Quay crane trolley track straightness adjusting method and quay crane trolley track system
By pre-positioning, centering and straightness adjustment of the trolley tracks on the opposite shore bridge, the problem of inaccurate straightness caused by component errors is solved, and the service life of the trolley tracks and the safety of the trolley bridge are improved.
Patent Information
- Application Number
- CN202411207389.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-11-12
AI Technical Summary
The existing shore bridge trolley tracks are inaccurate due to errors in manufacturing and assembly of parts, resulting in unstable trolley running, excessive wear of wheels and deformation of tracks, affecting the service life and safety of shore bridges.
The trolley tracks of the opposite shore bridge are pre-positioned, laid, line measurement, checking data, adjusting straightness and drawing data curves to ensure that the trolley tracks are centered with the rail bearing beams, and adjusting straightness to reduce deviations.
It effectively reduces the quality problems of uneven stress on the car track and the phenomenon of wheel gnawing on the rail, ensures the safety and stability of the shore bridge and improves the straightness accuracy of the car track.
Smart Images

Figure CN118929433A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shore container crane manufacturing, and in particular to a shore crane trolley track straightness adjustment method and a shore crane trolley track system. Background Art
[0002] The trolley track of the shore container crane (abbreviated as quay crane) mainly includes components such as long rails, short rails, pads, pressure plates and screws, which are deployed on the track-bearing beams of the front and rear beam box girder structures of the quay crane to achieve smooth and safe operation of the trolley on the fixed track.
[0003] Due to the manufacturing and assembly errors of various components, multiple errors accumulate together, which can easily cause the trolley track and the rail-bearing beam to be misaligned, straightness out of tolerance, etc., which makes it very difficult to solve the stubborn problems such as the trolley wheel gnawing the rail, unstable trolley operation (unsmooth running, deviation, etc.), excessive wear of the trolley wheels and deformation of the trolley track, which seriously affects the overall service life of the quay crane and increases safety risks.
[0004] In view of this, the inventor of the present application has designed a method for adjusting the straightness of a quay crane trolley track and a quay crane trolley track system in order to overcome the above-mentioned technical problems. Summary of the invention
[0005] The technical problem to be solved by the present invention is to overcome the defects in the prior art that due to manufacturing and assembly errors of various components, multiple errors accumulate together, which easily cause misalignment of the trolley track and the supporting beam, and excessive straightness, and provide a quay crane trolley track straightness adjustment method and a quay crane trolley track system.
[0006] The present invention solves the above technical problems through the following technical solutions:
[0007] The present invention provides a method for adjusting the straightness of a quay crane trolley track, which is characterized in that the quay crane trolley track comprises two trolley tracks arranged in parallel, and the method for adjusting the straightness of the quay crane trolley track comprises the following steps: S1, pre-positioning the trolley track; S2, centering and laying the trolley tracks on both sides and the rail-bearing beam; S3, arranging the straightness of the trolley track and measuring the arranging data; S4, checking the centering data of the track center and the web of the rail-bearing beam, and finding out the area in the data that does not meet the requirements; S5, if there is an area that does not meet the requirements, adjusting the straightness of the trolley track, measuring the adjusted arranging data, and drawing a trolley track data curve graph; if there is no area that does not meet the requirements, directly drawing the trolley track data curve graph; S6, adjusting the straightness of the trolley track according to the trolley track data curve graph.
[0008] According to one or more embodiments of the present invention, step S1 comprises the following steps: 111. When the side bend dimensions and opening dimensions of the front and rear beams meet the requirements, mark the center line of the quay crane trolley track and punch holes; S 12 2. According to the center hole of the trolley track, mark the installation position line of the bottom plate of the track pressure plate on the track supporting beam.
[0009] According to one or more embodiments of the present invention, step S2 comprises the following steps: 21 , Lay the pad on the rail beam panel; S 22 , taking the center punch eye of the trolley track and the center line of the web of the track-bearing beam as the reference, starting from the interface between the front and rear beam hinges and the track-bearing beam and moving forward and backward, lay the trolley tracks on both sides in a centralized manner on the panel of the track-bearing beam.
