Novel efficient pot-type furnace
By using hydraulic telescopic rods and automated driving components in tank furnaces to realize automatic replacement and vacuum maintenance of the thermal plate, the problem of cumbersome operation and air interference in the prior art is solved, and the removal efficiency and heating efficiency are improved .
Patent Information
- Application Number
- CN202410980015.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-22
AI Technical Summary
The existing tank furnaces are cumbersome and inefficient when replacing the triangular suction claws. After the vacuum chamber is opened, air will flow into the heating furnace, interfering with the heating operation.
A new high-efficiency tank furnace was designed, using hydraulic telescopic rods and automated driving components to realize automatic replacement of thermal conductor plates and maintain vacuum state in the heating tank. The thermal conductor plates are driven to perform circular motions through hollow rods to improve impurity removal efficiency. Pre-cooling and impurity cleaning using cooling and pre-assembly components.
The automatic replacement of the thermal conductor plate is realized without manual operation, greatly improving the working efficiency, maintaining the vacuum state of the heating tank, avoiding external air interference, improving the efficiency and purity of the heating process, and reducing the frequency of the thermal conductor plate replacement.
Smart Images

Figure CN118912909A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of canister furnaces, and more particularly to a novel high-efficiency canister furnace. Background Art
[0002] The Chinese patent with the publication number "CN114623687B" discloses a device and method for removing slag from a molten pool during vacuum induction smelting. The device and the method of use can remove slag, impurities and foreign matter floating on the surface of the molten pool during vacuum smelting, thereby improving the purity of the alloy smelting molten pool and reducing quality defects of alloy ingots. However, when replacing the triangular suction claw, the vacuum chamber needs to be opened and then the triangular suction claw needs to be replaced manually. During this process, the vacuum chamber needs to be frequently deflated and evacuated, and the operation process is cumbersome and inefficient. At the same time, after the vacuum chamber is opened, some air will flow into the heating furnace, causing interference with the vacuum heating operation. Summary of the invention
[0003] In order to overcome the shortcomings of the existing equipment that the operation process of replacing the triangular suction claw is complicated and inefficient, the present invention provides a new type of high-efficiency tank furnace.
[0004] The technical solution of the present invention is: A new type of high-efficiency tank furnace, comprising a support frame, a shell, a hydraulic telescopic rod, a shell and a pipe; the support frame is slidably connected to the shell; at least two hydraulic telescopic rods are fixedly connected to the support frame, and the telescopic ends of all the hydraulic telescopic rods are fixedly connected to the shell; the shell is provided with a shell, and a closed space is formed between the shells; the shell is connected with a pipe; it also includes an insulation cylinder, a heating tank, an insulation cover, a hollow rod, a magnet, an exhaust assembly, a debris absorption assembly, a cooling assembly, a limit assembly and a driving assembly; the shell is fixedly connected to the shell; the heating tank is placed on the insulation cylinder; the shell is A driving assembly is connected; a heat insulation cover 1 is connected to the driving assembly; a round hole is opened on the heat insulation cover 1; a hollow rod is connected to the heat insulation cover 1; a magnet is fixed to the hollow rod; a vacuum assembly is connected to the driving assembly; the driving assembly is used to drive the vacuum assembly to move vertically and horizontally, and the driving assembly is also used to drive the heat insulation cover 1 to move vertically and horizontally; a debris suction assembly is connected to the shell 1; the debris suction assembly cooperates with the hollow rod to suck out floating scum; a cooling assembly is connected to the hollow rod, and the cooling assembly is used to cool the debris suction assembly; a limiting assembly is connected to the shell 1, and the limiting assembly is used to assist the debris suction assembly to separate from the hollow rod.
[0005] Furthermore, the exhaust assembly includes a second heat-insulating cover and a second pipe; the drive assembly is connected to the second heat-insulating cover; and the second heat-insulating cover is connected to the second pipe.
[0006] Furthermore, the impurity absorption component includes a ring one, a ring two, a heat insulation cover, a heat conduction plate, a ring three, an air suction unit and a rotating unit; the outer shell one is connected to the ring one; the ring one is rotatably connected to the ring one; a number of heat insulation covers are placed on the ring two; a heat conduction plate is fixedly connected to each heat insulation cover; a ring three is fixedly connected to each heat insulation cover; the heat insulation cover is connected to the air suction unit, and the air suction unit is used to absorb impurities; the ring two is connected to the rotating unit, and the rotating unit is used to drive the ring two to rotate.
[0007] Furthermore, the air intake unit includes an insulation tube 1, an insulation tube 2, a filter and an insulation tube 3; each insulation cover is provided with an insulation tube 1; each insulation tube 1 is connected to a plurality of insulation tubes 2, and the insulation tubes 2 are fixedly connected to the corresponding heat conduction plates; a filter is arranged under each insulation tube 2, and the filter is fixedly connected to the corresponding heat conduction plate; the hollow rod is provided with an insulation tube 3.
