Prefabricated box girder wet joint construction method

By pre-embedding of the connecting steel bars in the prefabricated box girder factory and adjusting the straightness using the down parts at the construction site, the problem of deformation of the connecting steel bars is solved, the construction quality and efficiency of the wet joints is improved, and the alignment of the connecting steel bars is ensured. and pouring quality.

CN118932862APending Publication Date: 2024-11-12CCCC FOURTH HARBOR ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411043709.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the bridge construction process, the connecting steel bars of prefabricated box girders are prone to deform during transportation and lifting, resulting in changes in straightness and affecting the docking and appearance quality of wet joints. The existing technology relies on manual adjustment, with low efficiency and low accuracy. .

Method used

When prefabricating the box girder in the factory, the connecting steel bars are pre-buried, and the straightness of the steel bars is adjusted using the pressing parts at the construction site. By setting the first pressing parts, the second pressing parts, etc., ensure that the highest point of all connecting steel bars remains the same The horizontal plane ensures that the steel bars do not lift up during concrete pouring, and detachable connections are used for easy construction.

Benefits of technology

The straightness of the connecting steel bars and the construction quality of wet joints are improved, the construction efficiency and accuracy are improved, and the alignment and casting quality of the connecting steel bars are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932862A_ABST
    Figure CN118932862A_ABST
Patent Text Reader

Abstract

The invention relates to the field of bridge engineering, in particular to a prefabricated box girder wet joint construction method which comprises the steps that a box girder is prefabricated in a factory, connecting steel bars are embedded in the two sides of the box girder respectively, and the highest points of all the connecting steel bars on the same side of the box girder are kept on the same horizontal plane during prefabrication; transporting and hoisting the prefabricated box girder to a construction site; downward pressing pieces are arranged above the connecting steel bars correspondingly, and all the downward pressing pieces are arranged in the arrangement direction of the connecting steel bars in a full-length mode; pressing down the pressing piece to enable the highest points of all the connecting steel bars on the same side to be kept on the same horizontal plane; wet joint concrete on one side is poured, and in the concrete pouring process, it is always kept that the pressing piece on the other side presses the connecting steel bars downwards; and wet joint construction of the box girder is completed. In the pouring process of the wet joint concrete on one side of the box girder, the connecting steel bars on the other side of the box girder are always kept in the downward pressing state, the connecting steel bars on the other side are prevented from being tilted in the pouring process, and the straightness of the connecting steel bars and the wet joint construction quality are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of bridge engineering, and in particular to a wet joint construction method for a prefabricated box girder. Background Art

[0002] During the construction of prefabricated bridges, concrete box girders are prefabricated in blocks at the beam yard, and then the prefabricated box girders are transported to the construction site separately. Concrete is poured between two adjacent prefabricated box girders to connect the beam blocks into a whole. The joints between the left and right adjacent box girders are called wet joints. In order to improve the connection stability between box girders, it is necessary to reserve connecting steel bars on one or both sides of the box girder for wet joint connection. The connecting steel bars of the box girder are tied at the beam yard and bonded to the box girder concrete. In the factory state, the connecting steel bars of the box girder can maintain good straightness (straightness means that the highest points of the connecting steel bars on the same side of the box girder are on the same horizontal plane). However, during the transportation and hoisting of the box girder, the connecting steel bars of the box girder are prone to deformation due to uneven force or collision, resulting in changes in the straightness of the connecting steel bars. At the same time, during the construction of the wet joint on one side of the box beam, due to the heavy weight of the poured concrete, the concrete presses down on the connecting steel bars on one side, which can easily cause the connecting steel bars on the opposite side to rise, thereby affecting the straightness of the connecting steel bars, resulting in the height of the connecting steel bars of adjacent box beams being inconsistent, making it difficult to connect them smoothly, or affecting the visual quality of the wet joint. Currently, the straightness of the connecting steel bars is manually adjusted, which has low construction efficiency and low construction accuracy. Summary of the invention

[0003] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a prefabricated box beam wet joint construction method.

