Ecological restoration method for river bank slope

Through the screening and dehydration treatment of sludge, combined with physical solidification and plant absorption technology, the problems of soil erosion and pollution in river bank slopes are solved, the stability of the bank slope and ecological restoration are achieved, the cost and pollution risks are reduced, and the stability of the bank slope is improved. Sex and ecosystem health.

CN118932928APending Publication Date: 2024-11-12HUBEI UNIV OF TECH

Patent Information

Application Number
CN202411038678.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The river bank slopes are prone to soil erosion and collapse due to factors such as water flow erosion, rainfall and groundwater penetration. The protection of traditional hard materials has the problems of complex silt treatment, high cost and low strength.

Method used

After screening and partially dehydrating the silt, it is used in the foundation and ecological layers of the river bank slope. Combined with physical solidification and plant absorption methods, harmful substances in the silt will be removed, soil and water pollution risk will be reduced, and pine piles will be used. Ecological restoration with plant seeds.

Benefits of technology

It effectively reduces the risks of soil erosion and pollution, reduces the cost of silt treatment, improves the stability and ecological diversity of the shore slope, extends the service life, and promotes the health and stability of surrounding ecosystems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932928A_ABST
    Figure CN118932928A_ABST
Patent Text Reader

Abstract

The invention discloses an ecological restoration method for a river bank slope, and relates to the technical field of ecological restoration, and the ecological restoration method comprises the following steps: removing sludge at the bottom of a river out of a water body; frame beams are poured on the slope surface of the bank slope; sequentially laying a foundation layer and an ecological layer on the slope surface in the sash of the sash beam; the base layer is prepared by mixing an alkali activator, blast furnace mineral powder, aggregate, sludge and water; the ecological layer is prepared by mixing bottom mud, soil, a water-retaining agent, a binder and plant seeds; the bottom mud is prepared by screening, airing, air-drying and loosening sludge removed from a water body. Through physical solidification and plant absorption methods, harmful substances in the sludge soil are removed, the soil quality is improved, the pollution risk of the soil and water is reduced under the comprehensive action, the sludge is recycled, and ecological restoration and maintenance of the river bank slope are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of ecological restoration technology, and in particular to a method for ecological restoration of river bank slopes. Background Art

[0002] The river bank slope is affected by factors such as water erosion, rainfall, and groundwater infiltration, which can easily lead to soil erosion and even bank collapse. Traditionally, hard materials such as cast-in-place concrete or concrete blocks are often used to protect the river bank slope.

[0003] With the large-scale dredging and desilting projects in rivers and lakes, a large amount of silt containing organic matter and heavy metals has been generated. Currently, there are studies on using silt as raw material to cast concrete or make concrete blocks to protect river banks, thereby reducing environmental pollution and costs caused by silt storage and transportation.

[0004] However, since sludge contains a large amount of organic matter and heavy metals, has a high water content and poor mechanical properties, on the one hand, the sludge needs to remove organic matter and heavy metals and reduce the water content before it can be reused, and the pre-treatment process is complicated and costly. On the other hand, the cast-in-place concrete or concrete blocks made from sludge as raw materials have low strength, are difficult to maintain, and have a limited service life. Summary of the invention

[0005] In view of the deficiencies of the above-mentioned related technologies, the present application provides a method for ecological restoration of river bank slopes. The present application reuses the bottom sludge obtained after sludge screening and partial dehydration in the base layer and ecological layer, removes harmful substances in the sludge soil and improves soil quality through physical solidification and plant absorption methods, and reduces the pollution risk of soil and water bodies under the combined effect, which not only reuses the sludge but also is conducive to the restoration and maintenance of the river bank slope ecology.

[0006] The ecological restoration method of a river bank slope provided in this application adopts the following technical solution: A method for ecological restoration of a river bank slope comprises the following steps: removing silt from the bottom of the river channel out of the water body; casting a frame beam on the slope surface of the bank slope; laying a foundation layer and an ecological layer in sequence on the slope surface in the frame of the frame beam; The base layer is made of a mixture of alkali activator, blast furnace ore powder, aggregate, sludge and water; The ecological layer is made of a mixture of bottom mud, soil, a water retaining agent, a binder and plant seeds; the bottom mud is prepared by removing the sludge from the water body through screening, airing, air drying and loosening.