[0008] Furthermore, the cooling assembly includes a heat conducting sheet, a pipe three, a pipe four, a heat conducting baffle plate one, a heat conducting baffle plate two, a heat conducting strip and a heat conducting block one; each heat insulating cover is provided with a plurality of heat conducting sheets, and the heat conducting sheets are fixedly connected to the corresponding heat conducting sheets; one side of the upper end of the hollow rod is connected to the pipe three, and the other side of the upper end of the hollow rod is connected to the pipe four; a heat conducting baffle plate one is fixedly connected between the hollow rod and the heat insulating pipe three; a heat conducting baffle plate two is fixedly connected between the hollow rod and the heat insulating pipe three; a square hole is provided at the lower end of each of the heat conducting baffle plates one and two; The insulation tube three, the heat-conducting partition one and the heat-conducting partition two cooperate to divide the inner side of the hollow rod into two cavities, the two cavities are connected through the square hole, the pipe three is connected with one of the cavities, and the pipe four is connected with the other cavity; at least two heat-conducting strips are fixedly connected to the inner side of the hollow rod; the heat-conducting strip is in contact with the heat-conducting partition one, and the heat-conducting strip is in contact with the heat-conducting partition two; the lower end of the hollow rod is fixedly connected with a heat-conducting block one; the insulation tube three, the heat-conducting partition one, the heat-conducting partition two and the heat-conducting strip are all fixedly connected with the heat-conducting block one; a plurality of slots are provided on the heat-conducting block one.
[0009] Furthermore, the limiting assembly includes a hydraulic telescopic rod 2 and a pressure block; at least two hydraulic telescopic rods 2 are connected to the housing 1; and a pressure block is fixedly connected to the telescopic end of each hydraulic telescopic rod 2.
[0010] Furthermore, it also includes a motor; the motor is fixedly connected to the insulation cover; the motor output shaft is connected to the hollow rod through a gear set; the hollow rod is rotatably connected to the insulation cover; the hollow rod is composed of two straight tubes and one inclined tube, and the two straight tubes are respectively located at both ends of the inclined tube; the maximum horizontal distance between the two straight tubes of the hollow rod is smaller than the inner diameter of the opening of the heating tank.
[0011] Furthermore, it also includes bumps; a plurality of bumps are fixedly connected to the heat conducting plate.
[0012] Furthermore, it also includes a preparatory component; the preparatory component is connected to the outer shell one; the preparatory component includes an insulation box, an electric door, a pipe five, a block, a pipe six and a heat-conducting block two; the insulation box is fixedly connected to the outer shell one, and the circular ring one and the hydraulic telescopic rod two are both fixedly connected to the insulation box; the electric door is slidably connected to the insulation box; the pipe five is passed through the circular ring one, and the pipe five passes through the insulation box; the pipe six is passed through the circular ring one, and the pipe six passes through the insulation box; the block is fixedly connected to the circular ring one, and the block is located between the pipe five and the pipe six; the block is in contact with the circular ring two; a number of heat-conducting blocks two are fixedly connected to the circular ring two, and the heat-conducting blocks two are in contact with the corresponding heat-conducting plates.
[0013] Furthermore, it also includes a cleaning component; the cleaning component is connected to the insulation box; the cleaning component includes a hydraulic telescopic rod five, a baffle and a pipe seven; at least two hydraulic telescopic rods five are fixedly connected to the insulation box; the telescopic ends of all hydraulic telescopic rods five are commonly fixedly connected to the baffle; the baffle is penetrated by a pipe seven, and the pipe seven is slidably connected to the insulation box; a plurality of L-shaped through holes are opened on the circular ring two, and the L-shaped through holes are located above the outer side of the corresponding heat-conducting block two.
[0014] The beneficial effects are: 1. The heat conducting plate used for absorbing scum can be automatically replaced without manual operation, which greatly improves the work efficiency. In addition, during the replacement of the heat conducting plate, the inner sides of the first and second shells can maintain a vacuum state. Even if the opening on the heating tank is opened, there will be no problem of air from the external environment flowing into the heating tank to interfere with the heating operation. Second, the middle part of the hollow rod is tilted so that the heat conducting plate moves to the inside of the heating tank in an eccentric posture, and then the heating tank is driven to perform circular motion by the hollow rod. Compared with the heat conducting plate in a static state, the heat conducting plate in circular motion can adsorb scum in a wider range, which is beneficial to improve the impurity removal efficiency and reduce the replacement frequency of the heat conducting plate. At the same time, the scum adsorption amount is increased by the convex block, which improves the efficiency and further reduces the replacement frequency of the heat conducting plate. 3. Precooling the heat conducting plate to be used by heat conducting block 2 is beneficial to improving the scum removal efficiency. The heat in the heating tank is intercepted by the cooperation of the heat insulating cylinder and the heat insulating box to prevent the heat generated by the heating tank from being transferred to the heat conducting plate to be used, so as to ensure the precooling effect. At the same time, the impurities remaining on the heat conducting block 2 are absorbed by the cooperation of the pipeline 7 and the L-shaped through hole to avoid interference with the precooling operation of the heat conducting plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The structural schematic diagram of the novel high-efficiency tank furnace of the present invention is shown; Figure 2 The schematic diagram of the structure of the inner side of the housing 1 and the housing 2 of the present invention is shown; Figure 3 A schematic diagram of the structure of the inner side of the second housing of the present invention is shown; Figure 4 A schematic diagram of the structure of the cooling assembly of the present invention is shown; Figure 5 The schematic diagram of the structure of the magnet of the present invention is shown; Figure 6 A schematic diagram of the structure of the inner side of a housing of the present invention is shown; Figure 7 The schematic diagram of the structure of the impurity gettering assembly of the present invention is shown; Figure 8 A schematic structural diagram of the position limiting assembly of the present invention is shown; Fig. 9 A schematic diagram of the structure of the bump of the present invention is shown; Fig.10 A schematic diagram of the structure of the preparatory assembly of the present invention is shown; Fig.11 The present invention is shown Figure 6 Enlarged view of point A in the middle.