[0004] In a first aspect, the present invention provides a prefabricated box girder wet joint construction method, comprising the following steps:

[0005] S1: prefabricate the first box girder and the second box girder in a factory, embed the first connecting steel bar on the first side of the first box girder, embed the second connecting steel bar on the second side of the first box girder, embed the third connecting steel bar on the first side of the second box girder, and embed the fourth connecting steel bar on the second side of the second box girder, and during prefabrication, keep the highest points of all the connecting steel bars on the same side of the box girder on the same horizontal plane;

[0006] S2: transport the prefabricated first box girder and the second box girder to the construction site, and hoist them to the installation positions respectively;

[0007] S3: a first pressing member is arranged above the first connecting steel bar of the first box girder, a second pressing member is arranged above the second connecting steel bar of the first box girder, a third pressing member is arranged above the third connecting steel bar of the second box girder, and a fourth pressing member is arranged above the fourth connecting steel bar of the second box girder, and all the pressing members are arranged along the entire length of the connecting steel bars;

[0008] S4: Press down the second pressing member and the third pressing member so that the highest points of all the second connecting steel bars of the first box girder and all the third connecting steel bars of the second box girder are kept at the same horizontal plane; press down the first pressing member so that the highest points of all the first connecting steel bars of the first box girder are kept at the same horizontal plane; press down the fourth pressing member so that the highest points of all the fourth connecting steel bars of the second box girder are kept at the same horizontal plane;

[0009] S5: removing the second pressing member and the third pressing member;

[0010] S6: pouring concrete between the second connecting steel bar of the first box girder and the third connecting steel bar of the second box girder, and during the concrete pouring process, the first pressing member always presses down the first connecting steel bar, and the fourth pressing member always presses down the fourth connecting steel bar;

[0011] S7: Complete the wet joint construction of the first box girder and the second box girder.

[0012] Preferably, the pressing member is a rod.

[0013] Preferably, a fixing piece is welded to the supporting truss of the box beam formwork, and the pressing piece is placed just above the fixing piece and fixed to the fixing piece by a connecting piece.

[0014] Preferably, the connecting member is a turnbuckle bolt.

[0015] Preferably, the fixing member is a rod.

[0016] Preferably, multiple connecting members are arranged at intervals of 0.5m-1.5m along the length direction of the pressing member.

[0017] Preferably, 1 to 3 pressing members are arranged perpendicular to the arrangement direction of the connecting steel bars.

[0018] Preferably, the interval between two adjacent pressing members is 0.5m-1.5m.

[0019] Preferably, an upper pressing piece is arranged below the connecting steel bars of the box beam, and the connecting steel bars are pressed upward by the upper pressing piece so that the highest points of all the connecting steel bars are maintained at the same horizontal plane.

[0020] In a second aspect, the present invention provides a prefabricated box girder wet joint, which is constructed using any of the prefabricated box girder wet joint construction methods.

[0021] In a third aspect, the present invention provides a bridge comprising the prefabricated box girder wet joint.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] 1. The prefabricated box girder wet joint construction method provided by the present invention is provided with a first pressing member, a second pressing member, a third pressing member and a fourth pressing member. By providing the pressing members, the highest points of all the connecting steel bars on the same side of the box girder can be kept at the same horizontal plane, thereby improving the straightness of the connecting steel bars, thereby ensuring that the adjacent connecting steel bars can be well aligned during the wet joint construction, thereby improving the construction quality of the wet joint. Furthermore, during the pouring of wet joint concrete on one side of the box girder, the connecting steel bars on the other side of the box girder are always kept in a downward pressure state, thereby avoiding the warping of the connecting steel bars on the other side during the concrete pouring process, so that the connecting steel bars on the other side can always maintain a good straightness, thereby improving the alignment of the adjacent connecting steel bars during the wet joint construction on the other side of the box girder, thereby further improving the construction quality of the wet joint.

[0024] 2. The present invention sets the lower pressing piece through the entire length, so that the lower pressing piece can press all the connecting steel bars on one side at the same time, which has high construction efficiency and good construction accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a cross-sectional view of the first box girder described in the present invention.

