Method for analyzing influence of photovoltaic project shielding on generating capacity based on PVsyst

PVsyst software simulates the power generation of photovoltaic power stations under unobstructed and occluded conditions, calculates the magnification of the shadow of the occluded object, solves the problem of difficult-to-estimate impact of occluded objects in mountain photovoltaic power station projects, provides an accurate power generation loss rate, and supports Photovoltaic project site selection and reduce operation and maintenance costs.

CN118917071APending Publication Date: 2024-11-08CHINA CONSTRUCTION EIGHTH BUREAU GENERAL CONTRACTING CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410958760.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The prior art cannot accurately estimate the impact of shading on power generation efficiency in mountain photovoltaic power station projects, resulting in site selection difficulties and loss of power generation.

Method used

The PVsyst-based analysis method is adopted to estimate the power generation loss rate by determining the latitude and longitude, counting the solar altitude angle and azimuth angle, calculating the magnification of the shadow of the occlusion, and using PVsyst software to perform simulation calculations under occlusion and occlusion conditions.

Benefits of technology

It realizes a fast and accurate estimate of the impact of shading, provides data support for photovoltaic project site selection, reduces land use and operation and maintenance costs, and promotes the construction of mountain photovoltaic power station projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917071A_ABST
    Figure CN118917071A_ABST
Patent Text Reader

Abstract

The invention discloses a PVsyst-based method for analyzing the influence of photovoltaic project shielding on the generating capacity. The method comprises the following steps: determining the longitude and latitude of the location of a mountain photovoltaic project and the surrounding shielding object information of a photovoltaic sub-array; counting a solar altitude angle and a solar azimuth angle of one year; calculating the magnification of the shadow of the shelter at 9 a.m. on the winter solstice day of the mountain photovoltaic project; pVsyst software is used for simulating and creating a photovoltaic power generation system and simulating and calculating the generating capacity when no shielding exists, the position relation between a photovoltaic subarray in a field area and shielding objects around the photovoltaic subarray is constructed through a near shielding model, a linear influence mode is substituted into the photovoltaic power generation system for simulating and calculating the generating capacity, and the generating capacity when no shielding exists is compared; and analyzing the annual generating capacity shadow shielding loss rate of the mountain photovoltaic project. The invention relates to the technical field of photovoltaic engineering, and can solve the problem that the influence degree of a shelter on the power generation efficiency of a photovoltaic power station cannot be accurately estimated when the shelter is encountered during project site selection of the mountain photovoltaic power station in the prior art.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of photovoltaic engineering technology, and in particular to a method for analyzing the impact of shading on power generation of a photovoltaic project based on PVsyst. Background Art

[0002] The sunshine conditions in the mountains are better than those in the flat land, which is the preferred construction site for photovoltaic projects. However, when selecting a site for a photovoltaic power station project in the mountains, it is inevitable to encounter obstructions such as high-voltage transmission line towers, communication towers or other tall columns. The shadows of the obstructions around the photovoltaic project will affect the power generation efficiency of the photovoltaic power station's battery panels to a certain extent, and long-term shadows will also have a serious impact on the service life of the panels of the entire photovoltaic power station.

[0003] For example, according to the requirements of Section 7.2.2 of the "Design Specifications for Photovoltaic Power Stations", "The spacing of the rows and columns of the photovoltaic array, whether fixed or tracking, should ensure that there is no mutual blocking in the front, back, left and right during the period of 9:00 to 15:00 (local true solar time) throughout the year, that is, there is no mutual blocking in the front, back, left and right during the period of 9:00 to 15:00 on the winter solstice." Some photovoltaic power stations are restricted by site selection conditions (generally, the sites selected for photovoltaic power stations are mostly unusable land, and there are inevitably high-voltage transmission lines, signal towers and other facilities around them). If these facilities are completely avoided, a large area of ​​avoidance will be generated, which is a waste for photovoltaic power station projects with limited land.

