Device for preheating pulverized coal by using blast furnace slag and iron runner radiant heat
The radiant heat of the blast furnace slag iron groove is absorbed by the molten salt heat exchange system and preheated the coal powder, which solves the problem of failing to effectively utilize thermal energy in the existing technology, and achieves efficient coal powder preheating and energy-saving and consumption-saving effects.
Patent Information
- Application Number
- CN202410998480.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
AI Technical Summary
The existing technology fails to effectively use the radiant heat of blast furnace slag iron groove to preheat coal powder, resulting in the failure to fully utilize thermal energy resources, and there is a potential problem of energy saving and consumption reduction.
Modified salt heat exchange system is adopted to absorb the radiant heat heat of the blast furnace slag iron groove through the circulating flow of the molten salt low temperature zone and high temperature zone, and use high-temperature molten salt to use coal powder preheater to realize the coal powder Preheat at high temperature.
Under normal pressure conditions, efficient heat transfer medium temperature is achieved, the preheating temperature of coal powder is increased, and the radiant heat of slag iron grooves is effectively utilized, energy saving and consumption reduction are reduced, and production costs are reduced.
Smart Images

Figure CN118932128A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of metallurgy and iron making, and in particular to a device for preheating pulverized coal by utilizing radiation heat from a blast furnace slag iron channel. Background Art
[0002] In the field of metallurgical ironmaking technology, the utilization of blast furnace waste heat plays an important role in energy conservation and consumption reduction. For example, waste heat recovery is used for heating, power generation, drying blast furnace gas, preheating hot blast furnace combustion air and gas, etc.
[0003] Chinese utility model patent CN 219951089 U discloses a device for recovering radiation heat from blast furnace slag iron channel, which only provides a device for recovering radiation heat from blast furnace slag iron channel and cannot use the radiation heat from blast furnace slag iron channel to preheat blast furnace pulverized coal. Summary of the invention
[0004] The object of the present invention is to provide a device for preheating pulverized coal using radiant heat from blast furnace slag iron channels, so as to solve at least one of the above-mentioned problems existing in the prior art.
[0005] In order to achieve the above object, the present invention adopts the following technical solutions:
[0006] A device for preheating pulverized coal using blast furnace slag iron channel radiation heat, comprising a molten salt heat exchange system, a molten salt low temperature zone, a molten salt high temperature zone and a pulverized coal preheater;
[0007] The molten salt heat exchange system comprises a first molten salt pipeline, a molten salt heat exchanger, a first molten salt pump and a second molten salt pipeline, wherein the molten salt low temperature zone is connected to the inlet of the molten salt heat exchanger through the first molten salt pipeline, the first molten salt pump is arranged on the first molten salt pipeline, the outlet of the molten salt heat exchanger is connected to the molten salt high temperature zone through the second molten salt pipeline, and the low temperature molten salt flowing through the molten salt heat exchanger absorbs the radiant heat of the slag iron groove;
[0008] The molten salt high temperature zone is connected to the shell side inlet of the pulverized coal preheater through the third molten salt pipeline, a second molten salt pump is arranged on the third molten salt pipeline, the shell side outlet of the pulverized coal preheater is connected to the molten salt low temperature zone through the fourth molten salt pipeline, the tube side inlet of the pulverized coal preheater is connected to the coal injection workshop through the coal inlet pipeline, and the tube side outlet of the pulverized coal preheater is connected to the blast furnace through the coal outlet pipeline.
