Pi-shaped steel-concrete composite beam prefabricating method

By adopting the prefabricating method of π-shaped steel-concrete composite beams in bridge construction, and using the combination of driving tracks and gantry cranes, the problems of low layout efficiency and concrete pollution in the prefabricated field are solved, and efficient and safe construction processes and cost reduction are achieved.

CN118958758APending Publication Date: 2024-11-15ZHEJIANG COMM CONSTR GRP CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411066657.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

During the construction of existing bridges, the flow-through layout of the prefabricated yard leads to busy loading and unloading yards at one end and idle at the other end. The concrete easily pollutes the lower surface of the steel beam roof slab during mold pouring, increasing construction costs.

Method used

Using the prefabrication method of π-shaped steel-concrete combination beam, two driving tracks and gantry cranes supported by mobile ground are set up, and loading and unloading truck areas and steel bar binding areas are set up. The gantry cranes can achieve flexible material transportation and combination, avoid concrete pollution of the roof panel, and set up a canopy support rails. With the mold support base, ensure parallel operation of the steel beam and bridge deck panels, and reduce interference.

Benefits of technology

Parallel operations of the two sides are achieved, construction efficiency and safety are improved, loading and unloading costs are reduced, concrete pollution is avoided, the amount of post-corrosion treatment is reduced, and the overall construction cost is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958758A_ABST
    Figure CN118958758A_ABST
Patent Text Reader

Abstract

The invention provides a method for prefabricating a pi-shaped steel-concrete composite beam, which is completed in the prefabrication of the pi-shaped steel-concrete composite beam, and the process for manufacturing the pi-shaped steel-concrete composite beam comprises the following steps of: conveying materials for manufacturing the pi-shaped steel-concrete composite beam to a left loading and unloading vehicle area and a right loading and unloading vehicle area through an automobile; the manufactured pi-shaped steel-concrete composite beam falls onto automobiles located on the left loading and unloading vehicle area and the right loading and unloading vehicle area through a gantry crane to be transported away, a steel reinforcement framework of a bridge deck is bundled in a steel reinforcement bundling area, concrete is poured into a manufacturing mold of the top plate of the pi-shaped steel-concrete composite beam, and the steel reinforcement framework and a steel beam are poured after the concrete is solidified. And the manufacturing mold for the top plate of the pi-shaped steel-concrete composite beam is detached, and the manufactured pi-shaped steel-concrete composite beam is transferred to the left pi-shaped steel-concrete composite beam storage area and the right pi-shaped steel-concrete composite beam storage area through a gantry crane. The method has the advantage of symmetrical layout, and solves the problem that one end is busy and the other end is idle in the flowing water type layout of one end in and one end out in the existing Pi-shaped steel-concrete composite beam precast yard.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a method for prefabricating a π-shaped steel-concrete composite beam. Background Art

[0002] During bridge construction, the arched steel-concrete composite beam will be prefabricated in the prefabrication yard first, and then the arched steel-concrete composite beam will be transported to the bridge pier by vehicle. The arched steel-concrete composite beam includes a concrete structure bridge deck, a left steel beam and a right steel beam. The lower surface of the bridge deck is provided with a left convex strip and a right convex strip extending in the longitudinal direction of the bridge. The left steel beam and the right steel beam are distributed along the transverse direction and extend in the longitudinal direction of the bridge. The left steel beam includes a left top plate, a left vertical plate and a left bottom plate. The left top plate, the left vertical plate and the left bottom plate are connected together in an "I" shape. The left top plate is fixed on the lower surface of the left convex strip. The right steel beam includes a right top plate, a right vertical plate and a right bottom plate. The right top plate, the right vertical plate and the right bottom plate are connected together in an "I" shape. The right top plate is fixed on the lower surface of the right convex strip. The layout of the existing prefabrication yard is to feed materials from one side, and then use the inherent thinking mode of the assembly line, from front to back, feed materials at one end, then produce, and then output from the other end. This layout has the following shortcomings: there may be a phenomenon that one end of the loading and unloading site is busy and requires waiting in line while the other end is idle; when the top plate of the v-shaped steel-concrete composite beam is prefabricated according to the existing mold, the mold also wraps the steel beam, which will cause concrete to penetrate and pollute the lower surfaces of the left and right top plates. When the lower surface of the top plate is subjected to anti-corrosion treatment in the later stage, the concrete on the lower surface of the top plate needs to be removed, which increases the construction cost. Summary of the invention

[0003] The first purpose of the present invention is to provide a method for prefabrication of π-shaped steel-concrete composite beams with a symmetrical layout, which solves the problem that the existing π-shaped steel-concrete composite beam prefabrication yard has a flow-through layout with one end in and one end out, which results in one end being busy while the other end is idle.

[0004] The second purpose of the present invention is to further provide a method for prefabricating a π-shaped steel-concrete composite beam in which the concrete is not easy to contaminate the lower surface of the top plate of the steel beam during the production process, thereby solving the problem that when the top plate of the existing steel-concrete composite beam is cast in a mold, the concrete will contaminate the lower surface of the top plate, resulting in increased construction costs.