[0010] According to one or more embodiments of the present invention, step S3 comprises the following steps: 31 1. Arrange the track according to the straightness design requirements of the quay crane trolley track. The deviation between the center line of the trolley track and the theoretical center line is required to be no more than 1 mm within a range of 2 meters, and the maximum lateral deviation of the entire track is within ±5 mm; S 32 , use measuring equipment to measure the straightness data of the trolley tracks on both sides, the track gauge data of the trolley tracks on both sides, and the track centering data, measure every 2 meters and record the data.
[0011] According to one or more embodiments of the present invention, the method for verifying the alignment data of the track center and the web of the rail-supporting beam in step S4 is to sort out the wiring data of the trolley track, deduce the alignment misalignment between the trolley track and the rail-supporting beam, as well as the straightness data of the rail-supporting beam, and find out the areas that do not meet the requirements.
[0012] According to one or more embodiments of the present invention, in step S5, if there is an area that does not meet the requirements, the method for adjusting the straightness of the trolley track includes the following steps: 51 , by analyzing the data of the misalignment between the trolley track and the rail beam, and combining the design accuracy requirements, adjust the straightness of the trolley track to ensure that the offset between the center line of the trolley track and the center of the web of the rail beam does not exceed half of the thickness of the web of the rail beam; S 52 , use measuring equipment to measure the straightness data of the trolley tracks on both sides, the track gauge data of the trolley tracks on both sides, and the track centering data, measure every 2 meters and record the data.
[0013] According to one or more embodiments of the present invention, in step S5, the method for drawing the trolley track data curve graph is to draw the trolley track straightness data curve graph according to the trolley track straightness data in the wiring data and the track gauges of the trolley tracks on both sides, and detect and analyze the out-of-tolerance parts of the trolley track straightness and track gauge; if there are areas that do not meet the requirements, the wiring data are the wiring data after adjusting the trolley track straightness; if there are no areas that do not meet the requirements, the wiring data are the wiring data in step S3.
[0014] According to one or more embodiments of the present invention, in step S6, the method for adjusting the straightness of the trolley track is to adjust the out-of-tolerance parts of the trolley track straightness and track gauge, including the following steps: 61 1. Take the trolley track on one side as the reference to ensure that the trolley track and the rail beam are aligned. If the alignment meets the requirements, adjust the straightness of the trolley track on one side; S 62 , adjust the straightness of the trolley track on the other side so that the data of the centering of the trolley track and the supporting beam, the height difference of the trolley tracks on both sides and the gauge deviation of the trolley tracks on both sides meet the requirements.
[0015] According to one or more embodiments of the present invention, in step S6, if there is a large deviation and the trolley track straightness cannot be adjusted, it is further determined whether the box girder structural member has a lateral bending tolerance problem. If the lateral bending tolerance problem exists, the lateral bending tolerance problem of the box girder structural member is preferentially solved; after solving the lateral bending tolerance problem of the box girder structural member, steps S1 to S6 are re-executed.
[0016] The present invention also provides a quay crane trolley track system, which is characterized in that the quay crane trolley track system includes: a first side beam box, a second side beam box, a first side beam track-bearing beam, a second side beam track-bearing beam, a first side trolley track and a second side trolley track, the first side beam box and the second side beam box are arranged opposite to each other; the first side beam track-bearing beam is connected to the first side beam box, and the second side beam track-bearing beam is connected to the second side beam box; the first side trolley track is laid on the first side beam track-bearing beam, and the second side trolley track is laid on the second side beam track-bearing beam; the quay crane trolley track system is adjusted using the quay crane trolley track straightness adjustment method as described above.