[0009] In the technical solution, since the low-temperature zone of molten salt is connected to the inlet of the molten salt heat exchanger through the first molten salt pipeline, the first molten salt pump is arranged on the first molten salt pipeline, and the outlet of the molten salt heat exchanger is connected to the high-temperature zone of molten salt through the second molten salt pipeline, the first molten salt pump sucks liquid molten salt from the low-temperature zone of molten salt, and the liquid molten salt enters the molten salt heat exchanger through the first molten salt pipeline, and the low-temperature molten salt flowing through the molten salt heat exchanger absorbs the radiant heat of the slag iron groove, and then flows back to the high-temperature zone of molten salt from the second molten salt pipeline, forming a cycle of absorbing the radiant heat of the slag iron groove; since the high-temperature zone of molten salt is connected to the pulverized coal preheating unit through the third molten salt pipeline, the molten salt is sucked into the molten salt heat exchanger through the first molten salt pipeline, and the molten salt is sucked into the high-temperature zone of molten salt through the third molten salt pipeline. The shell side inlet of the pulverized coal preheater is connected, a second molten salt pump is arranged on the third molten salt pipeline, the shell side outlet of the pulverized coal preheater is connected with the molten salt low temperature zone through the fourth molten salt pipeline, the tube side inlet of the pulverized coal preheater is connected with the coal injection workshop through the coal inlet pipeline, and the tube side outlet of the pulverized coal preheater is connected with the blast furnace through the coal outlet pipeline. The second molten salt pump sucks high-temperature liquid molten salt from the molten salt high temperature zone, and the high-temperature liquid molten salt enters the pulverized coal preheater through the third molten salt pipeline to preheat the pulverized coal. After the temperature of the liquid molten salt is reduced, it flows back to the molten salt low temperature zone from the fourth molten salt pipeline, forming a cycle of molten salt releasing heat and preheating pulverized coal.
[0010] In summary, the present invention uses a molten salt heat exchanger to recover the radiant heat of the slag ditch to preheat the pulverized coal. Under normal pressure operating conditions, a very high heat transfer medium temperature can be obtained, and the pulverized coal can be preheated to a relatively high temperature with high thermal efficiency. The radiant heat of the slag ditch can be effectively utilized for preheating the pulverized coal for blast furnace injection, thereby saving energy, reducing consumption, and reducing costs and increasing efficiency.
[0011] Furthermore, in order to improve the integration of the system, the molten salt low temperature zone and the molten salt high temperature zone are located in a molten salt heat storage tank, and a partition is provided in the molten salt heat storage tank, which separates the molten salt low temperature zone and the molten salt high temperature zone.
[0012] Furthermore, the partition is located in the middle of the molten salt heat storage tank, and a through hole is provided at the lower part of the partition, and the through hole connects the molten salt high temperature zone and the molten salt low temperature zone. The molten salt in the high temperature zone is connected to the low temperature zone at the bottom through the through hole, and the liquid levels in the two zones can be kept basically balanced.
[0013] Furthermore, in order to facilitate the installation of the first molten salt pump and the second molten salt pump, the first molten salt pump and the second molten salt pump are both arranged at the upper end of the molten salt heat storage tank.
[0014] Furthermore, in order to improve the heat exchange efficiency of the liquid molten salt, a plurality of molten salt heat exchange systems are provided between the molten salt low temperature zone and the molten salt high temperature zone.
[0015] Furthermore, in order to improve the heat exchange efficiency, the molten salt heat exchanger is arranged above the slag ditch.
[0016] Furthermore, in order to simplify the pipeline connection between the molten salt heat storage tank, the pulverized coal preheater and the blast furnace, the molten salt heat storage tank is arranged near the pulverized coal preheater, and the pulverized coal preheater is arranged near the blast furnace.
[0017] Furthermore, in order to prevent blockage in the pipeline during the coal powder heat exchange process and improve the smoothness of coal powder transportation, the coal powder preheater includes a vertical shell and tube heat exchanger, and a mixture of coal powder and high-pressure nitrogen is introduced into the tube side of the vertical shell and tube heat exchanger.
[0018] Furthermore, in order to provide a specific coal powder conveying pipeline, the pipe side inlet of the coal powder preheater is connected to the first coal conveying pipeline of the coal injection workshop through the second coal conveying pipeline, and the pipe side outlet of the coal powder preheater is connected to the fourth coal conveying pipeline of the blast furnace through the third coal conveying pipeline, and a coal powder emergency coal conveying pipeline is arranged between the first coal conveying pipeline and the fourth coal conveying pipeline.
[0019] Furthermore, in order to improve the pulverized coal transportation and heat exchange effect, the pulverized coal preheater includes an inlet uniform distributor, a vertical shell and tube heat exchanger and an outlet flow collector which are arranged in sequence. The inlet uniform distributor has an inlet guide body and an inlet uniform ring grid inside, which can make the pulverized coal evenly enter the vertical shell and tube heat exchanger; an anti-blocking and anti-collapse device is provided in the middle of the vertical shell and tube heat exchanger, and the anti-blocking and anti-collapse device is used to introduce nitrogen into the tube pass; the outlet flow collector is composed of an outlet guide body and an outlet flow collector ring grid, which can make the pulverized coal flowing out of the vertical shell and tube heat exchanger evenly converge and output.