[0016] In the accompanying drawings, 1-support frame, 2-housing 1, 3-hydraulic telescopic rod 1, 4-housing 2, 5-pipeline 1, 6-insulation cylinder, 7-heating tank, 8-insulation cover 1, 9-hollow rod, 10-magnet, 201-insulation cover 2, 202-pipeline 2, 203-ring 1, 204-ring 2, 205-insulation cover, 206-heat conducting plate, 207-ring 3, 208-insulation pipe 1, 209-insulation pipe 2, 2010-filter screen, 2011-insulation pipe 3, 2012-heat conducting sheet, 2013-pipeline 3, 2014-pipeline 4, 2015-heat conducting baffle 1, 2016-heat conducting baffle 2, 2017-heat conducting strip, 2018-heat conducting baffle 2, 2019-heat conducting strip, 2020-heat conducting baffle 3, 2021-heat conducting baffle 3, 2022-heat conducting baffle 3, 2023-heat conducting baffle 3, 2024-heat conducting baffle 3, 2025-heat conducting baffle 3, 2026-heat conducting baffle 3, 2027-heat conducting strip, 2028-heat conducting baffle 3, 2029-heat conducting baffle 3, 2030-heat conducting baffle 3, 2031-heat conducting baffle 3, 2032-heat conducting baffle 3, 2033-heat conducting baffle 3, 2034-heat conducting baffle 3, 2035-heat conducting baffle 3, 2036-heat conducting baffle 3, 2037 8-heat conducting block 1, 2019-hydraulic telescopic rod 2, 2020-pressure block, 2021-electric slide rail 1, 2022-electric slider 1, 2023-connecting plate, 2024-hydraulic telescopic rod 3, 2025-hydraulic telescopic rod 4, 2026-electric slide rail 2, 2027-electric slider 2, 2028-motor, 2029-bump, 2030-insulation box, 2031-electric door, 2032-pipeline 5, 2033-block, 2034-pipeline 6, 2035-heat conducting block 2, 2036-hydraulic telescopic rod 5, 2037-baffle, 2038-pipeline 7, 91-square hole, 92-slot, 93-L-shaped through hole. DETAILED DESCRIPTION
[0017] The preferred technical solutions of the present invention are described in detail below with reference to the accompanying drawings.
[0018] Example 1 A new type of high efficiency tank furnace, such as Figure 1-Figure 9As shown, it includes a support frame 1, a shell 2, a hydraulic telescopic rod 3, a shell 2 4 and a pipe 5; the support frame 1 is slidably connected to the shell 2, and the support frame 1 is set to an alloy material; two hydraulic telescopic rods 3 are bolted to the support frame 1, and the telescopic ends of all the hydraulic telescopic rods 3 are fixedly connected to the shell 2, and the hydraulic telescopic rods 3 are set to a multi-stage telescopic structure; the shell 2 4 is provided on the shell 2, and a closed space is formed between the shell 2 and the shell 2 4; the shell 2 4 is connected and welded with a pipe 5; it also includes an insulation cylinder 6, a heating tank 7, an insulation cover 8, a hollow rod 9, a magnet 10, an exhaust assembly, a debris absorption assembly, a cooling assembly, a limit assembly and a driving assembly; the insulation cylinder 6 is fixedly connected to the shell 2 ; A heating tank 7 is placed on the insulation cylinder 6; a driving assembly is connected to the outer shell 4; an insulation cover 8 is connected to the driving assembly; a round hole is opened on the insulation cover 8; a hollow rod 9 is connected to the insulation cover 8; a magnet 10 is bolted to the hollow rod 9; an exhaust assembly is connected to the driving assembly; the driving assembly is used to drive the exhaust assembly to move vertically and horizontally, and the driving assembly is also used to drive the insulation cover 8 to move vertically and horizontally; a debris suction assembly is connected to the outer shell 2; the debris suction assembly cooperates with the hollow rod 9 to suck out scum; a cooling assembly is connected to the hollow rod 9, and the cooling assembly is used to cool the debris suction assembly; a limiting assembly is connected to the outer shell 2, and the limiting assembly is used to assist the debris suction assembly to separate from the hollow rod 9.
[0019] The exhaust assembly includes a second heat-insulating cover 201 and a second pipe 202 ; the second heat-insulating cover 201 is connected to the driving assembly; the second pipe 202 is connected to and fixed to the second heat-insulating cover 201 , and air is sucked into the heating tank 7 through the second pipe 202 .
[0020] The impurity absorption component includes a ring 1 203, a ring 204, a heat insulation cover 205, a heat conducting plate 206, a ring 3 207, an air suction unit and a rotating unit; the outer shell 1 2 is connected to the ring 1 203; the ring 204 is rotatably connected to the ring 1 203; twelve heat insulation covers 205 are placed on the ring 2 204; a heat conducting plate 206 is fixedly connected to each heat insulation cover 205; a ring 3 207 is fixedly connected to each heat insulation cover 205; the heat insulation cover 205 is connected to the air suction unit, and the air suction unit is used for absorbing impurities; the ring 2 204 is connected to the rotating unit, and the rotating unit is used to drive the ring 2 204 to rotate.
[0021] The air intake unit includes an insulation tube 1 208, an insulation tube 2 209, a filter 2010 and an insulation tube 3 2011; each insulation cover 205 is provided with an insulation tube 1 208; each insulation tube 1 208 is connected and fixedly connected with seven insulation tubes 209, and the insulation tubes 209 are fixedly connected to the corresponding heat conduction plates 206; a filter 2010 is arranged under each insulation tube 209, and the filter 2010 is fixedly connected to the corresponding heat conduction plate 206, and impurities are intercepted by the filter 2010; the hollow rod 9 is provided with an insulation tube 3 2011.