[0005] In order to achieve the above-mentioned invention object, the present invention adopts the following technology: a method for prefabrication of π-shaped steel-concrete composite beams, wherein the π-shaped steel-concrete composite beam comprises a bridge deck of a concrete structure and two steel beams connected to the lower surface of the bridge deck, wherein the two steel beams are distributed in the transverse direction of the bridge and extend in the longitudinal direction of the bridge, and the method is characterized in that the π-shaped steel-concrete composite beam prefabrication is completed, and the π-shaped steel-concrete composite beam prefabrication yard comprises two running tracks, and at least two gantry cranes movably supported on the two running tracks at both ends, wherein the running tracks are of a straight structure, and the running tracks extend in the left and right directions before There are two canopy support rails in the steel bar binding area, which are distributed in the front and rear directions and extend in the left and right directions. The two canopy support rails are arranged in the front and rear directions and extend in the left and right directions. The ends can be movably supported on the two canopy support rails; the process of making the π-shaped steel-concrete composite beam is: the materials for making the π-shaped steel-concrete composite beam are transported to the left and right loading and unloading areas by car, the manufactured π-shaped steel-concrete composite beam is dropped onto the cars located on the left and right loading and unloading areas by gantry cranes and transported away, the steel beams transported to the left and right loading and unloading areas are transferred to the left and right steel beam storage areas by gantry cranes for storage, the steel bars are transferred to the left and right steel bar binding areas by gantry cranes, the steel bar skeleton of the bridge deck is bundled in the steel bar binding area, and the steel beams located in the steel beam storage area are transferred by gantry cranes Transfer to the π-shaped steel-concrete composite beam production area, then assemble the top plate production mold of the steel-concrete composite beam at the work station where the steel beam is placed, transfer the steel skeleton tied in the steel-concrete binding area to the top plate production mold of the steel-concrete composite beam through the gantry crane, pour concrete into the top plate production mold of the steel-concrete composite beam, and pour the steel skeleton and steel beam after the concrete solidifies, so as to produce the π-shaped steel-concrete composite beam, disassemble the top plate production mold of the steel-concrete composite beam, and transfer the produced π-shaped steel-concrete composite beam to the left and right π-shaped steel-concrete composite beam storage areas through the gantry crane. The technical solution sets up two loading and unloading areas, which are flexible for steel beams to enter and unload and finished beams (π-shaped steel-concrete composite beams) to leave and load, and are set up at both ends of the prefabrication yard for entry and exit, which is convenient and safe to operate; the steel bar binding area is located in the middle, and other areas are on both sides, so that the two sides can operate in parallel without interfering with each other, and the casting combination of steel beams and bridge decks can be completed quickly and efficiently.

[0006] Preferably, the left π-shaped steel-concrete composite beam production area and the right π-shaped steel-concrete composite beam production area are each provided with a plurality of steel-concrete composite beam top plate production mold support bases distributed along the left and right directions, the steel-concrete composite beam top plate production mold support bases include a concrete hardened ground and two rows of concrete bosses arranged on the concrete hardened ground and distributed along the left and right directions, the concrete bosses in the same row of concrete bosses are distributed along the front-back direction, the distance between the two steel beams is equal to the distance between the two rows of concrete bosses, a steel support seat is cast on the concrete bosses, a left mold support track is provided on the left side of the two rows of concrete bosses, a right mold support track is provided on the right side, and an intermediate mold support track is provided between the two rows of concrete bosses; when in use, the two steel beams are placed on the steel support seats on the two rows of concrete bosses one by one, the left template is supported on the left mold support track, the intermediate mold is supported on the intermediate mold support track, and the right mold is supported on the right mold support track. It is convenient and reliable to support and fix the mold.

[0007] Preferably, angle steel is cast on the left and right edges of the upper end surface of the concrete boss as a edging, and the steel support seat includes two I-beam sections extending in the left and right directions and distributed along the front-back direction and a plurality of channel steel sections connecting the I-beams together, the opening directions of the two channel steel sections are opposite, and the channel steel section and the I-beam section are welded together. The structural strength is good.

