Indoor high-low span swimming pool structure construction method based on BIM (Building Information Modeling) condition
By adopting the construction principle of low first and high first, segmented and then integrated under BIM technology, combined with water-stop steel plates and waterproof layers, the leakage problem in the indoor swimming pool with spanned depth and shallow connections is solved, and safety is achieved Reliable construction convenience and efficient anti-seepage effect.
Patent Information
- Application Number
- CN202411189896.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-08
AI Technical Summary
Under the conditions of connecting foundation pits across the depths of indoors, traditional swimming pool construction methods are prone to cause leakage problems, especially cracks caused by construction joints and concrete shrinkage stress, which reduces the self-waterproofing ability and seepage resistance of concrete.
Using the construction method based on BIM technology, the construction of the swimming pool structure is gradually completed through the principle of low places first, then high places, first segments and then wholesome, combined with water-stop steel plates and waterproof layers, ensuring the continuity of concrete pouring and the overall waterproof layer. reduces construction joints and stress concentration. Specific steps include low-level raft slab construction, side wall pouring, slope area backfilling, high-level raft slab construction, swimming pool wall overall construction and internal backfilling, and layered and segmented pouring and waterproof rolling.
The construction of a swimming pool under the conditions of connecting foundation pits across the depths and shallows is achieved, which is convenient, safe and reliable, reduces leakage risks, saves construction costs and construction periods, and improves the anti-permeability and operability of the structure.
Smart Images

Figure CN118911490A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of swimming pool construction, and in particular to a method for constructing an indoor high and low span swimming pool structure based on BIM conditions. Background Art
[0002] In the current field of national fitness, the importance of swimming pools is gradually becoming more prominent, and the corresponding functional characteristics of swimming pools and quality issues such as leakage are also receiving more and more attention, especially the anti-seepage construction technology of indoor swimming pools that span deep and shallow foundation pits.
[0003] The construction of conventional swimming pools faces many challenges, among which leakage is one of the main concerns. In the traditional construction process, the risk of leakage is reduced by turning up the swimming pool raft 300mm and adding water-stop steel plates. However, when the swimming pool encounters a foundation pit that spans deep and shallow, it needs to be constructed in layers and sections, which is easy to produce more construction joints. The joint treatment is the most prone to leakage in the swimming pool structure. If the joint treatment is not done properly and fails to be effectively sealed, it will become a channel for water penetration. In addition, concrete will shrink during the curing process, and the shrinkage degree of concrete poured in different time periods may be inconsistent, which will produce stress at the joints, which may cause cracks to increase the risk of leakage. In addition to concrete self-waterproofing, the waterproof layer of the swimming pool also needs to be particularly careful to ensure the continuity and integrity of the waterproof layer. In summary, the traditional swimming pool construction method is no longer applicable when facing a foundation pit that spans deep and shallow.
[0004] Therefore, it is urgent to solve the problems caused by concrete construction when the indoor swimming pool spans a connected foundation pit. It must be safe and reliable, save construction time and costs, and reduce the risk of leakage. It is increasingly worth exploring by engineers. Summary of the invention
[0005] The present invention aims to overcome the defects of the prior art and provide a method for constructing indoor high and low span swimming pool structures based on BIM conditions, so as to solve the problem that, under the conditions of indoor spanning deep and shallow connected foundation pits, the concrete and waterproofing construction of the swimming pool increases concrete cracks due to the appearance of construction joints, thereby reducing the self-waterproofing ability and anti-seepage performance of the swimming pool concrete.
[0006] In order to solve the problem of swimming pool concrete construction and reduce the risk of leakage, especially under the condition of indoor spanning connected foundation pits, the present invention is implemented as follows: A method for constructing an indoor high-low span swimming pool structure based on BIM, characterized in that it comprises the following steps: Step 1: construct the raft slab at the lower part, turn over the side wall, and install the water-stop steel plate; Step 2: Pour concrete on the side wall until the bottom of the raft slab is facing downwards, leaving a water-stop steel plate; Step 3: Backfill the slope area with plain concrete; Step 4: construct the raft slab at high altitude, turn up the side wall, and leave a water-stop steel plate; Step 5: The construction of the swimming pool wall is completed; Step 6: Backfill the swimming pool with plain concrete.
