Replaceable coupling beam energy dissipation structure convenient to repair
By designing a replaceable coupling beam energy-dissipating structure, seismic energy is dissipated through bolt friction and deformation of the energy-dissipating beam segment, enabling rapid repair and functional restoration of high-rise buildings after an earthquake. This solves the problems of high difficulty and long time required for traditional repairs, reduces repair costs, and improves repair efficiency.
Patent Information
- Application Number
- CN202411342799.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-09-25
AI Technical Summary
Traditional high-rise buildings are difficult and time-consuming to repair after an earthquake, and existing coupled beam energy-consuming structures cannot achieve rapid repair and economical restoration of building functions.
A replaceable coupled beam energy-dissipating structure that is easy to repair is designed. By using a detachable second bolt between the steel deep beam and the energy-dissipating beam segment, the friction of the bolt and the deformation of the energy-dissipating beam segment are used to dissipate seismic energy. The energy-dissipating beam segment can be easily replaced after damage, thus achieving rapid repair.
The goal is to restore the building's seismic resistance function within a short period before aftershocks, reduce repair costs, ensure repair efficiency, and then carry out a perfect repair once time permits, restoring the building's load-bearing capacity.
Smart Images

Figure CN118911343A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of structural earthquake resistance, and in particular relates to a replaceable connecting beam energy dissipation structure which is easy to repair. Background Art
[0002] Traditional engineering structure seismic design is mainly anti-collapse design to prevent structural collapse and casualties under strong earthquakes. However, with the development of social economy, high-rise buildings and important buildings are increasing day by day, and simple anti-collapse design can no longer meet the needs. The difficulty and cost of repairing structures damaged by earthquakes have increased accordingly.
[0003] When an earthquake disaster occurs in a city, all kinds of buildings need to be repaired as quickly as possible to restore the basic functions of the city as soon as possible, while avoiding greater losses caused by aftershocks. However, the restoration of buildings is extremely difficult and requires the overall planning and dispatch of many resources. The repair strategy is very important for the evaluation of seismic resilience. According to the priority and degree of building repair, we believe that the repair of buildings can be summarized as "perfect repair" and "imperfect repair". For example, hospitals, water plants and power plants need to be perfectly repaired and resumed as soon as possible, and try to avoid further damage. For buildings that store supplies, the structural maintenance strategy can be relatively simple, that is, imperfect repair, just to ensure that the building does not collapse.
[0004] The realization of "perfect restoration" and "imperfect restoration" of a building depends on the difficulty and efficiency of the repairable parts of the building.
[0005] Among the four major structural systems of high-rise buildings, shear wall structure and frame-shear wall structure have been widely used in the engineering field due to their good lateral stiffness and bearing capacity. The connecting beams between the wall limbs are the main energy-absorbing components of the structure.
[0006] At present, high-rise shear wall structures can achieve the design goal of "not collapsing in a major earthquake", but there are problems such as great difficulty and long time in post-earthquake repair. In order to achieve rapid recovery of the post-earthquake housing function of the structure, we propose a replaceable connecting beam energy-absorbing structure that is easy to repair to solve the above problems. Summary of the invention
[0007] The purpose of the present invention is to provide a replaceable connecting beam energy dissipation structure which is easy to repair, so as to solve the above problems.
[0008] To achieve the above object, the present invention provides the following solutions:
[0009] A replaceable connecting beam energy dissipation structure that is easy to repair, comprising: a steel deep beam embedded in a wall limb, and an energy dissipation beam section is detachably connected between two of the steel deep beams;
[0010] The steel deep beam comprises an embedding component and a fixed end face, the fixed end face is fixedly connected to one end of the embedding component, two rows of first oblong holes for second bolts to pass through are opened on the fixed end face, the two rows of first oblong holes are symmetrically arranged, and the end of the energy-absorbing beam section is fixedly connected to the fixed end face through the second bolt;
[0011] The first oblong hole has a size larger than a diameter of the second bolt.
[0012] Preferably, the embedded component includes a horizontal I-beam, one end of which is embedded in the wall limb, and the other end of which is fixedly connected to the fixed end surface.
