Dismounting and loading construction method for in-service tower equipment
Through the preliminary lifting and side-pushing and sliding loading methods of in-service tower equipment, combined with slide rails, slippers, jacks and transportation axis vehicles, the difficulty of transportation of tower equipment after removal is solved, and a safe and reliable loading is achieved. Reduced construction and loading costs.
Patent Information
- Application Number
- CN202411183277.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-12
AI Technical Summary
The transportation difficulty of in-service tower equipment is after the removal, especially because the demolition and transportation cannot be carried out continuously, resulting in increased construction and loading costs, and it is necessary to overcome various complex situations. It is difficult for the existing technology to achieve smooth loading, especially in the absence of large-scale loading. In the case of crane.
The method of small angle offset perpendicular to the crane lifting is used for preliminary lifting to separate the bottom and foundation of the tower equipment. After temporary placement, the side-pushing and sliding loading is used to use a combination of slide rails, slide boots and jacks to carry out side-pushing and loading, and the transport axis is used to transport the vehicle and Tooling enables safe and reliable loading of equipment.
It reduces construction difficulty and loading costs, realizes safe and reliable dismantling and loading of tower equipment, avoids the need to use large cranes, and improves loading efficiency and safety.
Smart Images

Figure CN118929446A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of petrochemical equipment hoisting, in particular to a construction method for dismantling and loading in-service tower equipment. Background Art
[0002] Tower equipment is the core equipment of petrochemical plants, and is mainly used for multiple contact reactions of process media. Due to the long medium reaction process, it needs to pass through multiple layers of tower plates and fillers for reaction, and the internal pressure is high, so the tower equipment as a whole is heavy in weight, small in diameter and high in height.
[0003] Some tower equipment in service needs to be dismantled and transported to another construction site for reinstallation. The dismantling is difficult and requires overcoming multiple situations. At the same time, since the construction period of the demolition project is usually inconsistent with that of the planned project, the dismantling and transportation cannot be carried out continuously and need to be carried out separately in two time periods, which brings great inconvenience to the construction and transportation, and increases the construction difficulty and loading costs. Summary of the invention
[0004] The purpose of the present invention is to provide a construction method for dismantling and loading tower equipment in service, so as to realize smooth loading of tower equipment without using a large crane.
[0005] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a method for dismantling and loading in-service tower equipment, comprising: Step 1: Preparation before demolition; Before dismantling, the tower equipment is in an installation restraint state, and all restraints must be removed. Dismantling can only be carried out after confirmation; Step 2: dismantling tower equipment; First, use a small angle offset method in the vertical direction of the crane lifting to carry out preliminary lifting. After the bottom side of the tower equipment is separated from the equipment foundation, formal lifting can be carried out. After dismantling, the tower equipment will be temporarily placed in an idle area on site, waiting for later transportation; Step 3: The transport axis vehicle is in place; After the transport axis vehicle arrives at the site, it is arranged parallel to and close to the tower equipment, and the height of the axis vehicle is adjusted to make it consistent with the bottom height of the pre-erected slide rail at the bottom of the tower equipment; Step 4: tooling layout; Before the tooling is arranged, a pile of sleepers is arranged at the pre-arrangement position; the tooling includes a slide rail, a slide shoe, a stopper and a jack; a plurality of slide rails are erected on the pile of sleepers and the axis car, the slide shoe is placed on the upper end of the slide rail, a stopper and a jack are arranged at one end of the slide rail, the jack is placed horizontally, the rear end of the jack is located at the stopper end, and the front end of the jack is located at the slide shoe end; the tower equipment is placed on the slide shoe; Step 5: Push the tower equipment sideways and move it horizontally for loading; The tower equipment is pushed sideways and horizontally onto the axis vehicle by using the jack to push the sliding shoe sideways, and the transport saddle is arranged on the axis vehicle; Step 6: Remove the tooling; Remove the tooling, adjust the stress state of the transport saddle, and complete loading.
[0006] As a preferred embodiment of the present invention, in step 2, the lifting is performed at an angle of 5 degrees offset from the vertical direction.
[0007] As a preferred embodiment of the present invention, in step 2, the tower equipment is dismantled by cooperating with two cranes. The main crane lifts the tower equipment away from the equipment foundation, and the auxiliary crane cooperates with the tail to adjust the tower equipment 4 from a vertical state to a horizontal state in the air.
[0008] As a preferred embodiment of the present invention, in step 2, after the tower equipment is dismantled, it is horizontally placed in an idle area on site, and multiple piles of sleepers are set below the tower equipment during placement.