[0008] As preferably, it also includes a v-shaped steel-concrete composite beam top plate manufacturing mold supported on a supporting base of the v-shaped steel-concrete composite beam top plate manufacturing mold for manufacturing a bridge deck, wherein the lower surface of the bridge deck is provided with a left convex strip and a right convex strip extending in the longitudinal direction of the bridge, and the two steel beams are respectively a left steel beam and a right steel beam, the left steel beam includes a left top plate, a left vertical plate and a left bottom plate, the left top plate, the left vertical plate and the left bottom plate are connected together in an "I" shape, the left top plate is fixed on the lower surface of the left convex strip, the right steel beam includes a right top plate, a right vertical plate and a right bottom plate, the right top plate, the right vertical plate and the right bottom plate are connected together in an "I" shape, and the right top plate is fixed on the lower surface of the right convex strip, the v-shaped steel-concrete composite beam top plate manufacturing mold includes a left side mold, a middle mold and a right side mold distributed in the transverse direction of the bridge, the left side mold includes a left side template and a left mold chassis supporting the left side template, and the left mold chassis supports On the left mold support track, the right mold includes a right template and a right mold chassis supporting the right template, the right mold chassis is supported on the right mold support track, the middle mold includes an middle template and an middle mold chassis supporting the middle template, the middle mold chassis is supported on the middle mold support track, the left template, the left top plate, the middle template, the right top plate and the right template surround the bridge deck cavity for casting the bridge deck; the process of making the bridge deck is to install the left steel beam and the right steel beam, assemble the top plate making mold of the v-shaped steel-concrete composite beam to form the bridge deck cavity, build a steel skeleton in the bridge deck cavity, pour concrete into the bridge deck cavity, pour the steel bars after the concrete is solidified to form the bridge deck, remove the v-shaped steel-concrete composite beam top plate making method, and leave the bridge deck, the left steel beam and the right steel beam to form the v-shaped steel-concrete composite beam. The steel beam can be used as part of the mold, and the concrete will not flow to the lower surface of the top plate. The second invention purpose is achieved.

[0009] Preferably, the left side surface of the left convex strip, the right side surface of the left convex strip, the left side surface of the right convex strip and the right side surface of the right convex strip are all inclined surfaces inclined downward, the intermediate template includes a middle support plate, a left support plate whose right end is hinged to the middle support plate, and a right support plate whose left end is hinged to the middle support plate, the middle support plate is fixed to the upper end of the intermediate mold chassis, the left end of the left support plate is hinged to the upper end of the left push-pull cylinder, the lower end of the left push-pull cylinder is hinged to the intermediate mold chassis, the left support plate is used to form the right side surface of the left convex strip, the right end of the right support plate is hinged to the upper end of the right push-pull cylinder, the lower end of the right push-pull cylinder is hinged to the intermediate mold chassis, and the right support plate is used to form the left side surface of the right convex strip; when demoulding, the left support plate is first disengaged by the contraction of the left push-pull cylinder and the right support plate is disengaged by the contraction of the right push-pull cylinder, so that demoulding is more labor-saving and convenient.

[0010] Preferably, the intermediate mold chassis includes a bracket, a plurality of lifting cylinders supporting the bracket and a top frame arranged on the bracket, the middle support plate is fixed on the upper end of the top frame, and the lower ends of the left push-pull cylinder and the right push-pull cylinder are hinged on the top frame or the bracket; during the demoulding process, when the left and right support plates are disengaged, the lifting cylinder contracts to disengage the middle support plate, further improving the convenience and labor saving during demoulding.

[0011] Preferably, when the left support plate is connected to the left top plate, the left top plate abuts against the upper surface of the left support plate, and when the right support plate is connected to the right top plate, the right top plate abuts against the upper surface of the right support plate. This can increase the area of ​​the bridge deck wrapping the left bottom plate and the right top plate, thereby reducing the amount of subsequent anti-corrosion treatment of the left and right steel beams. This reduces the construction cost.

[0012] Preferably, the left side template includes a left middle supporting plate, a left baffle plate connected to the left end of the left middle supporting plate, and a right supporting plate connected to the right end of the left middle supporting plate, and the right supporting plate is used to form the left side surface of the left convex strip; the right side template includes a right middle supporting plate, a right baffle plate connected to the right end of the right middle supporting plate, and a left supporting plate connected to the left end of the middle supporting plate, and the left supporting plate is used to form the right side surface of the right convex strip.

[0013] Preferably, when the right supporting plate is connected to the left top plate, the left top plate abuts against the upper surface of the right supporting plate; when the left supporting plate is connected to the right top plate, the right top plate abuts against the upper surface of the left supporting plate. This can increase the area of ​​the bridge deck wrapping the left bottom plate and the right top plate, thereby reducing the amount of subsequent anti-corrosion treatment of the left and right steel beams. This reduces the construction cost.

[0014] Preferably, the left mold further includes a left slide rail and a left telescopic mechanism, the right end of the left slide rail is higher than the left end, the left mold chassis is slidably connected to the left slide rail, and the left telescopic mechanism is used to drive the left mold chassis to move on the left slide rail; the right mold further includes a right slide rail and a right telescopic mechanism, the left end of the right slide rail is higher than the right end, the right mold chassis is slidably connected to the right slide rail, and the right telescopic mechanism is used to drive the right mold chassis to move on the right slide rail; when demoulding, the telescopic mechanism is used to drive the left and right molds to move obliquely to achieve disengagement. The mold is opened by pulling down obliquely, thereby reducing the impact on the bridge deck during mold opening and making mold opening more labor-saving.