[0013] Preferably, a plurality of first vertical stiffening ribs are fixedly connected to the middle portion of the horizontal I-beam, and the plurality of first vertical stiffening ribs located at the front and rear sides of the horizontal I-beam are symmetrically arranged.
[0014] Preferably, one end of a horizontal stiffening rib is fixedly connected to the top and the bottom of the front and rear sides of the fixed end surface respectively, and the other end of the horizontal stiffening rib is fixedly connected to the side wall of the corresponding first vertical stiffening rib.
[0015] Preferably, the energy-absorbing beam section includes an energy-absorbing I-beam, and both ends of the energy-absorbing I-beam are respectively fixed with connecting end faces, and a plurality of second oblong holes are opened on the connecting end faces, and the plurality of second oblong holes correspond one-to-one to the plurality of first oblong holes, and the second oblong holes have the same structure as the first oblong holes.
[0016] Preferably, a plurality of second vertical stiffening ribs are fixedly connected to the front and rear sides of the energy-absorbing I-beam, respectively, and the plurality of second vertical stiffening ribs on the front and rear sides are symmetrically arranged.
[0017] Preferably, one end of a shear plate is fixedly connected to the horizontal stiffening rib, and the other end of the shear plate is fixedly connected to the end of the energy-absorbing I-beam.
[0018] Compared with the prior art, the present invention has the following advantages and technical effects:
[0019] When in use, the steel deep beam is fixedly connected to the steel bars in the wall limb, and then concrete is poured. After the concrete solidifies, the wall limb is formed. At this time, the steel deep beam is firmly embedded in the wall limb, and the energy-absorbing beam section is installed between two adjacent steel deep beams. The fixed end face of the steel deep beam and the end of the energy-absorbing beam section are firmly connected by a plurality of second bolts. The size of the first oblong hole for the second bolt to pass through, which is opened on the fixed end face, is larger than the diameter of the second bolt, leaving a margin for the movement of the second bolt. Before an earthquake occurs, the second bolt is tightened to form an extrusion between the fixed end face and the end of the energy-absorbing beam section to generate friction, so that the fixed end face and the energy-absorbing beam section are fixedly connected. When an earthquake occurs, the energy-absorbing beam section first deforms under the action of the earthquake to consume the earthquake energy. At the same time, the second bolt is subjected to shear force, axial tension or Pressure will also cause deformation, causing the end of the energy-absorbing beam section to loosen with the fixed end face. The purpose of setting the first oblong hole is to reduce the stress between the second bolt and the first oblong hole when an earthquake occurs, so as to avoid damage to the fixed end face, so that the energy-absorbing beam section can absorb most of the earthquake energy. After the earthquake, since the fixed end face is not damaged, the second bolt used for fixing also becomes loose, which makes it convenient to remove the damaged energy-absorbing beam section and replace it with a new energy-absorbing beam section in time. Based on the new concept of restoring building structures without perfect repair, the present invention can complete the restoration of the seismic function of the building in a short time before aftershocks, while ensuring the repair efficiency and reducing the repair cost. When there is time for repair, perfect repair can also be carried out on the basis of imperfect repair to fully restore the bearing capacity of the building. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative labor:
[0021] Figure 1 It is a schematic diagram of the structure of the present invention;
[0022] Figure 2 It is an exploded view of the structure of the present invention;
[0023] Figure 3 This is a schematic diagram of the steel deep beam structure of the present invention;
[0024] Figure 4 It is a schematic diagram of the structure of the energy-absorbing beam section of the present invention;
[0025] Figure 5 This is a schematic diagram of the second bolt structure of Example 2 of the present invention;
[0026] Among them, 1. steel deep beam; 2. energy-absorbing beam section; 3. shear plate; 4. first bolt; 5. second bolt; 101. horizontal I-beam; 102. fixed end face; 103. horizontal stiffening rib; 104. first circular hole; 105. first oblong hole; 106. first vertical stiffening rib; 201. energy-absorbing I-beam; 202. connecting end face; 203. second oblong hole; 204. second circular hole; 205. second vertical stiffening rib; 501. bolt body; 502. first gasket; 503. threaded slot hole; 504. threaded column; 505. expanded metal column; 506. second gasket; 507. nut; 508. cover; 509. torsional shear fracture column; 510. spline groove; 511. hot-melt grease; 512. leak hole; 513. cavity. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0029] Embodiment 1:
[0030] Reference Figures 1 to 4 , this embodiment discloses a replaceable connecting beam energy-absorbing structure that is easy to repair, comprising: a steel deep beam 1 embedded in a wall limb, and an energy-absorbing beam section 2 is detachably connected between two steel deep beams 1;
[0031] The steel deep beam 1 includes an embedded component and a fixed end face 102. The fixed end face 102 is fixedly connected to one end of the embedded component. Two rows of first oblong holes 105 for the second bolts 5 to pass through are opened on the fixed end face 102. The two rows of first oblong holes 105 are symmetrically arranged. The end of the energy dissipation beam section 2 is fixedly connected to the fixed end face 102 through the second bolts 5.