[0007] Preferably, the base layer is made of the following components in parts by weight: 5-8 parts of alkali activator, 20-30 parts of blast furnace ore powder, 20-40 parts of aggregate, 40-60 parts of sludge and 5-10 parts of water.

[0008] Preferably, the base layer is made of the following components in parts by weight: 7 parts of alkali activator, 22 parts of blast furnace ore powder, 30 parts of aggregate, 50 parts of sludge and 7 parts of water.

[0009] Preferably, the particle size of the aggregate is 5-10 mm.

[0010] Preferably, the aggregate comprises one or more of pebbles, concrete blocks, red brick blocks and crushed stones.

[0011] Preferably, the aggregate comprises concrete blocks, red brick blocks and crushed stones in a weight ratio of 2-4:0.8-1.2:1.

[0012] Preferably, the aggregate comprises concrete blocks, red brick blocks and crushed stones in a weight ratio of 3:1:1.

[0013] Preferably, the concrete blocks, the red brick blocks and the crushed stones are taken from construction solid waste.

[0014] Preferably, the ecological layer is made of the following components in parts by weight: 20-40 parts of bottom mud, 20-40 parts of soil, 0.6-0.8 parts of water retaining agent, 3-5 parts of binder, and 1-2 parts of plant seeds.

[0015] Preferably, the ecological layer is made of the following components in parts by weight: 30 parts of bottom mud, 30 parts of soil, 0.7 parts of water retaining agent, 4 parts of binder and 1.5 parts of plant seeds.

[0016] Preferably, the soil is taken from the soil of the river bank slope.

[0017] Preferably, the plant seeds include one or more of cool-season grass seeds, warm-season grass seeds and emergent aquatic herbaceous plants.

[0018] Preferably, the cool-season grass species include one or more of tall fescue, bluegrass and ryegrass.

[0019] Preferably, the warm-season grass species include one or both of Bermuda grass and Zoysia japonica.

[0020] Preferably, the emergent aquatic herb includes one or both of Zizania latifolia and Phragmites australis.

[0021] Preferably, different types of plant seeds are selected in the ecological layers at different locations on the bank slope according to their distances to the bottom of the bank slope.

[0022] Preferably, the plant seeds are tall fescue.

[0023] Preferably, the plant seeds are Poa annua.

[0024] Preferably, the plant seeds are wild rice stem.

[0025] Preferably, the plant seeds are tall fescue and wild rice stem.

[0026] Preferably, the plant seeds are bluegrass and wild rice stem.

[0027] Preferably, the plant seeds are tall fescue and bluegrass.

[0028] Preferably, the plant seeds are tall fescue, bluegrass and wild rice.

[0029] Preferably, the water retaining agent includes one or more of polyacrylamide, potassium polyacrylate and sodium polyacrylate.

[0030] Preferably, the water retaining agent is potassium polyacrylate.

[0031] Preferably, the binder includes one or both of xanthan gum and balsam gum.

[0032] Preferably, the binder is xanthan gum.

[0033] Preferably, before casting the frame beam, a plurality of pine piles are set on the soil on the side of the bank slope close to the river channel, and the plurality of pine piles are arranged along the length direction of the river channel. The depth of the pine piles inserted into the soil is greater than 2.5m, and the height from one end of the pine pile outside the soil to the water surface of the river channel is less than 0.5m.

[0034] Preferably, the piling depth of the pine wood piles is greater than 2.5 m.

[0035] Preferably, the diameter of the pine wood pile is 14-16 cm, the distance between two adjacent pine wood piles is 8-10 cm, and the piling depth is 3.2-3.5 m.

[0036] Preferably, the portion of the pine pile located outside the water surface is coated with an anti-corrosion layer.

[0037] Preferably, before laying the foundation layer, anti-filter geotextile is laid in the grids of the grid beams.