[0009] As a preferred embodiment of the present invention, in step four, jacking jacks as temporary jacking tools are set at both ends of the tower equipment in a horizontal state, and jacking is performed at both ends of the tower equipment at the same time, and the jacking is stopped when the original support parts are not under stress; after withdrawing the original support parts, the jacking height of the jacking jack is lowered until the tower equipment contacts the sliding shoe and is subjected to stress, and the jacking height of the jacking jack is continued to be slowly lowered, and at the same time, the lifting height of the axis car is adjusted according to the descending height of the tower equipment, so that the slide rail is always in a horizontal state until the jacking jack is no longer under stress.
[0010] As a preferred embodiment of the present invention, each slide rail uses two I-beams as a group.
[0011] As a preferred embodiment of the present invention, in step four, a steel plate is horizontally laid on the upper surface of the sleeper pile, and a slide rail is laid on the steel plate and the axle car.
[0012] As a preferred embodiment of the present invention, in step five, a movable limit stop is provided at the other end of the slide rail, and a jacking gap is retained between the limit stop and the slide shoe. Each time the jack is jacked horizontally and reaches the limit stop, the jacking is stopped, and then the limit stop is moved backward to the above-mentioned tightening gap. This operation is repeated until the tower equipment is pushed sideways and translated onto the axis vehicle, and the limit stop stops moving backward and is in close contact with the side of the slide shoe to prevent the slide shoe from moving.
[0013] As a preferred embodiment of the present invention, a 100mm jacking clearance is reserved between the limit stopper and the sliding shoe.
[0014] As a preferred embodiment of the present invention, the transport saddle is arranged at 5 locations in total, and the transport saddle is fixed to the tower equipment using a fastening steel belt.
[0015] The present invention uses a crane to lift the equipment at a small vertical angle for preliminary lifting, so that the bottom of the tower equipment is separated from the bonding surface of the foundation, and then the tower equipment is temporarily placed by a double-machine crane. When the loading conditions are met, in order to reduce the lifting cost, the crane is not used during loading, and an unconventional manual side-pushing and translation method is used for loading. A combination of a slide rail, a slide shoe, and a jack is used to push and translate the tower equipment sideways to complete the equipment loading. The lifting and loading process is safe and reliable, ensuring the quality of the tower equipment dismantling, and reducing the construction difficulty and loading cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The drawings herein are used to provide further explanation of the present invention and constitute a part of this application. The illustrative embodiments of the present invention and their description are used to explain the present invention and do not constitute improper limitations on the present invention.
[0017] Figure 1 This is a diagram of the initial hoisting state of the main crane of the present invention with a small angle offset; Figure 2 This is a diagram of the lifting state of the main and auxiliary cranes of the present invention; Figure 3 Temporary placement of main view for tower equipment; Figure 4 This is the left view of the initial state of the side-push translation method for tower equipment; Figure 5 This is the left view of the tower equipment side push translation method completed state; Figure 6 This is the main view of the loading status of tower equipment.
[0018] In the figure, 1-main crane, 2-main lifting wire rope, 3-main lifting ear, 4-tower equipment, 5-anchor bolts and nuts, 6-skirt base plate, 7-gap, 8-equipment foundation, 9-auxiliary crane, 10-auxiliary lifting wire rope, 11-auxiliary lifting ear, 12-sleeper pile, 13-slide rail, 14-stopper, 15-jack, 16-steel plate, 17-anti-derailment baffle, 18-slide shoe, 19-limit block, 20-axis car, 21-top block, 22-transport saddle, 23-fastening steel belt. DETAILED DESCRIPTION
[0019] In order to make those skilled in the art better understand the present invention, the present invention is further clearly and completely described below in conjunction with the accompanying drawings and embodiments. It should be noted that, in the absence of conflict, the features in the embodiments and examples of this application can be combined with each other.
[0020] The present embodiment provides a method for dismantling and loading an in-service tower equipment. The tower equipment 4 weighs 290 tons, has a diameter of 2000 mm, a total height of 48 m, and a foundation elevation of 0.2 m. It needs to be dismantled and transported to another construction site for reinstallation.
[0021] 1. Selection of dismantling and hoisting conditions for tower equipment 4; According to the crane station location, equipment weight, and equipment height, the lifting machinery is selected, and the tower equipment 4 is dismantled by the cooperation of two cranes.