[0020] The beneficial effects of the present invention are as follows: in the present technical solution, since the low-temperature zone of the molten salt is connected to the inlet of the molten salt heat exchanger through the first molten salt pipeline, the first molten salt pump is arranged on the first molten salt pipeline, and the outlet of the molten salt heat exchanger is connected to the high-temperature zone of the molten salt through the second molten salt pipeline, the first molten salt pump sucks liquid molten salt from the low-temperature zone of the molten salt, and the liquid molten salt enters the molten salt heat exchanger through the first molten salt pipeline, and the low-temperature molten salt flowing through the molten salt heat exchanger absorbs the radiant heat of the slag iron groove, and then flows back from the second molten salt pipeline to the high-temperature zone of the molten salt, forming a cycle of absorbing the radiant heat of the slag iron groove; since the high-temperature zone of the molten salt is connected to the high-temperature zone of the molten salt through the third molten salt pipeline, the molten salt is sucked into the high-temperature zone of the molten salt through the third molten salt pipeline. It is connected to the shell side inlet of the pulverized coal preheater, a second molten salt pump is arranged on the third molten salt pipeline, the shell side outlet of the pulverized coal preheater is connected to the molten salt low temperature zone through the fourth molten salt pipeline, the tube side inlet of the pulverized coal preheater is connected to the coal injection workshop through the coal inlet pipeline, the tube side outlet of the pulverized coal preheater is connected to the blast furnace through the coal outlet pipeline, the second molten salt pump sucks high temperature liquid molten salt from the molten salt high temperature zone, the high temperature liquid molten salt enters the pulverized coal preheater through the third molten salt pipeline to preheat the pulverized coal, and after the temperature of the liquid molten salt is reduced, it flows back to the molten salt low temperature zone from the fourth molten salt pipeline, forming a cycle of molten salt releasing heat and preheating pulverized coal.
[0021] In summary, the present invention uses a molten salt heat exchanger to recover the radiant heat of the slag ditch to preheat the pulverized coal. Under normal pressure operating conditions, a very high heat transfer medium temperature can be obtained, and the pulverized coal can be preheated to a relatively high temperature with high thermal efficiency. The radiant heat of the slag ditch can be effectively utilized for preheating the pulverized coal for blast furnace injection, thereby saving energy, reducing consumption, and reducing costs and increasing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of the present invention.
[0023] In the figure: molten salt low temperature zone 1; molten salt high temperature zone 2; pulverized coal preheater 3; inlet distributor 3.1; vertical shell and tube heat exchanger 3.2; outlet combiner 3.3; anti-blocking and anti-collapse device 3.4; first molten salt pipeline 4; molten salt heat exchanger 5; first molten salt pump 6; second molten salt pipeline 7; third molten salt pipeline 8; second molten salt pump 9; fourth molten salt pipeline 10; molten salt heat storage tank 11; partition 12; blast furnace 13; second coal conveying pipeline 14; coal injection workshop 15; first coal conveying pipeline 16; third coal conveying pipeline 17; fourth coal conveying pipeline 18; pulverized coal emergency coal conveying pipeline 19. DETAILED DESCRIPTION
[0024] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the present invention will be briefly introduced below in combination with the drawings and the description of the embodiments or the prior art. Obviously, the following description of the structure of the drawings is only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention.
[0025] Embodiment 1:
[0026] like Figure 1 As shown, this embodiment provides a device for preheating pulverized coal using blast furnace slag iron channel radiation heat, including a molten salt heat exchange system, a molten salt low temperature zone 1, a molten salt high temperature zone 2 and a pulverized coal preheater 3;
[0027] The molten salt heat exchange system includes a first molten salt pipeline 4, a molten salt heat exchanger 5, a first molten salt pump 6 and a second molten salt pipeline 7. The molten salt low temperature zone 1 is connected to the inlet of the molten salt heat exchanger 5 through the first molten salt pipeline 4. The first molten salt pump 6 is arranged on the first molten salt pipeline 4. The outlet of the molten salt heat exchanger 5 is connected to the molten salt high temperature zone 2 through the second molten salt pipeline 7. The low temperature molten salt flowing through the molten salt heat exchanger 5 absorbs the radiant heat of the slag iron groove.