[0017] The positive and progressive effects of the present invention are:
[0018] The quay crane trolley track straightness adjustment method and the quay crane trolley track system of the present invention have at least the following advantages:
[0019] The quay crane trolley track straightness adjustment method and quay crane trolley track system of the present invention can ensure the safe operation of the quay crane and increase the service life of the trolley wheels and tracks. The quay crane trolley track straightness adjustment method of the present invention not only effectively and comprehensively adjusts the cumulative errors generated by the manufacturing of the quay crane, reduces the quality problems of the trolley track due to uneven force and the "track gnawing" phenomenon of the trolley wheels, but also ensures the safe and stable performance of the load-carrying trolley when running at high speed, and plays a positive effect on the stability of the overall structure of the quay crane. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The above and other features, properties and advantages of the present invention will become more apparent through the following description in conjunction with the accompanying drawings and embodiments, in which the same reference numerals always represent the same features, wherein:
[0021] Figure 1 It is a schematic diagram of the quay crane trolley track system of the present invention.
[0022] Figure 2 It is a schematic diagram of the track structure of the quay crane trolley.
[0023] Figure 3 It is a schematic diagram of the structure of the trolley track fixing device.
[0024] Figure 4 It is a schematic diagram of the centering laying of the trolley track in the method for adjusting the straightness of the quay crane trolley track of the present invention.
[0025] Figure 5 It is a schematic diagram of measuring the trolley track line arrangement data in the quay crane trolley track straightness adjustment method of the present invention.
[0026] Figure 6 It is a curve diagram of trolley track data in the quay crane trolley track straightness adjustment method of the present invention. DETAILED DESCRIPTION
[0027] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0028] Embodiments of the present invention will now be described in detail with reference to the accompanying drawings. Reference will now be made in detail to preferred embodiments of the present invention, examples of which are shown in the accompanying drawings. Wherever possible, the same reference numerals will be used in all drawings to represent the same or similar parts. In addition, although the terms used in the present invention are selected from well-known and commonly used terms, some of the terms mentioned in the specification of the present invention may be selected by the applicant at his or her discretion, and their detailed meanings are explained in the relevant parts of the description herein. In addition, it is required to understand the present invention not only by the actual terms used, but also by the meaning implied by each term.
[0029] The present invention provides a method for adjusting the straightness of a quay crane trolley track. The quay crane trolley track comprises two trolley tracks arranged in parallel. The method for adjusting the straightness of the quay crane trolley track comprises the following steps:
[0030] Step S1, pre-positioning the trolley track 200;
[0031] Step S2, aligning and laying the trolley rails and the rail-bearing beams 100 on both sides;
[0032] Step S3, arranging the straightness of the trolley track and measuring the arrangement data;
[0033] Step S4, verifying the alignment data between the track center and the web of the track-bearing beam, and finding out the area in the data that does not meet the requirements;
[0034] Step S5: if there is an area that does not meet the requirements, the straightness of the trolley track is adjusted, the adjusted wiring data is measured, and a trolley track data curve graph is drawn; if there is no area that does not meet the requirements, the trolley track data curve graph is directly drawn;
[0035] Step S6: adjusting the straightness of the trolley track according to the trolley track data curve.
[0036] The two side trolley tracks include a first side trolley track 210 and a second side trolley track 220 .
[0037] The method for adjusting the straightness of the quay crane trolley track of the present invention reduces stubborn problems and can increase the service life of the wheels and tracks of the quay crane trolley, thereby meeting the requirements of safe high-altitude lifting operations of the quay crane. The method is a simple and easy-to-operate method for adjusting the straightness accuracy of the trolley track.
[0038] like Figure 1 As shown, the trolley track 200 is laid on the track-bearing beam 100 of the beam box 300. The beam box 300 includes a first side beam box 310 and a second side beam box 320. The track-bearing beam 100 is used to support the safe operation of the heavy-loaded trolley track 200. Figure 1 The middle rail beam 100 is a T-shaped rail beam.
[0039] like Figure 2 As shown, the trolley track 200 is mainly composed of a long rail 201, a short rail, a baffle 202 and a fixing device 203. The long rail 201 and the short rail are welded at the joint. The short rail is divided into two sections, one for the front beam and one for the rear beam, namely, the short rail 205 at the hinge point of the front beam and the short rail 204 at the hinge point of the rear beam, which are laid at the lower end of the hinge point of the beam respectively. The long rail 201 and the short rail are effectively fixedly connected to the T-shaped rail beam by the fixing device 203.