[0022] Specifically, the operating radius is determined by the position of the crane station; the rated load is determined by the weight of the tower equipment 4 and the weight of the sling; the calculated load is determined by the rated load, dynamic load coefficient, and unbalance coefficient; the sling specifications are determined by the calculated load; the boom working condition is determined by the height of the tower equipment 4; and finally a complete lifting condition is formed. According to calculations, the weight of the sling in this embodiment is about 10t, and the rated load is 300t. Finally, a 750t crawler crane is selected as the main crane, and a 500t truck crane is selected as the auxiliary crane. The two cranes work together to complete the removal of the tower equipment 4.
[0023] Second, preparation work before demolition; Before dismantling, the tower equipment 4 is in an installation restraint state, and all restraints need to be removed. Only after confirmation can the dismantling be formally carried out, including: removal of tower equipment 4 attached tower pipelines, removal of tower equipment 4 insulation layer, removal of tower equipment 4 electrical and instrumentation facilities, removal of tower equipment 4 auxiliary platforms, railings, and brackets, loosening of tower equipment anchor bolts and nuts 5, and removal of visible grouting layer around the base of tower equipment 4.
[0024] 3. Dismantling of tower equipment 4; First, a method of small angle offset perpendicular to the crane lifting direction is used for preliminary lifting. After the bottom side of the tower equipment 4 is separated from the equipment foundation 8, formal lifting is carried out. After dismantling, the tower equipment 4 is temporarily placed in an idle area on site, waiting for later transportation.
[0025] Because the tower equipment 4 being dismantled is in an installed state when it is dismantled, although the grouting layers around the equipment base have been removed, the grouting layer at the bottom of the tower equipment 4 cannot be completely removed, and there is a certain degree of adhesion between the bottom of the tower equipment 4 and the grouting layer. If vertical lifting is directly adopted, at the moment when the base of the tower equipment 4 and the bonding surface of the grouting layer are separated, the vertical force will be instantly unbalanced, the main arm of the crane will vibrate obviously, and in severe cases, a lifting accident will be caused.
[0026] This embodiment adopts the method of small angle offset from the vertical direction for preliminary lifting, changing the bonding separation force from surface force to linear force. It is calculated that when the lifting angle is offset by 5 degrees and the lifting force is greater than the rated load of 30t of the tower equipment 4, the base of the tower equipment 4 will generate a pulling force of 29.89t, which is sufficient to separate the base of the tower equipment 4 from the bonding surface of the grouting layer in a linear separation manner. After successful separation, the vertical state of the tower equipment 4 is restored, and vertical lifting is formally carried out to successfully dismantle the tower equipment 4.
[0027] like Figure 1As shown, before the initial lifting of the tower equipment 4, the anchor bolts and nuts 5 are loosened by 10 cm, the main purpose of which is to limit the distance of the skirt base plate 6 of the tower equipment 4 from the foundation; the main crane 1 is lifted by the main lifting wire rope 2 at an angle of 5 degrees offset from the vertical direction, and the main lifting wire rope 2 is connected to the tower equipment 4 through the main lifting lug 3; the main crane 1 is lifted slowly, and because the rated load is 300t, the over-rated load force F1 is limited to an upper limit of 30t, and the lifting force is slowly increased. The lifting is stopped after the skirt base plate 6 and the equipment foundation 8 are obviously separated on one side and a gap 7 is generated; the tower equipment 4 is restored to a vertical state and the lifting is formally dismantled.
[0028] like Figure 2 As shown, after the main crane 1 lifts the tower equipment 4 off the equipment foundation 8, the auxiliary crane 9 is used to adjust the tower equipment 4 from a vertical state to a horizontal state in the air.
[0029] like Figure 3 As shown, after the tower equipment 4 is dismantled, it is horizontally placed in an idle area on site. When placed, 5 piles of sleepers 12 are arranged below the tower equipment 4, with a height of 1 m.
[0030] Fourth, the transport axis vehicle 20 is in place; After the transport axis vehicle 20 arrives at the site, it is arranged parallel to and close to the tower equipment 4 , and the height of the axis vehicle 20 is adjusted so that the height of the axis vehicle 20 is consistent with the bottom height of the pre-installed slide rail 13 at the bottom of the tower equipment 4 .