[0022] The cooling assembly includes a heat conducting sheet 2012, a pipe three 2013, a pipe four 2014, a heat conducting baffle one 2015, a heat conducting baffle two 2016, a heat conducting strip 2017 and a heat conducting block one 2018; each heat insulating cover 205 is provided with a plurality of heat conducting sheets 2012, and the heat conducting sheets 2012 are fixedly connected to the corresponding heat conducting plates 206; one side of the upper end of the hollow rod 9 is connected and fixedly connected to the pipe three 2013, and the other side of the upper end of the hollow rod 9 is connected and fixedly connected to the pipe four 2014; a heat conducting baffle one 2015 is fixedly connected between the hollow rod 9 and the heat insulating pipe three 2011; a heat conducting baffle two 2016 is fixedly connected between the hollow rod 9 and the heat insulating pipe three 2011; a square hole 91 is provided at the lower end of each of the heat conducting baffle one 2015 and the heat conducting baffle two 2016, and the coolant flows from the square hole 91 Flows through; the heat-insulating tube three 2011, the heat-conducting baffle one 2015 and the heat-conducting baffle two 2016 cooperate to divide the inner side of the hollow rod 9 into two cavities, the two cavities are connected through the square hole 91, the pipe three 2013 is connected to one of the cavities, and the pipe four 2014 is connected to the other cavity; two heat-conducting strips 2017 are fixedly connected to the inner side of the hollow rod 9; the heat-conducting strip 2017 is in contact with the heat-conducting baffle one 2015, and the heat-conducting strip 2017 is in contact with the heat-conducting baffle two 2016, and the heat-conducting strip 2017 is set to be made of copper; a heat-conducting block one 2018 is fixedly connected to the lower end of the hollow rod 9; the heat-insulating tube three 2011, the heat-conducting baffle one 2015, the heat-conducting baffle two 2016 and the heat-conducting strip 2017 are all fixedly connected to the heat-conducting block one 2018; a plurality of slots 92 are provided on the heat-conducting block one 2018.
[0023] The limiting assembly includes a hydraulic telescopic rod 2019 and a pressure block 2020; two hydraulic telescopic rods 2019 are connected to the outer shell 2; a pressure block 2020 is fixedly connected to the telescopic end of each hydraulic telescopic rod 2019, and the hydraulic telescopic rod 2019 drives the pressure block 2020 to move obliquely downward, so that after the pressure block 2020 presses the adjacent heat insulation cover 205, the hollow rod 9 is pulled away from the ring 3 207.
[0024] The driving assembly includes an electric slide rail 2021, an electric slider 2022, a connecting plate 2023, a hydraulic telescopic rod three 2024 and a hydraulic telescopic rod four 2025; two electric slide rails 2021 are bolted to the outer shell 2024; each electric slide rail 2021 is slidably connected to an electric slider 2022; a connecting plate 2023 is commonly fixed between all electric sliders 2022; two hydraulic telescopic rods three 2024 are bolted to the connecting plate 2023, the telescopic ends of the hydraulic telescopic rods three 2024 are fixed to the insulation cover 8, and the hydraulic telescopic rods three 2024 are arranged as a multi-stage telescopic structure; two hydraulic telescopic rods four 2025 are bolted to the connecting plate 2023, the telescopic ends of the hydraulic telescopic rods four 2025 are fixed to the insulation cover 201, and the hydraulic telescopic rods four 2025 are arranged as a multi-stage telescopic structure.
[0025] The rotating unit includes an electric slide rail 2026 and an electric slider 2027 ; the housing 1 2 is connected with the electric slide rail 2026 ; four electric sliders 2027 are slidably connected to the electric slide rail 2026 , and the electric slider 2027 is fixedly connected to the ring 2 204 .