[0032] The first oblong hole 105 is larger than the diameter of the second bolt 5 .
[0033] When in use, the steel deep beam 1 is fixedly connected to the steel bars in the wall limb, and then concrete is poured. After the concrete solidifies, a wall limb is formed. At this time, the steel deep beam 1 is firmly embedded in the wall limb, and the energy absorption beam section 2 is installed between two adjacent steel deep beams 1. The fixed end face 102 of the steel deep beam 1 is firmly connected to the end of the energy absorption beam section 2 by a plurality of second bolts 5. The size of the first oblong hole 105 for the second bolt 5 to pass through is larger than the diameter of the second bolt 5, leaving a margin for the movement of the second bolt 5. Before an earthquake occurs, the second bolt 5 is tightened to form an extrusion between the fixed end face 102 and the end of the energy absorption beam section 2 to generate friction, so that the fixed end face 102 and the energy absorption beam section 2 are fixedly connected. When an earthquake occurs, the energy absorption beam section 2 first deforms under the action of the earthquake to consume the earthquake energy. At the same time, the second bolt 5 is subjected to shear force and axial force under the action of the earthquake. Tensile force or pressure will also cause deformation, causing the end of the energy-absorbing beam section 2 to loosen with the fixed end face 102. The purpose of setting the first oblong hole 105 is to reduce the stress between the second bolt 5 and the first oblong hole 105 when an earthquake occurs, so as to avoid damage to the fixed end face 102, so that the energy-absorbing beam section 2 can absorb most of the earthquake energy. After the earthquake, since the fixed end face 102 is not damaged, the second bolt 5 used for fixing also becomes loose, which makes it convenient to remove the damaged energy-absorbing beam section 2 and replace it with a new energy-absorbing beam section 2 in time. Based on the new concept of restoring building structures with imperfect repairs, the present invention can complete the restoration of the seismic resistance function of the building in a short time before aftershocks, while ensuring the repair efficiency and reducing the repair cost. When there is time for repair, perfect repair can also be performed on the basis of imperfect repair to fully restore the bearing capacity of the building.
[0034] According to a further optimized solution, the embedded component includes a horizontal I-beam 101 , one end of which is embedded in the wall limb, and the other end of which is fixedly connected to the fixed end face 102 .
[0035] According to a further optimization scheme, a plurality of first vertical stiffening ribs 106 are fixedly connected to the middle portion of the horizontal I-beam 101 , and the plurality of first vertical stiffening ribs 106 located at the front and rear sides of the horizontal I-beam 101 are symmetrically arranged.
[0036] The first vertical stiffening rib 106 is provided to improve the strength of the horizontal I-beam 101 itself.
[0037] According to a further optimized solution, one end of a horizontal stiffening rib 103 is fixedly connected to the top and bottom of the front and rear sides of the fixed end surface 102 , respectively, and the other end of the horizontal stiffening rib 103 is fixedly connected to the side wall of the corresponding first vertical stiffening rib 106 .
[0038] The provision of the horizontal stiffening ribs 103 further improves the firmness of the connection between the fixed end surface 102 and the horizontal I-beam 101 .
[0039] According to a further optimization scheme, the energy-absorbing beam section 2 includes an energy-absorbing I-beam 201, and connecting end faces 202 are respectively fixed at both ends of the energy-absorbing I-beam 201. A plurality of second oblong holes 203 are opened on the connecting end faces 202. The plurality of second oblong holes 203 correspond one-to-one to the plurality of first oblong holes 105, and the second oblong holes 203 have the same structure as the first oblong holes 105.