[0028] The molten salt high temperature zone 2 is connected to the shell side inlet of the pulverized coal preheater 3 through the third molten salt pipeline 8, and a second molten salt pump 9 is provided on the third molten salt pipeline 8. The shell side outlet of the pulverized coal preheater 3 is connected to the molten salt low temperature zone 1 through the fourth molten salt pipeline 10. The tube side inlet of the pulverized coal preheater 3 is connected to the coal injection workshop 15 through the coal inlet pipeline, and the tube side outlet of the pulverized coal preheater 3 is connected to the blast furnace 13 through the coal outlet pipeline.
[0029] In the technical solution, since the molten salt low temperature zone 1 is connected to the inlet of the molten salt heat exchanger 5 through the first molten salt pipeline 4, the first molten salt pump 6 is arranged on the first molten salt pipeline 4, and the outlet of the molten salt heat exchanger 5 is connected to the molten salt high temperature zone 2 through the second molten salt pipeline 7, the first molten salt pump 6 sucks liquid molten salt from the molten salt low temperature zone 1, and the liquid molten salt enters the molten salt heat exchanger 5 through the first molten salt pipeline 4. After the low temperature molten salt flowing through the molten salt heat exchanger 5 absorbs the radiant heat of the slag iron groove, it flows back from the second molten salt pipeline 7 to the molten salt high temperature zone 2, forming a cycle of absorbing the radiant heat of the slag iron groove; since the molten salt high temperature zone 2 is connected to the pulverized coal preheater 3 through the third molten salt pipeline 8, the molten salt high temperature zone 2 is connected to the pulverized coal preheater 3 through the third molten salt pipeline 8. The shell side inlet of the pulverized coal preheater 3 is connected, a second molten salt pump 9 is provided on the third molten salt pipeline 8, the shell side outlet of the pulverized coal preheater 3 is connected to the molten salt low temperature zone 1 through the fourth molten salt pipeline 10, the tube side inlet of the pulverized coal preheater 3 is connected to the coal injection workshop 15 through the coal inlet pipeline, and the tube side outlet of the pulverized coal preheater 3 is connected to the blast furnace 13 through the coal outlet pipeline. The second molten salt pump 9 sucks high-temperature liquid molten salt from the molten salt high temperature zone 2, and the high-temperature liquid molten salt enters the pulverized coal preheater 3 through the third molten salt pipeline 8 to preheat the pulverized coal. After the temperature of the liquid molten salt is reduced, it flows back to the molten salt low temperature zone 1 from the fourth molten salt pipeline 10, forming a cycle of molten salt exothermicity and preheating pulverized coal.
[0030] In summary, the present invention uses the molten salt heat exchanger 5 to recover the radiant heat of the slag ditch to preheat the pulverized coal. Under normal pressure operating conditions, a very high heat transfer medium temperature can be obtained, and the pulverized coal can be preheated to a relatively high temperature with high thermal efficiency. The radiant heat of the slag ditch can be effectively utilized for preheating the pulverized coal for blast furnace injection, thereby saving energy, reducing consumption, and reducing costs and increasing efficiency.
[0031] Embodiment 2:
[0032] This embodiment is optimized based on the above-mentioned embodiment 1.
[0033] In order to improve the integration of the system, the molten salt low temperature zone 1 and the molten salt high temperature zone 2 are located in the molten salt heat storage tank 11. A partition 12 is provided in the molten salt heat storage tank 11 to separate the molten salt low temperature zone 1 and the molten salt high temperature zone 2.
[0034] Embodiment 3:
[0035] This embodiment is optimized based on the above-mentioned embodiment 2.
[0036] The partition 12 is located in the middle of the molten salt heat storage tank 11. A through hole is provided at the lower part of the partition 12, and the through hole connects the molten salt high temperature zone 2 and the molten salt low temperature zone 1. The liquid molten salt in the molten salt high temperature zone 2 is connected to the molten salt low temperature zone 1 at the bottom through the through hole, and the liquid levels in the two zones can be kept basically balanced.