[0007] The method for constructing an indoor high-low span swimming pool structure based on BIM conditions is characterized in that in step one: first, the low raft slab is constructed, and the finished surface elevation is -6.25m. At this time, the side wall of the raft slab is turned up 300mm, and the first water-stop steel plate is set around the circle.
[0008] The method for constructing an indoor high-low span swimming pool structure based on BIM conditions is characterized in that in step 2: concrete is poured upward from a height of 300mm on the lower raft outer wall to 150mm below the raft cushion layer at the bottom of the swimming pool, and a second section of water-stop steel plate is arranged around the circumference.
[0009] The method for constructing an indoor swimming pool structure with high and low spans based on BIM conditions is characterized in that in step three: C15 plain concrete is used to backfill between the side wall of the swimming pool and the slope support, and the backfill elevation is 150mm below the swimming pool cushion layer, and is cast synchronously with the swimming pool cushion layer in the later stage; waterproof membrane construction is first carried out before the plain concrete is backfilled, and the membrane is turned up along the slope to form a whole with the waterproof membrane at the bottom of the swimming pool, and a waterproof additional layer is added at the junction of the backfilled plain concrete and the natural slope of the swimming pool to avoid stress concentration in the later stage, which may cause local cracking of the membrane.
[0010] The method for constructing an indoor high-low span swimming pool structure based on BIM conditions is characterized in that in step four: the swimming pool raft and the upturned pool wall are cast with a height of 300 mm in concrete, and before the raft is cast, the integrity of the connection between the waterproofing of the swimming pool cushion membrane and the upturned membrane is ensured; the swimming pool wall is upturned 300 mm in height, and a third waterstop steel plate is arranged around it.
[0011] The method for constructing an indoor swimming pool structure with high and low spans based on BIM conditions is characterized in that in step five: the swimming pool wall is turned up 300 mm to the top elevation of the swimming pool wall, and is constructed simultaneously with the basement walls, columns, beams and slabs around the venue to complete the overall construction of the swimming pool wall. At this point, the overall construction of the swimming pool wall including the basement is completed.
[0012] The method for constructing an indoor high-low span swimming pool structure based on BIM conditions is characterized in that in step six: 850mm-1050mm thick C15 plain concrete is backfilled inside the swimming pool, and a layered and segmented method is used to ensure the continuity of concrete pouring. The pouring depth is 2.0m at the deepest part of the swimming pool and 1.8m at the shallowest part. At this point, the construction of the swimming pool structure layer is completed.
[0013] The present invention follows the principle of "low places first, high places later; sections first, whole later" in the overall construction of swimming pool concrete, supplemented by water-stop steel plates and waterproof layers, so that the construction of indoor swimming pools spanning deep and shallow foundation pits is convenient, safe and reliable, and the structural self-waterproofing is connected in series with the waterproof layer as a whole, further reducing the risk of leakage of the side wall of the swimming pool.
[0014] The beneficial effects of the present invention are as follows: It can be seen from the above technical scheme that the present application provides a method for constructing an indoor high and low span swimming pool structure based on BIM conditions, and adopts a concrete construction process method for an indoor deep and shallow connected foundation pit swimming pool under the auxiliary conditions of BIM technology, and is verified by combining with engineering example applications. The process method is safe and reliable, convenient to construct, saves construction costs, shortens construction period, and has good anti-permeability and operability. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments: Figure 1 This is a plan view of a swimming pool according to the construction process of the present invention.