[0040] like Figure 3As shown, the fixing device 203 of the trolley track of the quay crane mainly consists of a rubber pad 2031, a rigid pad 2031, a track pressure plate 2033, a pressure plate bottom plate 2034, a bolt connection pair 2032, etc., and is fixedly laid on the T-shaped rail bearing beams of the front and rear beams. During the quay crane hoisting operation, the trolley track 200 can provide a route for the trolley to run smoothly and accurately position.
[0041] As a preferred implementation of the method for adjusting the straightness of the quay crane trolley track of the present invention, step S1 comprises the following steps:
[0042] Step S 11 1. When the side bend dimensions and opening dimensions of the front and rear beams meet the requirements, mark the center line 400 of the quay crane trolley track and punch holes;
[0043] Step S 12 , and then, according to the hole punched in the center of the trolley track, mark the installation position line of the pressure plate bottom plate 2034 of the track on the track-bearing beam 100.
[0044] Preferably, step S 11 When the side bends and openings of the front and rear beams meet the requirements, mark the center line 400 of the quay crane trolley track and punch holes;
[0045] Step S 12 Then, according to the hole punched in the center of the trolley track, use chalk line to mark the installation position line of the pressure plate bottom plate 2034 of the track on the track-bearing beam 100.
[0046] As a preferred implementation of the method for adjusting the straightness of the quay crane trolley track of the present invention, step S2 comprises the following steps:
[0047] Step S 21 , laying a pad 2031 on the rail beam panel;
[0048] Step S 22 , taking the center punch eye of the trolley track and the center line 400 of the web of the track-bearing beam 100 as the reference, starting from the interface between the front and rear beam hinges and the track-bearing beam and moving forward, lay the trolley tracks on both sides in a centralized manner on the panel of the track-bearing beam 100.
[0049] like Figure 4 As shown, preferably, step S 21 Lay rubber or rigid pads 2031 on the T-shaped rail beam panel;
[0050] Step S 22Then, taking the center punch of the long rail 201 in the trolley track 200, the short rail 205 at the front beam hinge or the short rail 204 at the rear beam hinge and the center line 400 of the web of the T-shaped rail-bearing beam as the reference, starting from the interface of the front and rear beam hinges and the rail-bearing beams, the long rail 201 in the trolley tracks on both sides, the short rail 205 at the front beam hinge or the short rail 204 at the rear beam hinge are laid centeringly on the panel of the T-shaped rail-bearing beam.
[0051] As a preferred implementation of the method for adjusting the straightness of the quay crane trolley track of the present invention, step S3 comprises the following steps:
[0052] Step S 31 1. Arrange the track according to the straightness design requirements of the quay crane trolley track. The deviation between the 200 center line of the trolley track and the theoretical center line is required to be no more than 1 mm in straightness within 2 meters, and the maximum lateral deviation of the entire track is within ±5 mm;
[0053] Step S 32 , use measuring equipment to measure the straightness data of the trolley tracks on both sides, the track gauge data of the trolley tracks on both sides, and the track centering data, measure every 2 meters, and record the relevant data.
[0054] like Figure 5 As shown, preferably, step S 32 Use laser theodolite, 10-meter measuring tape, 300mm steel ruler and other equipment to measure the trolley track straightness data, the two track gauge data and the track centering data. Take measurements every 2 meters and record the relevant data.
[0055] Preferably, the track gauge L1 of the two tracks, the distance L3 from the edge of the first side trolley track 210 and the edge of the second side trolley track 220 to the laser reference line 500, the distance L2 from the edge of the first side trolley track 210 to the edge of the panel of the track-supporting beam 100, and the distance L4 from the edge of the second side trolley track 220 to the edge of the panel of the track-supporting beam 100 are measured every 2 meters.
[0056] The track gauge data of the two tracks is reflected by the track gauge L1 of the first side trolley track 210 and the second side trolley track 220; the trolley track straightness data is reflected by the distance L3 from the edge of the first side trolley track 210 and the edge of the second side trolley track 220 to the laser reference line 500 measured by multiple measuring points; the track centering data is reflected by the distance L2 from the edge of the first side trolley track 210 to the edge of the panel of the track-supporting beam 100, and the distance L4 from the edge of the second side trolley track 220 to the edge of the panel of the track-supporting beam 100 measured by multiple measuring points.