[0037] Embodiment 4:
[0038] This embodiment is optimized based on the above-mentioned embodiment 2.
[0039] In order to facilitate the installation of the first molten salt pump 6 and the second molten salt pump 9 , the first molten salt pump 6 and the second molten salt pump 9 are both arranged at the upper end of the molten salt heat storage tank 11 .
[0040] Embodiment 5:
[0041] This embodiment is optimized based on the above-mentioned embodiment 1.
[0042] In order to improve the heat exchange efficiency of liquid molten salt, multiple groups of molten salt heat exchange systems are provided between the molten salt low temperature zone 1 and the molten salt high temperature zone 2, and each group of molten salt heat exchange systems corresponds to different slag grooves, that is, the molten salt heat exchanger 5 is arranged at different slag grooves.
[0043] Embodiment 6:
[0044] This embodiment is optimized based on the above-mentioned embodiment 1.
[0045] In order to improve the heat exchange efficiency, the molten salt heat exchanger 5 is arranged above the slag ditch.
[0046] Embodiment 7:
[0047] This embodiment is optimized based on the above-mentioned embodiment 2.
[0048] In order to simplify the pipeline connection between the molten salt heat storage tank 11 , the pulverized coal preheater 3 and the blast furnace 13 , the molten salt heat storage tank 11 is arranged near the pulverized coal preheater 3 , and the pulverized coal preheater 3 is arranged near the blast furnace 13 .
[0049] Embodiment 8:
[0050] This embodiment is optimized based on the above-mentioned embodiment 1.
[0051] In order to prevent clogging in the pipeline during the coal powder heat exchange process and improve the smoothness of coal powder transportation, the coal powder preheater 3 includes a vertical shell and tube heat exchanger 3.2, and a mixture of coal powder and high-pressure nitrogen is introduced into the tube of the vertical shell and tube heat exchanger 3.2.
[0052] Embodiment 9:
[0053] This embodiment is optimized based on the above-mentioned embodiment 8.
[0054] In order to provide a specific pulverized coal conveying pipeline, the pipeline inlet of the pulverized coal preheater 3 is connected to the first coal conveying pipeline 16 of the coal injection workshop 15 through the second coal conveying pipeline 14, and the pipeline outlet of the pulverized coal preheater 3 is connected to the fourth coal conveying pipeline 18 of the blast furnace 13 through the third coal conveying pipeline 17. A pulverized coal emergency coal conveying pipeline 19 is provided between the first coal conveying pipeline 16 and the fourth coal conveying pipeline 18, which is connected in parallel with the pulverized coal preheater 3 and can be automatically switched in case of an accident.
[0055] Embodiment 10:
[0056] This embodiment is optimized based on the above-mentioned embodiment 8.
[0057] In order to improve the coal powder transportation and heat exchange effect, the coal powder preheater 3 includes an inlet uniform distributor 3.1, a vertical shell and tube heat exchanger 3.2 and an outlet flow collector 3.3 which are arranged in sequence. The inlet uniform distributor 3.1 has an inlet guide body and an inlet uniform ring grid inside, which can make the coal powder evenly enter the vertical shell and tube heat exchanger 3.2; an anti-blocking and anti-collapse device 3.4 is arranged in the middle of the vertical shell and tube heat exchanger 3.2, and the anti-blocking and anti-collapse device 3.4 is used to introduce nitrogen into the tube pass; the outlet flow collector 3.3 is composed of an outlet guide body and an outlet flow collector ring grid, which can make the coal powder flowing out of the vertical shell and tube heat exchanger 3.2 evenly converge and output.