[0031] 5. Tooling layout; Before the tooling is arranged, a pile of sleepers 12 is set at the pre-arrangement position; the tooling includes a slide rail 13, a slide shoe 18, a stopper 14 and a jack 15; a plurality of slide rails 13 are erected on the pile of sleepers 12 and the axis vehicle 20, the slide shoe 18 is placed on the upper end of the slide rail 13, a stopper 14 and a jack 15 are set at one end of the slide rail 13, the jack 15 is placed horizontally, the rear end of the jack 15 is located at the end of the stopper 14, and the front end of the jack 15 is located at the end of the slide shoe 18; the tower equipment 4 is placed on the slide shoe 18.
[0032] In this embodiment, the slide rail 13 is made of I-beams, and each slide rail 13 uses 2 I-beams as a group. Before arranging the slide rail 13, multiple sleeper piles 12 are first set at the pre-arrangement position. The sleeper piles 12 are placed layer by layer in a cross pattern. The placement height of the sleeper pile 12 is consistent with the sum of the heights of the reserved slide rails 13 and the slide shoes 18 and the horizontal height of the axis car 20. The center distance between each sleeper pile 12 is controlled at about 12m, and a steel plate 16 is horizontally laid on the upper side of the sleeper pile 12. The specification of the steel plate 16 is 1000×1000×20㎜.
[0033] The slide rail 13 is laid above the steel plate 16 and the axis car 20. The slide rail 13 is horizontally perpendicular to the tower equipment 4 and the axis car 20. To reduce friction, grease is applied to the upper surface of the slide rail 13 after assembly. The slide shoe 18 is placed on the upper end of the slide rail 13. The lower step width of the slide shoe 18 is consistent with the slide rail 13. Anti-derailment baffles 17 are arranged on both sides of the bottom of the slide shoe 18. The upper curvature is consistent with the outer circle curvature of the tower equipment 4. A stopper 14 is arranged at one end of the slide rail 13. Four jacks 15 with a lifting weight of 100t are used. The jacks 15 are placed horizontally, with the rear end of the jack 15 located at the stopper 14 and the front end located on one side of the slide shoe 18.
[0034] Lifting jacks are set as temporary lifting tools at both ends of the horizontal tower equipment 4, with two 100t jacks at each end. Lifting is carried out simultaneously at both ends of the tower equipment 4, and the jacking is stopped when the original supporting parts are no longer under stress; the original supporting parts are withdrawn, and the lifting height of the lifting jacks is slowly lowered until the tower equipment 4 contacts and is subjected to stress with the sliding shoes 18, and the lifting height of the lifting jacks is continued to be slowly lowered. At the same time, the lifting height of the axis car 20 is adjusted according to the lowered height of the tower equipment 4, so that the slide rail 13 is always in a horizontal state until the lifting jacks are no longer under stress.
[0035] 6. Side push and translation loading of tower equipment 4; The tower equipment 4 is laterally pushed and translated onto the axis vehicle 20 by means of the jack 15 and the sliding shoe 18 is laterally pushed and translated onto the axis vehicle 20 , and a transport saddle 22 is arranged on the axis vehicle 20 .
[0036] like Figure 4 As shown, the jack 15 is used to push the sliding shoe 18 horizontally from side to side, with each push stroke of 100mm. A movable limit stopper 19 is set on the other side of the sliding shoe 18 away from the push direction, and a 100mm push clearance is reserved between the limit stopper 19 and the sliding shoe 18. The jack 15 pushes horizontally for 100mm each time, and stops pushing after reaching the limit stopper 19. A push block 21 with a thickness of 100mm is placed between the rear end of the jack 15 and the stopper 14, and then the limit stopper 19 is moved backward 100mm. This operation is repeated until the tower equipment 4 is pushed sideways and translated onto the axis vehicle 20, as shown in FIG. Figure 5 As shown, the limit block 19 stops moving backward and is in close contact with the side of the sliding shoe 18 to prevent the sliding shoe 18 from moving, thereby temporarily fixing the two sides of the tower equipment 4.
[0037] like Figure 6 As shown, transport saddles 22 are arranged on the axle vehicle 20, and are evenly arranged below the tower equipment 4, with a total of 5 locations. The transport saddles 22 are fixed to the tower equipment 4 using fastening steel belts 23.
[0038] 7. Tooling removal; Remove the tooling, adjust the stress state of the transport saddle, and complete loading.
[0039] By lowering the local axis car section supporting the slide rail, the slide rail and the slide shoe are no longer stressed, and then the slide rail, the slide shoe 18, the jack 15, etc. are removed one by one. By lifting the local car section of the axis car 20 where the transport saddle is located, all transport saddles are evenly stressed, and the overall state of the axis car 20 is adjusted to complete all loading work.