[0026] Figure 2 It is a cross-sectional view of the second box girder described in the present invention.

[0027] Figure 3 It is a longitudinal section view of the first box girder described in the present invention.

[0028] Figure 4 It is a longitudinal section view of the second box girder described in the present invention.

[0029] Figure 5 It is a schematic diagram (horizontally) of the wet joint connection between the first box girder and the second box girder according to the present invention.

[0030] Figure 6 It is a schematic diagram (longitudinal direction) of the wet joint connection between the first box girder and the second box girder according to the present invention.

[0031] Markings in the figure:

[0032] 1- First box girder,

[0033] 11-first connecting steel bar, 12-second connecting steel bar, 13-first pressing piece, 14-second pressing piece, 15-first connecting piece, 16-second connecting piece,

[0034] 2- Second box girder,

[0035] 21-third connecting steel bar, 22-fourth connecting steel bar, 23-third pressing piece, 24-fourth pressing piece, 25-third connecting piece, 26-fourth connecting piece,

[0036] 3-Box beam formwork,

[0037] 31-support truss, 32-fixing parts,

[0038] 4- Cast-in-place concrete. DETAILED DESCRIPTION

[0039] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0040] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0041] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.

[0042] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0043] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0044] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0045] Example 1

[0046] A prefabricated box girder wet joint construction method comprises the following steps:

[0047] Multiple box girders are prefabricated in the factory. The box girders are usually prefabricated in the factory in batches. Each batch of box girders usually consists of dozens of pieces. The following takes the first box girder 1 and the second box girder 2 as examples to illustrate the construction of the wet joint between two adjacent box girders. The wet joint construction between the box girders of the entire bridge can be completed by repeating the following steps.

[0048] S1: Figure 1-4 As shown, the first box beam 1 and the second box beam 2 are prefabricated in the factory, the first connecting steel bar 11 is embedded in the first side of the first box beam 1, the second connecting steel bar 12 is embedded in the second side of the first box beam 1, the third connecting steel bar 21 is embedded in the first side of the second box beam 2, and the fourth connecting steel bar 22 is embedded in the second side of the second box beam 2. The first side can be the left side of the box beam, and the second side can be the right side of the box beam, that is, the connecting steel bars are embedded in both sides of the box beam for wet joint construction. When prefabricated in the factory, the highest points of all connecting steel bars on the same side of the box beam should be kept at the same horizontal plane as much as possible, that is, the highest points of all connecting steel bars on the same side of the box beam are at the same height, so that the box beam has good straightness in the factory state. The same horizontal plane described in the present invention means that the highest points of all connecting steel bars can be set with an error / deviation of ±10% relative to the same horizontal plane, more preferably within an error / deviation of ±8%, more preferably within an error / deviation of ±6%, more preferably within an error / deviation of ±5%, and more preferably within an error / deviation of ±4%. As long as the highest points of all connected steel bars are within the error / deviation range, the function of the solution of the present invention can be achieved.

[0049] S2: transport the prefabricated first box girder 1 and the second box girder 2 to the construction site, and hoist them to the installation positions respectively.

[0050] S3: A first pressing member 13 is arranged above the first connecting steel bar 11 of the first box girder 1, a second pressing member 14 is arranged above the second connecting steel bar 12 of the first box girder 1, a third pressing member 23 is arranged above the third connecting steel bar 21 of the second box girder 2, and a fourth pressing member 24 is arranged above the fourth connecting steel bar 22 of the second box girder 2. All the pressing members are arranged along the arrangement direction of the connecting steel bars, that is, all the connecting steel bars on one side of the box girder can be pressed down simultaneously by the same pressing member.

[0051] S4: Press down the second pressing member 14 and the third pressing member 23 so that the highest points of all the second connecting steel bars 12 of the first box girder 1 and all the third connecting steel bars 21 of the second box girder 2 are maintained at the same horizontal plane; press down the first pressing member 13 so that the highest points of all the first connecting steel bars 11 of the first box girder 1 are maintained at the same horizontal plane; press down the fourth pressing member 24 so that the highest points of all the fourth connecting steel bars 22 of the second box girder 2 are maintained at the same horizontal plane.