[0026] The working principle of the above embodiment is as follows: First, the outer shell 2 4 is bolted to the rack in the factory, the first external air intake pipe is manually connected to the pipe 1 5, the second external air intake pipe is connected to the pipe 2 202, the third external air intake pipe is connected to the insulation pipe 3 2011, the first coolant circulation system is connected to the pipe 3 2013 and the pipe 4 2014, the external air supply pipe is connected to the circular hole of the insulation cover 1 8, then the hydraulic telescopic rod 1 3 pushes the outer shell 1 2 and the parts thereon to move to the left, so that the heating tank 7 moves to the left and away from the bottom of the outer shell 2 4, and then a preset amount of the material to be heated is manually poured into the heating tank 7, and then the hydraulic telescopic rod 1 3 drives the outer shell 1 2 and the parts thereon to move back to their original positions, and the hydraulic telescopic rod 4 2025 drives the insulation cover 2 201 to move downward, so that the insulation cover The second 201 is inserted into the opening of the heating tank 7 to seal the opening of the heating tank 7, and then the first external suction pipe and the second external suction pipe start to evacuate air at the same time, so that the air inside the heating tank 7 is discharged from the pipe two 202 into the second external suction pipe, and the inside of the heating tank 7 is evacuated to a near vacuum state, and the air inside the outer shell 1 2 and the outer shell 2 4 is discharged from the pipe one 5 into the first external suction pipe, and the inside of the outer shell 1 2 and the outer shell 2 4 is evacuated to a near vacuum state, and then the heating tank 7 heats the material inside it for a predetermined time, at which time scum is formed on the surface of the molten material, and then, the hydraulic telescopic rod three 2024 drives the insulation cover one 8 to move downward, and the insulation cover one 8 drives the hollow rod 9 and the parts thereon to move downward, so that the hollow rod 9 is inserted into the inside of the ring three 207, and at the same time the heat conductive block one 2018 moves downward, so that the slot 92 thereon is inserted into the outside of the heat conductive sheet 2012, and at the same time, the heat insulating tube three 2011 is inserted into the outside of the heat insulating tube one 208 and is connected with the heat insulating tube one 208. At the same time, the magnet 10 moves downward to contact the ring three 207, and the magnet 10 sucks the ring three 207 tightly by magnetic force. Then the first coolant circulation system transports coolant to the pipe three 2013, and the coolant flows into the inside of the hollow rod 9 through the pipe three 2013, and then flows downward to the heat conductive block one 2018, and then flows upward through the square hole 91, and finally flows back to the first coolant circulation system from the pipe four 2014. In this process, the circulating coolant has a great influence on the heat conductive baffle one 2015, the heat conductive baffle two 2016, the heat conductive strip 2017 and the heat conductive baffle. The heat on the heat conducting plate 206 is conducted to the heat conducting block 2018 through the heat conducting sheet 2012, and then absorbed into the circulating coolant, thereby cooling the heat conducting plate 206. Then, the hydraulic telescopic rod three 2024 drives the heat insulating cover 8 and the parts thereon to move upward, so that the magnet 10 drives the ring three 207 and the parts thereon to move upward away from the ring two 204. Then, the hydraulic telescopic rod four 2025 drives the heat insulating cover two 201 to move upward away from the heating tank 7. Then, the electric slide rail 1 2021 and the electric slider 1 2022 are started. The electric slider 1 2022 drives the connecting plate 2023 and the parts thereon to move to the left, so that the ring three 207 and the parts thereon move to the top of the heating tank 7.Then the hydraulic telescopic rod three 2024 drives the insulation cover one 8 and the parts thereon to move downward, so that the heat conducting plate 206 and the parts thereon move to the inside of the heating tank 7, and the heat conducting plate 206 is close to the liquid surface of the melt. At this time, the insulation cover one 8 is tightly covered at the opening of the heating tank 7, and then the external air pipe transports inert gas to the inside of the heating tank 7 through the circular hole on the insulation cover one 8, and the third external air suction pipe sucks air into the insulation pipe three 2011, so that the inert gas at the liquid surface of the melt flows into the insulation pipe two 209, the insulation pipe three 2011 and the third external air suction pipe in turn. At this time, the inert gas generates suction on the floating slag, causing the floating slag to float. The slag moves with the inert gas, and the filter screen 2010 intercepts the slag, so that the slag contacts the position around the port of the heat insulation pipe 209 corresponding to the heat conduction plate 206. The slag is in a high temperature state and the heat conduction plate 206 is in a low temperature state, forming a large temperature difference, so that the slag is quickly cooled and adheres to the surface of the heat conduction plate 206. Then, the electric slide rail 1 2021, the electric slider 1 2022 and the hydraulic telescopic rod 3 2024 cooperate to control the ring 3 207 and the parts thereon to move away from the heating tank 7, and control the ring 3 207 and the parts thereon to move back to their original positions. The third external The suction pipe stops sucking air, and then the hydraulic telescopic rod 2019 drives the pressure block 2020 to move obliquely downward, so that the pressure block 2020 presses the heat insulation cover 205, and then the hydraulic telescopic rod 3 2024 drives the heat insulation cover 1 8 and the parts thereon to move upward, so that the hollow rod 9 drives the magnet 10 away from the ring 3 207, and at the same time, the hollow rod 9 is pulled out of the ring 3 207, and at the same time, the heat insulation pipe 3 2011 is pulled off the heat insulation pipe 1 208, and the heat conductive block 1 2018 is pulled off the heat conductive sheet 2012, and then the electric slide rail 2026 and the electric slider 2027 are started, and the electric slider 202 7 drives the second ring 204 to rotate on the first ring 203, and the second ring 204 drives the parts on it to rotate, so that the heat conducting plate 206 with scum adsorbed is away from the bottom of the hollow rod 9, and the next clean heat conducting plate 206 and the parts on it are transported to the bottom of the hollow rod 9, and then the above operation is repeated, and the impurity removal operation is performed again to realize the automatic replacement operation, which is conducive to improving efficiency. In addition, during the replacement process, the inner side of the shell 1 2 and the shell 2 4 can maintain a vacuum state. Even if the opening on the heating tank 7 is opened, there will be no problem of air from the external environment flowing into the heating tank 7 to interfere with the heating operation.
[0027] According to the above working principle, we know that the present invention has the following effects: The heat conducting plate 206 for absorbing scum can be automatically replaced without manual operation, which greatly improves work efficiency. In addition, during the replacement of the heat conducting plate 206, the inner sides of the shell 1 2 and the shell 2 4 can maintain a vacuum state. Even if the opening on the heating tank 7 is opened, there will be no problem of air from the external environment flowing into the heating tank 7 to interfere with the heating operation.
[0028] Example 2 On the basis of Example 1, Figure 1-Figure 9 As shown, it also includes a motor 2028; the motor 2028 is bolted to the insulation cover 8; the output shaft of the motor 2028 is connected to the hollow rod 9 through a gear set; the hollow rod 9 is rotatably connected to the insulation cover 8; the hollow rod 9 is composed of two straight tubes and one inclined tube, and the two straight tubes are respectively located at both ends of the inclined tube; the maximum horizontal distance between the two straight tubes of the hollow rod 9 is smaller than the inner diameter of the opening of the heating tank 7.