[0015] Preferably, the left telescopic mechanism is a left oil cylinder, the left bottom plate is supported on the left bottom frame, one end of the left oil cylinder is hinged to the left mold bottom frame, and the other end is hinged to the left bottom frame; the right telescopic mechanism is a right oil cylinder, the right bottom plate is supported on the right bottom frame, one end of the right oil cylinder is hinged to the right mold bottom frame, and the other end is hinged to the right bottom frame. The structure is simple and practical.

[0016] Preferably, a "T"-shaped left slide groove is provided at the lower end of the left mold chassis, the left side slide rail includes a left slide rail part slide plate and a left slide rail connecting plate connected to the middle of the lower surface of the left slide rail part slide rail, the supporting slide rail part slide rail is inserted into the left slide groove and slides with the left slide groove and hooks together; a "T"-shaped right slide groove is provided at the lower end of the right mold chassis, the right side slide rail includes a right slide rail part slide plate and a right slide rail connecting plate connected to the middle of the lower surface of the right slide rail part slide rail, the supporting slide rail part slide rail is inserted into the right slide groove and slides with the right slide groove and hooks together. It can improve the reliability during sliding and will not cause derailment.

[0017] Preferably, the height of the gantry crane is higher than that of the movable canopy, so that the gantry crane can be used in areas on both sides of the steel bar binding area.

[0018] Beneficial effects: This technical solution sets up two loading and unloading areas, which are flexible for steel beams to be unloaded and finished beams (π-shaped steel-concrete composite beams) to be loaded and unloaded. They are set at both ends of the prefabrication yard for entry and exit, making operations convenient and safe. The steel bar binding area is located in the middle, and other areas are on both sides, so that the two sides can operate in parallel without interfering with each other, and the casting combination of steel beams and bridge decks can be completed quickly and efficiently. The reliability during hoisting is good, the hoisting cost is low, and there is less damage to the v-shaped steel-concrete composite beams. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a top view of the π-type steel-concrete composite beam prefabrication site; Figure 2 for Figure 1 A local enlarged schematic diagram of point C; Figure 3 for Figure 2 D-D cross-sectional schematic diagram; Figure 4 A schematic diagram of a structure for making a mold for the top plate of a steel-concrete composite beam; Figure 5 for Figure 4 A local enlarged schematic diagram of point A; Figure 6 A schematic diagram of another structure for making a mold for the top plate of a steel-concrete composite beam; Figure 7 for Figure 6 A local enlarged schematic diagram of point B.

[0020] In the figure: bridge deck 1, left steel beam 2, right steel beam 3, left convex strip 4, right convex strip 5, left top plate 6, left vertical plate 7, left bottom plate 8, right top plate 9, right vertical plate 10, right bottom plate 11, left side formwork 12, left mold chassis 13, left middle holding plate 14, left baffle 15, right holding plate 16, right side formwork 18, right mold chassis 19, right middle holding plate 20, right baffle 21, left holding plate 22, middle formwork 24, middle mold chassis 25, middle supporting plate 26, left supporting plate 27, right supporting plate 28, left push-pull cylinder 29, right push-pull cylinder 30, bracket 31, lifting cylinder 32, top frame 33, left slide rail 34, left telescopic mechanism 35, left slide groove 36, left slide rail slide plate 37, left slide rail connecting plate 38, right telescopic mechanism 39, right slide groove 40 , right slide rail slide plate 41, right slide rail connecting plate 42, right slide rail 43, driving track 44, gantry crane 45, steel bar binding area 46, left π-shaped steel-concrete composite beam manufacturing area 47, left steel beam storage area 48, left π-shaped steel-concrete composite beam storage area 49, left loading and unloading area 50, right π-shaped steel-concrete composite beam manufacturing area 51, right steel beam storage area 52, right π-shaped steel-concrete composite beam storage area 53, right loading and unloading area 54, canopy support track 55, mobile canopy 56, V-shaped steel-concrete composite beam top plate manufacturing mold support base 57, concrete hardened ground 58, concrete boss 59, steel support seat 60, left mold support track 61, right mold support track 62, middle mold support track 63, angle steel 64, I-beam section 65, channel steel section 66. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] Example 1, see Figures 1 to 5 A method for prefabricating a π-shaped steel-concrete composite beam, wherein the π-shaped steel-concrete composite beam comprises a bridge deck 1 of a concrete structure, a left steel beam 2 and a right steel beam 3. A left convex strip 4 and a right convex strip 5 extending in the longitudinal direction of the bridge are provided on the lower surface of the bridge deck, and the left steel beam and the right steel beam are distributed in the transverse direction and extend in the longitudinal direction of the bridge. The left steel beam comprises a left top plate 6, a left vertical plate 7 and a left bottom plate 8, and the left top plate, the left vertical plate and the left bottom plate are connected together in an "I" shape. The left top plate is fixed on the lower surface of the left convex strip, and the right steel beam comprises a right top plate 9, a right vertical plate 10 and a right bottom plate 11, and the right top plate, the right vertical plate and the right bottom plate are connected together in an "I" shape. The right top plate is fixed on the lower surface of the right convex strip, and the left side surface of the left convex strip, the right side surface of the left convex strip, the left side surface of the right convex strip and the right side surface of the right convex strip are all inclined surfaces inclined downward.