[0040] When an earthquake occurs, the energy-absorbing I-beam 201 is deformed before the horizontal I-beam 101 to absorb earthquake energy. The second oblong hole 203 has the same structure as the first oblong hole 105 and is used to provide a movable margin for the second bolt 5 .
[0041] According to a further optimized solution, a plurality of second vertical stiffening ribs 205 are respectively fixedly connected to the front and rear sides of the energy-absorbing I-beam 201, and the plurality of second vertical stiffening ribs 205 on the front and rear sides are symmetrically arranged.
[0042] The second vertical stiffening rib 205 is used to improve the bearing strength of the energy-absorbing I-beam 201 .
[0043] According to a further optimized solution, one end of the shear plate 3 is fixedly connected to the horizontal stiffening rib 103 , and the other end of the shear plate 3 is fixedly connected to the end of the energy-absorbing I-beam 201 .
[0044] A plurality of first circular holes 104 are provided on the horizontal stiffening rib 103, and a plurality of second circular holes 204 are respectively provided on the wing plates at the top and bottom of the energy-absorbing I-beam 201. The first circular holes 104 and the second circular holes 204 are both used for passing the first bolts 4. Through holes corresponding to and matching the plurality of first circular holes 104 and the plurality of second circular holes 204 are respectively provided at the ends of the shear plate 3. The first bolts 4 are passed through the corresponding through holes, the first circular holes 104 and the second circular holes 204, and the first bolts 4 are tightened to fix the shear plate 3 to the corresponding horizontal stiffening rib 103 and the energy-absorbing I-beam 201.
[0045] The provision of the shear plate 3 can prevent shear failure of the second bolt 5, reduce the slip between the fixed end face 102 and the connecting end face 202, and make the energy-absorbing I-beam 201 participate more in earthquake energy absorption. The yield strength of the shear plate 3 is greater than the yield strength of the energy-absorbing beam section 2 and less than the yield strength of the steel deep beam 1, and the shear plate 3 can be deformed before the steel deep beam 1.
[0046] Embodiment 2:
[0047] refer to Figure 5The difference between this embodiment and embodiment 1 is that the second bolt 5 includes a bolt body 501, a nut 507 is threadedly connected to the bolt body 501, a first gasket 502 and a second gasket 506 are sleeved between the nut 507 and the end of the bolt body 501, a threaded slot 503 and a cavity 513 are opened in the bolt body 501, the diameter of the cavity 513 is larger than the diameter of the threaded slot 503, a threaded column 504 is threadedly connected to the threaded slot 503, one end of the threaded column 504 is coaxially fixed with an expansion metal column 505, the expansion metal column 505 is placed in the cavity 513, and the outer wall of the expansion metal column 505 is connected to the expansion metal column 505. There is a gap between the inner wall of the cavity 513, and the gap is filled with hot-melt grease 511. A cover 508 is coaxially fixed to the outside of the expansion metal column 505, and the cover 508 is used to seal the cavity 513. A torsional shear fracture column 509 is coaxially fixed to the end of the expansion metal column 505 away from the threaded column 504. The torsional shear fracture column 509 is provided with a plurality of spline grooves 510, and the plurality of spline grooves 510 are circumferentially evenly spaced. A plurality of leakage holes 512 arranged in a matrix are provided on the inner wall of the cavity 513, and the plurality of leakage holes 512 are circumferentially evenly spaced. The inner thread direction of the threaded groove hole 503 is opposite to the thread direction of the outer wall of the bolt body 501.
[0048] When in use, the fixed end face 102 and the connecting end face 202 are located between the first gasket 502 and the second gasket 506 , and the fixed end face 102 and the connecting end face 202 are clamped and fixed by tightening the nut 507 .
[0049] A threaded slot 503 and a cavity 513 are provided in the bolt body 501, and the expansion metal column 505 is coaxially fixed to the threaded column 504, so that the expansion metal column 505 is fixed by threaded cooperation between the threaded column 504 and the threaded slot 503. Before the expansion metal column 505 is inserted into the cavity 513, a proper amount of hot-melt grease 511 is filled into the cavity 513, and then the threaded column 504 and the threaded slot 503 are tightened so that the cover 508 is sealed at the open end of the cavity 513.