[0057] like Figure 5The figure shows a schematic diagram of the measurement of the trolley track arrangement data, wherein L1 is the gauge of the two tracks; L2 is the distance from the edge of the trolley track 210 on the first side to the edge of the panel of the track-supporting beam 100; L3 is the distance from the edge of the trolley track 210 on the first side and the edge of the trolley track 220 on the second side to the laser reference line 500; L4 is the distance from the edge of the trolley track 220 on the second side to the edge of the panel of the track-supporting beam 100; the distances L1, L2, L3 and L4 are measured every 2 meters. Figure 5 A represents the half width of the T-type rail beam panel; B represents the web thickness of the T-type rail beam; C represents the half width of the trolley track; the laser reference line 500 is used as the measurement reference for the wiring data.
[0058] As a preferred embodiment of the method for adjusting the straightness of the quay crane trolley track of the present invention, the method for verifying the alignment data of the track center and the web of the rail-bearing beam in step S4 is to sort out the wiring data of the trolley track, deduce the alignment misalignment between the trolley track 200 and the rail-bearing beam 100, and the straightness data of the rail-bearing beam 100, and find out the areas that do not meet the requirements.
[0059] Preferably, in step S4, by combing the wiring data of the trolley track 200, the misalignment between the trolley track 200 and the T-type rail beam and the straightness data of the T-type rail beam are calculated. The following formula is used as the basis for judging whether the area meets the requirements:
[0060] L2∈
(AC)-B / 2,(AC)+B / 2
[0061] L4∈
(AC)-B / 2,(AC)+B / 2
[0062] When L2 and L4 of the measurement area satisfy the above formula, the area meets the requirements; when L2 and L4 of the measurement area do not satisfy the above formula, the area does not meet the requirements; thus, the area that does not meet the requirements is found.
[0063] As a preferred embodiment of the method for adjusting the straightness of the quay crane trolley track of the present invention, in step S5, if there is an area that does not meet the requirements, the method for adjusting the straightness of the trolley track includes the following steps:
[0064] Step S 51 2. By analyzing the centering misalignment data of the trolley track 200 and the rail-bearing beam 100 and combining the design accuracy requirements, adjust the straightness of the trolley track to ensure that the offset between the center line 400 of the trolley track and the center of the web of the rail-bearing beam does not exceed half of the thickness of the web of the rail-bearing beam;
[0065] Step S 52, use measuring equipment to measure the straightness data of the trolley tracks on both sides, the track gauge data of the trolley tracks on both sides, and the track centering data, measure every 2 meters, and record the relevant data.
[0066] Preferably, step S 51 In the process, by analyzing the misalignment data of the trolley track 200 and the T-type rail beam, and combining the design accuracy requirements, the straightness of the trolley track is adjusted to ensure that the offset between the center line 400 of the trolley track 200 and the center of the web of the T-type rail beam does not exceed half of the thickness of the web of the T-type rail beam;
[0067] Preferably, step S 52 In the process, a laser theodolite, a 10-meter measuring tape, a 300mm steel ruler and other equipment are used to measure the straightness data of the trolley track 200, the track gauge data of the two tracks and the track centering data. Measurements are made every 2 meters and relevant data are recorded.
[0068] Preferably, the track gauge L1 of the two tracks, the distance L3 from the edge of the first side trolley track 210 and the edge of the second side trolley track 220 to the laser reference line 500, the distance L2 from the edge of the first side trolley track 210 to the edge of the panel of the track-supporting beam 100, and the distance L4 from the edge of the second side trolley track 220 to the edge of the panel of the track-supporting beam 100 are measured every 2 meters.
[0069] The track gauge data of the two tracks is reflected by the track gauge L1 of the first side trolley track 210 and the second side trolley track 220; the trolley track straightness data is reflected by the distance L3 from the edge of the first side trolley track 210 and the edge of the second side trolley track 220 to the laser reference line 500 measured by multiple measuring points; the track centering data is reflected by the distance L2 from the edge of the first side trolley track 210 to the edge of the panel of the track-supporting beam 100, and the distance L4 from the edge of the second side trolley track 220 to the edge of the panel of the track-supporting beam 100 measured by multiple measuring points.