[0052] During the transportation and hoisting of the box girder, it is inevitable that the connecting steel bars exposed outside the box girder will shift or deform, resulting in poor straightness of the connecting steel bars. Therefore, in this step, a lower pressure piece is set above all the connecting steel bars, the purpose of which is to press down the connecting steel bars through the lower pressure piece, adjust the position of the highest point of the connecting steel bars, so that the highest points of all the connecting steel bars on the same side of the box girder remain in the same horizontal plane. In this step, if necessary, an upper pressure piece can also be set at the bottom of the connecting steel bars, the upper pressure piece is arranged along the arrangement direction of the connecting steel bars, and the upper pressure piece presses the connecting steel bars to adjust the position of the highest point of the connecting steel bars, so that the highest points of all the connecting steel bars on the same side of the box girder remain in the same horizontal plane.

[0053] In an optional embodiment, the pressing member can be a rod. For example, a fixing member 32 is welded to the supporting truss 31 of the box beam formwork 3, and the fixing member 32 can also be a rod. The pressing member is placed directly above the fixing member 32 and fixed to the fixing member 32 by a plurality of connectors (such as the first connector 15, the second connector 16, the third connector 25, and the fourth connector 26) arranged at intervals. The connectors (such as the first connector 15, the second connector 16, the third connector 25, and the fourth connector 26) can be basket bolts, etc., as long as the pressing member can be tightened. In some embodiments, the connectors (such as the first connector 15, the second connector 16, the third connector 25, and the fourth connector 26) can be arranged in multiple paths at intervals of d=0.5m-1.5m along the length direction of the pressing member.

[0054] Similarly, in an optional embodiment, the upper pressing member can be a rod. For example, a fixing member 32 is welded to the supporting truss 31 of the box beam template 3, and the fixing member 32 can also be a rod. The upper pressing member is placed directly below the fixing member 32 and fixed to the fixing member 32 through a plurality of connecting members arranged at intervals. The connecting member can be a basket bolt, etc., as long as it can tighten the upper pressing member.

[0055] When the width of the wet joint of the bridge is wide, it is also possible to consider setting multiple lower / upper pressure pieces, for example, 1-3 lower / upper pressure pieces are set perpendicular to the arrangement direction of the connecting steel bars (i.e., the width direction of the wet joint of the bridge). Further preferably, the interval between two adjacent lower / upper pressure pieces is 0.5m-1.5m. In this way, it is further convenient to adjust the straightness of each position of the connecting steel bars, so that the highest points of all the connecting steel bars on the same side of the box girder are kept on the same horizontal plane.

[0056] S5: Remove the second pressing member 14 and the third pressing member 23.

[0057] Since the present invention adopts a detachable connection mode, it is convenient to remove the pressing piece and can also realize the recycling of the pressing piece.

[0058] S6: Figure 5-6 As shown, concrete is poured between the second connecting steel bar 12 of the first box girder 1 and the third connecting steel bar 21 of the second box girder 2 to form a cast-in-place concrete 4. During the concrete pouring process, the first pressing member 13 is always kept pressing down the first connecting steel bar 11, and the fourth pressing member 24 is always kept pressing down the fourth connecting steel bar 22.

[0059] During the pouring of wet joint concrete, the connecting steel bars at the wet joint may tilt downward for a distance due to the influence of the concrete weight, while the connecting steel bars at the opposite side of the box girder will correspondingly tilt upward. In order to reduce the downward tilting of the connecting steel bars at the wet joint of the box girder and the upward tilting of the connecting steel bars on the opposite side, the present application maintains the connecting steel bars on the opposite side in a compressed state through a downward pressure piece, so that the connecting steel bars on the opposite side will not tilt, and also reduces the downward tilt of the connecting steel bars at the wet joint pouring site to a certain extent.