[0023] The π-shaped steel-concrete composite beam prefabrication yard is completed. The π-shaped steel-concrete composite beam prefabrication yard includes two traveling tracks 44, five gantry cranes 45 movably supported at both ends on the two traveling tracks, and several molds for manufacturing the top plates of the steel-concrete composite beams. The traveling tracks are straight structures, extending in the left-right direction and distributed in the front-back direction. A steel bar binding area 46 is provided between the two traveling tracks, and a left π-shaped steel-concrete composite beam manufacturing area 47, a left steel beam storage area 48, a left π-shaped steel-concrete composite beam storage area 49 and a left loading and unloading area 50 are arranged in sequence from right to left on the left side of the steel bar binding area, and a right π-shaped steel-concrete composite beam manufacturing area 51, a right steel beam storage area 52, a right π-shaped steel-concrete composite beam storage area 53 and a right loading and unloading area 54 are arranged in sequence from left to right on the right side of the steel bar binding area. Two canopy support tracks 55 are provided in the steel bar binding area. The two canopy support tracks are distributed in the front-back direction and extend in the left-right direction. Both ends of the movable canopy 56 can be movably supported on the two canopy support tracks. The process of making π-shaped steel-concrete composite beams is as follows: the materials for making π-shaped steel-concrete composite beams are transported to the left and right loading and unloading areas by car, the manufactured π-shaped steel-concrete composite beams are dropped onto the cars located on the left and right loading and unloading areas by gantry cranes and transported away, the steel beams transported to the left and right loading and unloading areas are transferred to the left and right steel beam storage areas by gantry cranes for storage, the steel bars are transferred to the left and right steel bar binding areas by gantry cranes, the steel bar skeleton of the bridge deck is bundled in the steel bar binding area, and the steel beams located in the steel beam storage area are transferred to the π-shaped steel-concrete composite beams by gantry cranes. The production area is then equipped with a mold for manufacturing the top plate of a steel-concrete composite beam at the workstation where the steel beam is placed. The steel bar skeleton tied in the steel bar binding area is transferred to the mold for manufacturing the top plate of a steel-concrete composite beam by a gantry crane. Concrete is poured into the mold for manufacturing the top plate of a steel-concrete composite beam. After the concrete solidifies, the steel bar skeleton and the steel beam are poured to manufacture a π-shaped steel-concrete composite beam. The mold for manufacturing the top plate of a steel-concrete composite beam is disassembled, and the manufactured π-shaped steel-concrete composite beam is transferred to the left and right π-shaped steel-concrete composite beam storage areas by a gantry crane. The left π-shaped steel-concrete composite beam production area and the right π-shaped steel-concrete composite beam production area are each provided with a plurality of support bases 57 for manufacturing the top plate of a steel-concrete composite beam distributed along the left and right directions. A support base for manufacturing the top plate of a steel-concrete composite beam supports two steel beams and a pair of top plate manufacturing molds for a steel-concrete composite beam, thereby manufacturing a steel-concrete composite beam.The mold support base for making the top plate of the v-shaped steel-concrete composite beam includes a concrete hardened ground 58 and two rows of concrete bosses 59 arranged on the concrete hardened ground and distributed along the left-right direction. The concrete bosses in the same row of concrete bosses are distributed along the front-back direction. The distance between the two steel beams is equal to the distance between the two rows of concrete bosses. A steel support seat 60 is cast on the concrete bosses. A left mold support track 61 is provided on the left side of the two rows of concrete bosses, and a right mold support track 62 is provided on the right side. A middle mold support track 63 is provided between the two rows of concrete bosses. When in use, the two steel beams (and the left steel beam and the right steel beam) are placed one by one on the steel support seats on the two rows of concrete bosses, the left template is supported on the left mold support track, the middle mold is supported on the middle mold support track, and the right mold is supported on the right mold support track. Angle steel 64 is cast on the left and right edges of the upper end surface of the concrete boss as a edging. The steel support seat includes two I-beam sections 65 distributed along the front-to-back direction and extending in the left and right directions, and a plurality of channel steel sections 66 connecting the I-beams together. The opening directions of the two channel steel sections are opposite, and the channel steel sections and the I-beam sections are welded together.