[0070] like Figure 5 The figure shows a schematic diagram of the measurement of the trolley track arrangement data, wherein L1 is the gauge of the two tracks; L2 is the distance from the edge of the trolley track 210 on the first side to the edge of the panel of the track-supporting beam 100; L3 is the distance from the edge of the trolley track 210 on the first side and the edge of the trolley track 220 on the second side to the laser reference line 500; L4 is the distance from the edge of the trolley track 220 on the second side to the edge of the panel of the track-supporting beam 100; the distances L1, L2, L3 and L4 are measured every 2 meters. Figure 5 A represents the half width of the T-type rail beam panel; B represents the web thickness of the T-type rail beam; C represents the half width of the trolley track; the laser reference line 500 is used as the measurement reference for the wiring data.
[0071] As a preferred embodiment of the method for adjusting the straightness of the quay crane trolley track of the present invention, in step S5, the method for drawing the trolley track data curve diagram is to draw the trolley track straightness data curve diagram according to the trolley track straightness data in the wiring data and the track gauges of the trolley tracks on both sides, and detect and analyze the out-of-tolerance parts 610 of the trolley track straightness and track gauge.
[0072] If there are areas that do not meet the requirements, the wiring data is the wiring data after adjusting the straightness of the trolley track; if there are no areas that do not meet the requirements, the wiring data is the wiring data in step S3.
[0073] The method for drawing the trolley track data curve graph is preferably to draw the trolley track straightness related data curve graph according to the wiring data trolley track straightness data and the two track gauge data in step S3, and then detect and analyze the out-of-tolerance parts 610 of the trolley track straightness and gauge.
[0074] Figure 6 The figure shows a curve chart drawn based on the measured data of the wiring data, and the curvature of the first curve 620 and the second curve 630 representing the straightness of the trolley track are magnified in the schematic diagram. The first curve 620 and the second curve 630 represent the straightness of the trolley track on the first side and the straightness of the trolley track on the second side, respectively.
[0075] As a preferred embodiment of the method for adjusting the straightness of the trolley track of the quay crane of the present invention, in step S6, the method for adjusting the straightness of the trolley track is to adjust the out-of-tolerance portion 610 of the trolley track straightness and track gauge, including the following steps:
[0076] Step S 61 1. Take the trolley track on one side as a reference to ensure that the trolley track 200 is aligned with the track-bearing beam 100. When the alignment meets the requirements, adjust the straightness of the trolley track on one side;
[0077] Step S 62 , adjust the straightness of the trolley track on the other side so that the data of the centering of the trolley track 200 and the track-bearing beam 100, the height difference of the trolley tracks on both sides and the gauge deviation of the trolley tracks on both sides meet the requirements.
[0078] Preferably, the out-of-tolerance portion 610 of the trolley track straightness and track gauge is adjusted by means of external force of the tooling.
[0079] When adjusting, first use one side of the trolley track as a reference, ensure that the straightness of the trolley track and the alignment with the T-type rail beam meet the requirements, and then adjust the straightness of the trolley track on one side.
[0080] Then adjust the straightness of the trolley track on the other side, and simultaneously consider the alignment data of the trolley track straightness and the T-type rail support beam, the height difference between the two tracks and the gauge deviation of the two tracks to meet the requirements.
[0081] As a preferred implementation of the method for adjusting the straightness of the quay crane trolley track of the present invention, in step S6, if there is a large deviation and the trolley track straightness cannot be adjusted, it is further determined whether there is a lateral bending problem of the box girder structure. If there is a lateral bending problem, the lateral bending problem of the box girder structure is preferentially solved;
[0082] After solving the problem of excessive lateral bending of the box girder structure, the steps S1 to S6 are executed again.
[0083] Preferably, if there is a large deviation and the trolley track straightness cannot be adjusted, it is necessary to consider whether the front and rear beam box girder structures have lateral bending tolerances. After the box girder structure problem is solved, readjust the trolley track straightness according to steps S1 to S6.