[0004] At present, when encountering obstructions in the site selection of mountain photovoltaic power station projects, it is impossible to accurately estimate the impact of the obstructions on the power generation efficiency of the photovoltaic power station, which is not conducive to promoting the construction of mountain photovoltaic power station projects. Therefore, it is necessary to provide an analysis method for the impact of photovoltaic project obstructions on power generation based on PVsyst, which can solve the problem in the prior art that when encountering obstructions in the site selection of mountain photovoltaic power station projects, it is impossible to accurately estimate the impact of the obstructions on the power generation efficiency of the photovoltaic power station. Summary of the invention

[0005] The purpose of the present invention is to provide an analysis method for the impact of shading on the power generation of photovoltaic projects based on PVsyst, which can solve the problem in the prior art that when encountering obstructions in the site selection of mountain photovoltaic power station projects, it is impossible to accurately estimate the impact of the obstructions on the power generation efficiency of the photovoltaic power station.

[0006] The present invention is achieved in that:

[0007] A method for analyzing the impact of shading on power generation of a photovoltaic project based on PVsyst, comprising the following steps:

[0008] Step 1: Determine the latitude and longitude information of the location of the mountain photovoltaic project;

[0009] Step 2: Sort out and analyze the information of surrounding obstructions that affect the photovoltaic sub-array, as well as the distance between the obstructions and the photovoltaic sub-array;

[0010] Step 3: Count the solar altitude angle and solar azimuth angle for each day of the year;

[0011] Step 4: Calculate the shadow ratio of the obstruction at 9 a.m. on the winter solstice at the location of the mountain photovoltaic project;

[0012] Step 5: Use PVsyst software to simulate and create the photovoltaic power generation system of the mountain photovoltaic project;

[0013] Step 6: Use PVsyst software to perform simulation calculations under unobstructed conditions to obtain the power generation of the photovoltaic power generation system simulated and created in step 5;

[0014] Step 7: Based on the obstruction information determined in step 2, the near obstruction model in the PVsyst software is used to construct the positional relationship between the photovoltaic sub-array in the field and the surrounding obstructions, and the photovoltaic power generation system is substituted into the linear influence model for simulation calculation to obtain the power generation of the photovoltaic power generation system created in step 5 under actual obstruction conditions;

[0015] Step 8: Compare the power generation in step 6 and step 7;

[0016] Step 9: Analyze the shadow loss rate of the mountain photovoltaic project's power generation in one year under the condition of being affected by obstructions.

[0017] The obstructions include high-voltage transmission line towers, communication towers or other tall columnar objects, and the obstruction information includes the specifications and height of the obstructions.

[0018] In step 4, the length of the shadow of an obstruction with a height of L erected vertically on a horizontal plane in the north-south direction is Ls, and the calculation formula of the ratio Ls / L of the shadow of the obstruction is as follows:

[0019]

[0020] in, is the latitude of the location of the mountain photovoltaic project;

[0021] δ is the solar declination of the location of the mountain PV project;

[0022] ω is the hour angle at 9:00 a.m. on the winter solstice at the location of the mountain photovoltaic project;

[0023] α is the solar altitude angle,

[0024] β is the solar azimuth angle, sinβ=cosδsinω / cosα(3).

[0025] In the step 5, the photovoltaic sub-array installation type of the mountain photovoltaic project is set to a fixed-orientation daylighting surface; the daylighting surface inclination angle is set to the maximum angle value of the photovoltaic sub-array; and the grid-connected power limit is unlimited.