[0038] In summary, the present application includes at least one of the following beneficial technical effects: 1. The present application screens and partially dehydrates the silt to obtain bottom mud, solidifies the bottom mud and uses it for planting bank protection plants. On the one hand, it is conducive to reducing soil erosion and landslides caused by water erosion on the bank slope; on the other hand, it reduces environmental pollution caused by silt storage, reduces the cost of silt transportation and landfill sites, and reduces the overall cost of dredging projects; on the third hand, through physical solidification and plant absorption methods, harmful substances in silt soil are removed and soil quality is improved, effectively reducing the risk of soil and water pollution, which is conducive to the restoration and maintenance of bank slope ecology and promotes the health and stability of the surrounding ecosystem; 2. When the plant seeds in the ecological layer of the present application grow up, their root systems can stabilize the bank slope, slow down the speed of water flow, and prevent bank slope scouring and soil erosion. Plant revetments can also increase the roughness of the bank slope, improve the stability of the slope protection structure, and provide living space for aquatic plants and animals. In addition, the natural ecological revetment made of pine piles has a good natural ecological appearance and a stable structure with a low cost, which also guarantees the needs of amphibian habitat channels. While meeting the needs of biological habitats, it can also improve the strength of the bank protection and play an anti-scouring role. The gaps between the pine piles can allow the accumulated water in the mud along the coast to flow into the river, avoiding soil erosion; 3. The gaps in the aggregates derived from construction solid waste are filled with bottom mud, and the sludge is solidified with alkali activators and blast furnace ore powder to obtain a base layer. On the one hand, after the plant seeds take root and germinate in the ecological layer, as the plants grow, the roots extend to the base layer and the slope in turn. The silt in the base layer provides nutrients for the plant roots, and the plant roots penetrate the aggregates to form a network, further improving the stability of the plants. On the other hand, the blast furnace ore powder and aggregates derived from construction solid waste are not only low-cost, but also realize the recycling of waste resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a schematic diagram of the structure of the river bank slope formed by the ecological restoration method of the present application.

[0040] Figure numerals: 1. bank slope; 2. frame beam; 3. foundation layer; 4. ecological layer; 5. slope protection plants; 6. pine piles; 7. river channel. DETAILED DESCRIPTION

[0041] The following is combined with Figure 1 This application is described in further detail.

[0042] The present application embodiment discloses a method for ecological restoration of river bank slope. Figure 1 , a method for ecological restoration of a river bank slope comprises the following steps: (1) Dredging silt: The dredging machinery is installed on a movable working vessel. The silt is removed from the water body through dredging tools. Large rocks and impurities in the salvaged silt are screened and removed.

[0043] (2) Piling: sharpen one end of the pine pile 6 and use an excavator equipped with a special pile driving head to continuously drive the pine pile 6 into the soil. The diameter of the pine pile 6 is 15 cm and the piling depth is 3.3 m. The part of the pine pile 6 exposed above the water surface is coated with tung oil for corrosion protection. Multiple pine piles 6 are driven in sequence along the length of the river channel 7 at intervals of 9 cm.

[0044] (3) Forming of frame beam 2: First, fill the slope surface on the bank slope 1 in sections to a slope of 40° and compact it. Then, dig the foundation trench manually, support the formwork, tie the steel bars, pour the frame concrete, and maintain it. After the strength of the concrete frame beam 2 reaches 70% of the design requirements, clean the loose soil and debris in the frame, level and compact the slope surface in the frame, and lay 400g / m 2 The anti-filter geotextile is temporarily anchored with bamboo nails. Design of frame beam 2: The cross-sectional structure is a C25 reinforced concrete structure of 200mm×350mm. The frame beam 2 is provided with a deformation joint every 10m, with a joint width of 20mm, and the joints are separated by asphalt fir boards.

[0045] (4) Laying of foundation layer 3: Mix concrete blocks, red bricks and crushed stones in a weight ratio of 3:1:1 from construction solid waste to obtain aggregates. Take 7 parts of alkali activator, 22 parts of blast furnace ore powder, 30 parts of aggregates, 50 parts of sludge and 7 parts of water and mix them evenly to obtain a mixture. Load the mixture into the 0.5m³ loading hopper of the dump truck, and slide the mixture to the frame bin surface through the chute built on the slope for pouring. The pouring thickness is 200mm. When pouring, use manual shovels to level and pat to make it dense. Finally, clean and sweep the two sides of the frame beam to remove the mixture attached to the frame.