[0084] After completing all the steps from step S1 to step S6, the baffle plate 202 is welded at the reserved installation position of the baffle plate 202 of the trolley track with qualified straightness adjustment, and the track pressure plate 2033 and the bolt connection pair 2032 are installed.
[0085] The method for adjusting the straightness of the quay crane trolley track of the present invention truly presents the straightness of the track-bearing beam 100 and the trolley track 200 through the data of the arrangement and positioning of the trolley track 200.
[0086] The method for adjusting the straightness of the quay crane trolley track of the present invention can effectively eliminate the cumulative errors generated in the manufacturing and assembly processes of steel structural parts by adjusting the centering dimensions of the trolley tracks on both sides and the corresponding rail-bearing beams 100, so as to ensure that the straightness of the trolley track meets the design requirements, increase the service life of the trolley frame wheels, and ensure safe working conditions for the driver.
[0087] like Figure 1 As shown, the present invention also provides a quay crane trolley track system, the quay crane trolley track system comprising: a first side beam box 310, a second side beam box 320, a first side beam track-bearing beam 110, a second side beam track-bearing beam 120, a first side trolley track 210 and a second side trolley track 220,
[0088] The first side beam box 310 and the second side beam box 320 are arranged opposite to each other;
[0089] The first side beam rail-supporting beam 110 is connected to the first side beam box 310, and the second side beam rail-supporting beam 120 is connected to the second side beam box 320;
[0090] The first side trolley track 210 is laid on the first side beam rail support beam 110, and the second side trolley track 220 is laid on the second side beam rail support beam 120;
[0091] The quay crane trolley track system is adjusted using the quay crane trolley track straightness adjustment method described above.
[0092] In summary, the quay crane trolley track straightness adjustment method and quay crane trolley track system of the present invention can ensure the safe operation of the quay crane and increase the service life of the trolley wheels and tracks. The quay crane trolley track straightness adjustment method of the present invention not only effectively and comprehensively adjusts the cumulative errors caused by the manufacturing of the quay crane, reduces the quality problems of the trolley track 200 due to uneven force and the "track gnawing" phenomenon of the trolley wheels, but also ensures the safe and stable performance of the load-carrying trolley during high-speed operation, and has a positive effect on the stability of the overall structure of the quay crane.
[0093] Although the specific embodiments of the present invention are described above, it should be understood by those skilled in the art that these are only examples, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art may make various changes or modifications to these embodiments without departing from the principles and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.
Claims
1. A method for adjusting the straightness of a quay crane trolley track, characterized in that: The quay crane trolley track includes two trolley tracks arranged in parallel, and the quay crane trolley track straightness adjustment method includes the following steps: S1. Pre-position the trolley track; S2. Align and lay the trolley tracks and rail-bearing beams on both sides; S3, arrange the straightness of the trolley track and measure the arrangement data; S4. Check the alignment data between the track center and the web of the rail-bearing beam, and find out the areas in the data that do not meet the requirements; S5. If there are areas that do not meet the requirements, adjust the straightness of the trolley track, measure the adjusted wiring data, and draw a trolley track data curve chart; if there are no areas that do not meet the requirements, directly draw the trolley track data curve chart; S6. Adjust the straightness of the trolley track according to the trolley track data curve.
2. The method for adjusting the straightness of the track of the quay crane trolley according to claim 1, characterized in that: The step S1 comprises the following steps: S 11 1. When the side bend dimensions and opening dimensions of the front and rear beams meet the requirements, mark the center line of the quay crane trolley track and punch holes; S 12 2. According to the center hole of the trolley track, mark the installation position line of the bottom plate of the track pressure plate on the track supporting beam.
3. The method for adjusting the straightness of the track of the quay crane trolley according to claim 1, characterized in that: The step S2 comprises the following steps: S 21 , laying pads on the rail-bearing beam panels; S 22 , taking the center punch eye of the trolley track and the center line of the web of the track-bearing beam as the reference, starting from the interface between the front and rear beam hinges and the track-bearing beam and moving forward and backward, lay the trolley tracks on both sides in a centralized manner on the panel of the track-bearing beam.