[0026] Compared with the prior art, the present invention has the following beneficial effects:

[0027] The present invention utilizes PVsyst software to simulate and calculate the photovoltaic power generation system under unobstructed conditions, and substitutes the slope of the shadow of the obstruction in a linear influence mode to perform simulation calculations under actual obstruction conditions. It can truly simulate the influence of obstructions on the power generation of the photovoltaic power generation system, and the power generation loss rate can be obtained by comparing the power generation under conditions with and without obstruction. The estimation of the power generation loss due to the shadow of the obstruction is fast and accurate, which is beneficial to providing data support for the site selection of photovoltaic projects. It solves the problem in the prior art that when encountering obstructions in the site selection of mountain photovoltaic power station projects, it is impossible to accurately estimate the influence of the obstructions on the power generation efficiency of the photovoltaic power station, and is beneficial to promoting the construction of mountain photovoltaic power station projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of site selection of Example 1 of the method for analyzing the impact of shading on power generation of photovoltaic projects based on PVsyst of the present invention.

[0029] In the picture, 1 is the photovoltaic field, 2 is the angle steel tower. DETAILED DESCRIPTION

[0030] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0031] Please see attached Figure 1 , a method for analyzing the impact of shading on power generation of a photovoltaic project based on PVsyst, comprising the following steps:

[0032] Step 1: Determine the longitude and latitude information of the location of the mountain photovoltaic project.

[0033] Step 2: Sort out and analyze the information of surrounding obstructions that affect the photovoltaic sub-array, as well as the distance between the obstructions and the photovoltaic sub-array.

[0034] The obstructions include high-voltage transmission line towers, communication towers or other tall columnar objects, and the obstruction information includes the specifications and height of the obstructions.

[0035] Step 3: Based on the geographical location of the mountain photovoltaic project, calculate the solar altitude angle and solar azimuth angle for each day of the year.

[0036] Step 4: Calculate the shadow ratio of the obstruction at 9 a.m. on the winter solstice at the location of the mountain photovoltaic project. The calculation method is:

[0037] For an obstruction such as a wooden pole with a height of L erected vertically on a horizontal plane, the length of its shadow in the north-south direction is Ls, and the value of Ls / L is the shadow magnification. The shadow magnification is mainly related to the latitude. The higher the latitude, the greater the shadow magnification.

[0038] The calculation formula for the ratio Ls / L of the shadow of the obstruction is as follows:

[0039]

[0040] in, is the latitude of the location of the mountain photovoltaic project;

[0041] δ is the solar declination of the location of the mountain PV project;

[0042] ω is the hour angle at 9:00 a.m. on the winter solstice at the location of the mountain photovoltaic project;

[0043] α is the solar altitude angle,

[0044] β is the solar azimuth angle, sinβ=cosδsinω / cosα(3).

[0045] Since the winter solstice is the day when the sun's direct point reaches the southernmost position of the earth and the sunshine duration in the northern hemisphere is the shortest in the year, the current regulations require that photovoltaic power generation should ensure that there is no obstruction in the front, back, left and right during the period of 9:00-15:00 (local true solar time) throughout the year. In other words, there is no obstruction in the front, back, left and right during the period of 9:00-15:00 on the day of the winter solstice. Therefore, 9 am on the winter solstice is chosen for calculation.

[0046] Step 5: Use PVsyst software to simulate and create the photovoltaic power generation system of the mountain photovoltaic project.

[0047] In step 5, the simulation creation of the photovoltaic power generation system can be created according to the main technical parameters of the photovoltaic project, for example: the photovoltaic sub-array installation type of the mountain photovoltaic project is set to a fixed-oriented lighting surface; the lighting surface inclination angle is set to the maximum angle value of the photovoltaic sub-array; the grid-connected power limit is unlimited, etc.

[0048] Step 6: Use PVsyst software to perform simulation calculations under unobstructed conditions to obtain the power generation of the photovoltaic power generation system simulated and created in step 5.

[0049] The PVsyst software can simulate the total horizontal radiation, scattered horizontal radiation, ambient temperature, total radiation on the incident lighting surface, effective energy output by the array, grid-connected power, system efficiency and other data for the whole year, and can obtain the annual power generation of the photovoltaic power generation system for the whole year. The power generation is calculated by the PVsyst software based on the technical parameters input by the user, the solar altitude angle and solar azimuth angle throughout the year, and the calculation process will not be repeated here.