[0016] Figure 2 This is a cross-sectional view of a node of a swimming pool wall according to the construction process method of the present invention. DETAILED DESCRIPTION
[0017] The technical solutions of the embodiments of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field without creative work based on the embodiments in the embodiments of the present application are within the scope of protection requested by the present application. like Figure 1 , 2 As shown: A construction method for indoor high and low span swimming pool structure based on BIM conditions, which includes the following steps: Step 1: construct the raft slab at the lower part, turn over the side wall, and install the water-stop steel plate; First, the lower raft slab was constructed, and the finished surface elevation was -6.25m. At this time, the side wall of the raft slab was turned up 300mm, and the first water-stop steel plate was set around the circumference; Step 2: Pour concrete on the side wall until the bottom of the raft slab is facing downwards, leaving a water-stop steel plate; Pour concrete upwards from the lower raft slab outer wall at a height of 300mm to 150mm below the raft slab cushion at the bottom of the swimming pool, and set the second section of water-stop steel plate around the circumference; Step 3: Backfill the slope area with plain concrete; C15 plain concrete is used to backfill between the side wall and the slope support of the swimming pool. The backfill elevation is 150mm below the swimming pool cushion layer, and it will be poured synchronously with the swimming pool cushion layer in the later stage. Before the plain concrete is backfilled, waterproof membrane is constructed first. The membrane is turned up along the slope to form a whole with the waterproof membrane at the bottom of the swimming pool, and an additional waterproof layer is added at the junction of the backfilled plain concrete and the natural slope of the swimming pool to avoid stress concentration in the later stage, which may cause local cracking of the membrane. Step 4: construct the raft slab at high altitude, turn up the side wall, and leave a water-stop steel plate; Carry out the 300mm high concrete pouring construction of the swimming pool raft and the upper wall. Before pouring the raft, ensure the integrity of the connection between the swimming pool cushion waterproofing membrane and the upper membrane; the swimming pool wall is 300mm high, and the third water-stop steel plate is set around the circle; Step 5: The construction of the swimming pool wall is completed; The swimming pool wall is constructed 300mm upward to the top elevation of the swimming pool wall, and is constructed simultaneously with the surrounding basement walls, columns, beams and slabs to complete the overall construction of the swimming pool wall. At this point, the overall construction of the swimming pool wall including the basement is completed; Step 6: Backfill the swimming pool with plain concrete; The interior of the swimming pool is backfilled with 850mm-1050mm thick C15 plain concrete, and a layered and segmented method is used to ensure the continuity of concrete pouring. The pouring depth is 2.0m at the deepest part of the swimming pool and 1.8m at the shallowest part. At this point, the construction of the swimming pool structure layer is completed.
[0018] During the concrete pouring of the swimming pool wall in this project, in order to ensure its pouring integrity, three waterstop steel plates were set around the pool wall. The opening direction of the waterstop steel plates was facing the water surface. Concrete was poured at the waterstop steel plates, and the construction joints were strictly roughened to ensure that the new and old concretes were fully combined and dense, thereby ensuring the integrity of the pool wall and improving its self-waterproofing performance.
[0019] The foundation pit excavation slope and the triangular area between the pool wall are filled with plain concrete, with a backfill depth of 3.4m. The layered and step-by-step concrete construction process is adopted, which is divided into 7 steps. The thickness of each layer is 500mm. The upper layer of concrete is poured before the lower layer of concrete is vibrated and compacted to initially set until the backfill elevation is reached. Before the backfill concrete is poured, the high and low cross-area construction of the waterproof membrane along the slope of the swimming pool is completed to ensure the integrity of the waterproof layer of the swimming pool and the underground garage.
[0020] The plain concrete backfill at the bottom of the swimming pool is also constructed in layers and sections. Attention should be paid to the continuity of the concrete during construction. The layer thickness is 300mm during pouring. The vibrator rod of the upper concrete layer is inserted 50mm into the lower layer to eliminate the gap between the upper and lower concrete layers. The duration of vibration should ensure that the concrete no longer has bubbles upward, no longer sinks, and floating slurry is produced on the surface.
[0021] This process method is aimed at solving the problem of indoor swimming pool concrete construction under the conditions of deep and shallow connected foundation pits. The swimming pool is a competition standard swimming pool, with a pool bottom raft thickness of 500mm and a pool wall thickness of 350mm. C30 waterproof concrete is used, with a water resistance grade of P6. Nano-crystal shrinkage reducing and densifying agent is added to the waterproof concrete to improve the concrete's waterproof and crack resistance.
[0022] The elevation of the swimming pool raft foundation differs by 3.4m, and the slope excavation adopts a 1:1 natural slope. The pool walls on the north and east sides of the swimming pool are located at the junction of the high and low spans of the raft foundation. The pool walls here take root from the low span raft elevation of -6.25m to the top of the swimming pool at an elevation of -0.05m, where the swimming pool raft elevation is -2.85m. By backfilling the triangular area between the high and low foundation pit excavation slope surface and the pool wall with plain concrete in layers, the settlement of the high span foundation pit and the deviation of the swimming pool side wall, which leads to cracks, are effectively prevented, thereby reducing the risk of swimming pool leakage.
