self-weight of the surrounding soil and the effect of the reinforcement cage 10 will help maintain the stability of the structure.

[0037] like Figure 3 and Figure 4As shown, after the internal water of the casting cavity is completely pumped out, the construction personnel inject plastic concrete in the reverse direction toward the interior of the main pipe 1004, and the plastic concrete flows along the main pipe 1004 into the connecting pipe 1003 and the interior of the annular sleeve 1001, until the plastic concrete injected into the annular sleeve 1001 overflows from the liquid permeable hole 1002 into the casting cavity, ensuring that the plastic concrete can fully fill the interior of the connecting pipe 1003 and the annular sleeve 1001, avoiding hollows and defects, and enhancing the integrity of the structure; the filled concrete can effectively withstand external loads, enhance compressive strength, and improve the performance of the overall structure; the reverse injection method simplifies the construction process, reduces the need for multiple castings and complex operations, and helps to speed up the construction progress; after the concrete is cured and meets the design requirements, the plastic concrete is injected into the casting cavity.

[0038] Spring-shaped reinforcement ribs are provided inside the annular sleeve 1001, which can effectively improve the compressive and tensile strengths of the annular sleeve 1001 and enhance the stability of the overall structure. During concrete pouring or long-term load conditions, the spring-shaped reinforcement ribs can effectively prevent deformation and cracking of the annular sleeve 1001 and maintain the integrity of the structure. The spring-shaped design can promote the flow of injected concrete in the annular sleeve 1001, ensure more uniform filling, and avoid bubbles and gaps.

[0039] Optionally, further, during the process of pouring plastic concrete into the main pipe 1004 or during the process of injecting plastic concrete into the casting cavity, the main pipe 1004 can be connected to an external vibration device, and the vibration device transmits the vibration force generated by itself to the spring-shaped reinforcement bar through the main pipe 1004. When the vibration device is working, the vibration is transmitted to the concrete through the main pipe 1004, so that the concrete particles undergo relative displacement; the kinetic energy generated by the vibration can make the bubbles in the concrete move upward and eventually leave the liquid state of the concrete, thereby reducing the number of bubbles; and the vibration can reduce the internal friction of the concrete, thereby enhancing its fluidity, making it easier to fill every corner and gap of the annular sleeve 1001 and the connecting pipe 1003; this also helps the air to escape; the vibration process helps to evenly disperse the various components in the concrete, ensuring that the concrete components in each part are consistent, thereby improving its overall performance.

[0040] Specifically, the connecting pipe 1003 is connected to an extension pipe 11, the cross-section of the extension pipe 11 changes evenly from one end to the other end and forms an enlarged end and a reduced end at both ends respectively, the enlarged end of the extension pipe 11 is connected to the connecting pipe 1003, the reduced end of the extension pipe 11 passes through the joint between the first anti-seepage wall 1 and the second anti-seepage wall 2, the mesh of the metal reinforcement net 9 in turn, and spreads on the inner and outer surfaces of the first anti-seepage wall 1 and the second anti-seepage wall 2, the extension pipe 11 is a folded line-shaped flexible structure.

[0041] The plastic concrete enters the extension tube 11 through the enlarged end thereof, and due to its fluidity, it can be continuously filled in the extension tube 11; in this process, the concrete gradually fills the entire extension tube 11, so that the concrete in various parts is evenly distributed; the zigzag flexible structure of the extension tube 11 enables it to adapt to various shapes and layouts during the injection process; after the plastic concrete is injected, the zigzag portion of the extension tube 11 is pulled straight to a straight state, and this characteristic enables the concrete to effectively cover the total area of ​​the joint and the wall; when the plastic concrete solidifies, the concrete in the extension tube 11 will maintain the shape of the pipe, so that the solidified concrete forms a complete and stable supporting component in the structure; this helps to enhance the structural connection strength between the first anti-seepage wall 1 and the second anti-seepage wall 2.

[0042] Working principle: During construction, the construction workers first bury suitable anti-seepage walls according to the design drawings and after fixed-point layout. At this time, there are joints between adjacent anti-seepage walls. In this embodiment, when the wall strength of the first anti-seepage wall 1 and the second anti-seepage wall 2 is greater than 80% of the design strength, holes are opened at the joints between the first anti-seepage wall 1 and the second anti-seepage wall 2, and semicircular first through holes 3 and second through holes 4 are formed on the walls of the first anti-seepage wall 1 and the second anti-seepage wall 2, respectively.

[0043] Then, an overflow hole 5 is formed on the inner walls of the first through hole 3 and the second through hole 4 of the first anti-seepage wall 1 and the second anti-seepage wall 2 by drilling, and a positioning tube 6 is driven into the overflow hole 5, and the water flow is guided by the positioning tube 6 to prevent water pressure from accumulating at the joints, thereby reducing the possibility of leakage; a vertical downward slot 7 is then opened in the inner walls of the first through hole 3 and the second through hole 4 of the first anti-seepage wall 1 and the second anti-seepage wall 2 along the longitudinal direction; after the positioning tube 6 is inserted, a reinforcing plug plate 8 is inserted downward toward the inside of the slot 7 to fix the positioning tube 6 inside the overflow hole 5.

[0044] Then, metal reinforcement meshes 9 are hung on the inner and outer surfaces of the first anti-seepage wall 1 and the second anti-seepage wall 2. Specifically, the metal reinforcement meshes 9 are hung on the positioning tube 6, and the metal reinforcement meshes 9 span the joint between the first anti-seepage wall 1 and the second anti-seepage wall 2.