4. The method for adjusting the straightness of the track of the quay crane trolley according to claim 1, characterized in that: The step S3 comprises the following steps: S 31 1. Arrange the track according to the straightness design requirements of the quay crane trolley track. The deviation between the center line of the trolley track and the theoretical center line is required to be no more than 1 mm in straightness within 2 meters, and the maximum lateral deviation of the entire track is within ±5 mm; S 32 , use measuring equipment to measure the straightness data of the trolley tracks on both sides, the track gauge data of the trolley tracks on both sides, and the track centering data, measure every 2 meters and record the data.
5. The method for adjusting the straightness of the track of the quay crane trolley according to claim 1, characterized in that: The method for verifying the alignment data of the track center and the web of the rail-bearing beam in step S4 is to sort out the wiring data of the trolley track, deduce the alignment misalignment between the trolley track and the rail-bearing beam, as well as the straightness data of the rail-bearing beam, and find out the area that does not meet the requirements.
6. The method for adjusting the straightness of the track of the quay crane trolley according to claim 1, characterized in that: In step S5, if there is an area that does not meet the requirements, the method for adjusting the straightness of the trolley track includes the following steps: S 51 2. By analyzing the data of the centering misalignment between the trolley track and the rail-bearing beam, and combining the design accuracy requirements, adjust the straightness of the trolley track to ensure that the offset between the center line of the trolley track and the center of the web of the rail-bearing beam does not exceed half of the thickness of the web of the rail-bearing beam; S 52 , use measuring equipment to measure the straightness data of the trolley tracks on both sides, the track gauge data of the trolley tracks on both sides, and the track centering data, measure every 2 meters and record the data.
7. The method for adjusting the straightness of the track of the quay crane trolley according to claim 1, characterized in that: In the step S5, the method for drawing the trolley track data curve graph is to draw the trolley track straightness data curve graph according to the trolley track straightness data in the wiring data and the track gauges of the trolley tracks on both sides, and detect and analyze the out-of-tolerance parts of the trolley track straightness and track gauge; If there are areas that do not meet the requirements, the wiring data is the wiring data after adjusting the straightness of the trolley track; if there are no areas that do not meet the requirements, the wiring data is the wiring data in step S3.
8. The method for adjusting the straightness of the track of the quay crane trolley according to claim 1, characterized in that: In step S6, the method for adjusting the straightness of the trolley track is to adjust the out-of-tolerance parts of the straightness and track gauge of the trolley track, including the following steps: S 61 1. Take the trolley track on one side as the reference to ensure that the trolley track and the rail-bearing beam are aligned. If the alignment meets the requirements, adjust the straightness of the trolley track on one side; S 62 , adjust the straightness of the trolley track on the other side so that the data of the centering of the trolley track and the rail supporting beam, the height difference of the trolley tracks on both sides and the gauge deviation of the trolley tracks on both sides meet the requirements.
9. The method for adjusting the straightness of the track of the quay crane trolley according to claim 8, characterized in that: In the step S6, if there is a large deviation and the trolley track straightness cannot be adjusted, it is further determined whether the box girder structure has a lateral bending problem. If the lateral bending problem exists, the lateral bending problem of the box girder structure is solved first; After solving the problem of excessive lateral bending of the box girder structure, the steps S1 to S6 are executed again.
10. A quay crane trolley track system, characterized in that: The quay crane trolley track system comprises: a first side beam box, a second side beam box, a first side beam rail-bearing beam, a second side beam rail-bearing beam, a first side trolley track and a second side trolley track. The first side beam box body and the second side beam box body are arranged opposite to each other; The first side beam rail-bearing beam is connected to the first side beam box, and the second side beam rail-bearing beam is connected to the second side beam box; The first-side trolley track is laid on the first-side beam rail-bearing beam, and the second-side trolley track is laid on the second-side beam rail-bearing beam; The quay crane trolley track system is adjusted using the quay crane trolley track straightness adjustment method as described in any one of claims 1-9.