[0050] The other end of the threaded column 504 is connected to a torsion shear fracture column 509 , and a plurality of spline grooves 510 are formed on the torsion shear fracture column 509 .
[0051] When the second bolt 5 needs to be tightened, an electric torsion shear wrench for tightening torsion shear high-strength bolts is used to tighten the second bolt 5 of the present invention. The inner thread direction of the threaded slot 503 is opposite to the outer wall thread direction of the bolt body 501, which can prevent the threaded slot 503 and the threaded column 504 from loosening when using the electric torsion shear wrench.
[0052] After the fastening is completed, the connection between the steel deep beam 1 and the energy-absorbing beam section 2 is completed.
[0053] When an earthquake occurs, since the second bolt 5 will be deformed under the action of the earthquake, the bolt body 501 and the expansion metal column 505 will both generate heat under the action of deformation, and the heat will melt the hot melt grease 511. When the expansion metal column 505 expands due to heat, its expansion degree is higher than that of the bolt body 501. Therefore, the melted hot melt grease 511 will penetrate into the threads on the outer wall of the bolt body 501 through the plurality of leak holes 512 opened on the inner wall of the cavity 513, so as to lubricate it and facilitate the rotation of the nut 507. Furthermore, after the earthquake occurs, when the energy-absorbing beam section 2 needs to be quickly replaced, the nut 507 and the bolt body 501 can be easily rotated relative to each other, thereby improving the replacement efficiency.
[0054] The advantages of the non-perfect replacement strategy of the replaceable coupling beam designed by the present invention are as follows:
[0055] 1. First of all, it ensures that the "imperfect replacement" meets the structural design specifications of our country and ensures the stability of the structure.
[0056] 2. The coupling beam can be replaced imperfectly, which can provide more efficient restoration and repair strategies that save manpower and material resources for post-earthquake recovery projects in the entire city or building complex, and contribute to the evaluation of urban seismic resilience.
[0057] 3. When the post-earthquake restoration is basically completed, these imperfectly repaired components can be perfectly repaired.
[0058] 4. Some earthquakes are rare. After a major earthquake, when the service life of the structure ends, there is no chance of another major earthquake (extremely low probability). Therefore, for low-seismic fortification buildings that have experienced a major earthquake, perfect repair seems wasteful. Imperfect repair is a very economical and reasonable repair strategy.
[0059] Imperfect repair concept description:
[0060] 1. Macro concept: Imperfect restoration is a new concept for the restoration of urban building structures after earthquakes. It recognizes that after large-scale disasters, resources are limited and not all buildings need or deserve perfect restoration.
[0061] 2. Resource coordination: This strategy requires effective planning and scheduling of resources to determine which building structures should be restored immediately to protect critical services and which can be repaired more economically.
[0062] 3. Building classification: Key buildings (such as hospitals, water plants, and power plants) need to be perfectly repaired as soon as possible to avoid further damage and ensure that they can resume normal operation. They can even be used as temporary command posts during disasters. Secondary buildings, such as temporary resettlement buildings or buildings for storing materials and property, may only need to ensure that the structure is basically stable and does not collapse under aftershocks.
[0063] Advantages of imperfect repair strategy:
[0064] 1. Compliance with regulations and safety assurance: The imperfect repair strategy strictly abides by the national building structure design regulations to ensure that even under imperfect repair conditions, the building structure can still maintain its basic stability and safety and meet the minimum safety standards.
[0065] 2. Resource optimization and efficient recovery: This strategy allows for the rapid identification of critical infrastructure after an earthquake and prioritizes perfect repairs, while taking imperfect repairs of other buildings, thereby restoring the city’s basic operating functions in the shortest possible time and optimizing the allocation of human resources and materials.
[0066] 3. Phased repair and long-term planning: The imperfect repair strategy provides a phased repair plan that allows the basic functions of buildings to be quickly restored in the early post-earthquake period, while further improvement and repair of these structures can be carried out in the later period according to urban planning and resource conditions.