[0029] It also includes bumps 2029 ; a plurality of bumps 2029 are fixedly connected to the heat conducting plate 206 .
[0030] The working principle of the above embodiment is as follows: When the heat conducting plate 206 and the parts thereon are transported to the top of the heating tank 7 as described in Example 1: The hydraulic telescopic rod 3 2024 drives the heat insulation cover 8 and the parts thereon to move downward, so that the heat conducting plate 206 and the parts thereon move to the inside of the port of the heating tank 7, and then the electric slide rail 1 2021 and the electric slider 1 2022 are started, and the electric slider 1 2022 drives the connecting plate 2023 and the parts thereon to move to the right, and the hydraulic telescopic rod 3 2024 drives the heat insulation cover 8 to continue to move downward, so that the hollow rod 9 moves obliquely downward, and the oblique tube part of the hollow rod 9 moves to the inside of the heating tank 7, until the upper straight tube part of the hollow rod 9 is aligned with the center of the heating tank 7, the electric slider 1 2022 is closed to drive the connecting plate 2023, and then the hydraulic The telescopic rod three 2024 drives the insulating cover 8 and the parts thereon to continue to move downward, so that the heat conducting plate 206 moves above the melt surface, and the heat conducting plate 206 is located at an eccentric position of the melt surface, and then the motor 2028 is started. The motor 2028 drives the hollow rod 9 to rotate reciprocatingly through the gear set, and the hollow rod 9 drives the heat conducting plate 206 to perform a circular motion, so that the heat conducting plate 206 adsorbs impurities on the circumference of the melt surface. Compared with the heat conducting plate 206 in a stationary state, the heat conducting plate 206 in a circular motion can adsorb scum in a wider range, which is beneficial to improving the impurity removal efficiency and reducing the replacement frequency of the heat conducting plate 206.
[0031] During the cooling process, the heat on the bump 2029 is transferred to the heat conducting plate 206 and then dissipated along with the heat on the heat conducting plate 206, thereby cooling and reducing the temperature of the bump 2029. During the air intake process of the insulation tube 209, the gas carries the scum through the bump 2029, so that part of the scum is cooled and attached to the bump 2029, which is beneficial to increase the scum adsorption amount, improves the efficiency, and further reduces the replacement frequency of the heat conducting plate 206.
[0032] According to the above working principle, we know that the present invention has the following effects: The middle part of the hollow rod 9 is tilted so that the heat conducting plate 206 moves into the heating tank 7 in an eccentric posture, and then the heating tank 7 is driven by the hollow rod 9 to perform circular motion. Compared with the heat conducting plate 206 in a stationary state, the heat conducting plate 206 in circular motion can adsorb scum in a wider range, which is beneficial to improving the impurity removal efficiency and reducing the replacement frequency of the heat conducting plate 206. At the same time, the scum adsorption amount is increased by the protrusion 2029, which improves the efficiency and further reduces the replacement frequency of the heat conducting plate 206.
[0033] Example 3 On the basis of Example 2, Figure 7 , Fig.10 and Fig.11 As shown, it also includes a preparatory component; the shell 1 2 is connected to the preparatory component; the preparatory component includes an insulation box 2030, an electric door 2031, a pipe 5 2032, a block 2033, a pipe 6 2034 and a heat-conducting block 2035; the shell 1 2 is bolted to the insulation box 2030, the ring 1 203 and the hydraulic telescopic rod 2 2019 are both fixed to the insulation box 2030; the insulation box 2030 is slidably connected to the electric door 2031; the ring 1 203 is penetrated by a pipe 5 2032, the pipe 5 2032 passes through the insulation box 2030, and the pipe 5 20 32 is set to be a heat-insulating material; a pipe six 2034 is passed through the ring one 203, and the pipe six 2034 passes through the insulation box 2030, and the circulating coolant is transported to the ring one 203 through the cooperation of the pipe five 2032 and the pipe six 2034; the block 2033 is fixed on the ring one 203, and the block 2033 is located between the pipe five 2032 and the pipe six 2034; the block 2033 is in contact with the ring two 204; twelve heat-conducting blocks two 2035 are welded on the ring two 204, and the heat-conducting blocks two 2035 are in contact with the corresponding heat-conducting plates 206.
[0034] It also includes a cleaning component; the cleaning component is connected to the insulation box 2030; the cleaning component includes a hydraulic telescopic rod five 2036, a baffle 2037 and a pipe seven 2038; two hydraulic telescopic rods five 2036 are fixedly connected to the insulation box 2030; the telescopic ends of all hydraulic telescopic rods five 2036 are commonly fixedly connected to the baffle 2037; the baffle 2037 is penetrated by a pipe seven 2038, the pipe seven 2038 is slidably connected to the insulation box 2030, and the impurities remaining on the upper side of the heat conductive block two 2035 are absorbed through the pipe seven 2038; a plurality of L-shaped through holes 93 are opened on the ring two 204, and the L-shaped through holes 93 are located above the outer side of the corresponding heat conductive block two 2035.