[0046] (5) Maintenance of base layer 3: Use low-pressure water pipes for maintenance so as not to wash away the mud on the surface of the mixture. No human trampling is allowed within 7 days after the ecological concrete is paved.

[0047] (6) Laying of ecological layer 4: Then take the screened sludge and dry it in the sun, naturally air dry it and loosen it (crush the air-dried sludge and pass it through an 8mm sieve to remove coarse particles) to obtain the bottom mud to improve the air permeability and water retention of the bottom mud. Take 30 parts of bottom mud, 30 parts of soil, 0.7 parts of water retaining agent, 4 parts of binder and 1.5 parts of plant seeds and mix them evenly to obtain the ecological base material. Spread it manually from bottom to top with a thickness of 150mm, supplemented by manual loosening of the planting soil. If there are lumps of soil, they should be broken and loosened before laying to level the surface of the frame beam 2, and finally covered with 18g / m 2 of non-woven fabric.

[0048] In step (2), pine wood piles 6 are used to protect the junction between the bottom of the bank slope 1 and the river channel 7. This has a good natural ecological appearance and a stable structure with a low cost. It also ensures the needs of amphibian habitat channels. While meeting the needs of biological habitats, it also has good bank protection strength and plays an anti-scouring role. In addition, the gaps between the pine wood piles 6 can allow the accumulated water in the mud along the coast to flow into the river channel 7, avoiding soil erosion.

[0049] In step (4), the main components of the alkali activator are MgO, SiO2, Al2O3, CaO, etc., and its reaction activity is 30-100s. The blast furnace slag is a powder obtained by drying and grinding blast furnace slag, and its main components are SiO2, Al2O3, CaO, etc. During the laying process of the base layer 3, the alkali activator activates the hydration activity of the blast furnace slag, promotes its hydration reaction and volcanic ash reaction, thereby consuming the moisture in the sludge and improving the solidification effect of the sludge. In addition, the hydration products in the reaction process continue to increase, filling the gap between the sludge and the aggregate, and further strengthening the skeleton formed by the aggregate in the base layer 3.

[0050] Furthermore, in step (4), in order to improve the mixing effect and pouring quality of the mixture, a construction method of arranging a temporary mixing site nearby is adopted according to the pouring operation surface, a mobile mixer is used on site to shorten the horizontal transportation distance, and the problem of aggregate segregation caused by the long transportation distance is minimized. A small dump truck is used as the transportation vehicle.

[0051] In step (6), the soil is taken locally from the soil of the bank slope 1, the water retaining agent is potassium polyacrylate, and the binder is xanthan gum as a biological adhesive. The bottom mud, soil, sodium polyacrylate and xanthan gum cooperate with each other. On the one hand, the plant seeds are positioned, and on the other hand, the organic matter and nutrients contained in the bottom mud and soil are used by the plant seeds, which is beneficial to the growth of the plant seeds. After the plant seeds grow into slope protection plants 5, their roots extend from the ecological layer 4 to the base layer 3, absorb the organic matter in the silt in the base layer 3, and finally take root in the soil of the slope 1, which is beneficial to promote the root growth of the slope protection plants 5. On the one hand, through physical solidification and plant absorption, harmful substances in the silt soil are removed and the soil quality is improved, which effectively reduces the pollution risk of soil and water bodies and promotes the health and stability of the surrounding ecosystem; on the other hand, the stability of the slope protection plants 5 is improved, thereby stabilizing the slope 1, slowing down the water flow speed, and preventing the slope 1 from being scoured and soil erosion; on the third hand, the slope protection plants 5 can also increase the roughness of the slope 1, improve the stability of the slope protection structure, and provide living space for aquatic plants and animals.

[0052] Furthermore, in the selection of plants, the plant seeds in the ecological layer 4 located at the end of the bank slope 1 far away from the river channel 7 are tall fescue, bluegrass and bermudagrass, and the plant seeds in the ecological layer 4 located at the end of the bank slope 1 close to the river channel 7 are wild rice stems, thereby enhancing the complexity and stability of the ecosystem.