[0067] 4. Economic rationality and cost-effectiveness: Considering the low probability of earthquakes and the particularities of certain regions, imperfect repair avoids unnecessary long-term over-investment in buildings and provides an economically reasonable repair strategy from the perspective of full life cycle costs.
[0068] 5. Risk assessment and adaptability: This strategy provides customized repair solutions for different buildings based on a detailed assessment of the importance of the building and the earthquake risk, thus enhancing the adaptability of the building structure to earthquake risks.
[0069] 6. Long-term perspective and sustainable development: The non-perfect restoration strategy takes a long-term perspective, considers the probability of earthquake activity and the service life of the building, reduces preventive investment for disasters that are unlikely to occur in the future, and is in line with the concept of sustainable development.
[0070] 7. Urban resilience and functional continuity: Through imperfect repair strategies, cities can quickly restore key functions after an earthquake, enhance the city’s resilience to disasters, and ensure the continuity of urban operations.
[0071] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0072] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A replaceable connecting beam energy dissipation structure that is easy to repair, comprising: A steel deep beam (1) embedded in the wall limb, wherein an energy-absorbing beam section (2) is detachably connected between two of the steel deep beams (1); The steel deep beam (1) comprises an embedding component and a fixed end face (102), wherein the fixed end face (102) is fixedly connected to one end of the embedding component, and the fixed end face (102) is provided with two rows of first oblong holes (105) for second bolts (5) to pass through, and the two rows of first oblong holes (105) are symmetrically arranged, and the end of the energy-absorbing beam section (2) is fixedly connected to the fixed end face (102) via the second bolts (5); The size of the first oblong hole (105) is larger than the diameter of the second bolt (5).
2. According to the replaceable connecting beam energy dissipation structure that is easy to repair as described in claim 1, the embedded component includes a horizontal I-beam (101), one end of the horizontal I-beam (101) is embedded in the wall limb, and the other end of the horizontal I-beam (101) is fixedly connected to the fixed end surface (102).
3. According to the replaceable connecting beam energy-absorbing structure that is easy to repair as described in claim 2, a plurality of first vertical stiffening ribs (106) are fixedly connected to the middle part of the horizontal I-beam (101), and the plurality of first vertical stiffening ribs (106) located on the front and rear sides of the horizontal I-beam (101) are symmetrically arranged.
4. According to the replaceable connecting beam energy-absorbing structure that is easy to repair as described in claim 3, the top and bottom of the front and rear sides of the fixed end surface (102) are respectively fixed with one end of a horizontal stiffening rib (103), and the other end of the horizontal stiffening rib (103) is fixed to the side wall of the corresponding first vertical stiffening rib (106).
5. According to the replaceable connecting beam energy-absorbing structure that is easy to repair as described in claim 4, the energy-absorbing beam section (2) comprises an energy-absorbing I-beam (201), and the two ends of the energy-absorbing I-beam (201) are respectively fixed with connecting end surfaces (202), and the connecting end surfaces (202) are provided with a plurality of second oblong holes (203), and the plurality of second oblong holes (203) correspond to the plurality of first oblong holes (105) one by one, and the second oblong holes (203) have the same structure as the first oblong holes (105).
6. According to the replaceable connecting beam energy-absorbing structure that is easy to repair as described in claim 5, a plurality of second vertical stiffening ribs (205) are respectively fixedly connected to the front and rear sides of the energy-absorbing I-beam (201), and the plurality of second vertical stiffening ribs (205) on the front and rear sides are symmetrically arranged.
7. According to the replaceable connecting beam energy dissipation structure that is easy to repair as described in claim 6, one end of the shear plate (3) is fixedly connected to the horizontal stiffening rib (103), and the other end of the shear plate (3) is fixedly connected to the end of the energy dissipation I-beam (201).
Citation Information
Patent Citations
Double-T-shaped structure connected multistage replaceable energy-dissipation beam segment structure
CN110593432A
Flange bolt convenient to disassemble in damaged state and disassembling method thereof
CN118423342A
Replaceable shear type energy dissipation beam section-steel deep beam connecting structure
CN208830474U
Energy dissipation beam section-steel deep beam connecting structure easy to replace quickly
CN211114195U
Replaceable friction energy dissipation prefabricated assembly type partially-wrapped concrete composite coupling beam
CN218758066U