[0023] The swimming pool concrete construction effectively utilizes water-stop steel plates and casts the concrete in one go, effectively ensuring the integrity of the pool wall and swimming pool raft concrete. At the same time, before backfilling the plain concrete, the waterproof membrane is first integrated with the waterproof membrane at the bottom of the swimming pool along the slope, and an additional waterproof layer is added at the junction of the backfilled plain concrete and the natural slope of the swimming pool to avoid stress concentration in the later stage, which may lead to local cracking of the membrane.
[0024] During the second construction, the side wall of the swimming pool is constructed only to 150mm below the raft cushion layer at the bottom of the swimming pool. When the raft is constructed in the high foundation pit, it is constructed as a whole with the side wall of the swimming pool to reduce the occurrence of construction joints and thus reduce the risk of leakage.
[0025] The above are only embodiments provided for the present application and are not intended to limit the present application. Although the present application is described in detail with reference to the embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. However, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.
Claims
1. A method for constructing an indoor high-low span swimming pool structure based on BIM, characterized in that It includes the following steps: Step 1: construct the raft slab at the lower part, turn over the side wall, and install the water-stop steel plate; Step 2: Pour concrete on the side wall until the bottom of the raft slab is facing downwards, leaving a water-stop steel plate; Step 3: Backfill the slope area with plain concrete; Step 4: construct the raft slab at high altitude, turn up the side wall, and leave a water-stop steel plate; Step 5: The construction of the swimming pool wall is completed; Step 6: Backfill the swimming pool with plain concrete.
2. The method for constructing an indoor high-low span swimming pool structure based on BIM according to claim 1 is characterized in that In step one: first construct the lower raft slab, and complete the surface elevation to -6.25m. At this time, the side wall of the raft slab is turned up 300mm, and the first waterstop steel plate is set around the circle.
3. The method for constructing an indoor high-low span swimming pool structure based on BIM according to claim 1 is characterized in that In step 2: pour concrete from 300mm high on the lower raft outer wall to 150mm below the raft cushion layer at the bottom of the swimming pool, and set the second section of waterstop steel plate around it.
4. The method for constructing an indoor high-low span swimming pool structure based on BIM according to claim 1 is characterized in that In step three: C15 plain concrete is used to backfill between the side wall of the swimming pool and the slope support, and the backfill elevation is 150mm below the swimming pool cushion layer, and it is poured simultaneously with the swimming pool cushion layer in the later stage; before the plain concrete is backfilled, the waterproof membrane is constructed first, and the membrane is turned up along the slope to form a whole with the waterproof membrane at the bottom of the swimming pool, and an additional waterproof layer is added at the junction of the backfilled plain concrete and the natural slope of the swimming pool to avoid stress concentration in the later stage, which may cause local cracking of the membrane.
5. The method for constructing an indoor high-low span swimming pool structure based on BIM according to claim 1 is characterized in that In step 4: pour concrete for the swimming pool raft and the upturned pool wall at a height of 300mm. Before pouring the raft, ensure the integrity of the connection between the swimming pool cushion waterproofing membrane and the upturned membrane. The swimming pool wall is upturned 300mm high, and a third waterstop steel plate is installed around the circumference.
6. The method for constructing an indoor high-low span swimming pool structure based on BIM according to claim 1 is characterized in that In step five: the swimming pool wall is constructed 300mm upward to the top elevation of the swimming pool wall, and is constructed simultaneously with the basement walls, columns, beams and slabs around the venue to complete the overall construction of the swimming pool wall. At this point, the overall construction of the swimming pool wall including the basement is completed.
7. The method for constructing an indoor high-low span swimming pool structure based on BIM according to claim 1 is characterized in that In step six: fill the interior of the swimming pool with 850mm-1050mm thick C15 plain concrete, using a layered and segmented method to ensure the continuity of concrete pouring. The pouring depth is 2.0m at the deepest part of the swimming pool and 1.8m at the shallowest part. At this point, the construction of the swimming pool structure layer is completed.