[0035] The working principle of the above embodiment is as follows: During the heating operation of the heating tank 7 described in Example 1: First, the second external coolant circulation system is manually connected to pipe five 2032 and pipe six 2034, and the second external coolant circulation system transports coolant to pipe five 2032. Under the interception action of block 2033, the coolant flows into the inner side of ring one 203 through pipe five 2032, and then flows back to the second external coolant circulation system from pipe six 2034. The circulating coolant cools down the heat conductive block two 2035, and the heat conductive plate 206 to be used is in close contact with heat conductive block two 2035, so that the heat conductive plate 206 to be used is cooled down by heat conductive block two 2035, so as to achieve pre-cooling effect, which is beneficial to improve efficiency. In this process, the heat in the heating tank 7 is intercepted by the cooperation of the heat insulating tube 6 and the heat insulating box 2030, so as to prevent the heat generated by the heating of the heating tank 7 from being conducted to the heat conductive plate 206 to be used, so as to ensure the pre-cooling effect. During the replacement process, the electric door 2031 is opened so that the hollow rod 9 can be inserted downward into the ring three 207.
[0036] First, the external vacuum tube is manually connected to the pipe seven 2038. During regular maintenance, the hydraulic telescopic rod one 3 pushes the shell one 2 and the parts thereon to move to the left, and then the electric door 2031 is opened, and the electric slide rail two 2026 and the electric slider two 2027 are started. The electric slider two 2027 drives the ring two 204 and the parts thereon to rotate intermittently, so that the heat conducting plate 206 and the parts thereon are aligned with the opening of the heat insulation box 2030, and then the heat conducting plate 206 and the parts thereon are manually taken out of the heat insulation box 2030, and then the heat conducting plate 206 is cleaned. After the heat conducting plate 206 and the parts thereon are taken out, some impurities will remain in the heat conducting block The second heat conductive block 2035 is on the second heat conductive block 2035, which affects the heat transfer between the second heat conductive block 2035 and the new heat conductive plate 206, thereby interfering with the pre-cooling operation of the heat conductive plate 206. Therefore, the hydraulic telescopic rod five 2036 drives the baffle 2037 to move downward, so that the baffle 2037 covers the groove on the ring two 204, and the pipe seven 2038 is evacuated through the external dust suction pipe, so that the air flows in from the upper end of the L-shaped through hole 93, and then flows into the groove from the lower end of the L-shaped through hole 93, and then flows into the external dust suction pipe through the pipe seven 2038, thereby removing the impurities remaining on the heat conductive block two 2035, avoiding interference with the pre-cooling operation of the heat conductive plate 206.
[0037] According to the above working principle, we know that the present invention has the following effects: Pre-cooling the heat conductive plate 206 to be used by the heat conductive block 2035 is beneficial to improving the scum removal efficiency. The heat in the heating tank 7 is intercepted by the cooperation of the insulation cylinder 6 and the insulation box 2030 to prevent the heat generated by the heating tank 7 from being transferred to the heat conductive plate 206 to be used, so as to ensure the pre-cooling effect. At the same time, the impurities remaining on the heat conductive block 2035 are absorbed by the cooperation of the pipe 7 2038 and the L-shaped through hole 93 to avoid interference with the pre-cooling operation of the heat conductive plate 206.
[0038] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A novel high-efficiency tank furnace, comprising a support frame (1); a housing (2) is slidably connected to the support frame (1); at least two hydraulic telescopic rods (3) are fixedly connected to the support frame (1), and the telescopic ends of all the hydraulic telescopic rods (3) are fixedly connected to the housing (2); a housing (4) is provided on the housing (2), and a closed space is formed between the housing (2) and the housing (4); a pipe (5) is connected to the housing (4); the characteristics are as follows: The first shell (2) is fixedly connected to a heat insulating cylinder (6); a heating tank (7) is placed on the heat insulating cylinder (6); the second shell (4) is connected to a driving assembly; the driving assembly is connected to a heat insulating cover (8); a round hole is formed on the heat insulating cover (8); a hollow rod (9) is connected to the heat insulating cover (8); a magnet (10) is fixedly connected to the hollow rod (9); the driving assembly is connected to an exhaust assembly; the driving assembly is used to drive the exhaust assembly to move vertically and horizontally, and the driving assembly is also used to drive the heat insulating cover (8) to move vertically and horizontally; the first shell (2) is connected to a debris suction assembly; the debris suction assembly cooperates with the hollow rod (9) to suction scum; the hollow rod (9) is connected to a cooling assembly, and the cooling assembly is used to cool the debris suction assembly; the first shell (2) is connected to a limit assembly, and the limit assembly is used to assist the debris suction assembly to separate from the hollow rod (9).
2. A novel high-efficiency tank furnace according to claim 1, characterized in that: The exhaust assembly comprises a second heat-insulating cover (201) and a second pipe (202); the second heat-insulating cover (201) is connected to the driving assembly; and the second heat-insulating cover (201) is connected to the second pipe (202).
3. A novel high-efficiency tank furnace according to claim 1, characterized in that: The impurity suction component comprises a circular ring 1 (203); a circular ring 1 (203) is connected to a shell 1 (2); a circular ring 2 (204) is rotatably connected to the circular ring 1 (203); a plurality of heat insulation covers (205) are placed on the circular ring 2 (204); a heat conduction plate (206) is fixedly connected to each heat insulation cover (205); a circular ring 3 (207) is fixedly connected to each heat insulation cover (205); an air suction unit is connected to the heat insulation cover (205), and the air suction unit is used for sucking impurities; and a rotating unit is connected to the circular ring 2 (204), and the rotating unit is used for driving the circular ring 2 (204) to rotate.