[0024] The mold for making the top plate of the v-shaped steel-concrete composite beam includes a left mold, a middle mold and a right mold distributed along the transverse bridge direction. The left vertical plate is located between the left mold and the middle mold, and the right vertical plate is located between the right mold and the middle mold. The left mold includes a left template 12 and a left mold chassis 13 supporting the left template. The left template includes a left middle supporting plate 14, a left baffle plate 15 connected to the left end of the left middle supporting plate, and a right supporting plate 16 connected to the right end of the left middle supporting plate. The right supporting plate is used to form the left side of the left convex strip. When the right supporting plate is connected to the left top plate, the left top plate abuts on the upper surface of the right supporting plate. The right mold includes a right template 18 and a right mold chassis 19 supporting the right template. The right template includes a right middle supporting plate 20, a right baffle plate 21 connected to the right end of the right middle supporting plate, and a left supporting plate 22 connected to the left end of the middle supporting plate. The left supporting plate is used to form the right side of the right convex strip. When the left supporting plate is connected to the right top plate, the right top plate abuts against the upper surface of the left supporting plate. The intermediate mold includes an intermediate template 24 and an intermediate mold chassis 25 supporting the intermediate template. The intermediate template includes a middle supporting plate 26, a left supporting plate 27 whose right end is hinged to the middle supporting plate, and a right supporting plate 28 whose left end is hinged to the middle supporting plate. The middle supporting plate is fixed to the upper end of the intermediate mold chassis. The left end of the left supporting plate is hinged to the upper end of the left push-pull cylinder 29, and the lower end of the left push-pull cylinder is hinged to the intermediate mold chassis. The left supporting plate is used to form the right side surface of the left convex strip, the right end of the right supporting plate is hinged to the upper end of the right push-pull cylinder 30, and the lower end of the right push-pull cylinder is hinged to the intermediate mold chassis. The right supporting plate is used to form the left side surface of the right convex strip. The left side formwork, the left top plate, the middle formwork, the right top plate and the right side formwork form a bridge deck cavity for casting the bridge deck; when the left support plate is connected to the left top plate, the left top plate abuts against the upper surface of the left support plate, and when the right support plate is connected to the right top plate, the right top plate abuts against the upper surface of the right support plate.

[0025] The process of making the bridge top plate is to install the left steel beam and the right steel beam, assemble the method for making the top plate of the steel-concrete composite beam to form a bridge deck cavity, build a steel skeleton in the bridge deck cavity, pour concrete into the bridge deck cavity, pour the steel bars after the concrete solidifies to form the bridge deck, remove the method for making the top plate of the steel-concrete composite beam, and leave the bridge deck, the left steel beam and the right steel beam to form the steel-concrete composite beam. When demoulding, the left support plate is disengaged by contracting the left push-pull cylinder and the right support plate is disengaged by contracting the right push-pull cylinder.

[0026] Embodiment 2 is different from Embodiment 1 in that: See also Figure 6 and Figure 7The middle mold chassis includes a bracket 31, a plurality of lifting cylinders 32 supporting the bracket and a top frame 33 arranged on the bracket. The middle support plate is fixed on the upper end of the top frame. The lower ends of the left push-pull cylinder and the lower ends of the right push-pull cylinder are hinged on the top frame or the bracket. When the left and right support plates are disengaged during demoulding, the lifting cylinder contracts to disengage the middle support plate. The left mold also includes a left slide rail 34 and a left telescopic mechanism 35. The right end of the left slide rail is higher than the left end. The left mold chassis is slidably connected to the left slide rail. Specifically: a "T"-shaped left slide groove 36 is provided at the lower end of the left mold chassis. The left slide rail includes a left slide rail slide plate 37 and a left slide rail connecting plate 38 connected to the middle of the lower surface of the left slide rail slide plate. The slide rail slide plate is inserted into the left slide groove and slides with the left slide groove and is hooked together. The left telescopic mechanism is used to drive the left mold chassis to move on the left slide rail. Specifically, the left telescopic mechanism is a left oil cylinder. One end of the left oil cylinder is hinged to the left mold chassis, and the other end is hinged to the left chassis. The right mold also includes a right slide rail 43 and a right telescopic mechanism 39. The left end of the right slide rail is higher than the right end. The right mold chassis is slidably connected to the right slide rail. Specifically, a "T"-shaped right slide groove 40 is provided at the lower end of the right mold chassis. The right slide rail includes a right slide rail slide plate 41 and a right slide rail connecting plate 42 connected to the middle of the lower surface of the right slide rail slide plate. The slide rail slide plate is inserted into the right slide groove and slides and hooks with the right slide groove. The right telescopic mechanism is used to drive the right mold chassis to move on the right slide rail. Specifically, the right telescopic mechanism is a right oil cylinder. One end of the right oil cylinder is hinged to the right mold chassis, and the other end is hinged to the right chassis.

[0027] When demoulding, the left and right molds are tilted and moved by the telescopic mechanism to achieve disengagement.