[0053] The implementation principle of the ecological restoration method of a river bank slope in an embodiment of the present application is as follows: the present application protects the bank slope 1 from a physical structure by setting pine piles 6, lattice beams 2, base layer 3 and ecological layer 4, wherein the pine piles 6 and ecological layer 4 constitute the ecological restoration and maintenance of the bank slope 1, and the plant seeds in the ecological layer 4 extend their roots to the soil of the base layer 3 and the bank slope 1 during the growth process, forming a three-dimensional mesh protection for the surface of the bank slope 1, and the silt dredged from the river channel 7 is used in two forms in the base layer 3 and the ecological layer 4 respectively, and the plant seeds are used to purify and solidify the silt. Under the combined effect, the silt treatment cost is reduced, and the ecological diversity of the surface of the bank slope 1 is improved, so that the bank slope 1 can be stabilized while the ecological restoration is carried out, the water flow speed is slowed down, and the bank slope 1 is prevented from being scoured and soil eroded.

[0054] Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. The words "first", "second", "third" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "One" or "one" and similar words do not indicate a quantitative limit, but indicate that there is at least one. "Include" or "comprise" and similar words mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0055] The above are all optional embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for ecological restoration of river bank slope, characterized in that: The following steps are involved: The silt at the bottom of the river channel is removed from the water body; the frame beam is cast on the slope surface of the bank; the foundation layer and the ecological layer are laid in sequence on the slope surface in the frame of the frame beam; The base layer is made of a mixture of alkali activator, blast furnace ore powder, aggregate, sludge and water; The ecological layer is made of a mixture of bottom mud, soil, a water retaining agent, a binder and plant seeds; the bottom mud is prepared by removing the sludge from the water body through screening, airing, air drying and loosening.

2. The ecological restoration method for river bank slope according to claim 1, characterized in that: The base layer is made of the following components in parts by weight: 5-8 parts of alkali activator, 20-30 parts of blast furnace ore powder, 20-40 parts of aggregate, 40-60 parts of sludge and 5-10 parts of water.

3. The ecological restoration method of a river bank slope according to claim 2, characterized in that: The aggregate includes one or more of pebbles, concrete blocks, red brick blocks and crushed stones.

4. The ecological restoration method for river bank slope according to claim 3, characterized in that: The aggregate comprises concrete blocks, red brick blocks and crushed stones in a weight ratio of 2-4:0.8-1.2:

1.

5. The ecological restoration method for river bank slope according to claim 1, characterized in that: The ecological layer is made of the following components in parts by weight: 20-40 parts of bottom mud, 20-40 parts of soil, 0.6-0.8 parts of water retaining agent, 3-5 parts of binder, and 1-2 parts of plant seeds.

6. The ecological restoration method for river bank slope according to claim 1, characterized in that: The plant seeds include one or more of cool-season grass seeds, warm-season grass seeds and emergent aquatic herbaceous plants.

7. The ecological restoration method for river bank slope according to claim 1, characterized in that: The water retaining agent includes one or more of polyacrylamide, potassium polyacrylate and sodium polyacrylate.

8. The ecological restoration method for river bank slope according to claim 1, characterized in that: The binder includes one or two of xanthan gum and balsam gum.

9. The ecological restoration method for river bank slope according to claim 1, characterized in that: Before casting the frame beam, a plurality of pine piles are arranged on the soil of the bank slope close to the river channel. The plurality of pine piles are arranged along the length direction of the river channel. The depth of the pine piles inserted into the soil is greater than 2.5m, and the height from one end of the pine pile outside the soil to the water surface of the river channel is less than 0.5m.

10. The ecological restoration method for river bank slope according to claim 1, characterized in that: Before laying the foundation layer, anti-filter geotextile is laid in the grid of the grid beam.

Citation Information

Patent Citations

  • Ecological slope protection method based on sludge solidification soil

    CN105970979A

  • Refuse landfill evapotranspiration covering structure and preparation method

    CN115069720A

  • Water-retaining and fertilizer-fixing ecological base material prepared from wood powdery biochar and bottom mud of Yellow River and restoration method of water-retaining and fertilizer-fixing ecological base material

    CN117678495A

  • Ecological embankment structure

    CN207944417U

  • Ecological embankment for nearby river silt absorption

    CN211421028U

Cited By

  • Biological glue and multi-element solid waste synergetic sludge ecological slope and construction and monitoring method of biological glue and multi-element solid waste synergetic sludge ecological slope

    CN119736873A