[0045] Then, a reinforcement cage 10 is sunk into the casting cavity formed between the first through hole 3 and the second through hole 4 . The reinforcement cage 10 is used to extract groundwater in the casting cavity and reinforce the first and second anti-seepage walls 1 and 2 .

[0046] Specifically, when in use, the construction workers first sink the reinforcement cage 10 into the interior of the casting cavity, and connect the main pipe 1004 to the external pumping equipment. Through the pumping equipment, negative pressure can be formed inside the annular sleeve 1001 and the connecting pipe 1003. The generation of negative pressure prompts the liquid in the casting cavity to be discharged through the permeable hole 1002 and then through the connecting pipe 1003; by pumping, the excess groundwater in the casting cavity is removed; in addition, the reinforcement cage 10 structure sunk into the casting cavity can provide physical support during the casting process to prevent the surrounding soil from sinking or moving; once the liquid is effectively pumped out, the deadweight of the surrounding soil and the action of the reinforcement cage 10 will help maintain the stability of the structure.

[0047] After the accumulated water inside the casting cavity is completely evacuated, the construction personnel inject plastic concrete in the reverse direction into the main pipe 1004, and the plastic concrete flows along the main pipe 1004 into the connecting pipe 1003 and the annular sleeve 1001, until the plastic concrete injected into the annular sleeve 1001 overflows from the liquid permeable hole 1002 into the casting cavity, ensuring that the plastic concrete can fully fill the connecting pipe 1003 and the annular sleeve 1001, avoiding hollows and defects, and enhancing the integrity of the structure; the filled concrete can effectively withstand external loads, enhance compressive strength, and improve the performance of the overall structure; the reverse injection method simplifies the construction process, reduces the need for multiple castings and complex operations, and helps to speed up the construction progress; after the concrete is cured and meets the design requirements, the plastic concrete is injected into the casting cavity.

[0048] It is worth noting that in the process of pouring plastic concrete into the main pipe 1004, the plastic concrete will pass through the enlarged end of the extension tube 11 and continue to fill the internal cavity of the extension tube 11 until the extension tube 11 is extended from a zigzag flexible structure to a straight state with the continuous injection of plastic concrete. When the plastic concrete in the extension tube 11 solidifies, the concrete in the extension tube 11 will maintain the shape of the pipe, so that the solidified concrete forms a complete and stable supporting component in the structure.

[0049] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A plastic concrete anti-seepage wall joint structure, comprising a first anti-seepage wall (1) and a second anti-seepage wall (2), wherein a semicircular first through hole (3) and a second through hole (4) are provided at the joint between the first anti-seepage wall (1) and the second anti-seepage wall (2), characterized in that: A casting cavity is formed between the first through hole (3) and the second through hole (4), a reinforcement cage (10) is provided inside the casting cavity, the reinforcement cage (10) comprises an annular sleeve (1001), a plurality of liquid permeable holes (1002) are provided on the outer surface of the annular sleeve (1001), the annular sleeve (1001) is provided with a plurality of connecting pipes (1003), and a main pipe (1004) is provided on the top annular sleeve (1001).

2. The plastic concrete anti-seepage wall joint structure according to claim 1, characterized in that: Overflow holes (5) are provided on the inner walls of the first through hole (3) of the first anti-seepage wall (1) and the second through hole (4) of the second anti-seepage wall (2), and a plurality of the overflow holes (5) are provided along the longitudinal direction of the first anti-seepage wall (1) and the second anti-seepage wall (2).

3. The plastic concrete anti-seepage wall joint structure according to claim 2, characterized in that: Positioning tubes (6) are inserted into the overflow holes (5) of the first anti-seepage wall (1) and the second anti-seepage wall (2).

4. The plastic concrete anti-seepage wall joint structure according to claim 3, characterized in that: Metal reinforcement meshes (9) are provided on the inner and outer surfaces of the first anti-seepage wall (1) and the second anti-seepage wall (2), and the metal reinforcement meshes (9) span the joint between the first anti-seepage wall (1) and the second anti-seepage wall (2).

5. The plastic concrete anti-seepage wall joint structure according to claim 4, characterized in that: The outer end of the positioning tube (6) passes through the mesh of the metal reinforcement net (9).

6. The plastic concrete anti-seepage wall joint structure according to claim 5, characterized in that: The metal reinforcement mesh (9) is made of galvanized metal material.

7. The plastic concrete anti-seepage wall joint structure according to claim 1, characterized in that: The annular sleeve (1001) is provided with spring-shaped reinforcing ribs inside.

8. The plastic concrete anti-seepage wall joint structure according to claim 1, characterized in that: The connecting tube (1003) is connected to an extension tube (11), the cross section of the extension tube (11) changes evenly from one end to the other and forms an enlarged end and a reduced end at both ends respectively, and the enlarged end of the extension tube (11) is connected to the connecting tube (1003).

9. The plastic concrete anti-seepage wall joint structure according to claim 8, characterized in that: The narrowed end of the extension tube (11) passes through the joint between the first anti-seepage wall (1) and the second anti-seepage wall (2), the mesh of the metal reinforcement net (9) in sequence, and is spread on the inner and outer surfaces of the first anti-seepage wall (1) and the second anti-seepage wall (2).

10. The plastic concrete anti-seepage wall joint structure according to claim 9, characterized in that: The extension tube (11) is a flexible structure in the shape of a broken line.