[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for prefabricating a π-shaped steel-concrete composite beam, wherein the π-shaped steel-concrete composite beam comprises a bridge deck of a concrete structure and two steel beams connected to the lower surface of the bridge deck, wherein the two steel beams are distributed in the transverse direction of the bridge and extend in the longitudinal direction of the bridge, and wherein: The π-shaped steel-concrete composite beam prefabrication is completed. The π-shaped steel-concrete composite beam prefabrication yard includes two running tracks, at least two gantry cranes whose two ends are movably supported on the two running tracks, the running tracks are straight structures, the running tracks extend in the left-right direction and are distributed in the front-back direction, a reinforcement binding area is provided between the two running tracks, a left π-shaped steel-concrete composite beam manufacturing area, a left steel beam storage area, a left π-shaped steel-concrete composite beam storage area and a left loading and unloading area are arranged in sequence from right to left on the left side of the reinforcement binding area, and a right π-shaped steel-concrete composite beam manufacturing area, a right steel beam storage area, a right π-shaped steel-concrete composite beam storage area and a right loading and unloading area are arranged in sequence from left to right on the right side of the reinforcement binding area, the reinforcement binding area is provided with two canopy support tracks, the two canopy support tracks are distributed in the front-back direction and extend in the left-right direction, and the two ends of the movable canopy are movably supported on the two canopy support tracks; the process of manufacturing the π-shaped steel-concrete composite beam is as follows: the materials for manufacturing the π-shaped steel-concrete composite beam are laid on the steel bar binding area. The π-shaped steel-concrete composite beams are transported to the left and right loading and unloading areas by cars, and the manufactured π-shaped steel-concrete composite beams are dropped onto cars located in the left and right loading and unloading areas by gantry cranes and transported away. The steel beams transported to the left and right loading and unloading areas are transferred to the left and right steel beam storage areas by gantry cranes for storage, and the steel bars are transferred to the left and right steel bar binding areas by gantry cranes. The steel bar skeleton of the bridge deck is bundled in the steel bar binding area, and the steel beams located in the steel beam storage area are transferred to the π-shaped steel-concrete composite beam manufacturing area by gantry cranes. Then, the mold for manufacturing the top slab of the v-shaped steel-concrete composite beam is assembled at the work station where the steel beams are placed, and the steel bar skeleton bundled in the steel bar binding area is transferred to the mold for manufacturing the top slab of the v-shaped steel-concrete composite beam by gantry cranes. Concrete is poured into the mold for manufacturing the top slab of the v-shaped steel-concrete composite beam, and the steel bar skeleton and the steel beam are poured after the concrete is solidified, thereby manufacturing the π-shaped steel-concrete composite beam, and the mold for manufacturing the top slab of the v-shaped steel-concrete composite beam is disassembled, and the manufactured π-shaped steel-concrete composite beam is transferred to the left and right π-shaped steel-concrete composite beam storage areas by gantry cranes.

2. A method for prefabricating a π-shaped steel-concrete composite beam according to claim 1, characterized in that: The left π-shaped steel-concrete composite beam production area and the right π-shaped steel-concrete composite beam production area are each provided with a plurality of arched steel-concrete composite beam top plate production mold support bases distributed along the left-right direction, the arched steel-concrete composite beam top plate production mold support bases include a concrete hardened ground and two rows of concrete bosses arranged on the concrete hardened ground and distributed along the left-right direction, the concrete bosses in the same row of concrete bosses are distributed along the front-to-back direction, the distance between the two steel beams is equal to the distance between the two rows of concrete bosses, a steel support seat is cast on the concrete bosses, a left mold support track is provided on the left side of the two rows of concrete bosses, a right mold support track is provided on the right side, and a middle mold support track is provided between the two rows of concrete bosses; when in use, the two steel beams are placed one by one on the steel support seats on the two rows of concrete bosses, the left template is supported on the left mold support track, the middle mold is supported on the middle mold support track, and the right mold is supported on the right mold support track.

3. A method for prefabricating a π-shaped steel-concrete composite beam according to claim 2, characterized in that: The left and right edges of the upper end surface of the concrete boss are cast with angle steel as edging, and the steel support seat includes two I-beam sections distributed along the front-to-back direction and extending in the left and right directions and a plurality of channel steel sections connecting the I-beams together, the opening directions of the two channel steel sections are opposite, and the channel steel sections and the I-beam sections are welded together.