[0050] Step 7: Based on the obstruction information determined in step 2, the near-obstruction model in the PVsyst software is used to construct the positional relationship between the photovoltaic sub-array in the field and its surrounding obstructions, and the linear influence model is substituted into the photovoltaic power generation system for simulation calculation to obtain the power generation of the photovoltaic power generation system created in step 5 under actual obstruction conditions.

[0051] Due to the rugged terrain of the mountains, high-voltage transmission line towers, communication towers and other tall single obstructions are inevitably deployed in the installation area of ​​​​the photovoltaic sub-array. The shadows of the obstructions will inevitably affect the power generation efficiency of the photovoltaic sub-array. The impact of the obstructions is brought into the photovoltaic power generation system through the linear impact model of the PVsyst software for simulation calculation, and then the annual power generation of the photovoltaic power generation system under the influence of the shadow is obtained. The power generation is simulated and calculated by the PVsyst software based on the technical parameters input by the user, the shadow magnification, the annual solar altitude angle and the solar azimuth angle and other data. The calculation process will not be repeated here.

[0052] Step 8: Compare the power generation in Step 6 and Step 7.

[0053] Step 9: Analyze the shadow loss rate of the mountain photovoltaic project's power generation in one year under the condition of being affected by obstructions.

[0054] By comparing the power generation in step 6 with the power generation in step 7, the power generation lost due to shadowing throughout the year and the power generation loss rate can be calculated.

[0055] Embodiment 1:

[0056] In a certain mountain photovoltaic project, the site is located near Cuihua Town, Luquan County, Kunming City. The straight-line distance from the site center to Cuihua Town is about 6.1km, and the straight-line distance from the site to Luquan County is about 18.5km. The longitude and latitude information of the site can be queried. The AC measurement capacity of the mountain photovoltaic project is 200MW, the DC side capacity is 246MWp, and the photovoltaic power station capacity is 4.9MWac.

[0057] The photovoltaic field of this project includes four areas: east slope, south slope, west slope and north slope. The south slope is installed with a fixed bracket tilted at 24° facing south, and the west, east and north slopes are installed with a fixed bracket tilted at 5° facing south. The lower end of the photovoltaic module is 2.5m above the ground.

[0058] Through the geographical location of the photovoltaic project, the solar altitude angle and the solar azimuth angle can be calculated to determine the solar trajectory diagram for each day of the year.

[0059] The solar declination of the photovoltaic field on the winter solstice is -23.5 degrees, and the hour angle at 9 am on the winter solstice is 45 degrees. Figure 1 There is an angle steel tower 2 with a height of 35m (tower top to foundation elevation) near the photovoltaic field 1. The closest distance between the angle steel tower and the photovoltaic sub-array is 5m. If the requirement of no shielding is taken into account, the distance between the photovoltaic sub-array and the angle steel tower should be no less than 70m, which is very unfavorable to the comprehensive utilization of the soil.

[0060] The calculation by formula (1)-(3) shows that the shadow ratio of the obstruction at 9 am on the winter solstice is 2.0.

[0061] The PVsyst software was used to simulate and create the photovoltaic power generation system of the mountain photovoltaic project. Its main technical parameters are shown in Table 1.

[0062] Table 1 Main technical parameters of photovoltaic power generation system

[0063]

[0064]

[0065] Using PVsyst software, simulation calculations were performed under unobstructed conditions to obtain the power generation of mountain photovoltaic projects. The positional relationship between the photovoltaic array and the angle steel tower was constructed using the near-obstruction model in PVsyst software, and the linear influence model was substituted into the system for simulation calculations to obtain the power generation of mountain photovoltaic projects under actual obstruction conditions.

[0066] Comparing the power generation under unshaded conditions and actual shading conditions, the shadow shading loss of the entire 4.9MWac photovoltaic power station's system power generation in one year is about 2.41%.