[0058] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A device for preheating pulverized coal using radiant heat from blast furnace slag iron channels. Features: It includes molten salt heat exchange system, molten salt low temperature zone, molten salt high temperature zone and pulverized coal preheater; The molten salt heat exchange system comprises a first molten salt pipeline, a molten salt heat exchanger, a first molten salt pump and a second molten salt pipeline, wherein the molten salt low temperature zone is connected to the inlet of the molten salt heat exchanger through the first molten salt pipeline, the first molten salt pump is arranged on the first molten salt pipeline, the outlet of the molten salt heat exchanger is connected to the molten salt high temperature zone through the second molten salt pipeline, and the low temperature molten salt flowing through the molten salt heat exchanger absorbs the radiant heat of the slag iron groove; The molten salt high temperature zone is connected to the shell side inlet of the pulverized coal preheater through the third molten salt pipeline, a second molten salt pump is arranged on the third molten salt pipeline, the shell side outlet of the pulverized coal preheater is connected to the molten salt low temperature zone through the fourth molten salt pipeline, the tube side inlet of the pulverized coal preheater is connected to the coal injection workshop through the coal inlet pipeline, and the tube side outlet of the pulverized coal preheater is connected to the blast furnace through the coal outlet pipeline.
2. A device for preheating pulverized coal using blast furnace slag iron channel radiation heat according to claim 1, Features: The molten salt low temperature zone and the molten salt high temperature zone are located in a molten salt heat storage tank, and a partition is provided in the molten salt heat storage tank, and the partition separates the molten salt low temperature zone and the molten salt high temperature zone.
3. A device for preheating pulverized coal using blast furnace slag iron channel radiation heat according to claim 2, Features: The partition is located in the middle of the molten salt heat storage tank, and a through hole is provided at the lower part of the partition, and the through hole connects the molten salt high temperature zone and the molten salt low temperature zone.
4. A device for preheating pulverized coal using blast furnace slag iron channel radiation heat according to claim 2, Features: The first molten salt pump and the second molten salt pump are both arranged at the upper end of the molten salt heat storage tank.
5. The device for preheating pulverized coal using blast furnace slag iron channel radiation heat according to claim 1, Features: A plurality of molten salt heat exchange systems are arranged between the molten salt low temperature zone and the molten salt high temperature zone.
6. The device for preheating pulverized coal using blast furnace slag iron channel radiation heat according to claim 1, Features: The molten salt heat exchanger is arranged above the slag-iron ditch.
7. A device for preheating pulverized coal using blast furnace slag iron channel radiation heat according to claim 2, Features: The molten salt heat storage tank is arranged near a pulverized coal preheater, and the pulverized coal preheater is arranged near a blast furnace.
8. The device for preheating pulverized coal using blast furnace slag iron channel radiation heat according to claim 1, Features: The pulverized coal preheater comprises a vertical shell and tube heat exchanger, and a mixture of pulverized coal and high-pressure nitrogen is introduced into the tube side of the vertical shell and tube heat exchanger.
9. A device for preheating pulverized coal using blast furnace slag iron channel radiation heat according to claim 8, Features: The pipe inlet of the pulverized coal preheater is connected to the first coal conveying pipeline of the coal injection workshop through the second coal conveying pipeline, and the pipe outlet of the pulverized coal preheater is connected to the fourth coal conveying pipeline of the blast furnace through the third coal conveying pipeline. A pulverized coal emergency coal conveying pipeline is provided between the first coal conveying pipeline and the fourth coal conveying pipeline.
10. The device for preheating pulverized coal using blast furnace slag iron channel radiation heat according to claim 8, Features: The pulverized coal preheater comprises an inlet uniform distributor, a vertical shell and tube heat exchanger and an outlet flow collector which are arranged in sequence. The inlet uniform distributor has an inlet guide body and an inlet uniform distribution ring grid inside, which can make the pulverized coal evenly enter the vertical shell and tube heat exchanger; an anti-blocking and anti-collapse device is arranged in the middle of the vertical shell and tube heat exchanger, and the anti-blocking and anti-collapse device is used to introduce nitrogen into the tube pass; the outlet flow collector consists of an outlet guide body and an outlet flow collector ring grid, which can make the pulverized coal flowing out of the vertical shell and tube heat exchanger evenly converge and output.
Citation Information
Patent Citations
Pyrolysis gas recycling system and method thereof
CN107760339A
Recycling system for high-temperature radiant heat of blast furnace tapping channel
CN114774603A
Improved efficient vertical pulverized coal heating device and method
CN115992298A
Molten salt heat storage and energy release unit and deep peak shaving system of boiler unit
CN118009779A
An energy-saving blast furnace hot blast stove flue gas heating pulverized coal system
CN220999696U