4. A method for prefabricating a π-shaped steel-concrete composite beam according to claim 2 or 3, characterized in that: The invention also includes a mold for making a v-shaped steel-concrete composite beam top plate, which is supported on a supporting base of the mold for making a v-shaped steel-concrete composite beam top plate to make a bridge deck, wherein the lower surface of the bridge deck is provided with a left convex strip and a right convex strip extending in the longitudinal direction of the bridge, and the two steel beams are respectively a left steel beam and a right steel beam, the left steel beam includes a left top plate, a left vertical plate and a left bottom plate, the left top plate, the left vertical plate and the left bottom plate are connected together in an "I" shape, the left top plate is fixed on the lower surface of the left convex strip, the right steel beam includes a right top plate, a right vertical plate and a right bottom plate, the right top plate, the right vertical plate and the right bottom plate are connected together in an "I" shape, and the right top plate is fixed on the lower surface of the right convex strip, and the mold for making the v-shaped steel-concrete composite beam top plate includes a left side mold, a middle mold and a right side mold distributed in the transverse direction of the bridge, the left side mold includes a left side template and a left mold chassis supporting the left side template, and the left mold chassis is supported on the left On the side mold support track, the right mold includes a right mold and a right mold base supporting the right mold, the right mold base is supported on the right mold support track, the middle mold includes a middle mold and a middle mold base supporting the middle mold, the middle mold base is supported on the middle mold support track, the left mold, the left top plate, the middle mold, the right top plate and the right mold form a bridge deck cavity for pouring the bridge deck; the process of making the bridge deck is to install the left steel beam and the right steel beam, assemble the v-shaped steel-concrete composite beam top plate making mold to form a bridge deck cavity, build a steel skeleton in the bridge deck cavity, pour concrete into the bridge deck cavity, pour the steel bars after the concrete is cured to form a bridge deck, dismantle the v-shaped steel-concrete composite beam top plate making method, and leave the bridge deck, the left steel beam and the right steel beam to constitute the v-shaped steel-concrete composite beam.

5. The method for prefabricating a π-shaped steel-concrete composite beam according to claim 4, characterized in that: The left side surface of the left convex strip, the right side surface of the left convex strip, the left side surface of the right convex strip and the right side surface of the right convex strip are all downwardly inclined surfaces, the intermediate template includes a middle support plate, a left support plate whose right end is hinged to the middle support plate, and a right support plate whose left end is hinged to the middle support plate, the middle support plate is fixed to the upper end of the intermediate mold base, the left end of the left support plate is hinged to the upper end of the left push-pull cylinder, the lower end of the left push-pull cylinder is hinged to the intermediate mold base, the left support plate is used to form the right side surface of the left convex strip, the right end of the right support plate is hinged to the upper end of the right push-pull cylinder, the lower end of the right push-pull cylinder is hinged to the intermediate mold base, and the right support plate is used to form the left side surface of the right convex strip; when demolding, the left support plate is first disengaged by contraction of the left push-pull cylinder and the right support plate is disengaged by contraction of the right push-pull cylinder.

6. A method for prefabricating a π-shaped steel-concrete composite beam according to claim 5, characterized in that: The intermediate mold base frame includes a bracket, a plurality of lifting cylinders supporting the bracket and a top frame arranged on the bracket, the middle support plate is fixed on the upper end of the top frame, and the lower ends of the left push-pull cylinder and the right push-pull cylinder are hinged on the top frame or the bracket; during the demoulding process, when the left support plate and the right support plate are disengaged, the lifting cylinder contracts to disengage the middle support plate.

7. The method for prefabricating a π-shaped steel-concrete composite beam according to claim 5, characterized in that: When the left support plate is connected to the left top plate, the left top plate abuts against the upper surface of the left support plate, and when the right support plate is connected to the right top plate, the right top plate abuts against the upper surface of the right support plate.

8. The method for prefabricating a π-shaped steel-concrete composite beam according to claim 5, characterized in that: The left side template includes a left middle supporting plate, a left baffle plate connected to the left end of the left middle supporting plate, and a right supporting plate connected to the right end of the left middle supporting plate, and the right supporting plate is used to form the left side surface of the left convex strip; the right side template includes a right middle supporting plate, a right baffle plate connected to the right end of the right middle supporting plate, and a left supporting plate connected to the left end of the middle supporting plate, and the left supporting plate is used to form the right side surface of the right convex strip.

9. The method for prefabricating a π-shaped steel-concrete composite beam according to claim 8, characterized in that: When the right supporting plate is connected to the left top plate, the left top plate abuts against the upper surface of the right supporting plate; when the left supporting plate is connected to the right top plate, the right top plate abuts against the upper surface of the left supporting plate.

10. A method for prefabricating π-shaped steel-concrete composite beams according to claim 5, characterized in that: The left mold also includes a left slide rail and a left telescopic mechanism supported on the left mold support rail, the right end of the left slide rail is higher than the left end, the left mold base is slidably connected to the left slide rail, and the left telescopic mechanism is used to drive the left mold base to move on the left slide rail; the right mold also includes a right slide rail and a right telescopic mechanism supported on the right mold support rail, the left end of the right slide rail is higher than the right end, the right mold base is slidably connected to the right slide rail, and the right telescopic mechanism is used to drive the right mold base to move on the right slide rail; when demolding, the left and right molds are tilted and moved by the telescopic mechanism to achieve disengagement.

Citation Information

Patent Citations

  • Mountainous area large-span steel-concrete composite beam on-site assembly and bridge erecting machine erecting construction method

    CN111254836A

  • Fabricated type bridge prefabricated part production base layout construction method and application

    CN113306002A

  • Formwork supporting system of prefabricated concrete pi-shaped beam and construction method of formwork supporting system

    CN116175742A

  • Form removal method for prefabricated box girder

    CN118386383A

  • Pi-shaped steel-concrete composite bridge unit construction mold

    CN211872655U