[0067] The photovoltaic power station simulated in this embodiment has a relatively small capacity setting and a high proportion. Similarly, for the same type of tower, in the same latitude area and light conditions as in this embodiment, the photovoltaic power station may lose up to 150MWh of electricity in a year, which is a considerable amount of electricity loss.

[0068] This embodiment only considers the impact of one angle steel tower on the power generation of the photovoltaic sub-array. For multiple obstructions that may cause shadows around the photovoltaic field area, including ground wires, the power generation loss of the photovoltaic power station can be preliminarily estimated based on the site conditions of the photovoltaic power station and combined with the present invention.

[0069] In addition, for photovoltaic sub-arrays that are under the shadow of obstructions for a long time, the hot spot effect of the photovoltaic panels will have a great impact on the life of the photovoltaic panels, increase the probability of panel damage in the photovoltaic power station, and increase the operation and maintenance costs of the photovoltaic power station. The hot spot effect can also be calculated by the shadow ratio, thereby estimating the operation and maintenance costs required for the photovoltaic power station, which can provide a reference for the site selection of the photovoltaic power station.

[0070] The above are only preferred embodiments of the present invention and are not intended to limit the scope of protection of the invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A method for analyzing the impact of shading on power generation of photovoltaic projects based on PVsyst, characterized by: The following steps are involved: Step 1: Determine the latitude and longitude information of the location of the mountain photovoltaic project; Step 2: Sort out and analyze the information of surrounding obstructions that affect the photovoltaic sub-array, as well as the distance between the obstructions and the photovoltaic sub-array; Step 3: Count the solar altitude angle and solar azimuth angle for each day of the year; Step 4: Calculate the shadow ratio of the obstruction at 9 a.m. on the winter solstice at the location of the mountain photovoltaic project; Step 5: Use PVsyst software to simulate and create the photovoltaic power generation system of the mountain photovoltaic project; Step 6: Use PVsyst software to perform simulation calculations under unobstructed conditions to obtain the power generation of the photovoltaic power generation system simulated and created in step 5; Step 7: Based on the obstruction information determined in step 2, the near obstruction model in the PVsyst software is used to construct the positional relationship between the photovoltaic sub-array in the field and the surrounding obstructions, and the photovoltaic power generation system is substituted into the linear influence model for simulation calculation to obtain the power generation of the photovoltaic power generation system created in step 5 under actual obstruction conditions; Step 8: Compare the power generation in step 6 and step 7; Step 9: Analyze the shadow loss rate of the mountain photovoltaic project's power generation in one year under the condition of being affected by obstructions.

2. The method for analyzing the impact of shading on power generation of photovoltaic projects based on PVsyst according to claim 1 is characterized by: The obstructions include high-voltage transmission line towers, communication towers or other tall columnar objects, and the obstruction information includes the specifications and height of the obstructions.

3. The method for analyzing the impact of shading on power generation of photovoltaic projects based on PVsyst according to claim 1 is characterized by: In step 4, the length of the shadow of an obstruction with a height of L erected vertically on a horizontal plane in the north-south direction is Ls, and the calculation formula of the ratio Ls / L of the shadow of the obstruction is as follows: in, is the latitude of the location of the mountain photovoltaic project; δ is the solar declination of the location of the mountain PV project; ω is the hour angle at 9:00 a.m. on the winter solstice at the location of the mountain photovoltaic project; α is the solar altitude angle, β is the solar azimuth angle, sinβ=cosδsinω / cosα(3).

4. The method for analyzing the impact of shading on power generation of photovoltaic projects based on PVsyst according to claim 1 is characterized by: In the step 5, the photovoltaic sub-array installation type of the mountain photovoltaic project is set to a fixed-orientation daylighting surface; the daylighting surface inclination angle is set to the maximum angle value of the photovoltaic sub-array; and the grid-connected power limit is unlimited.