[0040] The scope of protection claimed by the present invention is not limited to the above specific embodiments. For those skilled in the art, the present invention may have various deformations and changes. Any modifications, improvements and equivalent substitutions made within the concept and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for dismantling and loading in-service tower equipment, characterized in that: include: Step 1: Preparation before demolition; Before dismantling, the tower equipment is in an installation restraint state, and all restraints must be removed. Dismantling can only be carried out after confirmation; Step 2: dismantling tower equipment; First, use a small angle offset method in the vertical direction of the crane lifting to carry out preliminary lifting. After the bottom side of the tower equipment is separated from the equipment foundation, formal lifting can be carried out. After dismantling, the tower equipment will be temporarily placed in an idle area on site, waiting for later transportation; Step 3: The transport axis vehicle is in place; After the transport axis vehicle arrives at the site, it is arranged parallel to and close to the tower equipment, and the height of the axis vehicle is adjusted to make it consistent with the bottom height of the pre-erected slide rail at the bottom of the tower equipment; Step 4: tooling layout; Before the tooling is arranged, a pile of sleepers is arranged at the pre-arrangement position; the tooling includes a slide rail, a slide shoe, a stopper and a jack; a plurality of slide rails are erected on the pile of sleepers and the axis car, the slide shoe is placed on the upper end of the slide rail, a stopper and a jack are arranged at one end of the slide rail, the jack is placed horizontally, the rear end of the jack is located at the stopper end, and the front end of the jack is located at the slide shoe end; the tower equipment is placed on the slide shoe; Step 5: Push the tower equipment sideways and move it horizontally for loading; The tower equipment is pushed sideways and horizontally onto the axis vehicle by using the jack to push the sliding shoe sideways, and the transport saddle is arranged on the axis vehicle; Step 6: Remove the tooling; Remove the tooling, adjust the stress state of the transport saddle, and complete loading.
2. The method for dismantling and loading in-service tower equipment according to claim 1 is characterized in that: In step 2, the lifting is performed at an angle of 5 degrees offset from the vertical direction.
3. The method for dismantling and loading in-service tower equipment according to claim 1 or 2, characterized in that: In step 2, two cranes cooperate to dismantle the tower equipment. The main crane lifts the tower equipment away from the equipment foundation, and the auxiliary crane cooperates with the tail to adjust the tower equipment 4 from a vertical state to a horizontal state in the air.
4. The method for dismantling and loading in-service tower equipment according to claim 3 is characterized in that: In step 2, after the tower equipment is dismantled, it is placed horizontally in an idle area on site, and multiple piles of sleepers are set under the tower equipment during placement.
5. The method for dismantling and loading in-service tower equipment according to claim 1 or 4, characterized in that: In step 4, jacking jacks are set as temporary jacking tools at both ends of the horizontal tower equipment, and jacking is performed at both ends of the tower equipment at the same time, and the jacking is stopped when the original support parts are no longer under stress; after withdrawing the original support parts, the jacking height of the jacking jack is lowered until the tower equipment contacts the sliding shoe and is under stress, and the jacking height of the jacking jack is continued to be slowly lowered. At the same time, the lifting height of the axis car is adjusted according to the lowering height of the tower equipment, so that the slide rail is always in a horizontal state until the jacking jack is no longer under stress.
6. The method for dismantling and loading in-service tower equipment according to claim 5 is characterized in that: Each slide rail uses 2 I-beams as a set.
7. The method for dismantling and loading in-service tower equipment according to claim 6 is characterized in that: In step 4, a steel plate is horizontally laid on the upper surface of the sleeper pile, and the slide rail is laid on the steel plate and the axle car.
8. The method for dismantling and loading in-service tower equipment according to claim 1 or 7, characterized in that: In step five, a movable limit stop is set at the other end of the slide rail, and a jacking gap is retained between the limit stop and the slide shoe. Each time the jack reaches the limit stop when it is pushed horizontally, it stops pushing, and then the limit stop is moved backward to the above-mentioned tightening gap. This operation is repeated until the tower equipment is pushed sideways and translated onto the axis vehicle, and the limit stop stops moving backward and is in close contact with the side of the slide shoe to prevent the slide shoe from moving.
9. The method for dismantling and loading in-service tower equipment according to claim 8 is characterized in that: The limit block and the sliding shoe retain a 100mm jacking clearance.
10. The method for dismantling and loading in-service tower equipment according to claim 1 or 9, characterized in that: There are 5 transport saddles arranged in total, and fastening steel belts are used to fix the transport saddles to the tower equipment.