[0060] That is, in this embodiment, by pressing down the first connecting steel bars 11 and the fourth connecting steel bars 22, not only can the first connecting steel bars 11 and the fourth connecting steel bars 22 not be lifted up, but also the downward inclination of the second connecting steel bars 12 and the third connecting steel bars 21 can be reduced, thereby not only improving the uniformity of the wet joints between the second connecting steel bars 12 and the third connecting steel bars 21 and improving the construction system of the wet joints, but also being beneficial for the first connecting steel bars 11 / the fourth connecting steel bars 22 and the adjacent connecting steel bars to maintain a high degree of straightness during wet joint construction, thereby enabling smooth docking and improving the construction quality of the wet joints.

[0061] S7: Complete the wet joint construction of the first box girder 1 and the second box girder 2.

[0062] Example 2

[0063] A prefabricated box girder wet joint is constructed by using any of the prefabricated box girder wet joint construction methods.

[0064] Example 3

[0065] A bridge comprises the prefabricated box girder wet joint.

[0066] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A prefabricated box girder wet joint construction method, characterized in that: The following steps are involved: S1: prefabricate the first box girder and the second box girder in a factory, embed the first connecting steel bar on the first side of the first box girder, embed the second connecting steel bar on the second side of the first box girder, embed the third connecting steel bar on the first side of the second box girder, and embed the fourth connecting steel bar on the second side of the second box girder, and during prefabrication, keep the highest points of all the connecting steel bars on the same side of the box girder on the same horizontal plane; S2: transport the prefabricated first box girder and the second box girder to the construction site, and hoist them to the installation positions respectively; S3: a first pressing member is arranged above the first connecting steel bar of the first box girder, a second pressing member is arranged above the second connecting steel bar of the first box girder, a third pressing member is arranged above the third connecting steel bar of the second box girder, and a fourth pressing member is arranged above the fourth connecting steel bar of the second box girder, and all the pressing members are arranged along the entire length of the connecting steel bars; S4: Press down the second pressing member and the third pressing member so that the highest points of all the second connecting steel bars of the first box girder and all the third connecting steel bars of the second box girder are kept at the same horizontal plane; press down the first pressing member so that the highest points of all the first connecting steel bars of the first box girder are kept at the same horizontal plane; press down the fourth pressing member so that the highest points of all the fourth connecting steel bars of the second box girder are kept at the same horizontal plane; S5: removing the second pressing member and the third pressing member; S6: pouring concrete between the second connecting steel bar of the first box girder and the third connecting steel bar of the second box girder, and during the concrete pouring process, the first pressing member always presses down the first connecting steel bar, and the fourth pressing member always presses down the fourth connecting steel bar; S7: Complete the wet joint construction of the first box girder and the second box girder.

2. A prefabricated box girder wet joint construction method according to claim 1, characterized in that: The lower pressing part adopts a rod.

3. A prefabricated box girder wet joint construction method according to claim 2, characterized in that: Weld fixings to the supporting trusses of the box girder formwork, place the pressing piece just above the fixings, and fix it to the fixings through connecting pieces.

4. A prefabricated box beam wet joint construction method according to claim 3, characterized in that: The connecting parts are basket bolts and the fixing parts are rods.

5. A prefabricated box girder wet joint construction method according to claim 3, characterized in that: The connecting pieces are arranged in multiple rows at intervals of 0.5m-1.5m along the length direction of the pressing piece.

6. A prefabricated box girder wet joint construction method according to any one of claims 1 to 5, characterized in that: Perpendicular to the arrangement direction of the connecting steel bars, 1 to 3 downward pressing pieces are arranged.

7. A prefabricated box girder wet joint construction method according to claim 6, characterized in that: The interval between two adjacent pressing parts is 0.5m-1.5m.

8. A prefabricated box girder wet joint construction method according to any one of claims 1 to 5, characterized in that: An upper pressure piece is arranged below the connecting steel bars of the box girder, and the connecting steel bars are pressed upward by the upper pressure piece so that the highest points of all the connecting steel bars are kept at the same horizontal plane.

9. A prefabricated box girder wet joint, characterized in that: The prefabricated box girder is constructed by the wet joint construction method according to any one of claims 1 to 8.

10. A bridge, characterized in that: Comprising the prefabricated box girder wet joint as claimed in claim 9.