4. A novel high-efficiency tank furnace according to claim 3, characterized in that: The air intake unit comprises an insulation tube 1 (208); each insulation cover (205) is provided with an insulation tube 1 (208); each insulation tube 1 (208) is connected to a plurality of insulation tubes 2 (209), and the insulation tubes 2 (209) are fixedly connected to the corresponding heat conduction plate (206); a filter screen (2010) is arranged under each insulation tube 2 (209), and the filter screen (2010) is fixedly connected to the corresponding heat conduction plate (206); and an insulation tube 3 (211) is provided on the hollow rod (9).
5. A novel high-efficiency tank furnace according to claim 4, characterized in that: The cooling assembly comprises a heat conducting sheet (2012); each heat insulating cover (205) is provided with a plurality of heat conducting sheets (2012), and the heat conducting sheets (2012) are fixedly connected to the corresponding heat conducting plates (206); one side of the upper end of the hollow rod (9) is connected to a pipe three (2013), and the other side of the upper end of the hollow rod (9) is connected to a pipe four (2014); a heat conducting baffle plate one (2015) is fixedly connected between the hollow rod (9) and the heat insulating pipe three (2011); a heat conducting baffle plate two (2016) is fixedly connected between the hollow rod (9) and the heat insulating pipe three (2011); a square hole (91) is provided at the lower end of each of the heat conducting baffle plate one (2015) and the heat conducting baffle plate two (2016); the heat insulating pipe three (2011), the heat conducting baffle plate one (2015) and the heat conducting baffle plate two (2016) are connected to the heat insulating pipe three (2011); 16), the inner side of the hollow rod (9) is divided into two cavities, the two cavities are connected through the square hole (91), the pipe three (2013) is connected to one of the cavities, and the pipe four (2014) is connected to the other cavity; at least two heat-conducting strips (2017) are fixedly connected to the inner side of the hollow rod (9); the heat-conducting strip (2017) is in contact with the heat-conducting baffle plate one (2015), and the heat-conducting strip (2017) is in contact with the heat-conducting baffle plate two (2016); the lower end of the hollow rod (9) is fixedly connected to the heat-conducting block one (2018); the heat-insulating pipe three (2011), the heat-conducting baffle plate one (2015), the heat-conducting baffle plate two (2016) and the heat-conducting strip (2017) are all fixedly connected to the heat-conducting block one (2018); and a plurality of slots (92) are provided on the heat-conducting block one (2018).
6. A novel high-efficiency tank furnace according to claim 5, characterized in that: The limiting assembly comprises a hydraulic telescopic rod 2 (2019); at least two hydraulic telescopic rods 2 (2019) are connected to the housing 1 (2); and a pressing block (2020) is fixedly connected to the telescopic end of each hydraulic telescopic rod 2 (2019).
7. A novel high-efficiency tank furnace according to any one of claims 5-6, characterized in that: The invention also comprises a motor (2028); the motor (2028) is fixedly connected to the first heat insulation cover (8); the output shaft of the motor (2028) is connected to the hollow rod (9) via a gear set; the hollow rod (9) is rotatably connected to the first heat insulation cover (8); the hollow rod (9) is composed of two straight tubes and one inclined tube, and the two straight tubes are respectively located at two ends of the inclined tube; and the maximum horizontal distance between the two straight tubes of the hollow rod (9) is smaller than the inner diameter of the opening of the heating tank (7).
8. A novel high-efficiency tank furnace according to claim 7, characterized in that: It also includes a protrusion (2029); a plurality of protrusions (2029) are fixedly connected to the heat conducting plate (206).
9. A novel high-efficiency tank furnace according to claim 8, characterized in that: The invention also comprises a preparation component; the preparation component is connected to the outer shell one (2); the preparation component comprises a heat insulation box (2030); the heat insulation box (2030) is fixedly connected to the outer shell one (2); the circular ring one (203) and the hydraulic telescopic rod two (2019) are both fixedly connected to the heat insulation box (2030); the heat insulation box (2030) is slidably connected to an electric door (2031); the circular ring one (203) is penetrated by a pipe five (2032); the pipe five (2032) passes through the heat insulation box (2030); the circular ring one A pipe six (2034) passes through the (203), and the pipe six (2034) passes through the heat insulation box (2030); a stopper (2033) is fixedly connected to the circular ring (203), and the stopper (2033) is located between the pipe five (2032) and the pipe six (2034); the stopper (2033) is in contact with the circular ring (204); a plurality of heat conduction blocks (2035) are fixedly connected to the circular ring (204), and the heat conduction blocks (2035) are in contact with corresponding heat conduction plates (206).
10. A novel high-efficiency tank furnace according to claim 9, characterized in that: The cleaning assembly also includes a cleaning assembly; the cleaning assembly is connected to the heat insulation box (2030); the cleaning assembly includes a hydraulic telescopic rod five (2036); at least two hydraulic telescopic rods five (2036) are fixedly connected to the heat insulation box (2030); the telescopic ends of all the hydraulic telescopic rods five (2036) are commonly fixedly connected to a baffle (2037); a pipe seven (2038) is passed through the baffle (2037), and the pipe seven (2038) is slidably connected to the heat insulation box (2030); a plurality of L-shaped through holes (93) are opened on the circular ring two (204), and the L-shaped through holes (93) are located above the outer side of the corresponding heat conduction block two (2035).
Citation Information
Patent Citations
Environment-friendly type aluminum scrap recycling melting furnace
CN109724403A
Novel-structure crucible for high-temperature alloy smelting and vacuum induction smelting process thereof
CN112066725A
Uniform heat dissipation cooling kettle for glass production
CN117515992A
Drying box for new material film
CN218366008U
Holding furnace
JP2020069484A